Full Paper - Quality Improvement Using Model Based & Integrated Process Improvement (MIPI)
Full Paper - Quality Improvement Using Model Based & Integrated Process Improvement (MIPI)
Faculty of Engineering University of Indonesia, Depok 16424 Tel: (021) 7270011 ext 51. Fax: (021) 7270077 E-mail: [email protected]
ABSTRACT
This study using a method created by Sola Adesola and Tim Baines called Model-Based and Integrated Process Improvement. This method is a doctoral research in Cranfield University on year 2005. In this research, a team consist few PT.X staffs created. Data collection conducted by understands the hatchery flow process and brainstorming from team member. Analysis conducted by using techniques written in related journal and generic analysis techniques used as process improvement tools. The focus of this study is in order to operate effectively, efficient and able to face dynamic business changes. Hence, PT.X tried to identify things to be concerned as business needs. From identification result, the study is focus to customer complaints. Keywords Business Process Improvement, brainstorming, Process Improvement Matrix
1. INTRODUCTION
Growing and competitive industries creating high quality product or services as a compulsory requirement. While in the other side, company also requires to effectively and efficient in order to face dynamic business changes. In order to survive in such environment, reviewing, evaluating and develop plans for improving business process performance is a must thing to do. These activities called Business Process Improvement (BPI).
Business Process Improvement (BPI) can be recognizing as an organized and planned business activity improvement methodology. A definition of Business Process Improvement, Harrington, 1997: A methodology that is designed to bring about step-function improvements in administrative and support processes using approaches such as process benchmarking, process redesign and process re-engineering. Business Process Improvement is a structural approach to analyze and continuously improve company activity by focusing on waste elimination and bureaucratic. Under big BPI umbrella there are three common strategy and activity adopted by organization: Continuous Process Improvement (CPI), Business Process ReEngineering (BPR) and Business Process Benchmarking. Although there are many method of BPI has been developed, practitioner still found difficulties when implement the methods. MIPI (Model-based and Integrated Process Improvement), a BPI method created by Sola Adesola and Tim Baines as a result from doctorate research showed a holistic, structured and procedural guidance for improving business processes. Research conducted resulting on identifying companys criteria and target to improve its business process performance.
2. RESEARCH METHODOLOGY
Model-Based and Integrated Process Improvement (MIPI) methodology is a Business Process Improvement (BPI) methodology from a research program by Sola
Adesola and Tim Baines on Cranfield University, 2005. MIPI is a generic model of BPI consists of seven procedural steps as guidance for action and decision. MIPI methodology can be use for improvement process and engineering process initiative. This methodology describe what to do and how to make it happen. The structure for this methodology contains a hierarchical structure includes: aim, actions, people involved, outcome/exit, checklists, hints and tips, and relevant tolls and techniques
Step Understand business needs
Model-Based and Integrated Process Improvement (MIPI) was developed from literature and discussion from practitioners. This methodology has been tested in two steps. First, a single case study was carried out which the researcher participated to nurse the newly formed BPI methodology through assessment. The second step by conducting case studies without direct involvement from researcher. Detail of BPI steps is shown in Table 1 below.
Step Description Develop vision and strategic objectives Perform competitor analysis Develop organizational model Evaluate current practices, prioritize objectives Scope change Establish measurable targets Develop process objectives and asses readiness Obtain approval and initial project resource Benchmark the process Identify the business process architecture Scope and define the process Capture and model AS IS process information Model the process
Techniques Organization model SWOT analysis Force field analysis Readiness assessment Stakeholder analysis Process prioritization matrix Pareto analysis Process performance table
and the
Verify and validate the model Measure the existing process performance Analyze the business process Benchmark the process Identify performance criteria for re-design process Identify focus of re-design activity Model and validate new TO BE process model Identify IT requirements Estimate performance of re-designed process
Xpat process IDEFO Walkthrough Process flowchart ABC Cause and effect analysis Value added analysis
Plan the implementation Obtain implementation approval Review change management plan Communicate the change Technological development Make new process operational Train staff Roll-out changes Conduct process deployment performance data reflections Revise organizational approach
and
Review process
new
Develop strategic view of the business Set process targets and performance Develop a plan to meet targets Implement
Tabel 1: BPI steps and techniques
3. RESULT
Data collection gathers by conducting interview and company documents. Data collected are: company vision & mission, strategy and organization structure; performance indicator; process flow; production capacity & location; product specification & quality; technology; resources & infrastructure; others.
associated with the right side of an IDEF0 box. (3) Control: the class of arrows that express IDEF0 Control, i.e.: condition required to produce correct output. Data or objects modeled as controls may be transformed by the function, creating output. Control arrows are associated with the top side of an IDEF0 box. (4) Mechanism: the class of arrow that express IDEF0 mechanism, i.e.: the mean used to perform a function; includes the special case of Call Arrow. Mechanism arrowa are associated with the bottom side of an IDEF0 box.
Figure 4. Pareto Chart of Customer Complaint Figure 3. Child Diagram Operational Activity PT.X
From Pareto Chart result, PIT team continue the research by develop a cause and effect diagram to identify root cause from small and weak DOC problem. Through discussion and brainstorming, PIT team develop probability from each nonconformance. Below is the cause and effect diagram from small and weak DOC (Figure 5). As the result from the diagram, PIT team can identify type of problems and each causes (Table 2.)
Figure 5. Cause and Effect Diagram from Small and Weak DOC
Factor Man
Problems Not following procedure Pre-Heat process was not conducted Over stay Holding Room Chicken not god health in in
Causes Employee doing their job as their own experience Focusing to achieve production target Wrong placement Lack of control of farm sanitation Traffic Jam Limited truck with good standard T/H Limited of good quantity eggs from supplier Inappropriate setting, calibration not conducted as per schedule No electricity
Method
2 3 4
Material
5 6
Over time during travel T/H inside truck was not meet standard Small grade eggs T/H control not meet standard (too cold of to hot) Machine shutdown
Machine
4. CONCLUSION
From the business process improvement research using Model-Based and Integrated Process Improvement, criterias and target shall executed by company has been identified. Several quality improvement plans created to ensure company to meet with the business needs. Small and Weak DOC was identify as the highest customer complaint and by using cause and effect diagram several causes has been identified, i.e.: wrong setting; sick chicken; machine problem; temperature and humidity not meet with standard; over stay in holding room; pre-heat process was not conducted; long time delivery process; small grade eggs; not following procedure. As per Risk Priority Number from FMEA, it was observed that the Wrong Setting has the highest RPN. To easily monitor the progress of action plan taken, the Process Improvement Matrix is being used. REFERENCES [1] Sola Adesola and Tim Baines (2005). Developing and evaluating a methodology
for business process improvement. Business Process Management Journal, Vol. 11 No. 1. pp. 37-46 [2] K.T. Lee and K.B. Chuah (2001). A SUPER methodology for business process improvement. International Journal of Operations & Production Management. Vol. 21 No. 5/6, pp. 687-706 [3] Barry Povey (1998). The development of a best practice business process improvement methodology. Benchmarking for Quality Management & Technology.Vol. 5 No. 1. pp. 27-44 [4] Kettinger, W., Teng, J. and Guha, S (1997). Business Process Change: a study of methodologies, techniques, and tools Appendices MISQ Archivist. [5] Nancy R. Tague (2005). The Quality Tool Box Second Edition. ASQ Quality Press. [6] Harrington, H.J. (1991). Business Process Improvement The Breakthrough Strategy for Total Quality, Productivity and Competitiveness, McGraw-Hill, New York, NY [7] Bjorn Andersen (1999). Business Process Improvement Toolbox. ASQ Quality Press [8] Tinnila, M. (1995). Strategic perspectives to business process redesign. Business Process Reengineering & Management Journal, Vol. 1 No.1, pp. 44-50. [9] CEI/IEC 60812:2006, Analysis techniques for system reliability Procedure for failure mode and effects analysis (FMEA), [10] Chandrasa Sedyalaksana (2006). Introduction to Failure Mode and Effect Analysis. Indonesia Production Operations Management Society.