Connection ID Table
Connection ID Table
EVERSENDAI ENGINEERING
SHEET
OF
PROJECT
Designed by
Date
m. arunkumar
Doc. Ref.
P9906-S-CN-MI-13-01
The design of connections for the additional beams at third floor level has been done with
reference to the drawings PSI 0002 / 3AF /101 Rev. 1 and PSI 0002 / 3AF /102 Rev. 1.
The top of steel level is kept at +51.950m between grids X7 and X8, +51.125m between
grids X9 and X15. Between grids Y4 and Y6, the TOS is +52.100.
The connections are grouped into various categories, based on the member sizes and the
end actions, as furnished in the table.
Each connection category has been designed for the maximum intensity, with a load
factor of 1.4. The design is carried out in accordance to American (LRFD) Standards.
All wall embedments are designed with WILTRONEX chemical anchors, assuming the grade
of concrete as M30 and checked for the working load condition.
CALCULATION SHEET
05/Apr/2001
Job No
P9906
CALCULATION SHEET
EVERSENDAI ENGINEERING
SHEET
OF
PROJECT
Designed by
Date
m. arunkumar
10/Apr/2001
Doc. Ref.
Job No
P9906-S-CN-MI-13-01
Sl
Nr
Member
Section
1
Supporting
Member
Connection
Location
End Action
V in KN
M in KN.m
Bolt
Detail
Connection
Identification
3
P9906
100
M 3A 1
40
BC
01
M20
92
M 3A 1
40
BC
01
M20
110
M 3A 2
40
BC
01
M20
132
M 3A 2
40
BC
01
M20
109
M 3A 3
40
BC
01
M20
71
M 3A 3
40
BC
01
M20
72
M 3A 4
40
BC
01
M20
73
M 3A 4
40
BC
01
M20
74
M 3A 5
40
BC
01
M20
75
M 3A 5
40
BC
01
M20
76
M 3A 6
40
BC
01
M20
91
M 3A 6
40
BC
01
M20
96
M 3A 7
40
BC
01
M20
78
M 3A 7
40
BC
01
M20
79
M 3A 8
40
BC
01
M20
80
M 3A 8
40
BC
01
M20
83
M 3A 9
40
BC
01
M20
84
M 3A 9
40
BC
01
M20
85
M 3A 10
40
BC
01
M20
99
M 3A 10
40
BC
01
M20
104
M 3A 11 R
72
BC
02
M22
106
M 3A 11 R
72
BC
02
M22
97
M 3A 12
49
BC
02
M22
103
M 3A 12
72
BC
02
M22
105
M 3A 13
72
BC
02
M22
98
B15 500X200X101.5
M 3A 13 R
49
BC
02
M22
122
B15 500X200X101.5
M 3A 14 R
52
BC
02
M22
125
B15 500X200X101.5
M 3A 14
43
BC
02
M22
121
B16 600X300X132.8
M 3A 15
52
BC
02
M22
53
M 3A 15
86
BC
03
M22
54
M 3A 16 R
86
BC
03
M22
55
M 3A 16
71
BC
03
M22
56
M 3A 17 R
71
BC
03
M22
65
M 3A 17
84
BC
03
M22
67
M 3A 18
84
BC
03
M22
33
M 3A 17
62
BC
04
M22
35
M 3A 18
109
BC
04
M22
41
M 3A 21
108
BC
04
M22
42
M 3A 21 R
108
BC
04
M22
43
M 3A 22
108
BC
04
M22
CALCULATION SHEET
EVERSENDAI ENGINEERING
SHEET
OF
PROJECT
Designed by
Date
m. arunkumar
10/Apr/2001
Doc. Ref.
Job No
P9906-S-CN-MI-13-01
Sl
Nr
Member
Section
1
Supporting
Member
Connection
Location
End Action
V in KN
M in KN.m
Bolt
Detail
Connection
Identification
3
P9906
44
M 3A 22 R
108
BC
04
M22
34
M 3A 17 R
62
BC
04
M22
89
B15 500X200X101.5
M 3A 23
114
BC
04
M22
119
B15 500X200X101.5
M 3A 18
76
BC
04
M22
124
B15 500X200X101.5
M 3A 24 R
74
BC
04
M22
126
B15 500X200X101.5
M 3A 19 R
100
BC
04
M22
19
B16 600X300X132.8
M 3A 10
121
BC
04
M22
90
B16 600X300X132.8
M 3A 20 R
114
BC
04
M22
120
B16 600X300X132.8
M 3A 11 R
76
BC
04
M22
B17 600X300X147.0
M 3A 03
128
BC
04
M22
B17 600X300X147.0
M 3A 03 R
128
BC
04
M22
B17 600X300X147.0
M 3A 05
128
BC
04
M22
10
B17 600X300X147.0
M 3A 05 R
128
BC
04
M22
B17 600X300X147.0
M 3A 04
237
BC
05
10
M22
B17 600X300X147.0
M 3A 04 R
237
BC
05
10
M22
112
M 3A 5
72
BC
06
M22
111
M 3A 5
72
BC
06
M22
22
M 3A 11 R
88
BC
07
M22
20
M 3A 10 R
121
BC
07
M22
21
M 3A 11
88
BC
07
M22
59
M 3A 11
118
BC
07
M22
61
M 3A 12
118
BC
07
M22
37
M 3A 19
127
BC
07
M22
47
M 3A 24
127
BC
07
M22
49
M 3A 20
117
BC
07
M22
38
M 3A 19 R
127
BC
07
M22
48
M 3A 24 R
127
BC
07
M22
60
M 3A 20 R
118
BC
07
M22
62
M 3A 25 R
118
BC
07
M22
25
B15 500X200X101.5
M 3A 13
121
BC
07
M22
26
B15 500X200X101.5
M 3A 13 R
121
BC
07
M22
131
RC BEAM 800X250
M 3A 14
40
BC
08
M20
77
RC COLUMN
M 3A 14
40
BC
08
M20
86
RC COLUMN
M 3A 15 R
40
BC
08
M20
123
RC BEAM 1000X200
M 3A 15
74
BC
09
M22
17
RC COLUMN
M 3A 09
90
BC
09
M22
18
RC COLUMN
M 3A 09 R
90
BC
09
M22
66
M 3A 10 R
84
BC
09
M22
68
M 3A 10 R
84
BC
09
M22
11
RC COLUMN
M 3A 06
180
BC
10
M22
CALCULATION SHEET
EVERSENDAI ENGINEERING
SHEET
OF
PROJECT
Designed by
Date
m. arunkumar
10/Apr/2001
Doc. Ref.
Job No
P9906-S-CN-MI-13-01
Sl
Nr
Member
Section
1
Supporting
Member
Connection
Location
End Action
V in KN
M in KN.m
Bolt
Detail
Connection
Identification
3
P9906
12
RC COLUMN
M 3A 06 R
132
BC
10
M22
13
RC COLUMN
M 3A 07
121
BC
10
M22
14
RC COLUMN
M 3A 07 R
121
BC
10
M22
15
RC COLUMN
M 3A 08
137
BC
10
M22
16
RC COLUMN
M 3A 08 R
137
BC
10
M22
39
B15 500X200X101.5
RC COLUMN
M 3A 20
132
BC
10
M22
40
B15 500X200X101.5
RC COLUMN
M 3A 20 R
206
BC
10
M22
36
M 3A 18
118
252
MC
01
4-20
14-24
50
M 3A 21 R
128
377
MC
01
4-20
14-24
81
M 3A 19
100
377
MC
01
4-20
14-24
87
M 3A 22
100
377
MC
01
4-20
14-24
94
B16 600X300X132.8
M 3A 20 R
40
56
MC
02
2-20
10-20
95
B16 600X300X132.8
M 3A 23
40
56
MC
02
2-20
10-20
127
B15 500X200X101.5
RC COLUMN
M 3A 21
250
442
MC
03
8-24
16-24
129
B15 500X200X101.5
RC COLUMN
M 3A 24
250
442
MC
03
8-24
16-24
108
RC COLUMN
M 3A 22 R
105
50
PMC
01
4-20
8-20
107
M 3A 25
42
50
PMC
01
4-20
8-20
69
RC COLUMN
M 3A 23
148
50
PMC
02
6-20
6-20
101
RC COLUMN
M 3A 26
80
50
PMC
02
6-20
6-20
102
RC COLUMN
M 3A 24 R
115
50
PMC
02
6-20
6-20
70
RC WALL 200 TK
M 3A 27 R
63
50
PMC
02
6-20
6-20
64
M 3A 25 R
91
50
PMC
02
6-20
6-20
B17 600X300X147.0
RC COLUMN
M 3A 01
296
50
PMC
03
8-20
6-20
B17 600X300X147.0
RC COLUMN
M 3A 01 R
296
50
PMC
03
8-20
6-20
B17 600X300X147.0
RC COLUMN
M 3A 02
296
50
PMC
03
8-20
6-20
B17 600X300X147.0
RC COLUMN
M 3A 02 R
296
50
PMC
03
8-20
6-20
23
RC COLUMN
M 3A 12
209
50
PMC
03
8-20
6-20
24
RC COLUMN
M 3A 12 R
149
50
PMC
03
8-20
6-20
27
RC COLUMN
M 3A 14
165
50
PMC
03
8-20
6-20
28
RC COLUMN
M 3A 14 R
165
50
PMC
03
8-20
6-20
29
RC COLUMN
M 3A 15
45
50
PMC
03
8-20
6-20
30
RC COLUMN
M 3A 15 R
67
50
PMC
03
8-20
6-20
31
RC COLUMN
M 3A 16
170
50
PMC
03
8-20
6-20
45
B15 500X200X101.5
RC COLUMN
M 3A 23
132
50
PMC
03
8-20
6-20
46
B15 500X200X101.5
RC COLUMN
M 3A 23 R
206
50
PMC
03
8-20
6-20
51
B15 500X200X101.5
RC COLUMN
M 3A 24
135
50
PMC
03
8-20
6-20
52
B15 500X200X101.5
RC COLUMN
M 3A 24 R
184
50
PMC
03
8-20
6-20
57
B16 600X300X132.8
RC COLUMN
M 3A 25
278
50
PMC
03
8-20
6-20
58
B16 600X300X132.8
RC COLUMN
M 3A 25 R
161
50
PMC
03
8-20
6-20
63
RC COLUMN
M 3A 26
275
50
PMC
03
8-20
6-20
113
B15 500X200X101.5
RC COLUMN
M 3A 26
70
50
PMC
03
8-20
6-20
114
B15 500X200X101.5
RC COLUMN
M 3A 27 R
81
50
PMC
03
8-20
6-20
115
B16 600X300X132.8
RC COLUMN
M 3A 27
70
50
PMC
03
8-20
6-20
116
B16 600X300X132.8
RC COLUMN
M 3A 28 R
81
50
PMC
03
8-20
6-20
117
B15 500X200X101.5
RC COLUMN
M 3A 28
50
50
PMC
03
8-20
6-20
CALCULATION SHEET
EVERSENDAI ENGINEERING
SHEET
OF
PROJECT
Designed by
Date
m. arunkumar
10/Apr/2001
Doc. Ref.
Job No
P9906-S-CN-MI-13-01
Supporting
Member
End Action
Bolt
Detail
Sl
Nr
Member
Section
118
B15 500X200X101.5
RC COLUMN
M 3A 29 R
50
50
PMC
03
8-20
6-20
32
M 3A 16 R
170
50
PMC
03
8-20
6-20
82
M 3A 30 R
88
M 3A 17 R
93
M 3A 31
Connection
Location
P9906
V in KN
M in KN.m
Connection
Identification
3
128
B15 500X200X101.5 -
M 3A 18 R
130
B15 500X200X101.5 -
M 3A 32 R
OF
Date
05/Apr/2001
Job No
P9906
OF
Date
10/Apr/2001
Job No
P9906
Bolt
Detail
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
OF
Date
10/Apr/2001
Job No
P9906
Bolt
Detail
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
OF
Date
10/Apr/2001
Job No
P9906
Bolt
Detail
9
9
9
9
9
9
9
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
OF
Date
10/Apr/2001
Job No
P9906
Bolt
Detail
F10T
F10T
CALCULATION SHEET
EVERSENDAI ENGINEERING
SHEET
OF
PROJECT
Designed by
Date
m. arunkumar
Doc. Ref.
P9906-S-CN-MI-12-01
The design of connections for the additional beams at second floor level has been done with
reference to the drawings PSI 0002 / 2F /101 Rev. 3 and PSI 0002 / 2F /102 Rev. 4.
The top of steel level is kept at +43.825m between grids X12 and X14. Between X4 and X11,
the top of steel level is kept at +43.800m.
The connections are grouped into various categories, based on the member sizes and the
end actions, as furnished in the table.
Each connection category has been designed for the maximum intensity, with a load
factor of 1.4. The design is carried out in accordance to American (LRFD) Standards.
All wall embedments are designed with WILTRONEX chemical anchors, assuming the grade
of concrete as M30 and checked for the working load condition.
CALCULATION SHEET
02/Apr/2001
Job No
P9906
CALCULATION SHEET
EVERSENDAI ENGINEERING
SHEET
OF
PROJECT
Designed by
Date
m. arunkumar
Doc. Ref.
P9906-S-CN-MI-12-01
Sl
Nr
Member
Section
Supporting
Member
Connection
Location
End Action
V in KN
M in KN.m
Connection
Identification
1 B18 600X300X170.0
RC BEAM 700X600
M 2 01
290
BC
2 B18 600X300X170.0
RC BEAMS 650X450
M 2 01 R
220
BC
B18 600X300X170.0
M 2 02
40
BC
RC BEAM 650X450
M 2 02 R
40
BC
RC BEAM 650X450
M 2 03
40
BC
RC BEAM 650X450
M 2 03 R
40
BC
7 B18 600X300X170.0
RC COLUMN
M 2 04
92
BC
8 B18 600X300X170.0
RC COLUMN
M 2 04 R
92
BC
9 B18 600X300X170.0
B18 600X300X170.0
M 2 05
96
BC
10 B18 600X300X170.0
B18 600X300X170.0
M 2 05 R
203
BC
B18 600X300X170.0
M 2 06
63
BC
B16 600X300X133.0
M 2 06 R
63
BC
13 B16 600X300X133.0
14 B16 600X300X133.0
RC COLUMN
M 2 07 R
180
350
15 B18 600X300X170.0
RC COLUMN
M 2 08
187
BC
16 B18 600X300X170.0
RC COLUMN
M 2 08 R
160
BC
17 B18 600X300X170.0
RC COLUMN
M 2 09
92
BC
18 B18 600X300X170.0
RC COLUMN
M 2 09 R
92
BC
19 B18 600X300X170.0
B18 600X300X170.0
M 2 10
96
BC
20 B18 600X300X170.0
B18 600X300X170.0
M 2 10 R
203
BC
21 B18 600X300X170.0
RC COLUMN
M 2 11
160
BC
22 B18 600X300X170.0
RC COLUMN
M 2 11 R
187
BC
23 B16 600X300X133.0
M 2 07
M 2 12
MC -
24 B16 600X300X133.0
RC COLUMN
M 2 12 R
180
350
B16 600X300X133.0
M 2 13
63
BC
B18 600X300X170.0
M 2 13 R
63
BC
RC BEAM 650X450
M 2 14
40
BC
RC BEAM 650X450
M 2 14 R
40
BC
RC BEAM 650X450
M 2 15
40
BC
RC BEAM 650X450
M 2 15 R
40
BC
RC BEAM 650X450
M 2 16
76
BC
RC BEAM 650X450
M 2 16 R
76
BC
RC BEAM 650X450
M 2 17
76
BC
RC BEAM 650X450
M 2 17 R
76
BC
RC BEAM 650X450
M 2 18
76
BC
RC BEAM 650X450
M 2 18 R
76
BC
RC BEAM 650X450
M 2 19
40
BC
M 2 19 R
40
MC -
39 B16 600X300X133.0
RC COLUMN
M 2 20
300
675
MC -
02/Apr/2001
Job No
MC -
02
P9906
Bolt
Detail
CALCULATION SHEET
EVERSENDAI ENGINEERING
SHEET
OF
PROJECT
Designed by
Date
m. arunkumar
Doc. Ref.
P9906-S-CN-MI-12-01
Sl
Nr
Member
Section
40 B16 600X300X133.0
41 B16 600X300X133.0
42 B16 600X300X133.0
Supporting
Member
RC COLUMN
-
Connection
Location
M 2 20 R
M 2 21
M 2 21 R
End Action
V in KN
M in KN.m
300
675
Connection
Identification
MC -
RC BEAM 650X450
M 2 22
40
BC
M 2 22 R
40
BC
RC BEAM 1000X200
M 2 23
53
BC
B16 600X300X133.0
M 2 23 R
153
BC
B16 600X300X133.0
M 2 24
96
BC
B16 600X300X133.0
M 2 24 R
182
BC
49
50
02/Apr/2001
Job No
02
P9906
Bolt
Detail
CALCULATION SHEET
EVERSENDAI ENGINEERING
SHEET
PROJECT
Designed by
m. arunkuma
Checked by
Sl
Nr
Member
Section
Supporting
Member
Connection
Location
End Action
Shear-KN
38
B08
350X175X49.4
B09
400X200X56.1
M 1
19 R
90
41
B08
350X175X49.4
B09
400X200X56.1
M 1
21 L
90
B05
300X150X32.0
M 1
01 L
58
B05
300X150X32.0
M 1
04 R
90
15
B05
300X150X32.0
M 1
08 L
105
16
B05
300X150X32.0
M 1
08 R
105
B05
300X150X32.0
B18
600X300X170.0
M 1
01 R
58
B05
300X150X32.0
B18
600X300X170.0
M 1
04 L
90
24
B13
500X200X77.9
ENCASED COLUMN
M 1
12 R
108
29
B11
450X200X65.1
ENCASED COLUMN
M 1
15 L
85
34
B11
450X200X65.1
ENCASED COLUMN
M 1
17 R
130
40
B09
400X200X56.1
ENCASED COLUMN
M 1
20 R
128
B18
600X300X170.0
R.C. COLUMN
M 1
02 L
82
39
B09
400X200X56.1
R.C. COLUMN
M 1
20 L
114
45
B11
450X200X65.1
R.C. COLUMN
M 1
23 L
108
46
B11
450X200X65.1
R.C. COLUMN
M 1
23 R
108
32
B03
250X125X25.1
ENCASED COLUMN
M 1
16 R
40
B03
250X125X25.1
M 1
05 L
40
10
B03
250X125X25.1
M 1
05 R
40
11
B03
250X125X25.1
M 1
06 L
40
12
B03
250X125X25.1
M 1
06 R
40
13
B01
200X100X17.8
M 1
07 L
40
14
B01
200X100X17.8
M 1
07 R
40
43
B03
250X125X25.1
M 1
22 L
40
19
B13
500X200X77.9
B11
450X200X65.1
M 1
10 L
156
25
B11
450X200X65.1
B11
450X200X65.1
M 1
13 L
127
26
B11
450X200X65.1
B11
450X200X65.1
M 1
13 R
100
21
B09
400X200X56.1
M 1
11 L
98
37
B08
350X175X49.4
B11
450X200X65.1
M 1
19 L
90
22
B09
400X200X56.1
B13
500X200X77.9
M 1
11 R
98
30
B11
450X200X65.1
ENCASED COLUMN
M 1
15 R
175
B18
600X300X170.0
R.C. COLUMN
M 1
02 R
193
B18
600X300X170.0
M 1
03 R
220
17
B11
450X200X65.1
M 1
09 L
150
18
B11
450X200X65.1
M 1
09 R
150
20
B13
500X200X77.9
M 1
10 R
156
23
B13
500X200X77.9
M 1
12 L
163
33
B11
450X200X65.1
R.C. COLUMN
M 1
17 L
231
44
B03
250X125X25.1
B08
350X175X49.4
M 1
22 R
40
36
B03
250X125X25.1
B09
400X200X56.1
M 1
18 R
40
Moment-KN.m
CALCULATION SHEET
EVERSENDAI ENGINEERING
SHEET
PROJECT
Designed by
m. arunkuma
Checked by
Sl
Nr
Member
Section
Supporting
Member
27
B03
250X125X25.1
B11
450X200X65.1
M 1
14 L
40
28
B03
250X125X25.1
B11
450X200X65.1
M 1
14 R
40
31
B03
250X125X25.1
B11
450X200X65.1
M 1
16 L
40
35
B03
250X125X25.1
B11
450X200X65.1
M 1
18 L
40
B18
600X300X170.0
M 1
03 L
290
42
B08
350X175X49.4
M 1
21 R
Connection
Location
End Action
Shear-KN
Moment-KN.m
T
SHEET
OF
Designed by
Date
m. arunkumar
28/Mar/2001
Checked by
Job No
P9906
Moment-KN.m
Connection
Identification
214
MC
214
MC
BC
BC
BC
BC
BC
BC
BC
BC
BC
BC
BC
BC
BC
BC
BC
BC
BC
BC
BC
BC
BC
BC
BC
BC
BC
BC
BC
BC
BC
BC
BC
BC
BC
BC
BC
BC
BC
BC
T
SHEET
OF
Designed by
Date
m. arunkumar
28/Mar/2001
Checked by
Job No
P9906
Moment-KN.m
Connection
Identification
BC
BC
BC
BC
BC
10
CALCULATION SHEET
EVERSENDAI ENGINEERING
SHEET
OF
PROJECT
Designed by
Date
m. arunkumar
DESIGN
OF
WALL
Checked by
EMBEDMENTS
12/Mar/2001
Job No
P9906
CALCULATION SHEET
EVERSENDAI ENGINEERING
SHEET
PROJECT
Designed by
m. arunkumar
Doc. Ref.
P9906-S-CN-MI-13-01
The design of connections for the additional beams at third floor level has been done with
reference to the drawings PSI 0002 / 3AF /101 Rev. 1 and PSI 0002 / 3AF /102 Rev. 1.
The top of steel level is kept at +51.950m between grids X7 and X8, +51.125m between
grids X9 and X15. Between grids Y4 and Y6, the TOS is +52.100.
The connections are grouped into various categories, based on the member sizes and the
end actions, as furnished in the table.
Each connection category has been designed for the maximum intensity, with a load
factor of 1.4. The design is carried out in accordance to American (LRFD) Standards.
All wall embedments are designed with WILTRONEX chemical anchors, assuming the grade
of concrete as M30 and checked for the working load condition.
OF
Date
05/Apr/2001
Job No
P9906
CALCULATION SHEET
EVERSENDAI ENGINEERING
SHEET
PROJECT
Designed by
OF
Date
m. arunkumar
Doc. Ref.
10/Apr/2001
Job No
P9906-S-CN-MI-13-01
Sl
Nr
Member
Section
Supporting
Member
Connection
Location
End Action
V in KN
M in KN.m
P9906
Bolt
Detail
Connection
Identification
1 B17 600X300X147.0
RC COLUMN
M 3A 01
296
50
PMC
03
2 B17 600X300X147.0
RC COLUMN
M 3A 01 R
296
50
PMC
03
3 B17 600X300X147.0
RC COLUMN
M 3A 02
296
50
PMC
03
4 B17 600X300X147.0
RC COLUMN
M 3A 02 R
296
50
PMC
03
B17 600X300X147.0
M 3A 03
128
BC
04
B17 600X300X147.0
M 3A 03 R
128
BC
B17 600X300X147.0
M 3A 04
237
BC
B17 600X300X147.0
M 3A 04 R
237
BC
M22
8.8
04
M22
8.8
05
10 M22
8.8
05
10 M22
8.8
B17 600X300X147.0
M 3A 05
128
BC
04
M22
8.8
B17 600X300X147.0
M 3A 05 R
128
BC
04
M22
8.8
RC COLUMN
M 3A 06
180
BC
10
M22
8.8
RC COLUMN
M 3A 06 R
132
BC
10
M22
8.8
RC COLUMN
M 3A 07
121
BC
10
M22
8.8
RC COLUMN
M 3A 07 R
121
BC
10
M22
8.8
RC COLUMN
M 3A 08
137
BC
10
M22
8.8
RC COLUMN
M 3A 08 R
137
BC
10
M22
8.8
RC COLUMN
M 3A 09
90
BC
09
M22
8.8
RC COLUMN
M 3A 09 R
90
BC
09
M22
8.8
B16 600X300X132.8
M 3A 10
121
BC
04
M22
8.8
M 3A 10 R
121
BC
07
M22
8.8
M 3A 11
88
BC
07
M22
8.8
M 3A 11 R
88
BC
07
M22
8.8
RC COLUMN
M 3A 12
209
50
PMC
03
RC COLUMN
M 3A 12 R
149
50
PMC
03
B15 500X200X101.5
M 3A 13
121
BC
07
M22
8.8
B15 500X200X101.5
M 3A 13 R
121
BC
07
M22
8.8
RC COLUMN
M 3A 14
165
50
PMC
03
RC COLUMN
M 3A 14 R
165
50
PMC
03
RC COLUMN
M 3A 15
45
50
PMC
03
RC COLUMN
M 3A 15 R
67
50
PMC
03
RC COLUMN
M 3A 16
170
50
PMC
03
M 3A 16 R
170
50
PMC
03
M 3A 17
62
BC
04
M22
8.8
M 3A 17 R
62
BC
04
M22
8.8
CALCULATION SHEET
EVERSENDAI ENGINEERING
SHEET
PROJECT
Designed by
OF
Date
m. arunkumar
Doc. Ref.
10/Apr/2001
Job No
P9906-S-CN-MI-13-01
Sl
Nr
Member
Section
Supporting
Member
Connection
Location
End Action
V in KN
M 3A 18
109
M 3A 18
118
M 3A 19
127
M 3A 19 R
39 B15 500X200X101.5
RC COLUMN
M 3A 20
40 B15 500X200X101.5
RC COLUMN
M 3A 21
M 3A 22
M in KN.m
P9906
Bolt
Detail
Connection
Identification
BC
04
MC
01
BC
07
M22
8.8
127
BC
07
M22
8.8
132
BC
10
M22
8.8
M 3A 20 R
206
BC
10
M22
8.8
108
BC
04
M22
8.8
M 3A 21 R
108
BC
04
M22
8.8
108
BC
04
M22
8.8
M 3A 22 R
108
BC
04
M22
8.8
RC COLUMN
M 3A 23
132
50
PMC
03
46 B15 500X200X101.5
RC COLUMN
M 3A 23 R
206
50
PMC
03
M 3A 24
127
BC
07
M22
8.8
M 3A 24 R
127
BC
07
M22
8.8
M 3A 25
117
BC
07
M22
8.8
M 3A 25 R
128
377
MC
01
51 B15 500X200X101.5
RC COLUMN
M 3A 26
135
50
PMC
03
52 B15 500X200X101.5
RC COLUMN
M 3A 26 R
184
50
PMC
03
M 3A 27
86
BC
03
M22
8.8
M 3A 27 R
86
BC
03
M22
8.8
M 3A 28
71
BC
03
M22
8.8
M 3A 28 R
71
BC
03
M22
8.8
57 B16 600X300X132.8
RC COLUMN
M 3A 29
278
50
PMC
03
58 B16 600X300X132.8
RC COLUMN
M 3A 29 R
161
50
PMC
03
M 3A 30
118
BC
07
M22
8.8
M 3A 30 R
118
BC
07
M22
8.8
M 3A 31
118
BC
07
M22
8.8
M 3A 31 R
118
BC
07
M22
8.8
RC COLUMN
M 3A 32
275
50
PMC
03
M 3A 32 R
91
50
PMC
02
M 3A 33
84
BC
03
M22
8.8
M 3A 33 R
84
BC
09
M22
8.8
M 3A 34
84
BC
03
M22
8.8
M 3A 34 R
84
BC
09
M22
8.8
RC COLUMN
M 3A 35
148
PMC
02
252
50
M22
8.8
CALCULATION SHEET
EVERSENDAI ENGINEERING
SHEET
PROJECT
Designed by
OF
Date
m. arunkumar
Doc. Ref.
10/Apr/2001
Job No
P9906-S-CN-MI-13-01
Sl
Nr
Member
Section
Supporting
Member
Connection
Location
V in KN
End Action
RC WALL 200 TK
M 3A 35 R
63
M 3A 36
M 3A 36 R
M 3A 37
M in KN.m
Bolt
Detail
Connection
Identification
PMC
02
40
BC
01
M20
8.8
40
BC
01
M20
8.8
40
BC
01
M20
8.8
M 3A 37 R
40
BC
01
M20
8.8
M 3A 38
40
BC
01
M20
8.8
M 3A 38 R
40
BC
01
M20
8.8
RC COLUMN
M 3A 39
40
BC
08
M20
8.8
M 3A 39 R
40
BC
01
M20
8.8
M 3A 40
40
BC
01
M20
8.8
M 3A 40 R
40
BC
01
M20
8.8
M 3A 41
100
MC
01
M 3A 41 R
50
P9906
377
M 3A 42
40
BC
01
M20
8.8
M 3A 42 R
40
BC
01
M20
8.8
M 3A 43
40
BC
01
M20
8.8
RC COLUMN
M 3A 43 R
40
BC
08
M20
8.8
M 3A 44
100
MC
01
M 3A 44 R
377
B15 500X200X101.5
M 3A 45
114
BC
04
M22
8.8
B16 600X300X132.8
M 3A 45 R
114
BC
04
M22
8.8
M 3A 46
40
BC
01
M20
8.8
M 3A 46 R
40
BC
01
M20
8.8
M 3A 47
B16 600X300X132.8
M 3A 47 R
40
56
MC
02
B16 600X300X132.8
M 3A 48
40
56
MC
02
M 3A 48 R
40
BC
01
M20
8.8
M 3A 49
49
BC
02
M22
8.8
B15 500X200X101.5
M 3A 49 R
49
BC
02
M22
8.8
M 3A 50
40
BC
01
M20
8.8
M 3A 50 R
40
BC
01
M20
8.8
RC COLUMN
M 3A 51
80
50
PMC
02
RC COLUMN
M 3A 51 R
115
50
PMC
02
M 3A 52
72
BC
02
M22
8.8
M 3A 52 R
72
BC
02
M22
8.8
M 3A 53
72
BC
02
M22
8.8
M 3A 53 R
72
BC
02
M22
8.8
M 3A 54
42
PMC
01
50
CALCULATION SHEET
EVERSENDAI ENGINEERING
SHEET
PROJECT
Designed by
OF
Date
m. arunkumar
Doc. Ref.
10/Apr/2001
Job No
P9906-S-CN-MI-13-01
Sl
Nr
Member
Section
Supporting
Member
Connection
Location
V in KN
End Action
M in KN.m
Bolt
Detail
Connection
Identification
RC COLUMN
M 3A 54 R
105
PMC
01
M 3A 55
40
BC
01
M20
8.8
M 3A 55 R
40
BC
01
M20
8.8
M 3A 56
72
BC
06
M22
8.8
M 3A 56 R
72
BC
06
M22
8.8
RC COLUMN
M 3A 57
70
50
PMC
03
RC COLUMN
M 3A 57 R
81
50
PMC
03
RC COLUMN
M 3A 58
70
50
PMC
03
RC COLUMN
M 3A 58 R
81
50
PMC
03
RC COLUMN
M 3A 59
50
50
PMC
03
RC COLUMN
M 3A 59 R
50
50
PMC
03
B15 500X200X101.5
M 3A 60
76
BC
04
M22
8.8
B16 600X300X132.8
M 3A 60 R
76
BC
04
M22
8.8
B16 600X300X132.8
M 3A 61
52
BC
02
M22
8.8
B15 500X200X101.5
M 3A 61 R
52
BC
02
M22
8.8
RC BEAM 1000X200
M 3A 62
74
BC
09
M22
8.8
B15 500X200X101.5
M 3A 62 R
74
BC
04
M22
8.8
B15 500X200X101.5
M 3A 63
43
BC
02
M22
8.8
B15 500X200X101.5
M 3A 63 R
100
BC
04
M22
8.8
RC COLUMN
M 3A 64
250
442
MC
03
442
MC
03
M 3A 64 R
RC COLUMN
M 3A 65
M 3A 65 R
50
P9906
250
RC BEAM 800X250
M 3A 66
40
BC
01
M20
8.8
M 3A 66 R
40
BC
01
M20
8.8
CALCULATION SHEET
EVERSENDAI ENGINEERING
SHEET
PROJECT
Designed by
m. arunkumar
Doc. Ref.
P9906-S-CN-MI-13-01
Sl
Nr
Member
Section
Supporting
Member
Connection
Location
End Action
V in KN
M in KN.m
Connection
Identification
OF
Date
10/Apr/2001
Job No
P9906
Bolt
Detail
CALCULATION SHEET
EVERSENDAI ENGINEERING
SHEET
OF
PROJECT
Designed by
Date
m. arunkumar
Checked by
The design of connections for the additional beams at ground floor level has been done with
reference to the drawings PSI 0002 / GF /101 Rev. 1 and PSI 0002 / GF /102 Rev. 3.
The connections are grouped into various categories, based on the member sizes and the
end actions, as tabulated.
Each connection category has been designed for the maximum intensity, with a load
factor of 1.4. The design is carried out in accordance to American (LRFD) Standards.
All wall embedments are designed with WILTRONEX chemical anchors, assuming the grade
of concrete as M30 and checked for the working load condition.
CALCULATION SHEET
12/Mar/2001
Job No
P9906
CALCULATION SHEET
EVERSENDAI ENGINEERING
SHEET
OF
PROJECT
Designed by
Date
m. arunkumar
Checked by
Sl
Nr
Member
Section
Supporting
Member
B18 600X300X170.0
CONCRETE BEAM
B18 600X300X170.0
CONCRETE COLUMN
B15 500X200X102.0
4
5
Connection
Location
End Action
09/Mar/2001
Job No
P9906
Connection
Identification
Shear-KN
Moment-KN.m
M 01 L
270
BC -
M 01 R
202
BC -
CONCRETE COLUMN
M 02 L
140
BC -
B15 500X200X102.0
CONCRETE COLUMN
M 02 R
140
BC -
B8
350X175X49.4
B18 600X300X170.0
M 03 L
105
BC -
B8
350X175X49.4
B18 600X300X170.0
M 03 R
105
BC -
B8
350X175X49.4
B18 600X300X170.0
M 04 L
105
BC -
B8
350X175X49.4
B18 600X300X170.0
M 04 R
105
BC -
B8
350X175X49.4
B18 600X300X170.0
M 05 L
105
BC -
10
B8
350X175X49.4
B18 600X300X170.0
M 05 R
105
BC -
11
B8
350X175X49.4
B18 600X300X170.0
M 06 L
105
BC -
12
B8
350X175X49.4
B18 600X300X170.0
M 06 R
105
BC -
13
B8
350X175X49.4
B18 600X300X170.0
M 07 L
105
BC -
14
B8
350X175X49.4
B18 600X300X170.0
M 07 R
105
BC -
15
CONCRETE BEAM
M 08 L
190
BC -
16
CONCRETE BEAM
M 08 R
190
BC -
17
B8
350X175X49.4
CONCRETE COLUMN
M 09 L
67
BC -
18
B8
350X175X49.4
CONCRETE BEAM
M 09 R
67
BC -
19
B5
300X150X 32.0
CONCRETE COLUMN
M 10 L
48
BC -
20
B5
300X150X 32.0
CONCRETE BEAM
M 10 R
48
BC -
21
B18 600X300X170.0
M 11 L
190
BC -
22
CONCRETE BEAM
M 11 R
190
BC -
23
B8
350X175X49.4
B18 600X300X170.0
M 12 L
105
BC -
24
B8
350X175X49.4
B18 600X300X170.0
M 12 R
105
BC -
25
B8
350X175X49.4
B18 600X300X170.0
M 13 L
105
BC -
26
B8
350X175X49.4
B18 600X300X170.0
M 13 R
105
BC -
27
B8
350X175X49.4
B18 600X300X170.0
M 14 L
105
BC -
28
B8
350X175X49.4
B18 600X300X170.0
M 14 R
105
BC -
29
B8
350X175X49.4
B18 600X300X170.0
M 15 L
105
BC -
30
B8
350X175X49.4
B18 600X300X170.0
M 15 R
105
BC -
31
B8
350X175X49.4
B18 600X300X170.0
M 16 L
105
BC -
32
B8
350X175X49.4
B18 600X300X170.0
M 16 R
105
BC -
33
B7
350X175X41.2
CONCRETE COLUMN
M 17 L
42
BC -
34
B7
350X175X41.2
B18 600X300X170.0
M 17 R
75
BC -
35
B5
300X150X 32.0
B18 600X300X170.0
M 18 L
90
BC -
36
B5
300X150X 32.0
CONCRETE BEAM
M 18 R
90
BC -
37
B3
250X125X 25.1
CONCRETE BEAM
M 19 L
40
BC -
38
B3
250X125X 25.1
B15 500X200X102.0
M 19 R
40
BC -
39
B3
250X125X 25.1
B7
M 20 L
40
BC -
40
B3
250X125X 25.1
B18 600X300X170.0
M 20 R
40
BC -
350X175X41.2
CALCULATION SHEET
EVERSENDAI ENGINEERING
SHEET
OF
PROJECT
Designed by
Date
m. arunkumar
Checked by
Sl
Nr
Member
Section
Supporting
Member
41
CONCRETE COLUMN
42
43
B5
300X150X 32.0
44
B5
45
46
47
Connection
Location
End Action
Shear-KN
Moment-KN.m
M 21 L
120
200
M 21 R
CONCRETE COLUMN
M 22 L
117
300X150X 32.0
M 22 R
B18 600X300X170.0
M 23 L
B18 600X300X170.0
B18 600X300X170.0
48
49
50
09/Mar/2001
Job No
P9906
Connection
Identification
MC -
BC -
117
BC -
167
BC -
M 23 R
167
BC -
M 24 L
167
BC -
B18 600X300X170.0
M 24 R
167
BC -
B18 600X300X170.0
M 25 L
167
BC -
B18 600X300X170.0
M 25 R
167
BC -
51
B18 600X300X170.0
M 26 L
167
BC -
52
B18 600X300X170.0
M 26 R
167
BC -
53
B18 600X300X170.0
M 27 L
167
BC -
54
B18 600X300X170.0
M 27 R
167
BC -
55
B18 600X300X170.0
CONCRETE COLUMN
M 28 L
231
BC -
56
B18 600X300X170.0
CONCRETE COLUMN
M 28 R
247
BC -
57
B18 600X300X170.0
CONCRETE COLUMN
M 29 L
367
BC - 11
58
B18 600X300X170.0
CONCRETE COLUMN
M 29 R
367
BC - 11
59
B18 600X300X170.0
CONCRETE COLUMN
M 30 L
367
BC - 11
60
B18 600X300X170.0
CONCRETE COLUMN
M 30 R
367
BC - 11
61
B18 600X300X170.0
CONCRETE COLUMN
M 31 L
367
BC - 11
62
B18 600X300X170.0
CONCRETE COLUMN
M 31 R
367
BC - 11
63
B18 600X300X170.0
CONCRETE COLUMN
M 32 L
367
BC - 11
64
B18 600X300X170.0
CONCRETE COLUMN
M 32 R
367
BC - 11
65
B18 600X300X170.0
CONCRETE COLUMN
M 33 L
367
BC - 11
66
B18 600X300X170.0
CONCRETE COLUMN
M 33 R
367
BC - 11
67
M 34 L
110
BC - 10
68
M 34 R
110
BC - 10
CALCULATION SHEET
EVERSENDAI ENGINEERING
SHEET
OF
PROJECT
Designed by
Date
17/Apr/2001
Job No
P9906
m. arunkumar
Doc. Ref.
P9906-S-CN-MI-11-02
Sl
Nr
Member
Section
Supporting
Member
Connection
Location
End Action
V in KN
M in KN.m
Connection
Identification
Bolt
Detail
M 1 01
58
BC
01
6 M22
8.8
B18 600X300X170.0
M 1 01
58
BC
02
6 M22
8.8
R.C. COLUMN
M 1 02
82
BC
03
8 M20
8.8
B18 600X300X170.0
R.C. COLUMN
M 1 02
193
BC
08
5 M24
8.8
B18 600X300X170.0
M 1 03
290
BC -
10
6 M24
8.8
B18 600X300X170.0
M 1 03
220
BC
08
5 M24
8.8
B18 600X300X170.0
M 1 04
90
BC -
02
6 M22
8.8
M 1 04
90
BC
01
6 M22
8.8
M 1 05
40
BC -
04
3 M20
8.8
M 1 05
40
BC
04
3 M20
8.8
M 1 06
40
BC
04
3 M20
8.8
M 1 06
40
BC
04
3 M20
8.8
M 1 07
40
BC
04
3 M20
8.8
M 1 07
40
BC
04
3 M20
8.8
M 1 08
105
BC -
01
6 M22
8.8
M 1 08
105
BC
01
6 M22
8.8
M 1 09
150
BC
08
5 M24
8.8
M 1 09
150
BC
08
5 M24
8.8
M 1 10
156
BC
08
5 M24
8.8
M 1 10
156
BC
08
5 M24
8.8
M 1 11
98
BC -
06
4 M20
8.8
B13 500X200X77.9
M 1 11
98
BC -
07
4 M20
8.8
M 1 12
163
BC
08
5 M24
8.8
ENCASED COLUMN
M 1 12
108
BC
03
8 M20
8.8
B11 450X200X65.1
M 1 13
127
BC
05
8 M22
8.8
B11 450X200X65.1
M 1 13
100
BC
05
8 M22
8.8
B11 450X200X65.1
M 1 14
40
BC
09
3 M20
8.8
B11 450X200X65.1
M 1 14
40
BC
09
3 M20
8.8
ENCASED COLUMN
M 1 15
85
BC
03
8 M20
8.8
ENCASED COLUMN
M 1 15
175
BC
08
5 M24
8.8
B11 450X200X65.1
M 1 16
40
BC
09
3 M20
8.8
ENCASED COLUMN
M 1 16
40
BC
04
3 M20
8.8
R.C. COLUMN
M 1 17
231
BC -
08
5 M24
8.8
ENCASED COLUMN
M 1 17
130
BC -
03
8 M20
8.8
B11 450X200X65.1
M 1 18
40
BC
09
3 M20
8.8
B09 400X200X56.1
M 1 18
40
BC
09
3 M20
8.8
B11 450X200X65.1
M 1 19
90
BC
4 M20
8.8
B09 400X200X56.1
M 1 19
90
214
R.C. COLUMN
M 1 20
114
ENCASED COLUMN
M 1 20
128
07
MC -
01
BC
03
8 M20
8.8
BC
03
8 M20
8.8
13 M24 F10T
CALCULATION SHEET
EVERSENDAI ENGINEERING
SHEET
OF
PROJECT
Designed by
Date
17/Apr/2001
Job No
P9906
m. arunkumar
Doc. Ref.
P9906-S-CN-MI-11-02
Sl
Nr
Member
Section
Supporting
Member
B09 400X200X56.1
-
Connection
Location
End Action
V in KN
M in KN.m
Connection
Identification
MC -
01
Bolt
Detail
M 1 21
90
214
M 1 21
40
BC
04
3 M20
8.8
13 M24 F10T
-
M 1 22
B08 350X175X49.4
M 1 22
40
BC -
09
3 M20
8.8
R.C. COLUMN
M 1 23
108
BC
03
8 M20
8.8
R.C. COLUMN
M 1 23
108
BC
03
8 M20
8.8
M 1 24
140
BC
08
5 M24
8.8
M 1 24
140
BC
08
5 M24
8.8
49 B5
300X150X 32.0
M 1 25
80
BC
02
6 M22
8.8
50 B5
300X150X 32.0
M 1 25
80
BC
02
6 M22
8.8
M 1 26
140
BC
08
5 M24
8.8
M 1 26
140
BC
08
5 M24
8.8
M 1 27
40
BC
11
4 M20
8.8
R.C. COLUMN
M 1 27
40
BC
04
3 M20
8.8
55 B3
250X125X 25.1
M 1 28
50
BC
04
3 M20
8.8
56 B3
250X125X 25.1
M 1 28
50
BC
04
3 M20
8.8
57 B3
250X125X 25.1
M 1 29
50
BC
04
3 M20
8.8
58 B3
250X125X 25.1
M 1 29
50
BC
04
3 M20
8.8
59 B3
250X125X 25.1
M 1 30
50
BC
04
3 M20
8.8
60 B3
250X125X 25.1
M 1 30
50
BC
04
3 M20
8.8
61 B3
250X125X 25.1
M 1
31
50
BC
04
3 M20
8.8
62 B3
250X125X 25.1
M 1
31
50
BC
04
3 M20
8.8
CALCULATION SHEET
EVERSENDAI ENGINEERING
PROJECT
SHEET
OF
Designed by
Date
m. arunkumar
11/May/2001
Doc. Ref.
Job No
P9906-S-CN-MI-12-03
P9906
The design of connections for the additional beams at second floor level has been done with
reference to the drawings PSI 0002 / 2F /101 Rev. 3 and PSI 0002 / 2F /102 Rev. 4.
The top of steel level is kept at +43.825m between grids X12 and X14. Between X4 and X11,
the top of steel level is kept at +43.800m.
The connections are grouped into various categories, based on the member sizes and the
end actions, as furnished in the table.
Each connection category has been designed for the maximum intensity, with a load
factor of 1.4. The design is carried out in accordance to American (LRFD) Standards.
All wall embedments are designed with WILTRONEX chemical anchors, assuming the grade
of concrete as M30 and checked for the working load condition.
CALCULATION SHEET
CALCULATION SHEET
EVERSENDAI ENGINEERING
SHEET
PROJECT
Designed by
Date
m. arunkumar
11/May/2001
Doc. Ref.
Job No
P9906-S-CN-MI-12-03
P9906
Sl
Nr
Member
Section
Supporting
Member
OF
Connection
Location
End Action
V in KN
M in KN.m
Connection
Identification
Bolt
Detail
1 B18 600X300X170.0
RC BEAM 700X600
M 2 01
290
BC
06
10 M22
8.8
2 B18 600X300X170.0
RC BEAMS 650X450
M 2 01 R
220
BC
06
10 M22
8.8
B18 600X300X170.0
M 2 02
40
BC
02
4 M20
8.8
RC BEAM 650X450
M 2 02 R
40
BC
01
4 M20
8.8
RC BEAM 650X450
M 2 03
40
BC
01
4 M20
8.8
RC BEAM 650X450
M 2 03 R
40
BC
01
4 M20
8.8
7 B18 600X300X170.0
RC COLUMN
M 2 04
92
BC
03
3 M22
8.8
8 B18 600X300X170.0
RC COLUMN
M 2 04 R
92
BC
03
3 M22
8.8
9 B18 600X300X170.0
B18 600X300X170.0
M 2 05
96
BC
08
5 M22
8.8
10 B18 600X300X170.0
B18 600X300X170.0
M 2 05 R
203
BC
07
6 M22
8.8
B18 600X300X170.0
M 2 06
63
BC
04
3 M22
8.8
B16 600X300X133.0
M 2 06 R
63
BC
04
3 M22
8.8
MC -
02
4M24/ 10M30
F10T
13 B16 600X300X133.0
14 B16 600X300X133.0
RC COLUMN
M 2 07 R
180
350
15 B18 600X300X170.0
RC COLUMN
M 2 08
187
BC
06
10 M22
8.8
16 B18 600X300X170.0
RC COLUMN
M 2 08 R
160
BC
06
10 M22
8.8
17 B18 600X300X170.0
RC COLUMN
M 2 09
92
BC
03
3 M22
8.8
18 B18 600X300X170.0
RC COLUMN
M 2 09 R
92
BC
03
3 M22
8.8
19 B18 600X300X170.0
B18 600X300X170.0
M 2 10
96
BC
08
5 M22
8.8
20 B18 600X300X170.0
B18 600X300X170.0
M 2 10 R
203
BC
07
6 M22
8.8
21 B18 600X300X170.0
RC COLUMN
M 2 11
160
BC
06
10 M22
8.8
22 B18 600X300X170.0
RC COLUMN
M 2 11 R
187
BC
06
10 M22
8.8
MC -
02
4M24/ 10M30
F10T
23 B16 600X300X133.0
M 2 07
M 2 12
24 B16 600X300X133.0
RC COLUMN
M 2 12 R
180
350
B16 600X300X133.0
M 2 13
63
BC
04
3 M22
8.8
B18 600X300X170.0
M 2 13 R
63
BC
04
3 M22
8.8
RC BEAM 650X450
M 2 14
40
BC
01
4 M20
8.8
RC BEAM 650X450
M 2 14 R
40
BC
01
4 M20
8.8
RC BEAM 650X450
M 2 15
40
BC
01
4 M20
8.8
RC BEAM 650X450
M 2 15 R
40
BC
01
4 M20
8.8
RC BEAM 650X450
M 2 16
76
BC
03
3 M22
8.8
B16 600X300X133.0
M 2 16 R
76
BC
04
3 M22
8.8
RC BEAM 650X450
M 2 17
76
BC
03
3 M22
8.8
B16 600X300X133.0
M 2 17 R
76
BC
04
3 M22
8.8
RC BEAM 650X450
M 2 18
76
BC
03
3 M22
8.8
B16 600X300X133.0
M 2 18 R
76
BC
04
3 M22
8.8
B16 600X300X133.0
M 2 19
40
BC
02
4 M20
8.8
M 2 19 R
40
BC
02
4 M20
8.8
39 B16 600X300X133.0
RC COLUMN
M 2 20
300
675
MC -
01
CALCULATION SHEET
EVERSENDAI ENGINEERING
SHEET
PROJECT
Designed by
Date
m. arunkumar
11/May/2001
Doc. Ref.
Job No
P9906-S-CN-MI-12-03
P9906
Sl
Nr
Member
Section
40 B16 600X300X133.0
41 B16 600X300X133.0
42 B16 600X300X133.0
Supporting
Member
RC COLUMN
-
OF
Connection
Location
M 2 20 R
M 2 21
M 2 21 R
End Action
V in KN
M in KN.m
300
675
Connection
Identification
MC -
Bolt
Detail
01
RC BEAM 650X450
M 2 22
40
BC
01
4 M20
8.8
M 2 22 R
40
BC
02
4 M20
8.8
RC BEAM 1000X200
M 2 23
153
BC
06
10 M22
8.8
B16 600X300X133.0
M 2 23 R
153
BC
05
8 M22
8.8
B16 600X300X133.0
M 2 24
96
BC
04
3 M22
8.8
B16 600X300X133.0
M 2 24 R
182
BC
05
8 M22
8.8
49 B16 600X300X133.0
RC COLUMN
M 2 25
230
50
PMC -
01
50 B16 600X300X133.0
RC COLUMN
M 2 25 R
230
50
PMC -
01
RC BEAM 650X450
M 2 26
76
BC
03
3 M22
8.8
B16 600X300X133.0
M 2 26
76
BC
04
3 M22
8.8
CALCULATION SHEET
EVERSENDAI ENGINEERING
SHEET
OF
PROJECT
Designed by
Date
m. arunkumar
Doc. Ref.
P9906-S-CN-MI-13-01
The design of connections for the additional beams at third floor level has been done with
reference to the drawings PSI 0002 / 3AF /101 Rev. 1 and PSI 0002 / 3AF /102 Rev. 1.
The top of steel level is kept at +51.950m between grids X7 and X8, +51.125m between
grids X9 and X15. Between grids Y4 and Y6, the TOS is +52.100.
The connections are grouped into various categories, based on the member sizes and the
end actions, as furnished in the table.
Each connection category has been designed for the maximum intensity, with a load
factor of 1.4. The design is carried out in accordance to American (LRFD) Standards.
All wall embedments are designed with WILTRONEX chemical anchors, assuming the grade
of concrete as M30 and checked for the working load condition.
CALCULATION SHEET
05/Apr/2001
Job No
P9906
CALCULATION SHEET
EVERSENDAI ENGINEERING
PROJECT
Supporting
Member
Connection
Location
End Action
SHEET
OF
Designed by
m. arunkumar
Doc. Ref.
P9906-S-CN-MI-13-04
Date
15/Jun/2001
Job No
P9906
Member
Section
B17 600X300X147.0
RC COLUMN
M 3A 01
296
50
PMC
03
B17 600X300X147.0
RC COLUMN
M 3A 01 R
296
50
PMC
03
B17 600X300X147.0
RC COLUMN
M 3A 02
296
50
PMC
03
B17 600X300X147.0
RC COLUMN
M 3A 02 R
296
50
PMC
03
B17 600X300X147.0
M 3A 03
128
BC
04
B17 600X300X147.0
M 3A 03 R
128
BC
B17 600X300X147.0
M 3A 04
237
BC
B17 600X300X147.0
M 3A 04 R
237
BC
B17 600X300X147.0
M 3A 05
128
BC
10
B17 600X300X147.0
M 3A 05 R
128
11
RC COLUMN
M 3A 06
180
50
12
RC COLUMN
M 3A 06 R
132
13
RC COLUMN
M 3A 07
14
RC COLUMN
M 3A 07 R
15
RC COLUMN
M 3A 08
16
RC COLUMN
17
RC COLUMN
M 3A 09
18
RC COLUMN
19
B16 600X300X132.8
20
21
22
23
V in KN
M in KN.m
Connection
Identification
Bolt
Detail
Sl
Nr
6 M22
8.8
04
6 M22
8.8
05
10 M22
8.8
05
10 M22
8.8
04
6 M22
8.8
BC
04
6 M22
8.8
PMC
03
50
PMC
03
121
50
PMC
03
121
50
PMC
03
137
50
PMC
03
M 3A 08 R
137
50
PMC
03
90
50
PMC
03
M 3A 09 R
90
50
PMC
03
M 3A 10
121
BC
04
6 M22
8.8
M 3A 10 R
121
BC
07
4 M22
8.8
M 3A 11
88
BC
07
4 M22
8.8
M 3A 11 R
88
BC
07
4 M22
8.8
RC COLUMN
M 3A 12
209
50
PMC
03
24
RC COLUMN
M 3A 12 R
149
50
PMC
03
25
B15 500X200X101.5
M 3A 13
121
50
BC
07
4 M22
8.8
26
B15 500X200X101.5
M 3A 13 R
121
50
BC
07
4 M22
8.8
27
RC COLUMN
M 3A 14
165
50
PMC
03
28
RC COLUMN
M 3A 14 R
165
50
PMC
03
29
RC COLUMN
M 3A 15
45
50
PMC
03
30
RC COLUMN
M 3A 15 R
67
50
PMC
03
31
RC COLUMN
M 3A 16
170
50
PMC
03
32
M 3A 16 R
170
50
PMC
03
33
M 3A 17
62
BC
04
6 M22
8.8
34
M 3A 17 R
62
BC
04
6 M22
8.8
35
M 3A 18
109
BC
04
6 M22
8.8
36
M 3A 18 R
118
MC
01
37
M 3A 19
127
BC
07
4 M22
8.8
38
M 3A 19 R
127
BC
07
4 M22
8.8
39
B15 500X200X101.5
RC COLUMN
M 3A 20
132
50
PMC
03
40
B15 500X200X101.5
RC COLUMN
M 3A 20 R
206
50
PMC
03
252
CALCULATION SHEET
EVERSENDAI ENGINEERING
PROJECT
SHEET
OF
Designed by
m. arunkumar
Doc. Ref.
P9906-S-CN-MI-13-04
Date
15/Jun/2001
Job No
P9906
Connection
Identification
Bolt
Detail
108
BC
04
6 M22
8.8
108
BC
04
6 M22
8.8
108
BC
04
6 M22
8.8
M 3A 22 R
108
BC
04
6 M22
8.8
50
PMC
03
50
PMC
03
BC
07
4 M22
8.8
127
BC
07
4 M22
8.8
117
BC
07
4 M22
8.8
377
MC
01
50
PMC
03
50
PMC
03
86
BC
03
6 M22
8.8
86
BC
03
6 M22
8.8
71
BC
03
6 M22
8.8
M 3A 28 R
71
BC
03
6 M22
8.8
50
PMC
03
50
PMC
03
BC
07
4 M22
8.8
118
BC
07
4 M22
8.8
118
BC
07
4 M22
8.8
BC
07
4 M22
8.8
PMC
03
PMC
02
84
BC
03
6 M22
8.8
84
BC
09
3 M22
8.8
84
BC
03
6 M22
8.8
M 3A 34 R
84
BC
09
3 M22
8.8
50
PMC
02
50
PMC
02
BC
01
4 M20
8.8
40
BC
01
4 M20
8.8
40
BC
01
4 M20
8.8
M 3A 37 R
40
BC
01
4 M20
8.8
M 3A 38
40
BC
01
4 M20
8.8
M 3A 38 R
40
BC
01
4 M20
8.8
RC COLUMN
M 3A 39
40
BC
08
4 M20
8.8
M 3A 39 R
40
BC
01
4 M20
8.8
79
M 3A 40
40
BC
01
4 M20
8.8
80
M 3A 40 R
40
BC
01
4 M20
8.8
Sl
Nr
Member
Section
Supporting
Member
Connection
Location
End Action
41
M 3A 21
42
M 3A 21 R
43
M 3A 22
44
45
B15 500X200X101.5
RC COLUMN
M 3A 23
132
46
B15 500X200X101.5
RC COLUMN
M 3A 23 R
206
47
M 3A 24
127
48
M 3A 24 R
49
M 3A 25
50
M 3A 25 R
128
51
B15 500X200X101.5
RC COLUMN
M 3A 26
135
52
B15 500X200X101.5
RC COLUMN
M 3A 26 R
184
53
M 3A 27
54
M 3A 27 R
55
M 3A 28
56
57
B16 600X300X132.8
RC COLUMN
M 3A 29
278
58
B16 600X300X132.8
RC COLUMN
M 3A 29 R
161
59
M 3A 30
118
60
M 3A 30 R
61
M 3A 31
62
M 3A 31 R
118
63
RC COLUMN
M 3A 32
275
50
64
M 3A 32 R
91
50
65
M 3A 33
66
M 3A 33 R
67
M 3A 34
68
69
RC COLUMN
M 3A 35
148
70
RC WALL 200 TK
M 3A 35 R
63
71
M 3A 36
40
72
M 3A 36 R
73
M 3A 37
74
75
76
77
78
V in KN
M in KN.m
CALCULATION SHEET
EVERSENDAI ENGINEERING
PROJECT
Connection
Location
OF
Designed by
m. arunkumar
Doc. Ref.
P9906-S-CN-MI-13-04
Date
15/Jun/2001
Job No
P9906
Member
Section
Supporting
Member
81
82
83
M 3A 42
40
BC
01
4 M20
8.8
84
M 3A 42 R
40
BC
01
4 M20
8.8
85
M 3A 43
40
BC
01
4 M20
8.8
86
RC COLUMN
M 3A 43 R
40
BC
08
4 M20
8.8
87
M 3A 44
100
MC
01
88
89
B15 500X200X101.5
M 3A 45
114
BC
04
6 M22
8.8
90
B16 600X300X132.8
M 3A 45 R
114
BC
04
6 M22
8.8
91
M 3A 46
40
BC
01
4 M20
8.8
92
M 3A 46 R
40
BC
01
4 M20
8.8
93
94
B16 600X300X132.8
M 3A 47 R
40
56
MC
02
95
B16 600X300X132.8
M 3A 48
40
56
MC
02
96
M 3A 48 R
40
BC
01
4 M20
8.8
97
M 3A 49
49
BC
02
6 M22
8.8
98
B15 500X200X101.5
M 3A 49 R
49
BC
02
6 M22
8.8
99
M 3A 50
40
BC
01
4 M20
8.8
100
M 3A 50 R
40
BC
01
4 M20
8.8
101
RC COLUMN
M 3A 51
80
50
PMC
02
102
RC COLUMN
M 3A 51 R
115
50
PMC
02
103
M 3A 52
72
BC
02
6 M22
8.8
104
M 3A 52 R
72
BC
02
6 M22
8.8
105
M 3A 53
72
BC
02
6 M22
8.8
106
M 3A 53 R
72
BC
02
6 M22
8.8
107
M 3A 54
42
50
PMC
01
108
RC COLUMN
M 3A 54 R
105
50
PMC
01
109
M 3A 55
40
BC
01
4 M20
8.8
110
M 3A 55 R
40
BC
01
4 M20
8.8
111
M 3A 56
72
BC
06
3 M22
8.8
112
M 3A 56 R
72
BC
06
3 M22
8.8
113
B15 500X200X101.5
RC COLUMN
M 3A 57
70
50
PMC
03
114
B15 500X200X101.5
RC COLUMN
M 3A 57 R
81
50
PMC
03
115
B16 600X300X132.8
RC COLUMN
M 3A 58
70
50
PMC
03
116
B16 600X300X132.8
RC COLUMN
M 3A 58 R
81
50
PMC
03
117
B15 500X200X101.5
RC COLUMN
M 3A 59
50
50
PMC
03
118
B15 500X200X101.5
RC COLUMN
M 3A 59 R
50
50
PMC
03
119
B15 500X200X101.5
M 3A 60
76
BC
04
6 M22
8.8
120
B16 600X300X132.8
M 3A 60 R
76
BC
04
6 M22
8.8
121
B16 600X300X132.8
M 3A 61
52
BC
02
6 M22
8.8
122
B15 500X200X101.5
M 3A 61 R
52
BC
02
6 M22
8.8
123
RC BEAM 1000X200
M 3A 62
74
BC
09
3 M22
8.8
124
B15 500X200X101.5
M 3A 62 R
74
BC
04
6 M22
8.8
125
B15 500X200X101.5
M 3A 63
43
BC
02
6 M22
8.8
M 3A 41 R
M 3A 44 R
M 3A 47
V in KN
100
M in KN.m
377
Connection
Identification
Bolt
Detail
Sl
Nr
M 3A 41
End Action
SHEET
MC
01
377
CALCULATION SHEET
EVERSENDAI ENGINEERING
PROJECT
OF
Designed by
m. arunkumar
Doc. Ref.
P9906-S-CN-MI-13-04
Date
15/Jun/2001
Job No
P9906
Member
Section
Supporting
Member
Connection
Location
V in KN
126
B15 500X200X101.5
M 3A 63 R
100
127
B15 500X200X101.5
RC COLUMN
M 3A 64
250
128
B15 500X200X101.5
129
B15 500X200X101.5
130
B15 500X200X101.5
131
RC BEAM 800X250
M 3A 66
40
BC
08
4 M20
8.8
132
M 3A 66 R
40
BC
01
4 M20
8.8
133
M 3A 67
40
BC
01
4 M20
8.8
134
M 3A 67 R
40
BC
01
4 M20
8.8
135
RC COLUMN
M 3A 68
118
50
PMC
03
136
RC COLUMN
M 3A 68 R
118
50
PMC
03
RC COLUMN
M 3A 64 R
M 3A 65
M 3A 65 R
M in KN.m
Connection
Identification
Bolt
Detail
Sl
Nr
End Action
SHEET
BC
04
442
MC
03
442
MC
03
250
6 M22
8.8
New member
CALCULATION SHEET
EVERSENDAI ENGINEERING
SHEET
OF
PROJECT
Designed by
Date
13/Apr/2001
Job No
P9906
m. arunkumar
Doc. Ref.
P9906-S-CN-MI-14-01
The design of connections for the additional beams at third floor level has been done with
reference to the drawings PSI 0002 / 3F /101 Rev. 2 and PSI 0002 / 3F /102 Rev. 2.
The top of steel level is kept at +48.300m between grids X9 and X12. From grid X6 to grid X9
and X13 to X14, TOS is kept ar +48.325m.
The connections are grouped into various categories, based on the member sizes and the
end actions, as furnished in the table.
Each connection category has been designed for the maximum intensity, with a load
factor of 1.4. The design is carried out in accordance to American (LRFD) Standards.
All wall embedments are designed with WILTRONEX chemical anchors, assuming the grade
of concrete as M30 and checked for the working load condition.
CALCULATION SHEET
CALCULATION SHEET
EVERSENDAI ENGINEERING
SHEET
OF
PROJECT
Designed by
Date
16/Jun/2001
Job No
P9906
m. arunkumar
Doc. Ref.
P9906-S-CN-MI-14-03
Sl
Nr
Member
Section
Supporting
Member
Connection
Location
End Action
V in KN
M in KN.m
Connection
Identification
RC COLUMN
3 01
173
BC
07
RC COLUMN
3 01 R
173
BC
07
RC COLUMN
3 02
173
BC
07
RC COLUMN
3 02 R
173
BC
07
RC COLUMN
3 03
173
BC
07
RC COLUMN
3 03 R
173
BC
07
7 B15 500X200X101.5
RC COLUMN
3 04
188
BC
07
8 B15 500X200X101.5
RC COLUMN
3 04 R
188
BC
07
9 B18 600X300X170.4
RC COLUMN
3 05
171
BC
08
10 B18 600X300X170.4
RC COLUMN
3 05 R
247
BC
08
RC COLUMN
3 06
173
BC
07
RC COLUMN
3 06 R
173
BC
07
RC COLUMN
3 07
173
BC
07
RC COLUMN
3 07 R
173
BC
07
RC COLUMN
3 08
173
BC
07
RC COLUMN
3 08 R
173
BC
07
RC COLUMN
3 09
40
BC
09
RC COLUMN
3 09 R
40
BC
09
19 B18 600X300X170.4
RC COLUMN
3 10
125
BC
08
20 B18 600X300X170.4
RC COLUMN
3 10 R
125
BC
08
3 11
140
BC
01
3 11 R
140
BC
01
3 12
140
BC
01
3 12 R
140
BC
01
RC COLUMN
3 13
140
BC
07
RC COLUMN
3 13 R
140
BC
07
3 14
140
BC
01
3 14 R
140
BC
01
3 15
140
BC
01
3 15 R
140
BC
01
RC COLUMN
3 16
140
BC
07
RC COLUMN
3 16 R
140
BC
07
3 17
140
BC
01
3 17 R
140
BC
01
3 18
140
BC
01
3 18
140
BC
01
37 B16 600X300X132.8
RC COLUMN
3 19
162
BC
08
38 B16 600X300X132.8
RC COLUMN
3 19 R
224
BC
08
39 B15 500X200X101.5
B15 500X200X101.5
3 20
196
BC
02
40 B15 500X200X101.5
B16 600X300X132.8
3 20 R
121
BC
03
Bolt
Detail
CALCULATION SHEET
EVERSENDAI ENGINEERING
SHEET
OF
PROJECT
Designed by
Date
16/Jun/2001
Job No
P9906
m. arunkumar
Doc. Ref.
P9906-S-CN-MI-14-03
Sl
Nr
Member
Section
Supporting
Member
Connection
Location
End Action
V in KN
M in KN.m
Connection
Identification
B15 500X200X101.5
3 21
50
BC
13
RC COLUMN
3 21 R
50
BC
11
43 B16 600X300X132.8
3 22
44 B16 600X300X132.8
RC COLUMN
3 22 R
180
350
MC
02
45 B18 600X300X170.4
B18 600X300X170.4
3 23
96
BC
02
46 B18 600X300X170.4
B18 600X300X170.4
3 23 R
203
BC
02
RC BEAM 650X600
3 24
45
BC
11
RC BEAM 650X450
3 24 R
45
BC
11
RC WALL 200mm
3 25
153
BC
12
B16 600X300X132.8
3 25 R
153
BC
05
B16 600X300X132.8
3 26
96
BC
06
B16 600X300X132.8
3 26 R
182
BC
05
RC BEAM 650X450
3 27
40
BC
10
3 27 R
40
BC
04
55 B16 600X300X132.8
RC COLUMN
3 28
300
675
MC
01
3 28 R
3 29
300
675
56 B16 600X300X132.8
57 B16 600X300X132.8
58 B16 600X300X132.8
RC COLUMN
MC
01
3 29 R
RC BEAM 650X450
3 30
40
BC
10
3 30 R
40
BC
04
B16 600X300X132.8
3 31
63
BC
13
B18 600X300X170.4
3 31 R
63
BC
13
3 32
3 32 R
3 33
3 33 R
3 34
RC COLUMN
RC COLUMN
-
62
120
62
120
Rev
Bolt
Detail
MC
03
MC
03
Addnl.
members
RC COLUMN
3 34 R
62
120
MC
03
3 35
55
BC
06
3 35 R
55
BC
06
3 36
55
BC
06
3 36 R
55
BC
06
CALCULATION SHEET
EVERSENDAI ENGINEERING
SHEET
PROJECT
Designed by
OF
Date
13/Apr/2001
Doc. Ref.
Job No
P9906-S-CN-MI-14-01
P9906
m. arunkumar