0% found this document useful (0 votes)
137 views41 pages

Connection ID Table

The document is a calculation sheet for steel connections at the third floor level of a podium project. It provides details of various beam-to-beam connections, including the member sections, connection locations, end actions of force and moment, bolt details, and unique connection identifications. The connections have been designed according to American standards for the maximum intended loads with a load factor of 1.4. All wall embedments use chemical anchors and have been checked for the working load condition.

Uploaded by

kalpanaadhi
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
137 views41 pages

Connection ID Table

The document is a calculation sheet for steel connections at the third floor level of a podium project. It provides details of various beam-to-beam connections, including the member sections, connection locations, end actions of force and moment, bolt details, and unique connection identifications. The connections have been designed according to American standards for the maximum intended loads with a load factor of 1.4. All wall embedments use chemical anchors and have been checked for the working load condition.

Uploaded by

kalpanaadhi
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 41

CALCULATION SHEET

EVERSENDAI ENGINEERING

SHEET

OF

PROJECT

Designed by

Date

MAJU PERDANA - PODIUM -

m. arunkumar

Doc. Ref.

STEELWORK AT THIRD 'A' FLOOR LEVEL

P9906-S-CN-MI-13-01

The design of connections for the additional beams at third floor level has been done with
reference to the drawings PSI 0002 / 3AF /101 Rev. 1 and PSI 0002 / 3AF /102 Rev. 1.

The top of steel level is kept at +51.950m between grids X7 and X8, +51.125m between
grids X9 and X15. Between grids Y4 and Y6, the TOS is +52.100.

The connections are grouped into various categories, based on the member sizes and the
end actions, as furnished in the table.

Each connection category has been designed for the maximum intensity, with a load
factor of 1.4. The design is carried out in accordance to American (LRFD) Standards.

All wall embedments are designed with WILTRONEX chemical anchors, assuming the grade
of concrete as M30 and checked for the working load condition.

CALCULATION SHEET

05/Apr/2001

Job No
P9906

CALCULATION SHEET

EVERSENDAI ENGINEERING

SHEET

OF

PROJECT

Designed by

Date

MAJU PERDANA - PODIUM -

m. arunkumar

10/Apr/2001

Doc. Ref.

STEELWORK AT THIRD 'A' FLOOR LEVEL

Job No

P9906-S-CN-MI-13-01

Sl
Nr

Member
Section
1

Supporting
Member

Connection
Location

End Action
V in KN

M in KN.m

Bolt
Detail

Connection
Identification
3

P9906

100

B01 200X100X 17.8

B01 200X100X 17.8

M 3A 1

40

BC

01

M20

92

B01 200X100X 17.8

B03 250X125X 25.1

M 3A 1

40

BC

01

M20

110

B01 200X100X 17.8

B07 350X175X 41.2

M 3A 2

40

BC

01

M20

132

B01 200X100X 17.8

B07 350X175X 41.2

M 3A 2

40

BC

01

M20

109

B01 200X100X 17.8

B09 400X200X 56.1

M 3A 3

40

BC

01

M20

71

B05 300X150X 32.0

B11 450X200X 65.1

M 3A 3

40

BC

01

M20

72

B05 300X150X 32.0

B11 450X200X 65.1

M 3A 4

40

BC

01

M20

73

B02 200X100X 20.9

B11 450X200X 65.1

M 3A 4

40

BC

01

M20

74

B02 200X100X 20.9

B11 450X200X 65.1

M 3A 5

40

BC

01

M20

75

B03 250X125X 25.1

B11 450X200X 65.1

M 3A 5

40

BC

01

M20

76

B03 250X125X 25.1

B11 450X200X 65.1

M 3A 6

40

BC

01

M20

91

B01 200X100X 17.8

B11 450X200X 65.1

M 3A 6

40

BC

01

M20

96

B03 250X125X 25.1

B13 500X200X 77.9

M 3A 7

40

BC

01

M20

78

B01 200X100X 17.8

B14 500X200X 88.1

M 3A 7

40

BC

01

M20

79

B01 200X100X 17.8

B14 500X200X 88.1

M 3A 8

40

BC

01

M20

80

B01 200X100X 17.8

B14 500X200X 88.1

M 3A 8

40

BC

01

M20

83

B01 200X100X 17.8

B14 500X200X 88.1

M 3A 9

40

BC

01

M20

84

B01 200X100X 17.8

B14 500X200X 88.1

M 3A 9

40

BC

01

M20

85

B01 200X100X 17.8

B14 500X200X 88.1

M 3A 10

40

BC

01

M20

99

B01 200X100X 17.8

B14 500X200X 88.1

M 3A 10

40

BC

01

M20

104

B05 300X150X 32.0

B08 350X175X 49.4

M 3A 11 R

72

BC

02

M22

106

B05 300X150X 32.0

B08 350X175X 49.4

M 3A 11 R

72

BC

02

M22

97

B09 400X200X 56.1

B14 500X200X 88.1

M 3A 12

49

BC

02

M22

103

B05 300X150X 32.0

B14 500X200X 88.1

M 3A 12

72

BC

02

M22

105

B05 300X150X 32.0

B14 500X200X 88.1

M 3A 13

72

BC

02

M22

98

B09 400X200X 56.1

B15 500X200X101.5

M 3A 13 R

49

BC

02

M22

122

B05 300X150X 32.0

B15 500X200X101.5

M 3A 14 R

52

BC

02

M22

125

B07 350X175X 41.2

B15 500X200X101.5

M 3A 14

43

BC

02

M22

121

B05 300X150X 32.0

B16 600X300X132.8

M 3A 15

52

BC

02

M22

53

B07 350X175X 41.2

B11 450X200X 65.1

M 3A 15

86

BC

03

M22

54

B07 350X175X 41.2

B11 450X200X 65.1

M 3A 16 R

86

BC

03

M22

55

B07 350X175X 41.2

B11 450X200X 65.1

M 3A 16

71

BC

03

M22

56

B07 350X175X 41.2

B11 450X200X 65.1

M 3A 17 R

71

BC

03

M22

65

B07 350X175X 41.2

B11 450X200X 65.1

M 3A 17

84

BC

03

M22

67

B07 350X175X 41.2

B11 450X200X 65.1

M 3A 18

84

BC

03

M22

33

B11 450X200X 65.1

B13 500X200X 77.9

M 3A 17

62

BC

04

M22

35

B11 450X200X 65.1

B13 500X200X 77.9

M 3A 18

109

BC

04

M22

41

B11 450X200X 65.1

B13 500X200X 77.9

M 3A 21

108

BC

04

M22

42

B11 450X200X 65.1

B13 500X200X 77.9

M 3A 21 R

108

BC

04

M22

43

B11 450X200X 65.1

B13 500X200X 77.9

M 3A 22

108

BC

04

M22

CALCULATION SHEET

EVERSENDAI ENGINEERING

SHEET

OF

PROJECT

Designed by

Date

MAJU PERDANA - PODIUM -

m. arunkumar

10/Apr/2001

Doc. Ref.

STEELWORK AT THIRD 'A' FLOOR LEVEL

Job No

P9906-S-CN-MI-13-01

Sl
Nr

Member
Section
1

Supporting
Member

Connection
Location

End Action
V in KN

M in KN.m

Bolt
Detail

Connection
Identification
3

P9906

44

B11 450X200X 65.1

B13 500X200X 77.9

M 3A 22 R

108

BC

04

M22

34

B11 450X200X 65.1

B14 500X200X 88.1

M 3A 17 R

62

BC

04

M22

89

B11 450X200X 65.1

B15 500X200X101.5

M 3A 23

114

BC

04

M22

119

B11 450X200X 65.1

B15 500X200X101.5

M 3A 18

76

BC

04

M22

124

B09 400X200X 56.1

B15 500X200X101.5

M 3A 24 R

74

BC

04

M22

126

B07 350X175X 41.2

B15 500X200X101.5

M 3A 19 R

100

BC

04

M22

19

B12 450X200X 74.9

B16 600X300X132.8

M 3A 10

121

BC

04

M22

90

B11 450X200X 65.1

B16 600X300X132.8

M 3A 20 R

114

BC

04

M22

120

B11 450X200X 65.1

B16 600X300X132.8

M 3A 11 R

76

BC

04

M22

B09 400X200X 56.1

B17 600X300X147.0

M 3A 03

128

BC

04

M22

B09 400X200X 56.1

B17 600X300X147.0

M 3A 03 R

128

BC

04

M22

B09 400X200X 56.1

B17 600X300X147.0

M 3A 05

128

BC

04

M22

10

B09 400X200X 56.1

B17 600X300X147.0

M 3A 05 R

128

BC

04

M22

B14 500X200X 88.1

B17 600X300X147.0

M 3A 04

237

BC

05

10

M22

B14 500X200X 88.1

B17 600X300X147.0

M 3A 04 R

237

BC

05

10

M22

112

B08 350X175X 49.4

B02 200X100X 20.9

M 3A 5

72

BC

06

M22

111

B08 350X175X 49.4

B07 350X175X 41.2

M 3A 5

72

BC

06

M22

22

B11 450X200X 65.1

B07 350X175X 41.2

M 3A 11 R

88

BC

07

M22

20

B12 450X200X 74.9

B09 400X200X 56.1

M 3A 10 R

121

BC

07

M22

21

B11 450X200X 65.1

B09 400X200X 56.1

M 3A 11

88

BC

07

M22

59

B13 500X200X 77.9

B12 450X200X 74.9

M 3A 11

118

BC

07

M22

61

B13 500X200X 77.9

B12 450X200X 74.9

M 3A 12

118

BC

07

M22

37

B14 500X200X 88.1

B13 500X200X 77.9

M 3A 19

127

BC

07

M22

47

B14 500X200X 88.1

B13 500X200X 77.9

M 3A 24

127

BC

07

M22

49

B14 500X200X 88.1

B13 500X200X 77.9

M 3A 20

117

BC

07

M22

38

B14 500X200X 88.1

B14 500X200X 88.1

M 3A 19 R

127

BC

07

M22

48

B14 500X200X 88.1

B14 500X200X 88.1

M 3A 24 R

127

BC

07

M22

60

B13 500X200X 77.9

B14 500X200X 88.1

M 3A 20 R

118

BC

07

M22

62

B13 500X200X 77.9

B14 500X200X 88.1

M 3A 25 R

118

BC

07

M22

25

B13 500X200X 77.9

B15 500X200X101.5

M 3A 13

121

BC

07

M22

26

B13 500X200X 77.9

B15 500X200X101.5

M 3A 13 R

121

BC

07

M22

131

B01 200X100X 17.8

RC BEAM 800X250

M 3A 14

40

BC

08

M20

77

B01 200X100X 17.8

RC COLUMN

M 3A 14

40

BC

08

M20

86

B01 200X100X 17.8

RC COLUMN

M 3A 15 R

40

BC

08

M20

123

B09 400X200X 56.1

RC BEAM 1000X200

M 3A 15

74

BC

09

M22

17

B11 450X200X 65.1

RC COLUMN

M 3A 09

90

BC

09

M22

18

B11 450X200X 65.1

RC COLUMN

M 3A 09 R

90

BC

09

M22

66

B07 350X175X 41.2

RC WALL 200 TK.

M 3A 10 R

84

BC

09

M22

68

B07 350X175X 41.2

RC WALL 200 TK.

M 3A 10 R

84

BC

09

M22

11

B13 500X200X 77.9

RC COLUMN

M 3A 06

180

BC

10

M22

CALCULATION SHEET

EVERSENDAI ENGINEERING

SHEET

OF

PROJECT

Designed by

Date

MAJU PERDANA - PODIUM -

m. arunkumar

10/Apr/2001

Doc. Ref.

STEELWORK AT THIRD 'A' FLOOR LEVEL

Job No

P9906-S-CN-MI-13-01

Sl
Nr

Member
Section
1

Supporting
Member

Connection
Location

End Action
V in KN

M in KN.m

Bolt
Detail

Connection
Identification
3

P9906

12

B13 500X200X 77.9

RC COLUMN

M 3A 06 R

132

BC

10

M22

13

B13 500X200X 77.9

RC COLUMN

M 3A 07

121

BC

10

M22

14

B13 500X200X 77.9

RC COLUMN

M 3A 07 R

121

BC

10

M22

15

B13 500X200X 77.9

RC COLUMN

M 3A 08

137

BC

10

M22

16

B13 500X200X 77.9

RC COLUMN

M 3A 08 R

137

BC

10

M22

39

B15 500X200X101.5

RC COLUMN

M 3A 20

132

BC

10

M22

40

B15 500X200X101.5

RC COLUMN

M 3A 20 R

206

BC

10

M22

36

B11 450X200X 65.1

B14 500X200X 88.1

M 3A 18

118

252

MC

01

4-20

14-24

50

B14 500X200X 88.1

B14 500X200X 88.1

M 3A 21 R

128

377

MC

01

4-20

14-24

81

B14 500X200X 88.1

B14 500X200X 88.1

M 3A 19

100

377

MC

01

4-20

14-24

87

B14 500X200X 88.1

B14 500X200X 88.1

M 3A 22

100

377

MC

01

4-20

14-24

94

B03 250X125X 25.1

B16 600X300X132.8

M 3A 20 R

40

56

MC

02

2-20

10-20

95

B03 250X125X 25.1

B16 600X300X132.8

M 3A 23

40

56

MC

02

2-20

10-20

127

B15 500X200X101.5

RC COLUMN

M 3A 21

250

442

MC

03

8-24

16-24

129

B15 500X200X101.5

RC COLUMN

M 3A 24

250

442

MC

03

8-24

16-24

108

B02 200X100X 20.9

RC COLUMN

M 3A 22 R

105

50

PMC

01

4-20

8-20

107

B02 200X100X 20.9

RC WALL 200 TK.

M 3A 25

42

50

PMC

01

4-20

8-20

69

B07 350X175X 41.2

RC COLUMN

M 3A 23

148

50

PMC

02

6-20

6-20

101

B07 350X175X 41.2

RC COLUMN

M 3A 26

80

50

PMC

02

6-20

6-20

102

B07 350X175X 41.2

RC COLUMN

M 3A 24 R

115

50

PMC

02

6-20

6-20

70

B07 350X175X 41.2

RC WALL 200 TK

M 3A 27 R

63

50

PMC

02

6-20

6-20

64

B09 400X200X 56.1

RC WALL 200 TK.

M 3A 25 R

91

50

PMC

02

6-20

6-20

B17 600X300X147.0

RC COLUMN

M 3A 01

296

50

PMC

03

8-20

6-20

B17 600X300X147.0

RC COLUMN

M 3A 01 R

296

50

PMC

03

8-20

6-20

B17 600X300X147.0

RC COLUMN

M 3A 02

296

50

PMC

03

8-20

6-20

B17 600X300X147.0

RC COLUMN

M 3A 02 R

296

50

PMC

03

8-20

6-20

23

B14 500X200X 88.1

RC COLUMN

M 3A 12

209

50

PMC

03

8-20

6-20

24

B14 500X200X 88.1

RC COLUMN

M 3A 12 R

149

50

PMC

03

8-20

6-20

27

B14 500X200X 88.1

RC COLUMN

M 3A 14

165

50

PMC

03

8-20

6-20

28

B14 500X200X 88.1

RC COLUMN

M 3A 14 R

165

50

PMC

03

8-20

6-20

29

B14 500X200X 88.1

RC COLUMN

M 3A 15

45

50

PMC

03

8-20

6-20

30

B14 500X200X 88.1

RC COLUMN

M 3A 15 R

67

50

PMC

03

8-20

6-20

31

B14 500X200X 88.1

RC COLUMN

M 3A 16

170

50

PMC

03

8-20

6-20

45

B15 500X200X101.5

RC COLUMN

M 3A 23

132

50

PMC

03

8-20

6-20

46

B15 500X200X101.5

RC COLUMN

M 3A 23 R

206

50

PMC

03

8-20

6-20

51

B15 500X200X101.5

RC COLUMN

M 3A 24

135

50

PMC

03

8-20

6-20

52

B15 500X200X101.5

RC COLUMN

M 3A 24 R

184

50

PMC

03

8-20

6-20

57

B16 600X300X132.8

RC COLUMN

M 3A 25

278

50

PMC

03

8-20

6-20

58

B16 600X300X132.8

RC COLUMN

M 3A 25 R

161

50

PMC

03

8-20

6-20

63

B09 400X200X 56.1

RC COLUMN

M 3A 26

275

50

PMC

03

8-20

6-20

113

B15 500X200X101.5

RC COLUMN

M 3A 26

70

50

PMC

03

8-20

6-20

114

B15 500X200X101.5

RC COLUMN

M 3A 27 R

81

50

PMC

03

8-20

6-20

115

B16 600X300X132.8

RC COLUMN

M 3A 27

70

50

PMC

03

8-20

6-20

116

B16 600X300X132.8

RC COLUMN

M 3A 28 R

81

50

PMC

03

8-20

6-20

117

B15 500X200X101.5

RC COLUMN

M 3A 28

50

50

PMC

03

8-20

6-20

CALCULATION SHEET

EVERSENDAI ENGINEERING

SHEET

OF

PROJECT

Designed by

Date

MAJU PERDANA - PODIUM -

m. arunkumar

10/Apr/2001

Doc. Ref.

STEELWORK AT THIRD 'A' FLOOR LEVEL

Job No

P9906-S-CN-MI-13-01

Supporting
Member

End Action

Bolt
Detail

Sl
Nr

Member
Section

118

B15 500X200X101.5

RC COLUMN

M 3A 29 R

50

50

PMC

03

8-20

6-20

32

B14 500X200X 88.1

RC WALL 200 TK.

M 3A 16 R

170

50

PMC

03

8-20

6-20

82

B14 500X200X 88.1

M 3A 30 R

88

B14 500X200X 88.1

M 3A 17 R

93

B03 250X125X 25.1

M 3A 31

Connection
Location

P9906

V in KN

M in KN.m

Connection
Identification
3

128

B15 500X200X101.5 -

M 3A 18 R

130

B15 500X200X101.5 -

M 3A 32 R

OF
Date
05/Apr/2001

Job No
P9906

OF
Date
10/Apr/2001

Job No
P9906

Bolt
Detail
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9

OF
Date
10/Apr/2001

Job No
P9906

Bolt
Detail
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9

OF
Date
10/Apr/2001

Job No
P9906

Bolt
Detail
9
9
9
9
9
9
9
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T
F10T

OF
Date
10/Apr/2001

Job No
P9906

Bolt
Detail
F10T
F10T

CALCULATION SHEET

EVERSENDAI ENGINEERING

SHEET

OF

PROJECT

Designed by

Date

MAJU PERDANA - PODIUM -

m. arunkumar

ADDITIONAL STEELWORK AT SECOND FLOOR LEVEL

Doc. Ref.
P9906-S-CN-MI-12-01

The design of connections for the additional beams at second floor level has been done with
reference to the drawings PSI 0002 / 2F /101 Rev. 3 and PSI 0002 / 2F /102 Rev. 4.

The top of steel level is kept at +43.825m between grids X12 and X14. Between X4 and X11,
the top of steel level is kept at +43.800m.

The connections are grouped into various categories, based on the member sizes and the
end actions, as furnished in the table.

Each connection category has been designed for the maximum intensity, with a load
factor of 1.4. The design is carried out in accordance to American (LRFD) Standards.

All wall embedments are designed with WILTRONEX chemical anchors, assuming the grade
of concrete as M30 and checked for the working load condition.

CALCULATION SHEET

02/Apr/2001

Job No
P9906

CALCULATION SHEET

EVERSENDAI ENGINEERING

SHEET

OF

PROJECT

Designed by

Date

MAJU PERDANA - PODIUM -

m. arunkumar

Doc. Ref.

ADDITIONAL STEELWORK AT SECOND FLOOR LEVEL

P9906-S-CN-MI-12-01

Sl
Nr

Member
Section

Supporting
Member

Connection
Location

End Action
V in KN

M in KN.m

Connection
Identification

1 B18 600X300X170.0

RC BEAM 700X600

M 2 01

290

BC

2 B18 600X300X170.0

RC BEAMS 650X450

M 2 01 R

220

BC

3 B03 200X125X 25.1

B18 600X300X170.0

M 2 02

40

BC

4 B03 200X125X 25.1

RC BEAM 650X450

M 2 02 R

40

BC

5 B03 200X125X 25.1

RC BEAM 650X450

M 2 03

40

BC

6 B03 200X125X 25.1

RC BEAM 650X450

M 2 03 R

40

BC

7 B18 600X300X170.0

RC COLUMN

M 2 04

92

BC

8 B18 600X300X170.0

RC COLUMN

M 2 04 R

92

BC

9 B18 600X300X170.0

B18 600X300X170.0

M 2 05

96

BC

10 B18 600X300X170.0

B18 600X300X170.0

M 2 05 R

203

BC

11 B05 300X150X 32.0

B18 600X300X170.0

M 2 06

63

BC

12 B05 300X150X 32.0

B16 600X300X133.0

M 2 06 R

63

BC

13 B16 600X300X133.0

14 B16 600X300X133.0

RC COLUMN

M 2 07 R

180

350

15 B18 600X300X170.0

RC COLUMN

M 2 08

187

BC

16 B18 600X300X170.0

RC COLUMN

M 2 08 R

160

BC

17 B18 600X300X170.0

RC COLUMN

M 2 09

92

BC

18 B18 600X300X170.0

RC COLUMN

M 2 09 R

92

BC

19 B18 600X300X170.0

B18 600X300X170.0

M 2 10

96

BC

20 B18 600X300X170.0

B18 600X300X170.0

M 2 10 R

203

BC

21 B18 600X300X170.0

RC COLUMN

M 2 11

160

BC

22 B18 600X300X170.0

RC COLUMN

M 2 11 R

187

BC

23 B16 600X300X133.0

M 2 07

M 2 12

MC -

24 B16 600X300X133.0

RC COLUMN

M 2 12 R

180

350

25 B05 300X150X 32.0

B16 600X300X133.0

M 2 13

63

BC

26 B05 300X150X 32.0

B18 600X300X170.0

M 2 13 R

63

BC

27 B03 200X125X 25.1

RC BEAM 650X450

M 2 14

40

BC

28 B03 200X125X 25.1

RC BEAM 650X450

M 2 14 R

40

BC

29 B01 200X100X 17.8

RC BEAM 650X450

M 2 15

40

BC

30 B01 200X100X 17.8

RC BEAM 650X450

M 2 15 R

40

BC

31 B05 300X150X 32.0

RC BEAM 650X450

M 2 16

76

BC

32 B05 300X150X 32.0

RC BEAM 650X450

M 2 16 R

76

BC

33 B05 300X150X 32.0

RC BEAM 650X450

M 2 17

76

BC

34 B05 300X150X 32.0

RC BEAM 650X450

M 2 17 R

76

BC

35 B05 300X150X 32.0

RC BEAM 650X450

M 2 18

76

BC

36 B05 300X150X 32.0

RC BEAM 650X450

M 2 18 R

76

BC

37 B03 200X125X 25.1

RC BEAM 650X450

M 2 19

40

BC

38 B03 200X125X 25.1

B14 500X200X 88.1

M 2 19 R

40

MC -

39 B16 600X300X133.0

RC COLUMN

M 2 20

300

675

MC -

02/Apr/2001

Job No

MC -

02

P9906

Bolt
Detail

CALCULATION SHEET

EVERSENDAI ENGINEERING

SHEET

OF

PROJECT

Designed by

Date

MAJU PERDANA - PODIUM -

m. arunkumar

Doc. Ref.

ADDITIONAL STEELWORK AT SECOND FLOOR LEVEL

P9906-S-CN-MI-12-01

Sl
Nr

Member
Section

40 B16 600X300X133.0
41 B16 600X300X133.0
42 B16 600X300X133.0

Supporting
Member
RC COLUMN
-

Connection
Location
M 2 20 R
M 2 21

M 2 21 R

End Action
V in KN

M in KN.m

300

675

Connection
Identification
MC -

43 B03 200X125X 25.1

RC BEAM 650X450

M 2 22

40

BC

44 B03 200X125X 25.1

B09 400X200X 56.1

M 2 22 R

40

BC

45 B14 500X200X 88.1

RC BEAM 1000X200

M 2 23

53

BC

46 B14 500X200X 88.1

B16 600X300X133.0

M 2 23 R

153

BC

47 B09 400X200X 56.1

B16 600X300X133.0

M 2 24

96

BC

48 B09 400X200X 56.1

B16 600X300X133.0

M 2 24 R

182

BC

49
50

02/Apr/2001

Job No

02

P9906

Bolt
Detail

CALCULATION SHEET

EVERSENDAI ENGINEERING

SHEET

PROJECT

Designed by

MAJU PERDANA - PODIUM -

m. arunkuma

Checked by

ADDITIONAL STEELWORK AT FIRST FLOOR LEVEL

Sl
Nr

Member
Section

Supporting
Member

Connection
Location

End Action
Shear-KN

38

B08

350X175X49.4

B09

400X200X56.1

M 1

19 R

90

41

B08

350X175X49.4

B09

400X200X56.1

M 1

21 L

90

B05

300X150X32.0

R.C. BEAM - 700X600

M 1

01 L

58

B05

300X150X32.0

R.C. BEAM - 650X450

M 1

04 R

90

15

B05

300X150X32.0

R.C. BEAM - 650X450

M 1

08 L

105

16

B05

300X150X32.0

R.C. BEAM - 650X450

M 1

08 R

105

B05

300X150X32.0

B18

600X300X170.0

M 1

01 R

58

B05

300X150X32.0

B18

600X300X170.0

M 1

04 L

90

24

B13

500X200X77.9

ENCASED COLUMN

M 1

12 R

108

29

B11

450X200X65.1

ENCASED COLUMN

M 1

15 L

85

34

B11

450X200X65.1

ENCASED COLUMN

M 1

17 R

130

40

B09

400X200X56.1

ENCASED COLUMN

M 1

20 R

128

B18

600X300X170.0

R.C. COLUMN

M 1

02 L

82

39

B09

400X200X56.1

R.C. COLUMN

M 1

20 L

114

45

B11

450X200X65.1

R.C. COLUMN

M 1

23 L

108

46

B11

450X200X65.1

R.C. COLUMN

M 1

23 R

108

32

B03

250X125X25.1

ENCASED COLUMN

M 1

16 R

40

B03

250X125X25.1

R.C. BEAM - 650X450

M 1

05 L

40

10

B03

250X125X25.1

R.C. BEAM - 650X450

M 1

05 R

40

11

B03

250X125X25.1

R.C. BEAM - 650X450

M 1

06 L

40

12

B03

250X125X25.1

R.C. BEAM - 650X450

M 1

06 R

40

13

B01

200X100X17.8

R.C. BEAM - 650X450

M 1

07 L

40

14

B01

200X100X17.8

R.C. BEAM - 700X600

M 1

07 R

40

43

B03

250X125X25.1

R.C. BEAM - 650X450

M 1

22 L

40

19

B13

500X200X77.9

B11

450X200X65.1

M 1

10 L

156

25

B11

450X200X65.1

B11

450X200X65.1

M 1

13 L

127

26

B11

450X200X65.1

B11

450X200X65.1

M 1

13 R

100

21

B09

400X200X56.1

R.C. BEAM - 1000X200

M 1

11 L

98

37

B08

350X175X49.4

B11

450X200X65.1

M 1

19 L

90

22

B09

400X200X56.1

B13

500X200X77.9

M 1

11 R

98

30

B11

450X200X65.1

ENCASED COLUMN

M 1

15 R

175

B18

600X300X170.0

R.C. COLUMN

M 1

02 R

193

B18

600X300X170.0

R.C. BEAMS - 650X450

M 1

03 R

220

17

B11

450X200X65.1

R.C. BEAM - 600X450

M 1

09 L

150

18

B11

450X200X65.1

R.C. BEAM - 600X450

M 1

09 R

150

20

B13

500X200X77.9

R.C. BEAM - 650X450

M 1

10 R

156

23

B13

500X200X77.9

R.C. BEAM - 650X450

M 1

12 L

163

33

B11

450X200X65.1

R.C. COLUMN

M 1

17 L

231

44

B03

250X125X25.1

B08

350X175X49.4

M 1

22 R

40

36

B03

250X125X25.1

B09

400X200X56.1

M 1

18 R

40

Moment-KN.m

CALCULATION SHEET

EVERSENDAI ENGINEERING

SHEET

PROJECT

Designed by

MAJU PERDANA - PODIUM -

m. arunkuma

Checked by

ADDITIONAL STEELWORK AT FIRST FLOOR LEVEL

Sl
Nr

Member
Section

Supporting
Member

27

B03

250X125X25.1

B11

450X200X65.1

M 1

14 L

40

28

B03

250X125X25.1

B11

450X200X65.1

M 1

14 R

40

31

B03

250X125X25.1

B11

450X200X65.1

M 1

16 L

40

35

B03

250X125X25.1

B11

450X200X65.1

M 1

18 L

40

B18

600X300X170.0

R.C. BEAM - 700X600

M 1

03 L

290

42

B08

350X175X49.4

M 1

21 R

Connection
Location

End Action
Shear-KN

Moment-KN.m

T
SHEET

OF

Designed by

Date

m. arunkumar

28/Mar/2001

Checked by

Job No
P9906

Moment-KN.m

Connection
Identification

214

MC

214

MC

BC

BC

BC

BC

BC

BC

BC

BC

BC

BC

BC

BC

BC

BC

BC

BC

BC

BC

BC

BC

BC

BC

BC

BC

BC

BC

BC

BC

BC

BC

BC

BC

BC

BC

BC

BC

BC

BC

T
SHEET

OF

Designed by

Date

m. arunkumar

28/Mar/2001

Checked by

Job No
P9906

Moment-KN.m

Connection
Identification

BC

BC

BC

BC

BC

10

CALCULATION SHEET

EVERSENDAI ENGINEERING

SHEET

OF

PROJECT

Designed by

Date

MAJU PERDANA - PODIUM -

m. arunkumar

GROUND FLOOR ADDITIONAL STEELWORK

DESIGN

OF

WALL

Checked by

EMBEDMENTS

12/Mar/2001

Job No
P9906

CALCULATION SHEET

EVERSENDAI ENGINEERING

SHEET

PROJECT

Designed by

MAJU PERDANA - PODIUM STEELWORK AT THIRD 'A' FLOOR LEVEL

m. arunkumar

Doc. Ref.
P9906-S-CN-MI-13-01

The design of connections for the additional beams at third floor level has been done with
reference to the drawings PSI 0002 / 3AF /101 Rev. 1 and PSI 0002 / 3AF /102 Rev. 1.

The top of steel level is kept at +51.950m between grids X7 and X8, +51.125m between
grids X9 and X15. Between grids Y4 and Y6, the TOS is +52.100.

The connections are grouped into various categories, based on the member sizes and the
end actions, as furnished in the table.

Each connection category has been designed for the maximum intensity, with a load
factor of 1.4. The design is carried out in accordance to American (LRFD) Standards.

All wall embedments are designed with WILTRONEX chemical anchors, assuming the grade
of concrete as M30 and checked for the working load condition.

OF
Date
05/Apr/2001

Job No
P9906

CALCULATION SHEET

EVERSENDAI ENGINEERING

SHEET

PROJECT

Designed by

MAJU PERDANA - PODIUM -

OF
Date

m. arunkumar

Doc. Ref.

STEELWORK AT THIRD 'A' FLOOR LEVEL

10/Apr/2001

Job No

P9906-S-CN-MI-13-01

Sl
Nr

Member
Section

Supporting
Member

Connection
Location

End Action
V in KN

M in KN.m

P9906

Bolt
Detail

Connection
Identification

1 B17 600X300X147.0

RC COLUMN

M 3A 01

296

50

PMC

03

8-20 6-20 F10T

2 B17 600X300X147.0

RC COLUMN

M 3A 01 R

296

50

PMC

03

8-20 6-20 F10T

3 B17 600X300X147.0

RC COLUMN

M 3A 02

296

50

PMC

03

8-20 6-20 F10T

4 B17 600X300X147.0

RC COLUMN

M 3A 02 R

296

50

PMC

03

8-20 6-20 F10T

5 B09 400X200X 56.1

B17 600X300X147.0

M 3A 03

128

BC

04

6 B09 400X200X 56.1

B17 600X300X147.0

M 3A 03 R

128

BC

7 B14 500X200X 88.1

B17 600X300X147.0

M 3A 04

237

BC

8 B14 500X200X 88.1

B17 600X300X147.0

M 3A 04 R

237

BC

M22

8.8

04

M22

8.8

05

10 M22

8.8

05

10 M22

8.8

9 B09 400X200X 56.1

B17 600X300X147.0

M 3A 05

128

BC

04

M22

8.8

10 B09 400X200X 56.1

B17 600X300X147.0

M 3A 05 R

128

BC

04

M22

8.8

11 B13 500X200X 77.9

RC COLUMN

M 3A 06

180

BC

10

M22

8.8

12 B13 500X200X 77.9

RC COLUMN

M 3A 06 R

132

BC

10

M22

8.8

13 B13 500X200X 77.9

RC COLUMN

M 3A 07

121

BC

10

M22

8.8

14 B13 500X200X 77.9

RC COLUMN

M 3A 07 R

121

BC

10

M22

8.8

15 B13 500X200X 77.9

RC COLUMN

M 3A 08

137

BC

10

M22

8.8

16 B13 500X200X 77.9

RC COLUMN

M 3A 08 R

137

BC

10

M22

8.8

17 B11 450X200X 65.1

RC COLUMN

M 3A 09

90

BC

09

M22

8.8

18 B11 450X200X 65.1

RC COLUMN

M 3A 09 R

90

BC

09

M22

8.8

19 B12 450X200X 74.9

B16 600X300X132.8

M 3A 10

121

BC

04

M22

8.8

20 B12 450X200X 74.9

B09 400X200X 56.1

M 3A 10 R

121

BC

07

M22

8.8

21 B11 450X200X 65.1

B09 400X200X 56.1

M 3A 11

88

BC

07

M22

8.8

22 B11 450X200X 65.1

B07 350X175X 41.2

M 3A 11 R

88

BC

07

M22

8.8

23 B14 500X200X 88.1

RC COLUMN

M 3A 12

209

50

PMC

03

8-20 6-20 F10T

24 B14 500X200X 88.1

RC COLUMN

M 3A 12 R

149

50

PMC

03

8-20 6-20 F10T

25 B13 500X200X 77.9

B15 500X200X101.5

M 3A 13

121

BC

07

M22

8.8

26 B13 500X200X 77.9

B15 500X200X101.5

M 3A 13 R

121

BC

07

M22

8.8

27 B14 500X200X 88.1

RC COLUMN

M 3A 14

165

50

PMC

03

8-20 6-20 F10T

28 B14 500X200X 88.1

RC COLUMN

M 3A 14 R

165

50

PMC

03

8-20 6-20 F10T

29 B14 500X200X 88.1

RC COLUMN

M 3A 15

45

50

PMC

03

8-20 6-20 F10T

30 B14 500X200X 88.1

RC COLUMN

M 3A 15 R

67

50

PMC

03

8-20 6-20 F10T

31 B14 500X200X 88.1

RC COLUMN

M 3A 16

170

50

PMC

03

8-20 6-20 F10T

32 B14 500X200X 88.1

RC WALL 200 TK.

M 3A 16 R

170

50

PMC

03

8-20 6-20 F10T

33 B11 450X200X 65.1

B13 500X200X 77.9

M 3A 17

62

BC

04

M22

8.8

34 B11 450X200X 65.1

B14 500X200X 88.1

M 3A 17 R

62

BC

04

M22

8.8

CALCULATION SHEET

EVERSENDAI ENGINEERING

SHEET

PROJECT

Designed by

MAJU PERDANA - PODIUM -

OF
Date

m. arunkumar

Doc. Ref.

STEELWORK AT THIRD 'A' FLOOR LEVEL

10/Apr/2001

Job No

P9906-S-CN-MI-13-01

Sl
Nr

Member
Section

Supporting
Member

Connection
Location

End Action
V in KN

35 B11 450X200X 65.1

B13 500X200X 77.9

M 3A 18

109

36 B11 450X200X 65.1

B14 500X200X 88.1

M 3A 18

118

37 B14 500X200X 88.1

B13 500X200X 77.9

M 3A 19

127

38 B14 500X200X 88.1

B14 500X200X 88.1

M 3A 19 R

39 B15 500X200X101.5

RC COLUMN

M 3A 20

40 B15 500X200X101.5

RC COLUMN

41 B11 450X200X 65.1

B13 500X200X 77.9

M 3A 21

42 B11 450X200X 65.1

B13 500X200X 77.9

43 B11 450X200X 65.1

B13 500X200X 77.9

M 3A 22

44 B11 450X200X 65.1


45 B15 500X200X101.5

M in KN.m

P9906

Bolt
Detail

Connection
Identification
BC

04

MC

01

BC

07

M22

8.8

127

BC

07

M22

8.8

132

BC

10

M22

8.8

M 3A 20 R

206

BC

10

M22

8.8

108

BC

04

M22

8.8

M 3A 21 R

108

BC

04

M22

8.8

108

BC

04

M22

8.8

B13 500X200X 77.9

M 3A 22 R

108

BC

04

M22

8.8

RC COLUMN

M 3A 23

132

50

PMC

03

8-20 6-20 F10T

46 B15 500X200X101.5

RC COLUMN

M 3A 23 R

206

50

PMC

03

8-20 6-20 F10T

47 B14 500X200X 88.1

B13 500X200X 77.9

M 3A 24

127

BC

07

M22

8.8

48 B14 500X200X 88.1

B14 500X200X 88.1

M 3A 24 R

127

BC

07

M22

8.8

49 B14 500X200X 88.1

B13 500X200X 77.9

M 3A 25

117

BC

07

M22

8.8

50 B14 500X200X 88.1

B14 500X200X 88.1

M 3A 25 R

128

377

MC

01

4-20 14-24 F10T

51 B15 500X200X101.5

RC COLUMN

M 3A 26

135

50

PMC

03

8-20 6-20 F10T

52 B15 500X200X101.5

RC COLUMN

M 3A 26 R

184

50

PMC

03

8-20 6-20 F10T

53 B07 350X175X 41.2

B11 450X200X 65.1

M 3A 27

86

BC

03

M22

8.8

54 B07 350X175X 41.2

B11 450X200X 65.1

M 3A 27 R

86

BC

03

M22

8.8

55 B07 350X175X 41.2

B11 450X200X 65.1

M 3A 28

71

BC

03

M22

8.8

56 B07 350X175X 41.2

B11 450X200X 65.1

M 3A 28 R

71

BC

03

M22

8.8

57 B16 600X300X132.8

RC COLUMN

M 3A 29

278

50

PMC

03

8-20 6-20 F10T

58 B16 600X300X132.8

RC COLUMN

M 3A 29 R

161

50

PMC

03

8-20 6-20 F10T

59 B13 500X200X 77.9

B12 450X200X 74.9

M 3A 30

118

BC

07

M22

8.8

60 B13 500X200X 77.9

B14 500X200X 88.1

M 3A 30 R

118

BC

07

M22

8.8

61 B13 500X200X 77.9

B12 450X200X 74.9

M 3A 31

118

BC

07

M22

8.8

62 B13 500X200X 77.9

B14 500X200X 88.1

M 3A 31 R

118

BC

07

M22

8.8

63 B09 400X200X 56.1

RC COLUMN

M 3A 32

275

50

PMC

03

8-20 6-20 F10T

64 B09 400X200X 56.1

RC WALL 200 TK.

M 3A 32 R

91

50

PMC

02

6-20 6-20 F10T

65 B07 350X175X 41.2

B11 450X200X 65.1

M 3A 33

84

BC

03

M22

8.8

66 B07 350X175X 41.2

RC WALL 200 TK.

M 3A 33 R

84

BC

09

M22

8.8

67 B07 350X175X 41.2

B11 450X200X 65.1

M 3A 34

84

BC

03

M22

8.8

68 B07 350X175X 41.2

RC WALL 200 TK.

M 3A 34 R

84

BC

09

M22

8.8

69 B07 350X175X 41.2

RC COLUMN

M 3A 35

148

PMC

02

252

50

M22

8.8

4-20 14-24 F10T

6-20 6-20 F10T

CALCULATION SHEET

EVERSENDAI ENGINEERING

SHEET

PROJECT

Designed by

MAJU PERDANA - PODIUM -

OF
Date

m. arunkumar

Doc. Ref.

STEELWORK AT THIRD 'A' FLOOR LEVEL

10/Apr/2001

Job No

P9906-S-CN-MI-13-01

Sl
Nr

Member
Section

Supporting
Member

Connection
Location

V in KN

End Action

70 B07 350X175X 41.2

RC WALL 200 TK

M 3A 35 R

63

71 B05 300X150X 32.0

B11 450X200X 65.1

M 3A 36

72 B05 300X150X 32.0

B11 450X200X 65.1

M 3A 36 R

73 B02 200X100X 20.9

B11 450X200X 65.1

M 3A 37

74 B02 200X100X 20.9


75 B03 250X125X 25.1

M in KN.m

Bolt
Detail

Connection
Identification
PMC

02

40

BC

01

M20

8.8

40

BC

01

M20

8.8

40

BC

01

M20

8.8

B11 450X200X 65.1

M 3A 37 R

40

BC

01

M20

8.8

B11 450X200X 65.1

M 3A 38

40

BC

01

M20

8.8

76 B03 250X125X 25.1

B11 450X200X 65.1

M 3A 38 R

40

BC

01

M20

8.8

77 B01 200X100X 17.8

RC COLUMN

M 3A 39

40

BC

08

M20

8.8

78 B01 200X100X 17.8

B14 500X200X 88.1

M 3A 39 R

40

BC

01

M20

8.8

79 B01 200X100X 17.8

B14 500X200X 88.1

M 3A 40

40

BC

01

M20

8.8

80 B01 200X100X 17.8

B14 500X200X 88.1

M 3A 40 R

40

BC

01

M20

8.8

81 B14 500X200X 88.1

B14 500X200X 88.1

M 3A 41

100

MC

01

82 B14 500X200X 88.1 -

M 3A 41 R

50

P9906

377

6-20 6-20 F10T

4-20 14-24 F10T

83 B01 200X100X 17.8

B14 500X200X 88.1

M 3A 42

40

BC

01

M20

8.8

84 B01 200X100X 17.8

B14 500X200X 88.1

M 3A 42 R

40

BC

01

M20

8.8

85 B01 200X100X 17.8

B14 500X200X 88.1

M 3A 43

40

BC

01

M20

8.8

86 B01 200X100X 17.8

RC COLUMN

M 3A 43 R

40

BC

08

M20

8.8

87 B14 500X200X 88.1

B14 500X200X 88.1

M 3A 44

100

MC

01

88 B14 500X200X 88.1 -

M 3A 44 R

377

4-20 14-24 F10T

89 B11 450X200X 65.1

B15 500X200X101.5

M 3A 45

114

BC

04

M22

8.8

90 B11 450X200X 65.1

B16 600X300X132.8

M 3A 45 R

114

BC

04

M22

8.8

91 B01 200X100X 17.8

B11 450X200X 65.1

M 3A 46

40

BC

01

M20

8.8

92 B01 200X100X 17.8

B03 250X125X 25.1

M 3A 46 R

40

BC

01

M20

8.8

93 B03 250X125X 25.1 -

M 3A 47

94 B03 250X125X 25.1

B16 600X300X132.8

M 3A 47 R

40

56

MC

02

2-20 10-20 F10T

95 B03 250X125X 25.1

B16 600X300X132.8

M 3A 48

40

56

MC

02

2-20 10-20 F10T

96 B03 250X125X 25.1

B13 500X200X 77.9

M 3A 48 R

40

BC

01

M20

8.8

97 B09 400X200X 56.1

B14 500X200X 88.1

M 3A 49

49

BC

02

M22

8.8

98 B09 400X200X 56.1

B15 500X200X101.5

M 3A 49 R

49

BC

02

M22

8.8

99 B01 200X100X 17.8

B14 500X200X 88.1

M 3A 50

40

BC

01

M20

8.8

100 B01 200X100X 17.8

B01 200X100X 17.8

M 3A 50 R

40

BC

01

M20

8.8

101 B07 350X175X 41.2

RC COLUMN

M 3A 51

80

50

PMC

02

6-20 6-20 F10T

102 B07 350X175X 41.2

RC COLUMN

M 3A 51 R

115

50

PMC

02

6-20 6-20 F10T

103 B05 300X150X 32.0

B14 500X200X 88.1

M 3A 52

72

BC

02

M22

8.8

104 B05 300X150X 32.0

B08 350X175X 49.4

M 3A 52 R

72

BC

02

M22

8.8

105 B05 300X150X 32.0

B14 500X200X 88.1

M 3A 53

72

BC

02

M22

8.8

106 B05 300X150X 32.0

B08 350X175X 49.4

M 3A 53 R

72

BC

02

M22

8.8

107 B02 200X100X 20.9

RC WALL 200 TK.

M 3A 54

42

PMC

01

50

4-20 8-20 F10T

CALCULATION SHEET

EVERSENDAI ENGINEERING

SHEET

PROJECT

Designed by

MAJU PERDANA - PODIUM -

OF
Date

m. arunkumar

Doc. Ref.

STEELWORK AT THIRD 'A' FLOOR LEVEL

10/Apr/2001

Job No

P9906-S-CN-MI-13-01

Sl
Nr

Member
Section

Supporting
Member

Connection
Location

V in KN

End Action
M in KN.m

Bolt
Detail

Connection
Identification

108 B02 200X100X 20.9

RC COLUMN

M 3A 54 R

105

PMC

01

109 B01 200X100X 17.8

B09 400X200X 56.1

M 3A 55

40

BC

01

M20

8.8

110 B01 200X100X 17.8

B07 350X175X 41.2

M 3A 55 R

40

BC

01

M20

8.8

111 B08 350X175X 49.4

B07 350X175X 41.2

M 3A 56

72

BC

06

M22

8.8

112 B08 350X175X 49.4

B02 200X100X 20.9

M 3A 56 R

72

BC

06

M22

8.8

113 B15 500X200X101.5

RC COLUMN

M 3A 57

70

50

PMC

03

8-20 6-20 F10T

114 B15 500X200X101.5

RC COLUMN

M 3A 57 R

81

50

PMC

03

8-20 6-20 F10T

115 B16 600X300X132.8

RC COLUMN

M 3A 58

70

50

PMC

03

8-20 6-20 F10T

116 B16 600X300X132.8

RC COLUMN

M 3A 58 R

81

50

PMC

03

8-20 6-20 F10T

117 B15 500X200X101.5

RC COLUMN

M 3A 59

50

50

PMC

03

8-20 6-20 F10T

118 B15 500X200X101.5

RC COLUMN

M 3A 59 R

50

50

PMC

03

8-20 6-20 F10T

119 B11 450X200X 65.1

B15 500X200X101.5

M 3A 60

76

BC

04

M22

8.8

120 B11 450X200X 65.1

B16 600X300X132.8

M 3A 60 R

76

BC

04

M22

8.8

121 B05 300X150X 32.0

B16 600X300X132.8

M 3A 61

52

BC

02

M22

8.8

122 B05 300X150X 32.0

B15 500X200X101.5

M 3A 61 R

52

BC

02

M22

8.8

123 B09 400X200X 56.1

RC BEAM 1000X200

M 3A 62

74

BC

09

M22

8.8

124 B09 400X200X 56.1

B15 500X200X101.5

M 3A 62 R

74

BC

04

M22

8.8

125 B07 350X175X 41.2

B15 500X200X101.5

M 3A 63

43

BC

02

M22

8.8

126 B07 350X175X 41.2

B15 500X200X101.5

M 3A 63 R

100

BC

04

M22

8.8

127 B15 500X200X101.5

RC COLUMN

M 3A 64

250

442

MC

03

8-24 16-24 F10T

442

MC

03

8-24 16-24 F10T

128 B15 500X200X101.5 129 B15 500X200X101.5

M 3A 64 R
RC COLUMN

130 B15 500X200X101.5 -

M 3A 65

M 3A 65 R

50

P9906

250

4-20 8-20 F10T

131 B01 200X100X 17.8

RC BEAM 800X250

M 3A 66

40

BC

01

M20

8.8

132 B01 200X100X 17.8

B07 350X175X 41.2

M 3A 66 R

40

BC

01

M20

8.8

CALCULATION SHEET

EVERSENDAI ENGINEERING

SHEET

PROJECT

Designed by

MAJU PERDANA - PODIUM -

m. arunkumar

Doc. Ref.

STEELWORK AT THIRD 'A' FLOOR LEVEL

P9906-S-CN-MI-13-01

Sl
Nr

Member
Section

Supporting
Member

Connection
Location

End Action
V in KN

M in KN.m

Connection
Identification

OF
Date
10/Apr/2001

Job No
P9906

Bolt
Detail

CALCULATION SHEET

EVERSENDAI ENGINEERING

SHEET

OF

PROJECT

Designed by

Date

MAJU PERDANA - PODIUM -

m. arunkumar

GROUND FLOOR ADDITIONAL STEELWORK

Checked by

The design of connections for the additional beams at ground floor level has been done with
reference to the drawings PSI 0002 / GF /101 Rev. 1 and PSI 0002 / GF /102 Rev. 3.

The connections are grouped into various categories, based on the member sizes and the
end actions, as tabulated.

Each connection category has been designed for the maximum intensity, with a load
factor of 1.4. The design is carried out in accordance to American (LRFD) Standards.

All wall embedments are designed with WILTRONEX chemical anchors, assuming the grade
of concrete as M30 and checked for the working load condition.

CALCULATION SHEET

12/Mar/2001

Job No
P9906

CALCULATION SHEET

EVERSENDAI ENGINEERING

SHEET

OF

PROJECT

Designed by

Date

MAJU PERDANA - PODIUM -

m. arunkumar

Checked by

GROUND FLOOR ADDITIONAL STEELWORK

Sl
Nr

Member
Section

Supporting
Member

B18 600X300X170.0

CONCRETE BEAM

B18 600X300X170.0

CONCRETE COLUMN

B15 500X200X102.0

4
5

Connection
Location

End Action

09/Mar/2001

Job No
P9906

Connection
Identification

Shear-KN

Moment-KN.m

M 01 L

270

BC -

M 01 R

202

BC -

CONCRETE COLUMN

M 02 L

140

BC -

B15 500X200X102.0

CONCRETE COLUMN

M 02 R

140

BC -

B8

350X175X49.4

B18 600X300X170.0

M 03 L

105

BC -

B8

350X175X49.4

B18 600X300X170.0

M 03 R

105

BC -

B8

350X175X49.4

B18 600X300X170.0

M 04 L

105

BC -

B8

350X175X49.4

B18 600X300X170.0

M 04 R

105

BC -

B8

350X175X49.4

B18 600X300X170.0

M 05 L

105

BC -

10

B8

350X175X49.4

B18 600X300X170.0

M 05 R

105

BC -

11

B8

350X175X49.4

B18 600X300X170.0

M 06 L

105

BC -

12

B8

350X175X49.4

B18 600X300X170.0

M 06 R

105

BC -

13

B8

350X175X49.4

B18 600X300X170.0

M 07 L

105

BC -

14

B8

350X175X49.4

B18 600X300X170.0

M 07 R

105

BC -

15

B13 500X200X 77.9

CONCRETE BEAM

M 08 L

190

BC -

16

B13 500X200X 77.9

CONCRETE BEAM

M 08 R

190

BC -

17

B8

350X175X49.4

CONCRETE COLUMN

M 09 L

67

BC -

18

B8

350X175X49.4

CONCRETE BEAM

M 09 R

67

BC -

19

B5

300X150X 32.0

CONCRETE COLUMN

M 10 L

48

BC -

20

B5

300X150X 32.0

CONCRETE BEAM

M 10 R

48

BC -

21

B13 500X200X 77.9

B18 600X300X170.0

M 11 L

190

BC -

22

B13 500X200X 77.9

CONCRETE BEAM

M 11 R

190

BC -

23

B8

350X175X49.4

B18 600X300X170.0

M 12 L

105

BC -

24

B8

350X175X49.4

B18 600X300X170.0

M 12 R

105

BC -

25

B8

350X175X49.4

B18 600X300X170.0

M 13 L

105

BC -

26

B8

350X175X49.4

B18 600X300X170.0

M 13 R

105

BC -

27

B8

350X175X49.4

B18 600X300X170.0

M 14 L

105

BC -

28

B8

350X175X49.4

B18 600X300X170.0

M 14 R

105

BC -

29

B8

350X175X49.4

B18 600X300X170.0

M 15 L

105

BC -

30

B8

350X175X49.4

B18 600X300X170.0

M 15 R

105

BC -

31

B8

350X175X49.4

B18 600X300X170.0

M 16 L

105

BC -

32

B8

350X175X49.4

B18 600X300X170.0

M 16 R

105

BC -

33

B7

350X175X41.2

CONCRETE COLUMN

M 17 L

42

BC -

34

B7

350X175X41.2

B18 600X300X170.0

M 17 R

75

BC -

35

B5

300X150X 32.0

B18 600X300X170.0

M 18 L

90

BC -

36

B5

300X150X 32.0

CONCRETE BEAM

M 18 R

90

BC -

37

B3

250X125X 25.1

CONCRETE BEAM

M 19 L

40

BC -

38

B3

250X125X 25.1

B15 500X200X102.0

M 19 R

40

BC -

39

B3

250X125X 25.1

B7

M 20 L

40

BC -

40

B3

250X125X 25.1

B18 600X300X170.0

M 20 R

40

BC -

350X175X41.2

CALCULATION SHEET

EVERSENDAI ENGINEERING

SHEET

OF

PROJECT

Designed by

Date

MAJU PERDANA - PODIUM -

m. arunkumar

Checked by

GROUND FLOOR ADDITIONAL STEELWORK

Sl
Nr

Member
Section

Supporting
Member

41

B11 450X200X 65.1

CONCRETE COLUMN

42

B11 450X200X 65.1

43

B5

300X150X 32.0

44

B5

45
46
47

Connection
Location

End Action
Shear-KN

Moment-KN.m

M 21 L

120

200

M 21 R

CONCRETE COLUMN

M 22 L

117

300X150X 32.0

B11 450X200X 65.1

M 22 R

B11 450X200X 65.1

B18 600X300X170.0

M 23 L

B11 450X200X 65.1

B18 600X300X170.0

B11 450X200X 65.1

B18 600X300X170.0

48

B11 450X200X 65.1

49

B11 450X200X 65.1

50

09/Mar/2001

Job No
P9906

Connection
Identification
MC -

BC -

117

BC -

167

BC -

M 23 R

167

BC -

M 24 L

167

BC -

B18 600X300X170.0

M 24 R

167

BC -

B18 600X300X170.0

M 25 L

167

BC -

B11 450X200X 65.1

B18 600X300X170.0

M 25 R

167

BC -

51

B11 450X200X 65.1

B18 600X300X170.0

M 26 L

167

BC -

52

B11 450X200X 65.1

B18 600X300X170.0

M 26 R

167

BC -

53

B11 450X200X 65.1

B18 600X300X170.0

M 27 L

167

BC -

54

B11 450X200X 65.1

B18 600X300X170.0

M 27 R

167

BC -

55

B18 600X300X170.0

CONCRETE COLUMN

M 28 L

231

BC -

56

B18 600X300X170.0

CONCRETE COLUMN

M 28 R

247

BC -

57

B18 600X300X170.0

CONCRETE COLUMN

M 29 L

367

BC - 11

58

B18 600X300X170.0

CONCRETE COLUMN

M 29 R

367

BC - 11

59

B18 600X300X170.0

CONCRETE COLUMN

M 30 L

367

BC - 11

60

B18 600X300X170.0

CONCRETE COLUMN

M 30 R

367

BC - 11

61

B18 600X300X170.0

CONCRETE COLUMN

M 31 L

367

BC - 11

62

B18 600X300X170.0

CONCRETE COLUMN

M 31 R

367

BC - 11

63

B18 600X300X170.0

CONCRETE COLUMN

M 32 L

367

BC - 11

64

B18 600X300X170.0

CONCRETE COLUMN

M 32 R

367

BC - 11

65

B18 600X300X170.0

CONCRETE COLUMN

M 33 L

367

BC - 11

66

B18 600X300X170.0

CONCRETE COLUMN

M 33 R

367

BC - 11

67

B13 500X200X 77.9

B13 500X200X 77.9

M 34 L

110

BC - 10

68

B13 500X200X 77.9

B13 500X200X 77.9

M 34 R

110

BC - 10

CALCULATION SHEET

EVERSENDAI ENGINEERING

SHEET

OF

PROJECT

Designed by

Date
17/Apr/2001
Job No
P9906

MAJU PERDANA - PODIUM -

m. arunkumar

Doc. Ref.
P9906-S-CN-MI-11-02

ADDITIONAL STEELWORK AT FIRST FLOOR LEVEL

Sl
Nr

Member
Section

Supporting
Member

Connection
Location

End Action
V in KN

M in KN.m

Connection
Identification

Bolt
Detail

B05 300X150X 32.0

R.C. BEAM - 700X600

M 1 01

58

BC

01

6 M22

8.8

B05 300X150X 32.0

B18 600X300X170.0

M 1 01

58

BC

02

6 M22

8.8

B18 600X300X 70.0

R.C. COLUMN

M 1 02

82

BC

03

8 M20

8.8

B18 600X300X170.0

R.C. COLUMN

M 1 02

193

BC

08

5 M24

8.8

B18 600X300X170.0

R.C. BEAM - 700X600

M 1 03

290

BC -

10

6 M24

8.8

B18 600X300X170.0

R.C. BEAMS - 650X450

M 1 03

220

BC

08

5 M24

8.8

B05 300X150X 32.0

B18 600X300X170.0

M 1 04

90

BC -

02

6 M22

8.8

B05 300X150X 32.0

R.C. BEAM - 650X450

M 1 04

90

BC

01

6 M22

8.8

B03 250X125X 25.1

R.C. BEAM - 650X450

M 1 05

40

BC -

04

3 M20

8.8

10 B03 250X125X 25.1

R.C. BEAM - 650X450

M 1 05

40

BC

04

3 M20

8.8

11 B03 250X125X 25.1

R.C. BEAM - 650X450

M 1 06

40

BC

04

3 M20

8.8

12 B03 250X125X 25.1

R.C. BEAM - 650X450

M 1 06

40

BC

04

3 M20

8.8

13 B01 200X100X 17.8

R.C. BEAM - 650X450

M 1 07

40

BC

04

3 M20

8.8

14 B01 200X100X 17.8

R.C. BEAM - 700X600

M 1 07

40

BC

04

3 M20

8.8

15 B05 300X150X 32.0

R.C. BEAM - 650X450

M 1 08

105

BC -

01

6 M22

8.8

16 B05 300X150X 32.0

R.C. BEAM - 650X450

M 1 08

105

BC

01

6 M22

8.8

17 B11 450X200X 65.1

R.C. BEAM - 600X450

M 1 09

150

BC

08

5 M24

8.8

18 B11 450X200X 65.1

R.C. BEAM - 600X450

M 1 09

150

BC

08

5 M24

8.8

19 B13 500X200X 77.9

R.C. BEAM - 650X450

M 1 10

156

BC

08

5 M24

8.8

20 B13 500X200X 77.9

R.C. BEAM - 650X450

M 1 10

156

BC

08

5 M24

8.8

21 B09 400X200X 56.1

R.C. BEAM - 1000X200

M 1 11

98

BC -

06

4 M20

8.8

22 B09 400X200X 56.1

B13 500X200X77.9

M 1 11

98

BC -

07

4 M20

8.8

23 B13 500X200X 77.9

R.C. BEAM - 650X450

M 1 12

163

BC

08

5 M24

8.8

24 B13 500X200X 77.9

ENCASED COLUMN

M 1 12

108

BC

03

8 M20

8.8

25 B11 450X200X 65.1

B11 450X200X65.1

M 1 13

127

BC

05

8 M22

8.8

26 B11 450X200X 65.1

B11 450X200X65.1

M 1 13

100

BC

05

8 M22

8.8

27 B03 250X125X 25.1

B11 450X200X65.1

M 1 14

40

BC

09

3 M20

8.8

28 B03 250X125X 25.1

B11 450X200X65.1

M 1 14

40

BC

09

3 M20

8.8

29 B11 450X200X 65.1

ENCASED COLUMN

M 1 15

85

BC

03

8 M20

8.8

30 B11 450X200X 65.1

ENCASED COLUMN

M 1 15

175

BC

08

5 M24

8.8

31 B03 250X125X 25.1

B11 450X200X65.1

M 1 16

40

BC

09

3 M20

8.8

32 B03 250X125X 25.1

ENCASED COLUMN

M 1 16

40

BC

04

3 M20

8.8

33 B11 450X200X 65.1

R.C. COLUMN

M 1 17

231

BC -

08

5 M24

8.8

34 B11 450X200X 65.1

ENCASED COLUMN

M 1 17

130

BC -

03

8 M20

8.8

35 B03 250X125X 25.1

B11 450X200X65.1

M 1 18

40

BC

09

3 M20

8.8

36 B03 250X125X 25.1

B09 400X200X56.1

M 1 18

40

BC

09

3 M20

8.8

37 B08 350X175X 49.4

B11 450X200X65.1

M 1 19

90

BC

4 M20

8.8

38 B08 350X175X 49.4

B09 400X200X56.1

M 1 19

90

214

39 B09 400X200X 56.1

R.C. COLUMN

M 1 20

114

40 B09 400X200X 56.1

ENCASED COLUMN

M 1 20

128

07

MC -

01

BC

03

8 M20

8.8

BC

03

8 M20

8.8

13 M24 F10T

CALCULATION SHEET

EVERSENDAI ENGINEERING

SHEET

OF

PROJECT

Designed by

Date
17/Apr/2001
Job No
P9906

MAJU PERDANA - PODIUM -

m. arunkumar

Doc. Ref.
P9906-S-CN-MI-11-02

ADDITIONAL STEELWORK AT FIRST FLOOR LEVEL

Sl
Nr

Member
Section

41 B08 350X175X 49.4


42 B08 350X175X 49.4

Supporting
Member
B09 400X200X56.1
-

Connection
Location

End Action
V in KN

M in KN.m

Connection
Identification
MC -

01

Bolt
Detail

M 1 21

90

214

M 1 21

40

BC

04

3 M20

8.8

13 M24 F10T
-

43 B03 250X125X 25.1

R.C. BEAM - 650X450

M 1 22

44 B03 250X125X 25.1

B08 350X175X49.4

M 1 22

40

BC -

09

3 M20

8.8

45 B11 450X200X 65.1

R.C. COLUMN

M 1 23

108

BC

03

8 M20

8.8

46 B11 450X200X 65.1

R.C. COLUMN

M 1 23

108

BC

03

8 M20

8.8

47 B13 500X200X 77.9

R.C. BEAM - 600X400

M 1 24

140

BC

08

5 M24

8.8

48 B13 500X200X 77.9

R.C. BEAM - 600X400

M 1 24

140

BC

08

5 M24

8.8

49 B5

300X150X 32.0

B13 500X200X 77.9

M 1 25

80

BC

02

6 M22

8.8

50 B5

300X150X 32.0

B13 500X200X 77.9

M 1 25

80

BC

02

6 M22

8.8

51 B13 500X200X 77.9

R.C. BEAM - 600X400

M 1 26

140

BC

08

5 M24

8.8

52 B13 500X200X 77.9

R.C. BEAM - 600X400

M 1 26

140

BC

08

5 M24

8.8

53 B01 200X100X 17.8

B13 500X200X 77.9

M 1 27

40

BC

11

4 M20

8.8

54 B01 200X100X 17.8

R.C. COLUMN

M 1 27

40

BC

04

3 M20

8.8

55 B3

250X125X 25.1

R.C. BEAM - 700X450

M 1 28

50

BC

04

3 M20

8.8

56 B3

250X125X 25.1

R.C. BEAM - 700X450

M 1 28

50

BC

04

3 M20

8.8

57 B3

250X125X 25.1

R.C. BEAM - 700X450

M 1 29

50

BC

04

3 M20

8.8

58 B3

250X125X 25.1

R.C. BEAM - 700X450

M 1 29

50

BC

04

3 M20

8.8

59 B3

250X125X 25.1

R.C. BEAM - 700X450

M 1 30

50

BC

04

3 M20

8.8

60 B3

250X125X 25.1

R.C. BEAM - 700X450

M 1 30

50

BC

04

3 M20

8.8

61 B3

250X125X 25.1

R.C. BEAM - 700X450

M 1

31

50

BC

04

3 M20

8.8

62 B3

250X125X 25.1

R.C. BEAM - 700X450

M 1

31

50

BC

04

3 M20

8.8

CALCULATION SHEET

EVERSENDAI ENGINEERING
PROJECT

MAJU PERDANA - PODIUM STEELWORK AT SECOND FLOOR

SHEET

OF

Designed by
Date
m. arunkumar
11/May/2001
Doc. Ref.
Job No
P9906-S-CN-MI-12-03
P9906

The design of connections for the additional beams at second floor level has been done with
reference to the drawings PSI 0002 / 2F /101 Rev. 3 and PSI 0002 / 2F /102 Rev. 4.

The top of steel level is kept at +43.825m between grids X12 and X14. Between X4 and X11,
the top of steel level is kept at +43.800m.

The connections are grouped into various categories, based on the member sizes and the
end actions, as furnished in the table.

Each connection category has been designed for the maximum intensity, with a load
factor of 1.4. The design is carried out in accordance to American (LRFD) Standards.

All wall embedments are designed with WILTRONEX chemical anchors, assuming the grade
of concrete as M30 and checked for the working load condition.

CALCULATION SHEET

CALCULATION SHEET

EVERSENDAI ENGINEERING

SHEET

PROJECT

Designed by
Date
m. arunkumar
11/May/2001
Doc. Ref.
Job No
P9906-S-CN-MI-12-03
P9906

MAJU PERDANA - PODIUM STEELWORK AT SECOND FLOOR

Sl
Nr

Member
Section

Supporting
Member

OF

Connection
Location

End Action
V in KN

M in KN.m

Connection
Identification

Bolt
Detail

1 B18 600X300X170.0

RC BEAM 700X600

M 2 01

290

BC

06

10 M22

8.8

2 B18 600X300X170.0

RC BEAMS 650X450

M 2 01 R

220

BC

06

10 M22

8.8

3 B03 250X125X 25.1

B18 600X300X170.0

M 2 02

40

BC

02

4 M20

8.8

4 B03 250X125X 25.1

RC BEAM 650X450

M 2 02 R

40

BC

01

4 M20

8.8

5 B03 250X125X 25.1

RC BEAM 650X450

M 2 03

40

BC

01

4 M20

8.8

6 B03 250X125X 25.1

RC BEAM 650X450

M 2 03 R

40

BC

01

4 M20

8.8

7 B18 600X300X170.0

RC COLUMN

M 2 04

92

BC

03

3 M22

8.8

8 B18 600X300X170.0

RC COLUMN

M 2 04 R

92

BC

03

3 M22

8.8

9 B18 600X300X170.0

B18 600X300X170.0

M 2 05

96

BC

08

5 M22

8.8

10 B18 600X300X170.0

B18 600X300X170.0

M 2 05 R

203

BC

07

6 M22

8.8

11 B05 300X150X 32.0

B18 600X300X170.0

M 2 06

63

BC

04

3 M22

8.8

12 B05 300X150X 32.0

B16 600X300X133.0

M 2 06 R

63

BC

04

3 M22

8.8

MC -

02

4M24/ 10M30

F10T

13 B16 600X300X133.0

14 B16 600X300X133.0

RC COLUMN

M 2 07 R

180

350

15 B18 600X300X170.0

RC COLUMN

M 2 08

187

BC

06

10 M22

8.8

16 B18 600X300X170.0

RC COLUMN

M 2 08 R

160

BC

06

10 M22

8.8

17 B18 600X300X170.0

RC COLUMN

M 2 09

92

BC

03

3 M22

8.8

18 B18 600X300X170.0

RC COLUMN

M 2 09 R

92

BC

03

3 M22

8.8

19 B18 600X300X170.0

B18 600X300X170.0

M 2 10

96

BC

08

5 M22

8.8

20 B18 600X300X170.0

B18 600X300X170.0

M 2 10 R

203

BC

07

6 M22

8.8

21 B18 600X300X170.0

RC COLUMN

M 2 11

160

BC

06

10 M22

8.8

22 B18 600X300X170.0

RC COLUMN

M 2 11 R

187

BC

06

10 M22

8.8

MC -

02

4M24/ 10M30

F10T

23 B16 600X300X133.0

M 2 07

M 2 12

24 B16 600X300X133.0

RC COLUMN

M 2 12 R

180

350

25 B05 300X150X 32.0

B16 600X300X133.0

M 2 13

63

BC

04

3 M22

8.8

26 B05 300X150X 32.0

B18 600X300X170.0

M 2 13 R

63

BC

04

3 M22

8.8

27 B03 250X125X 25.1

RC BEAM 650X450

M 2 14

40

BC

01

4 M20

8.8

28 B03 250X125X 25.1

RC BEAM 650X450

M 2 14 R

40

BC

01

4 M20

8.8

29 B01 200X100X 17.8

RC BEAM 650X450

M 2 15

40

BC

01

4 M20

8.8

30 B01 200X100X 17.8

RC BEAM 650X450

M 2 15 R

40

BC

01

4 M20

8.8

31 B05 300X150X 32.0

RC BEAM 650X450

M 2 16

76

BC

03

3 M22

8.8

32 B05 300X150X 32.0

B16 600X300X133.0

M 2 16 R

76

BC

04

3 M22

8.8

33 B05 300X150X 32.0

RC BEAM 650X450

M 2 17

76

BC

03

3 M22

8.8

34 B05 300X150X 32.0

B16 600X300X133.0

M 2 17 R

76

BC

04

3 M22

8.8

35 B05 300X150X 32.0

RC BEAM 650X450

M 2 18

76

BC

03

3 M22

8.8

36 B05 300X150X 32.0

B16 600X300X133.0

M 2 18 R

76

BC

04

3 M22

8.8

37 B03 250X125X 25.1

B16 600X300X133.0

M 2 19

40

BC

02

4 M20

8.8

38 B03 250X125X 25.1

B14 500X200X 88.1

M 2 19 R

40

BC

02

4 M20

8.8

39 B16 600X300X133.0

RC COLUMN

M 2 20

300

675

MC -

01

8-M24 28-M30 F10T

CALCULATION SHEET

EVERSENDAI ENGINEERING

SHEET

PROJECT

Designed by
Date
m. arunkumar
11/May/2001
Doc. Ref.
Job No
P9906-S-CN-MI-12-03
P9906

MAJU PERDANA - PODIUM STEELWORK AT SECOND FLOOR

Sl
Nr

Member
Section

40 B16 600X300X133.0
41 B16 600X300X133.0
42 B16 600X300X133.0

Supporting
Member
RC COLUMN
-

OF

Connection
Location
M 2 20 R
M 2 21

M 2 21 R

End Action
V in KN

M in KN.m

300

675

Connection
Identification

MC -

Bolt
Detail

01

8-M24 28-M30 F10T

43 B03 250X125X 25.1

RC BEAM 650X450

M 2 22

40

BC

01

4 M20

8.8

44 B03 250X125X 25.1

B09 400X200X 56.1

M 2 22 R

40

BC

02

4 M20

8.8

45 B14 500X200X 88.1

RC BEAM 1000X200

M 2 23

153

BC

06

10 M22

8.8

46 B14 500X200X 88.1

B16 600X300X133.0

M 2 23 R

153

BC

05

8 M22

8.8

47 B09 400X200X 56.1

B16 600X300X133.0

M 2 24

96

BC

04

3 M22

8.8

48 B09 400X200X 56.1

B16 600X300X133.0

M 2 24 R

182

BC

05

8 M22

8.8

49 B16 600X300X133.0

RC COLUMN

M 2 25

230

50

PMC -

01

6-M20 12-M20 F10T

50 B16 600X300X133.0

RC COLUMN

M 2 25 R

230

50

PMC -

01

6-M20 12-M20 F10T

51 B05 300X150X 32.0

RC BEAM 650X450

M 2 26

76

BC

03

3 M22

8.8

52 B05 300X150X 32.0

B16 600X300X133.0

M 2 26

76

BC

04

3 M22

8.8

CALCULATION SHEET

EVERSENDAI ENGINEERING

SHEET

OF

PROJECT

Designed by

Date

MAJU PERDANA - PODIUM -

m. arunkumar

STEELWORK AT THIRD 'A' FLOOR LEVEL

Doc. Ref.
P9906-S-CN-MI-13-01

The design of connections for the additional beams at third floor level has been done with
reference to the drawings PSI 0002 / 3AF /101 Rev. 1 and PSI 0002 / 3AF /102 Rev. 1.

The top of steel level is kept at +51.950m between grids X7 and X8, +51.125m between
grids X9 and X15. Between grids Y4 and Y6, the TOS is +52.100.

The connections are grouped into various categories, based on the member sizes and the
end actions, as furnished in the table.

Each connection category has been designed for the maximum intensity, with a load
factor of 1.4. The design is carried out in accordance to American (LRFD) Standards.

All wall embedments are designed with WILTRONEX chemical anchors, assuming the grade
of concrete as M30 and checked for the working load condition.

CALCULATION SHEET

05/Apr/2001

Job No
P9906

CALCULATION SHEET

EVERSENDAI ENGINEERING
PROJECT

MAJU PERDANA - PODIUM STEELWORK AT THIRD 'A' FLOOR LEVEL

Supporting
Member

Connection
Location

End Action

SHEET

OF

Designed by
m. arunkumar
Doc. Ref.
P9906-S-CN-MI-13-04

Date
15/Jun/2001
Job No
P9906

Member
Section

B17 600X300X147.0

RC COLUMN

M 3A 01

296

50

PMC

03

8-20 6-20 F10T

B17 600X300X147.0

RC COLUMN

M 3A 01 R

296

50

PMC

03

8-20 6-20 F10T

B17 600X300X147.0

RC COLUMN

M 3A 02

296

50

PMC

03

8-20 6-20 F10T

B17 600X300X147.0

RC COLUMN

M 3A 02 R

296

50

PMC

03

8-20 6-20 F10T

B09 400X200X 56.1

B17 600X300X147.0

M 3A 03

128

BC

04

B09 400X200X 56.1

B17 600X300X147.0

M 3A 03 R

128

BC

B14 500X200X 88.1

B17 600X300X147.0

M 3A 04

237

BC

B14 500X200X 88.1

B17 600X300X147.0

M 3A 04 R

237

BC

B09 400X200X 56.1

B17 600X300X147.0

M 3A 05

128

BC

10

B09 400X200X 56.1

B17 600X300X147.0

M 3A 05 R

128

11

B13 500X200X 77.9

RC COLUMN

M 3A 06

180

50

12

B13 500X200X 77.9

RC COLUMN

M 3A 06 R

132

13

B13 500X200X 77.9

RC COLUMN

M 3A 07

14

B13 500X200X 77.9

RC COLUMN

M 3A 07 R

15

B13 500X200X 77.9

RC COLUMN

M 3A 08

16

B13 500X200X 77.9

RC COLUMN

17

B11 450X200X 65.1

RC COLUMN

M 3A 09

18

B11 450X200X 65.1

RC COLUMN

19

B12 450X200X 74.9

B16 600X300X132.8

20

B12 450X200X 74.9

21

B11 450X200X 65.1

22
23

V in KN

M in KN.m

Connection
Identification

Bolt
Detail

Sl
Nr

6 M22

8.8

04

6 M22

8.8

05

10 M22

8.8

05

10 M22

8.8

04

6 M22

8.8

BC

04

6 M22

8.8

PMC

03

8-20 6-20 F10T

50

PMC

03

8-20 6-20 F10T

121

50

PMC

03

8-20 6-20 F10T

121

50

PMC

03

8-20 6-20 F10T

137

50

PMC

03

8-20 6-20 F10T

M 3A 08 R

137

50

PMC

03

8-20 6-20 F10T

90

50

PMC

03

8-20 6-20 F10T

M 3A 09 R

90

50

PMC

03

8-20 6-20 F10T

M 3A 10

121

BC

04

6 M22

8.8

B09 400X200X 56.1

M 3A 10 R

121

BC

07

4 M22

8.8

B09 400X200X 56.1

M 3A 11

88

BC

07

4 M22

8.8

B11 450X200X 65.1

B07 350X175X 41.2

M 3A 11 R

88

BC

07

4 M22

8.8

B14 500X200X 88.1

RC COLUMN

M 3A 12

209

50

PMC

03

8-20 6-20 F10T

24

B14 500X200X 88.1

RC COLUMN

M 3A 12 R

149

50

PMC

03

8-20 6-20 F10T

25

B13 500X200X 77.9

B15 500X200X101.5

M 3A 13

121

50

BC

07

4 M22

8.8

26

B13 500X200X 77.9

B15 500X200X101.5

M 3A 13 R

121

50

BC

07

4 M22

8.8

27

B14 500X200X 88.1

RC COLUMN

M 3A 14

165

50

PMC

03

8-20 6-20 F10T

28

B14 500X200X 88.1

RC COLUMN

M 3A 14 R

165

50

PMC

03

8-20 6-20 F10T

29

B14 500X200X 88.1

RC COLUMN

M 3A 15

45

50

PMC

03

8-20 6-20 F10T

30

B14 500X200X 88.1

RC COLUMN

M 3A 15 R

67

50

PMC

03

8-20 6-20 F10T

31

B14 500X200X 88.1

RC COLUMN

M 3A 16

170

50

PMC

03

8-20 6-20 F10T

32

B14 500X200X 88.1

RC WALL 200 TK.

M 3A 16 R

170

50

PMC

03

8-20 6-20 F10T

33

B11 450X200X 65.1

B13 500X200X 77.9

M 3A 17

62

BC

04

6 M22

8.8

34

B11 450X200X 65.1

B14 500X200X 88.1

M 3A 17 R

62

BC

04

6 M22

8.8

35

B11 450X200X 65.1

B13 500X200X 77.9

M 3A 18

109

BC

04

6 M22

8.8

36

B11 450X200X 65.1

B14 500X200X 88.1

M 3A 18 R

118

MC

01

37

B14 500X200X 88.1

B13 500X200X 77.9

M 3A 19

127

BC

07

4 M22

8.8

38

B14 500X200X 88.1

B14 500X200X 88.1

M 3A 19 R

127

BC

07

4 M22

8.8

39

B15 500X200X101.5

RC COLUMN

M 3A 20

132

50

PMC

03

8-20 6-20 F10T

40

B15 500X200X101.5

RC COLUMN

M 3A 20 R

206

50

PMC

03

8-20 6-20 F10T

252

4-20 14-24 F10T

CALCULATION SHEET

EVERSENDAI ENGINEERING
PROJECT

MAJU PERDANA - PODIUM STEELWORK AT THIRD 'A' FLOOR LEVEL

SHEET

OF

Designed by
m. arunkumar
Doc. Ref.
P9906-S-CN-MI-13-04

Date
15/Jun/2001
Job No
P9906

Connection
Identification

Bolt
Detail

108

BC

04

6 M22

8.8

108

BC

04

6 M22

8.8

108

BC

04

6 M22

8.8

M 3A 22 R

108

BC

04

6 M22

8.8

50

PMC

03

8-20 6-20 F10T

50

PMC

03

8-20 6-20 F10T

BC

07

4 M22

8.8

127

BC

07

4 M22

8.8

117

BC

07

4 M22

8.8

377

MC

01

4-20 14-24 F10T

50

PMC

03

8-20 6-20 F10T

50

PMC

03

8-20 6-20 F10T

86

BC

03

6 M22

8.8

86

BC

03

6 M22

8.8

71

BC

03

6 M22

8.8

M 3A 28 R

71

BC

03

6 M22

8.8

50

PMC

03

8-20 6-20 F10T

50

PMC

03

8-20 6-20 F10T

BC

07

4 M22

8.8

118

BC

07

4 M22

8.8

118

BC

07

4 M22

8.8

BC

07

4 M22

8.8

PMC

03

8-20 6-20 F10T

PMC

02

6-20 6-20 F10T

84

BC

03

6 M22

8.8

84

BC

09

3 M22

8.8

84

BC

03

6 M22

8.8

M 3A 34 R

84

BC

09

3 M22

8.8

50

PMC

02

6-20 6-20 F10T

50

PMC

02

6-20 6-20 F10T

BC

01

4 M20

8.8

40

BC

01

4 M20

8.8

40

BC

01

4 M20

8.8

M 3A 37 R

40

BC

01

4 M20

8.8

B11 450X200X 65.1

M 3A 38

40

BC

01

4 M20

8.8

B11 450X200X 65.1

M 3A 38 R

40

BC

01

4 M20

8.8

B01 200X100X 17.8

RC COLUMN

M 3A 39

40

BC

08

4 M20

8.8

B01 200X100X 17.8

B14 500X200X 88.1

M 3A 39 R

40

BC

01

4 M20

8.8

79

B01 200X100X 17.8

B14 500X200X 88.1

M 3A 40

40

BC

01

4 M20

8.8

80

B01 200X100X 17.8

B14 500X200X 88.1

M 3A 40 R

40

BC

01

4 M20

8.8

Sl
Nr

Member
Section

Supporting
Member

Connection
Location

End Action

41

B11 450X200X 65.1

B13 500X200X 77.9

M 3A 21

42

B11 450X200X 65.1

B13 500X200X 77.9

M 3A 21 R

43

B11 450X200X 65.1

B13 500X200X 77.9

M 3A 22

44

B11 450X200X 65.1

B13 500X200X 77.9

45

B15 500X200X101.5

RC COLUMN

M 3A 23

132

46

B15 500X200X101.5

RC COLUMN

M 3A 23 R

206

47

B14 500X200X 88.1

B13 500X200X 77.9

M 3A 24

127

48

B14 500X200X 88.1

B14 500X200X 88.1

M 3A 24 R

49

B14 500X200X 88.1

B13 500X200X 77.9

M 3A 25

50

B14 500X200X 88.1

B14 500X200X 88.1

M 3A 25 R

128

51

B15 500X200X101.5

RC COLUMN

M 3A 26

135

52

B15 500X200X101.5

RC COLUMN

M 3A 26 R

184

53

B07 350X175X 41.2

B11 450X200X 65.1

M 3A 27

54

B07 350X175X 41.2

B11 450X200X 65.1

M 3A 27 R

55

B07 350X175X 41.2

B11 450X200X 65.1

M 3A 28

56

B07 350X175X 41.2

B11 450X200X 65.1

57

B16 600X300X132.8

RC COLUMN

M 3A 29

278

58

B16 600X300X132.8

RC COLUMN

M 3A 29 R

161

59

B13 500X200X 77.9

B12 450X200X 74.9

M 3A 30

118

60

B13 500X200X 77.9

B14 500X200X 88.1

M 3A 30 R

61

B13 500X200X 77.9

B12 450X200X 74.9

M 3A 31

62

B13 500X200X 77.9

B14 500X200X 88.1

M 3A 31 R

118

63

B09 400X200X 56.1

RC COLUMN

M 3A 32

275

50

64

B09 400X200X 56.1

RC WALL 200 TK.

M 3A 32 R

91

50

65

B07 350X175X 41.2

B11 450X200X 65.1

M 3A 33

66

B07 350X175X 41.2

RC WALL 200 TK.

M 3A 33 R

67

B07 350X175X 41.2

B11 450X200X 65.1

M 3A 34

68

B07 350X175X 41.2

RC WALL 200 TK.

69

B07 350X175X 41.2

RC COLUMN

M 3A 35

148

70

B07 350X175X 41.2

RC WALL 200 TK

M 3A 35 R

63

71

B05 300X150X 32.0

B11 450X200X 65.1

M 3A 36

40

72

B05 300X150X 32.0

B11 450X200X 65.1

M 3A 36 R

73

B02 200X100X 20.9

B11 450X200X 65.1

M 3A 37

74

B02 200X100X 20.9

B11 450X200X 65.1

75

B05 300X150X 32.0

76

B05 300X150X 32.0

77
78

V in KN

M in KN.m

CALCULATION SHEET

EVERSENDAI ENGINEERING
PROJECT

MAJU PERDANA - PODIUM STEELWORK AT THIRD 'A' FLOOR LEVEL

Connection
Location

OF

Designed by
m. arunkumar
Doc. Ref.
P9906-S-CN-MI-13-04

Date
15/Jun/2001
Job No
P9906

Member
Section

Supporting
Member

81

B14 500X200X 88.1

B14 500X200X 88.1

82

B14 500X200X 88.1

83

B01 200X100X 17.8

B14 500X200X 88.1

M 3A 42

40

BC

01

4 M20

8.8

84

B01 200X100X 17.8

B14 500X200X 88.1

M 3A 42 R

40

BC

01

4 M20

8.8

85

B01 200X100X 17.8

B14 500X200X 88.1

M 3A 43

40

BC

01

4 M20

8.8

86

B01 200X100X 17.8

RC COLUMN

M 3A 43 R

40

BC

08

4 M20

8.8

87

B14 500X200X 88.1

B14 500X200X 88.1

M 3A 44

100

MC

01

88

B14 500X200X 88.1

89

B11 450X200X 65.1

B15 500X200X101.5

M 3A 45

114

BC

04

6 M22

8.8

90

B11 450X200X 65.1

B16 600X300X132.8

M 3A 45 R

114

BC

04

6 M22

8.8

91

B01 200X100X 17.8

B11 450X200X 65.1

M 3A 46

40

BC

01

4 M20

8.8

92

B01 200X100X 17.8

B03 250X125X 25.1

M 3A 46 R

40

BC

01

4 M20

8.8

93

B03 250X125X 25.1

94

B03 250X125X 25.1

B16 600X300X132.8

M 3A 47 R

40

56

MC

02

2-20 10-20 F10T

95

B03 250X125X 25.1

B16 600X300X132.8

M 3A 48

40

56

MC

02

2-20 10-20 F10T

96

B03 250X125X 25.1

B13 500X200X 77.9

M 3A 48 R

40

BC

01

4 M20

8.8

97

B09 400X200X 56.1

B14 500X200X 88.1

M 3A 49

49

BC

02

6 M22

8.8

98

B09 400X200X 56.1

B15 500X200X101.5

M 3A 49 R

49

BC

02

6 M22

8.8

99

B01 200X100X 17.8

B14 500X200X 88.1

M 3A 50

40

BC

01

4 M20

8.8

100

B01 200X100X 17.8

B01 200X100X 17.8

M 3A 50 R

40

BC

01

4 M20

8.8

101

B07 350X175X 41.2

RC COLUMN

M 3A 51

80

50

PMC

02

6-20 6-20 F10T

102

B07 350X175X 41.2

RC COLUMN

M 3A 51 R

115

50

PMC

02

6-20 6-20 F10T

103

B05 300X150X 32.0

B14 500X200X 88.1

M 3A 52

72

BC

02

6 M22

8.8

104

B05 300X150X 32.0

B08 350X175X 49.4

M 3A 52 R

72

BC

02

6 M22

8.8

105

B05 300X150X 32.0

B14 500X200X 88.1

M 3A 53

72

BC

02

6 M22

8.8

106

B05 300X150X 32.0

B08 350X175X 49.4

M 3A 53 R

72

BC

02

6 M22

8.8

107

B05 300X150X 32.0

RC WALL 200 TK.

M 3A 54

42

50

PMC

01

3-20 8-20 F10T

108

B05 300X150X 32.0

RC COLUMN

M 3A 54 R

105

50

PMC

01

3-20 8-20 F10T

109

B01 200X100X 17.8

B09 400X200X 56.1

M 3A 55

40

BC

01

4 M20

8.8

110

B01 200X100X 17.8

B07 350X175X 41.2

M 3A 55 R

40

BC

01

4 M20

8.8

111

B08 350X175X 49.4

B07 350X175X 41.2

M 3A 56

72

BC

06

3 M22

8.8

112

B08 350X175X 49.4

B05 300X150X 32.0

M 3A 56 R

72

BC

06

3 M22

8.8

113

B15 500X200X101.5

RC COLUMN

M 3A 57

70

50

PMC

03

8-20 6-20 F10T

114

B15 500X200X101.5

RC COLUMN

M 3A 57 R

81

50

PMC

03

8-20 6-20 F10T

115

B16 600X300X132.8

RC COLUMN

M 3A 58

70

50

PMC

03

8-20 6-20 F10T

116

B16 600X300X132.8

RC COLUMN

M 3A 58 R

81

50

PMC

03

8-20 6-20 F10T

117

B15 500X200X101.5

RC COLUMN

M 3A 59

50

50

PMC

03

8-20 6-20 F10T

118

B15 500X200X101.5

RC COLUMN

M 3A 59 R

50

50

PMC

03

8-20 6-20 F10T

119

B11 450X200X 65.1

B15 500X200X101.5

M 3A 60

76

BC

04

6 M22

8.8

120

B11 450X200X 65.1

B16 600X300X132.8

M 3A 60 R

76

BC

04

6 M22

8.8

121

B05 300X150X 32.0

B16 600X300X132.8

M 3A 61

52

BC

02

6 M22

8.8

122

B05 300X150X 32.0

B15 500X200X101.5

M 3A 61 R

52

BC

02

6 M22

8.8

123

B09 400X200X 56.1

RC BEAM 1000X200

M 3A 62

74

BC

09

3 M22

8.8

124

B09 400X200X 56.1

B15 500X200X101.5

M 3A 62 R

74

BC

04

6 M22

8.8

125

B07 350X175X 41.2

B15 500X200X101.5

M 3A 63

43

BC

02

6 M22

8.8

M 3A 41 R

M 3A 44 R

M 3A 47

V in KN
100

M in KN.m
377

Connection
Identification

Bolt
Detail

Sl
Nr

M 3A 41

End Action

SHEET

MC

01

4-20 14-24 F10T

377

4-20 14-24 F10T

CALCULATION SHEET

EVERSENDAI ENGINEERING
PROJECT

MAJU PERDANA - PODIUM STEELWORK AT THIRD 'A' FLOOR LEVEL

OF

Designed by
m. arunkumar
Doc. Ref.
P9906-S-CN-MI-13-04

Date
15/Jun/2001
Job No
P9906

Member
Section

Supporting
Member

Connection
Location

V in KN

126

B07 350X175X 41.2

B15 500X200X101.5

M 3A 63 R

100

127

B15 500X200X101.5

RC COLUMN

M 3A 64

250

128

B15 500X200X101.5

129

B15 500X200X101.5

130

B15 500X200X101.5

131

B01 200X100X 17.8

RC BEAM 800X250

M 3A 66

40

BC

08

4 M20

8.8

132

B01 200X100X 17.8

B07 350X175X 41.2

M 3A 66 R

40

BC

01

4 M20

8.8

133

B01 200X100X 17.8

B05 300X150X 32.0

M 3A 67

40

BC

01

4 M20

8.8

134

B01 200X100X 17.8

B11 450X200X 65.1

M 3A 67 R

40

BC

01

4 M20

8.8

135

B13 500X200X 77.9

RC COLUMN

M 3A 68

118

50

PMC

03

8-20 6-20 F10T

136

B13 500X200X 77.9

RC COLUMN

M 3A 68 R

118

50

PMC

03

8-20 6-20 F10T

RC COLUMN

M 3A 64 R
M 3A 65

M 3A 65 R

M in KN.m

Connection
Identification

Bolt
Detail

Sl
Nr

End Action

SHEET

BC

04

442

MC

03

8-24 16-24 F10T

442

MC

03

8-24 16-24 F10T

250

6 M22

8.8

New member

CALCULATION SHEET

EVERSENDAI ENGINEERING

SHEET

OF

PROJECT

Designed by

Date
13/Apr/2001
Job No
P9906

MAJU PERDANA - PODIUM -

m. arunkumar

Doc. Ref.
P9906-S-CN-MI-14-01

STEELWORK AT THIRD FLOOR LEVEL

The design of connections for the additional beams at third floor level has been done with
reference to the drawings PSI 0002 / 3F /101 Rev. 2 and PSI 0002 / 3F /102 Rev. 2.

The top of steel level is kept at +48.300m between grids X9 and X12. From grid X6 to grid X9
and X13 to X14, TOS is kept ar +48.325m.

The connections are grouped into various categories, based on the member sizes and the
end actions, as furnished in the table.

Each connection category has been designed for the maximum intensity, with a load
factor of 1.4. The design is carried out in accordance to American (LRFD) Standards.

All wall embedments are designed with WILTRONEX chemical anchors, assuming the grade
of concrete as M30 and checked for the working load condition.

CALCULATION SHEET

CALCULATION SHEET

EVERSENDAI ENGINEERING

SHEET

OF

PROJECT

Designed by

Date
16/Jun/2001
Job No
P9906

MAJU PERDANA - PODIUM -

m. arunkumar

Doc. Ref.
P9906-S-CN-MI-14-03

STEELWORK AT THIRD FLOOR LEVEL

Sl
Nr

Member
Section

Supporting
Member

Connection
Location

End Action
V in KN

M in KN.m

Connection
Identification

1 B12 450X200X 74.9

RC COLUMN

3 01

173

BC

07

2 B12 450X200X 74.9

RC COLUMN

3 01 R

173

BC

07

3 B12 450X200X 74.9

RC COLUMN

3 02

173

BC

07

4 B12 450X200X 74.9

RC COLUMN

3 02 R

173

BC

07

5 B12 450X200X 74.9

RC COLUMN

3 03

173

BC

07

6 B12 450X200X 74.9

RC COLUMN

3 03 R

173

BC

07

7 B15 500X200X101.5

RC COLUMN

3 04

188

BC

07

8 B15 500X200X101.5

RC COLUMN

3 04 R

188

BC

07

9 B18 600X300X170.4

RC COLUMN

3 05

171

BC

08

10 B18 600X300X170.4

RC COLUMN

3 05 R

247

BC

08

11 B12 450X200X 74.9

RC COLUMN

3 06

173

BC

07

12 B12 450X200X 74.9

RC COLUMN

3 06 R

173

BC

07

13 B12 450X200X 74.9

RC COLUMN

3 07

173

BC

07

14 B12 450X200X 74.9

RC COLUMN

3 07 R

173

BC

07

15 B12 450X200X 74.9

RC COLUMN

3 08

173

BC

07

16 B12 450X200X 74.9

RC COLUMN

3 08 R

173

BC

07

17 B11 450X200X 65.1

RC COLUMN

3 09

40

BC

09

18 B11 450X200X 65.1

RC COLUMN

3 09 R

40

BC

09

19 B18 600X300X170.4

RC COLUMN

3 10

125

BC

08

20 B18 600X300X170.4

RC COLUMN

3 10 R

125

BC

08

21 B11 450X200X 65.1

B12 450X200X 74.9

3 11

140

BC

01

22 B11 450X200X 65.1

B12 450X200X 74.9

3 11 R

140

BC

01

23 B11 450X200X 65.1

B12 450X200X 74.9

3 12

140

BC

01

24 B11 450X200X 65.1

B12 450X200X 74.9

3 12 R

140

BC

01

25 B11 450X200X 65.1

RC COLUMN

3 13

140

BC

07

26 B11 450X200X 65.1

RC COLUMN

3 13 R

140

BC

07

27 B11 450X200X 65.1

B12 450X200X 74.9

3 14

140

BC

01

28 B11 450X200X 65.1

B12 450X200X 74.9

3 14 R

140

BC

01

29 B11 450X200X 65.1

B12 450X200X 74.9

3 15

140

BC

01

30 B11 450X200X 65.1

B12 450X200X 74.9

3 15 R

140

BC

01

31 B11 450X200X 65.1

RC COLUMN

3 16

140

BC

07

32 B11 450X200X 65.1

RC COLUMN

3 16 R

140

BC

07

33 B11 450X200X 65.1

B12 450X200X 74.9

3 17

140

BC

01

34 B11 450X200X 65.1

B12 450X200X 74.9

3 17 R

140

BC

01

35 B11 450X200X 65.1

B12 450X200X 74.9

3 18

140

BC

01

36 B11 450X200X 65.1

B12 450X200X 74.9

3 18

140

BC

01

37 B16 600X300X132.8

RC COLUMN

3 19

162

BC

08

38 B16 600X300X132.8

RC COLUMN

3 19 R

224

BC

08

39 B15 500X200X101.5

B15 500X200X101.5

3 20

196

BC

02

40 B15 500X200X101.5

B16 600X300X132.8

3 20 R

121

BC

03

Bolt
Detail

CALCULATION SHEET

EVERSENDAI ENGINEERING

SHEET

OF

PROJECT

Designed by

Date
16/Jun/2001
Job No
P9906

MAJU PERDANA - PODIUM -

m. arunkumar

Doc. Ref.
P9906-S-CN-MI-14-03

STEELWORK AT THIRD FLOOR LEVEL

Sl
Nr

Member
Section

Supporting
Member

Connection
Location

End Action
V in KN

M in KN.m

Connection
Identification

41 B05 300X150X 32.0

B15 500X200X101.5

3 21

50

BC

13

42 B05 300X150X 32.0

RC COLUMN

3 21 R

50

BC

11

43 B16 600X300X132.8

3 22

44 B16 600X300X132.8

RC COLUMN

3 22 R

180

350

MC

02

45 B18 600X300X170.4

B18 600X300X170.4

3 23

96

BC

02

46 B18 600X300X170.4

B18 600X300X170.4

3 23 R

203

BC

02

47 B05 300X150X 32.0

RC BEAM 650X600

3 24

45

BC

11

48 B05 300X150X 32.0

RC BEAM 650X450

3 24 R

45

BC

11

49 B14 500X200X 88.1

RC WALL 200mm

3 25

153

BC

12

50 B14 500X200X 88.1

B16 600X300X132.8

3 25 R

153

BC

05

51 B09 400X200X 56.1

B16 600X300X132.8

3 26

96

BC

06

52 B09 400X200X 56.1

B16 600X300X132.8

3 26 R

182

BC

05

53 B03 250X125X 25.1

RC BEAM 650X450

3 27

40

BC

10

54 B03 250X125X 25.1

B14 500X200X 88.1

3 27 R

40

BC

04

55 B16 600X300X132.8

RC COLUMN

3 28

300

675

MC

01

3 28 R

3 29

300

675

56 B16 600X300X132.8
57 B16 600X300X132.8
58 B16 600X300X132.8

RC COLUMN

MC

01

3 29 R

RC BEAM 650X450

3 30

40

BC

10

60 B03 250X125X 25.1

B09 400X200X 56.1

3 30 R

40

BC

04

61 B05 300X150X 32.0

B16 600X300X132.8

3 31

63

BC

13

62 B05 300X150X 32.0

B18 600X300X170.4

3 31 R

63

BC

13

3 32

3 32 R

3 33

3 33 R

3 34

64 B13 500X200X 77.9


65 B13 500X200X 77.9
66 B13 500X200X 77.9
67 B13 500X200X 77.9

RC COLUMN
RC COLUMN
-

62

120

62

120

Rev

59 B03 250X125X 25.1

63 B13 500X200X 77.9

Bolt
Detail

MC

03

MC

03

Addnl.
members

68 B13 500X200X 77.9

RC COLUMN

3 34 R

62

120

MC

03

69 B09 400X200X 56.1

B13 500X200X 77.9

3 35

55

BC

06

70 B09 400X200X 56.1

B13 500X200X 77.9

3 35 R

55

BC

06

71 B09 400X200X 56.1

B13 500X200X 77.9

3 36

55

BC

06

72 B09 400X200X 56.1

B13 500X200X 77.9

3 36 R

55

BC

06

CALCULATION SHEET

EVERSENDAI ENGINEERING

SHEET

PROJECT

Designed by

MAJU PERDANA - PODIUM

OF

Date
13/Apr/2001
Doc. Ref.
Job No
P9906-S-CN-MI-14-01
P9906
m. arunkumar