The objectives of the CME Guide are to:-
3
W Provide practical guidelines that define and
standardise positive performance measures (PPMs)
pertinent to the needs and diverse nature of the
mineral and resource industry in Western Australia.
3
W Provide a composite, user friendly, and valued tool
for PPMs, that is readily integrated into and in
support of an organisation’s Occupational Health
and Safety Management System (OHSMS).
3
W Explain the relationship of PPMs to an
organisation’s business plan and their OHSMS.
3
W Advocate the most current and authoritative
PPM methodologies.
3
W Acknowledge the varying stages of
organisational maturity in health and safety
management application.
3
W Acknowledge the different types of hazards
experienced in different mineral and resource
projects with their inherent work practises.
3
W Empower an organisation to identify where
occupational health and safety issues exist and to
target those areas with preventative action.
3
W Enable organisations to identify and select PPMs
(from a core selection) appropriate to their
organisational development and maturity rather
than as an ad hoc exercise.
3
W Assist Health and Safety Professionals, Advisors
and anyone wishing to utilise leading
performance indicators.
ILUKA RESOURCES LIMITED
CME would like to thank Newmont Australia Limited for supplying the photographs that appear on the front cover.
Contents
1. Introduction 2
2.1 Why should the minerals and resources industry adopt positive performance measures? 3
2.4 What problems can arise with the use of positive performance measures? 4
Appendix 4 Bibliography 37
Glossary 38
NEWMONT AUSTRALIA ROBE RIVER IRON ASSOCIATES ALCOA WORLD ALUMINA AUSTRALIA
C M E G U I D E TO P O S I T I V E P E R F O R M A N C E M E A S U R E M E N T 1
1. Introduction
Increased emphasis is placed on the need for promoting action to correct potential weaknesses
organisations to use leading indicators or positive without waiting for demonstrated failures.
performance measures rather than solely focusing on
To encourage increased use of PPMs, this guide has
lagging indicators such as lost time injury frequency been put together to provide:
rate (LTIFR), fatality frequency rate (FFR) and
disabling injury frequency rate (DIFR). • practical assistance on why and how PPMs should
be implemented;
• practical instruction on data collection and
A leading indicator is something measurement; and
that provides information that • implementation tools for the selection and use
helps the user respond to of PPMs.
changing circumstances and take The guide does not provide a definitive list of PPMs that
actions to achieve desired will be suitable for all businesses within the minerals
industry, nor is it a simple checklist for measuring health
outcomes or avoid unwanted and safety management. Rather this guide:
outcomes1.
• explains that the selection of PPMs is flexible and
open to review and change; and
The use of positive performance measures (PPMs) in • focuses on assessing how successfully a work site
occupational health and safety is focused on using is performing by monitoring processes, which
these measures to improve safety performance by produce good health and safety outcomes.
1
Step Change in Safety (2003) Leading Performance Indicators: Guidance for Use, Safety Change in Safety, UK
2 C M E G U I D E TO P O S I T I V E P E R F O R M A N C E M E A S U R E M E N T
2. Positive Performance Measures in the Minerals and Resources Industry
Positive performance measures are part of a process Positive performance measures are:
to guide actions that will improve future performance
• an essential planning and measurement tool for
within an organisation. Given the vast differences
achieving improved health and safety performance;
between organisations and work sites it is not possible
to establish: • a key step in any management process, forming
the basis of continual improvement in an
• a generic or standard set of positive performance
organisation’s OHS risk control mechanisms; and
measures that will apply to the entire minerals
industry; or • an objective measurement of total operational
performance.
• a set of positive performance measures that will
be relevant to an organisation indefinitely.
The purpose of identifying and
Each workplace needs to identify using PPMs is to assist work sites
where there are potential improve their health and safety
weaknesses or opportunities for performance.
improvement within that
particular workplace and identify
2.2 What is the purpose of positive
a limited number of PPMs to
performance measures?
address these.
They can achieve this through:
• providing information that helps the user to take
Relevant measures will vary depending on the actions to achieve desired outcomes or avoid
workplace structure, size, risk and existing unwanted outcomes;
occupational health and safety practices.
• enhancing an organisation’s ability to objectively
recognise areas of deterioration, poor performance
2.1 Why should the minerals and and/or underdevelopment in their OHS practices;
resources industry adopt positive • providing information on the progress and
performance measures? current status of the strategies, processes and
The use of lagging indicators in isolation is not a reliable activities used by worksites to address health and
and/or an accurate measurement of occupational health safety risks; and
and safety (OHS) performance. A wider range of OHS • allowing for periodical monitoring of progress
measurement is needed. and review of objectives to identify if targets are
being met.
C M E G U I D E TO P O S I T I V E P E R F O R M A N C E M E A S U R E M E N T 3
2.3 What can be achieved by using 2.4 What problems can arise with the use
positive performance measures? of positive performance measures?
The use of PPMs will lead to: - If measurement is not carried out correctly, the
effectiveness of health and safety practices cannot be
• Increased OHS activity and an improved health
assessed and there is no reliable information source
and safety culture that is encouraged by
to determine how well OHS risks are being
management and supported by the workforce.
controlled.
• Efficient implementation of corrective action
Incorrect measurement leads to ineffective
items which creates a new found interest and
development of OHSMS’s and inappropriate allocation
raised awareness in OHS.
of resources.
• Health and safety plans being discussed by all
Positive performance measures can lead to wrong
levels of the workforce allowing for greater
and/or misleading conclusions if inappropriate
participation in OHS reviews.
thresholds and measures are chosen. They are prone
• Improved processes and increasing OHS activity to being measured in isolation and therefore can
that results in achievement of set goals. generate misinformation.
• Improved performance due to focussing on what
is currently important and what can be measured.
• input or activity measures; In the example in Table 1 the predominant injury are
sprains and strains. The risk controls introduced were
• process or focus area type measures; and manual handling training for operators and risk
• output or action plan type measures. assessment with several controls to mitigate risk. To
determine the effectiveness of the introduced risk
3.1 Input (Activity Measures) controls it is necessary to monitor work practices and
behaviours associated with the task to determine a
This style of indicator measures inputs that can be cause and effect relationship. Where a reduction in the
counted or measured and is described numerically. precursors of significant strains/sprains (back, shoulder
For example the: injuries) can be demonstrated an indicator is
• number of JSAs written established that identifies risk control measures are
having an effect.
• percentage of safety training performed
• number of safety meetings The key with process measures is to focus on key
drivers or contributors to the outcome of concern and
• number of audits performed it must be directly related in a cause effect
• number of inspections completed relationship. Employee behaviours and task
• percentage of job descriptions with OHS observations can be useful indicators of how well risks
requirements documented. are perceived and controlled.
2
Minerals Council of Australia (2003) “Positive Performance Measures – A Practical Guide” Minerals Council of Australia: Sydney
4 C M E G U I D E TO P O S I T I V E P E R F O R M A N C E M E A S U R E M E N T
Predominant Risk Control Practices/behaviours Cause/Effect
Injury Measure to be Monitored Relationship
• Manual Handling (MH) Training • Compliance in use of • % of personnel who use MH
• Risk Assessment & Control i.e. MH aid/equipment aid/equipment for task not
Strains and • MH aid/equipment • Compliance in use of incurring a strain or sprain.
sprains • Access modified agreed access to task • No. of strains and sprains
• Material storage lowered to eliminate • Storage area incurred from task where agreed
lifting above shoulder height redesigned access not used.
3.3 Output (Action Plan Measures) performance indicators. For example if a occupational
health and safety management plan (OHSMP)
These measure outputs in terms of achievement of
objective is set as “all supervisors are required to
objectives or whether a target or goal has been met.
attend OHS training”, then the performance indicator
For example whether all supervisors have attended
is Supervisor Attendance at OHS training and the PPM
OHS training.
is actual attendances recorded, measured and
Output measures can be set in order to track progress reported as a percentage.
towards achieving items from an Action Plan and as
Continual
Improvement
Management
OHS Policy
Review
Measurement
Planning
& Evaluation
Implementation
Figure 1. AS/NZS 4801:2001 Occupational Health and Safety Management System Model3
3
Standards Australia, AS/NZS 4801:2001 Occupational Health and Safety Management Systems - Specification with guidance for use. Standards Australia
International Ltd: Sydney.
C M E G U I D E TO P O S I T I V E P E R F O R M A N C E M E A S U R E M E N T 5
OHS Management System Key Elements
1. OHS Policy 2. Planning 3. Implementation 4. Measurement 5. Management
and Evaluation Review
Sub Elements
• Document and
data control
• Hazard
identification, risk
assessment and
control of risks
(Risk assessment,
hierarchy of control,
evaluation, design,
contractor mgmt,
purchasing)
• Emergency
preparedness and
response
Figure 2. Occupational Health and Safety Management System Framework Detailing System Sub-Elements
4
Standards Australia, AS/NZS 4801:2001 Occupational Health and Safety Management Systems - Specification with guidance for use, Standards Australia
International Ltd: Sydney.
6 C M E G U I D E TO P O S I T I V E P E R F O R M A N C E M E A S U R E M E N T
ANGLOGOLD ASHANTI AUSTRALIA LIMITED
C M E G U I D E TO P O S I T I V E P E R F O R M A N C E M E A S U R E M E N T 7
Positive Performance Measures (PPMs)
Selection Process
Review Organisation’s OHS Management System
• Policy
• Objectives, Targets & Performance Indicators
• Audit findings ie Internal/Third party
STEP • Outstanding Corrective Actions
1 • Hazard Register
REVIEW
STEP
Define Specific Objectives Define Specific Targets
3 for improvement for each objective (with time frames allocated)
STEP
4 Determine OHS Activities required to achieve the objectives and targets within the specified time frame.
(These would be included in the OHS Management/Implementation/Improvement Plans).
STEP
5 Agree on the Types and Number of Positive Performance Measures
(PPMs) required to measure each PPI defined
Input Process Output
PLANNING
Implement
• Monitor Monthly
• Measure Quarterly
• Review Annually
8 C M E G U I D E TO P O S I T I V E P E R F O R M A N C E M E A S U R E M E N T
ANGLOGOLD ASHANTI AUSTRALIA LIMITED
STEP Review where we have been vs b. Set your targets with time frames applied i.e.
1 100% employee compliance with designated
where we want to be
instruction and training by end of Q3 2004.
a. Review existing OHS information from:
• audit results of the OHSMS; STEP Determine how we are going to
4
• legislative changes; get there
• achievement of objectives and targets from a. Determine what OHS activities are required to
previous year; and achieve each objective and target within the
specified timeframe. These would normally be
• outstanding corrective actions and hazard
included in the sites OHS Management plan if
register imperatives to determine the
related to improvements to the OHSMS or in
continuing suitability, adequacy and
the Site/department Implementation or
effectiveness of the OHSMS.
Improvement Plan if related to specific issues.
These results will also impact on the
b. Determine what of these OHS activities
appropriateness of the OHS Policy and
require monitoring and measurement to assure
whether the results are in support of the
achievement of objective i.e. structured Manual
OHS Policy.
Handling training and follow-up assessments -
b. Revisit overall OSH goals and determine These are your Positive Performance Indicators.
deficits in OHSMS and any changes to NB some activities may not always require
OHS Policy. measurement - i.e. purchase of new lifting
equipment.
STEP Identify what needs to be done to
2
help us get there STEP Select types and number of ppms
5
a. Identify specific OHS Improvement Areas i.e. & create your ppm table
OHSMS documentation, hazard mitigation, a. Once the specific PPI/s have been determined
OHS training and/or OHSMS sub-elements for each objective, the management team or
that require process improvement, promotion consultative group needs to agree on the
or reinforcement (OSH for Supervision types and number of PPMs required to measure
training, Hazard Management training for key each PPI.
personnel, machine guarding, ventilation
Remember that a PPM is a totally numeric
enhancement, purchase new equipment etc).
measurement of an OHS activity. A PPM does
not ask the question, “has a training needs
STEP
3 Define the goal-posts analysis been performed?” but rather, “how
a. State your objective/s for improvement i.e. many are complete?”
employees are to receive relevant instruction and A working example of this process is located at
training to ensure procedural compliance and Appendix 3
equipment competence
C M E G U I D E TO P O S I T I V E P E R F O R M A N C E M E A S U R E M E N T 9
6. Positive Performance Measures
1 OHS Policy
To enable the identification and selection of PPMs It is important for organisations to ensure that the
appropriate to the organisations development the PPMs selected relate closely to any OHS
AS/NZS 4801:2001 framework has been used to objectives set.
highlight PPI’s and PPMs for consideration.
1. OHS Policy
1.1. Leadership and Management Commitment
Objective PPI PPM Method of Approach Monitor & Review
10 C M E G U I D E TO P O S I T I V E P E R F O R M A N C E M E A S U R E M E N T
1.2. Safety & Health Policy
1 OHS Policy
Objective PPI PPM Method of Approach Monitor & Review
C M E G U I D E TO P O S I T I V E P E R F O R M A N C E M E A S U R E M E N T 11
2. Planning
2.1. Planning for Hazard Management
Objective PPI PPM Method of Approach Monitor & Review
• Review when
OHSMP are
created to ensure
Input (Activity Measures)
Action Plan
• No. of objectives that are
Objectives with format and
measurable with a time frame for
measurable alignment with
Safety completion (Can be at Corporate, • Review all
targets for OHS Safety Policy
Management site or department level) Corporate/Site/Dept
improvement • Monitor monthly,
Planning • No. of objectives that are in Safety Management Plans
have been measure
support of Safety Policy
determined quarterly and
(Can be at an organisational, site
review annually
or department level)
for achievement
against
objectives
12 C M E G U I D E TO P O S I T I V E P E R F O R M A N C E M E A S U R E M E N T
2.3. Occupational Health & Safety Management Plans (OHSMP)
Objective PPI PPM Method of Approach Monitor & Review
2 Planning
from Hazard Register in
(calendar or
planned safety activities
financial year)
• No. of activities determined to • Review OHSMPs to ensure
OHS Activities Safety • Monitor progress
support the OHSMS that required scheduled
are planned Management monthly, measure
activities from the OHSMS
and systematic Plans achievement of
have been included
planned activities
quarterly
Output (Action Plan Measures)
• Review annually
• Number of Safety Activities in • Review site/department
for achievement
OHSMP that address major risks Hazard Registers & report
against
identified in Hazard Register on compliance
objectives
(Can be at an organisational,
site or department level)
• % of Risk Controls with • Track site/department
budgetary allocation budgets to ensure that
operational/capital costs
have been allocated for
Risk Controls
C M E G U I D E TO P O S I T I V E P E R F O R M A N C E M E A S U R E M E N T 13
3. Implementation
3.1. Ensuring Capability - Accountability and Responsibility
Objective PPI PPM Method of Approach Monitor & Review
Statutory
Statutory Input (Activity Measures) • Quarterly
personnel are
personnel • % of statutory positions with • Log of Statutory positions management
familiarised with
awareness of OHS responsibilities included in with OHS responsibilities review and
their OHS
OHS duties job descriptions defined in job descriptions target gaps
responsibilities
14 C M E G U I D E TO P O S I T I V E P E R F O R M A N C E M E A S U R E M E N T
3.1. Ensuring Capability - Consultation, Motivation and Awareness
Objective PPI PPM Method of Approach Monitor & Review
3 Implementation
Practises in critical activities defined for each department • Review annually
Use of JSAs
place for for achievement
and SOPs
critical • Number of JSA/SOP completed • Log of JSA/SOP completed of KPI and to
activities • Report on % completed target areas for
improvement
C M E G U I D E TO P O S I T I V E P E R F O R M A N C E M E A S U R E M E N T 15
3.1. Ensuring Capability - Training and Competence
Objective PPI PPM Method of Approach Monitor & Review
16 C M E G U I D E TO P O S I T I V E P E R F O R M A N C E M E A S U R E M E N T
3.2. Support Action - Communication
Objective PPI PPM Method of Approach Monitor & Review
3 Implementation
participate in Toolbox Meetings Toolbox Meetings recorded • Monitor monthly
on minutes • Measure achieve-
• % of Safety Alerts that are • Report % communicated at ment quarterly
communicated to the workforce Toolbox Meetings to alerts • Review annually
raised for achievement
of KPI and to
target areas for
OHS issues are Formal
improvement
communicated Communication
• % of departments that review • Report % communicated at
systematically Processes
the Safety Climate Survey results Toolbox Meeting as agenda • Monitor monthly
• % of Toolbox meetings where items on minutes • Measure achieve-
incidents and hazards are ment quarterly
routinely discussed • Review annually
• % of Toolbox meetings where • Interview employees for achievement
changes to the work environment of KPI and to
(plant/equipment/process/mate target areas for
rials) are discussed improvement
• % of OHS dedicated notice-
boards that are updated monthly
• % of formal OHS • Review records
communications signed off as
sighted by employees
C M E G U I D E TO P O S I T I V E P E R F O R M A N C E M E A S U R E M E N T 17
3.2. Support Action - Reporting
Objective PPI PPM Method of Approach Monitor & Review
18 C M E G U I D E TO P O S I T I V E P E R F O R M A N C E M E A S U R E M E N T
3.2. Support Action - Documentation to Support the OHSMS
Objective PPI PPM Method of Approach Monitor & Review
3 Implementation
conducted per week/month/year Observation Reports,
• % of job observations performed compile and report
per week/month/year weekly/monthly
• No. of risk assessment • Record number completed
performed per week/month/year and report
• No. of risks identified per
week/month/year
• No. of written/revised JSAs/JHAs • Review schedule of JSA’s,
conducted per week/month/year HRA, SOP, Hazobs and
• No. of HRA, SOP, Hazobs workplace inspections
conducted per week/month/year
• No. of site inspections
completed per week/month/year • Monitor monthly
Demonstrate a
• No. of hazard inspections • Measure
consistent
completed per week/month/year achievement
approach to
• No. of housekeeping inspections quarterly
identification
Purchasing performed per week/month/year • Review annually
and assessment
Controls • % or the number of first aid • Analyse incident reports for for achievement
of risk prior to
injuries investigated to the injury severity of KPI and to
purchase of
number reported per target areas for
materials, plant
week/month/year improvement
and equipment
• % or the number of medical
treatment injuries investigated
to the number reported per
week/month/year
• % or the number of lost time • Compare number of
injuries investigated to the number incident reports to number
reported per week/month/year of corresponding
investigations completed
and report accordingly
• % of outstanding investigations • Review incident reports
per number of incidents occurring with completion dates
• Track completed actions
• Report outstanding
investigations
C M E G U I D E TO P O S I T I V E P E R F O R M A N C E M E A S U R E M E N T 19
3.3. Hazard Management - Hazard ID, Risk Assessment and Control
Objective PPI PPM Method of Approach Monitor & Review
20 C M E G U I D E TO P O S I T I V E P E R F O R M A N C E M E A S U R E M E N T
3.3. Hazard Management - Purchasing Goods, Services & Equipment
Objective PPI PPM Method of Approach Monitor & Review
3 Implementation
purchase of
• % of service contracts with OHS • Conduct audit of Service target areas for
materials, plant
clauses Contracts improvement
and equipment
• % of newly purchased plant/ • Interrogate maintenance
equipment being entered into database against records of
preventative maintenance plan purchases
• % of equipment meeting OHS • Conduct an equipment
Standards and requirements audit & report
• No. of OHS requirements • Conduct specific
defined in the purchasing policy Purchasing Control audit or
of principal employer review document
• No. of OHS requirements • Review purchase
defined in the purchasing policy specifications forms,
of contractors Project Action Team
• % of reference to OHS meeting minutes
guidelines when purchasing new
equipment and items
• % of chemicals assessed prior to • Review hazardous
being brought on site substances register &
report
C M E G U I D E TO P O S I T I V E P E R F O R M A N C E M E A S U R E M E N T 21
3.3. Hazard Management - Design, Fabrication, Installation & Commissioning
Objective PPI PPM Method of Approach Monitor & Review
22 C M E G U I D E TO P O S I T I V E P E R F O R M A N C E M E A S U R E M E N T
3.3. Hazard Management - Contractor Management
Objective PPI PPM Method of Approach Monitor & Review
Pre-qualification
Output (Action Plan Measures)
• No. of ‘major contract’ • Track tender pre- • Measure
contractors (based upon qualification records quarterly
number of employees, contract • Review annually
$ size or permanency) who have with target areas
met full prequalification status for improvement
• No. of minor contractors (based • Track contractor OHS
upon number of employees, records
contract $ size or permanency)
who have met prequalification
with demonstrated insurance,
indemnity and Workers
Compensation insurances
Post-qualification
Input (Activity Measures)
• No. of contractors that have • Review contractor Hazard • Monitor monthly
determined their major risks Register • Measure
• No. of risk assessments • Review contractor risk achievement
conducted on Hazards rated as assessments and Hazard quarterly
high/extreme Register • Review annually
• Hazard register is current and for achievement
monitored quarterly and of KPI and to
3 Implementation
reviewed annually target areas for
• No. of risk assessments performed improvement
on new plant/processes and
All contractors
prioritised with control measures
have an
• No. of outstanding control
effective and Management
measures resulting from risk
compatible of
assessments
OHS Contractors
• No. of incident investigations • Check Incident Log and • Monitor monthly
Management
performed and prioritised with Investigation Action Plan • Measure
system
control measures achievement
• No. of outstanding control • Review Incident quarterly
measures resulting from incident Investigation Reports/ • Review annually
investigations Database/ Corrective for achievement
Actions Register of KPI and to
• % of contractors represented on • Review participants of site target areas for
site OHS committee OHS committee improvement
• % of key contract personnel • Check contractor OHSMS
positions with OHS documents &/or role
responsibilities and descriptions
accountabilities defined
• % of safety meetings attended • Review safety meeting
by Senior Managers minutes for participants
• No. of meetings per month where • Interview SHRs or
OHS is a standard agenda item employees
• % of safety meeting • Check OHS Noticeboards
minutes/bulletins and alerts that
are communicated to employees
within 3 days of issue
• % of OHS competencies • Review Contractor OHS
acquired as per Contractor Training Needs matrix and
Training Plan (includes SHRs , training records
OHS for supervisors)
• No. of emergency • Review monthly OHS
response/emergency evacuation reporting by contractor;
drills performed per annum check contractor OHSMP
C M E G U I D E TO P O S I T I V E P E R F O R M A N C E M E A S U R E M E N T 23
3.3. Hazard Management - Contractor Management
Objective PPI PPM Method of Approach Monitor & Review
24 C M E G U I D E TO P O S I T I V E P E R F O R M A N C E M E A S U R E M E N T
3.4. Emergency Preparedness and Response- Emergency Response
Objective PPI PPM Method of Approach Monitor & Review
3 Implementation
Response plan from external providers listed in plan
service providers (i.e. FESA,
RFDS, Hospital, Police, Dept.
Environmental Protection/
To minimise the Emergency Dangerous Goods)
impact of an Preparedness
unplanned and Response Output (Action Plan Measures)
event Action • % of personnel trained in • Review Training Matrix and • Monitor monthly
emergency response and department Threat Analysis • Measure
coordination appropriate to achievement
departmental/site risk quarterly
• % of supervisors trained in • Review department Training • Review annually
emergency response coordination Matrix for achievement
• % of action items closed out • Track action items from of KPI and to
within allocated timeframe follow- debrief until completion target areas for
ing emergency response debrief improvement
• No. of personnel trained in • Review Training Matrix
public/media response against training records for
• No. of personnel trained in Critical emergency personnel/CIRP
Incident Recovery Planning Team
• % of emergency equipment • Review emergency equip-
included in a maintenance ment maintenance records
program (daily/weekly/monthly/ & report % included
quarterly/annual)
• % of personnel allocated to • Track number of emergency
conduct maintenance on response personnel with
emergency equipment allocated duties for
maintenance
• No. of emergency systems • Review emergency
tested for compliance and equipment maintenance
effectiveness (Fire system, Fall records & report number
arrest equipment, SCBA, Water included for testing
Hydrants, Site Alarms, PA
system) daily/weekly/monthly/
quarterly/ annually
C M E G U I D E TO P O S I T I V E P E R F O R M A N C E M E A S U R E M E N T 25
3.4. Emergency Preparedness and Response- Injury Management
Objective PPI PPM Method of Approach Monitor & Review
Injury progress to medical treatment date/time of 1st aid treat- of KPI and to
Management case or worse ment against injury severity target areas for
Injury
system that • % of injuries where alternative • Review rehabilitation improvement
Management
promotes duties have been made available records and incident log
Activities and
prompt 1st aid, that has not progressed to a LTI
Actions
rehabilitation • % of workers compensation • Review Case Management
and early return premium reduction as a result of Meeting minutes, WC
to work proactive Injury management premium estimations &
rehabilitation records
• % of injuries where injury level • Review Incident log,
minimised by specialised Occ. personal health file and
Health personnel intervention rehabilitation records
(Nurse, Physio, Occ. Physician,
rehabilitation provider)
26 C M E G U I D E TO P O S I T I V E P E R F O R M A N C E M E A S U R E M E N T
4. Measurement & Evaluation
4.1. Monitoring the Safety Management System
Objective PPI PPM Method of Approach Monitor & Review
4 &
targets for achievement
• % of OHSMP Action Items • Track Action Items from of KPI and to
completed per department OHSMPs and report target areas for
completion improvement
Measurement
Evaluation
• % of employees participating in • Track employees
wellness programs participation and/or review
Wellness program evaluation
• % of Departments that review • Self report by department
their OHSMP quarterly or review their Safety
meeting minutes
• % of Departments that report • Track monthly reporting &
OHS KPIs within 3 days of end report % received within
of month timeframe
LAG Indicators
A qualitative indicator that can be • Analyse Incident Report log
counted or measured and is and Workers’
described numerically i.e. Compensation reports
• Fatalities
• LTIFR
• First aid cases
• Notifiable dangerous occurrence
rate
• Environmental incidents
• Non injury incident (near miss)
• Compensable injury rates
• Workers compensation claims
C M E G U I D E TO P O S I T I V E P E R F O R M A N C E M E A S U R E M E N T 27
4.2. Inspection Testing and Monitoring
Objective PPI PPM Method of Approach Monitor & Review
28 C M E G U I D E TO P O S I T I V E P E R F O R M A N C E M E A S U R E M E N T
4.2. Inspection Testing and Monitoring
Objective PPI PPM Method of Approach Monitor & Review
4 &
failures
• Cost of equipment failures • Interrogate Loss Control
records, Maintenance costs
Measurement
and Quality Incident Log for
down time due to failures
Evaluation
C M E G U I D E TO P O S I T I V E P E R F O R M A N C E M E A S U R E M E N T 29
4.3. Audits of the Safety Management System
Objective PPI PPM Method of Approach Monitor & Review
• No., regularity, quality and • Review audit results and • Monitor monthly
outcomes of self assessments records (internal and • Measure
external)
Measurement
30 C M E G U I D E TO P O S I T I V E P E R F O R M A N C E M E A S U R E M E N T
4.4. Corrective and Preventive Action
Objective PPI PPM Method of Approach Monitor & Review
4 &
Measurement
Evaluation
C M E G U I D E TO P O S I T I V E P E R F O R M A N C E M E A S U R E M E N T 31
4.5. Incident Investigation
Objective PPI PPM Method of Approach Monitor & Review
within xx days
• No. of Investigations completed
Evaluation
32 C M E G U I D E TO P O S I T I V E P E R F O R M A N C E M E A S U R E M E N T
5. Management Review
Objective PPI PPM Method of Approach Monitor & Review
C M E G U I D E TO P O S I T I V E P E R F O R M A N C E M E A S U R E M E N T 33
Appendix 1. The Advantages of a Systems Format
• Australian Industry has comprehensively adopted • System PPMs can easily be integrated into a
AS/NZS 4801:2001 (and other safety complimentary systems format;
management systems) as an OHS tool that
• Mirroring PPMs against an OHSMS format helps
ensures that all facets of OHS management have
to ensure sequential chronology for effective
been considered and that the system is complete;
PPM measurement;
• Systems formats are portable and recognisable
• PPMs determined against management system
by management as they follow the process of all
headings can assist a company with objective
other management systems whether they are
evidence of system improvement; and
financial, production and/or auditing;
• PPMs determined against a known OHSMS can
• PPMs that follow a management systems format
be matched into Australian Standards or other
would be more user friendly and readily
audit accreditation with positive marketing
recognisable;
implications.
Commitment and Policy are displayed in the An organisation will provide, implement and maintain
organisations’ OHS Policy. The policy should reflect documented OHS objectives and targets at each
the organisations’ commitment from senior relevant level and function within the organisation.
management, to be compliant to laws governing Appropriate performance indicators should be used.
operations and promote continual improvement. The The objectives and targets are to reflect the
policy is the basis of how the organisation sets its organisation’s OHS Policy.
objectives and targets. Occupational Health and Safety Management Plans
The OHS Management plan will describe how the
Planning targets are to be achieved, time lines and management
Planning Identification of Hazards, Hazard/Risk responsibilities. The plan will also include a review of
Assessment and Controof Hazards/Risks. current and new activities.
34 C M E G U I D E TO P O S I T I V E P E R F O R M A N C E M E A S U R E M E N T
Consultation, Communication and Reporting of equipment for monitoring and measuring (related
to health and safety risks), their calibration, storage
The employees are to be engaged in the OHS
and maintenance shall be maintained and stored.
decision-making process. The organisation is to elect
Safety and Health Representatives from the employee Health Surveillance
group who will represent employees on OHS matters.
The organisation will identify situations where employee
Elected representative are to receive training for their
health surveillance is required. Employees shall have
roles. Employees are also to be provided with
access to their individual results. Where specified by
adequate opportunity and support to take part in
legislation, employees’ health will be monitored and
OHS activities in their daily work.
recorded when exposed to specific hazards.
A documented procedure on how OHS information is
Incident Investigation, Corrective and
passed to and from employees is to be communicated
Preventative Action
and implemented.
The organisation is to establish, implement and
Reporting of OHS performance (audits and reviews),
maintain procedures for, investigating any incident that
incidents and system failures, hazards identified,
cause harm, investigate system failures and initiating
hazard/risk assessments, preventative and corrective
appropriate corrective and preventative actions. The
action and statutory reporting requirements are all to
organisation shall implement and record any changes
be established. Reporting timeframes are to be
to OHSMS procedures resulting from incident
determined by the organisation, to ensure the
investigation, corrective and preventative action.
OHSMS is monitored and performance improved.
Records and Records Management
Documentation
An organisation will establish, implement and maintain
The organisation will create, apply and maintain
procedures for identification, maintenance and
documentation in a suitable form to describe the core
disposition of records needed for the implementation
elements of the OHSMS and provide direction to
and operation of OHSMS and to record the extent to
related documentation.
which planned objectives and targets have been met.
Documentation and Data Control
Occupational Health and Safety Management
The Organisation will establish, implement and System Audit
maintain procedures for controlling relevant OHS
The organisation is to establish, implement and
documents.
maintain an audit program for regular reviews of the
Hazard Identification, Hazard/Risk Assessment and OHSMS. The audit is to be carried out by a
Control of Hazards/Risks competent person.
Hazards associated with the organisation’s activities
and services are to be identified, hazard/risk Management Review
assessment conducted, control measured Review of the Occupational Health and Safety
implemented and evaluated to ascertain if risk Management System
reduction was achieved. This usually includes design,
construction, commissioning and purchasing controls, Senior management will at regular intervals conduct a
contractor management and management of change. review to ensure continuing suitability and
effectiveness in satisfying the targets and objectives
Emergency Preparedness and Response set for the OHSMS. The review includes, policy,
The organisation is to identify any emergency objective, targets and performance indicators, audit
situations and ensure that emergency procedures are findings, and corrective actions.
documented. Continual Improvement
Management from the review, will change were
Measurement and Evaluation appropriate any deficiencies identified. Continual
Monitoring and Measurement improvement is based on the continuous evaluation of
OHS performance for the purpose of identifying
The organisation is to establish, implement, and
opportunities for improvement.
maintain documented procedures to monitor and
measure on a regular basis the key operations and
activities, which can cause illness and injury. Records
C M E G U I D E TO P O S I T I V E P E R F O R M A N C E M E A S U R E M E N T 35
Appendix 3. Example – Manual Handling Training
1) PPI – ensure that employees have received • Process Measure – Examine the % of
Structured Manual Handling Training (with employees who demonstrate correct manual
practical assessment); handling techniques (calculated by
examination of behaviour observation
2) PPM – what requires measurement
records).
• Input Measure - number of
3) Create PPM Table – Using the framework
documented/complete Training Needs
illustrated below, ensure that for each PPM the:-
Analysis (TNA). This is calculated by
counting the number of completed TNAs • Method Of Approach (how are you going to
from the Departments. The TNA has either collect the information and how are you going
been completed or it has not. to manipulate/calculate the data),
• Output Measure - % of employees who have • Monitoring Strategy (how is this information
completed Manual Handling Training. to be reported to you and how often; and
Calculated by examining the department
• Review Period (How often are you measuring
TNA (% = projected/actual x100).
that the targets are being met and when will a
• Input Measure – number of employees who judgement be made on whether the objective
have attended Manual Handling Training per has been achieved).
month/quarter (calculated by examination
of the individual training records).
The PPMs have been written to quantify the response a. Input measures - how many TNA completed and
with a measurement, not to direct you to respond how many employees trained (compliance)
whether you have performed a function or not. The b. Output measure - % completed (was the target
questions are not asking IF the action has occurred, but met? - what needs to be completed vs. what has
rather, to what extent. been completed)
Examination of the results can be used to emphatically c. Process measure - examination of the incidence of
demonstrate the extent of, and by extrapolation, the LTIFR prior to training compared with the number
weaknesses and strengths of OHS activity. of LTIFR after the training (effectiveness of training)
36 C M E G U I D E TO P O S I T I V E P E R F O R M A N C E M E A S U R E M E N T
Appendix 4. Bibliography
De Beek, R.O. and Van Heuverswyn, K. (2001) “New NOHSC. (2002) “Extending the Use of OHS
Trends in Accident Prevention.” European Agency Positive Performance Indicators in Australian
for Safety and Health at Work, ed. 4, pg 11-13. Industry.” AGPS: Canberra
Belgium.
NSCA (1998) “OH&S Performance Measures –
Chamber of Mines. (2003) “Lagging and leading With An Emphasis Of Positivity!” in Australian
indicators of OHS Performance.” Compendium Safety News
Chamber of Mines: South Africa
NSW Minerals Council (1998) “Moving to the New
Comcare (2003) “Positive Performance Indicators Way of Measuring OHS Performance – Guidelines
– Measuring Safety, Rehabilitation and for the Measurement of Site OHS Performance.”
Compensation Performance.” SRC Commission. NSW Minerals Council: Sydney
ACT. Australia
Nuclear Energy Agency Working Group on Inspection
Department of Energy. Office of Performance Practises. (1998) “Performance Indicators And
Assessment and Analysis (2003) “DOE ISM Combining Assessments To Evaluate The Safety
Performance Report. Period Ending December 31, Performance Of Licensees.” Organisation For
2002.” Department of Energy: USA Economic Co-Operation And Development: Paris
Department of Industry and Resources (2002) Pardy, W. (1999) “Performance Measurement for
“Safety Performance 2001-2002 – Accident & Workplace Safety.” Vermont SIRI Safety Library Page.
Injury Statistics.” D.O.I.R.: Perth Internet
C M E G U I D E TO P O S I T I V E P E R F O R M A N C E M E A S U R E M E N T 37
Glossary
Objective Method of Approach
States the purpose of collecting the measurement i.e. States how the information will be collected i.e. track
to demonstrate management commitment to training completed via departmental OHS
OHS activities performance reports
Abbreviations
ALARP As low as reasonably practicable MSDS Material Data Safety Sheet
CIRP Critical Incident Response Plan OHS Occupational health and safety
DG Dangerous goods OHSMP Occupational health and safety
management plan
DIFR Disabling injury frequency rate
OHSMS Occupational health and safety
EAP Employee assistance program
management system
FFR Fatality frequency rate
PPIs Positive performance indicators
Hazobs Hazard observations
PPMs Positive performance measures
JSAs Job safety analysis
SHR Safety and Health Representative
KPI Key performance indicator
SOP Standard operating procedure
LTI Lost time injury
TNA Training needs analysis
LTIFR Lost time injury frequency rate
38 C M E G U I D E TO P O S I T I V E P E R F O R M A N C E M E A S U R E M E N T
ROBE RIVER IRON ASSOCIATES
Perth Office Kalgoorlie Office Bunbury Office
7th Floor, 12 St Georges Terrace 115 Egan Street, Kalgoorlie Podium Level, 61 Victoria Street
Perth, Western Australia 6000 Western Australia 6430 Bunbury, Western Australia 6230
Locked Bag N984, Perth PO Box 147, Kalgoorlie PO Box 739, Bunbury
Western Australia 6844 Western Australia 6430 Western Australia 6231
Telephone: (61 8) 9325 2955 Telephone: (61 8) 9021 2155 Telephone: (61 8) 9791 6707
Facsimile: (61 8) 9221 3701 Facsimile: (61 8) 9021 1257 Facsimile: (61 8) 9791 7680
Email: [email protected]
JCR DESIGN