Building Quotation PDF
Building Quotation PDF
Building Quotation PDF
R.C. CONSTRUCTION
No.4, First Floor, Dr.Ambekar Salai, Periyar Nagar, Madipakkam, Chennai - 600 091. Email : [email protected] / www.rc constructions in chennai.com
Rs.
2.
Rs.
Earth work excavation for column foundation : Depth of River sand filling for column Foundation : Depth of plain cement concrete (PCC) using 1 size Blue Granite metal for column foundation bed concreting work :
9 inch
DETAILS OF STEELS USED FOR COLUMN & FOOTING AND COLUMN BED 1. Column : Main Rod 12 mm dia @ 6 Nos Stirrups Rod (Rings) 6mm dia @ 9" c/c
2.
Column bed : Main rod & Distribution rod 8mm dia @ 6" c/c Depth of Bed concrete RCC 1:2:4 mix column : 4 inch Depth of Bed Concrete RCC 1:2:4 mix for column footing Tapper portion : 6 inch Depth of RCC Tie Beam above Ground Level for sitting of Basement & superstructure : 1 feet
R.C. CONSTRUCTION
No.4, First Floor, Dr.Ambekar Salai, Periyar Nagar, Madipakkam, Chennai - 600 091. Email : [email protected] / www.rc constructions in chennai.com
Main rod
12 mm dia @ 5 Nos
Distribution rod (Rings) : 8mm dia @ 9" c/c Height of Basement level brick work above Tie Beam level : Total Height of Basement including Tie Beam above Ground level Depth of Earth filling in Basement : Depth of River sand filling in Basement : Depth of plain cement concrete (PCC) in Basement :
Height of Lintel above Basement Height of Roof above Basement Thickness of Roof concrete Main Rods Stirrups (Rings) : :
: :
1. 2.
: :
CONCRETE MIX RATIO FOR CONCRETE WORKS 1. Plain Cement concre work i.e cement : Sand : 1 Blue Metal (Jelly) : : 1 Bond 5 Bond 7 Bond 1:4:8 mix
R.C. CONSTRUCTION
No.4, First Floor, Dr.Ambekar Salai, Periyar Nagar, Madipakkam, Chennai - 600 091. Email : [email protected] / www.rc constructions in chennai.com
2.
Reniforcement Cement Concrete work i.e cement : Sand : Blue metal (Jelly) :
CEMENT AND RIVER SAND RATIO FOR USING IN BRICK WORK & PLASTERING WORK
Brick work i.e 1 Bond Cement 6 Bond Sand Plastering i.e 1 Bond - Cement 4 Bond Sand
1:6 mix
1:4 mix
Each Room only one cupboard (size 46" x 70") will be provided with cuddapah slab Each room only one loft in any one side of the room will be provided. In Verandah, shoe cupboard (size 30" x 26") will cuddapah slab will be provided. In Hall ceiling finishing with Border work will be provided on 4 sides. In Kitchen, kitchen Platform finishing with Granite slab Top with cuddapah sink Kitchen counter boil finished with wall Tiles 3 feet height.
FLOORING
Provided ceramic floor tiles in all room, (Tile cost per sqft Rs.30/-) and Provided ceramic wall tiles in Bath, Wc: (Tile cost per sq.ft Rs.20/-) Any other flooring to be made, difference in cost of tiles & labour and other materials to be paid by the building owner. In Bath room inside wall finished with ceramic wall tiles 7 feet height above floor level, and rough finished ceramic floor tiles for flooring. In wc inside wall finished with ceramic wall tiles 4 feet height above floor level and Rough finished ceramic floor tiles for flooring.
R.C. CONSTRUCTION
No.4, First Floor, Dr.Ambekar Salai, Periyar Nagar, Madipakkam, Chennai - 600 091. Email : [email protected] / www.rc constructions in chennai.com
WOOD WORK
Main Door (size 36" x 70") using with teak frame & paneled shutter and finishing complete. Inside other Doors using with country wood (kongu) frame & water proof flush shutters and finishing complete. Inside windows using with country wood (kongu) frame & Iron grills and glazed shutters using with 2nd quality Teak wood and finishing complete. All Room windows size (40" x 40") In kitchen window size (30" x 26") In bath & WC ventilator size (20" x 16") In bath & WC provided with sintex doors.
Each rooms Except pooja 5 power points will be provided. More than 5 Power points, each points cost in Rs. 400/- paid by the building owners.
PAINTING WORK
All inside rooms wall surface painted with best quality acrylic emulsion wall paint (Asian) over one coat of JK white cement paint. All outers walls surface painted with best quality supercem cement paint, over one coat of JK white cement paint. Wooden& Steel works are painted with Acrylic paints (Asian) over one coat of primer. Colouring choice by building owner Responsibility.
R.C. CONSTRUCTION
No.4, First Floor, Dr.Ambekar Salai, Periyar Nagar, Madipakkam, Chennai - 600 091. Email : [email protected] / www.rc constructions in chennai.com
For all plumbing works (in bath room, Toilet, Wash Bain, kitchen, sink etc) the first quality branded materials will be used for concelled pipeline works for all water line inside the building. Wash basin provision; closet provision. All waste line will be connected to main chamber Drainage lines using superior grade plastic pipes (Parry ware white ceramic fittings Metro tap fittings)
MISCELLANEOUS The contractor Responsibility for below item. Heir charges for concrete mixer machine. Heir charges for ladder Water curing work etc.
MORE OF PAYMENT Advance Upto Basement level Upto Lintel level Upto Roof level Upto Inside wall plastering work Upto outside wall plastering work On handing over of possession : : : : : : : 10% of total construction cost 25% of total construction cost 10% of total construction cost 25% of total construction cost 15% of total construction cost 10% of total construction cost 5% of total construction cost