RAPTOR 7. Tutorial Workbook First Edition ARINC engineering services, LLC. No part of this publication may be reproduced or distributed without the prior written permission of the publisher.

Uploaded by

Anonymous 3dRnPG
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
339 views405 pages

Manual Del Raptor Ver - 7

RAPTOR 7. Tutorial Workbook First Edition ARINC engineering services, LLC. No part of this publication may be reproduced or distributed without the prior written permission of the publisher.

Uploaded by

Anonymous 3dRnPG
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 405

RAPTOR 7.

Tutorial Workbook

RAPTOR 7.0 Tutorial Workbook


First Edition
Kenneth E. Murphy Manager, Simulation & Analysis RAPTOR Team Leader ARINC Engineering Services, LLC Charles M. Carter Staff Principal Engineer RAPTOR Engine Developer ARINC Engineering Services, LLC Elizabeth A. Grimes Principal Engineer RAPTOR Graphical User Interface Developer ARINC Engineering Services, LLC Anthony W. Malerich Principal Analyst RAPTOR Engine Developer ARINC Engineering Services, LLC

Copyright 2004 by ARINC. All rights reserved. Printed in the United States of America. Except as permitted under the United States Copyright Act of 1976, no part of this publication may be reproduced or distributed in any form or by any means, or stored in a data base or retrieval system, without the prior written permission of the publisher.

Table of Contents
Overview ....................................................................................... vii Raptor Workbook Tutorial
Chapter 1 Elements and Views Problems ................................................................................................ 1-6 Chapter 2 A Basic Reliability Block Diagram Adding a Block ..................................................................................... Copying and Pasting ............................................................................. Adding Nodes and Links ...................................................................... Simulating ............................................................................................. Simulation Toolbar ............................................................................... Simulation Results ................................................................................ Problems ............................................................................................... Chapter 3 Distributions Selecting a Failure Distribution ............................................................ Distribution Nomenclature .................................................................... The Empirical Distribution ................................................................... Problems ............................................................................................... Chapter 4 Logistics Constraints Custom Sparing .................................................................................... Spare Pool ............................................................................................. Infinite Sparing ..................................................................................... Creating a Spare Pool ........................................................................... Creating a Resource Pool ..................................................................... Sparing Results ..................................................................................... Repair Cycle ......................................................................................... Problems ............................................................................................... 2-2 2-4 2-5 2-7 2-8 2-9 2-11 3-3 3-5 3-8 3-19 4-4 4-7 4-7 4-8 4-11 4-13 4-15 4-15

Chapter 5 Hands On Example I Problems ............................................................................................... 5-8 Chapter 6 Preventive Maintenance Definition .............................................................................................. Setting a Block to Perform PM ............................................................. Setting Duration of Preventive Maintenance ........................................ Defining a Trigger ................................................................................. Tying PM to a Trigger ........................................................................... Starting a Simulation in Step Mode ...................................................... Problems ................................................................................................ 6-2 6-2 6-4 6-7 6-9 6-13 6-16

Chapter 7 Dependency Definition ............................................................................................... 7-2 Dependent Block Diagrams ................................................................... 7-2 General Block Properties ....................................................................... 7-3 System Dependence ............................................................................... 7-6 Local Dependence .................................................................................. 7-7 Elemental Dependence ........................................................................... 7-8 Generating Detailed Event Log ............................................................. 7-13 Problems ................................................................................................ 7-14 Chapter 8 Standby Definition .............................................................................................. Node k-star Value ................................................................................. Node Priority ......................................................................................... Imperfect Switch-over .......................................................................... Standby Stress ...................................................................................... Perfect Switch-over .............................................................................. Standby and Dependence ..................................................................... Problems ............................................................................................... Chapter 9 Transients Definition .............................................................................................. Delayed Statistics Gathering ................................................................. Displaying Ao Plots .............................................................................. Graph Window....................................................................................... Setting a Graphs Y-Axis ...................................................................... Components With Exhausted Life ........................................................ Problems ............................................................................................... 8-2 8-3 8-4 8-5 8-6 8-9 8-9 8-11 9-2 9-2 9-3 9-4 9-6 9-17 9-18

Chapter 10 Failure Effects View Definition ............................................................................................... 10-2 Initiating Failure Effects View .............................................................. 10-2 Failing a Component ............................................................................. 10-2 System Status Summary ........................................................................ 10-3 Induced Dependency .............................................................................. 10-4 Refreshing the RBD ............................................................................... 10-4 Create Single Point Failure File ............................................................. 10-5 Using the Interactive Log ...................................................................... 10-5 Problems ................................................................................................ 10-6 Chapter 11 Weak Link Analysis Conducting a Weak Link Analysis ....................................................... Weak Link Analysis Type .................................................................... Defining Thresholds ............................................................................. Domain Diagram .................................................................................. Node Analysis Results .......................................................................... Block Analysis Results ......................................................................... Availability & Dependability Equations .............................................. 11-3 11-4 11-4 11-5 11-5 11-6 11-7 ii

Reliability Equations ............................................................................ 11-16 Weak Link Analysis View .................................................................... 11-16 Problems ............................................................................................... 11-17 Chapter 12 Cost Analysis Block Cost Fields ................................................................................. Spare Pool Cost Fields .......................................................................... Resource Cost Field .............................................................................. System Cost Fields ................................................................................ Block Costs ........................................................................................... Example Cost Report ............................................................................ Interim Cost Report ............................................................................... Problems ................................................................................................ 12-3 12-6 12-6 12-7 12-8 12-11 12-14 12-15

Chapter 13 Hands On Example II Problems ............................................................................................... 13-12 Chapter 14 Capacity Analysis Flow & Capacity Equations .................................................................. Flow Generation & Cost of Loss .......................................................... Nominal & Maximum Flows ................................................................ Capacity Summary Results ................................................................... Node Capacity Results .......................................................................... Usage & Capability Equations .............................................................. Capacity Plot ......................................................................................... Problems ............................................................................................... Chapter 15 Events Adding an Event ................................................................................... System Status Indicators ....................................................................... Complex RBDs ..................................................................................... Problems ............................................................................................... Chapter 16 Hierarchy Collapsing Elements into a Hierarchy .................................................. Home and Up Navigation Buttons ....................................................... Adding a Hierarchy .............................................................................. Dragging Elements into a Hierarchy .................................................... Hierarchical Model ............................................................................... Importing an RBD as a Hierarchy ........................................................ Simulating a Hierarchical RBD ............................................................ Displaying the Hierarchical Tree .......................................................... Goto Hierarchy Button ......................................................................... Descendant Status Indicator ................................................................. Problems ............................................................................................... 14-2 14-3 14-5 14-9 14-10 14-11 14-12 14-18 15-3 15-6 15-7 15-8 16-4 16-5 16-6 16-7 16-8 16-9 16-11 16-13 16-15 16-16 16-19

Chapter 17 Phasing Definition .............................................................................................. 17-2

iii

Setting a Block to be Phased ................................................................ Setting an Event to be Phased ............................................................... Setting a Node to be Phased .................................................................. Setting a Hierarchy to be Phased .......................................................... Defining Phases .................................................................................... Assign Block Phases ............................................................................. Component Functioning State Colors ................................................... Component Link and Cut State Colors ................................................. Assign Node Phases .............................................................................. Assign Event Phases ............................................................................. Assign Hierarchy Phases ....................................................................... Phased DSI Colors ................................................................................ Phased Elements in the Workspace View ............................................ System Availability and Dependability Equations ............................... Phased Elements in the Simulation View ............................................. Cycle Terminated Simulation ............................................................... Problems ...............................................................................................

17-3 17-4 17-5 17-6 17-7 17-9 17-11 17-12 17-13 17-14 17-15 17-16 17-16 17-17 17-17 17-21 17-22

Chapter 18 Hands On Example III Problems ............................................................................................... 18-3 Chapter 19 Simulation Mechanics System Random Numbers ..................................................................... Example I Time Line ............................................................................ Example II Time Line ........................................................................... Problems ............................................................................................... Chapter 20 Miscellaneous Topics Preferences Dialog Box ........................................................................ Failure Rate Mode ................................................................................ System Settings Dialog Box ................................................................. Simulation Settings ............................................................................... Setting System Streams ........................................................................ Mass Edit Dialog Box ........................................................................... Import & Export Libraries .................................................................... Print Tables ........................................................................................... Print Window ........................................................................................ Find Item Dialog Box ........................................................................... Linear Growth or Decay ....................................................................... Geometric Growth or Decay ................................................................. Asymptotic Growth or Decay ............................................................... Random Numbers ................................................................................. Block Defaults ...................................................................................... Advanced Simulation Options .............................................................. Problems ............................................................................................... 19-2 19-3 19-5 19-6 20-2 20-3 20-4 20-5 20-5 20-7 20-10 20-11 20-12 20-12 20-14 20-14 20-15 20-16 20-18 20-19 20-19

iv

Appendix A: Solutions to Problems Chapter One Solutions .......... Chapter Two Solutions ......... Chapter Three Solutions ....... Chapter Four Solutions ......... Chapter Five Solutions ............. Chapter Six Solutions ........... Chapter Seven Solutions ........... Chapter Eight Solutions ............ Chapter Nine Solutions ............. Chapter Ten Solutions .......... Chapter Eleven Solutions ............. Chapter Twelve Solutions ............ Chapter Thirteen Solutions .......... Chapter Fourteen Solutions .......... Chapter Fifteen Solutions ............. Chapter Sixteen Solutions ............. Chapter Seventeen Solutions ............ Chapter Nineteen Solutions .............. Chapter Twenty Solutions ............. Appendix B: Menus and Button Bars Workspace View Menu Bar ................................................................. Simulation View Menu Bar ................................................................. Weak Link View Menu Bar ................................................................. Failure Effects View Menu Bar ........................................................... Ao Graph Menu Bar ............................................................................. Workspace View Toolbar ..................................................................... Simulation View Toolbar ..................................................................... Weak Link View Toolbar ..................................................................... Failure Effects View Toolbar ............................................................... Appendix C: File and Reports All system failure times file ................................................................. All system down times file .................................................................. Key parameters file .............................................................................. Ending sim times file ........................................................................... Ao plot data .......................................................................................... Capacity plot data ................................................................................ Final Results report .............................................................................. End of run report .................................................................................. Detailed event log ................................................................................ Interim cost log ....................................................................................

A-1 A-1 A-2 A-4 A-5 A-7 A-8 A-9 A-11 A-13 A-13 A-14 A-14 A-15 A-17 A-20 A-21 A-23 A-25 B-1 B-10 B-14 B-16 B-21 B-23 B-26 B-27 B-28 C-1 C-1 C-2 C-3 C-3 C-4 C-5 C-10 C-12 C-13

Appendix D: Raptor Color and Statuses Block Colors ......................................................................................... D-1

Node Colors .......................................................................................... Event Colors ......................................................................................... Hierarchy Colors .................................................................................. Hierarchy DSI Colors ........................................................................... Marker Colors ....................................................................................... Link Colors ........................................................................................... System Colors ....................................................................................... System Status Indicators ....................................................................... Block Status Diagram ........................................................................... Node Status Diagram ............................................................................ Event Status Diagram ........................................................................... Hierarchy Status Diagram .................................................................... Link Status Diagram ............................................................................ System Status Diagram ........................................................................ Appendix E: Raptor Rules Elemental .............................................................................................. Distributional ........................................................................................ Logistics ............................................................................................... Cost ...................................................................................................... Phasing ................................................................................................. Growth and Decay ................................................................................ Standby ................................................................................................. Capacity ................................................................................................ Random Start-ups ................................................................................. Preventive Maintenance ....................................................................... Appendix F: Raptor Definitions System-level Parameters ...................................................................... Weak Link Analysis Parameters .......................................................... Growth and Decay ................................................................................ Capacity ................................................................................................

D-5 D-6 D-9 D-13 D-14 D-15 D-15 D-16 D-18 D-18 D-19 D-19 D-20 D-20 E-1 E-1 E-2 E-2 E-3 E-3 E-4 E-4 E-4 E-5 F-1 F-3 F-6 F-7

vi

Overview
This workbook concentrates on the use of the Raptor software and can be subdivided into three subsections, namely: novice, journeymen, and expert subsections. Chapters 1 through 6 constitute the novice subsection. After completing these lessons, a user should be able to model most systems. Chapters 7 through 13 comprise the journeymen subsection and enhance a Raptor users ability to conduct sophisticated analysis of most Raptor simulations. Finally, the expert subsection encompasses Chapters 14 through 20. These lessons provide a Raptor user with all the knowledge needed to conduct rigorous simulations and analysis of any system. When Raptor is installed, it will automatically create the following folders under the file directory that was chosen for installation. The top-level Raptor 7.0 directory contains the program executable files. The Examples directory contains rbd files created by Raptor for teaching purposes and is the default directory for rbd files created by a user. The Graphics directory includes the objects that are displayed within the different Raptor Views and the Help directory contains the help files. The Library directory is the default location for library files created by a user and the Reports directory is the default location for text files generated by a user. Finally, the Sounds directory includes the wave files that increase the usability of the Raptor tool. If a user re-installs Raptor, only files or directories that were created by the original installation will be over-written. Hence, user built rbds, libraries, configuration files or text files will not be over-written unless they have the same filename as Raptor installed files. Several types of notation are incorporated within this workbook to enhance its usability. Bold text is used to indicate a file that needs to be opened or created. Italic text refers to either menu options that the user is instructed to follow or phrases that need emphasis. The context surrounding the italic text should easily allow the reader to discern between the different uses. If assistance in needed in solving the problems within this workbook or clarification is needed regarding the solutions, contact the Raptor Team at 505.248.0718. Finally, you can always obtain the latest Raptor information concerning new releases, training and consulting via the Raptor website at www.raptorplus.com.

vii

Chapter 1

Elements and Views


Objectives
1. 2. 3. 4. Understand the role Reliability Block Diagrams (RBD) play within Raptor. Understand the roles that blocks, events and hierarchies perform in an RBD. Understand the roles that nodes and links perform in an RBD. Be able to distinguish between the Workspace, Simulation, Weak Link Analysis and Failure Effects Views.

Recommended Problems
1, 2 and 4

Recommended Reading
Classic Bamboozles of Reliability

Chapter 1

1-1

Elements and Views A reliability block diagram is a graphical representation of a systems components arranged in a manner to convey system-level failures. Included within this representation are the logistical relationships between the components and the system itself. Reliability block diagrams are denoted as RBDs and usually contain components arranged in a combination of series (Figure 1.1) and parallel (Figure 1.2) sub-structures.

Figure 1.1 Series Sub-structure

Figure 1.2 Parallel Sub-structure

All elements of a series sub-structure must function in order for the system containing these elements to work properly. A parallel sub-structure, however, is one in which a pre-specified number of elements must function properly or else the system will not work. These parallel sub-structures are usually denoted using a k-out-of-n nomenclature. Where k is the number of parallel elements that must function properly for the system to work, and n is the total number of these elements within the parallel sub-structure. Raptor operates based on an RBD that represents a system for which Reliability, Availability or Maintainability (RAM) characteristics are desired. RBDs can be comprised of six different types of elements: blocks, events, nodes, links, hierarchies and markers. A block usually represents a physical piece of equipment, but can also represent a virtual concept. For example, a block could represent either software contained within a system or the failures induced by other entities (e.g., humans, commercial power, etc.). All blocks fail and repair based on probabilistic distributions as time passes through a simulation. When a block initiates its repair cycle as a result of a failure, it

Chapter 1

1-2

consumes resources, spares and time. Events represent actions that either do or do not occur. As a default, events resolve their status, or fire, at the start of a simulation, and their impacts are assessed without the passage of simulation time. Events are based on draws from the Bernoulli distribution, which is a discrete function with only two possible outcomes. Success occurs with a probability of p while failure occurs with a corresponding probability of 1-p. Although events can either fire good or fire bad, they never initiate a repair cycle. It is, however, possible to re-fire events or change the probability of firing as time passes. Examples of events include inspections, switches, landing gear, etc. Nodes and links tie the blocks and events together such that the failure logic of a system is defined. That is, nodes and links define the series-parallel sub-structures within a system-level RBD. If a node only has one link coming into it, then it is considered a pass through or passive node since it does not contain any redundancy information. If a node has more then one link coming into it, then the node is known as a k-out-of-n node. These nodes house the redundancy information that defines the parallel sub-structure of a system. Hierarchical elements contain a collection of elements, including additional hierarchies themselves and often represent major subsystems of the system being modeled. Hierarchical elements essentially represent a window into a lower level indenturing of a component. For example, a hierarchy may represent an aircraft engine that itself contains hundreds of sub-components including additional hierarchies of even lower indentured sub-systems. Start and end markers are in every RBD and if hierarchies are present, in and out markers are also included. These markers are not considered active elements of an RBD since they merely define the beginning and end of an RBD structure and its substructures. The Raptor tool has four modes in which the user may interact with the software. The first mode is called the Workspace View (Figure 1.3). In this mode, the user creates, edits and assembles a system-level RBD. The Workspace view contains a toolbar that facilitates building RBDs, and a status bar that indicates attributes of an element. The second mode is called the Simulation View (Figure 1.4). This mode contains a simulation menu and toolbar to control the aspects of the ongoing simulation. Additionally, this mode contains: the status of the individual elements, system status, and a status bar that indicates cumulative results. The third mode, which can be accessed after a weak link analysis has been performed, is called the Weak Link Analysis View (Figure 1.5). This view helps users to determine the weakest components of a system. Lastly, the user can utilize the "Failure Effects View" (Figure 1.6) to determine the impact on a system due to single or multiple component failures. Examples of all four views are shown respectively in the next four figures.

Chapter 1

1-3

Figure 1.3 Workspace View

Figure 1.4 Simulation View

Chapter 1

1-4

Figure 1.5 Weak Link Analysis View

Figure 1.6 Failure Effects View

Chapter 1

1-5

Problems
1. Place elements into the Workspace View and determine the rules for connecting links to nodes, blocks, events and hierarchies. 2. State the two fundamental differences between events and blocks. 3. What kind of information is displayed in the status bar while in the Workspace View versus the Simulation View? 4. Which view allows the user to modify an RBD and which views allow the viewing of results?

Chapter 1

1-6

Chapter 2

A Basic Reliability Block Diagram


Objectives
1. Build and simulate an RBD. 2. Understand the copy and paste features. 3. Understand the difference between time-truncated and failure-truncated simulations. 4. Understand the values displayed in the Output Tables dialog box. 5. Understand the toolbars of the Workspace and Simulation Views.

Recommended Problems
1, 2, 7, 9, 10, 12 and 15

Chapter 2

2-1

A Basic Reliability Block Diagram We want to complete the building of the RBD located within the file labeled Basic1.rbd in such a way that when we have completed this chapter it looks like the RBD in Figure 2.1.

Figure 2.1 Completed RBD for Chapter 2

Open Basic1.rbd from the File menu most recently used list and notice that the structure shown in Figure 2.2 is partially built for you.

Figure 2.2 Initial RBD for Chapter 2

Add a block or component called "HighGain" (between the n2 and Comm nodes) with an exponential mean life of 350 hours, a lognormal repair mean of 72 hours and a standard deviation of 12 hours. Figure 2.3 illustrates how a component can be added via the Edit Add Block menu item.

Figure 2.3 Add Block from Edit Menu Option

Chapter 2

2-2

Figure 2.4 displays the Block Properties dialog box that appears after a component is placed within the Workspace View. The title of the dialog box changes from unnamed to the text specified in the Block Name value box when the Update Statistics button is clicked. In addition, the mean and standard deviation of the failure and repair distributions are determined by Raptor and displayed near the bottom of the dialog box.

Figure 2.4 HighGain Failure and Repair Distributions

Use the right mouse click to exit from add block cursor mode. If subsystems are identical, you can use any one of four methods to copy and paste items onto the screen. In all four cases, you must first select an item by single clicking on it and thus changing its color to Raptors highlight color of blue. The traditional methods are to use the copy and paste options under the Edit menu or the corresponding buttons from the toolbar. An easier way is to use the right mouse click while the cursor is over the object, and then select the copy and paste options from the right click menu. Finally, you can use the Windows standard for copying and pasting (i.e., Crtl C and Crtl V, respectively). Copy the 500-Watt solar panel (SolarP_500W) and add two more solar panels to the screen using any method you prefer. Figure 2.5 shows two of the four methods that can be used to copy or paste elements into the Workspace View.

Chapter 2

2-3

Figure 2.5 Copying Elements

Raptor is not limited to single element copying and pasting. Hold the left mouse button down and drag the mouse to activate a rubber-band box that allows you to highlight the nickel-cadmium batteries (BatteriesNiCd) and the unregulated bus (Bus_UR). While the components are highlighted, perform a right mouse click over one of the components and then select the copy option from the menu that appears. Paste the components twice such that your RBD mimics the one shown in Figure 2.6. Notice that all links not completely enclosed by the rubber-band box are not copied.

Figure 2.6 Multiple Copying and Pasting

Chapter 2

2-4

Now that all the physical pieces of the system are placed into the Workspace, let us add the nodes and links needed to define the series-parallel logic of the system. Figure 2.7 displays a node being added to the Workspace View via the Edit menu option. Add a node after the bus components and before the thermal component as shown in Figure 2.8. Used the right mouse click to exit from add node cursor mode.

Figure 2.7 Add Node from Edit Menu Option

Figure 2.8 Node Added to RBD

Add links via the right mouse click menu option and connect the RBD so that it matches the RBD shown in Figure 2.9. Right click anywhere in the Workspace to halt the action of adding of links to the model.

Figure 2.9 Complete RBD

Chapter 2

2-5

Double-click the node labeled n19 and change its name to Power. Set the number of good paths to be two (i.e., k = 2). This is the number of parallel strings (or paths) that must operate for this parallel substructure to function. The modifications to node n19 are shown in Figure 2.10.

Figure 2.10 Node Properties Dialog Box

Immediately after you leave the Node Properties dialog box, the k-out-of-n information is displayed above the node, and the name is displayed below the node as shown in Figure 2.11. To finish construction of this RBD, double-click on the Comm node and ensure its k-out-of-n is set to 1-out-of-2.

Figure 2.11 A Nodes k-out-of-n and Name

Chapter 2

2-6

Now that we have added all the required components, nodes, and links, we have a complete RBD that is ready to be simulated. Choose the Simulation option from the Launch menu or from the right click menu as shown in Figure 2.12.

Figure 2.12 Simulation from the Right Click Menu

This menu item will bring up the Simulation Options dialog box shown in Figure 2.13. Let us conduct a time-truncated simulation for 730.5 hours. We will instruct Raptor to repeat the simulation ten times, that is, ten trials of 730.5 hours in length.

Figure 2.13 Simulation Options Dialog Box

Chapter 2

2-7

Start the simulation by clicking the OK button of the Simulation Options dialog box and then note the changing system status indicator in the upper left-hand corner of the Simulation View. The images shown in Figure 2.14 represent the systems status.

Figure 2.14 Bulls Eye Status Symbols

The green symbol indicates that all elements of the system are functioning properly. The yellow symbol notifies the user that some element or combination of elements have either permanently failed or are being repaired. The red symbol indicates that some combination of elements or possibly a single series element has failed and thus caused the entire system to fail. The Simulation View toolbar contains a collection of buttons that control the simulation. These buttons are labeled in Figure 2.15 and their functions are explained in Appendix B.
Pause simulation Jump simulation Re-simulation Increase simulation speed

Step simulation

Stop simulation

Decrease simulation speed

Figure 2.15 Simulation Buttons

The results of the simulation are shown in Figure 2.16 and are obtained by clicking the View Outputs button from the Simulation toolbar or directly from the Options menu. The reader should note the mean availability and average Mean Down Time (MDT) for this particular simulation, since we will refer to these values in future lessons. You have now completed your first construction and simulation of an RBD. Future lessons will increase the fidelity of the simulations and demonstrate analysis techniques that help provide scientific rigor to RAM decisions.
2-8

Chapter 2

Figure 2.16 Results for Chapter 2

Click on the Return to Workspace button from the Simulation toolbar to return to the Workspace View. Now let us look at the failure and repair distributions that have been entered for this system by selecting the Options Tables View Block Inputs as shown in Figure 2.17.

Figure 2.17 Block Inputs from Menu Options

Chapter 2

2-9

The first tab of the Block Input Tables dialog box lists all the blocks and their associated failure and repair distributions. As shown in Figure 2.18, this RBD is rather simplistic since the failure and repair distributions are identical and somewhat easy to manipulate mathematically.

Figure 2.18 Failure and Repair Distributions for Chapter Two

This simple RBD could be solved using advanced mathematical (i.e., nonsimulation) techniques, but as we shall soon see, it takes only a small change to a components failure distribution, repair distribution, or repair cycle to cause this RBD to be mathematically intractable to all techniques except simulation.

Finally, Raptor is a unit-less tool, enabling the user to define the simulation unit. As far as a Raptor simulation is concerned, 350 hours is equivalent to 350 kilometers or 350 cycles. Raptor allows the user to define what 350 means by providing a list of standard units in the Options System Settings menu. The System Settings dialog box General tab allows users to choose a unit of simulation as shown in Figure 2.19. The chosen unit will be displayed on any relevant dialog boxes (e.g., see Figures 2.4 and 2.13) so that the user is reminded of the units being used within a particular RBD. Changing units in Raptor, however, does not modify any entered values (e.g., 350 hours does not become 21,000 minutes). System settings changes are associated with a particular RBD; global changes can be made in the Preferences dialog box.

Chapter 2

2-10

Figure 2.19 Setting Units on the System Settings Dialog Box

Problems
1. What two inputs must be specified for each component to be placed on the screen? 2. Since Raptor is a unitless tool, what controls the consistency of the inputs? 3. How do you stop adding blocks, events, links, nodes or hierarchies? 4. Can spaces be used in specifying an elements name? 5. What is the maximum number of characters that can be used to specify an elements name? 6. If the k-information for a node is not set while in the Workspace View, when will Raptor prompt the user for this information?

Chapter 2

2-11

7. What is the most significant difference between time-truncated and failuretruncated simulations? 8. When might a cycle-termination simulation be conducted? 9. Are the random numbers drawn for each trial different? 10. Explain the Minimum, Mean, Maximum, Standard Dev and SEM for the MDT results in Figure 2.16. 11. Why does the Ao parameter have more precision than the other parameters shown in Figure 2.16? 12. How long do simulation results remain within Raptors memory? 13. Determine the mission reliability at 50 hours for the system shown below. The MTBDE for components A, B and C are 2,000 hours, 500 hours and 1,000 hours, respectively. All these components fail exponentially and are not repaired.

B A A B B
2-out-of-3

14. If the MTBDE of the exponential components is 75 hours, what is the system reliability at 75 hours if none of the components can be repaired?

R
1-out-of-2

R
1-out-of-2

R R R R
1-out-of-3

R
1-out-of-2

Chapter 2

2-12

15. If the components in Problem 13 are repaired lognormally with a mean of 10 hours and a standard deviation of 1 hour, what is the availability of the system at 75 hours?

Chapter 2

2-13

Chapter 3

Distributions
Objectives
1. Understand what failure and repair probability density functions represent. 2. Understand how means and standard deviations are determined for Raptors probability density functions. 3. Understand which distributions are best for different types of data. 4. Understand how to use the empirical distribution.

Recommended Problems
4, 5, 6, 8, 9, 10, 11 and 12

Recommended Reading
The Exponential Distribution: the Good, the Bad and the Ugly.

Chapter 3

3-1

Distributions Open the file labeled Distributions1.rbd and notice that the solar panels, batteries, and electrical buses are no longer identical as in Chapter 2. Although the RBD in Figure 3.1 possesses the same topology as the previous chapters RBD, the final results produced by these two RBDs are radically different.

Figure 3.1 Initial RBD for Chapter 3

To understand the differences let us first view the failure and repair distributions of the blocks via the Options Tables View Block Inputs (shown in Figure 3.2).

Figure 3.2 Failure and Repair Distributions for Chapter 3

Chapter 3

3-2

Notice that this RBD is noticeably more complex, because it has more than the traditional exponential and lognormal failure and repair distributions. In fact, these distributions are sufficiently complex to cause this RBD to be extremely difficult if not implausible to analyze without simulation. Failure and repair distributions are set in the Block Properties dialog box under the Failure and Repair Distribution tab. As a user selects different distributions, the failure or repair parameter value boxes change to reflect the required input attributes of a particular distribution as shown in Figure 3.3.

Figure 3.3 Choosing a Failure Distribution

Raptor allows users to choose from eighteen statistical distributions to accurately match data obtained from the field, testing or operations. Additionally, by choosing the None for the repair distribution as shown in Figure 3.4, repairs of a component are prohibited from occurring. Choosing the Fixed distribution (Figure 3.5) for repairs allows a set repair time to be implemented each time a block fails. This distribution is often used when the repair of a block has no variance.

Chapter 3

3-3

Figure 3.4 Choosing the None Distribution

Figure 3.5 Choosing the Fixed Distribution

Chapter 3

3-4

Ultimately, to design a realistic reliability block diagram, a user must determine which failure and repair distribution is appropriate for each component. There are many statistics books that help facilitate the choice of distribution, but the one most often used by the authors of this workbook is entitled Statistical Distributions, by Evans, Hastings and Peacock (2nd Edition, ISBN 0-471-559512). Unfortunately, even with the availability of such textbooks, choosing a suitable distribution is somewhat of an art that can take years of experience to perform well. A structured approach to this art, however, can be developed by understanding how failure and repair data exists in the reliability community. Data will generally be available from one of three sources as shown in Figure 3.6.
Historical Data
Handbooks and databases Distribution and parameters provided

Raw Data

Regression or maximum likelihood curve fit

Data fitted; distribution and parameters fitted

Probability density function determined

Absence of Data

Engineering guess

Triangular distribution: min, max and mode estimated

Figure 3.6 Data Sources for Failure and Repair Distributions

If data comes from historical references, the distribution and its key descriptive parameters (e.g., mean, variance, shape, etc.) will be provided. Several organizations collect and then resell to interested parties databases of failure and repair data. These databases are often partitioned by industry. For example, electronic industries will often use the U.S. Governments Military Handbook 217 while the petrochemical industry will often use their own specific proprietary guide. No matter which guide is used, analysts are using these databases to find similar equipment to their application so that they have a basis for choosing a particular Raptor distribution. A common oversight in using these guides is the failure to consider matching the equipments operating environment (e.g., ground benign, uninhabited cargo bay, desert, low Earth orbit, habited-fighter aircraft, cycle of usage, etc.). If raw data from life-testing or maintenance demonstrations is available, it must first be converted into a special type of histogram in which the area under the histogram sums to unity before it can be implemented within Raptor. Thus, a histogram that has been normalized to reflect the probability of an event (failure or repair) must be established. This special type of histogram is known as a

Chapter 3

3-5

probability density function. All of Raptors distributions are predefined to be probability density functions that represent the likelihood intensity of a particular failure or repair event occurring. The construction of probability density functions can be accomplished by hand (if one possesses robust statistical skills) or by curve-fitting software that embeds statistical fitting techniques. These tools use goodness-of-fit tests to guide the choice of a distribution based on supplied data. In general, these curve-fitting tools either use regression or maximum likelihood techniques to determine the best fit. The pertinent output of these curve-fitting tools is to specify a best fit distribution with associated descriptive parameters. If data is unavailable, choosing a distribution becomes speculative. When historical or actual data does not exist from which to form a basis to choose a failure or repair distribution, the triangular distribution should be considered. Since equipment designers can usually bound the values likely to be exhibited by their equipment, the triangular distribution is a natural choice. That is, a minimum, maximum and most likely value can be established for any failure or repair situation by those individuals who either have built or maintained the equipment. This method is often known as implementing the best engineering guess. If a particular engineering guess is considered questionable, Raptor can be used to iterate to a more accurate guess by varying the inputs of the triangular distribution and then analyzing the impacts to the resulting outputs. The nomenclature, equation for the mean, representative illustrations (Figures 3.7 through 3.24) and a brief description of Raptors eighteen built-in failure and repair probability density functions follows: Beta (shape , shape2 )
2
=1 =2 =2 =1 = 0.5 = 0.5

Mean:

=1 =1

= 0.2 = 1

0 0.0 0.5 1.0

Figure 3.7 Beta Density Functions


Chapter 3

Continuous Bathtub curve shape when and equal one-half Data always range from zero to one Often used when data is comprised of p-values Example of use: probability of kill data; probability of success data
3-6

Binomial (trials n, probability p)


0.5 0.4
N = 10 p = 0.1

Mean: np
0.5 0.4
N = 10 p = 0.5

0.3 0.2 0.1 0 1 2 3 4 5 6 7 8 9 10

0.3 0.2 0.1 0 1 2 3 4 5 6 7 8 9 10

Figure 3.8 Binomial Density Functions

Discrete Probability of number of successes occurring Often used in statistics in a cumulative fashion p-value must remain constant from trial to trial Varying p-value is an indication of the multinomial distribution Example of use: probability of x missiles hitting a target

Chi-squared (shape )
0.2
=4

Mean:

0.1

= 10

= 20

0.0

10

15

20

25

30

35

Figure 3.9 Chi-squared Density Functions

Continuous Related to the gamma and normal distributions Often used in statistics in confidence bound determination Example of use: repair data

Chapter 3

3-7

x
Empirical (n number of data points)
0.8

Mean:

i =1

n = 200

0.4

0.0

12

24

28

Figure 3.10 Empirical Density Function

Continuous Raw data is discrete Information about the tails is often missing Example of use: multi-modal data; small data sample sizes

Erlang (shape c, scale b)


1.0
c=1 b=1

Mean: bc

0.5

c=2

b=1 c=5 b=1

0.0

10

Figure 3.11 Erlang Density Functions

Continuous Related to the gamma distribution when shape parameter is an integer Can be used to represent the sum of independent exponential variates Example of use: failure data; repair data

Chapter 3

3-8

Exponential (mean , location )


2.0
= 0.5

Mean: +

1.0
=1 =2

0.0

Figure 3.12 Exponential Density Functions

Continuous Related to the Weibull and Poisson distributions Raptor failure distribution default Raptor allows the entering of exponential data in mean or lambda mode Most commonly used failure distribution in reliability industry Possesses the memoryless property Location parameter most commonly used in warranty analysis Example of use: failure data of electronic components

Extreme Value (location a, scale b)

Mean: a b (1)

Figure 3.13 Extreme Value Density Functions

Continuous Portion of curve lies within the negative domain; warrants caution Example of use: extreme data sources

Chapter 3

3-9

Gamma (shape c, scale b, location )


1.0
c = 0.5 b = 1

Mean: bc +

0.5

c=1

b=1 c=2 b=1 c=5 b=1

0.0

10

Figure 3.14 Gamma Density Functions

Continuous Fundamental distribution that describes most shapes Location parameter most commonly used in warranty analysis Example of use: failure data; repair data

Laplace (location a, scale b)

Mean: a

Figure 3.15 Laplace Density Functions

Continuous Portion of curve lies within the negative domain; warrants caution Often known as the double exponential distribution Example of use: repair data and miss distances

Chapter 3

3-10

Lognormal (mean m, standard deviation )


0.8
m=1 = 0.6

Mean: m

0.4
m=1 =1

0.0

Figure 3.16 Lognormal Density Functions

Continuous Related to the Normal distribution Raptor repair distribution default Raptor allows the entering of lognormal data in normal and log mode Extremely good fit for repair data of most systems Example of use: repair data

Normal (mean , standard deviation )


0.4

Mean:

=0 =1

0.2

0.0

-3

-2

-1

Figure 3.17 Normal Density Function

Continuous Related to the Lognormal distribution Also know as the Bell Curve or Gaussian distributions Extremely good for data involving measurements Portion of curve lies within the negative domain; warrants caution Example of use: failure data; repair data

Chapter 3

3-11

Pearson V (shape , scale , location )


3.6

Mean:

=4

=1

1.8

=2

=1

= 0.5

=1

0.0

Figure 3.18 Pearson V Density Functions

Continuous Similar to Lognormal distribution Used when small repair times dominate the repair data set Location parameter used when minimum repair is greater than zero Example of use: repair data

Pearson VI (shape 1, shape2 2, scale )

Mean:

1 2 1

4.0
1 = 1 2 = 4 =1

2.0
1 = 4 2 = 4 =1

0.0

Figure 3.19 Pearson VI Density Functions

Continuous Similar to Lognormal distribution Used when small repair times excessively dominate the repair data set Example of use: repair data; computer re-boots

Chapter 3

3-12

Poisson (mean )
0.5 0.4
=1

Mean:
0.5 0.4
=4

0.3 0.2 0.1 0 1 2 3 4 5 6 7 8 9 10

0.3 0.2 0.1 0 1 2 3 4 5 6 7 8 9 10

Figure 3.20 Poisson Density Functions

Discrete Related to the exponential distribution Probability of x arrivals in given time interval Often used in queuing theory Often used in optimization of sparing levels Example of use: probability of x failures occurring in a t

Triangular (minimum a, mode c, maximum b)


2.0
c = (b a ) 4

Mean:

a+b+c 3

c = 3(b a ) 4

1.0
c = (b a ) 2

0.0

Figure 3.21 Triangular Density Functions

Continuous Best distribution when information about a component does not exist Mode is the most frequently occurring value of the density function Example of use: failure data; repair data

Chapter 3

3-13

Uniform Integer (minimum i, maximum j)

Mean:

i+ j 2

1 j i +1

Figure 3.22 Uniform Integer Density Function

Discrete Used when probability of occurrence is equally likely within a range Often used to model queuing lines and dice Example of use: repair data

Uniform Real (minimum i, maximum j)

Mean:

i+ j 2

1 ji

Figure 3.23 Uniform Real Density Function

Continuous Used when probability of occurrence is equally likely within a range Fundamental distribution from which all other distributions are derived Often used to model queuing lines Example of use: repair data

Chapter 3

3-14

Weibull (shape , scale , location )

+ 1 Mean: +

1.2
=3 =1

=1

=1

0.6

= 0.5

=1

0.0

Figure 3.24 Weibull Density Functions

Continuous Related to the exponential and Erlang distributions Fundamental distribution that describes most shapes Can take on all aspects of the bathtub curve but not simultaneously Location parameter most commonly used in warranty analysis Example of use: failure data; particularly wear-in and out; repair data

Sometimes the data does not fit any standard statistical distribution well. The frequency histogram of failure data for a hypothetical piece of equipment shown in Figure 3.25 is an example of this concern.
Failure Data
25

20 density function f(t)

15

10

0 Mean Life (hours) 100 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96

Figure 3.25 Histogram of Bimodal Data

Chapter 3

3-15

This data is bimodal and does not fit any of the traditional statistical distributions used for reliability analysis (the reader might wish to verify this by reviewing Figures 3.7 through 3.24). By choosing Raptor's empirical distribution, a failure or repair density function will be generated based on user specified data. Data outside the range of values entered, however, cannot be represented by the empirical distribution. The data can be entered by hand, loaded from a file, or a combination of both methods may be used. Change the repair distribution of the Thermal block using the following empirical data shown in Figure 3.26. When you choose the empirical distribution from within the Block Properties dialog box, another dialog box appears entitled Empirical Data. This box awaits data input from the user as shown in Figure 3.27. Enter each data point and click the accept button to load a data point into the empirical data table. 7.3 21.7 6.9 23.5 15.5 17.7 22.0 13.0 24.0 6.0 9.2 9.0

Figure 3.26 Empirical Repair Data

Figure 3.27 Empirical Data Entry

Chapter 3

3-16

After entering the twelve repair data points, click the OK button of the Empirical Data dialog box and then the Update Statistics button of the Block Properties dialog box. If all data was entered correctly, the mean repair time for the Thermal block should be as shown in Figure 3.28.

Figure 3.28 Empirical Repair Mean

If a file is used to load empirical data for a component, it must be in the standard txt format. It must be comprised of a single column of data without any delimiters or end-of-file markers. A single column of data brought into Excel, Access, or any other database-type tool that can convert data into a txt file, will produce a file that can be read by Raptors empirical algorithm. The maximum number of data points that can be read into Raptor for each empirical failure or repair distribution is 999. Open the Block Input Tables dialog box either by the View Block Inputs button or via the Options Tables View Block Inputs menu item. Figure 3.29 displays the Thermal block with an empirical repair distribution. Notice that the empirical distribution does not display any parameter values like the other distributions. Conduct a time-truncated simulation (ten trials of 730.5 hours each) and note the results shown in Figure 3.30.

Chapter 3

3-17

Figure 3.29 Empirical Distribution Displayed in Input Tables

Figure 3.30 Results for Chapter 3

Chapter 3

3-18

Problems
1. Can the failure or repair distributions of a component be changed within the Fail & Repair Distributions table of the Input Tables dialog box? 2. List and describe two types of systems that might have components that use the None repair distribution. 3. What is the difference in a component having the None repair distribution opposed to having the Fixed 0.0 repair distribution? 4. How many Raptor distributions have a failure parameter that equals the mean of the probability density function? 5. Name a major drawback for using the empirical function. 6. Why is the MDT parameter displayed in Figure 3.30 only based on seven trials when ten were conducted? 7. Why does the MTBDE parameter have a greater-than sign in front of the mean value of 562.94 in Figure 3.30? 8. Why is the MTBDEs standard deviation listed as N/A in Figure 3.30? 9. A histogram of data with a mean of 75.4 and a standard deviation 74.7 is shown below. Which distribution might be the best to describe this data?

10. A histogram of 30 data points is shown below. The data is a collection of target miss-distances. Which distribution might be the best to describe this data?

Chapter 3

3-19

11. A histogram of 300 data points is shown below. The data is a collection of target miss-distances. Which distribution might be the best to describe this data?

12. Take the data displayed below and make a txt file (Excel, NotePad, etc.) and load it into the repair distribution of the Thermal component for the Distribution1.rbd. Conduct a simulation and confirm that the Ao is 0.976734136 and the MDT is 13.019976. 7.3 21.7 6.9 23.5 6.2 8 23.5 15.5 17.7 19.5 12 10.1 22.0 13.0 24.0 20 6.9 6.1 6.0 9.2 9.0 13.8 12.4 22

Chapter 3

3-20

Chapter 4

Logistics Constraints
Objectives
1. Be able to distinguish between the different types of replacement strategies. 2. Be able to create a spare and resource pool. 3. Understand the logistical information in the Sparing tab of the Block Input Tables dialog box. 4. Understand the logistical information in the Maintenance Delays tab of the Block Input Tables dialog box. 5. Understand the information in the Logistics tab of the Output Tables dialog box. 6. Understand the information in the Sparing tab of the Output Tables dialog box. 7. Understand the Raptor repair cycle.

Recommended Problems
1, 2, 3, 4, 5, 6, 7, 9 and 11

Chapter 4

4-1

Logistics Constraints Logistics, or lack thereof, can often cause a system to be unavailable. Disregarding logistics in a simulation model can produce low fidelity results. This chapter will focus on how to implement logistic constraints within Raptor. Open Logisctics1.rbd, look at the Block Input Tables dialog box and focus on the second tab, labeled "Sparing", shown in Figure 4.1.

Figure 4.1 Spare or Replacement Strategies

Only blocks possess sparing or replacement strategies and the three types of replacement strategies are Infinite, Spare Pool and Custom sparing. The words "Infinite" and "Custom" appear in the second column of the Sparing tab, but a block belonging to a spare pool displays the name of that pool in the second column. A replacement strategy is an algorithm that specifies the type of spare that will be used to fix a broken component. A fundamental Raptor assumption is that a spare is always an identical replacement of the particular component that failed. A component can be assigned to only one of the three replacement strategies. First, components that implement an infinite replacement strategy will never run out of spares, since their stockpile is by definition infinitely large. When a component utilizing infinite sparing fails, a spare is immediately available to begin the repair

Chapter 4

4-2

process, barring any other logistics constraints (e.g., labor, repair equipment, etc). Second, components that belong to a spare pool are in competition with other components trying to acquire spares from the very same pool. This competition may delay a component from beginning its hands-on maintenance portion of its repair cycle. Lastly, components designated with the custom sparing replacement strategy are guaranteed spares (again, barring other logistical constraints) designated for particular components. None of the replacement strategies attempt to fix the broken components; they are simply discarded after replacement. It is important to understand that custom sparing is different from spare pools in that the former applies to a single component, while the latter applies to multiple components. This may seem like a trivial difference, but it is rather important since a component using custom sparing will never be subject to competition with other components for its spares. Logistical constraints other than the lack of spares that might interfere with the completion of a components repair cycle include lack of resources, logistic delays, preventive maintenance and dependency. This chapter will cover resources and logistical delays while preventive maintenance and dependency will be discussed separately in Chapters 6 and 7 respectively, do to the complexity of these two subjects. For this particular RBD, a summary of the resource and logistical delay constraints are listed in the Maintenance Delays tab of the Block Input Tables dialog box shown in Figure 4.2.

Figure 4.2 Maintenance Delays Properties

Chapter 4

4-3

Notice that the pre and post repair logistics delays have been specified as fixed lengths of time. Both can be specified as random variables, however, using any of Raptors eighteen built-in distributions. Notice also that Figure 4.2 indicates that resources for each component are needed to conduct a repair. Double-click on the Thermal block and select the second tab, labeled Maintenance Information, as shown in Figure 4.3.

Figure 4.3 Thermals Maintenance Information

This tab allows a component to be assigned to one of three types of replacement strategies as well as two fixed or random logistical delays. Figure 4.3 indicates that the Thermal component is implementing custom sparing with two of three options utilized; although any combination of these three options can be specified. When custom sparing is selected, an initial stockpile that is available at the beginning of a simulation trial must be chosen even if it is initially zero. The first option allows for a number of new spares to arrive at a fixed frequency. The second option allows for a number of new spares to arrive after a component's stock level has reached a given level and a specified time has past. The last option allows a spare to arrive after a specified time when the component's stock level is emptied and the demand for another spare has been made by a component.

Chapter 4

4-4

Observe that the default for pre and post logistics delays is the fixed distribution with a mean of zero. Thus, the Thermal components repair cycle is only composed of hands-on maintenance whose length was specified on the Failure & Repair tab of the Block Properties dialog box. Let us change the pre-repair logistic delay time to be represented by the triangular distribution as shown in Figure 4.4. By selecting the pre repair logistics delay button, the Define Distribution dialog box appears on top of the Block Properties dialog box. Throughout Raptor, if a distribution is displayed on a button, it can be modified by simply clicking on the button and displaying the Define Distribution dialog box. Additionally, whenever one dialog box appears on top of another, the one on top has focus and must be resolved (i.e., selecting the OK or Cancel buttons) before the dialog box on the bottom can be manipulated.

Figure 4.4 Setting the Pre Logistics Delay to be Random

We have selected a triangular distribution with a minimum of 0.10 hours, a maximum of 0.65 hours and a mode (or most likely value) of 0.15 hours. While the Define Distribution dialog box is displayed, select the Update Statistics button to determine the mean and standard deviation of this particular triangular distribution. Thus, on average eighteen minutes (0.30 hours) of pre logistic delay time is needed before hands-on maintenance can be started (i.e., assuming spare and resource constraints are met). Modify the properties of the post-repair
4-5

Chapter 4

logistics delay time in the same manner as the pre-repair logistic delay time such that the Thermals Block Properties dialog box appears as shown in Figure 4.5.

Figure 4.5 Random Pre and Post Logistics Delays

On average, eighteen minutes (0.30 hours) of post logistic delay time is needed after hands-on maintenance is completed before the component can be considered repaired. Until the post-repair logistics delay has expired, a component cannot begin to operate. Pre and post logistical delays are common elements of a components repair cycle and examples of these types of delays include: acquiring repair personnel or tools, driving to or from a repair location, safety inspection of a repaired component, functional testing of a component and paperwork required to be filled out after a repair is completed. Double-click on the nickel-cadmium batteries (BatteriesNiCd) component and select the second tab labeled Maintenance Information. Figure 4.6 displays an example of a component that uses the spare pool replacement strategy. Notice that a component can be assigned to any of the spare pools listed in the spare pools drop down list box. An example of infinite sparing can be observed by doubleclicking on the 500-watt solar panel (SolarP_500W) component and selecting the second tab as shown in Figure 4.7.

Chapter 4

4-6

Figure 4.6 Nickel-Cadmiums Maintenance Information

Figure 4.7 500 Watt Solar Panels Maintenance Information

Chapter 4

4-7

Let us change this components replacement strategy from infinite to spare pool by clicking on the Create Spare Pool button, which results in the Spare Pools dialog box being displayed on top of the 500-watt solar panels Block Properties dialog box. Create a spare pool called PhotoVPanels (i.e., photovoltaic panels) with the attributes shown in Figure 4.8. There will be an initial stock pile of two spares and one new spare will arrive approximately every six months from a shuttle re-supply mission. If needed, an emergency spare can be acquired in three days from a dedicated launch of a Spaceship One type vehicle. The stock level ordering sparing strategy was determined to be infeasible for this component and therefore was not engaged.

Figure 4.8 Spare Pools Dialog Box via Create Pool Button

You must click the Apply button to register the creation of a spare pool each time a new one is generated. Once you have clicked the Apply button, the Spare Pools dialog box is reset to allow the development of more pools if desired. After creating the photovoltaic spare pool cancel from this dialog box and change this component from infinite sparing to the photovoltaic spare pool as shown in Figure 4.9. Set both of the other solar panels (i.e., the 650 and 900 watt components) to acquire spares from the photovoltaic spare pool as well. Before continuing on in this chapter, view the Sparing tab from the Block Input Tables dialog box and confirm that your table looks exactly like the one displayed in Figure 4.10 (specifically all three solar panel components have the same spare pool attributes).
Chapter 4 4-8

Figure 4.9 Changing from Infinite to Spare Pool Replacement Strategy

Figure 4.10 Completed Replacement Strategies

Chapter 4

4-9

Select the fourth tab of the Attitude components Block Properties dialog box and notice that this component requires three astronauts to begin its hands-on repair (Figure 4.11). Resources concerning preventive maintenance will be discussed in Chapter 6 when the subject is introduced.

Figure 4.11 Resources for the Attitude Component

These three astronauts are drawn from a resource pool that has already been created for this RBD. The creation of resource pools is conducted in the same manner as spare pools by simply clicking on the Create Resources button of the Resources tab. Resources differ from spares in that they are not discarded but are entities that are held by components until their repairs are completed. Even if a spare is available, repair of a component cannot begin until all resources requested by a component are also available. In fact, resources are not requested until a spare has first been obtained by a component. Click the Create Resources button and select Astronauts from the dropdown list box. As shown in Figure 4.12, there are only five astronauts available to conduct repair operations for all components assigned to this resource pool. See Figure 4.2 to view a global perspective of the component demand for the five astronauts. Note: While an RBD can possess numerous resource pools, a component can only draw from one of these pools.
4-10

Chapter 4

Figure 4.12 Resources for the Attitude Component

You can create spare and resource pools without having to be within the Block Properties dialog box of a particular component; this is merely a convenience. The Spare Pools and Resource Pools dialog boxes can be displayed via the Options Spares menu item and the Options Resources menu item, respectively. For the RBD we have just finished building, conduct a time-truncated simulation for ten trials. Set the simulation length to 730.5 hours. Your results should look identical to those shown in Figures 4.13 through 4.15. Specifically note that the availability and MDT results of Chapter 3 (0.976313806 and 13.263877, respectively) are significantly different from those highlighted in Figure 4.13. Since the RBDs from Chapters 3 and 4 are so different, a direct comparison of results is not appropriate. For the purposes of this workbook however, we shall say that the results from this chapter are more accurate representations of the true RAM characteristics for this system, since this model is of higher fidelity by simulating the effects of numerous logistical constraints. Recall that the Chapter 3 RBD possessed infinite spares and infinite resources since neither were ever specified (i.e., the Raptor default situation). In the long run, the action of adding logistics constraints can only degrade a systems overall RAM performance since infinite spares and resources represents ideal conditions.
4-11

Chapter 4

Figure 4.13 Summary Results from Chapter 4

Figure 4.14 Logistics Results from Chapter 4

Chapter 4

4-12

Figure 4.15 Sparing Results from Chapter 4

The total mean time between maintenance (MTBM) is nearly 109 hours, which indicates how often the system requires some kind of maintenance that may or may not be associated with a system-level failure. The unscheduled mean time between maintenance (MTBMu) is identical to the total MTBM since preventive maintenance is not specified in this model. The total mean maintenance time (MMT) is just over 60 hours, which indicates the average repair cycle for all components that failed during the simulation. If preventive maintenance is not included in a particular model, the MMT parameter is commonly denoted as the Mean Repair Time (MRT). Figure 4.14 also indicates the percentage of time the system is within a red (failed), yellow (weakened) or green (fully functional) state. Notice that minimum, maximum, standard deviation and standard error of the mean (SEM) are given for each reliability, availability or maintainability parameter. The minimum is the smallest value observed over the number of trials simulated, while the maximum is the largest. The standard deviation (sample not population) is a measure of the spread of the results across all relevant trials. The SEM is a measure of the spread about the mean value and is determined by dividing the standard deviation by the square root of the number of runs (or trials) that were simulated. The SEM is often used when attempting to construct confidence bounds about the mean of a particular parameter. For example, the

Chapter 4

4-13

90% confidence interval about the mean availability, MDT, MTBM and MMT is approximately equivalent to the mean plus or minus two SEMs and are shown in Figure 4.16.
Lower Bound Availability MDT MTBM MMT 0.895 6.106 83.732 51.551 Mean 0.945 33.590 108.991 60.188 Upper Bound 0.995 61.075 134.250 68.825

Figure 4.16 Confidence Bounds for some Chapter 4 Results

Notice that Figure 4.15, the Sparing tab of the Output tables, displays the number of spares that have been consumed during the simulation. The HighGain component consumed on average 1.7 spares across the ten trials of simulation. At least one trial needed three spares for the HighGain component and at least one trial did not need any spares. Again, it can be shown that a 90% confidence bound interval for the number of spares needed for the HighGain component ranges from 1.086 to 2.314. Thus, providing 2.3 spares would ensure high confidence that the HighGain component will not run out of spares during this length of simulation. Since non-integer spares often cannot be acquired, a provisioning of three spares might be considered appropriate for this component. (Note: This results in a confidence of 99.63%). The Attitude component had an infinite supply of spares but did not require any during the ten trials of simulation. If the simulation length is representative of the operational time of interest and enough trials are conducted, the Sparing tab of the Output Tables could be used to determine the provisioning levels for each block. Notice that the solar panels collectively consumed only 0.6 spares (the sum of 0.4, 0.2 and 0.0 average spares consumed for the 500, 650 and 900-watt solar panels, respectively) across the ten trials. Recall that the photovoltaic spare pool has an initial stockpile of one, which for this simulation seems to be adequate. While Raptors logistics capabilities are designed to allow an assessment of a particular sparing or resource strategy, Raptor cannot directly determine an optimal strategy. Raptor can be used, however, as a tool that allows a user to iterate towards an optimal solution.

To fully grasp the logistics simulated by Raptor, you must understand the repair cycle that components undergo once they have failed. Figure 4.17 summarizes the repair cycle that a component undergoes each time it fails unless the None distribution is specified. The reader should note that some portions of a repair
Chapter 4 4-14

cycle always occur instantaneously since they are logic features of the Raptor code (e.g., check system status, tally statistics, etc.) and thus are not traditional aspects of a logistic repair cycle. The most important aspect of this diagram is to realize that there are a number of events (resources, spare availability, etc.) that can delay the start or conclusion of a components repair, which then directly affects a systems RAM characteristics. If a component uses the None repair distribution, it will not initiate a repair cycle. Instead, a component is permanently failed without any possibility of being repaired within a particular trial of a simulation.
Check for spare Wait pre logistic delay time Acquire spare

} t = zero

} }

t = random, fixed, or zero

Wait for resources Wait random removal and replacement time Wait post logistic delay time Check system status Wait for dependent elements Change block to operational and tally statistics

} t = random or zero
t = random

} t = fixed } t = zero } t = random or zero

t = zero

Figure 4.17 Component Repair Cycle

Problems
1. When is it appropriate to use the unrealistic replacement scenario of infinite sparing? 2. What happens to a component that tries to obtain a spare from an empty pool?

Chapter 4

4-15

3. If two components with different repair distributions are in the same spare pool, and one of them fails, what repair rate is used to fix the broken component? 4. Does a custom sparing of 10 spares arriving every 1000 hours equal 1 spare arriving every 100 hours? 5. Is there any priority for assigning resources to competing components? 6. Can a component be assigned to a resource pool and a spare pool? 7. If component A needs three repair people to start its repair cycle but only one is available, then component B fails and needs only one repair person from that same pool, can the repair of component B begin? 8. Name a system that might use a fixed length logistics time delay and one that might use a random delay length. 9. Determine the 90% confidence interval for the mean number of system failures as shown in Figure 4.13. 10. Determine the 99% confidence interval for the mean system green time as shown in Figure 4.14. 11. What is the probability that more than one spare would be needed for the LowGain component for a month of operation? 12. Is the length of any repair cycle fixed, random, or either? reasoning. Explain your

Chapter 4

4-16

Chapter 5

Hands-on Example I
Objectives
1. Be able to build an RBD. 2. Be able to extract relevant attributes of an RBD from a physical description of a system. 3. Be able to set up a spare pool. 4. Understand the best way to determine a systems MTBDE. 5. Understand the importance of consistent units in a simulation. 6. Understand the difference between no repair and zero length repairs.

Recommended Problems
2, 3, 5 and 6

Chapter 5

5-1

Hands On Example The best way to understand how to apply and appreciate any software application is to actually use the software. A problem is presented below that should reinforce your understanding of the previous lessons. It begins with the actual development of a system-level RBD (sometimes the most difficult task in constructing reliability simulations), and ends with the generation of statistically meaningful results.

System Description: A new 14-wheel truck is being designed by WorldFleet. The tractor consists of the following subsystems: engine, electronics, fuel, cooling, transfer-drive, brakes, tires, structure and a gearbox. The fuel subsystem is composed of two tanks and one pump. There are two braking systems, either of which is capable of stopping the truck. The trailer is comprised of the following subsystems: tires, electronics and structure. The configuration of the tires is shown in Figure 5.1.

10,000 pounds max per corner


Figure 5.1 Tire Configuration of a WorldFleet Truck

The tires beneath the trailer primarily support the truck's load. Each tire can support a 5,000-pound load. The truck will continue to function if each of the four corners (not including the front axle) can sustain a 10,000 pound load. The truck carries two different spares; one spare is for the four interior tires and the other spare is for the remaining tires not including the front axle.

Chapter 5

5-2

A. Describe a downing event for the truck system.

B. Draw an RBD of the truck system.

Chapter 5

5-3

C. Determine the replacement strategies for each element.

D. Open Truck1.rbd and use the inside tire information in Figure 5.2 (all values are in miles) and the replacement strategies you just determined to complete the RBD. The inside tires, which have not yet been added to the RBD take 60 minutes to repair while the outside tires take 30 minutes to repair. Conduct a 25-trial simulation to determine the mission reliability of the truck on a 1200-mile trip and the systems mean time to failure.
Block Name Engine Tractor_Ele Fuel_Tank1 Fuel_Tank2 Fuel_Pump Cooling Transfer_Drive Brakes_1 Brakes_2 Gearbox Tractor_Structure LeftFront_Tire RightFront_Tire Trailer_Structure Trailer_Ele Tire_Outside_1 Tire_Outside_2 Tire_Outside_3 Tire_Outside_4 Tire_Outside_5 Tire_Outside_6 Tire_Outside_7 Tire_Outside_8 Tire_Inside_1 Tire_Inside_2 Tire_Inside_3 Tire_Inside_4 Order 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 Failure Normal Exponential Gamma Gamma Weibull Exponential Lognormal Weibull Weibull Weibull Weibull Weibull Normal Weibull Exponential Weibull Weibull Weibull Weibull Weibull Weibull Weibull Weibull Weibull Weibull Weibull Weibull Par1 12,000 60,000 1.4 1.4 1.25 15,000 45,000 1.3 1.3 2.3 1.5 1.4 1.4 1.5 84,000 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 Par2 1,000 0 57,000 57,000 57,000 0 1,200 15,000 15,000 36,000 900,000 60,000 60,000 720,000 0 28,000 28,000 28,000 28,000 28,000 28,000 28,000 28,000 36,000 36,000 36,000 36,000 Par3

0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Figure 5.2 Truck Failure Distributions

R(1200) = ____________________

MTBDE = ____________________

Chapter 5

5-4

Two separate simulations are required to resolve the previous questions. To determine the reliability of a 1200-mile trip, the simulation needs to be a timetruncated simulation with an ending simulation time of 1200 (i.e., run until 1200 miles have been exhausted). If you built your RBD correctly, your results should be identical to those shown in Figure 5.3. If your results do not match, open Truck2.rbd and simulate to achieve the correct results.

Figure 5.3 Reliability Results for Truck Example

Notice that the reliability of the system at time 1200 was 0.8000 with a SEM of 0.0816. Hence, for this simulation of the 25 runs, 20 were completed without a system failure. One of the conditions of this hands-on example was to conduct only 25 trials and therefore a very precise answer cannot be determined for such a small sample size. A 95% confidence interval on the mean reliability is between 0.4439 and 0.9748. This may be considered a rather large interval and if more fidelity in the mission reliability result is desired, many more trials should be conducted. Notice that Figure 5.3 does not indicate an exact value for the system's MTBDE but instead displays a value that is greater than 1101.778016. The greater than sign is a warning that indicates that some trials were completed with the system still in an up condition and thus this value is not a good estimator of the system's true MTBDE.

Chapter 5

5-5

A longer simulation time could have been chosen such that the system was guaranteed to fail in each trial. This approach would ensure that the greater than sign would not be displayed in front of the MTBDE value. An obstacle with this approach is that the user would have to guess the ending simulation time such that all trials would see at least one system failure. This type of simulation could be slow since those trials that would have early system failures would continue until the ending simulation time is reached. A method for overcoming this obstacle is to conduct what are known as failure-truncated simulations. Thus, the best way to achieve a good indication of the system's mean time to first downing event would be to conduct a one-failure simulation for a number of trials. This type of simulation is often called an endurability simulation since you are attempting to determine how long a system can endure before failing. Figure 5.4 displays how to set up a failure-truncated simulation.

Figure 5.4 Setting up a Failure-Truncated Simulation

Use your existing RBD or open Truck3.rbd and conduct a failure-truncated simulation. The results of such a simulation are shown in Figure 5.5.

Chapter 5

5-6

Figure 5.5 Summary Results for Failure-Truncated Simulation

Of the 25 trials conducted, the average trip duration achieved was a little more than 6,942 miles; this is enough for a cross-country round trip of the United States. An MTBDE of 6,942 miles is a much better estimate of the truck's mean life than the previous simulation result of a little more than 1,101 miles. Perhaps of more interest is the minimum value obtained, which in this case was a little more than 593 miles. Thus we could be relatively confident that our truck could consistently accomplish a 600-mile trip based on a sample size of 25 trials. Notice in Figure 5.5 that the mission reliability parameter is zero when conducting failure-truncated simulations. The reason for this is that we specified the system to fail once, thus we know the mission reliability by definition will equal zero for every trial.

Readers should not be surprised that they must modify a simulation to extract relevant data from the summary results tab of the Output Tables dialog box. That is, one simulation does not necessarily yield all the information desired about the systems RAM characteristics. The previous simulations were structured to yield relevant mission reliability values in one case, and system MTBDE in another.

Chapter 5

5-7

The reader should note that during these simulations, all non-tire components turned an Indian red color (i.e., done status) upon failing and this color indicates that there is no possibility of repairing this component (e.g., none repair distribution selected, spare stockpile is exhausted or replacement spares are not scheduled to arrive). Also, notice in Figure 5.5 that the last rows title has changed from System Failures to Ending Sim Time since we already know the number of system failures that will occur. We do not know, however, when each simulation trial will terminate since this is a random variable for failure-truncated simulations.

Problems
1. Why are the MDT results in Figure 5.3 based on only five of the 25 trials conducted? 2. What do the MDT values from Figure 5.3 represent with respect to miles? 3. Why are the availability numbers in Figure 5.3 bad estimators of the trucks true availability? 4. Explain when you would conduct a mission reliability simulation and when you would conduct an endurability simulation. 5. How would you properly determine this system's MDT? 6. List some ambiguous aspects of the truck examples. 7. Why are the MMT results from the Truck3.rbd based on only eight of the 25 trials conducted?

Chapter 5

5-8

Chapter 6

Preventive Maintenance
Objectives
1. Understand the preventive maintenance options. 2. Be able to distinguish between individual and collective preventive maintenance. 3. Be able to create a preventive maintenance trigger. 4. Be able to assign preventive maintenance resources. 5. Understand the preventive maintenance specific output parameters. 6. Understand the issue with scheduling preventive maintenance activities for exponentially distributed components.

Recommended Problems

Chapter 6

6-1

Preventive Maintenance Thus far, Raptor has only sent a component to its repair cycle if a failure occurs based on the components probability density failure function. This is often called a hard failure and occurs randomly, which implies that the failures are unscheduled. This chapters focus is on Raptors abilities to model scheduled maintenance activities for a single component and for a group of components. Often scheduled maintenance is referred to as preventive maintenance and is traditionally implemented to lengthen the mean time between failures of a component. The goal of preventive maintenance is to time a scheduled maintenance action before the component was due to fail and thus avoid an unpredictable failure. By timing the frequency of preventive maintenance correctly, users can manage the impacts of component failures on a system. Open the PreventMx1.rbd file and then display the Block Properties dialog box for the Attitude component. As shown in Figure 6.1, select the third tab labeled Preventive Maintenance and then engage the checkbox at the top of the tab. Once this checkbox is marked, the preventive maintenance activities of this component can be defined.

Figure 6.1 Preventive Maintenance Tab of Block Properties Dialog Box

Chapter 6

6-2

The first task that must be specified before any preventive maintenance can transpire for a particular component is to determine how often this scheduled maintenance will occur. Raptor allows the frequency of preventive maintenance to be defined in one of two forms. First, a component can have a fixed frequency that is entirely associated with only that component. Second, a component can belong to a group of components that all have preventive maintenance occurring at the same time. The latter is a common maintenance strategy for many systems since it coordinates maintenance activities on groups of components that possess the same preventive maintenance frequency. For example, after a fighter aircraft has flown for 500 hours, it is sent to its preventive maintenance inspection where numerous components are scrutinized, replaced or possibly lubricated. Another example is a car that has a preventive maintenance cycle of 3,000 miles in which the oil, the oil filter and the air filter are all replaced. It is possible to define all three of the previously mentioned preventive maintenance actions individually by component but since they all occur at the same frequency, it easier to define a preventive maintenance group. A group is defined by specifying a trigger and then attaching the desired components to that trigger. We will discuss triggerbased preventive maintenance later in this chapter. Set the Attitudes frequency of preventive maintenance to be a fixed 1,500 hours as shown in Figure 6.2.

Figure 6.2 Setting the Frequency of Preventive Maintenance

Chapter 6

6-3

Now that the frequency has been specified, we need to define the duration of the preventive maintenance repair action. Select the Duration button and set the length of the preventive maintenance to be triangularly distributed as shown in Figure 6.3. Return to the components preventive maintenance tab (Figure 6.4) and note that the Duration button now displays a mean of 2.167.

Figure 6.3 Setting the Duration of Preventive Maintenance

At this point, the basic preventive maintenance functions for this component have been defined. There remains an advanced feature that is commonly specified when multiple components have the same preventive maintenance frequency. An elapsed time can be delineated that can shorten the first occurrence of a components preventive maintenance. This is often used when a user does not want an entire group to arrive for preventive maintenance at the same time and thus overwhelm the maintenance personnel, unnecessarily weakening the system. For example, four machines may need to be lubricated every 100 hours. The first machine could have an elapsed time of 80 hours and thus its first preventive maintenance action would occur at a simulation time of 20 hours. The time to the first preventive maintenance action is determined by subtracting the elapsed time from the preventive maintenance frequency. The elapsed times for the other three machines could be specified as 60, 40 and 20 hours and thus their first preventive maintenance actions will occur at 40, 60 and 80 hours, respectively. This type of offset strategy ensures that the four-machine system does not inundate the maintenance personnel and that the system never has more than one of four machines engaged in preventive maintenance activities. There are five checkbox options that can be specified for a component if further fidelity is needed to stipulate a components preventive maintenance activities. The first checkbox specifies whether or not a spare is needed to engage the preventive maintenance action. For example, an inspection type of preventive maintenance often does not require a spare. The second checkbox states that after a preventive maintenance action is completed, a component is either refreshed as
Chapter 6 6-4

good as new or operates with the amount of life exhausted that it possessed when it started the preventive maintenance action. The third checkbox, which is currently deactivated, states whether a preventive maintenance action is delayed until a system is in a non-mission mode. Missions will be defined in Chapter 17. The essence of this option is that you might not want to perform preventive maintenance on an aircraft engine while the aircraft is in flight. The fourth checkbox allows a user to specify whether or not a component will defer its preventive maintenance until the required spare and resources are available to begin the repair action. When this checkbox is unmarked, a component may have a longer effective preventive maintenance time than specified since it could be waiting to start its scheduled maintenance action due to logistical competition for spares and resources. The last option is a checkbox that states whether a hard failure (i.e., an unscheduled maintenance event) resets the time to the next preventive maintenance activity or allows it to occur as previous scheduled. For example, if a component with a preventive maintenance frequency of 100 hours fails after 99 hours of operation, should it conduct its preventive maintenance action one-hour later or 100 hours after its repair is completed?

Figure 6.4 Updating the Preventive Maintenance Duration for the Attitude Component

Chapter 6

6-5

As shown in Figure 6.4, the Attitude component needs a spare to perform its preventive maintenance action, will be refreshed to a new component status after this action, will wait for the appropriate number of Astronauts and a spare are available to start this action, and a hard failure will reset its time for its next preventive maintenance action. Now that all of the preventive maintenance functions are delineated for the Attitude component, the number of resources needed to conduct the preventive maintenance action needs to be specified. For this component, we will need two Astronaut resources to perform the preventive maintenance action. Recall from Chapter 4 that a components resource information is located on the fourth tab of the Block Properties dialog box. After being modified as described above, Figure 6.5 shows that three Astronaut resources are needed to repair the component as a result of an unscheduled maintenance event while only two are needed for a scheduled maintenance event.

Figure 6.5 Setting the Number of Preventive Maintenance Resources

Thus far we have only defined preventive maintenance for a single component. Next, we next want to define a few preventive maintenance groups. By defining groups we ensure that the preventive maintenance actions are performed at regular intervals, which might not be the case for a single component. The repair of a component, its dependency relationship or is standby status can all shift a single components preventive maintenance schedule.

Chapter 6

6-6

We want to perform preventive maintenance at regular intervals on each of the solar panels and their corresponding batteries but in such a manner that we do not needlessly take the entire system down. We will define three triggers that occur approximately every twelve days such that each trigger is offset from the others by twenty-four hours. Select the Triggers menu item from the Options menu and note that the Define Triggers dialog appears as shown in Figure 6.6. This dialog box allows numerous triggers to be defined in the same manner as the Spare Pools and Resource Pools dialog boxes.

Figure 6.6 Triggers Dialog Box

Triggers must have a unique name, can possess a fixed or random frequency and can be offset by an elapsed time. Triggers can also be defined to occur just once or repetitively during a simulation trial. By contrast, a non-trigger based preventive maintenance frequency is by definition repetitive. Build a 500WPowerString trigger using a frequency that is normally distributed (with a mean of 288 hours and a standard deviation of one hour) and an elapsed time of 264 hours as shown in Figure 6.7.

Figure 6.7 500W-PowerString Trigger Defined

Chapter 6

6-7

Be sure to establish the creation of a trigger by clicking the Apply button. Build the 650W-PowerString and 900W-PowerString triggers as shown in Figures 6.8 and 6.9, respectively. Both of these triggers are normally distributed with a mean of 288 hours and a standard deviation of one hour. Ensure the respective elapsed times are also entered.

Figure 6.8 650W-PowerString Trigger Defined

Figure 6.9 900W-PowerString Trigger Defined

Notice that each trigger differs from at least one other by twenty-four hours (i.e., subtract their elapsed times from each other). These triggers are set up such that the 500W-PowerString will occur first, after about twenty-fours of simulation, followed by the 650W-PowerString approximately twenty-fours later. Then the 900W-PowerString trigger will occur about twenty-four hours after the 650WPowerString trigger. This cycle will repeat approximately every twelve days. A clearer explanation of the manner in which the triggers will operate during a simulation trial of length 730.5 hours is shown in Figure 6.10.
Chapter 6 6-8

Figure 6.10 Preventive Maintenance Schedule Design

Now that we have defined the triggers, we need to group components that will be controlled by a trigger. Select the 500 Watt solar panel component, assign it to the 500W-PowerString trigger, and set its remaining preventive maintenance attributes as shown in Figure 6.11.

Figure 6.11 500 Watt Component Preventive Maintenance Attributes

Ensure to set the duration to be triangularly distributed with a minimum of one, a maximum of two and the most likely value of 1.5. Uncheck the first two preventive maintenance options checkboxes and note that the last checkbox is deactivated. If a component belongs to a trigger it cannot alter the timing of a triggers next event since a trigger is a community event associated with multiple components and not an individual component event. Select the Nickel-Cadmium
Chapter 6 6-9

battery component and set its preventive maintenance attributes as shown in Figure 6.12.

Figure 6.12 Nickel-Cadmium Battery Component Preventive Maintenance Attributes

Set the duration to be normally distributed with a mean of 8 hours and standard deviation of 0.50 hours. Uncheck only the first preventive maintenance option. Thus, the batteries of a power string are refreshed as a new component while their corresponding solar panels are merely inspected and not refreshed. This represents a scenario where by the batteries can be refreshed with new catalysts but the space-based solar panels cannot due to the constant degradation of solar radiation. Assign the 650 Watt solar panel component to the 650W-PowerString trigger and the 900 Watt solar panel component to the 900W-PowerString trigger. Specify the same triangular duration and mark the checkboxes as they are for the 500 Watt solar panel component. Select the Nickel-Hydrogen battery and the Sodium Sulfate battery components and set their preventive maintenance attributes as shown in Figures 6.13 and 6.14. Both have normally distributed preventive maintenance durations with the former possessing a mean duration of 6 hours with a standard deviation of a 0.25 hours and the latter has a mean of 4 hours with a standard deviation of 0.10 hours.
6-10

Chapter 6

Figure 6.13 Nickel-Hydrogen Battery Component Preventive Maintenance Attributes

Figure 6.14 Sodium-Sulfate Battery Component Preventive Maintenance Attributes

Chapter 6

6-11

Open the Block Input Tables dialog box and select the Preventive Maintenance tab. If all changes were conducted properly, the tab should appear as shown in Figure 6.15. Notice that only the seven components for which we checked the preventive maintenance checkbox are listed on this tab. All other components possess only unscheduled maintenance activities. The last five columns of Figure 6.15 represent the five preventive maintenance check boxes previous described.

Figure 6.15 Preventive Maintenance Tab of the Block Input Tables Dialog Box

A global view of the triggers can be obtained from the Options Tables View System Inputs menu item. This will bring up the System Settings Input Tables dialog box, which provides an overview of the system topology on the first tab. The last tab displays all the triggers contained within a model and their attributes as shown in Figure 6.16. Additionally, this dialog box provides a global view of the spare pools and resources associated with a particular model. Open the Simulation Options dialog box and select the Advanced tab as displayed in Figure 6.17. Check the Start the simulation in step mode checkbox, which will allow us to view the effects of the preventive maintenance that we specified in this chapter. This simulation will start with the simulation halted at time zero and will only advance when the Step button is clicked. Each time the Step button is clicked, the simulation will jump to the next event on the simulation calendar. Click the OK button to start the simulation.

Chapter 6

6-12

Figure 6.16 Global View of All Triggers

Figure 6.17 Advanced Tab of the Simulation Options Dialog Box

Chapter 6

6-13

It should be noted that the Step mode function is often used to facilitate the detailed validation of numerous simulation effects. Clicking the depressed Pause button will place the simulation back into normal operation mode and thus progress without stopping through all of the events of a simulation. Clicking on the Jump button will change the simulation back to normal simulation speed and then stop at the next trial. This button is often used to jump to the nth trial instead of clicking through each and every event contained with the first (n-1) trials. Figure 6.18 shows the Pause, Step and Jump buttons of the Simulation toolbar.

Figure 6.18 The Pause, Step and Jump Buttons of the Simulation Toolbar

Step once and notice that the 500 Watt solar panel and the Nickel-Cadmium batteries have turned to an orange color (Figure 6.19), which is the color that indicates a component is undergoing preventive maintenance activities.

Figure 6.19 Color Status of Preventive Maintenance Activities

Take fifteen more steps and notice that 500 Watt solar panel is undergoing preventive maintenance but its trigger companion, the Nickel-Cadmium battery component, is not. Recall that we specified that a component must wait to engage its preventive maintenance action until enough resources are available. The failure of the Bus_QR component takes four of the five Astronauts and does not leave enough resources to conduct preventive maintenance on both components of the 500W-PowerString trigger group.

Figure 6.20 Effects of Deferring Preventive Maintenance Due to Lack of Resources

Click on the depressed Pause button and allow the simulation to complete. You should obtain results as shown in Figures 6.21 and 6.22

Chapter 6

6-14

Figure 6.21 Summary Results for Chapter 6

Figure 6.22 Logistics Results for Chapter 6

Chapter 6

6-15

Both the availability and MDT improved for this model as compared to the results of Chapter 4 (0.944926395 and 33.590480, respectively) as would be expected since we occasionally avoid hard failures as a result of our preventive maintenance strategies. Figure 6.22 is showing for the first time results for both the MTBMs and MMTs parameters. The total MTBM is 30.193797 hours while the unscheduled and scheduled MTBM are 123.526674 and 40.557737 hours, respectively. It should be obvious that the total MTBM is not a straight average of the MTBMu and MTBMs parameters but a weighted average based on the number of each type of maintenance activity. Likewise, the total MMT is 17.034785 hours while the unscheduled and scheduled MMT are 59.650385 and 3.671913 hours, respectively.

It should be stressed that, if a component has an exponential failure rate without planned scheduled maintenance, conducting preventive maintenance on such a component would make little sense. An exponentially distributed component possesses the memory-less property, which states that no matter how much life is exhausted on a component, it has nothing to do with when it will fail in the future. In the long run, performing preventive maintenance on an exponentially distributed component will not extend the expected time to the components next failure and hence should not be performed.

Problems
1. How would you set up a random preventive maintenance frequency for a single component? 2. Does it make sense to define the Attitudes preventive maintenance frequency to be greater than the simulation length? If not, when would it? 3. Assume a component has a preventive maintenance frequency of 100 hours, a PM duration of ten hours and an elapsed time of 50 hours. When would the first and second preventive maintenance actions occur? 4. Assume a component belongs to a trigger group such that it has a preventive maintenance frequency of 100 hours, a duration of ten hours and an elapsed time of 50 hours. When would the first and second preventive maintenance actions occur? 5. Could a components first preventive maintenance action occur at a random time given that the elapsed time field takes on a fixed value? If yes, explain how this would be set up.

Chapter 6

6-16

6. State a component that requires a spare to perform its preventive maintenance action and one that does not. 7. State a component that is refreshed like a new component after its preventive maintenance action and one that is not. 8. What risk is being taken if the defer preventive maintenance until a spare and resources are available checkbox is unmarked? 9. State a component for which a hard failure would reset the time to its next preventive maintenance action, and one for which it would not. 10. Why would one model a component that receives preventive maintenance but does not refresh the component as good as new?

Chapter 6

6-17

Chapter 7

Dependency
Objectives
1. Understand the general concept of dependence. 2. Understand the difference between system dependence, local dependence and elemental dependence. 3. Understand the different states a component that is dependent on another can be sent to. 4. Understand the role of nodes when they are used with dependence. 5. Be able to build or modify an RBD to properly model dependence.

Recommended Problems
3, 4, 5, 7 and 8

Chapter 7

7-1

Dependence One aspect of modeling a system that is important, but is nevertheless often completely ignored during RBD development, is dependence. At its core, dependence is completely embodied with the following question: Do the components in my system continue to operate in their own failure-repair cycles regardless of what happens elsewhere within the system, or do these components stop operating based on the status of other components? Consider a simple dependent system consisting of a power supply and an electric motor. The major failure mode of the electric motor is its brushes, which exhibit wear and fail after approximately 100 hours of operation. The power supply is unreliable and only operates about 50% of the time. When the power supply fails and is being repaired, the motor stops rotating and wear on the brushes does not accumulate. Thus, the motor is dependent on the power supply to operate. When the motor is stopped from operating because of the failure of the power supply, the motor is said to be in an idle status. The motor will transition between operating and being placed in a dependent state until it has accumulated 100 hours of operating time. On average, the electric motor will fail every 200 hours due to the power supply's 50% availability to function and not 100 hours as might be expected. Figure 7.1 displays the states that a component can be in when tasked to initiate its dependency rules and what states the component can ultimately reach and remain in until the dependency link is severed.
PM Cycle Repair Cycle Running

Standby Running Dependency Rule Standby PM Cycle Default Dependency Repair Cycle Idle

Running

Idle

Figure 7.1 Dependency From- State-To- State Diagram

Chapter 7

7-2

It is important to understand that only when a component fails can another component activate its own dependency rules. In the next chapter we will extend this linkage between components by introducing the combined effects of dependency and standby conditions. A component can possess one of four types of dependency. A component can be independent, system dependent, elementally dependent or locally dependent. A new component placed within the Workspace View has a default of independence unless changed via the Block Defaults menu option of the Edit menu. A components dependence type is selected from the Dependency tab of the Block Properties dialog box as shown in Figure 7.2. A component that is declared independent will fail and repair according to its failure and repair distributions without any regard to outside dependency influences. Even if the system itself is down, an independent component will continue to operate and thus accumulate hours towards its next failure. A component that is system dependent will be affected only by the status of the system. Every component that is dependent upon the system will initiate its own dependency rules when the system is down.

Figure 7.2 Dependency Tab of the Block Properties Dialog Box

A component that is elementally dependent will be affected only by the status of a particular element. A component can only be elementally dependent upon a single element. Local dependence is similar to system dependence, but on a subsystemtype level. For a block, being locally dependent is equivalent to being elementally

Chapter 7

7-3

dependent on the next downstream node. For a node or hierarchy, local dependence is equivalent to being elementally dependent on the first downstream node that is able to withstand the failure of the node in question; that is, everything else being up, it is the first node downstream that would not go red with the failure of the dependent node. Local dependence is a good choice when the user wants components to go to an idle state when their impact on the system is not necessary. This option is also convenient for creating a subsystem with internal dependencies that is then copied and pasted multiple times. Thus, each copied subsystem will have the same internal dependencies defined. Let us begin to manipulate the dependency aspects of an RBD to better understand the essence of the dependency concept. Open Dependence1.rbd, and then display the Dependency tab of the Block Input Tables dialog box as shown in Figure 7.3. As you can see, some dependency rules have already been employed in this model compared to the previous model (recall that all components in Chapter 6 were defaulted to be independent). We will implement some additional dependency rules for the attitude, the 500 Watt solar panel and the 900 Watt solar panel components. In fact, we will build a system, local and elemental dependency relationship to ensure each type of dependency is clarified.

Figure 7.3 Dependence1.rbd

Chapter 7

7-4

It is often difficult to understand dependency since its construction within Raptor is abstract with no visual feedback in the Workspace View. To alleviate this situation, it is recommended that users develop dependency diagrams to facilitate their model verification efforts. Figure 7.4 shows a dependency diagram of the Dependence1.rbd model. Notice that the links that provide topology logic for the RBD have been removed and colored arcs have been added. The yellow arcs represent components that are system dependent. Thus, when the system goes down (i.e., a red status indicator is displayed) the high and low gain antennas will engage their dependency rules. The purple arcs represent components that are locally dependent and thus tied to special nodes that control the status of localized areas within an RBD topology. For example, if the 500path node was to go down, the nickel-cadmium battery and unregulated bus components would engage their dependency rules. The red arcs represent components that are elementally dependent and hence tied to a user defined element other than itself or the system.

SolarP_500W

BatteriesNiCd

Bus_UR

500path

2/3

HighGain

1/2

Attitude

n1

SolarP_650W

BatteriesNiH

Bus_QR

650path

Power

Thermal

n2

Comm

end

LowGain

SolarP_900W

BatteriesNaS

Bus_FR

900path

Figure 7.4 Dependence Diagram for Dependence1.rbd

Hence, Figure 7.4 displays all of the dependencies that have thus far been embedded into the Dependence1.rbd model. We will add three additional dependencies to this model as shown in Figure 7.5.

SolarP_500W

BatteriesNiCd

Bus_UR

500path

2/3

HighGain

1/2

Attitude

n1

SolarP_650W

BatteriesNiH

Bus_QR

650path

Power

Thermal

n2

Comm

end

LowGain

SolarP_900W

BatteriesNaS

Bus_FR

900path

Chapter 7

7-5

Figure 7.5 Added Dependencies to Dependence1.rbd

Double click on the Attitude component to open its Block Properties dialog box and select the Dependency tab. Currently, the Attitude component's dependency type has been designated as independent. Change the Attitude's dependency type to system dependent and modify its dependency rules as shown in Figure 7.6.

Figure 7.6 System Dependent Attitude Component

When the system goes down, the Attitude component will remain operating seventy percent of the time as if there were no dependency effects at all. Fifteen percent of the time the Attitude component will stop operating and be placed into an idle status awaiting its master element (i.e., the system in this case) to be returned to an operating status. Five percent of the time this component will engage its preventive maintenance activities as described in Chapter 6 provided that seventy-five percent or more of the Attitudes mean expected life is currently exhausted. If this last condition is not met, the component will engage its default dependency action (currently set to the idle state for this component), which will be discussed in greater detail later in this chapter. Sending a component into a

Chapter 7

7-6

preventive maintenance status when its master element has stopped operating is often called opportunistic maintenance. The remaining ten percent of the time, the Attitude component will fail as a result of its master element failing. This scenario is known as induced or precipitated failures.

Chapter 7

7-7

Change the 500 Watt solar panel dependency type to locally dependent and modify its dependency rules as shown in Figure 7.7. The 500 Watt solar panel component is now dependent on the 500path node as are the other two components of the 500path string. If the 500 Watt solar panel, the nickel-cadmium batteries or the unregulated bus component fails, the other two components will employ their respective dependency rules. This will occur since the 500path node controls the dependency aspects of the localized series topology. While a node itself can not go down, when any one of these series components fails, the 500path string has failed. Once this has occurred, the 500path node then instructs all elements dependent on it to engage their dependency rules.

Figure 7.7 Locally Dependent 500 Watt Component

When instructed by the 500path node, the 500 Watt component will go into an idle status ninety percent of the time. A component that is idle does not acquire life and thus acts as if it is in suspended animation. Ten percent of the time, this component will be induced to fail itself as a result of either the nickel-cadmium batteries or the unregulated bus component failing. This component cannot remain operating or go into its preventive maintenance state as a result of a dependency event since both of these dependency rules have been set to zero percent.

Chapter 7

7-8

Lastly, change the 900 Watt solar panel dependency type to elementally dependent and modify its dependency rules as shown in Figure 7.8. The 900 Watt solar panel component is now dependent on the 900path node as are the other two components of the 900path string. If the 900 Watt solar panel, the sodium-sulfate batteries or the fully-regulated bus component fails, the other two components will employ their respective dependency rules. Again, this will occur since the 900path node controls the dependency aspects of the localized series topology.

Figure 7.8 Elementally Dependent 900 Watt Component

When instructed by the 900path node, the 900 Watt component will remain operating twenty percent of the time as if there were no dependency effects at all. Sixty percent of the time the Attitude component will stop operating and be placed into an idle status. Ten percent of the time this component will engage its preventive maintenance activities provided that ninety percent or more of the 900 Watt components mean expected life is currently exhausted. The remaining ten percent of the time, this component will be induced to fail itself as a result of either the sodium-sulfate batteries or the fully-regulated bus component failing. Notice that all of the components set in this model have their default dependency actions set to the idle state (as shown in Figures 7.6, 7.7 and 7.8). This option ensures that a component that is exiting its repair cycle and dependent upon an
7-9

Chapter 7

element that is currently failed will be sent into an idle state. Thus, the dependency percentage rules are only employed when a component is operating (i.e., not repairing) and its master element has gone down. The default dependency action could also be specified to be the operating state. It interesting to note that the local dependence setting for the 500 Watt solar panel has the same dependency affect as the elemental dependence of the 900 Watt solar panel. Both components are dependent on their respective downstream node and both of these configurations are often called string dependence, since if any member of a string fails all other good members engage their dependency rules. If all dependencies have been set correctly, the Dependency tab of the Block Input Tables dialog box should be identical to Figure 7.9. We have thus augmented our model from the dependencies shown in Figure 7.4 to those in Figure 7.5.

Figure 7.9 Dependency Tab of the Block Input Tables

Simulate this model in step mode and take a single step such that the 500 Watt solar panel and the nickel-cadmium components have engaged their preventive maintenance activities as shown in Figure 7.10. Notice that the 500path node has gone into a preventive maintenance status due to the 500 Watt solar panel and the nickel-cadmium components being triggered to a preventive maintenance status. Further notice that the unregulated bus has changed its color to sienna, which is the status color for elements that are idle as a result of their dependency rules. Recall

Chapter 7

7-10

from Figure 7.9 that the unregulated bus goes into an idle state ninety percent of the time. Figure 7.10 is an example of a locally dependent component.

Figure 7.10 Local Dependence in Action

Take another step and notice in Figure 7.11 that the 500 Watt solar panel has finished its preventive maintenance action and is then sent to the idle state due to its default dependency criteria.

Figure 7.11 Default Dependency in Action

Click five more times on the Step button and note in Figure 7.12 that the 900 Watt solar panel and the sodium-sulfate components have been triggered to engage their preventive maintenance. Furthermore, the status of these components has caused the fully-regulated bus to fail by induction as a result of the elemental dependency relationships within the 900path power string. Recall that the fully-regulated bus will be induced to fail ten percent of the time due to its elemental dependency relationship with the 900path node.

Figure 7.12 Elemental Dependence in Action

Skip to the 5th trial by clicking the Jump button four times and then take eight steps (i.e., simulation time 189.181217) such that your RBD appears as the one shown in Figure 7.13. Be sure to note the status of all components during each step.

Chapter 7

7-11

Figure 7.13 System Dependence in Action

To understand the situation in Figure 7.13 you would have had to notice that the high gain antenna failed at simulation time 11.596526 followed by the unregulated bus failing at simulation time 23.330757. The unregulated bus failed as a result of the 500W-PowerString preventive maintenance trigger firing and inducing the unregulated bus to fail. The unregulated bus, however, cannot begin its repair action since it requires five astronaut resources and three of them are currently occupied (one each for the high gain antennas, the 500 Watt solar panel and the nickel-cadmium battery components). As a result of the long repair time for the high gain antenna (it has a mean of 111 hours) the preventive maintenance actions for the 650 Watt and 900 Watt power strings are deferred. Recall from Chapter 6 that the components that comprise the power string triggers will defer their preventive maintenance actions until enough spares and resources are available. Rather quickly, the 500 Watt solar panel and the nickel-cadmium battery components complete their preventive maintenance activities and eventually, at simulation time 134.879208, the high gain releases its repairing resources. This allows the unregulated bus to begin its hands-on repair yet the 650 Watt and 900 Watt power strings are still deferred since the unregulated bus requires the entire astronaut repair crew to conduct its repair actions. Once the unregulated bus releases its resources at simulation time 189.181217, the 650 Watt and 900 Watt power string triggers are implemented. This causes the 650 Watt solar panel, the nickel-hydrogen battery, the 900 Watt solar panel and the sodium-sulfate battery components to each obtain one resource and begin their preventive maintenance activities. The quasi-regulated bus goes into an idle status as a result of the 650 Watt trigger. Furthermore, the entire system has gone down since the Power node has been rendered inactive due to preventive maintenance activities. This causes all system dependent components (the Attitude and the high and low gain antennas) to determine their dependency status. Recall from Figure 7.9 that the high and low gain antennas go to an idle state 100% of the time while the likelihood of the Attitude component going to an idle status is only 15%. Figure 7.13 is a complicated example of system dependency issues coupled with preventive maintenance activities and logistical constraints. The local, elemental and system dependency types have now all been demonstrated in Figures 7.10, 7.12 and 7.13, respectively. Click on the depressed Paused button and allow the simulation to run unabated. View the results as shown in Figure 7.14.

Chapter 7

7-12

Figure 7.14 Summary Results from Chapter 7

You cannot directly compare these results to those in Chapter 6 since the addition of dependent relationships dramatically alters this model. We can say, however, that the results shown in Figure 7.14 (i.e., an availability of 0.963636919 and a mean down time of 9.883302 hours) are more accurate since this model contains more fidelity with respect to operational realism. Some may argue that deferring the power string triggers until resources are available is unwise since it caused a large drain on the maintenance personnel when they all came due at the same time. Yet, one must realize that this system remained operating for more than 165 hours that it otherwise would have been down if the preventive maintenance actions were not deferred. That is nearly 23% of the total operating time of this system and thus the deferring of the preventive maintenance seems advantageous. Determining the sequence of events for Figure 7.13 can often be quite difficult and in most complex cases can only be determined explicitly by viewing the detailed event log. This can be generated by selecting the Detailed event log checkbox of the Files & Reports tab of the Simulation Options dialog box as shown in Figure 7.15. A portion of this log that is relevant to Figure 7.13 is shown in Figure 7.16.

Chapter 7

7-13

Figure 7.15 Generating the Detailed Event Log

Figure 7.16 Portion of a Detailed Event Log

Chapter 7

7-14

Figure 7.16 clearly shows that at simulation time 47.668331 the 650WPowerString trigger fired but the preventive maintenance on the 650 Watt and nickel-hydrogen battery components was deferred. Likewise at simulation time 72.373347, the 900W-PowerString trigger fired but the preventive maintenance on the 900 Watt and sodium-sulfate battery components was deferred. At simulation time 189.181217 the unregulated bus is repaired freeing up the astronaut resources so that all of the deferred preventive maintenance activities can be accomplished.

It should be noted that most reliability textbooks containing theoretical equations that determine the reliability and availability of particular configurations more often than not assume that all components operate independently. Improper use or appreciation of dependency concepts is a common error of novice reliability engineers, especially for those who attempt to compare dependent systems' results to independent systems' results.

Problems
1. Provide an example of a system that might contain system dependent components. 2. Provide an example of a system that might contain independent components. 3. Can several components within a string be daisy chained with elemental dependence (i.e., each component dependent on the component following it) as another method of implementing string dependence? 4. Can a component be dependent on an event? 5. Can an event be dependent on a component, node or another event? 6. What are some advantages of using local dependence instead of elemental dependence within a string if they both perform the same dependency function? 7. With the current configuration of Dependence2.rbd, if two strings were to fail the blocks in the remaining string will continue to operate. Change this RBD such that the components of a third functioning string will go into an idle status whenever two strings have failed.

Chapter 7

7-15

8. Starting with the solution to Problem 7, further modify the RBD so that the power strings go idle if the system fails but they still retain their string dependence properties. 9. Explain how and why each non-green colored component is the color that it is as shown in the Figure below. Generate the detailed event log for Dependence2.rbd and review the first few steps of the ninth trial.

Chapter 7

7-16

Chapter 8

Standby
Objectives
1. 2. 3. 4. Understand the concept of standby. Be able to build or modify an RBD to establish standby relationships. Understand the standby features of priority return and switching. Understand how dependence options can be used with standby to model groups of standby components.

Recommended Problems
1, 2, 3, 5 and 6

Chapter 8

8-1

Standby Up to this point, we have seen how redundant components can be modeled using nodes with their k-out-of-n logic. When these components were connected in parallel (e.g., the high and low gain antennas in the previous RBDs) both components operated continuously. Occasionally, components are configured in a similar parallel relationship, but one in which both components do not operate simultaneously. One of the components, called the primary, is operating and the other, denoted the alternate, is in a standby state waiting to be called upon if needed. Raptor allows for the modeling of alternates that may accumulate life while being in a standby state. When a component is in a standby state it is capable of operating but is not, as a result of a users elective. A standby component is in a redundant relationship and will be called upon to operate when its associated alternates fail. A standby component is known as cold standby if no life is accumulated while acting as an alternate. A standby component is known as warm standby if life is accumulated at a lesser than normal operating rate while acting as an alternate. A standby component is known as hot standby if life is accumulated at a greater than normal operating rate while acting as an alternate. Figure 8.1 emphasizes the aforementioned information by expressing the standby states as stresses and the associated colors that will appear when simulating alternate components.

Standby Type Cold Warm Hot

Stress r = 0 0 < r < 1 r 1

Color

Figure 8.1 Standby Types, Stresses and Colors

Nodes are the controlling element for any standby structure. The status of a node is determined by the status of its inbound links, and therefore, a node has insight into how many of the immediately upstream elements are functioning at any given time. Raptor's standby logic takes advantage of this fact by allowing a node to determine when a sufficient number of good paths are present and then instructing excess components to transform to an alternate state.

Chapter 8

8-2

This chapter will instruct a user on how to set up and properly utilize the various standby options. Begin by opening Standby1.rbd and double click on the Comm node to open the Node Properties dialog box. As Figure 8.2 indicates, select the Standby tab and mark the first checkbox, which engages the remainder of the tab. Additionally, be sure to mark the second checkbox. This ensures that if a primary component fails, an alternate component will take its place only until the primary component is repaired and then again operates as a primary. If this checkbox is not checked, alternates that become primaries will remain as primaries until they themselves fail. The last checkbox ensures that an attempt will be made to turn on each alternate using automatic switchover before resorting to manual switchover.

Figure 8.2 Standby Tab of the Node Properties Dialog Box

While a nodes k-value is defined on the first tab of the Node Properties dialog box, a nodes k-star value is set on the standby tab. The k-star value is the value box associated with the first checkbox. Recall that the nodes k-value defines the minimum number of paths that must be operating for the node to be considered operating. The k-star value indicates the number of paths that a user would desire to have operating at anytime. For example, a user might need a minimum of three of seven paths to be operating (i.e., k-value equals three) but would desire six of seven paths to be operating (i.e., k-star value equals six). The value of k-star must be greater than or equal to k, and less than or equal to n. The default value for k-

Chapter 8

8-3

star is equal to k. If k-star equals n, then a standard redundancy topology exists where all components are primaries. If k-star equals k, a standard standby redundancy topology exists. The k-star function is most often associated with capacity issues and will be discussed more in Chapters 13 and 14. Highlight the high gain's priority cell (see Figure 8.3), which is currently displaying the value of fifty. Enter a value of twenty-five in the value box that appears and select the Accept Change button. This will make the high gain component the primary of this k-out-of-n structure and thus, the low gain component will be designated as the alternate. A lower priority number represents a higher priority. The highest priority is a value of one and the lowest is ninetynine. The default priority value is fifty. Priorities are evaluated based on a relative ranking scheme such that a value of 10 has the same rank over a value of 50 as does the value of 51.

Figure 8.3 Changing a Nodes Standby Path Priority

Click in a cell under the Auto Prob column and note that the same value box is used to update other cells in this table. Use the value box and update the table until it appears as the one in Figure 8.4. The Auto Prob represents the probability that a component will automatically switchover to an alternate component in the time specified under the Auto Time column. Often, the auto-

Chapter 8

8-4

switch time is zero, allowing for an immediate switchover with no interruption in system performance. If the auto-switch fails, the switchover will manually switch in the time specified under the Man Time column. Manual switching may be set to N/A if manual switching is not allowed. In this case, an alternate component would no longer be available for the remainder of a simulation trial. Continue to modify this tab such that it appears as in Figure 8.4.

Figure 8.4 Changing a Nodes Switching Information

The standby stress for a component defaults to zero and as mentioned earlier represents a cold standby condition. We will leave the high gain antenna component to be a cold standby component since it will never act as an alternate given its priority value. Let us modify the low gain antenna components stress from zero to a value of five percent. This implies that the low gain antenna component, while acting as an alternate, will only acquire life at five percent of its normal operating rate. Thus, the low gain antenna component has been changed from a cold standby alternate to a warm standby alternate. Standby stress is unique to each component and is thus specified within a components Block Properties dialog box. Open the low gain antenna components Block Properties dialog box and select the Advanced tab. Modify the Standby stress value box as shown in Figure 8.5.

Chapter 8

8-5

Figure 8.5 Changing a Components Standby Stress Value

Open the Simulation Options dialog box and conduct a simulation that starts in step mode. Notice that the effect of the low gain antenna standby component is immediately apparent, as Figure 8.6 indicates.

Figure 8.6 Standby RBD at Simulation Time Zero

The low gain antenna component is now a medium blue color at the start of the simulation. This indicates that it is capable of operating but is not because it is in a standby state. Recall from Figure 8.1, the medium blue color indicates that the low gain antenna component has been designated as a warm standby component. Jump to the third trial and then take a single step such that the high gain antenna fails as shown in Figure 8.7.

Chapter 8

8-6

Figure 8.7 Switchover in Progress

A switchover is in progress as indicated by the light purple colored link in Figure 8.7. The system is now down, since neither the high gain nor the low gain antenna component is operating. If auto-switching with a zero switchover time was implemented, the switchover would have occurred immediately without a system downing event occurring. When the switchover is completed (another three steps), the low gain block becomes the primary and the system comes back up to a yellow or degraded status, which is shown in Figure 8.8.

Figure 8.8 Switchover Completed

It is interesting to note that it took three hours to switch over to the low gain antenna component. This means that the automatic switchover probability failed since, had it succeeded, the switchover time would have been one-half hour as indicated in Figure 8.4. When the failed high gain component is repaired (i.e., six additional steps), it returns to its role as the primary communications antenna and the low gain component returns to its role as an alternate in a warm standby status (Figure 8.9). Click on the depressed Pause button and allow the simulation to run until completion and note the results in Figure 8.10.

Figure 8.9 HighGain Component Regains its Role as Primary

Chapter 8

8-7

Figure 8.10 Summary Results for Chapter 8

You cannot directly compare these results to those in Chapter 7 since the addition of standby relationships dramatically alters this model. We can say, however, that the results shown in Figure 8.10 (i.e., an availability of 0.896685221 and a mean down time of 22.871593 hours) are more accurate since this model contains more fidelity with respect to operational redundant realism. The standby feature can be used along with the dependence features presented in the last chapter to create strings or subsets of components that collectively act as a standby structure. Open StandbyDep1.rbd and notice that this RBD appears to be identical to the preceding model. The only difference is that the Power node was modified to be a standby node. Recall that internal dependencies within the power strings were defined in the previous chapter (i.e., elements within the strings are tied to the node at the end of a string). Open the Power nodes Node Properties dialog box and note how the standby attributes were applied (see Figure 8.11). Since there is no priority distinction among paths into the Power standby node, Raptor defaults to the order the components were linked to the standby node as they were placed within the Workspace View.

Chapter 8

8-8

Figure 8.11 Power Node's Standby Attributes

Open the Simulation Options dialog box and conduct a simulation in step mode. For this model, of the three paths linking into the Power node, the link from the 500path node was the last link placed within the Workspace View. Thus, it is treated as the lowest priority as indicated in Figure 8.12. Notice that the 500path power string is entirely in a cold standby status while the low gain antenna component is in a warm standby status.

Figure 8.12 Standby and Dependence Features Combined

Step four times and note that the 650path power string is incapable of functioning because of triggered preventive maintenance as shown Figure 8.13. In this case, the switchover times have been specified to be zero, so the switchover to the top

Chapter 8

8-9

power string is immediate and no system down time is incurred. Notice that the Power node changes to a degraded status, but still meets its requirement of 2-outof-3 paths operating.

Figure 8.13 Immediate Switchover

Step twice more and notice that the standby string is now the middle string (Figure 8.14). This is because the priority return option was not checked within the Power node's standby tab (Figure 8.11). Click the depressed Pause button and allow the simulation to run and notice that the string that fails always becomes the standby string. This model construct ensures equal wear on the three power strings.

Figure 8.14 Non-Priority Return

This group standby structure is possible because of the interaction of the standby and dependence features of Raptor. Without dependence, standby will only affect a component immediately upstream (i.e., to the left as dictated by a left to right reading bias) of a standby node. Figure 8.15 is an example of how standby would appear within a string where dependence is not implemented. The remaining components in the string are unaffected by the Power node's standby directions.

Figure 8.15 Cold Standby Without Dependence

Chapter 8

8-10

One feature that was not used in the examples of this chapter is the option to check all auto-switching before trying any manual switching. When several components are on standby and the auto-switch fails for the highest priority standby, that standby will begin manual switching. If this option is selected, the standby node will check other standby components to see if an auto-switch can be conducted with one of the other standby components.

Readers are cautioned that it is possible to construct RBDs that have several standby nodes that together provide conflicting control over an element. If this occurs, an element will flash between two states in an infinite loop. This scenario can only occur when an element is given more than one standby master. While no man can serve two masters well, neither can a block or node. Hence, we strongly encourage users not to model components with two or more standby masters.

Problems
1. Give an example of a system that has standby components. 2. What types of redundant components typically use priority return? 3. What is the effect of designating a node to be a standby node if all inbound paths to that node are from nodes, and those upstream nodes have no dependent elements? 4. System A and system B are each comprised of the same type of components. The components have a failure and repair distribution that is exponentially distributed with a mean of 100. System A consists of two components in a 1-outof-2 standby configuration. System B consists of four components in a 2-out-of-4 standby configuration. Both systems switch perfectly and instantaneously. Which system has the greater availability? 5. System C and system D each consist of two blocks in a 1-out-of-2 standby configuration. The only difference is that one system auto-switches in zero time and the other auto-switches in 0.0001 time units. How does this affect the MTBDE and availability of the two systems?

Chapter 8

8-11

6. Can a passive node (one that has one inbound link and one outbound link) be designated as a standby node? 7. Name a system that would likely possess a hot standby status. 8. What is the effect of placing events within a standby structure? 9. Why is the node in the following diagram yellow?

Chapter 8

8-12

Chapter 9

Transients
Objectives
Understand how to generate availability plots. Understand the different types of availability plots. Understand the causes of startup transients. Be able to implement the delayed statistics gathering method of controlling transients. 5. Be able to implement the random start-up method of controlling transients. 1. 2. 3. 4.

Recommended Problems
2, 5, 6, 7, 8, 9, 10, 11, 13, 14, 15, 16 and 17

Chapter 9

9-1

Transients The simulations conducted thus far started with every element in an up or what is considered a good state. If a model contains logistics, then at simulation time zero all stocks are full, all queues are empty, and there are no components in their repair cycles. Stated another way, a Raptor simulation will by default start with brand new components, fully stocked spares and complete availability of all resources. Starting a simulation with new components causes the initial portion of a simulation to be over represented, particularly for short-length trials. With respect to simulation theory, this initial over representation is known as startup transients. This chapter provides the reader with an understanding of Raptor's embedded startup transients, and when it is advantageous to do so, how to manage them. Startup transients should not be viewed as either good or bad but a consequence of simulation theory that must be consciously addressed and then managed. Raptor allows transients to be controlled by implementing one of two methods, both of which will be discussed in this chapter. The first method called delayed statistics gathering, is an effective technique to managing startup transients associated with RBDs that contain logistical concerns. The second technique, known as a random startup simulation is an efficient method of managing startup transients for RBDs that are not dominated by logistical constraints. Additionally, the latter technique allows users to start a model in an unusually weakened condition and then be able to determine the mean time for the system to recover to a viable state.

Delayed Statistic Gathering Method Open Transients1.rbd and note the similarity of this RBD to those used in the previous chapters. Open the Simulation Options dialog box and set the simulation parameters as shown in Figure 9.1. Be sure to set the time-truncated field to a value of 8,000 hours. The choice of 8,000 hours was merely a guess that we know is several times greater than the simulation length of interest (i.e., a length of 730.5 hours as defined in the earlier chapters). The 8,000 hour parameter is believed to be a point in time where we hope that the effects of the startup transients will no longer be dominating and hence overly biasing the results of this model. The 8,000 hour parameter is often called the steady-state point for a particular system and its associated simulation criteria. While the Raptor tool cannot explicitly defined the steady-state point for a given model, Raptor does provide a tool that can determine this point by analysis and iteration. Click on the Advanced tab of the Simulation Options dialog box and check Display Ao plot during simulation, which is shown in Figure 9.2. Ensure that you set the Ao plot rate to fifty from its default value of ten.

Chapter 9

9-2

Figure 9.1 Simulation Options for Chapter 9

Figure 9.2 Advanced Tab of Simulation Options Dialog Box

Chapter 9

9-3

The Ao plot sample rate value box specifies how often a data point will be placed on a graph displayed within the Simulation View. This value only modifies the density of plotted points and not the overall results of the simulation or its graphs. Since we are conducting an 8,000 hour simulation and we have modified the sample rate to a value of fifty, 160 data points (i.e., 8000/50) will be plotted for each availability graph displayed in the Simulation View. Raptor limits the number of plotted points to 1,000 for each displayed graph. The reader is cautioned to only plot enough points to acquire an appreciation of a systems steady-state availability behavior. Plotting multiple 1,000-point availability graphs and simulating a large RBD can consume an enormous portion of a computers memory and thus unnecessarily slow the process of acquiring meaningful results. Begin the simulation by clicking the OK button and notice how the Simulation View has been augmented with a graph window as shown in Figure 9.3.

Figure 9.3 Simulation View with Availability Plots

The graph that first appears in the plot window is the Multi-run Ao Graph, which displays the availability of a system at any given time. For this model, all availability graphs are plotted every fifty hours since that is the value set in the Ao plot sample rate field. From the Control menu of this graph window change the Ao plot from the multi-run to the per trial graph by selecting the View Per Trial Ao menu item, as shown in Figure 9.4.

Chapter 9

9-4

Figure 9.4 Changing the Ao plot to Per Trial

As Figure 9.5 indicates, the Per Trial Ao plot displays the percentage of time a system is in its green, yellow and red statuses. The top of the yellow region is by definition the availability of the system at any given time since a system's availability is the sum of the times it is in the green and yellow states (see Appendix F for the definition of availability as well as all other parameters used in Raptor).

Figure 9.5 Per Trial Ao Plot

From the Control menu item of this graph window change the Ao plot from the per trial to the interval graph by selecting the View Interval Trial Ao menu item. This availability graph is shown in Figure 9.6.

Figure 9.6 Interval Ao Plot

Chapter 9

9-5

The interval Ao graph window plots the availability of a system based on the sample rate set within the Advanced tab of the Simulation Options dialog box. For this simulation, the sample rate was fifty; thus, the availability for every successive fifty time units is plotted. This plot is pertinent when a system is suspected of possessing constraints that cause its availability to be cyclic in nature. This type of plot is often used in conjunction with phased RBDs that will be discussed in Chapter 17. Return to the multi-run Ao plot and allow the simulation to continue as shown in Figure 9.7.

Figure 9.7 Multi-run Ao Plot

The multi-run Ao graph displays the maximum, average and minimum Ao values observed across all trials. It is important to understand that the lines for the maximum and minimum are not running averages, but absolutes. They represent bounds for which the availability of a system over time never exceeds nor is ever less than. A user should view the maximum and minimum lines as system availability extremes plotted against simulation time. The line representing the average availability (i.e., the blue line) is a running average of the availability of the system at any given point in time up to the termination point of 8,000 hours. You can zoom into any graph via the graph windows Control Change Y-Axis Min menu item. This menu option brings up the Set Y-Axis Min dialog box that allows modifications to the minimum y-axis value. Within the Set Y-Axis Min dialog box, change the minimum value from 0.0 to 0.7 as shown in Figures 9.8.

Figure 9.8 Set Y-Axis Minimum Dialog Box

Chapter 9

9-6

Figure 9.9 displays the effects of changing the minimum y-axis value on the multirun Ao graph.

Figure 9.9 Effects of Changing Y-Axis Minimum on the Multi-run Ao Graph

An examination of the multi-run Ao graph reveals an interesting aspect concerning the startup transients of this system. As shown in Figure 9.9, the availability of the system is relatively unchanged after 6,000 hours. When the average availability line of the multi-run Ao graph begins to stabilize or level out, a steady-state condition has been reached and thus the effects of the startup transients have been overcome. Let us resolve that the average availability line is level enough such that we can conclude that the effects of the system starting in an initially good state have been overcome after 6,000 hours of simulation time. The choice of the steady-state point is a judgment call that will likely vary among analysts. When determining the steady-state point, you should always err on the conservative side. If a debate ensues that a greater time is needed to achieve steady-state, then simulate the longer time to ensure that steady-state is achieved. The cost for choosing a longer steady-state point is that more time will be needed to obtain meaningful results; the reward is that meaningful results will be obtained. Raptor allows for the discarding of initial, and often biased, results by specifying a delayed statistics gathering parameter. This parameter instructs Raptor to discard all results up to that point in the simulation for each trial. Thus, only the last portion of a trials results is incorporated into the calculation of the final results across all trials. For the purpose of this chapter, we have quantified the effects of the startup transients, and we will now attempt to manage these effects so that we can obtain results that are more representative of the steady-state operations of this system. Open the Simulation Options dialog box and change the simulation termination time to 6,730.5 hours on the General tab. Select the Advanced tab and set the Start statistics value box to 6,000 hours as shown in Figure 9.10. Simulate this RBD by selecting the OK button. The reason for using what seems to be an unusual simulation length of 6,730.5 hours is that we wish to compare the results of this simulation with those of Chapter 8. Recall that in Chapter 8 we conducted ten trials of 730.5 hours and achieved results that we called more accurate representations of the true RAM characteristics of this system. From the steady-

Chapter 9

9-7

state analysis of Figure 9.9, we determined that we needed to eliminate the first 6,000 hours from the simulation statistics to overcome the effects of the startup transients. Therefore, by simulating for 6,730.5 hours (i.e., the sum of 6,000 and 730.5), we can compare the results of this chapter with those of Chapter 8.

Figure 9.10 Setting the Start Statistics Value

Figures 9.11 and 9.12 display the results from this chapter without the startup transients and those from Chapter 8 (reference Figure 8.10), which contained the transients, respectively. The results that we thought were good estimators in Chapter 8 turned out to be less robust than we had anticipated. The steady-state availability of this system is much closer to 0.8578 than to 0.8967. The steadystate MDT value of about 28.26 hours is greater than twenty percent more than our estimate in Chapter 8. These results should demonstrate that this system is strongly affected by its startup transients. Had you based your decisions on the results of Chapter 8, you would have been disappointed with your systems steadystate performance. If you are interested in the first month of operation, the results of Chapter 8 are more accurate than those of this chapter. Both simulations can be considered correct depending on the type of results desired (i.e., start-up or steadystate results).

Chapter 9

9-8

Figure 9.11 Results With Startup Transients Removed Using Delayed Statistics Gathering

Figure 9.12 Results With Startup Transients (Chapter 8)

Chapter 9

9-9

Random Startup Method A second method for managing startup transients is to start each component of an RBD in a more representative or random state. Raptor allows a component to be initiated in six different manners or what are known as startup conditions. Let us review each startup condition by opening Transients3.rbd. Open the Block Properties dialog box for the low gain antenna and click on the Simulation Theory tab as shown in Figure 9.13. The area at the bottom of the dialog box labeled This block begins the simulation controls the startup conditions of a component.

Figure 9.13 Default Startup Simulation Settings

Figure 9.13 displays the default startup condition for a component (unless modified by the block default feature). The current startup condition is up with no life exhausted. This declares that the low gain antenna component under these conditions is assumed to be brand new at the start of each trial. Thus, this type of component will start each trial in a good state or be displayed as green or blue within the Simulation View. Click the "At random time" radio button as shown in Figure 9.14. A component with this startup condition would start a simulation trial in a good state but some random amount of life will already have been exhausted. Raptor will draw a
9-10

Chapter 9

uniform real random number from zero to one at the beginning of a simulation trial for each component with this condition and exhaust that percentage of time from its first random mean life. For example, a component with a mean life of 100 hours that is normally distributed could obtain 120 hours as its first life. If its life exhausted random number was 0.75 for the first trial, then 90 hours (i.e., 0.75 x 120 hours) would have been exhausted before the trial begins. This component will fail during the first simulation trial after 30 hours of operation. For each trial, a different random number is drawn and thus a different amount of life is randomly exhausted. Contrast this startup condition with the previous condition that allowed the same fixed and therefore non-random amount of time to be exhausted from each trial. This feature is used when it is known that a component possesses some amount of life exhausted but this information has not been recorded, so the specific value is unknown. For example, if you purchased a set of used tires you might not know how much life is exhausted (i.e., miles) on each tire. It might be prudent to model each tire as operating with some unknown amount of life exhausted.

Figure 9.14 Start Up With Some Random Life Exhausted

Change the radio button to appear as shown in Figure 9.15. This startup condition instructs Raptor at the start of each simulation trial to begin this component in a
9-11

Chapter 9

failed state at the beginning of its repair cycle. Recall the repair cycle is comprised of logistics delays, waiting for spares and resources and the actual hands-on maintenance of the repair. Thus, a component with this condition essentially fails at the simulation time zero and initiates its repair cycle. If the percent complete value box is non-zero, then that percentage of repair time would have already been completed. For example, suppose a component has a basic repair cycle length of ten hours (this includes logistical delays and hands-on maintenance but does not include delays due to spares or resources) and 40 percent was entered into the percent complete value box. Then this component would start failed with six hours (e.g., 10 - 10 x 0.40) remaining before it is fixed (assuming resources and spares were available).

Figure 9.15 Start Failed With Repair Cycle Zero Percent Complete

Contrast this with the other two conditions for starting a component failed. First, a component can start a simulation trial failed but with some random amount of its repair cycle completed (Figure 9.16). Recall that the previous condition allows for the same fixed and therefore non-random amount of a component's repair cycle to be completed at the start of each trial. The other failed condition is shown in Figure 9.17, which indicates a component starts a simulation trial failed at the beginning of its hands-on maintenance point of its repair cycle as long as spares and resources are available.
9-12

Chapter 9

Figure 9.16 Start Failed With Random Amount of Repair Cycle Complete

Figure 9.17 Start Failed at Hands-on Maintenance Point of Repair Cycle

Chapter 9

9-13

Change the radio button to appear as shown in Figure 9.18 to view the last of six startup conditions for a component.

Figure 9.18 Start in a Completely Random State

This startup condition allows a component at the start of each trial to possess a probability of starting in a failed state or an operating state with some random amount of life exhausted. The probability that a component starts a trial in an up or down status is directly related to a component's operational availability without regards to dependency, preventive maintenance, resource and sparing delay issues. Maintain this startup condition for the low gain antenna component by clicking the OK button. Open the Block Input Tables dialog box and select the Advanced tab. As Figure 9.21 shows, all the other components have had their startup conditions modified to be completely random similar to the low gain antenna component. The impact of starting all components in a completely random state is to start each trial at some random point in time of a systems operations. Thus, the system's startup transients are managed by starting all components in a jumbled or random condition. This jumbled condition ensures that the startup transients are nonexistent. This type of simulation would not represent a new system very well but one that has already operated for some time and is likely to have reached its steady-state condition.
9-14

Chapter 9

Figure 9.19 Advanced Tab of the Block Input Tables Dialog Box

Start a simulation in step mode and notice that the fully-regulated bus component has failed (see Figure 9.20) at a simulation time of zero.

Figure 9.20 Failure at Simulation Time Zero for the First Trial

Jump to the second trial and notice that the 650 Watt solar panel component has failed at the start of this trial as shown in Figure 9.21. In fact, each trials startup conditions will be different.

Figure 9.21 Failure at Simulation Time Zero for the Second Trial

Chapter 9

9-15

Click on the depressed Pause button and allow the simulation to run to completion. The results of applying the random startup method to this model are shown in Figure 9.22.

Figure 9.22 Results With Startup Transients Removed Using Random Startup Method

Notice that the availability value of this simulation is slightly different from the availability of the previous method of transient control (i.e., 0.8239 versus 0.8578). A drawback to the random startup method is that the logistical aspects of a model have not been jumbled. All spares are fully stocked and all the repair people are available at the beginning of each trial. RBDs that contain significant logistical aspects might be better served to use the delayed statistics gathering method of managing startup transients. If an RBD does not contain significant logistical aspects, however, this method is far superior to delayed statistics gathering because it is faster since simulation time is not discarded. The difference in the availabilities of the two methods implies that the logistical characteristics of this model is important and may dominate the system's overall results. Recall that a byproduct of the random startup method of managing transients is that life can be exhausted on components before they start a simulation trial. It is common for a system to be comprised of subsystems that have varying degrees of life previously exhausted. When modifications are being contemplated for a

Chapter 9

9-16

system that has already been operating for some time, exhausting some amount of life for those components affected by aging often yields better results. Open Transients5.rbd and look at the Simulation Theory tab of the Block Properties dialog box of the low gain antenna component. As shown in Figure 9.23, we have decided that the low gain antenna previously operated for 2,000 hours before being placed into the current system.

Figure 9.23 Life Exhausted for the Low Gain Antenna

We will only retain this facet of the random startup method for the low gain antenna component as we progress through the remaining chapters of this book. All other components have been set back to starting brand new with no life exhausted. Thus in essence, we have decided that the results with the startup transients are more pertinent to our system than the steady-state results. For the remaining chapters that use this model, we are interested in the availability and MDT for the first month of operation. Simulate this model and note the results that are shown in Figure 9.24. Pay particular attention to the system's availability of 0.928 since we will refer back to this value when we conduct weak link analysis in Chapter 11.

Chapter 9

9-17

Figure 9.24 Final Results for Chapter 9

Problems
1. If you are conducting a 500-hour simulation with a graph sample rate of 2 hours, how many data points will be plotted for each graph? 2. Why can you not conduct a 5000-hour simulation with a graph sample rate of 2 hours? 3. Why must the Display Ao Plot During Simulation check box be marked each time a simulation is conducted (i.e., why is this information not retained by Raptor)? 4. Which of the three graphs plot an accumulating availability across trials (while the other two plot only the availability information for a particular trial)? 5. Explain what the three lines of the Multi-run Ao Graph represent. 6. What does it mean if the three lines of the Multi-run Ao Graph converge? What if the lines converge while simultaneously being parallel to each other?

Chapter 9

9-18

7. What happens to components that are in their repair cycles when the transition point between discarding statistics and collecting statistics occurs? 8. Describe a system in which the startup transients are desired. That is, when would the use of delayed statistics gathering not be prudent? 9. Can failure-truncated simulations with delayed statistics gathering be conducted? Is your answer the same for cycle-truncated simulations? 10. A component has a 2-hour pre logistic delay, an average hands-on repair of 5 hours and a 3-hour post logistic delay. Assuming no lack of spares, lack of resources or dependency issues, what state is the component in if it starts a simulation failed with 35 percent of its repair cycle completed? 11. A component has a 2-hour pre logistic delay, an average hands-on repair of 5 hours and a 3-hour post logistic delay. Assuming no lack of spares, lack of resources or dependency issues, what state is the component in if it starts a simulation failed with 85 percent of its repair cycle completed? 12. If multiple components start failed and insufficient spares or resources are available to initiate all the repair cycles, what priority scheme is used to assign the available spares and resources? 13. Does it make sense to exhaust life on a component that fails exponentially? 14. If two components are in series and both are system dependent and go idle 100% of the time, is it natural for both components to start a random startup simulation down? 15. What might be a reason for a system always starting a trial without any failed components even though all of the components are engaging random startups?

Chapter 9

9-19

Chapter 10

Failure Effects
Objectives
1. Understand the purpose and benefits of the Failure Effect View (FEV) 2. Understand the rules related to FEV

Recommended Problems
1, 2, and 3

Chapter 10

10-1

Failure Effects View The Failure Effects View (FEV) is a refreshable palette that allows analysts to fail single components or combinations of components to determine the effects of these failures on a system. In essence, this view is a design tool to conduct Failure Modes, Effects and Criticality Analysis (FMECA). The failure effects view takes into account phasing, dependency, induced failures, standby and multiple failures simultaneously. A feature was also added to this view that instructs Raptor to generate the single point failure report automatically for any system. Open FEV1.rbd and go to Failure Effects View. Failure Effects View can be initiated from the Workspace View menubar or by clicking the button indicated by the arrow in the diagram below, from the Workspace View toolbar. To run Failure Effects View, the reliability block diagram must be complete and meet the same requirements of a valid diagram needed to perform a simulation. If this not the case, error messages will provide feedback of requirements not met.

When Failure Effect View opens, a new menubar and toolbar are displayed.

The main window initially looks very similar to the Simulation View. User can now interact with the program to view the effect of various failures. Left-click on the block BatteriesNiCd. Left-clicking a block that is currently in Running (green) status, causes that block to fail and turn red. The same effects that would occur during a simulation are displayed. Several additional effects can also be observed.

The block itself turned red, as did the node at the end of the string 500W. The 500W node feeds into the Power node, which requires 2 of 3 inbound paths to

Chapter 10

10-2

be up. This caused the Power node to turn yellow. The other blocks in the top string are locally dependent, and set to fail 10% of the time when the local string fails. Finally, the system indicator changed to the yellow face since the system is Up with some maintenance ongoing. These effects can also be viewed in text from by clicking on the Display Failure Effects button and displaying the System Status Summary dialog box.

In the example above, the blocks SolarP_500W and Bus_UR are shown with hatch lines. This indicates that these blocks changes status due to induced effects from the manually failed component. Induced effects are changes to a blocks status due to dependence options. In this case, the blocks were designated to go to Idle status, 90% of the time and fail 10% of the time. There are other induced conditions besides induced failure. A dependent block can be set to go to Idle status, PM status (preventive maintenance), or Failed status, or can be set to go to one of these states based on a probabilistic random draw.

Chapter 10

10-3

If there are several options for dependency, the option to cause an induced failure will always be displayed if the probability to occur is greater than zero. The next highest priority is PM so if there is no chance of a failure but a probability of going to PM greater than zero, the dependent block would appear in PM status with hatch marks indicating an induced effect. The next highest priority is Idle followed by the option to have no effect. If a block has several dependency options, the highest priority option is displayed first, but the user can cycle through the remaining options by left-clicking on the hatched block. When another block is then manually failed, as in the case below when BatteriesNiH was failed, hatched blocks from the previous step are unhatched. Induced state changes from that failure are then hatched.

In this case, the system has failed. Since the antenna group on the right is system dependent, these components were changed to Idle status. Block Attitude was also system dependent, but had a 10% probability of induced failure upon a system failure. At any time, a user can erase the current palette and start fresh. The small pencil eraser toolbar button will clear all block and return them to the start up conditions, but will not reset phases if phasing is used. The large eraser button will clear all blocks and return the system to phase 1 if phasing is used. Refresh the palette and left click block Bus_FR. Again the worst case dependence option of affected dependent blocks is displayed. SolarP900 and BatteriesNaS have failed.

Failed blocks can also be returned to Running status by left-clicking the block again. What would happen if this situation occurred during a simulation and Bus_FR repaired? Left click Bus_FR and you see that the failed blocks are
10-4

Chapter 10

still failed. Clear the RBD, and fail Bus_FR again. This time click in BatteriesNaS next. BatteriesNaS has several dependence options and clicking the block while it is hatched will cycle through them. In this case, the block has turned orange indicating induced preventive maintenance. Click on Solar__900 twice and cycle it to the idle state. Your RBD should like the figure below.

What do you expect to happen this time if you left click on Bus_FR? In a real simulation if Bus_FR repaired it would then go to idle status. Left clicking an unhatched red component in FEV mode always changes it to green, so it is not exactly the same thing as repairing the item.

The condition shown on screen can occur in this simulation since Bus_FR has its dependency set so that 20% of time it remains in the same state when node 900path goes down. It is possible though to force the simulation into a condition using FEV mode that cannot occur in the actual simulation. There are two files available to write from the Failure Effect View. Selecting Create Single Point Failure File from the File menu will generate a file listing all blocks that can cause a system level failure by failing that block. This includes the effects of induced failures. In the example above, blocks Attitude and Thermal will be in the Single Point Failure File since they are series blocks. Depending on how dependence is set up parallel blocks may also be single point failures. The other file that can be created is the Interactive Log. The log can be opened by selecting Open Interactive Log from the File menu or by clicking the Open Interactive Log toolbar button. Once the file is named, the Write to Log menu item and toolbar are activated. Selecting Write to Log will write the text based System Status Summary information (the information that is displayed in a dialog box when the user selects Display Failure Effects) to a text file. During a session using the failure effect view, users can write to the interactive log as often as they want. The file can be closed by selecting Close Interactive Log from the menubar or toolbar. The file will automatically close if failure effects view is exited.

Chapter 10

10-5

Problems
1. What does hatching on a block mean while in FEV view? 2. Can you always cycle through multiple states by clicking a hatched block? 3. If ten blocks in a 1 of 10 parallel system are each dependent on the one above them with a 1% chance of an induced failure, what happens when the top block is failed in FEV mode? Is the top block a SPF block? What about the fifth block?

Chapter 10

10-6

Chapter 11

Weak Link Analysis


Objectives
1. 2. 3. 4. Understand how to use the weak link analysis function. Understand what localized availability, dependability and reliability represents. Be able to ascertain which elements are the weak links of an RBD. Understand the concept of a nodes domain.

Recommended Problems
1, 2, 3, 4 and 5

Chapter 11

11-1

Weak Link Analysis Significant improvements have been made in the realism of the models between the first one presented in Chapter 2 and the model we concluded with in Chapter 9. Implementing various distributions and considering the affects of logistics, dependence, standby and transients improved the fidelity of those models. Recall from Chapter 9 that the availability for the final model of the commercial space station was 0.928. What if an availability of 0.928 is not good enough? Imagine that you are tasked with improving the system's availability such that you obtain a value of 0.948 or better (i.e., a two point increase in the system-level availability). Where might you begin? Given that the MTBDE and Ao are positively correlated, you might try improving the MTBDE of the weakest element first and then determine how much improvement occurred in the systems availability. How would you determine, however, which element in particular is contributing the most to system down time? This chapter provides a methodology that facilitates the process of determining which elements of a system are the weakest links. Open WeakLinkAo.rbd and notice that the system shown in Figure 11.1 is the same model we simulated in Chapter 9. Upon which elements might you focus your investigation in order to improve the systems availability?

Figure 11.1 WeakLinkAo.rbd

This is not an easy question to answer. One might jump to the conclusion that the components in series (i.e., Attitude and Thermal components) are the main causes of the system's down time. Yet, series elements are often designed to have much higher reliabilities than parallel components since they have to operate without backup capabilities. Furthermore, if a series element was to fail often but is repaired quickly, it would not account for much system downtime. This leads us to an important rule of reliability optimization. One must investigate a system's logistical limitations and the failure distributions of its components as well as its series and parallel inadequacies to determine and implement improvements in a systems RAM characteristics. Raptor provides an analysis technique that helps to focus investigations into a systems weaknesses. This technique is called weak link analysis and this chapter will provide the reader with an understanding of how this type of analysis is implemented within Raptor, and how to interpret the results of such an analysis.
Chapter 11 11-2

Notice that the weak link analysis toolbar button for this model is depressed (Figure 11.2), which indicates that weak link analysis will be performed whenever a simulation of this system is initiated. The three analysis buttons (i.e., weak link, capacity and cost) all instruct Raptor to engage code that is not normally exercised thus improving the speed of a simulation when these capabilities are not desired.

Figure 11.2 Workspace View Weak Link Analysis Toolbar Button

Simulate this system using the existing simulation conditions (i.e., 730.5 hours, 10 trials, with graphics) and notice that upon completion of the simulation, the availability of each component and node is displayed to three-digits of accuracy in the center of each element as demonstrated in Figure 11.3.

Figure 11.3 Component Availability

At the end of the simulation, the elements are all colored either red, yellow or green. The red serial elements should be the first to be considered for improvement, followed by the yellow and then the green elements. A user can define the red, yellow and green thresholds used for weak link analysis by selecting the Color Thresholds button on the Simulation View toolbar. This button is available at the end of a simulation and when clicked, the Weak Link Analysis tab of the System Settings dialog box appears as shown in Figure 11.4. This tab allows users to define a range for the red, yellow and green colors. In Figure 11.4 the red color threshold is currently defined to be any availability value from zero to less than 0.90. The yellow threshold ranges from values greater than or equal to 0.90 but less than 0.95, while the green threshold ranges from 0.95 to one. Notice that only the green and yellow thresholds are set. The red threshold is by definition the remainder since availability values only range from zero to one. This tab also allows the user to specify two other analysis types, dependability and reliability, which both will be discussed later in this chapter. Color thresholds can also be set before the start of a simulation by modifying the System Settings dialog box via the Options System Settings menu item.

Chapter 11

11-3

Figure 11.4 Weak Link Analysis Tab of the System Settings Dialog Box

The availability numbers on the block elements are relatively straightforward and easy to understand. For example, the Thermal component displays a value of 0.995 and thus we know that this element was in an up state on average 99.5% of the time and down only 0.5% of the simulated time. The weak link values displayed on the nodes can be a bit more difficult to comprehend. The key concept that must be understood in interpreting weak link analysis results for nodes is the notion of a node's domain. The domain of a node is the region of a system that affects the status of that node as a result of failures and repairs of that region. For example, the status of the n2 node in Figure 11.3 is only affected by the status of the Thermal component. Thus, if the Thermal component fails, the n2 node changes it status to failed and is displayed red in color. When the n2 node turns red, it propagates the affect of the Thermal component failure to the End marker, causing the system status indicator to turn red as well. Hence, the Thermal component and the n2 node are by definition elements of the End marker's domain. Since all elements of an RBD can affect the status of its End marker, every element of an RBD is contained within an End marker's domain. The failure of the

Chapter 11

11-4

Thermal component has no affect on any other nodes in the RBD shown in Figure 11.3 and therefore is not an element of their domains. A domain diagram for this model is shown in Figure 11.5. This illustration takes the form of a hierarchical tree diagram so that every element underneath a particular branch is within that elements domain. Creation of node diagrams is relatively simple for uncomplicated topologies and can be quite difficult for complex topologies. You can acquire some practice developing domain diagrams in the problems at the end of this chapter.
end

2/3

Power

1/2

500path

650path

900path

Comm

n1

n2

SolarP_500W

BatteriesNiCd

Bus_UR

SolarP_650W

BatteriesNiH

Bus_QR

SolarP_900W

BatteriesNaS

Bus_FR

HighGain

LowGain

Attitude

Thermal

Figure 11.5 Domain Diagram of Current System

From this table, it is easier to read the availability numbers. There is an additional benefit in that nine digits of precision are displayed within this table. Select the Output Tables dialog box and then click on the Node Analysis tab as shown in Figure 11.6.

Figure 11.6 Node Analysis Tab of the Output Tables Dialog Box

Chapter 11

11-5

Figure 11.6 displays the availability values for all the nodes to nine digits of accuracy and provides the minimum, maximum, standard deviation and standard error of the mean across all trials. Additionally, the weak link analysis color is provided in the second column. Based on Figure 11.6, the areas that should be considered for improvement are the 500path and 650path power strings. That is, we should first consider improvements to the elements contained within the domains of these two nodes. Making improvements to other areas of the RBD, even serial components such as the Attitude and Thermal, would not yield as large of a return on investment with respect to system-level availability. Recall that the system-level availability is 0.928, which can be viewed on the first tab of this dialog box. Select the Block Analysis tab of this dialog box and then click on the Mean column to sort the values from the lowest to the highest. It should be noted that all Raptor tables can be sorted both from low to high and from high to low by repeatedly clicking on a particular column heading. After sorting the table by the Mean column, it should appear as shown in Figure 11.7

Figure 11.7 Block Analysis Tab of the Output Tables Dialog Box Sorted by Mean

Notice in Figure 11.7, that the 500 Watt solar panel, the unregulated bus and the nickel-cadmium battery components all have identical availability values. This

Chapter 11

11-6

should disturb some of the more statistically inclined readers since the odds of these three components having the same availability value to nine digits of precision is extremely rare given that they all have different failure and repair distributions. A more shrewd reader should recall from Chapter 6, however, that when the 500path node is down due to triggered preventive maintenance, the 500 Watt solar panel and the unregulated bus components are in preventive maintenance and the nickel-cadmium component engages its dependency rules. Furthermore, with the dependence constraints set in Chapter 7, when the 500path node is down, the 500 Watt solar panel, the unregulated bus and the nickelcadmium components all engage their respective dependency rules. These components often go down together when any one of them has gone down due to a hard failure or preventive maintenance. This explains why these three components display the same availability values. Unfortunately, the availability parameter does not yield a clear answer as to which of these three components is the weakest. What is needed is a readiness parameter that ignores the outside influences (e.g., dependency, preventive maintenance, standby) on a component so that we can look at the inherent aspects of the components. Raptor allows for the weak link analysis calculations to be based on the dependability of the components, which is often known in the logistical communities as inherent availability. Let as review the definitions for a blocks availability and dependability calculations as shown in Figures 11.8 and 11.9.

Ab =

uptime uptime + downtime

Ab =

+
Figure 11.8 Block Availability Definition

Db =

principal uptime principal uptime + principal downtime

Db =
+
Figure 11.9 Block Dependability Definition

Chapter 11

11-7

Notice from Figure 11.8 that a components uptime is comprised of all up conditions of the functioning (i.e., shades of green) and reserved (i.e., shades of blue) states. A components downtime is comprised of all up conditions of the constrained (i.e., brown color), scheduled (i.e., shades of orange) and failed (i.e., shades of red) states. Hence, the availability of a component is all of its up times divided by the sum of its up and down times. This is the fundamental definition of availability and is acknowledged formally by the reliability theory community. The dependability equation is a measure of the components intrinsic reliability and maintainability properties and excludes the outside influences of standby (blues), preventive maintenance (oranges) and dependency (brown). By outside influences we are referring to those actions dictated by policies, which include the standby topology design, the preventive maintenance schedules and the dependency scenarios established for a system. It is interesting to note that Raptor views the shades of blue as up states while the shades of orange and the brown color are considered down states. It is true that all of these states are precipitated by outside influences but in the case of the reserved states, the component could operate if it was called upon. The availability and dependability of a node are defined as shown in Figures 11.10 and 11.11.

An =

uptime uptime + downtime

An =
+
Figure 11.10 Node Availability Definition

Dn =

principal uptime principal uptime + principal downtime

Dn =
+
Figure 11.11 Node Dependability Definition

The node availability and dependability definitions follow the same format as those defined for a block. The node availability definition considers all possible
Chapter 11 11-8

states in which a node can exist while the dependability definition excludes outside influences. The node definitions are generally less complex compared to those of a block since a node cannot exist in as many distinct states. In fact, all three green states are represented by a single green state for a node. This amalgamated nature of the nodes states is also true for the shades of blue, orange and red. Select the color Thresholds button and change the analysis type to dependability as shown in Figure 11.12. Click on the OK button and notice how the values on the elements have changed. As shown in Figure 11.13, we now see a clear difference between the three elements of the 500path power string as a result of the dependency values being displayed.

Figure 11.12 Setting the Analysis Type to Dependability

Figure 11.13 Component Dependability

Chapter 11

11-9

Figure 11.14 zooms in on those components causing the most down time to the system. If we focus our efforts on the nickel-cadmium battery, unregulated bus and the quasi-regulated bus components, we might be able to achieve the original goal of this chapter. Recall, we are attempting to improve our current availability of 0.928 to 0.948. We now know where we will focus our improvement analysis efforts but what is not evident, is what attributes of these components should be altered. Since the unregulated bus component is the weakest of the three candidates, we will start with it and see if we can improve the system-level availability in such a manner as to achieve the required goal.

Figure 11.14 Zoomed-in Component Dependability

Earlier in this chapter we stated an important rule of reliability optimization is that one must investigate a system's logistics limitations, the failure distributions of its components as well as its series and parallel inadequacies to determine improvements to a systems RAM characteristics. We might attempt to add a redundant unregulated bus but given that this system is a space station, management has stated that adding mass to the system is a no-go decision. Thus, let us assume that we cannot change the topology of the system to improve the system-level availability. We might attempt to replace the unregulated bus with a component that fails less often but again management has rejected this idea since they cannot afford to replace the unregulated bus component until it has exceeded its designed life. This leaves us with one remaining avenue to improve the systems availability and that lies in the vast world of logistics. Since we need to investigate the major logistical aspects of the unregulated bus component, we will start with its demand for resources and spares. Open the Block Input Tables dialog box and select the Maintenance Delays tab. Note the number of resources the unregulated bus needs to begin its repair cycle (see Figure 11.15). The number of resources needed seems like an opportunity for improvement since the unregulated bus component requires the entire astronaut staff to perform its repair. Maybe the maintenance procedures can be augmented to require only four astronauts. Continuing our investigation, select the Sparing tab of this dialog box and recall that the unregulated bus draws its spares from the Electronics spare pool (see Figure 11.16).

Chapter 11

11-10

Figure 11.15 Unregulated Bus Components Resource Demand

Figure 11.16 Unregulated Bus Components Sparing Demand

Chapter 11

11-11

The Electronics spare pool has an initial stockpile of two spares but can only be refurbished with an emergency launch of a Spaceship One type vehicle. After the Electronics spare pool is exhausted and once another failure of one of the buses occurs, a request for an Electronics spare is placed and then received twenty-four hours later. What if we changed the sparing strategy slightly? We could place the order for Electronics spares as soon as the astronauts notice that the stockpile has reached zero as opposed to waiting for another bus failure before ordering. Changing the number of resources or the sparing strategy might allow us to obtain our goal of a system availability of greater than 0.948. Making both changes simultaneously, however, might not be prudent. Making a single modification to the system that achieves our goal would be a more parsimonious solution and generally a superior decision. Changing the sparing strategy seems to be a quicker and easier solution since it merely requires adding a function to an astronaut daily checklist. Modifying the number of astronauts needed for a repair will require as a minimum the modifications to repair procedures, ground demonstrations of the new procedures and the modification to existing repair manuals. Cancel from the Block Input Tables dialog box and select the Options Spares menu item. From the Spare Pools dialog box modify the Electronics spare pool as shown in Figure 11.17. Click the OK button and then agree to update the Electronics spare pool with the new data. Simulate this model with weak link analysis engaged and note the system-level availability result shown in Figure 11.18.

Figure 11.17 Modifying the Electronics Spare Pool

Chapter 11

11-12

Figure 11.18 New Availability Results

A zoomed in view of the unregulated bus components dependability value is shown in Figure 11.19. As indicated, the change in the sparing strategy for the Electronics spare pool has significantly improved the 500path and 650path nodes dependability values, and thus the dependability of the Power node. The 650path power string improvements result from the components within this power string being coupled with the components of the 500path power sting in several manners. Recall that both power strings make demands from the same spare pools and need the same resources to perform repairs.

Figure 11.19 New Dependability Results

Chapter 11

11-13

The system-level availability of 0.949 exceeds our goal of 0.948 and we have thus achieved our task of improving the system within all the constraints placed on us by management. The approach used in this chapter to make improvements in the systems availability value did not necessarily result in the optimal solution. Improvements in other elements reliability or maintainability could produce the same or better results than those achieved in this lesson. Nevertheless, the approach used was at least logical, providing a much better chance of success than a purely trial and error approach. When the weak link analysis preferences were discussed earlier there were three options for the type of analysis that could be performed. Thus far, we have not discussed reliability weak link analysis. Reliability is the probability that a system or subsystem exceeds a specified time without a failure. Analysis of a system which goes up and down often usually involves the availability and dependability weak link analysis functions. Conversely, analysis of a system simulated for a relatively short duration will usually use the reliability weak link analysis function. Let us modify this model by saying that we are interested in the system remaining up for four hours during a particularly sensitive operation. Thus, we want to determine the reliability of the system for a four hour mission. Open the WeakLinkRt.rbd file and begin a simulation with the changes shown in Figure 11.20 implemented.

Figure 11.20 Simulating Missions without Graphics or Status Bar Updates

Chapter 11

11-14

Conducting simulations without updates to the status bar will greatly increase the speed with which the simulation progresses. The system-level reliability results are shown in Figure 11.21 and the reliability weak link analysis results are shown in Figure 11.22.

Figure 11.21 Reliability of the System Performing a Four Hour Mission

Figure 11.22 Component Reliability

As indicated by Figure 11.22, this system is very reliable for a four hour mission. The reliability of a system is determined by dividing the total number of runs that were completed without a system-level failure by the total number of runs completed. The reliability of a block or node is calculated in the same manner and their definitions are shown on the next page.

Chapter 11

11-15

R(t )b =

# of missions completed without a block failure # of missions attempted

R(t )n =

# of missions completed without a node failure # of missions attempted

Return to the Workspace View and notice that the weak link analysis values and the color thresholds have all been removed. If you desire to view the weak link analysis values again, you can enter the Weak Link Analysis View by clicking on the Weak Link View button as shown in Figure 11.23. The Weak Link Analysis View is similar to the Simulation View except that some toolbar options are not available. This view is not available if you have not yet conducted a weak link analysis or if you have modified the RBD since the last simulation results were generated.

Figure 11.23 Weak Link Analysis View Button

You may have noticed, that the Node Analysis tab of the Output Tables dialog box (see Figure 11.6) is a listing containing the availability, dependability or reliability for every node contained within an RBD. Occasionally, it is desirable to display only a certain subset of crucial nodes. This can be accomplished by deselecting the checkbox on the Advanced tab of the Node Properties dialog box as shown in Figure 11.24. When this checkbox is not marked, the weak link analysis values for a node will not be displayed within the Node Analysis tab. Nodes are often used to make the appearance of a model more pleasing and thus these nodes would not be viewed as central to the understanding of the systems RAM parameters. When the Weak Link Analysis button is engaged, the analysis values are always calculated by Raptor so if you desire, you can always add a nodes values back to the Node Analysis tab. This feature is not available for a block since it is viewed that every components readiness parameter is crucial to the understanding of the system-level RAM parameters. Furthermore, Raptor calculates the availability,

Chapter 11

11-16

dependability and reliability for every element simultaneously so there is no need to re-simulate if you change your mind as to which readiness parameter you desire.

Figure 11.24 Display Node Analysis Information for a Particular Node

To summarize this chapter, weak link analysis provides localized performance values so that the weak links of a system can be determined. Weak link analysis is performed with respect to the failure and repair distribution of each component, the systems logistical constraints, and the topological structure of the system. Thus, weak link analysis yields far more powerful insights than a simple review of the component's mean life, or simply focusing on improving components that are in series.

Problems
1. Imagine an RBD that is simply a long string of several components all in series. Is the product of these components availability weak link analysis values equal to the systems availability? Why or why not?

Chapter 11

11-17

2. Explain what the node availability values represent for each of the nodes marked in the figure below (i.e., A, B, C, D, E and F). Components are independent and have no logistical delay times.

3. Determine the domain diagram of the system shown in Problem 2. 4. Name three general classes of design changes that can be made to improve the RAM characteristics of any system. 5. Explain why availability is not the best weak link analysis parameter to use to evaluate component performance and recommend improvements for a system that contains significant internal dependencies. 6. Determine the domain diagram of the following system.

7. If the system shown above was created by merely taking the WeakLinkDo.rbd file and only adding nodes, would this system obtain the same weak link analysis values for the blocks? What about for the nodes?

Chapter 11

11-18

Chapter 12

Cost Analysis
Objectives
1. 2. 3. 4. Understand how to input cost information for blocks and events. Understand all the input cost fields. Be able to interpret the cost outputs. Be able to generate a cost report.

Recommended Problems
1, 2, 3 and 4

Chapter 12

12-1

Cost Analysis Making changes to a systems configuration or logistics is not prudent without consideration of the financial impacts of these changes. Raptor allows a user to capture numerous cost parameters so that informed decisions can be made with respect to RAM and cost tradeoffs. Raptors cost fields are unit-less so that analysis can be conducted in dollars, pounds, yen or any other currency the user desires. Raptor limits the accuracy of the cost fields to the nearest cent or 1/100th unit of currency. Recall from the previous chapter concerning weak link analysis that we determined the unregulated bus component and its associated sparing pool were the likely weak links of the system. In this chapter, in addition to retaining the logistical changes to the system made in Chapter 11, we will conduct analysis to determine the cost impact of adding a redundant unregulated bus component to further improve system-level availability. Open Cost1.rbd and again note the similarity of this RBD in Figure 12.1 with those of previous chapters.

Figure 12.1 Initial RBD for Cost Analysis

This RBD is functionally identical to the final model used in Chapter 11 (after the logistical changes were implemented) except that cost fields are no longer set to their default values of 1.00. Let us explore the cost fields associated with a component by opening the Attitude components Block Properties dialog box. Select the Costs tab and note that the cost fields for this component have already been entered as shown in Figure 12.2. Fourteen cost fields can be designated for any component. The cost fields are grouped into three categories of up states, down states and fixed costs. There are two costs that comprise the up state cost group and include the cost to operate or run the component as well as the cost for that component to be in a standby state (recall that the standby state is considered an up state). For these two cost fields, a cost is incurred per unit time whenever a component is in a good state. Thus, a charge is assessed for each unit of time a component is or could function properly. There are eight costs that comprise the down state cost group. The first two are associated with the cost to repair a component. These costs represent the per unit time cost to repair a component and are only related to the actual hands-on maintenance time of a component's repair cycle. In addition to a per unit time

Chapter 12

12-2

repair cost, a fixed cost can be accrued for each repair occurrence. This field is shown to the right of the hands-on maintenance cost line. For example, some home service professionals will charge $30 to come to your house regardless of the predicament, plus a $75 per hour rate to accomplish the actual hands on repair.

Figure 12.2 Attitude Components Cost Fields

The next two cost fields are associated with the cost to perform preventive maintenance. These expenditures represent the per unit time cost to conduct preventive maintenance activities as well as a fixed cost for each preventive maintenance occurrence. The next two fields deal with the time spent in a hold status due to either logistical or preventive maintenance reasons. Both of these fields accrue costs on a per unit time basis. The seventh down state cost is the per unit time cost of being in an idle state, which is caused by dependency relationships. The remaining down state expense is the per unit time cost of being in a permanently done state, which can occur when a component has failed and there is no possibility of this component operating again within a particular trial. At this point, for each of the major colors that a component can display during a simulation, an associated cost can be defined. In two cases, the shades of the color group have been joined to form one cost category. The shades of green (running) and blue (standby) have been fused into two cost categories, respectively. Thus, a
12-3

Chapter 12

user cannot specify a cost for a component being in a cold, warm or hot standby state simultaneously. Based on Chapter 8, it should be understood that a component cannot occupy more than one of these standby sub-states within the same model. However, we will see in Chapter 17 that even though a component can exist in all three of the green shades within one model, there is still only one cost field associated with this functioning state. There are four costs that comprise the fixed cost group. The first field specifies an initial cost of a component, which might be higher than recurring spare costs due to setup expenses like implementing jigs, training personnel to use new equipment, the cost of the first production unit, etc. The second field is the cost of each spare in a components stockpile and the cost for any spares ordered during a simulation. The next field is the additional cost for acquiring an emergency spare. For example, when an emergency spare is ordered, the cost of the spare (i.e., the previous field) and the cost to ship that spare quickly are incurred. Thus, this cost is always an additional fee to the previous cost associated with recurring spares. The last field of the fixed group pertains to the cost to dispose or salvage a component that reaches a done state within a trial. If a cost is incurred for the disposal of the component, then a positive value in this field should be used. If a rebate is gained by salvaging the component once it has reached its done state, then a negative value should be placed in this field. This is the only cost field that permits a negative cost value (i.e., rebate). For the Attitude component it has neither a salvage nor a disposal cost since the likely scenario is that this component, as well as some of the others, will eventually burn up in the Earths atmosphere and there is generally no cost associated with this type of action. In some cases, components will be disposed of or salvaged for a rebate at the end of a simulation trial regardless of whether the components reached their done state. To activate this feature, check the only checkbox on this tab, which is labeled Always assess rebate or disposal cost at end of a trial. As shown in Figure 12.2, a done cost will not be assessed for the Attitude component, which correlates well to the rebate or disposal cost field being set to zero. The Attitudes standby cost is zero since this component will never be in a standby state (it has no alternates). The Attitudes emergency spare cost has been set to zero since this cost is only related to the custom and spare pool replacement strategies. Recall that the Attitude component uses the infinite spares replacement strategy. Cancel from this dialog box and open the Block Properties dialog box for the unregulated bus component. Select the Costs tab as shown in Figure 12.3. Similar to the Attitude component, the unregulated bus has no standby or done costs. Additionally, the unregulated bus component has a zero cost for the three preventive maintenance fields since this component has no scheduled maintenance activities defined. Notice in Figure 12.3 that two of the cost fields are visible but deactivated. These fields are the components cost for a spare and the additional cost for acquiring an emergency spare. Bear in mind that this component obtains its spares from the Electronics spare pool and fields associated with a spare pool

Chapter 12

12-4

can only be modified from the Spare Pools dialog box. Since a spare pool is a system-level entity as opposed to a component attribute, costs for such entities must be set where they are defined to ensure that they have system wide impact. Thus, the deactivated fields are a protection mechanism to ensure that all components drawing from the same spare pool have the same sparing costs.

Figure 12.3 Unregulated Bus Components Cost Fields

Cancel from this dialog box and open the Spare Pools dialog box by selecting the Options-Spares menu item. Select the Electronics spare pool from the pool name list box to display the properties of this pool as shown in Figure 12.4. The cost fields for this spare pool, as well as all the other pools, have already been updated to include cost information. The last two fields of the Spare Pools dialog box are used to enter the cost of obtaining a spare from this pool and the additional costs associated with obtaining an emergency spare. Notice that these two cost fields are identical to the two unregulated bus component cost fields that were shown deactivated in Figure 12.3. Any modifications to these fields in Figure 12.4 will be reflected in the corresponding component cost fields that are assigned to a particular spare pool. At the start of a simulation trial, all spare pools are charged a spare cost based on the number of spares in their initial stockpile. This applies to custom sparing as well as spare pools. Resource pools also possess cost fields and are shown in Figure 12.5.
12-5

Chapter 12

Figure 12.4 Spare Pool Cost Fields

Figure 12.5 Resource Pool Cost Fields

Chapter 12

12-6

At the beginning of each trial, an initial cost is accrued for each resource. Additionally, there is a per unit time and fixed costs associated with using resources. When more than one resource is required, resource charges are multiplied by the number of resources employed for a repair. For example, if three astronauts are needed to conduct a repair, then the resource costs would be $1,125 (i.e., 3 x $375/hr) per hour of repair plus a fixed cost of $261 (i.e., 3 x $87/hr). For some systems, there are costs associated with a system being down. This cost could represent loss of business or a penalty paid for not providing a service. The cost per unit of time for a system in a down state can be set in the System Settings dialog box via the Options System Settings menu item as shown in Figure 12.6.

Figure 12.6 Cost of System Down Time

There is a critical cost field that has not yet been explored. This field is related to Raptors capacity analysis feature and will be discussed in Chapter 14. This field is also entered in the System Settings dialog box as shown in Figure 12.6 and for now will be set to a cost of zero. All cost input fields for a component can be viewed simultaneously on the Costs tab of the Block Input Tables dialog box, as shown in Figures 12.7, 12.8 and 12.9. It should be obvious that the number of columns exceeds the tables viewable area so a scroll bar is included at the bottom of the table to allow the user to view all of a components cost fields.

Chapter 12

12-7

Figure 12.7 First Third of the Component Cost Tab

Figure 12.8 Second Third of the Component Cost Tab

Chapter 12

12-8

Figure 12.9 Final Third of the Component Cost Tab

Cancel from the dialog box and notice that the cost analysis toolbar button for this model is depressed (see Figure 12.10), which indicates that cost analysis will be performed whenever a simulation of this system is initiated.

Figure 12.10 Workspace View Cost Analysis Toolbar Button

Let us conduct a simulation of the Cost1.rbd model and assess the impacts of populating this system with cost data. The cost results of this simulation are contained within several tabs of the Output Tables dialog box, which are shown in Figures 12.11 and 12.12. On average, this system costs 21.473 million dollars to operate and maintain for one month with an availability of 0.949. A user should note that the addition of cost fields did not alter the RAM output parameters in any manner, which should be reassuring. Let us take a closer look at the cost results for each component by selecting the Block Costs tab of this dialog box, as indicated by Figure 12.12. Be sure to sort this tab from high to low based on the total costs.
12-9

Chapter 12

Figure 12.11 Overall Cost Results

Figure 12.12 Component Cost Results Sorted by Total Cost

Chapter 12

12-10

The Block Costs tab shows a life cycle breakdown of the cost for each component. The Initial Cost column is just the component's initial cost. The Operating Cost column is the combined cost for a component being in a variety of operating states throughout a simulation including running, repairing, hold, idle, preventive maintenance and standby states. If a component uses custom or infinite sparing, the cost of using spares is included in this table in the Spare Cost column. If a component was permanently failed or if the option to always add done cost was selected, the disposal or salvage cost would be included in the Disposal Cost column. The total cost is displayed for each component in the last column and it is evident from Figure 12.12 that the battery components are the most expensive followed, by the solar panels. Both the End of Run and the Final Results reports contain additional information on cost. The End of Run report contains a full cost assessment for each simulation trial, while the Final Results report has the same format but contains average values across all trials. In addition to the information in Figure 12.12, these reports contain a further breakdown of the operating costs by state for each component. Figure 12.13 is a portion of the Final Results report for this model.
Block Attitude BatteriesNaS BatteriesNiCd BatteriesNiH Bus_FR Bus_QR Bus_UR HighGain LowGain SolarP_500W SolarP_650W SolarP_900W Thermal Totals Block Attitude BatteriesNaS BatteriesNiCd BatteriesNiH Bus_FR Bus_QR Bus_UR HighGain LowGain SolarP_500W SolarP_650W SolarP_900W Thermal Totals Good 104745.01 203063.34 234551.55 235798.67 77860.77 84365.13 90693.27 7235.76 2780.76 140730.93 152546.30 135174.94 10905.69 1480452.12 Repair 2878.08 9722.77 30938.04 9297.10 19999.44 11190.67 25903.73 13245.87 0.00 6155.13 4190.20 2690.72 2203.72 138415.47 Idle 433.50 2614.13 7674.46 5836.65 428.98 855.59 2078.89 56.42 81.98 2957.58 1147.25 1500.77 0.00 25666.21 RepHold 372.96 127.75 29.40 7.50 134.15 63.12 693.54 43.46 0.00 691.73 1310.58 347.67 24.98 PM PMHold Standby 0.00 0.00 0.00 7042.36 0.00 0.00 7214.68 0.00 0.00 7275.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3883.42 2619.12 0.00 0.00 3224.36 0.00 0.00 4269.87 0.00 0.00 0.00 0.00 0.00 0.00 3883.42 Done 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

3846.86 31645.57

InitSpares NewSpares EmerShip 0.00 3951.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 418.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5185.00 0.00 0.00 5185.00 4369.00 0.00

Figure 12.13 Component Cost Section of the Final Results Report

Chapter 12

12-11

Costs for spare and resource pools incurred during a simulation are also contained within these reports as shown in Figure 12.14. Spare pool costs include the initial stockpile costs, costs for ordering additional spares and the costs associated with acquiring emergency spares. Resource pool costs include the initial cost of possessing five astronauts, the fixed costs for using the astronauts and the hourly wages for the astronauts to perform repair activities. For this simulation, it should be observed that a significant contributor to the total cost of this model is the Astronaut resource pool costs (i.e., approximately 89% of the total cost).
SparePools Cells PhotoVPanels Electronics SparePool_Totals Initial 9225.00 6250.00 17570.00 33045.00 NewSpares 3690.00 312.50 15813.00 19815.50 EmerShip 0.00 5000.00 0.00 5000.00 Total 12915.00 11562.50 33383.00 57860.50

Resources Astronauts Resource_Totals

Initial 18750000.00 18750000.00

PerUseCost 3245.10 3245.10

PerTimeCost 295186.23 295186.23

Total 19048431.33 19048431.33

Figure 12.14 Spare and Resource Pool Cost Section of Final Results Report

Open the Cost2.rbd file, which is a modified version of the previous RBD. A redundant unregulated bus was added, as shown in Figure 12.15, while retaining the correct dependencies. It is recommended that the user verify that the dependencies were maintained with this new topology using Raptors Failure Effects View, which was discussed in Chapter 10.

Figure 12.15 Modified Cost RBD

Simulate this RBD using the same parameters as in the previous simulation, which will allow us to determine the impact on the systems cost and RAM parameters resulting from such a modification. You should obtain identical results to those shown in Figure 12.16. The price has risen from 21.473 million to 21.545 million
12-12

Chapter 12

dollars due to adding the redundant unregulated bus component. The availability has increased from the original value of 0.949 to 0.964. Therefore, for $71,216 a month, this system's availability increased slightly more than 1.6 percent (i.e., 0.015). The question is whether this increase in cost is worth the increased availability. There is no clear answer to this question but for some systems, a small increase in availability is worth a lot more than $71,216 (e.g., communication networks, missile defense shields, etc.). Since the answer to this question is highly dependent on the system being considered, Raptor cannot resolve this question directly. Nevertheless, Raptor provides the analysis methodology to conduct cost analysis versus system RAM attributes and therefore facilitate the formulation of sound design decisions.

Figure 12.16 Final Results with Redundant Unregulated Buses

An important consideration when conducting cost analysis for a system that will be in service for several years is the time value of money. Analysis conducted based on present year dollars may not represent a valid projection of costs ten years from now. Many spreadsheet tools exist that contain excellent time value of money capabilities. Instead of attempting to build in cost analysis algorithms and

Chapter 12

12-13

trying to mimic features that other tools do quite well, the approach Raptor takes is to provide cost data at specified time intervals so that the data can be postprocessed. For example, Raptor allows a user to simulate a system for ten years of operation and write a cumulative cost report at the end of each year. The user can now take this data to a spreadsheet post-processor and experiment with various inflation rates to project future costs. To engage this feature, selected the Files & Reports tab of the Simulations Options dialog box. The checkbox labeled Interim cost results must be checked and the frequency of the report generation must be specified. For this example, Figure 12.17 indicates that Raptor will generate cost results every quarter month for a model with a simulation termination point of 730.5 hours. The format of the interim cost report is the same as the cost section of the End of Run or Final Results reports.

Figure 12.17 Generating Interim Cost Results

It is interesting to note that a component that is partially repaired at the end of a simulation trial will accrue a pro-rated repair cost based on the amount of repair completed. The fixed cost associated with a repair, however, is never pro-rated

Chapter 12

12-14

and is accrued at the start of the hands-on repair activities. If a component uses infinite sparing, the cost of a spare is incurred as soon as the spare is obtained and thus a full spare charge is always accrued for either a partial or clipped repair. For all other sparing strategies, costs for spares in the initial stockpile are accrued at time zero, and the costs for additional spares are accrued at the time spares are ordered.

Problems
1. If a spare pool contains five spares at $500 each, what would be the initial spare pool cost? 2. What cost field specifies the per unit holding cost for spares maintained within a stockpile? 3. What is the cost of repairing a component under the following conditions: 7 resources were required, total downtime of the component was 10 hours, logistics delay time was 2 hours, cost of repair is $20 per hour plus fixed repair cost of $15, cost of resources is $15 per hour, the cost of a spare is $1,250 and a hold cost of $8 per hour? 4. If several components use spares from one pool, the sparing cost for these components is combined and listed in the spare pools section of the cost reports. How can you determine how much cost was due to each component?

Chapter 12

12-15

Chapter 13

Hands-on Example II
Objectives
1. Be able to convert a physical description of a system into a Raptor Reliability Block Diagram. 2. To practice applying all the standby features of Raptor. 3. Be able to apply Weak Link and Cost analysis for the purpose of design trade-off. 4. Be able to use the preventive maintenance and standby features of Raptor to increase component and system level availability. 5. Be able to bake one hell of a rhubarb pie.

Chapter 13

13-1

Hands On Example The best way to understand how to apply and appreciate any software application is to actually use the software. A problem is presented below that should test and reinforce your understanding of the preceding lessons. It begins with the actual development of a system-level RBD (often the most difficult task in conducting reliability simulations), and ends with the generation of statistically meaningful results that could be used for design trade-offs.

System Description: A pie-making facility is under study.

The pie-making plant consists of three main areas: power/electrical facilities, motors, and pie-making mechanisms. The power facility runs principally on AC power, but there is a battery back-up that can be turned on in the event of AC failure. The battery is turned off if the AC power is running, although it still burns some life, about 10% as much as when it is running, when not active. The power system is regulated by a computer, and requires a 1553 card for proper operation. There are separate motors that drive the main production line belt and the box folder. Both are necessary for the pie facility to be operational. The pie mechanisms are the oven, the boxer, the emergency switch and the pie forming lines. The pie forming lines each have a mixer, a crust former, and a filling station. There are three pie forming lines, one each for apple pie, cherry

Chapter 13

13-2

pie, and rhubarb pie. The plant can only handle the capacity from two of three lines at any one time; the line not in use will be placed in cold standby.

Apple

Cherry

Rhubarb

The plant runs for 16 hours a day, 365 days a year. The facility produces 15 pies per filling line per hour that it operates, and each pie generates an income of $2.17. Exercise 1. Draw an RBD of the pie-making facility. Do not use Raptor at this point.

Chapter 13

13-3

Exercise 2. Now open PieFacility1.rbd. The blocks have been entered with their complete data, including failure and repair, sparing, resources, and costs. The failure and repair data is given in days, assuming that the components run for 16 hours a day as mentioned above. They have not, however, been configured. Save the .rbd file as PieFacilityyourname.rbd. Complete the RBD at this point and come up with a preliminary estimate of availability and cost of the facility over its operating period of one year.

Figure 13-1 Block Distribution Input Table

Using the availability, make an estimate of the income generated. Is the facility profitable?

Chapter 13

13-4

Solution to Exercise 2. PieFacility2.rbd contains a fully assembled model of the system that follows all the rules laid out in the system description. We simulate.

Figure 13-2 Results from simulating PieFacility2.rbd

For the purposes of completing this exercise in class, we recommend simulating for five trials, as shown above. For actual analysis, the RBD would be simulated throughout many more trials. In the period of a year, the facility produces (30 pies/hour)*(16 hours/day)*(365 days/year)*Availability = (30 pies/hour)*(16 hours/day)*(365 days/year)*(0.793772828) = 139,069 pies. Each pie generates $2.17 in income, so the facility makes 139,069 * $2.17 = $301,779.73. Comparing this to the operating cost of $221,028.18, we find that we have $80,751.55 in profit.

Chapter 13

13-5

Exercise 3. For this exercise, you will employ Raptor to perform design trade-off analysis. Given below are three ideas as to how to improve the pie making facility. You will adjust your RBD to each of the plans to see which is best. The chief baker, Kenny, thinks that the biggest bottleneck is the fact that the computer and 1553 card need to be used to regulate the power supply, and has gone to engineering to come up with a scheme to eliminate them. Create PieFacilityyourname-baker.rbd to analyze his suggestion. Stan the plant manager argues that the biggest improvement can be achieved by using redundancy, preventive maintenance, and standby to improve the availability of the plant. Starting with PieFacilityyourname.rbd, make a new RBD to investigate his idea by doing the following. Identify the worst component using weak link analysis. Introduce a back-up for this component. The back-up will have identical cost information and repair data, and its failure mean will be half that of the original unit. Place the back-up in a cold standby configuration with the prime. Set up a preventive maintenance schedule that optimizes the availability of the prime, assuming that preventive maintenance requires a fixed time of 0.5 days to complete. The lead accountant is named Kyle, and he wants to eliminate the red time by hiring one or more additional plant mechanics to prevent holds due to insufficient resources. Starting with PieFacilityyourname.rbd, make an RBD to evaluate the accountants plan. Conduct simulations using the new configurations. Do any of the plans increase availability? What about profitability? How do you report to the company president, Eric?

Chapter 13

13-6

Solution to Exercise 3. To carry out the bakers plan, we eliminate the blocks representing the computer and 1553 card, and re-link the RBD. Upon simulating PieFacility3.rbd, we find

Figure 13-3 Results from the baker's plan

So we see some increase in availability, and a reduction in cost. Not bad. To implement productions scheme, we examine the RBD in Weak Link view.

Chapter 13

13-7

Figure 13-4 Weak Link view of PieFacility2.rbd

The worst offender is the main motor. We add a component called backup_motor by copying the main_motor block and then pasting it. Since this backup motor is not as powerful as the prime, we change its failure distribution as specified.

Figure 13-5 The backup motor's properties

Chapter 13

13-8

Then we place it in a standby configuration with the main motor, being certain to set the priority to the main motor, and to specify priority return. We also set up preventive maintenance on the main motor, with the maintenance activity scheduled to occur every 10 days. Simulating this new configuration, PieFacility4.rbd, produces these results.

Figure 13-6 Results of production's scheme

Productions scheme would result in a substantial improvement of availability. It also, however, increases the cost. To carry out the idea advanced by accounting, we return to the baseline RBD and increase the number of plant mechanics from two to four. Conducting the simulation of PieFacility5.rbd gives the following results.

Chapter 13

13-9

Figure 13-7 Results of accounting's idea

Tabulating the results of the three variations, and computing the net profit:
Option Baseline Kenny's plan Stan's scheme Kyle's idea Availability 0.793772828 0.805396457 0.877593962 0.790220261 Production 139069 141105 153754 138447 Income $301,779.73 $306,197.85 $333,646.18 $300,429.99 Mean Cost $221,028.18 $206,735.48 $234,116.82 $223,540.96 Net $80,751.55 $99,462.37 $99,529.36 $76,889.03

Many of you will have been troubled by the fact that we have assumed that the plant produces 30 pies per hour that it is running, since each of the three pieforming lines can make 15 pies per hour, and we do not always have at least two of them up and running. This is a legitimate concern. How can we determine how many pies are actually being produced? To answer this question, we simulate

Chapter 13

13-10

PieFacility2.rbd with the final results report, since it is our baseline model of the pie facility. The final results report contains more detailed weak link analysis information, but we could also obtain all the numbers that we need from the Node Analysis tab of the Output Table.
***WEAK_LINK_ANALYSIS*** NODE_ANALYSIS Availability_Data Node AoMin apple_pie 0.903060824 cherry_pie 0.896110663 n26 1.000000000 n27 0.998523682 n34 0.814827578 pies 0.987517818 rhubarb_pie 0.902065153

AoMean 0.911361420 0.917006846 1.000000000 0.999516473 0.825302412 0.995353481 0.912852608

AoMax 0.922442565 0.930338073 1.000000000 1.000000000 0.844543741 0.999774499 0.930849115

AoStdDev 0.008458985 0.012957587 0.000000000 0.000663780 0.011483331 0.004966236 0.011604566

AoSEM 0.003782973 0.005794809 0.000000000 0.000296851 0.005135502 0.002220968 0.005189720

Figure 13-7 Node availability analysis section of final results report

Using this information, we need to determine when the pies node has two available paths coming in, when it has one path available, and when it is unavailable. The unavailable question is the easiest to answer. If we look to the availability section of the nodes, we see that the pies node had a mean availability of 0.995353481. Thus, the proportion that it was not available was 1 0.995353481 = 0.004646519. This is the proportion of time for which it was in a state with zero paths feeding in. To determine the proportion of time that the pies node was in a two or more paths available versus an only one path available state, we look first to the mean availability of the apple_pies, cherry_pies, and rhubarb_pies nodes. Respectively, they are 0.911361420, 0.917006846, and 0.912852608, which we will denote as Aa , Ac , and Ar . Standard reliability equations state that the proportion of time that the pies node is in an at least two paths state is Aa Ac Ar + Aa Ac (1 Ar ) + Aa (1 Ac ) Ar + (1 Aa ) Ac Ar , or 0.978968528. Since we know how often the pies node is in the two or more state and the zero state, it follows that its proportion in the one available path state is 1 - 0.978968528 0.004646519 = 0.016384953. Having determined the proportions of each state, we can compute the actual number of pies that were produced. In the two or more paths state, we produce 30 pies per hour. In the one path state we produce 15 pies per hour. Thus, we multiply 30 pies by the proportion in the two or more paths state (0.978968528), then by the number of hours of operation per day (16), then by the number of days of operation per year (365), then by the overall availability (0.793772828) to find that this produces 136,144.174 pies in a year. Likewise we compute that the one path state yields 1,139.319 pies per year, so in total we produce 137,286.493 pies per year. This is a more realistic capacity number than our initial, oversimplified estimate of 139,069 pies per year, but it does require more work to arrive at. In the next chapter, we will see a capability of Raptor that eases this type of analysis.

Chapter 13

13-11

We close with the following recommendations.

Pie crust recipes and some helpful tips and techniques


For best results, refrigerate all ingredients prior to making the dough - even the flour. Use pastry flour or all-purpose. Bread flour has too much gluten to make a tender crust, and cake flour is too soft to give the proper body. Lard and shortening produce the most tender crusts. You may use half lard or shortening and half butter if you want the buttery flavor. The pockets of fat make the flakiness in the crust. Use a pastry blender or 2 knives to cut in fat. Dough should still have some pea-size pieces. Handle as little as possible with your hands. All liquids should be ice-cold. For a flakier crust, substitute ice cold sour cream or heavy cream for the water. Sugar in a pastry dough sweetens and tenderizes.

Problems
1. What was ambiguous in the system description of the pie-making facility? 2. If we wanted to know how many pies of each type were produced, how could we determine that? 3. What other assumptions did we make with our model? calculation, did we really eliminate all assumptions? In our capacity

4. Were you surprised at how similar the availabilities were for the apple_pie, cherry_pie, and rhubarb_pie nodes? To what do you attribute this?

Chapter 13

13-12

Chapter 14

Capacity Analysis
Objectives
1. Understand how to use the Capacity Analysis feature of Raptor. 2. Understand the difference between throughput and capacity. 3. Be able to determine if an element is underutilized.

Recommended Problems
2, 3, 4, 5, 6, 7, 8 and 9

Chapter 14

14-1

Capacity Analysis Some systems perform identically in a yellow state as they do in a green state, as long as a minimum set of elements is functioning. Other systems perform in a degraded manner when failures occur. One of the main reasons that the capacity analysis feature was added to Raptor was to help quantify the degree of degradation a system is experiencing as elements fail and repair. When a system performs in a degraded manner, this may indicate that it is producing fewer products, generating less power or possibly handling fewer messages. It is imperative to understand that capacity analysis is the realization that some generic substance, defined by the user, is flowing through a system and if failures occur, that flow is interrupted or diminished. The concepts of "flow" and "capacity" are two fundamental underpinnings of Raptors capacity analysis feature. These terms are defined as follows:

Flow is the amount of substance per unit time that is being processed through a particular path or a system.

Flow =

substance gallons cars chlorine atoms messages > > > > time minute hour seconds nano - seconds

Capacity is the maximum amount of flow a path or system can manage per unit time.

gallons cars messages Capacity = max(Flow) > max > max > max minute hour second

The reader should take note that the word "throughput" is synonymous with the word flow and both will be used throughout this chapter. The concept of capacity analysis is comprehended best by reviewing and understanding some examples. Open the Capacity1.rbd file and open the System Settings dialog box from the Options System Settings menu item. Modify the two capacity fields of this dialog box as shown in Figure 14.1. For this model our capacity concerns are related to how much electrical power can be generated by this system. Electricity is needed to perform daily functions such as maintaining attitude control, providing heat and light, running the electronics of the system and providing additional power for onboard experiments. Every capacity analysis model starts with determining how much substance will be allowed to flow through a system.

Chapter 14

14-2

For this model, the electrical capacity, or maximum achievable flow, of this system is 2,050 Watts. This is merely the sum of three power strings capacity of 500, 650 and 900 Watts of power. The cost incurred for the inability to produce electricity has been established to be $346 per unit of lost flow for each unit of down time this system experiences. This cost field makes it possible to model the forfeiture of money or opportunities whenever flow is interrupted such that a system cannot process some portion of the flow generated value.

Figure 14.1 Setting the Flow Generation and Cost of Lost Flow

To facilitate the understanding of capacity analysis, imagine that this system generates 2,050 Watts of electricity at the Start marker and flows this substance through its different paths. This substance is generic in nature and can represent any non-varying discrete entity like messages, cars, chemicals, liquids, manufactured products or simply, the generic material widely known as widgets. In this version of the Raptor tool, only one type of substance can be generated for a given simulation. Occasionally, all of the flow will reach the End marker. Other times, only a fraction of the flow reaches the End marker due to components being in one of their many down states. Thus, components in a down state restrict or obstruct the flow generated from the Start marker. While the flow generation can be viewed as if it starts from the Start marker, a question arises as to how Raptor determines

Chapter 14

14-3

which path the flow should take when presented with multiple choices. Is the flow sent down one preferred path or split equally (i.e., without fractionalizing any integer flow) among all possible paths? This question can be answered yes for both situations depending on how users specify the partitioning of the flow. We have already established in Chapters 7, 8 and 11 (i.e., dependence, standby and weak link analysis, respectively) that nodes occupy a unique position in an RBDs topology. They exist at the intersection of paths and thus are a natural choice for controlling or distributing the flow between the Start and End markers. All nodes have the ability to house the flow-in as well as the flow-out capacity information. Thus, nodes control the amount of flow that can traverse through its inbound paths and determine the direction to send its outbound flow. Nodes default in essence to being infinitely large pipes and thus can handle any amount of flow either into or out of them. Once you place any restriction on the infinite flow either in or out of a node, that node becomes a capacity node. Only these nodes will display capacity information within the Simulation View and have their results reported in the Output Tables dialog box. Let us create a capacity node by placing flow restrictions on the Power node. Open the Node Properties dialog box for the Power node and select the Capacity tab. Figure 14.2 displays both the Unrestricted flow and Use any available path checkboxes as being marked, which indicates that this node acts as an infinitely large pipe.

Figure 14.2 Power Nodes Capacity Tab with Unrestricted Flow

Chapter 14

14-4

The use any path checkbox is deactivated since only one path departs from the Power node and all flow must use that single path. When the unrestricted flow checkbox is marked, all paths coming into this node have no upper limit on the amount of flow that can be channeled through them. When not marked, the capacity flow can be modified within the flow-in table as shown in Figure 14.3. Uncheck the unrestricted flow checkbox and specify a nominal flow that the path carries under normal operating conditions and a maximum flow, or as we defined earlier, its capacity. Click on the cell in the Max Flow column for the link coming from the 900path node to display a flow value box. Enter a quantity of 900 in the value box and click on the Accept Changes button or select the cell in which you want the value to appear. Click on the cell in the Nominal Flow column for the same path and note that a wattage value of 900 will appear in that cell as well. Continue editing the dialog box until it mimics those values shown in Figure 14.3.

Figure 14.3 Power Nodes Capacity Tab with Restricted Flow

We have just specified that the 900path node, which controls the 900 Watt solar panels, the sodium-sulfate battery and the fully-regulated bus components, can nominally manage 900 Watts of energy and has no additional surge capacity since the maximum flow value is equivalent to the nominal value. Likewise, the 650path and 500path nodes can handle 650 and 500 Watts of energy, respectively.

Chapter 14

14-5

Recall that we are generating 2,050 Watts and we have just defined how much each power string path can handle. Open the Node Properties dialog box for the n1 node and select the Capacity tab. Uncheck the Use any available path checkbox and modify the table as shown in Figure 14.4. Since this node has multiple outbound paths we can define a priority relationship amongst these paths. Outbound flow will be sent down the path with the highest priority first. A lower number represents a higher priority. The highest priority value for an outbound path is one and the lowest priority is ninety-nine. Flow will be sent to the highest priority path until that path reaches its nominal flow value. Additional flow is then sent to the path with the next highest priority. Flow will be distributed evenly among paths with equal priority. If all paths are handling their nominal flow amounts, and excess flow needs to be distributed, flow will be added to the highest priority path until it reaches its maximum flow value. This continues until all paths are flowing at full capacity. Any additional flow is rejected but may be redirected to other paths that might be able to handle the surplus flow. Given that we are generating as much flow as this system can handle, the priorities set in this node will not affect the capacity output results. Later in the chapter we will conduct a less than maximum capacity simulation and these priorities will then become more relevant.

Figure 14.4 Capacity with Prioritized Paths

Chapter 14

14-6

Return to the Workspace View by selecting the OK button of this dialog box and notice that the capacity analysis and cost analysis toolbar buttons for this model are depressed (see Figure 14.5), which indicates that both capacity and cost analysis will be performed whenever a simulation of this system is initiated.

Figure 14.5 Workspace View Capacity and Cost Analysis Toolbar Buttons Engaged

Start the simulation of this model in step mode. Figure 14.6 displays the initial flow conditions, which includes only the two nodes defined to be capacity nodes and the Start marker. Displayed above the Start marker will be the system flow value, which is currently 2,050 Watts. The Power and n1 nodes display the value of 2,050 as well, which is the current amount of flow passing through them.

Figure 14.6 Initial Flow Conditions

Click the Step button once and the high gain antenna component will fail as shown in Figure 14.7. This same failure would have occurred even if capacity analysis was not engaged since capacity analysis is an additional layer of code that does not affect the RAM aspects of a simulation (similar to weak link and cost analysis). When this failure occurs, and because the switchover is not immediate, the system goes down causing the flow through the system to drop to zero. The current flow of zero is now displayed above the Start marker.

Figure 14.7 Flow Loss Due to a System Failure

Chapter 14

14-7

Take three more steps and note in Figure 14.8 that only 1,550 Watts are flowing since preventive maintenance for the 500 Watt solar panel and nickel-cadmium batteries has been triggered. With the 500path power string down, 500 Watts of capacity has been lost and will remain lost until this power sting starts functioning again. The amount of time and the flow during a time interval is maintained by Raptor so that a time-weighted average flow can be calculated.

Figure 14.8 Partial Flow Loss of 500 Watts

Take three more steps and note in Figure 14.9 that only 1,400 Watts are flowing since preventive maintenance for the 650 Watt solar panel and nickel-hydrogen batteries has been triggered. With the 650path power string down, 650 Watts of capacity has been lost and will remain lost until this power sting starts functioning again.

Figure 14.9 Partial Flow Loss of 650 Watts

Once again click the Step button three more times and note in Figure 14.10 that only 1,150 Watts are flowing since preventive maintenance for the 900 Watt solar panel and sodium-sulfate batteries has been triggered. With the 900path power string down, 900 Watts of capacity has been lost and will remain lost until this power sting starts functioning again.

Figure 14.10 Partial Flow Loss of 900 Watts

Chapter 14

14-8

Click on the depressed Pause button and allow the simulation to run to its completion. Open the Output Tables dialog box and note the new capacity information now available. As indicated in Figure 14.11, the system availability value is 0.949, which is unchanged from the previous chapter, as we should expect. In fact, all of the values in the summary table from the availability row and below are unchanged.

Figure 14.11 Summary Results of the first Capacity Simulation

Three additional rows have been added to the summary tab (i.e., mean capacity, mean flow, and units produced) that only appear when capacity analysis is conducted. During any individual trial, the capacity of a system is likely to fluctuate. After each trial, the mean capacity is calculated as the time weighted average of the capacity values observed. The mean capacity row displays the minimum mean capacity observed during all trials as well as the maximum. For this simulation, the flow generated equals the system's maximum capacity, so the mean flow row matches the mean capacity row. If less flow is generated than a system's capacity, these values will not match. For each run, once the mean flow rate is calculated, the total units produced can be determined as the product of the mean flow rate and the simulation time. Again, the minimum, average, maximum, standard deviation and standard error of the mean for each parameter are displayed.

Chapter 14

14-9

In the previous chapter, the cost for operating this RBD for a month averaged $21.473 million. Notice that the cost to operate the very same system in this chapter is $85.079 million. The difference in cost is caused by assessing the cost of lost flow at a rate of $346 per hour per unit of flow. This system produced more than 1.3 million units (Watts) and had a capacity of nearly 1,798 Watts. Hence, about 252 Watts per hour are lost due to components being in down states. Put another way, this system has the theoretical ability to produce 2,050 Watts but in reality on average it can produce only 1,798 Watts. Click on the Capacity tab as indicated in Figure 14.12.

Figure 14.12 Detailed Capacity Results by Nodes

Only capacity nodes will be displayed in this table plus a row for the End marker and system will be included. The first row always displays the system-level capacity results and provides more detail than contained on the Summary tab. The first column is the minimum flow, which is the average minimum flow value observed across all trials. In the first trial, we observed a system failure that caused the flow to drop to zero. Since the average minimum flow is also zero, this must have occurred in all of the other trials as well. The second column is the average of the average flow from each of the ten trials. The third column is the average of the maximum flow observed from each of the ten trials.

Chapter 14

14-10

The minimum capacity column is the average of the minimum capacity values observed across all trials. The average capacity and maximum capacity are the averages of the average capacity and maximum capacity from across all trials, respectively. The remaining two parameters are functions of the flow and capacity results. First, the usage rate is an indicator of how much of a system or paths capacity is being utilized. It is calculated as follows:

Usage rate =

Average Flow Average Capacity

In this simulation, the system was producing as much flow as possible, so the usage rate for the system was 1.0. In contrast, the Power node was only being utilized 98.4% of the simulation. Small usage rates may indicate excess equipment that may not be needed. High usage rates may indicate that a path or system has no surge capacity if pressed upon to produce more product. The second parameter, known as capability, is only a function of the capacity results. The capability parameter is a measure of how well a system maintains its capacity. It is calculated using the equation below:

Capability =

Average Capacity Maximum Capacity

On average, the system's capacity is 87.7% of what it is capable of when operating at peak capability. The flow and capacity values for the nodes are not equivalent since there are times when paths are capable of handling flow but are not due to failures elsewhere in the system that are restricting the total flow. Notice that for some values of the table, the not applicable symbol is displayed. This occurs for nodes that have their unrestricted flow marked since their capacity is not defined when they can handle an infinite amount of flow. A plot of the capacity of the system versus simulation time can be created by first requesting that the capacity graph be generated. Before a simulation begins, a user can check the Capacity checkbox on the Files & Reports tab of the Simulation Options dialog box as shown in Figure 14.13 to generate the capacity plot data. This file is relatively easy to read into a spreadsheet type tool to create a capacity plot. The capacity for the first trial is shown in Figure 14.14 and indicates that twice the system was unable to produce any flow and hence two system failures occurred during this trial. If the area under the capacity curve for each trial was calculated and divided by the simulation time (730.5 hours) then the timeweighted capacity would be 1798.35 Watts, which would match the system-level capacity reported in Figure 14.11, as it should.

Chapter 14

14-11

Figure 14.13 Generating the Capacity Plot Data File

2100 1800 1500

Flow

1200 900 600 300 0 0 50 100 150 200 250 300 350 400 450 500 550 600 650 700 750

Simulation Time
Figure 14.14 Capacity Plot of First Trial of Simulation

Chapter 14

14-12

Let us now look at a case where the flow generated is less than the system's capacity. When this situation occurs, the system can tolerate some failures and still meet flow generation requirements. Open Capacity2.rbd and then modify the System Settings dialog box to generate a flow of only 1,500 Watts as indicated in Figure 14.15.

Figure 14.15 Flow Generated Less Than System's Capacity

Although this system is capable of producing 2,050 Watts, we only need 1,500 Watts to maintain the essential functions of the space station. Any additional electricity will be used for onboard experimentation as it becomes available. Let us further specify that under nominal conditions, the three strings that comprise the power subsystem can each process 500 Watts of throughput. Open the Node Properties dialog box for the Power node, select its Capacity tab and modify its attributes to appear as shown in Figure 14.16. Thus, the 650-Watt string nominally processes 500 Watts but can surge an additional 150 Watts to 650 Watts if called upon by the system. Make a similar change to the 900path node as shown in Figure 14.16. Its nominal flow should be set to 500 Watts and its maximum flow should be set to 900 Watts. Changes to the 500path node are not required since this path's maximum flow is 500 Watts. Hence, the 500-Watt string does not have any reserve capacity since its nominal and maximum flows are identical.

Chapter 14

14-13

Figure 14.16 Flow for the 650path and 900path Nodes

Select the Options Tables View Node Inputs menu item. The Capacity tab of the Node Input Tables dialog box should appear as displayed in Figure 14.17.

Figure 14.17 Capacity Tab of the Node Input Tables Dialog Box

Chapter 14

14-14

Simulate this RBD starting in step mode and note the initial flow conditions as shown in Figure 14.18.

Figure 14.18 Initial Conditions with Excess Capacity

The Start marker indicates 1,500 Watts of flow is being generated and each of the three strings in the power subsystem is handling an equal share of 500 Watts. Take four steps and as shown in Figure 14.19, the 500path power string is down due to preventive maintenance. The 900path has accepted 400 Watts of the 500paths flow and the 650path has taken the 100 Watts. The 900path node receives the lions share of the excess since its priority is higher (recall Figure 14.4). Even though the 500path power string has lost flow, there is sufficient reserve capacity in the remaining two operating power strings to ensure no system loss of flow.

Figure 14.19 Flow Redirection to the 650path and 900path Nodes

Take three more steps and note that the 650path power string is down due to preventive maintenance (Figure 14.20). The 900path has accepted 400 Watts of the 650paths flow but the 500path was unable to accept the remaining 100 Watts since it possesses no reserve capacity (i.e., its nominal and maximum flows are identical). Thus, the loss of 500 Watts of flow from the 650path power string only results in a system loss of 100 Watts due to the 900path power strings ability to handle surplus capacity.

Figure 14.20 Flow Redirection to the 900path Node

Chapter 14

14-15

Take three more steps and note that the 900path power string is down due to preventive maintenance as shown in Figure 14.21. The 650path has accepted 150 Watts of the 900paths flow but again the 500path was unable to accept the remaining 350 Watts since it possesses no reserve capacity. Hence, the loss of 500 Watts of flow from the 900path power string only results in a system loss of 350 Watts due to the 650path power strings reserve capacity.

Figure 14.21 Flow Redirection to the 650path Node

Click on the depressed Pause button to allow the simulation to complete. As indicated in Figure 14.22, the mean capacity no longer equals the mean flow. This system has the ability to handle an average flow of 1,798 Watts, but is only producing 1,400 Watts.

Figure 14.22 Summary Results for Excess Capacity System

Chapter 14

14-16

The value of 1,798 Watts should not surprise us since that is the quantity we obtained in the previous simulation where we determined that this is the maximum flow that this system can process. The 1,400 Watts of mean flow indicates that the system does not have enough reserve capacity to consistently maintain the desired level of 1,500 Watts. If the requirement of 1,500 Watts is the minimum needed for daily operations, a RAM versus capacity versus cost tradeoff study would have to be conducted to achieve all the aforementioned goals simultaneously. We have reserved this task for the reader as a problem at the end of this chapter. The total cost of this model is significantly less than the previous model by more than thirty-eight million dollars since fewer lost flow charges are assessed. The lower throughput requirement of this simulation allowed excess capacity to compensate for component failures and thus provided more consistent power output at a much lower cost. Select the Capacity tab of this dialog box as shown in Figure 14.23 and note the usage rates for the various nodes. The 500path power string was used almost to its fullest ability with a usage rate of 96.9%. In contrast, the 900path power string was only utilized to 63.2% of its maximum ability. These results should not be surprising since the 900path power string possesses significant reserve capacity.

Figure 14.23 Capacity Tab of the Output Tables for Excess Capacity System

Chapter 14

14-17

Problems
1. What is the difference between throughput and capacity? 2. What analysis features of Raptor must be activated to obtain the cost of lost system flow? 3. A system has a flow of ten units per hour for two hours, and then forty units per hour for an hour. Calculate the total units produced and the mean flow value. 4. Fill in the columns to show the proper distribution of flow if the flow generated is sixty. Calculate the capacity, throughput and loss.
Path A Priority=50
90 80 70 60 50 40 30 20 10

Path B Priority=50
90 80 70 60 50 40 30 20 10

Path C Priority=50
90 80 70 60 50 40 30 20 10

Max Nom

M ax Nom

Max Nom

Capacity = ______ Throughput = ______

Loss = ______

5. Fill in the columns to show the proper distribution of flow if the flow generated is sixty. Calculate the capacity, throughput and loss.
Path A Priority=25
90 80 70 60 50 40 30 20 10

Path B Priority=50
90 80 70 60 50 40 30 20 10

Path C Priority=75
90 80 70 60 50 40 30 20 10

Max Nom

Max Nom

Max Nom

Capacity = ______ Throughput = ______

Loss = ______

Chapter 14

14-18

6. Fill in the columns to show the proper distribution of flow if the flow generated is 140. Calculate the capacity, throughput and loss.
Path A Priority=50
90 80 70 60 50 40 30 20 10

Path B Priority=50
90 80 70 60 50 40 30 20 10

Path C Priority=50
90 80 70 60 50 40 30 20 10

Max Nom

Max Nom

Max Nom

Capacity = ______ Throughput = ______

Loss = ______

7. Fill in the columns to show the proper distribution of flow if the flow generated is 140. Calculate the capacity, throughput and loss.
Path A Priority=25
90 80 70 60 50 40 30 20 10

Path B Prior ity =50


90 80 70 60 50 40 30 20 10

Path C Priority=75
90 80 70 60 50 40 30 20 10

Max Nom

Max Nom

Max Nom

Capacity = ______ Throughput = ______

Loss = ______

8. Fill in the columns to show the proper distribution of flow if the flow generated is 200. Calculate the capacity, throughput and loss.
Path A Priority=50
90 80 70 60 50 40 30 20 10

Path B Priority=50
90 80 70 60 50 40 30 20 10

Path C Priority=50
90 80 70 60 50 40 30 20 10

Max Nom

Max Nom

Max Nom

Capacity = ______ Throughput = ______

Loss = ______

Chapter 14

14-19

9. Fill in the columns to show the proper distribution of flow if the flow generated is 200. Calculate the capacity, throughput and loss. Path C is not available to accept flow.
Path A Priority=50
90 80 70 60 50 40 30 20 10

Path B Priority=50
90 80 70 60 50 40 30 20 10

Path C Priority=50
90 80 70 60 50 40 30 20 10

Max Nom

Max Nom

Max Nom

X
FAILED

Capacity = ______ Throughput = ______

Loss = ______

10. The production facility shown below has three production lines, each of which produces 100 widgets per hour. When all three are running, the factory produces 300 widgets per hour. Each component is independent, fails exponentially (mean of 100 hours) and repairs lognormally (mean of ten hours and a standard deviation of two hours). Determine the average amount of widgets per hour that the system produces.

Production Facility

11. Modify the Capacity3.rbd model by adding similar redundant power strings to achieve an availability of 0.960, a mean flow of 1,450 Watts and a first month cost less than 55 million dollars. 12. How can a node be specified to be a choke point or a flow restrictor?

Chapter 14

14-20

Chapter 15

Events
Objectives
1. Understand when and why you would use an event element. 2. Be able to simulate constant reliability models. 3. Understand the meaning of a complex RBD.

Recommended Problems
2, 4 and 6

Chapter 15

15-1

Events Often there are situations in the building of an RBD where you need to represent an instantaneously occurring binomial event. A binomial event is discrete, and can be in one of two states: Success state or Failed state. In the world of reliability simulations, there are traditionally two types of models that require binomial events. The first type is constant reliability models, which are elaborated upon in this chapter. The latter type is a phased-RBD model that will be discussed in Chapter 17. Raptor allows representation of a binomial event by using a diamond-shaped element known as an Event. We want to complete the building of the RBD file labeled Events1.rbd in such a manner that upon completion of this chapter it looks like the RBD in Figure 15.1. Let each event represent a piece of equipment of a system that can be modeled with a constant reliability. Thus, we will assume that the system components do not change their reliability significantly during the systems operations (at least during the period of operations with which we are concerned).

Figure 15.1 Completed RBD for Chapter 15

Events1.rbd starts with the following structure already built for you:

Figure 15.2 Initial RBD for Chapter 15

Let us add an event to the Workspace View, which Figure 15.3 illustrates via the Edit Add Event menu item. Events can also be added by using the right mouse click or from the add Event button of the toolbar. When an event is placed within the Workspace View, the Event Properties dialog box appears awaiting input. Set this events name to P=0.53 and its Probability of event success value box to 0.53 as shown in Figure 15.4.

Chapter 15

15-2

Figure 15.3 Add Event from Edit Menu Option

Figure 15.4 Event Properties Dialog Box

Add two nodes and the remaining links such that your RBD matches the one shown in Figure 15.1. When you attempt to simulate this RBD the Node Paths dialog box may appear before the simulation starts. The Node Paths dialog box will appear for any k-out-of-n node not previously specified, or whose topology has been modified since the last time the RBD was simulated. This dialog box, shown in Figure 15.5, highlights the node whose k-information is absent and

Chapter 15

15-3

causes the screen to zoom close to that particular node. It will continue to appear until all unspecified k-out-of-n nodes have been designated.

Figure 15.5 Node Paths Dialog Box

If the Node Paths dialog box appears, set the k-values of each of the k-out-of-n nodes in this RBD to a value of one. The Simulation Options dialog box will appear as soon as the Node Paths dialog box is no longer required. Conduct a failure-truncated simulation, allowing one system failure to occur per trial. Allow the simulation to run 200 trials with the graphics engaged. The results for this simulation are shown in Figure 15.6.

Figure 15.6 Results for 200 Trials

Chapter 15

15-4

The reliability of this system is 0.85 (Note: This is not known by the term mission reliability since zero time passes for this type of simulation). Raptor calculates the reliability of a system by dividing the number of successful trials by the total number of trials simulated. Thus, for the simulation conducted earlier, we can deduce that 170 of the 200 trials were successful (170/200 = 0.85). In order to obtain greater accuracy in the system reliability parameter, we must simulate more trials. Repeat the last simulation, but for this situation conduct 10,000 trials without graphics. The results of this simulation are shown in Figure 15.7.

Figure 15.7 Results for 10,000 Trials

The system reliability for 10,000 trials is 0.8722. This RBD is sufficiently simple such that a mathematical derivation can yield a closed-form solution for the reliability of the system. Thus, it can be shown that the true reliability of this system is 0.8707. The 10,000 trial simulation yielded a reliability value that deviates only 0.2% from the known value. More trials would result in even greater accuracy.

Chapter 15

15-5

By definition, events happen instantaneously and thus are not functions of time. These types of event-only simulations are usually implemented when it is known that the reliability of the components of the system will not vary much during the time of interest. Another use of this type of simulation is to evaluate whether one system configuration is better than another, all other aspects of the simulation being equal. For example, you might wish to know which of the designs shown in Figure 15.8 is more reliable. By building two RBDs using only events, you can quickly determine which system is more reliable.

R
1-out-of-2

R
1-out-of-2

R
1-out-of-2

R R

Figure 15.8 Comparisons of Reliability Designs

You may have noticed during these simulations that the system status indicator was no longer a bulls eye icon. As shown in Figure 15.9, this RBD used a circuit card as its system status indicator.

Figure 15.9 Circuit Card Status Symbols

Any one of nineteen status images can be chosen from the Options System Settings menu item. Figure 15.10 shows the General Tab of the System Settings dialog box, which allows a user to change the status image. Alternatively, during a simulation you can use the right mouse click while positioned over the status indicator to cycle through each of the nineteen symbols. To globally change the system status indicator for all newly constructed RBDs, go to the General tab of the Preferences dialog box via the Options Preferences menu item and select the desired indicator.

Chapter 15

15-6

Figure 15.10 System Settings Dialog Box

An interesting aspect of the RBD built for this chapter is that it cannot be simplified into series or parallel sub-structures. The event in the center of the RBD in Figure 15.1 causes the RBD to be called complex. The term complex in reliability theory does not reflect the number of elements comprising an RBD, but rather that an RBDs topology cannot be reduced to more simple series or parallel sub-structures. Traditionally, complex RBDs could only be solved by hand and only for systems that did not contain too many elements. The reason for this is that the methods used to solve complex RBDs are based on the mathematics of combinations. Since mathematics of combinations is itself based on the factorial function, it does not take many elements to cause an RBD to be unsolvable by hand. Raptor does not use combinatorial techniques so it is not susceptible to the weaknesses of the traditional methods. In fact, Raptor can resolve complex RBDs of any size. Complex RBDs, however, can be difficult to construct as evidenced by the number of nodes required for this rather unobtrusive RBD.

Chapter 15

15-7

Problems
1. What are the purposes of the zooming feature and the Go Back button of the Node Paths dialog box? 2. Which configuration is more reliable if R = 0.85?

R
1-out-of-2

R
1-out-of-2

R
1-out-of-2

R R

3. Derive a general expression that proves that the reliability of one of the systems in Problem 2 is always greater than the other, regardless of the value chosen for R. 4. What is the minimum number of trials you must run to have confidence in the fourth digit of a system reliability value (e.g., 0.9995, where we want to be sure that the 5 is truly a 5 and not a 4 or 6). 5. If the reliability of all the components shown in the RBD below is 0.76, what is the reliability of the system?
1-out-of-3

R R
1-out-of-2

R R
1-out-of-2

R R R R
2-out-of-3

Chapter 15

15-8

6. What is the reliability of the RBD shown below? All redundant paths are in a 1-out-of-2 configuration.

0.55

0.88

0.66

0.77

7. What is the reliability of the RBD shown below? All redundant paths are in a 1-out-of-2 configuration.

0.92

0.97

0.83

0.86

0.88

8. Determine how the standard deviation and standard error of the mean were determined for the reliability parameter shown in Figure 15.6. 9. What is the two-sided 95% confidence bound of the mean reliability for the results shown in Figure 15.6? Use both the traditional t or Z confidence equations as well as the more precise F equations for binomial events. Compare the two methods.

Chapter 15

15-9

10. If the 2-out-of-3 node shown below is standby, why are all three paths up and running? How would you correct this?

Chapter 15

15-10

Chapter 16

Hierarchy
Objectives
1. 2. 3. 4. 5. Be able to add a hierarchy element. Be able to collapse an existing topology into a hierarchy element. Understand the hierarchy navigation tools. Be able import an existing RBD as a hierarchy element. Understand the function of the Descendent Status Indicator (DSI)

Recommended Problems
1, 2 and 3

Chapter 16

16-1

Hierarchies Often there are situations in the construction of an RBD when the model becomes cluttered. While there are no limitations to the number of components that can be placed within the Raptor Workspace View, eventually too many elements will make for a poor presentation of your model. A crucial part of model development is the verification and validation of a model to those often not knowledgeable in the ways of simulation and reliability theories. Raptor allows the representation of a subsystem by a single element known as a hierarchy. Thus, a large model can be reduced in appearance to its major subsystems to help ease the understanding of a system. As you will see, no information or elements are lost by using hierarchies; the information has been merely hidden below the main or home Raptor Workspace window. A hierarchy is shaped like an elongated oval and is the last of the Raptor elements that were briefly mentioned in Chapter 1. Representative hierarchy elements are shown in Figure 16.1.

Figure 16.1 Hierarchy Elements

Let us take a look at an aircraft system that could benefit from the use of the hierarchy element. Open the Hierarchy1.rbd file and notice in Figure 16.2 that this model is significantly larger than any of the models we have built or assessed thus far.

Figure 16.2 Aircraft System

Because of the size of this model it may be difficult to present. The analyst who built this model was wise enough to group the components by subsystems in such a manner that even from a zoomed-out view as shown in Figure 16.2, the subsystems are recognizable as triangular shapes. Yet, to view the entire model,
16-2

Chapter 16

the zoom setting has to be such that the components appear quite small. Because of this some colors will be difficult to distinguish during simulation, especially those with similar hues (e.g., the blue, red and green shades). Presenting this model to management might create doubt that your model accurately represents the genuine aircraft. Let us make this model more presentable by including some hierarchical structures and in the process learn how to employ the hierarchy element. Right click in the first cluster of components near the top left side of the RBD and select the Center-zoom menu item as indicated in Figure 16.3. Change the zoom setting to 20% once the Center Zoom dialog box appears. Your model should look similar to Figure 16.4.

Figure 16.3 Zooming Using the Right Click Menu Option

Figure 16.4 Zoomed-in View of the Aircraft System

Now that we have zoomed-in, we can distinguish that the first cluster of elements represents the four engines of the aircraft system. The next cluster of components represents the hydraulics of the system. We will convert both of these clusters of components into hierarchies using two different techniques.

Chapter 16

16-3

Use the rubber band feature of Raptor (i.e., left click hold drag and then release) as shown in Figure 16.5 to highlight the engine subsystem. Select the Edit Collapse menu item and notice that a hierarchal element has been attached to the cursor. Place this element within the Workspace View near the Start marker and once the Hierarchy Properties dialog box appears, modify it as shown in Figure 16.6.

Figure 16.5 Selecting the Engine Subsystem of the Aircraft System

Figure 16.6 Engine Hierarchy Properties Dialog Box

Chapter 16

16-4

Select the OK button of this dialog box and then double click on the Engines hierarchy element. Notice that this action drops you into a new window (see Figure 16.7) that is one level below the original or home level. The engine components that were previously located on the home level have now been collapsed into a lower or child window of the main system.

Figure 16.7 Within the Engines Hierarchy Window

In and Out markers are always included within a hierarchy window and like the Start and End markers cannot be deleted. Connect the engine subsystem with links as shown in Figure 16.8. In essence, this RBD is now embedded within the main RBD.

Figure 16.8 Completed Engine Hierarchy Subsystem

There are several ways to navigate back to the home level within a hierarchical RBD. The Home or Up buttons shown in Figure 16.9 can be used or you can simply double click on an Out marker. This action will always take you up one level. This version of Raptor allows for five levels of hierarchical indenturing. Use one of the navigation methods to get back to the home level.

Figure 16.9 Home and Up Navigation Buttons

Chapter 16

16-5

Add a hierarchy element by using the Edit Add Hierarchy menu item as shown in Figure 16.10. Place this element near the engine subsystem and modify its properties as indicated in Figure 16.11. If you were to drop into this hierarchy element, you would see that it is empty except for the required In and Out markers. Like other elemental cursor modes, be sure to right click to exit from the hierarchy cursor mode.

Figure 16.10 Adding a Hierarchy via the Edit Menu Item

Figure 16.11 Hydraulics Hierarchy Properties Dialog Box

Chapter 16

16-6

Highlight the hydraulics components and drag them over the newly placed hydraulics hierarchy element as shown in Figure 16.12. Hover the cursor over this element for a few seconds until the highlighted components are automatically transported into the Hydraulics window as shown in Figure 16.13.

Figure 16.12 Highlighted Components Hovering Over a Hierarchy Element

Figure 16.13 Hovered Components being Dropped into a Hierarchy

Add a link from the In marker to the hydraulic component that is in series and one from the serial hydraulics node to the Out marker. Continue collapsing (or creating new hierarchies and dragging the appropriate elements into them) the major subsystems of this aircraft model into hierarchies as shown in Figure 16.14. Be sure to descend into each hierarchy and construct a valid RBD. This could take some time so if you are less adventurous than most, open the Hierarchy2.rbd file and note that all of this work has already been completed. This aircraft system is now comprised of fourteen major subsystems of which thirteen are hierarchies. Additionally, this model contains 149 components, 95 nodes and 343 links. Knowing what is specifically contained within a hierarchical
16-7

Chapter 16

RBD can be at times beneficial. From the Options Tables View System Inputs menu item, a summary of the number of elements contained within an RBD is available on the first tab of the System Settings Input Tables dialog box as shown in Figure 16.15.

Figure 16.14 Hierarchical Aircraft Model

Figure 16.15 Overview of the Elements within the Aircraft Model

In figure 16.14, notice that one block still remains at the home level, that is, the landing gear component. When this model was originally built, it was assumed that the landing gear subsystem was so reliable that little fidelity beyond a single component representing the entire subsystem was needed. What if more detailed information is now available concerning the landing gear subsystem from the manufacturer? If a Raptor RBD model exists of this subsystem, it can be imported in its entirety into the current aircraft model. Remove the landing gear component
Chapter 16 16-8

from the current model and then select the File Import RBD menu item. Choose the ImportMe.rbd file from the Examples subdirectory as shown in Figure 16.16,

Figure 16.16 Importing an RBD File Menu Item

Figure 16.17 Placing an Imported RBD in the Workspace View

Notice that this entire RBD materializes into Raptor as a hierarchy element attached to the cursor as indicated in Figure 16.17. Place the hierarchy element into the Workspace View near the former location of the landing gear component and modify its properties as shown in Figure 16.18. Connect the Radios hierarchy to the LandingGear hierarchy and then to the Flight-Controls hierarchy. Double click on the LandingGear hierarchy and confirm that the landing gear RBD model has been successfully imported as shown in Figure 16.19.

Chapter 16

16-9

Figure 16.18 Landing Gear Hierarchy Properties Dialog Box

Figure 16.19 Imported Landing Gear RBD

The final and now more presentable RBD is shown in Figure 16.20. This is the type of model that can be presented to management. It appears high-level and simplistic but during a presentation or verification activities, an analyst can demonstrate that the model possesses considerable depth.

Figure 16.20 Aircraft Model with a Less Complex Appearance

Chapter 16

16-10

Start the simulation in step mode and take a single step and note the status of the system as indicated in Figure 16.21. During a simulation the hierarchies have the potential to display all the colors of a node. As shown in this figure, the landing gear subsystem is weakened (i.e., yellow hierarchy) but not enough to take the system down so a yellow system status indicator is displayed. During a simulation, you can drop into whichever hierarchy window you desire and watch the localized simulation effects. Double click on the landing gear subsystem and note what is causing the yellow status of this hierarchy element (see Figure 16.22).

Figure 16.21 Simulated Hierarchy Model

Figure 16.22 Cause of Landing Gears Yellow Status

Click on the depressed Pause button and allow the simulation to complete. At the end of a simulation the weak link analysis values are displayed on the hierarchies just like they are for the other elements of Raptor. Figure 16.23 shows the weak link reliability values for the major aircraft subsystems. Further weak link analysis insight can be gained by drilling down into a hierarchy to see the weak link values for its subcomponents. Open the Output Tables dialog box and notice on the first tab the reliability of this model is 92%. Thus, this aircraft has a probability of 0.92 of completing a four hour sortie or mission without a system-level failure.

Chapter 16

16-11

Figure 16.23 Hierarchy Weak Link Analysis Values

Select the Block Analysis tab of this dialog box and notice that the tables hierarchy filter, which appears on many input and output tables, is now activated (see Figure 16.24). The table filter defaults to All, which displays all possible data for a particular tab. Selecting a specific hierarchy filter will only display information in a table for the components contained within that hierarchy element.

Figure 16.24 Block Analysis Values for Aircraft Model

Change the tables hierarchy filter to Engines and then sort the mean value from low to high. As indicated in Figure 16.25, the right inboard engine seems to be less reliable than the other engines. In this model the engines are identical and

Chapter 16

16-12

exponentially distributed so a better estimate of an engines mission reliability would by the average reliability of the four engines or 0.9902 (i.e., 3.9606/4).

Figure 16.25 Hierarchy Filter and Sorted Block Analysis Values

Close the Output Tables dialog box and return to the Workspace View. There are some additional navigational aids associated with hierarchies that should be reviewed. Select the Display tree button as indicated in Figure 16.26 and note that a dialog box appears entitled with the file name of the currently open file. Figure 16.27 is an indentured tree diagram showing the hierarchical structure of the RBD.

Figure 16.26 The Display Tree Button

Chapter 16

16-13

Figure 16.27 RBD Hierarchical Tree

This tree diagram can be printed to help a user see a global map of all the components within a system and indicate their memberships to one hierarchy or another. A printed tree diagram has all of its indentures completely expanded. There exists another global view of the hierarchical elements that can be viewed by selecting the Options Tables View Hierarchy Inputs menu item and displaying the Hierarchy Input Table dialog box. Figure 16.28 shows a listing of all hierarchies contained within this model as well as how many of each element types the hierarchies themselves contain. The second column of this table indicates the level of the RBD in which the hierarchy resides. Level zero is the home level so all of these hierarchies with a level of one are children of the home level. A hierarchy with a level of two would be a grandchild to the home level and a child to another hierarchy. The maximum level number is five and a hierarchy with such a level value would be a greatgreat-great-grandchild of the home level. Any attempt to exceed Raptors limit of five levels of indenturing would be fruitless. For example, attempting to import an RBD with three levels of indenturing into the second level will be allowed but if attempted at the third level, it would be blocked. The second column indicates that a hierarchy element can be dependent on other elements. Thus, the flight controls hierarchy could be dependent on the engine hierarchy and when the engines fail, the flight control hierarchy passes this information to all of its descendants. This
16-14

Chapter 16

might cause elements within this hierarchy to invoke their dependency rules and thus ripple back up to the hierarchy itself. It is possible for an element to be dependent on another for which neither are contained within the same hierarchy. Thus, if the reader was wondering if Raptor could perform trans-hierarchical dependency, the answer is a definite yes.

Figure 16.28 Hierarchy Input Table

There is one more navigation button that will help facilitate movement around the multiple window environment of a hierarchical RBD. The Goto Hierarchy button shown in Figure 16.29 brings up the Goto Hierarchy dialog box (see Figure 16.30), which allows a user to jump to a particular hierarchical window.

Figure 16.29 Goto Hierarchy Button

Chapter 16

16-15

Figure 16.30 Goto Hierarchy Dialog Box

For models with more than one level of indenture, it can be difficult to determine how deep the problem component lies within a hierarchical subsystem. Located in the center of a hierarchy image within the Workspace view (see Figure 16.31), is a symbol of two black triangles. For any hierarchy with two or more levels of indenturing, that symbol has the potential to change color within the Simulation and Failure Effects Views. This symbol is called the Descendent Status Indicator (DSI) and provides insight into the status of elements below the immediate hierarchy window. Open the Hierarchy4.rbd file and start the simulation in step mode. Take one step and notice the DSI of the Electronics hierarchy in Figure 16.32.

Figure 16.31 Model with Numerous Levels of Indenture

Figure 16.32 Yellow DSI on the Green Electronics Hierarchy

Chapter 16

16-16

As shown in Figure 16.32, the Electronics hierarchy element has a green body with a yellow DSI. This means that the Electronics subsystem has some maintenance ongoing beneath the current window but the subsystem itself is still functioning. In fact given that the DSI is yellow, we know that it is the result of some sort of redundancy failure and not a serial loss. Double click on the Electronics hierarchy and note that the 1553 Card is a solid yellow with no DSI as shown in Figure 16.33. Also note that the Out marker changes color to indicate the color status of the subsystem being displayed.

Figure 16.33 Yellow Body of the 1553 Card Hierarchy

You must have two or more levels of indenture below a hierarchy for its DSI to be displayed. Double click on the 1553 Card hierarchy and as indicated by Figure 16.34. We now realize the cause of the yellow color of the Electronics DSI is the failure of the Data-Bus-15 component.

Figure 16.34 Failed Data Bus Component

Return to the home level and take another step such that your RBD matches the one shown in Figure 16.35.

Figure 16.35 Red Body of the Motors Hierarchy

Chapter 16

16-17

Double click on the Motors element and note that the motors armature has failed (see Figure 16.36) and thus has brought down the entire system.

Figure 16.36 Failed Armature Component

Return to the home level and take four more steps such that your RBD appears as the one in Figure 16.37

Figure 16.37 Red DSI on the Yellow Electronics Hierarchy

In this case, the Electronics hierarchy has a yellow body with a red DSI. The yellow body indicates that there is a loss of redundancy one level down and the red DSI indicates that at some level further down there is a failed hierarchy element. Double clicking on the Electronics hierarchy indicates that the AC-Power hierarchy has failed as shown in Figure 16.38.

Figure 16.38 Red AC-Power Hierarchy

Double click on the AC-Power hierarchy to determine the ultimate problem with the Electronics hierarchy. As shown in Figure 16.39, the Rectifier component has failed causing the AC-Power hierarchy to be failed, which in turn causes the Electronics hierarchy to have a yellow body with a red DSI.

Chapter 16

16-18

Figure 16.39 Failed Rectifier Component

In summary, the body of a hierarchy will be red if it cannot function, yellow if it is weakened and green if there are no downed components beneath this element. The DSI on a given hierarchy always indicates the worst case status of all of its internal hierarchies. A DSI has the potential to take on any color that a node itself can assume.

Problems
1. Modify the Capacity3.rbd file such that the three power strings are converted to hierarchical structures as shown in the figure below. Determine the availability and MDT parameters. Does it match those in Figure 14.22? Should the results match?

2. Explain the color of each hierarchy shown in the figure below.

Can you recreate this situation in Failure Effects view?

Chapter 16

16-19

3. Explain the color of each hierarchy shown in the figure below.

Can you recreate this situation in Failure Effects view?

Chapter 16

16-20

Chapter 17

Phasing
Objectives
1. Understand which block, node, event and hierarchy attributes can be modified from one phase to another. 2. Understand the phasing nomenclature. 3. Be able build a phased RBD.

Recommended Problems
1, 3, 4, 6, 8, 9, 10, 11, 13, 14, 16, 18, 19 and 20

Chapter 17

17-1

Phasing Often a system changes its configuration as time passes. These discrete configuration changes at defined times are known as phases. These segments of time could represent different employment shifts or portions of a systems mission. For example, an aircraft's flight profile might be separated into three distinct phases, namely, takeoff, cruise and landing. Each of these phases might require different equipment or levels of redundancy for the system to function properly. A four engine aircraft might need all its engines during the takeoff phase, but only 3out-of-4 during the cruise phase, and 2-out-of-4 during the landing phase. Whenever it is desirable to change the attributes or configuration of a system as time passes, you will want to build a phased RBD. Raptor allows simulations to be segregated into at most 999 phases. Blocks, event, nodes and hierarchies all can be designated as phased elements and thus are eligible for their attributes to be modified from one phase to another. This lesson will instruct you on how to build a phased RBD, and how to determine which attributes of the different elements can be changed within a phase. Open Phasing1.rbd and note the new elements that have been added to the space station system and that the power strings are now represented by hierarchies. Figure 17.1 shows that two new power sources have been added to this system. The top string provides nuclear power to the system while the bottom string provides electrical power via redundant tether devices.

Figure 17.1 Non-Phased RBD

Operations of the space station will be subdivided into six shifts of four hours in duration. Only ten elements will change their characteristics as the system operates from one phase to another. These elements are the Tether and Thermal components, the Power node, the Ground_Control and Inspection events, the 500path hierarchy and its three subcomponents. We will first need to instruct Raptor to designate each of these elements as phased elements. This has already been done for you but let us review how an element is designated to be phased.

Chapter 17

17-2

Double-click on the Tether-A component and select the Advanced tab of the Block Properties dialog box as shown in Figure 17.2. The first checkbox on this tab instructs Raptor to consider this component to be a phased element.

Figure 17.2 Phased Tether-A Component

Of the more than eighty attributes that can be assigned to a component, its most crucial attribute is its mean life. In the previous models illustrated in this workbook, all components possessed a static mean life. For example, an exponential component with a mean life of 100 hours never changed to an exponential component with a mean life of 50 hours within a single simulation. The mean life of a component might change by being diminished due to less stress on the component when it is not used or needed. Some components actually wear out faster (i.e., higher mean life) when not used since they are not being lubricated (e.g., pumps in the petrochemical industry). By designating a component as phased, Raptor will recognize such a component to be dynamic in nature and allow its mean life to vary within a simulation trial. Often components are not needed for a portion of a simulation trial. For example, a bomber aircraft does not need its bomb release mechanism during its return flight. If this mechanism fails during ingress this would be considered a failure of the system, but if this component fails during egress it would not be considered a
17-3

Chapter 17

system-level failure. To accommodate components that are occasionally not needed, Raptor allows components to be cut or linked within a system. A cut or linked component is not considered a part of the system and thus a failure of this component will have no impact on the system. The concepts of cut and linked components will be discussed in greater detail later in this chapter. For now just realize that a phased component can change its mean life and be designated as part of its system or not. Leave this dialog box and double click on the Inspection event to open its Event Properties dialog box. This event has been declared to be a phased element since its phasing checkbox on the Advanced tab has been marked as shown in Figure 17.3.

Figure 17.3 Phased Inspection Event

The key attribute of the event element is its probability of success. A non-phased event always fires once at simulation time zero with a constant probability. A phased event can fire multiple times, at different times and can vary its probability of firing. As will be demonstrated later in this chapter, events can also be cut or linked from a system. Leave this dialog box and double click on the Power node to open its Node Properties dialog box. This node has been declared to be a phased element since its phasing checkbox on the Advanced tab has been marked as shown in Figure 17.4. The most important attribute of a node is its k-value or the number of paths into the node that must be functioning for that node itself to be considered

Chapter 17

17-4

functioning. A non-phased node possesses a static k-value while a phased node can vary its k-value and thus vary the nodes redundancy requirement. A node can also be cut or linked from a system resulting in a localized string of components (i.e., the components of its domain) that are not needed or considered a part of a system.

Figure 17.4 Phased Power Node

Common reasons for changing a nodes k-value usually involve a varying demand on a systems redundancy requirements. For example, a ship with multiple engines might need more engines during rough sea conditions compared to the number needed to perform more benign actions such as docking maneuvers. An electrical system comprised of say ten power sources might need to deliver more power during peak demand. During low demand a 5-out-of-10 system is sufficient but during its greatest demand 9-out-of-10 power sources are needed. A phased node can model this common characteristic of varying k-values. Leave the current dialog box and right click on the 500path hierarchy element and select the Properties menu item. Recall that double clicking on a hierarchy takes you into a new window as opposed to opening its properties dialog box like the other elements. Although there are no truly key attributes of a hierarchy element since it merely defines a sub-window within Raptor, a hierarchy element can be

Chapter 17

17-5

phased as well (see Figure 17.5). A phased hierarchy allows an entire subsystem to be linked or cut from a system without the need to define all of a hierarchys subcomponents as being phased.

Figure 17.5 Phased 500path Hierarchy

Having now explored how to declare each element type as phased, the process of creating a phased RBD is only half accomplished. Phases themselves will need to be defined before a phased simulation can be conducted. By default, all nonphased RBDs, those without any phases defined, can in essence be considered a single phased RBD. Thus far in this workbook, only single or non-phased simulations have been conducted. A single phased RBD is considered a nonphased RBD because without multiple phases, variation in the elements key attributes cannot be specified. Let us break up the operations of the space station model by defining a day to be approximately comprised of six segments, each four hours in length. These segments or phases will represent different topologies of the system by varying the key attributes of the phased elements. Thus, we will essentially model six different RBDs within the same simulation and account for the effects of traversing from one phase to another. To define phases, we can either select the Options Phases menu item or the Phasing button of the Workspace toolbar (see figure 17.6).

Chapter 17

17-6

Figure 17.6 Phasing Button of the Workspace View

Figure 17.7 displays the appearance of the Phasing dialog box before any phases have been defined.

Figure 17.7 Initial Phasing Dialog Box

The upper right section of the Define Phases tab allows for the three attributes of a phase to be defined. A phase can possess a name, a fixed or random length and a designation as to whether the phase is considered a part of a mission or not. Our phases shall be name according to the space stations location as it orbits the Earth. Thus, a phase name of D000-060_Orbit designates that the space station is within the first sixty degrees of its orbit. As a reference, the line intersecting the sun and the Earths centroids shall be considered the zero degree line. The length of each phase will be based on random draws from a normal distribution with a
17-7

Chapter 17

mean of 4.0 hours and a standard deviation of 0.1 hours. Thus, the sum of the six phases will be approximately equal to the length of a day. The combined length of all phases defined within a model is known as its cycle. Once Raptor reaches the end of a cycle (i.e., the end of the last defined phase) and there exists additional simulation time, Raptor will loop back to the first phase and continue this pattern until a simulation trial is completed. Edit the current dialog box such that it matches the one shown in Figure 17.8. Notice that the fifth phase is the only one designated as a non-mission phase. We will discuss more about this issue later in this chapter but for now we are stating that phase five is not as important as the other phases. Be sure to click on the Insert Phase button for each phase after you define all of its properties. If you make a mistake while entering the data shown in Figure 17.8, select the errant phase and use the Edit Phase button to correct the mistake.

Figure 17.8 Phases Defined

Now that the day and the orbit of the space station have been divided into six phases, we can modify the key attributes of the elements that have been declared to be phased. Select the Assign Block Phases tab and set the attributes of the components using the information in Figure 17.9 such that your Phasing dialog box appears as the one shown in Figure 17.10.

Chapter 17

17-8

BatteriesNiCd Bus_UR SolarP_500W Tether-A Tether-B Thermal

P001 C:0.500 C:0.500 C:0.500 L:1.000 L:1.000 A:2.000

P002 A:1.000 A:1.000 A:1.000 A:1.000 A:1.000 A:1.500

P003 A:1.000 A:1.000 A:1.000 A:1.000 A:1.000 A:1.000

P004 A:1.000 A:1.000 A:1.000 A:1.000 A:1.000 A:0.500

P005 A:1.000 A:1.000 A:1.000 A:1.000 A:1.000 A:1.000

P006 C:0.500 C:0.500 C:0.500 L:1.000 L:1.000 A:1.500

Figure 17.9 Block Phasing Data

Figure 17.10 Block Phase Attributes

The L code used in Figure 17.10 represents a component that is linked in a particular phase. A linked component is not considered to be a part of the system. A linked components localized path within the RBD is by definition deemed to be a good path regardless of the state of the component itself. The C code represents a component that is cut from a particular phase. A cut component is not considered to be a part of the system. A cut components localized path within the RBD is by definition deemed to be a bad path regardless of the state of the component itself. While there is no difference with respect to the component itself between being linked or cut, there is a significant difference with respect to the system. A link is a good path for the system while a cut is a bad path. The A
17-9

Chapter 17

code represents an active component, which is by definition not a linked or cut component. An active component will progress through its life cycle of failing and repairing. All of the components utilized in the previous models were active components. The link, cut and active codes possess a number after them that represents the stress on a component during a particular phase. Nominal or no stress condition is equal to 1.000. Stress values can range from 0.000 to 999.999. A component with a value of zero is under no stress and will not accumulate any life. A component with a stress greater than zero but less than one is under-stressed and accumulates life at a slower rate than normal. A component with a stress greater than one is over-stressed and accumulates life at a faster rate than normal. As indicated in Figure 17.9, a user can interpret the Thermal component to be under a stress of two during phase one, a stress of 1.5 for phases two and six, a nominal stress of one during phases three and five, and a stress of 0.5 during phase four. This stress profile represents the stress on the Thermal component as it proceeds through its orbit. As shown in Figure 17.11, this components stress is a function of its orbit location due to the intensity of solar radiation. That is, when the space station is between the Earth and the sun, its thermal shield is under greater than normal stress. In contrast, when the space station is behind the Earths shadow, the thermal shield is not stressed very much since the damaging solar radiation effects are lower.
1.000 1.500

0.500

2.000

1.000

1.500

Figure 17.11 Thermals Stress as Defined by the Orbit Location

The Tether components operate normally during phases two through five but are not a part of the system during phases one and six since they are linked. This represents the situation that the tethers are not allowed to be used during the early morning and late hours of a day due to ground control restrictions. The three components of the 500path hierarchy are all cut (not available for use) during the

Chapter 17

17-10

first and sixth phases with a stress value that is half of its normal value. These stress values affect the mean life of a component by the following relationship:

resulting =

original stress

This equation states that the mean life of a component for a particular phase (i.e., resulting mean life) is its original mean life (i.e., the mean of the components failure distribution) divided by the stress defined for a phase. For example, a 100 hour component with a stress of two is going to act like a component with a mean life of 50 hours and will fail twice as often. A 100 hour component with a stress of 0.5 is going to act like a component with a mean life of 200 hours and last twice as long. The astute reader should realize that a component designated as A:1.000 across all defined phases is equivalent to a non-phased component. It is fundamentally imperative that a user understands that stress values only affect those components that are running (i.e., displaying one of the three green shades). During a simulation, a phased component that is functioning may display the colors shown in Figure 17.12 based on the stress values defined for this component. The Thermal component is such a component and when we eventually simulate this model, be sure to notice the color changes it undergoes.
Stress Type Nominal Under-stress Over-stress Stress f = 1 0 f < 1 f > 1 Color

Figure 17.12 Component Functioning State Colors

A linked component will be displayed with a white square overlaying the component. In contrast, a cut component will be displayed with a black square overlaying the component. Although a linked or cut component will possess an overlaying square, the components state can still be determined. As shown in Figure 17.13, the linked and cut scenarios are considered to represent components that are offline and thus not a part of a system.

Chapter 17

17-11

Online Active

Offline Linked Cut

Running

Standby

Idle PM PM-Hold Hold Repairing Done


Figure 17.13 Link and Cut State Colors

Notice that a cut or linked component can still be in a failed state, a standby state or any other state of an active online component. Let us now progress to discussing the next type of phased component. Select the Assign Node Phases tab of the Phases dialog box. Recall that the only attribute of a node that can vary by phase is its k-value and it can range from one to n. As indicated in Figure 17.14, the base k and n values are shown in the second and third columns, respectively and are provided as a reminder of the nodes k-out-of-n attribute when the node is not phased. Fill in this tab such that it mimics Figure 17.14 by specifying the Power nodes k-value to be a value of one for the first, second and sixth phases and a value of two for the third, fourth and fifth phases. We have now defined the Power node to be a 1-out-of-5 redundant node during one half of the day and a 2-out-of-5 redundant node during the other half. This represents the varying need for electricity during different phases of a day.

Chapter 17

17-12

Figure 17.14 Node Phase Attributes

Similar to a component, a node can be cut or linked. A linked node is in essence a 0-out-of-n redundant node, which implies that no paths are needed so the node and its entire domain are not a part of the system and thus not needed. A cut node is fundamentally an (n+1)-out-of-n redundant node, which means that the node and its domain cannot fulfill the require n-value and thus creates a bad path for the system. Select the Assign Event Phases tab of this dialog box and populate the event phasing table with the information shown in Figure 17.15. Notice that the second column states the base p-value for each event. As indicated in this figure, the base p-value for the Ground_Control event is 0.800 and for the Inspection event it is 0.960. The base p-value is the probability of firing successfully when the event is not phased; it is a reference point for defining an events phased firing information.
Ground_Control Inspection P001 C 0.960 P002 F P P003 P 0.940 P004 P P P005 P 0.920 P006 C P

Figure 17.15 Event Phasing Data

Chapter 17

17-13

Figure 17.16 Event Phase Attributes

Let us first interpret the data entered for the Inspection event. This event will fire three times every day, drawing a different random number from a uniform real distribution that ranges from zero to one. Recall that a non-phased event can only be fired once at the start of each trial (i.e., simulation time zero). A phased event can be fired as many times as there are phases defined. The Inspection event possesses an additional level of detail in that its p-value is varying each time the event is fired. This may represent the variability in the inspection process itself. A non-phased event always fires with the same p-value for each trial of a simulation. The Inspection event also has been encoded with the letter P for prior in the second, fourth and sixth phases. An event that is marked as prior in a particular phase will take on the attributes of the previous phase that was fired. For example, if the Inspection event fires successfully in phase one, then this event will also be considered fired successfully in phase two. If the Inspection event misfires in phase three, then this event will also be considered a misfire in phase four. Consecutive prior settings always refer back (i.e., to the left) to a previous phase that has been fired. If the p-value does not change from the base p-value during a particular phase, a letter F code can be used to fire an event. For the Ground_Control event, the F in phase two could have been replaced with a p-value of 0.80 and there would be no change in this events behavior. An event can be cut or linked much like a

Chapter 17

17-14

component. A linked event will be displayed with a white diamond overlaying the event. In contrast, a cut event will be displayed with a black diamond overlaying the event. Although a linked or cut event will possess an overlaying diamond, an events state of fired, misfired or armed can still be determined. The armed state of an event is one in which the event has yet to fire. The cut codes marked in the first and last phases of the Ground_Control event represent a time when the tether power string is unavailable for use by the system. The tether equipment will not be employed during the early morning or late night phases due to safety concerns of the ground control staff and therefore cannot provide tether power to the system during these phases. If it is decided not to use the tether equipment for a particular day (event misfires in phase two), then it is not used for the entire day since phase two is followed with three prior markings. Likewise, if the Ground_Control event fires successfully within a particular day, then the tether equipment can be utilize for the remainder of the day. Since the Ground_Control event is in series with the tether components, it will dictate whether the tether power string may produce electricity for the space station. Finally, select the last tab of this dialog box labeled Assign Hierarchy Phases. Modify you tab to appear as the one shown in Figure 17.17. The 500path hierarchy is cut in phase one, linked in phase six and active for all of the other phases.

Figure 17.17 Hierarchy Phase Attributes

Chapter 17

17-15

A hierarchys phase attributes are limited since the hierarchy merely represents a subsystem. A hierarchy can be active, cut or linked. An active hierarchy is nothing more than a non-phased hierarchy. It monitors all its descendants then expresses the overall effect of their states by changing the color of its body and possibly its DSI. A cut hierarchy represents an entire subsystem that is not a part of the system and represents a bad localized path. A linked hierarchy represents a subsystem that is not a part of the system but represents a localized good path. A hierarchy will change the color of its DSI to indicate whether it is linked or cut. As shown in Figure 17.18, a black DSI represents a cut hierarchy while a white DSI represents one that is linked.

Figure 17.18 Phased DSI Colors

Be sure to click the OK button of this dialog box to save all the changes that you have made. Return to the Workspace View and notice that all phased elements are hatched as shown in Figure 17.19. If phases are defined, then any element marked to be phased will be displayed as hatched within the Workspace View. This hatching helps the user to distinguish the dynamic elements from the static ones. Recall that hatching implies a different concept of induced dependency in Failure Effects View.

Figure 17.19 Phased RBD within the Workspace View

Before we begin to simulate this model, let us recall that we specified the fifth phase to be a non-mission phase. The mission designator indicates whether the user considers a particular phase to be critical or not. By this, we mean that a failure during a mission phase is more critical to the operations of the space station than one during a non-mission phase. Failures during non-mission phases are still a concern but not as much compared to those failures occurring during a mission phase. For example, suppose a single engine aircraft lost the use of its engine during a non-mission phase of pre-flight inspection. The engine failure would bring the system down and cause a mission abort but it is not as critical as a failure of the engine during flight. Raptor delineates between mission failures and non17-16

Chapter 17

mission failures by computing two distinct readiness parameters for a system. First, the system-level availability is determined without regards as whether a failure occurs during a mission or non-mission phase. That is, all failures effect the system-level availability calculation. This is the traditional availability definition we have been using throughout this workbook. The second readiness parameter is called dependability and is only concerned with system-level failures that occur during mission phases. The system-level dependability parameter measures the effect of system failures while the system is actually employed to perform its critical tasks as oppose to its mundane tasks. The definitions of the system-level availability and dependability parameters are show below:
Ao = uptime (mission + non - mission ) uptime (mission + non - mission ) + downtime (mission + non - mission )

Ao =
+

Do =

mission uptime mission uptime + mission downtime


Do =
+

Let us simulate this system and notice that within the Simulation View, the phased elements are displaying the phase attributes as indicated in Figures 17.20 through 17.24.

Figure 17.20 Thermal Components Phase Appearance

Figure 17.21 Tether and Ground_Control Elements Phase Appearance

Chapter 17

17-17

Figure 17.22 500 Watt Power String Components Phase Appearance

Figure 17.23 Power Nodes Phase Appearance

Figure 17.24 Inspection and 500path Hierarchy Elements Phase Appearance

Chapter 17

17-18

During a simulation, note that the status bar at the bottom of the Simulation View indicates not only the cumulative results, the percent completion of a trial and the trial number, but also the phase currently being simulated and whether it is a mission phase or not. Figure 17.25 is a partial view of the Simulation Views status bar during the simulation of the current model.

Figure 17.25 Phased Status Bar Information

After each phase is simulated, the simulation cycles back to the first phase and this process repeats until the end of the simulation is reached. If all the phasing information was entered correctly, the simulation results should match those shown in Figures 17.26 and 17.27.

Figure 17.26 Phased Summary Results

While the availability and dependability values are very similar they differ as a result of any system-level failures occurring during the fifth phase; the only nonmission phase.

Chapter 17

17-19

For a phased simulation, reliability is no longer either a one or zero for a particular trial. Reliability is now the number of missions successfully completed divided by the number of missions attempted. A mission is a collection of contiguous mission phases. For this model the mission length is approximately twenty hours long and is comprised of phases six, one, two, three and four (i.e., all mission phases that are contiguous). The beginning of phase five is the end of one mission and the end of phase five is the beginning of another. Within the simulation length, approximately 31 missions are performed. The conditional reliability parameter is new and only appears for phased and delayed statistics gathering simulations. The conditional reliability parameter is determined by dividing the number of missions started in an up state divided by the number of these types of missions that were attempted. That is, since phase five is the only non-mission phase, if the system was up at the end of phase five and then completes phases six, one, two, three and four without a system-level failure, then this mission has a reliability of one. If coming off the end of phase five the system was down, then the next mission does not count towards the conditional reliability parameter, although it counts against the reliability parameter. If at the end of phase five the system is up but cannot make it all the way to the beginning of the next phase five, then that mission has a reliability of zero. All of these mission reliabilities are averaged together to produce the mean reliability parameters shown in Figure 17.26.

Figure 17.27 Phased Logistics Results

Chapter 17

17-20

Figure 17.27 shows that a mission red, yellow and green percentage can now be calculated. These values are very similar to the all-encompassing red, yellow and green percentages since there is very little non-mission time in this model. Let us run one more phased model but we shall change the termination conditions. Open Phasing3.rbd and begin the simulation by opening the Simulation Options dialog box. As shown in Figure 17.28, we are going to terminate this system after 100 cycles have been simulated. Recall that one cycle is the sum of all defined phases, both mission and non-mission phases.

Figure 17.28 Cycle-Terminated Simulation Option

This type of simulation will proceed to simulate the six phases of this model and then stop the current trial and begin another trial. Thus, this simulation uses one hundred cycles to assess just the first orbit or day of operations. The results are shown in Figure 17.29. As indicated in this figure, the ending simulation time is 23.99 hours, which represents the average cycle length. Recall that the cycle is not exactly 24 hours since the cycle is comprised of random phase lengths. The reliability and conditional reliability are identical merely because the cycle length

Chapter 17

17-21

is so short. This means that we did not simulate enough cycles to see a failure that occurred in phase five and that was not fixed by the time phase six started.

Figure 17.29 Cycle-Terminated Phased Results

Problems
1. Can failure-truncated simulations be phased? 2. What is the stress value for components that are not phased? 3. If a component has an average mean life of 100 hours and its stress is 5.00 in a particular phase, what value best describes its mean life during this phase? 4. If a component has an average mean life of 100 hours and its stress is 0.20 in a particular phase, what value best describes its mean life during this phase? 5. If a component has been stressed such that its mean life is 50 hours during a particular phase, does this mean that the component will fail 50 hours after the initiation of this phase? Why or why not?

Chapter 17

17-22

6. A components mean life is 100 hours. Let us say that a particular random draw resulted in the components time to first failure to be 120 hours. The component enters phase two having not failed during the 40 hours of phase one in which it was under a stress of one. The component is designated with a stress value of four during phase two. Phase two lasts for 80 hours and then the simulation is cycled back to phase one. Will the components first failure occur during phase one or two and at what simulation time value? 7. What does a node that is linked represent? 8. Explain the state of an event for each of seven phases if it was designated as follows: F(p-value = 0.90) P P F(p-value = 0.50) P L P

Assume the first time that an event fires it does so successfully, but the second time it fires failed. 9. Are ongoing repairs completed when a component enters a new phase that does not include this component (i.e., the component is either linked or cut)? 10. A component has a running cost of $45/hour, a cut stress of 2.0 and a linked stress of 0.5. What is the per unit time cost for each of the nine conditions a running block can be in during a phased simulation?

11. Two identical components that are actively repairing in a particular phase traverse into a new phase. The first component is set to A:0.000 and the second to L:0.000. Describe the condition of both components as they enter the new phase. Be sure to state which component creates localized good or bad paths and which component is accumulating life during this new phase.

A:1.000 A:1.000 Phase n

? ?

A:0.000 L:0.000

Phase n+1

Chapter 17

17-23

12. Four different phased conditions for the elements of the 500path hierarchy are shown below. Each case occurred when the 500path hierarchy was cut during a phase of the simulation of the Phasing2.rbd file. Develop a valid explanation as to why the components are displayed as the figure indicates.

13. What is the color of the blank elements shown below if the node is a standby node with the first component having a priority of one and the second a priority of two?

Priority 1

Priority 1

?
Priority 2 Phase n Priority P riority 2

Phase n+1

14. What is the color of the blank elements shown below if the node is a standby node with the first component having a priority of two and the second a priority of one?

Priority 2

Priority 2

?
Priority 1 Phase n Priority 1

Phase n+1

Chapter 17

17-24

15. Why is the total cost shown in Figure 17.29 twenty percent of the total cost of Figure 17.26 when the former represents a single day of simulation and the later more than thirty days of simulation? 16. Can the k-value of a standby node be changed during phasing? 17. What two methods could be implemented to ensure whole cycles are simulated with respect to a phased simulation? 18. For the phasing information shown below, what are the average cycle and mission lengths for a simulation of near infinite duration?
Name Phase 1 Phase 2 Phase 3 Phase 4 Phase 5 Phase 6 Phase 7 Phase 8 Phase 9 Phase 10 Length (hrs) Expo(3000) Fixed(1) Fixed(0.3) Fixed(0.3) Fixed(0.3) Fixed(1.1) Fixed(2.5) Fixed(2) Fixed(0.5) Fixed(2) Type Non-mission Mission Mission Mission Mission Mission Mission Mission Mission Mission

19. For the phasing information shown below, what are the average cycle and mission lengths for a simulation of 280 hours in duration?
Name Phase 1 Phase 2 Phase 3 Phase 4 Phase 5 Phase 6 Phase 7 Length (hrs) Fixed(1) Fixed(2) Fixed(3) Fixed(4) Fixed(5) Fixed(6) Fixed(7) Type Mission Mission Non-mission Mission Mission Non-mission Mission

Chapter 17

17-25

20. For the phasing information shown below, what are the average cycle and mission lengths for a simulation of 300 hours in duration?
Name Phase 1 Phase 2 Phase 3 Phase 4 Phase 5 Length Norm(5,0.01) Expo(10) Norm(5,0.01) Norm(5,0.01) Expo(10) Type Mission Non-mission Mission Mission Non-mission

21. If the Power node is standby, and 2-out-of-5, why are there three paths up in the following diagram? How might you correct this?

22. What is the difference between setting a block in a particular phase to active with zero stress (A;0.00) and linked with zero stress (L:0.00)?

Chapter 17

17-26

Chapter 18

Hands-on Example III


Objectives
1. Understand how to set up resource pools. 2. Understand how to use the phasing feature. 3. Gain practical experience by modifying a block diagram to improve system performance.

Chapter 18

18-1

Hands-On Example III Congratulations! You have just been hired as the new Facilities Engineer for Rapco Electronics. Your predecessor was fired for incompetence after an audit revealed the company was spending much more than the industry average for environmental controls needed to produce the flash memory cards. After conducting some initial research, you discovered that the most significant contributor to the environmental expense total was air conditioning. Last year, the company spent $70,000 on operations and maintenance on the facilitys five air conditioning units. The air conditioning units, shown below, all feed into a common plenum connected to the facilitys duct system.

Cold Blaster 2000

XR-15

Arctic Air

Chill Master Deluxe (2)

RAPCO

Currently, all of the air conditioners are configured to run as much as possible in order to insure the facility reaches the required average cooling capacity of 46,000 BTU. Two facility repair technicians are available around the clock. There is no cost to use these personnel. There is no preventive maintenance program in place.

Chapter 18

18-2

A) A review of available documentation has revealed the following information on the current air conditioning equipment.
Manufacturer CMC Cooling Fujii SimTec Dynastar AC Unit Specifications Model Output (BTU) MTBF (hrs) Cold Blaster 2000 25000 730 XR-15 15000 1000 Arctic Air 10000 1100 Chill Master Deluxe 5000 1500 MRT (hrs) 6 3 9 5.75

Model Cold Blaster 2000 XR-15 Arctic Air Chill Master Deluxe

Maintenance Policy Policy Requires 3 CMC Cooling Techs, 24 delay due to travel time Repaired in house with 2 Rapco Techs Repaired in house with 1 Rapco Techs Repaired in house with 1 Rapco Techs Sparing Policy 2 in stock, Order 2 when stock = 0 2 in stock, Order 2 when stock = 0 2 in stock, Order 2 when stock = 0 2 in stock, Order 2 when stock = 0

Model Cold Blaster 2000 XR-15 Arctic Air Chill Master Deluxe

Unit ArcticAir_10000 CB2000_25000 CMD_5000 CMD_5000 XR-15_15000

Running $1.00 $2.50 $0.50 $0.50 $1.50

Operation & Maintenance Cost Summary Hourly Fixed Standby Repair* PM Rep_Hold PM_Hold Idle Spare EmerShip $0.10 $30.00 N/A $1.00 $1.00 $0.00 $100.00 $20.00 $0.25 $30.00 $30.00 $1.00 $1.00 $0.00 $250.00 $20.00 $0.05 $30.00 N/A $1.00 $1.00 $0.00 $50.00 $20.00 $0.05 $30.00 N/A $1.00 $1.00 $0.00 $50.00 $20.00 $0.15 $30.00 N/A $1.00 $1.00 $0.00 $150.00 $20.00

* This is the cost associated with materials needed for the repair other than the spare. CMC Cooling also charges $30.00 per hour per person for service calls.

Open Rapco.rbd and complete the reliability block diagram. Only resource and capacity data is missing. Run the rbd for 5 trials of 1 year and determine the baseline mean system throughput and average annual cost. Hint: The highlighted cells are the only ones that contain information not already in the rbd.
Ave. From 5 Trials

RESULTS Mean Flow Total Cost

Chapter 18

18-3

B) The as-is model should show an expected annual cost of $70, 012 for 58,926 average BTUs of output. You conduct further research and uncover the following additional information. Preventive Maintenance Options Preventive maintenance on any of the components will refresh the component like new. PM for the Cold Blaster 2000 takes 2 CMC personnel and takes 3 hours to complete; all other components take the same time and same resources as unscheduled repairs. Preventive Maintenance does require a spare. Standby Options The Chill Master Deluxe units have the capability to be on standby mode with automatic instantaneous switching. The units accumulate life at 10% of their normal rate while in Standby mode. None of the other units can be put into standby status. Power Options SimTec sells a solar power unit specifically designed for the Arctic Air. When used with solar power, the Arctic Air can produce the same output at a cost of only $0.10 per hour. The MTBF of the solar kit is 3000 hours and MRT is 4 hours. Assume it is Weibull distributed with a shape parameter of 2.1. The solar kit has the same failure stress rate regardless of the time of day. The solar kit costs $1500. The only cost associated with the solar kit is the initial acquisition. The solar unit provides power for 12 hours and then is off for 12 hours repeating daily. The solar unit will not work if it is cloudy in the morning, which occurs 5% of the time. If it is cloudy in the morning, it stays cloudy all day. The Arctic Air unit goes to Idle status without power. Other Options Any of the units can be disposed of. There is no disposal fee. It takes 3 days to order a spare through normal ordering mechanisms. An emergency can be ordered in 24 hours. Modify the baseline system to reduce the operating and maintenance cost while still meeting the overall building requirement of 46000 BTU. Run the rbd for 5 trials of 1 year and determine the mean system throughput and average annual cost.
RESULTS Mean Flow Total Cost Ave. From 5 Trials

Chapter 18

18-4

Chapter 19

Simulation Mechanics
Objectives
1. Understand the basic simulation algorithms for acquiring random numbers. 2. Understand the importance of an element's identification number. 3. Understand the simulation calendar.

Recommended Problems
1, 2, 4, 5, 7 and 8

Chapter 19

19-1

Simulation Mechanics Let us look at how Raptor uses random numbers to understand the underlying mechanics of the Raptor algorithms. We will use the simple RBD below to determine by hand what Raptor performs automatically. Let us say that an RBD is comprised of three independent and identical components configured as shown in Figure 19.1. Each component fails using a uniform real distribution with a mean of 50 hours and repairs according to a uniform real distribution with a mean of 10 hours. This RBD uses the unrealistic failure and repair distribution of uniform real since this will make the effects of the random numbers easier to determine by hand. Let us assume that each component has infinite spares, zero-length logistic delays and does not need resources to complete a repair. Component A was placed into the Workspace View first, followed by component B and then by component C. Thus, they received identification numbers (i.e., ID#) one, two and three, respectively.
ID# 2

B
ID# 1

A
F-Uniform (0,100) R-Uniform (0,20)

F-Uniform (0,100) R-Uniform (0,20) 1/2 ID# 3

C
F-Uniform (0,100) R-Uniform (0,20)

Figure 19.1 Example I Simplistic RBD

Each component will use system stream C. The first forty numbers of this system stream are shown in Figure 19.2.

1 11 21 31

2 12 22 32

3 13 23 33

4 14 24 34

5 15 25 35

6 16 26 36

7 17 27 37

8 18 28 38

9 19 29 39

10 20 30 40

0.5470 0.1898 0.5577 0.2294 0.7166 0.0864 0.2851 0.0139 0.5025 0.1144 0.6411 0.4695 0.2329 0.7211 0.9906 0.0584 0.7779 0.5647 0.2597 0.1944 0.8335 0.3364 0.0028 0.6427 0.1031 0.9010 0.6282 0.5399 0.8988 0.2446 0.0190 0.1607 0.9838 0.2560 0.9699 0.5378 0.6832 0.0444 0.8136 0.7453
Figure 19.2 System Stream C Random Numbers

Chapter 19

19-2

Let us conduct a time-truncated simulation of 75 hours to determine which components will receive which random numbers and their effects on the system. Figure 19.3 delineates how the random numbers were assigned at the beginning of the simulation (i.e., simulation time equal to zero), and the order the components received the subsequent random numbers. Figure 19.3 also displays the random numbers rounded to the second decimal place to simplify the arithmetic involved in this illustrative example.
Sim time Component Random # Fail Repair Will occur at Events 0.0 A 0.55 55 hrs 55.0 55 0.0 B 0.19 19 hrs 19.0 19, 55 0.0 C 0.56 56 hrs 56.0 19, 55, 56 19.0 B 0.23 4.6 hrs 23.6 23.6, 55, 56 23.6 B 0.72 72 hrs 95.6 55, 56, 95.6 55.0 A 0.09 1.8 hrs 56.8 56, 56.8, 95.6 56.0 C 0.29 5.8 hrs 61.8 56.8, 61.8, 95.6 56.8 A 0.01 1 hr 57.8 57.8, 61.8, 95.6 57.8 A 0.50 10 hrs 67.8 61.8, 67.8, 95.6 61.8 C 0.11 11 hrs 72.8 67.8, 72.8, 95.6 67.8 A 0.64 64 hrs 131.8 72.8, 95.6, 131.8 72.8 C 0.47 9.4 hrs 82.2 82.2, 95.6, 131.8 **************** Simulation Terminated at 75 hours *****************
Figure 19.3 How the Random Numbers Were Consumed for Example I

The time line shown in Figure 19.4 illustrates how events occur and graphically displays how Raptor schedules events as it proceeds through a simulation.
A's scheduled next fail time C Fails B Fails A Fails C Repairs C's scheduled repair complete B's scheduled next fail time

B Repairs A Repairs A Fails

50

Terminate Simulation

100

A Repairs

C Fails

55.0

1.0 1.8 10.0

7.2

System Up System Down

Figure 19.4 Example I Time Line

Chapter 19

19-3

Component A gets the first random number and is placed on the simulation calendar at time 55 hours. Component B gets the second random number and component C gets the third random number. Component B is scheduled to fail at simulation time 19 hours and component C at 56 hours. The earliest event on the calendar is the failure of component B. This component will fail and then seize another random number to determine its repair time. Component B's repair takes 4.6 hours and this repair is finished before any other event occurs on the simulation calendar. Thus, component B is now repaired and needs another failure time to be placed back on the simulation calendar. It consumes the fifth random number and gets placed on the calendar 72 hours later or calendar time 95.6 hours. This process of components failing and repairing and only consuming random numbers when they are needed (i.e., new failure or repair times), is the basic simulation mechanics of the Raptor software. Let us take another look at Raptor's simulation mechanics with an example that is somewhat similar to the previous example. The RBD shown in Figure 19.5 is again comprised of independent components that do not need spares or resources and use system stream C. Component B was placed within the Workspace View first followed by components A and then C.
ID# 1

B
ID# 2

A
F-Uniform (0,100) R-Uniform (0,20)

F-Uniform (0,100) R-Uniform (0,20) 1/2 ID# 3

C
F-Uniform (0,100) R-Uniform (0,20)

Figure 19.5 Example II Simplistic RBD

Let us conduct a time-truncated simulation of 75 hours to determine which components will receive which random numbers and their effects on the system. Figure 19.6 delineates how the random numbers were assigned at the beginning of the simulation (i.e., simulation time equal to zero), and the order the components received the subsequent random numbers. Figure 19.6 also displays the random numbers rounded to the second decimal place to simplify the arithmetic involved in this illustrative example.

Chapter 19

19-4

Sim time Component Random # Fail Repair Will occur at Events 0.0 B 0.55 55 hrs 55.0 55 0.0 A 0.19 19 hrs 19.0 19, 55 0.0 C 0.56 56 hrs 56.0 19, 55, 56 19.0 A 0.23 4.6 hrs 23.6 23.6, 55, 56 23.6 A 0.72 72 hrs 95.6 55, 56, 95.6 55.0 B 0.09 1.8 hrs 56.8 56, 56.8, 95.6 56.0 C 0.29 5.8 hrs 61.8 56.8, 61.8, 95.6 56.8 B 0.01 1 hr 57.8 57.8, 61.8, 95.6 57.8 B 0.50 10 hrs 67.8 61.8, 67.8, 95.6 61.8 C 0.11 11 hrs 72.8 67.8, 72.8, 95.6 67.8 B 0.64 64 hrs 131.8 72.8, 95.6, 131.8 72.8 C 0.47 9.4 hrs 82.2 82.2, 95.6, 131.8 **************** Simulation Terminated at 75 hours *****************
Figure 19.6 How the Random Numbers Were Consumed for Example II

The time line shown in Figure 19.7 illustrates how events occur and graphically displays how Raptor schedules events as it proceeds through a simulation.
B's scheduled next fail time C Fails A Fails B Fails C Repairs C's scheduled repair complete A's scheduled next fail time

A Repairs B Repairs B Fails

50

Terminate Simulation

100

B Repairs

C Fails

19.0 4.6

32.4

1.0 0.8 4.0

13.2

System Up System Down

Figure 19.7 Example II Time Line

Component B gets the first random number and is placed on the simulation calendar at time 55 hours. Component A gets the second random number and component C gets the third random number. Component A is scheduled to fail at

Chapter 19

19-5

simulation time 19 hours and component C at 56 hours. Notice the differences between Figures 19.4 and 19.7 even though the same RBD appears to have been constructed in both examples. In the long term, the results of the first example and of the second example will converge upon truth, and hence upon each other. Essentially, if a sequence is formed using the results of successively longer simulations of the two examples, this resulting sequence will be Cauchy. The convergence is assured because of the well known fact that Cauchy sequences converge in any complete metric space; intuitively we can interpret this by understanding that eventually the effects of any particular sample of random numbers will even out over long simulations of many trials.

Problems
1. Calculate the availability of the system with the event time line (i.e., simulation calendar) shown in Figure 19.3. 2. What are the MTBDE and MDT of the system described in Problem 1? 3. What is the percent yellow time of the system described in Problem 1? 4. What is the MTBDE of component B based on the data displayed in Figure 19.1? 5. Calculate the availability of the system with the simulation calendar shown in Figure 19.6. 6. What are the MTBDE and MDT of the system described in Problem 5? 7. What is the percent yellow time of the system described in Problem 5? 8. What is the MTBDE of component B based on the data displayed in Figure 19.5?

Chapter 19

19-6

Chapter 20

Miscellaneous Topics
Objectives
1. 2. 3. 4. 5. 6. 7. Understand how to set preferences. Know how to mass edit. Understand the purpose and implementation steps of libraries. Understand the Print dialog box options. Know how to find items in a large RBD. Understand how to use the block growth and decay options. Understand the purpose and implementation methods for choosing random number streams. 8. Know how to implement block defaults. 9. Understand the options available in the Simulation Options dialog box.

Recommended Problems
1, 2, 3, 4, 5 and 7

Chapter 20

20-1

Miscellaneous Topics This chapter covers miscellaneous features and options in Raptor that do not fit well into other chapters and do not themselves justify a chapter. The various topics are unrelated and are covered in their own section of this chapter. Additional help for these topics can be found in Raptors help file.

Preferences Dialog Box The Preferences dialog box is opened by selecting the Options - Preferences menu item from the Workspace View menu bar. It is comprised of two tabs in which the user preferred settings can be implemented. Preferences are saved in a separate file and are independent of any RBD files. Thus, preferences defined by this dialog box are global to all Raptor files.

Figure 20.1 General Tab of the Preferences Dialog Box

The first tab is the General tab shown in Figure 20.1. A user can turn sounds on or off, turn the auto-save feature on or off, set the auto-save frequency, set the time units or select the system status indicator. Recall that Raptor is a unit-less tool and choosing a time unit merely places text fields of the chosen time unit on various dialog boxes. This helps a user to maintain consistency of data input by helping the user to remember which time unit is being used for a particular RBD. The determination of results by Raptor are unaffected by the selection of the time unit.

Chapter 20

20-2

The second tab, as show in Figure 20.2 is for setting options related to the parameters of the exponential and lognormal distributions. The exponential distribution has two forms that are mathematically equivalent. One form uses the mean of the distribution as the input parameter and the other uses the failure rate, which is the reciprocal of the mean. Some reliability engineers prefer to work in failure rates when using the exponential distribution. When the option to enter failure rates is selected, a failure rate text field will appear on the Failure & Repair tab of the Block Properties dialog box instead of the traditional text field of the mean.

Figure 20.2 Parameters Tab of the Preferences Dialog Box

The lognormal distribution is another distribution whose input parameters can be defined in more than one way. Some people prefer to enter the mean and standard deviation of the sample data, or equivalently, the mean and standard deviation of the actual distribution. The lognormal distribution, however, is based on the normal distribution. That is, the log of data from a lognormal distribution is normally distributed. Another way to define lognormally distributed data is to define the mean and standard deviation of the data in the normal space. These values are referred to using the Greek letters and (i.e., mu and sigma). The probability density function equation for the lognormal distribution contains the parameters and and most curve fitting tools will provide analysts with the and values.

Chapter 20

20-3

System Settings Dialog Box The System Settings dialog box is opened by selecting the Options System Settings menu item from the Workspace View menu bar. It is comprised of four tabs in which the system specific settings can be implemented. System settings are saved within the RBD file. Thus, settings defined by this dialog box are specific to a particular RBD.

Figure 20.3 General Tab of the System Settings Dialog Box

The first tab is the General tab shown in Figure 20.3. The first two settings, time units and system status indicator, can be set here for a particular RBD, or globally through the Preferences dialog box. The volume generated, cost of lost flow, and cost of red time for the system are also set here. By checking the ignore negative value warning check box, the warning box that appears when negative values are drawn during simulation will not be displayed. A system comment can also be set. The second tab, as shown in Figure 20.4, contains settings related to simulation. The simulation termination type (time, failure, or cycle) can be set, as well as the number of runs, the simulation time at which statistics gathering will start, and whether or not this particular RBD will be simulated with graphics. The third tab (Figure 20.5) is for changing the designated system streams. By default, new components are tied to system stream C, which is seed number nine of the 109 built in random number streams of the underlying Raptor simulation language. In some cases, when numerous components are set to use a particular

Chapter 20

20-4

system stream and a user desires to change them all to another stream, it is easier to just change the definition of the stream itself. A discussion of random number streams, including definitions for system streams and independent streams, and reasons why one might want to change streams is included in the Raptor help file.

Figure 20.4 Simulation Tab of the System Settings Dialog Box

Figure 20.5 System Streams Tab of the System Settings Dialog Box

Chapter 20

20-5

The final tab of the System Settings dialog box is the Weak Link Analysis tab (Figure 20.6). This tab is identical to the Weak Link Analysis Settings dialog box that can be accessed while in the Simulation or Weak Link Analysis view. The various options are explained in Chapter 11.

Figure 20.6 Weak Link Analysis Tab of the System Settings Dialog Box

Mass Edit Dialog Box The Mass Edit dialog box is opened by selecting the Edit - Mass Edit menu item from the Workspace View menu bar or from the right click menu. This option is deactivated unless a group of blocks, nodes, events, or at least one hierarchy is selected. A group of elements can be highlighted using the rubber-band box or by selecting elements while holding down the control key. Selection of a hierarchy element automatically selects any objects contained within that hierarchy for edit as well. The dialog box displays between one and four tabs depending on the elements selected. Figure 20.7 displays the Blocks tab. The phasing preference, dependency, block name, and system stream source can be set from this tab for all blocks selected. The block name can be altered in one of three ways. The existing block name can have characters appended as a prefix, characters appended as a suffix, or the block name can be replaced in its entirety. The option to have no repair, infinite spares, or no resource requirements can also be set. These options are valuable for

Chapter 20

20-6

running simulations to determine upper or lower bounds of logistics constraints. For example, the results obtained when all blocks have infinite spares represent the best possible result when various sparing schemes are being tested.

Figure 20.7 Mass Edit Blocks

If events are included in the group of selected elements, the event tab is visible (Figure 20.8). The phasing preference, success probability, system stream source, and event name can be changed for all selected events. If nodes are included in the group of selected elements, the node tab is visible (Figure 20.9). Like the block and hierarchy elements, the phasing preference, dependency, and node name can be set from this tab. Additionally, the k- value for the k-out-of-n parallel structures can be bounded. A k-value of one represents an upper bound since the redundancy structures have the minimum requirement for number of needed paths. A k-value of n represents a lower bound since the redundancy structures have been converted into series structures. If any hierarchies are included in the group of selected elements, the hierarchy tab is visible (Figure 20.10). Like the block and node elements, the phasing preference, dependency, and node name can be set from this tab.

Chapter 20

20-7

Figure 20.8 Mass Edit Events

Figure 20.9 Mass Edit Nodes

Chapter 20

20-8

Figure 20.10 Mass Edit Nodes

A word of warning regarding the mass edit options is appropriate. The changes are permanent. Changing all repair distributions to None, for example, will delete all the previously entered selections for repair distributions and their relevant parameters. If the RBD is then saved, the original values are gone forever.

Library Functions Raptor has the capability to read library files and thus allow users to select block templates from a library. The library must be in a specific format that is defined in the Library File Design Specification, June 2001, publication. This document is available upon request from the Raptor Team. Users can integrate their own inhouse tools by adding the ability to output data in the Raptor format. Raptor not only reads library files but it can create them by exporting an existing RBD to a library file. An update function is also available that can automatically update block templates within an RBD when a library is loaded. This feature is often employed by those users who receive monthly updates to their block failure and repair data. Library options are implemented by selecting the File - Library Import or File - Library - Export menu options, as shown in Figure 20.11.

Chapter 20

20-9

Figure 20.11 Library Options

Print Tables Dialog Box The Print Tables dialog box (Figure 20.12) allows a user to print any of Raptors tables from one location and can be accessed from the File Print Tables menu option. The input table check boxes are for printing block, event, node, and hierarchy input information as well as input information related to system settings, spare pools, resources, and triggers. Only tables relevant to the current RBD will be available for selection. For example, if an RBD does not contain any events, then the event table check box will be deactivated. The System Settings checkbox is always available. The phasing tables are only available for printing if at least one phase has been defined. The output tables can only be printed if a simulation has been conducted. Any number of check boxes can be marked before selecting the OK button to implement printing selections.

Chapter 20

20-10

Figure 20.12 Print Tables Dialog Box

Print Window Dialog Box The Print Window dialog box (Figure 20.13) allows a user to print the current RBD window and can be accessed from the File Print Window menu option of the Workspace View menu bar, or the File Print Window menu option from the menu bars associated with the other three views. Additionally, each view contains a Print Window button on its toolbar for quicker access to this feature. Users can select the portrait or landscape format for an RBD window printout and specify the number of pages to print the window across.

Chapter 20

20-11

Figure 20.13 Print Window Dialog Box

Find Item Dialog Box When large RBDs are constructed, it can be difficult to find a particular element. The find item feature provides a simple way to locate any Raptor element within the current RBD. Select the Navigate - Find Item menu item or simply click on the Find Item button from the toolbar and the Find Item dialog box will be displayed, as shown in Figure 20.14.

Figure 20.14 Find an item in a large RBD

Chapter 20

20-12

The dialog box contains a list box with the names and ID numbers of all elements contained within the RBD. Users select an element by scrolling down and clicking on the name of the desired element. Raptor will then adjust the view of the RBD so that the chosen element is visible and highlighted. If the chosen element is not contained within the active window (it belongs to a hierarchy that is at least one level down from the window currently displayed), Raptor will change into the window of that elements parent hierarchy so that it is visible on the screen.

Mean Life Growth and Decay On the Advanced tab of the Block Properties dialog box (Figure 20.15), there is a check box labeled This block will change its mean life following a failure. Checking this box allows the user to specify growth and decay options for a component. This instructs Raptor to modify a components mean life during a simulation as it fails and repairs. The three types of growth or decay are known as linear, geometric and asymptotic. If decay is used without a limit specified for the lower bound, a limit of 0.00001 is automatically imposed. If growth is used without a limit specified for an upper bound, a limit of 999,999,999.999999 is automatically imposed.

Figure 20.15 Advanced Tab of the Block Properties Dialog Box

Chapter 20

20-13

Linear growth or decay: When this option is chosen, the relative mean life of a component will change after each failure in a linear manner according to the slope and mean life limit entered. A limit can also be imposed on the growth or decay. The equation for calculating linear mean life is as follows:

new = [(Slope # of failures ) + 1] base


If the slope is specified as zero, the mean life remains constant. A positive slope causes the mean life to grow over time and a negative slope causes the mean life to decay. For example, if the mean life of a component is 100 hours with a linear growth slope of 0.10 and a growth limit of 180 hours, the mean life curve that will be in effect during a simulation is shown in Figure 20.16.
200 180

Mean Life

160 140 120 100 0 1 2 3 4 5 6 7 8 9 10

Failures
Figure 20.16 Linear Growth

Initially, when a component has not experienced any failures, it will have a mean life of 100 hours. Once a component has failed and repaired, its average time to the second failure will be 110 hours. Once the mean life has grown to 180 hours it will remain at that value. Geometric growth or decay: When this option is chosen, the relative mean life of a component will change after each failure in a geometric manner according to the base value entered. A limit can also be imposed on the growth or decay. The equation for calculating geometric mean life is as follows:

new = (Base # of

failures

base

Chapter 20

20-14

If the base value of one is specified, the mean life remains constant. A base value greater than one causes the mean life to grow and a value less than one cause the mean life to decay. For example, if the mean life of a component is 100 hours with a geometric decay base value of 0.90 and a limit of 40 hours, the mean life curve that will be in effect during a simulation is shown in Figure 20.17.

120 100 Mean Life 80 60 40 20 0 0 1 2 3 4 5 6 7 8 9 10 Failures


Figure 20.17 Geometric Decay

Initially, when a component has not experienced any failures, it will have a mean life of 100 hours. Once a component has failed and repaired, its average time to the second failure will be 90 hours. Once the mean life has decayed to 40 hours it will remain at that value. Asymptotic growth or decay: When this option is chosen, the relative mean life of a component will change after each failure in an asymptotic manner according the entered limit. The rate entered effects how quickly a mean life approaches the limit. The equation for calculating mean life is as follows:

new = Limit + ( Base Limit )e( rate # of

failures )

If the limit equals the original mean life, the mean life remains constant. If the limit is greater than the original mean life then growth occurs and if it is less, decay occurs. The rate entered must be greater than zero. High rate values cause the mean life to approach a limit faster. Assume a component has a mean life of 100 hours and it has asymptotic growth with a limit of 150 hours. The graph in Figure 20.18 shows the mean life that will be in effect during a simulation for various growth rates.

Chapter 20

20-15

160 140 Mean Life 120 100 80 0 1 2 3 4 5 6 7 8 9 10 Failures


Figure 20.18 Asymptotic Growth

Initially, when a component has not experienced any failures, it will have a mean life of 100 hours. Once the mean life has grown to 150 hours it will remain at that value. Although this method has the greatest flexibility of the three growth or decay methods, it is somewhat difficult to determine the appropriate rate value. It is probably best to use an analysis tool that generates graphs and displays the expected growth curve along with an asymptotic growth curve for a given value of rate and limit. Vary the rate and limit values until an asymptotic curve matches the expected growth of the component.

Random Numbers
Raptor is a discrete event simulator that simulates the operation of a system through the use of random numbers. Regardless of the statistical distribution selected to model a component, the process of determining the failure or repair time of a component starts with a random number that is uniformly distributed between zero and one (denoted UR[0,1]). Various algorithms are used to convert this UR[0,1] random number into a value from a particular distribution. Raptor defines two types of streams for use; independent streams and system streams. To avoid confusion, the independent streams are referred to using the numbers one through six and 11 through 69 and the system streams are referred to as streams A through J. By default, system streams A through D are set to seed numbers 7, 8, 9 and 10 while streams E through J are set to seeds 70 through 75.

Chapter 20

20-16

The assignment of seeds for the system streams can be changed by using the System Settings dialog box. An additional feature of Raptor is the ability to use a streams antithetic values. An antithetic stream is a set of random numbers equal to one minus the value in the original stream. For example, if the first random number in steam one is 0.888888, then the first value in the antithetic of stream one is 0.111112. The option to choose the antithetic of each stream is available as a checkbox just to the right of each list box that contains the stream choices. When checked, the antithetic of the selected stream will be used. The source of random numbers a component will use during a simulation is defined on the Simulation Theory tab of the Block Properties dialog box (Figure 20.19).

Figure 20.19 Independent Stream Selected

Chapter 20

20-17

Block Defaults
When a block is placed within the Workspace view, all of its fields are loaded with default values. The initial Raptor settings for the components default values are set so that it operates in a simplistic manner. It will have infinite spares, no logistics delays, no resource requirements and no dependencies. All cost values are set to one dollar and no advanced features are activated. The only parameters that must be defined are the failure and repair distributions. The default failure distribution is the exponential distribution, as this distribution is very commonly used in the reliability community. For the same reason, the lognormal distribution was chosen as the default repair distribution. Users have the ability to modify the default values that the component possesses when it is placed within the Workspace. To set a components default values, select the Edit - Block Defaults menu item. A modified Block Properties dialog box is displayed (Figure 20.20). Any changes made are saved with the RBD file and become the default setting for that RBD only.

Figure 20.20 Setting Block Defaults using the Block Properties Dialog Box

The Reset Defaults button will reconfigure the block defaults to the Raptor factory settings. These are the defaults that existed when Raptor was first installed.
Chapter 20 20-18

Simulation Options Dialog Box, Advance Tab Options

Figure 20.21 Advanced Tab of the Simulation Options Dialog Box

There is a check box on the Advanced tab of the Simulation Options dialog box (Figure 20.21) that has not yet been discussed in this workbook. This check box is labeled Do not count failures which occur at time zero. In most simulations, all components start in a good status, so a system starts up. When recovery simulation options are implemented, it is possible to start a simulation with components in a variety of conditions, resulting in the possibility of a system starting down. Since failure-truncated simulations are designed to run until a specified number of system failures occur, this option allows the user to specify whether the initial failure will count towards that total.

Problems
1. If you enter the mean of an exponential distribution as 200 hours for component A and then change the preferences so that the exponential parameter is entered as a failure rate, what value for the distribution parameter is displayed for component A in the Failure & Repair Distributions tab of the Block Input Tables dialog box?

Chapter 20

20-19

2. If you select Print RBD across 3 pages, how many pages down are printed? 3. If a component has a base mean life of 100 hours and has linear growth with a slope of one, what is the mean life after two failures? 4. What is the mean life of the component in Problem 3 after two failures if the component is also phased and currently has a stress level of 0.5? 5. What happens when identical components are set to the same independent steam? 6. What is the difference in the way preferences are saved versus the way system settings and block defaults are saved? 7. Why is it generally not a good idea to count failures that occur at time zero?

Chapter 20

20-20

Appendix A
Chapter 1: Elements and Views

Solutions to Problems

1. There are seven rules to linking elements within Raptor. They are: - links cannot connect into the start marker - only one link can connect out of the start marker - links cannot connect out of the end marker - only one link can connect into the end marker - only one link can connect into or out of a block, event, or hierarchy - any number of links can connect into or out of a node - all elements must be properly linked together 2. First, blocks function (or operate) as simulation time progresses while events function instantaneously. Second, blocks are repaired while events are not. 3. While in the Workspace view, the status bar information is concerned with attributes of the elements. While in the Simulation view, the status bar information focuses on a simulation and the cumulative results of the trials. 4. Only the Workspace view allows changes to the attributes and structure of an RBD. Failure Effects view allows the user to determine the impact of failures on the system, while the other two views, Simulation view and Weak Link Analysis view , allow the results to be viewed .

Chapter 2: A Basic Reliability Block Diagram 1. A failure and repair distribution must be specified for each block. 2. The user controls the consistency of the units. 3. A right mouse click while in any add cursor mode will stop the add function. 4. No spaces are allowed in naming any element or file. 5. An elements name cannot exceed 20 characters. 6. Just before the start of any simulation, all unspecified k-out-of-n nodes would cause a dialog box to appear prompting the user for each nodes k-information.

Appendix A

A-1

7. For a time-truncated simulation the number of system failures is a random variable, while for a failure-truncated simulation, the ending simulation time is a random variable. 8. A cycle-termination is most appropriate when an RBD has random-length phases defined, and the period of interest is in conducting all of the phases some number of times. 9. Each trial draws different random numbers. This feature ensures that the trials are independent and identically distributed (iid). Most basic statistical techniques have an inherent assumption of iid sample data. 10. The Minimum is the smallest MDT value produced from the ten trials. The Mean is the average MDT value across the ten trials. The Maximum is the largest MDT value produced from the ten trials. The Standard Dev is the sample standard deviation of the MDT for the ten trials. The SEM is the standard error of the mean. 11. Often, more precision is required for availability type parameters since systems are built that require resolution in the sixth or seventh decimal place. It is an extremely rare case that would require that kind of precision in the mean down time or mean time between downing events (especially given the typical precision of the input data). 12. Results from a particular simulation remain within Raptor until another simulation is conducted or an rbd file is opened or closed. 13. The exact reliability of the system is 0.838807966. A Raptor simulation of 1000 trials gives an approximate system reliability of 0.836. The true reliability of the system for any time t is:

R system (t ) = e -2at 3e -2bt 2e -3bt e -2ct

)(

)(

14. An approximate solution by simulation gives Rsystem(75) 0.0775. The exact solution is 0.072586167. 15. By conducting a simulation in Raptor of 1000 trials, we obtain an approximate availability of 0.796024799 at time 75. An exact solution for steady-state availability could be calculated, but it is not possible to compute an exact solution for the availability at time 75.

Chapter 3: Distributions

Appendix A

A-2

1. No. Only the parameters of a distribution can be modified within the Failure & Repair Distributions table; not the distribution type. 2. Systems that use the None repair distribution are usually those where the repair is economically unwarranted (i.e., too expensive to repair or a system itself is inexpensive so replacement without repair is justified). Examples include system models of satellites, or system models that include satellites as components; system models of smoke detectors or VCRs. Also, the None repair distribution may be used to for simulations that address particular questions, such as a system model of an aircraft when the parameter in question is reliability over one mission, or a system model of a washing machine when the question to be addressed is how long should the warranty be. 3. If a component uses the None repair distribution, upon failure it is done: the block will not be available to the system, and will turn Indian Red if simulating with graphics. If the Fixed 0.0 repair is selected, upon a failure the component will immediately repair. 4. Six. The Chi-squared, Exponential, Laplace, Lognormal, Normal, and the Poisson distributions. 5. The empirical distribution does not contain information beyond the minimum and maximum data values entered. Thus, the empirical distribution usually possesses no information about the extreme regions of the data. These extreme regions are known as the tails of a distribution. Without the tail information, the extreme conditions are never simulated. The effects of long or short failures or repairs never occur and a simulation may not provide sufficient information concerning a system during extreme situations. These extreme situations often provide significant insight into a systems design. 6. Since three of the ten trials did not experience a downing event (i.e., reliability is 0.3), the MDT parameter can only be based on seven trials. If additional statistical analysis is performed on the data provided by Raptor, it is often critical to know the proper sample size of the data (i.e., seven vs. ten in this case). 7. Three trials of the ten did not contain any system downing events and thus the mathematically best nonparametric estimate for the MTBDE parameter is infinity. That is, averaging the seven good estimates (trials in which downing events occurred) with three estimates of infinity leads to an estimate for MTBDE that is also infinite. Raptor does not average, however, infinity into its estimate; instead, Raptor will assume the simulation termination time is the best estimate of the MTBDE for a trial without downing events. Since this is not the most mathematically correct estimate for the MTBDE parameter, Raptor warns users of this situation by placing a greater than sign in front of the MTBDE value.

Appendix A

A-3

8. Since three trials of the ten did not contain any system downing events, a good estimate of the MTBDE's standard deviation cannot be adequately determined. (See the answer to the previous question for a more detailed explanation.) 9. The data is discrete and bell shaped so the binominal distribution is a good guess but a better guess is the Poisson distribution. An interesting attribute of the Poisson distribution is that its mean is equal to its standard deviation; which is the case described in this problem. 10. Two clues indicate the normal distribution. First, the data is a collection of measurements, which therefore has a great probability of being normally distributed. Second, the shape of the data is generally bell-shaped. The dip near the mean is more likely caused by the small sample size and less likely an indication of bi-modal behavior. 11. Given the relatively large sample size, the dip near the mean is unlikely to be caused by a lack of data. Thus, the best distribution is likely the empirical distribution since this would mimic the bi-modal behavior. 12. Ao = 0.976734135 and the MDT = 13.019976.

Chapter 4: Logistics Constraints 1. Use the infinite sparing replacement strategy when it is desired to determine a systems best possible RAM characteristics without regard to the effects of sparing or resources. 2. The block is held waiting for a spare to arrive into the pool. The block does not continue its repair cycle nor does it request resources. Once a spare arrives, the block continues with its repair cycle by requesting resources to initiate its hands-on repair if its pre-repair logistic delay time has expired. 3. Although the spare comes from a common pool, the repair characteristics emulate the repair distribution of the broken block. Thus, it is customary to place identical blocks into the same pool. 4. No. Ten spares arriving every 1000 hours stipulates that a batch of ten spares arrive after a thousand hours of simulation time has expired. Contrast this to a single spare arriving after 100 hours of simulation. In the first case, more delays due to the lack of spares are likely. 5. The priority used to assign resources to competing blocks is First to ask, first to acquire.

Appendix A

A-4

6. Yes. A block assigned to a resource pool can be assigned to one of the three types of sparing strategies (i.e., infinite, spare pool, or custom). 7. The repair of Block B cannot begin because the resource is being held by Block A. The priority scheme of First to ask, first to acquire means that resources are held by blocks even if these blocks do not have all the resources they need to start their repair. Thus, the action of holding resources can cause delays for other blocks. 8. The failure of a mechanical component in any facility that requires paperwork to be completed at the end of a maintenance action would best be modeled with a fixed length ldt. Buoys are an example of a system that could require random length ldts. 9. A 95% confidence interval for the number of system failures is given by (0.312746, 1.887253). This is computed by multiplying Students t distribution, with = 0.025 ((1-0.95)/2, dividing by 2 makes it two-sided) and 9 (the number of trials minus one) degrees of freedom, by the standard error of the mean. 10. A 99% confidence interval on mean green time: (35.64, 65.86). 11. This question is the same as that of the confidence intervals, only in reverse. We are asked, essentially, what is the probability of being a certain number of SEMs away from the mean. To require more than one spare, we would be (10.2)/(0.421637/10) SEMs away from the mean. Finding the inverse of the t distribution for this value gives us a probability of 0.00010125. 12. The length of any non-trivial repair cycle is random. The sum of any number of fixed repair or random repair lengths is always itself a random length.

Chapter 5: Hands On Example A. A system level downing event can be caused by any of the following: 1. Failure of any series component. 2. Failure of both fuel tanks. 3. Failure of both brake systems. 4. Failure of two tires on the same corner after spares for that type of tire have been depleted. B. The key features of this RBD are the 1-out-of-2 structures for the fuel tanks and brakes and the 2-out-of-3 structures for the four rear corners. These six structures must be in series with the remaining blocks. The order in which they are placed in series does not matter.

Appendix A

A-5

C. A spare pool must be created that has an initial stock of one outside-tire. All eight outside tires must be set so they draw spares from this pool. A second spare pool must be created that has an initial stock of one inside-tire. All four inside tires must be set so they draw spares from this pool. All other blocks can be left with the default of infinite sparing since the remaining blocks are designated to have no repair capability (i.e., a sparing strategy is not relevant). D. A mission reliability for 1200 miles is 0.84 and the MTBDE is 6375 miles. See Figures 5.3 and 5.5, respectively. Discussion is included in Chapter 5. 1. Only 5 of the 25 trials experienced a downing event, so the MDT parameter was calculated by averaging the MDT obtained on those five trials. 2. In this case, they represent the amount of miles left to the end of simulation after the downing events occurred. 3. Availability is a function of a systems MTBDE and MDT. The MDT is only based on five data points and the MTBDE is displaying a greater than sign, which indicates that it is not good estimator. Since both the MTBDE and MDT are bad or weak estimators, any parameter that incorporates them into a function is also a poor estimator. MTBDE Ao = MTBDE + MDT 4. A mission reliability simulation is time-truncated and is used to determine a systems probability of surviving some specified time. An endurability simulation, however, is failure-truncated and is used to determine the average length of time before a specified number of failures.

Appendix A

A-6

5. In order to obtain a meaningful system downtime in hours for the truck, failure data for the truck's components would have to be entered in hours. This may be a simple transformation relating miles traveled to hours traveled. The repair time for each component would also have to be entered for each component. Then a simulation could be run for an extended time to determine a steady state estimate of the truck's MDT. 6. First, the fuel tanks are not clearly defined to be a 1-out-of-2 parallel subsystem. They could be two tanks in series. Second, trailer tires are defined in Figure 4.1 to be any tires under the trailer even though two of the four axles are actually part of the tractor. These ambiguities are there to demonstrate that most modeling efforts take several iterations to converge on the best modeling approach. 7. The only components in the truck system that are repairable are the tires. Since the MMT parameter is reported as being based on eight runs, this means that on eight of the 25 trials, there was a tire failure that incurred maintenance. Thus, on the other 17 trials, a critical failure occurred before any tire failures.

Chapter 6: Preventive Maintenance 1. To have one or any components perform PM at a random frequency, the user must tie the components PM frequency to a trigger. 2. With the length of the simulation being 730.5 hours, and the Attitudes preventive maintenance set to occur after 1500 hours, the Attitude component will never perform PM during the simulation, so one may argue that this does not make sense as it is irrelevant. If the simulation were due to run longer than 1500 hours, that would be a situation where this set up would make more sense. 3. Assuming that the component does not experience a hard failure, the first PM activity will occur at time 50. This maintenance will last ten hours during which time it does not accumulate hours. Hence, the next PM activity will occur at time 160. 4. This is a near identical set up to that of problem 3, however now the components PM is tied to a triggers schedule. Hence the first PM activity will be at time 50 and the second will occur at time 150. 5. Despite the fact that the elapsed time field can only be a fixed value, it is possible for a components first preventive maintenance activity to occur at a random time. One way for this to occur is if the components preventive maintenance schedule is tied to a trigger, and the trigger fires at random intervals.

Appendix A

A-7

6. Consider the motorcycle as a system. If one conducts preventive maintenance on the tires, this would require a spare. If one conducts PM on the chain, this would not require a spare. 7. Changing the oil in a vehicle is a preventive maintenance action that is necessary but would not refresh the engine as new. Changing the tire on that same vehicle would refresh it as a new component. 8. If the defer preventive maintenance until spare and resources are available option is not selected, one is risking some unavailability of the component and the subsequent system impacts of this unavailability. 9. Changing a tire would reset the time to the next preventive maintenance. A hard failure to the chain of a bike would not reset the PM time. 10. This could be the reason that a components failure distribution is what it is. For example, in a manufacturing facility with a good scheduled maintenance plan, a mechanical component could have an exponential failure distribution due to the fact that PM is performed on this component.

Chapter 7: Dependence 1. Automobiles. Many components of an automobile wear out based on how many miles have accumulated. When the vehicle is not operating, these components are not aging. 2. Communications networks. Often, communication networks consist of many electronic components. Typically, when a failure occurs in a system, unaffected components are not powered down. 3. No. Only the block that is directly tied to a failed block will go to an idle status. The other blocks will continue to operate. 4. Yes, this is common. 5. No. An event cannot be dependent on any other element. 6. Local dependence can be set at the time a block is created even if its downstream node is not yet defined (the node does not exist or the block is not yet linked). 7. In order to insure a third string goes to an idle status, the effects of the failed Power node must be passed back to this string. The blocks are already dependent on the node at the end of the string. Select the three nodes at the end of each

Appendix A

A-8

string, that is, the 500path, 650path and 900path node and set the dependency for these nodes to local dependence. 8. Change Power node to system dependent. 9. Starting from left to right: The Attitude is brown because it has gone idle because the system is failed. Node n1 is brown because it reflects the state of the subsystem preceding it and the Attitude is idle. In the top string, the first two components are orange because their triggered preventive maintenance has come up. The Bus_UR is brown because its compatriots are down for PM. The 500path node is orange because the reason this string is not operational is PM. The SolarP_650W is red because it has failed. This failure has caused the other two components in the string to go idle, hence their color is brown. The 650path node is red since it is a failure which is causing it to not be operational. The Power node is orange since it is the preventive maintenance in the top string which is causing it to not be available. The HighGain and LowGain components are system dependent, so the failure of the system moves them to an idle state, hence the brown color, which is then also reflected in the Comm node.

Chapter 8: Standby 1. Petroleum pumps and power generators. 2. Priority return is usually associated with non-identical standby components. An example might be alternate power sources such as commercial power, batteries and generators. Typically, when commercial power is returned after an outage, generators or batteries are turned off and power is switched back to the primary power source. 3. This has no affect on the system. When a standby node attempts to change an inbound path to standby, the node will check whether the first upstream element is a block or a node. If it is a block, that element is switched to its standby status. If it is a node, however, the upstream node is instructed to propagate the standby status to any elements that are dependent on the upstream node. If the upstream node does not have an element dependent upon it, the path will not change to standby. 4. System A has an availability of approximately 80% and System B has an availability of approximately 75%.

Appendix A

A-9

System A

System B

5. When system C conducts a switch-over, system downtime does not occur and thus, there are no downing events due to switch-over. Each time system D fails, however, the system is experiencing a small amount of system down time. MTBDE is defined to be the system uptime (green time + yellow time) divided by the number of downing events. The uptime is essentially the same for these two systems but the number of downing events will differ greatly. The MTBDE for system D will be significantly lower than the MTBDE for system C. Availability is calculated as the uptime divided by the total simulation time. Since the uptime is nearly identical for both cases, the availability of the two systems will be very similar. 6. No. In order for a node to be designated a standby node it must have at least two inbound links. 7. Oil pumps. In the petrochemical industry, when oil pumps are not being used, they are more susceptible to rust, and since they are not moving they are more

Appendix A

A-10

likely to freeze up. Hence when they are not being used they are more likely to fail. 8. Events cannot go to standby. However, it is perfectly reasonable to place an event in a standby configuration with blocks, as long as the priority of the events path is higher (lower number) than the blocks paths. 9. The node is set to standby. There is automatic switching with probability < 1, and no manual switching. The top block tried to switch at some point and failed, hence it is now (and forever) unavailable.

Chapter 9: Transients 1. 250 data points # data points = Sim Time 500 = = 250 Sample Rate 2

2. Graphs are limited to 1,000 data points and the combination of the simulation time and sample rate exceeds this limit. # data points = Sim Time 5000 = = 2500 / 1000 Sample Rate 2

3. Since graphs consume a significant amount of memory, Raptor was designed to require the user to request graphs each time they are desired. 4. The multi-run availability graph. The other two graphs (per trial and interval graphs) display availability for a particular trial. 5. The uppermost line is the maximum availability observed at a particular time. The lowermost line is the minimum availability observed at a particular time. Neither of these lines represents average values but extreme values with respect to time. The middle line is the average availability observed at a particular time. 6. If at some point the three lines of the Multi-run A0 Graph converge, nothing can be concluded. However, if they converge while being parallel to each other,
A-11

Appendix A

we can conclude that the system has achieved steady-state with respect to the availability parameter. 7. The block continues to repair but only the segment of the repair cycle that crosses into the statistics-gathering portion of a simulation is accounted for within the results. 8. A satellite, leased equipment, refrigerator, etc. Equipment that will never reach its true steady-state RAM value because it will be discarded long before this point in time occurs. 9. Yes. The Simulation Options dialog box changes to allow the user to enter the number of failures after which data is collected. It is equally possible to use the delayed statistics option with cycle-truncated simulations. 10. The block's total repair cycle is ten hours (i.e., the sum of 2, 5, and 3). Thirtyfive percent of the repair cycle is 3.5 hours. Therefore, the block is in the handson repair portion of its repair cycle. The block has completed 1.5 hours of handson repair and has 6.5 hours (i.e., the sum of 3.5 and 3) remaining in its repair cycle. 11. The block's total repair cycle is ten hours (i.e., the sum of 2, 5, and 3). Eightyfive percent of the repair cycle is 8.5 hours. Therefore, the block is in its post logistic delay portion of its repair cycle. The block has 1.5 hours of logistic delay remaining in its repair cycle. 12. When the simulation begins, Raptor steps through each block in the order it was placed within the Workspace and initiates that block for the simulation. Once spares or resources are exhausted, other blocks requiring them will be put in a hold status waiting for a new spare or resources to arrive. 13. No. The exponential distribution is unique in that a component that has some life accumulated is no different than one that is new. This is called the memoryless property of the exponential distribution. It can be shown mathematically that the conditional probability density function of an exponential distribution is equivalent to its probability density function. 14. It is possible for the two blocks to both start down when random startup techniques are utilized. Once they have repaired, however, this condition cannot occur again within a trial. Since both blocks are system dependent, if one block fails the other is sent to its idle status and cannot fail before the first block is repaired. Thus, it is not a natural state of this RBD for both series blocks to be down simultaneously. 15. Most modern components have a much larger failure mean than a repair mean. In other words, the availability of each component is relatively high so blocks

Appendix A

A-12

spend more time up than down. A random start will reflect this since it is common for an RBD to start with many of its blocks in an up state, even if all were set to start in a random condition.

Chapter 10: Failure Effects View 1. If a block is hatched in Failure Effects view, that indicates that its current state is due to a dependence action. 2. You can only cycle through multiple states when clicking on a hatched block if more than one possible dependence actions have been defined for that block. 3. When the top block is failed, in FEV mode this will cause the following block to fail, which will then cause the third block to fail, and so on. The result is that all ten blocks will fail, hence the system will fail, and we can say that the top block is a single point failure block. If the fifth block is failed, this will cause a chain reaction of failures as we saw before, with the result that the fifth block on will all be failed. Since the system only requires one block to be up, and the top four blocks have not failed, the fifth block is not an SPF block.

Chapter 11: Weak Link Analysis 1. Usually not since blocks are not independent of each other with respect to logistics. Blocks that share resources or spares are correlated to each other and multiplication of their node availabilities is meaningless in a probabilistic sense. 2. Node A represents the probability that block alpha is operating at any given time (i.e., the availability of block alpha). Node B represents the probability that either block alpha or block beta or both are operating at any given time. P[ or ] Node C represents the probability that block beta is operating at any given time. Node D represents the probability that both block alpha and block gamma are operating at any given time. P[ and ] Node E represents the probability that either block beta or block alpha and block gamma or all three are operating at any given time. P[ or ( and )] Node F represents the probability that the system is operating at any given time. P[( and and ) or ( and ) or ( and and )] 3. Solution is forthcoming. 4. Logistics, Mean life, and Redundancy.

Appendix A

A-13

5. Blocks that are dependent are not available when the element they are dependent upon is down. It is not clear by looking at availability numbers only which blocks actually failed and which ones were down for dependency reasons. Consider using dependability weak link analysis for systems that possess a fair amount of internal dependencies 6. Solution is coming. 7. The weak link analysis results change for both the blocks and the nodes. The only reason they change is due to the dependency settings.

Chapter 12: Cost Analysis 1. $2500 (5 x $500) 2. There is no such field. Raptor has costs associated with a component being in a hold status due to logistics constraints or preventive maintenance, but there is no cost associated with having a spare in stock. 3. $2281
7 resources 2 hrs LDT 8 hrs repair spare Total $840 $16 $175 $1,250 $2,281 (7 x 8hr x $15) (2hr x $8)) (8hr x $20 + $15)

4. At the top of both the End of Run and the Final Results report is a section that lists how many spares each block used. Values in this table can be multiplied by the cost of each spare to determine how much of a pools total cost was due to each block.

Chapter 13: Hands-on Example II 1. There are some ambiguities. 2. To determine how many pies of each type were produced, we would have to conduct the simulation with the final results report selected. Then we could look at the weak link analysis section of this report, node analysis state data subsection. This will give the percent of sim time that the three pie nodes were in each state. At the times that they were green, they would be producing pies.
Appendix A A-14

3. There are still some assumptions. 4. The apple_pie node had an availability of 0.911361420, for the cherry_pie node it was 0.917006846, and for the rhubarb_pie node it was 0.912852608. These results are quite similar, yet this should not surprise any Raptor users. The components leading in to these nodes have identical MTBDEs and MDTs across the three nodes. Hence, one would expect the availabilities of the nodes to be equal once the system has reached steady-state; if we conducted the simulation for more time or more trials, we should expect the availabilities of the three nodes to be even closer than they are.

Chapter 14: Capacity Analysis 1. Throughput is a measure of what is flowing through a path or a system. Capacity is a measure of what a path or system is capable of flowing. 2. In order to obtain the cost of lost flow, both the capacity and cost analysis features must be activated. 3. Units produced are the product of the flow rate and time. (10 units per hour) x (2 hours) = 20 units produced + (40 units per hour) x (1 hours) = 40 units produced = 60 units produced The average flow rate can be calculated using the units produced result.

Average Flow =

Total Units Produced 60 units = = 20 units hour Simulation Time 3 hours

4. The 60 units of flow are evenly distributed.


Path A Priority=50
90 80 70 60 50 40 30 20 10

Path B Priority=50
90 80 70 60 50 40 30 20 10

Path C Priority=50
90 80 70 60 50 40 30 20 10 0 Loss = ______

Max Nom

Max Nom

Max Nom

190 60 Capacity = ______ Throughp ut = ______

Appendix A

A-15

5. Paths A and B are each filled to their nominal values.


Path A Priority=25
90 80 70 60 50 40 30 20 10

Path B Priority=50
90 80 70 60 50 40 30 20 10

Path C Priority=75
90 80 70 60 50 40 30 20 10 0 Loss = ______

Max Nom

Max Nom

Max Nom

190 Throughput = ______ 60 Capacity = ______

6. Paths A, B and C are each filled to their nominal values first; then the additional 30 is evenly distributed.
Path A Priority=50
90 80 70 60 50 40 30 20 10

Path B Priority=50
90 80 70 60 50 40 30 20 10

Path C Priority=50

M ax Nom

M ax Nom

M ax Nom

90 80 70 60 50 40 30 20 10

190 Throughput = ______ 140 Capacity = ______

0 Loss = ______

7. Paths A, B and C are each filled to their nominal values; then Path A is filled to its maximum flow value and then the remainder is sent to path B.
Path A Priority=25
90 80 70 60 50 40 30 20 10

Path B Priority=50
90 80 70 60 50 40 30 20 10

Path C Priority=75
90 80 70 60 50 40 30 20 10

M ax Nom

M ax Nom

M ax Nom

190 140 Capacity = ______ Throughput = ______

0 Loss = ______

Appendix A

A-16

8. Paths A, B and C are all filled to their maximum capacity. The remaining 10 units of flow are lost.
Path A Priority=50
90 80 70 60 50 40 30 20 10

Path B Priority=50
90 80 70 60 50 40 30 20 10

Path C Priority=50
90 80 70 60 50 40 30 20 10

Max Nom

Max Nom

Max
Nom

190 Throughput = ______ 190 Capacity = ______

10 Loss = ______

9. Flow cannot be sent to Path C. Paths A and B are filled to their maximum capacity and the remaining 90 units of flow are lost.
Path A Priority=50
90 80 70 60 50 40 30 20 10

Path B Priority=50
90 80 70 60 50 40 30 20 10

Path C Priority=50
90 80 70 60 50 40 30 20 10

Max Nom

Max Nom

Max Nom

X
FAILED 90 Loss = ______

110 110 Capacity = ______ Throughput = ______

10. The average flow rate is 204.904. This is an exact answer and with sufficiently long simulation lengths, a simulation solution will approach the exact solution. 11. There are many possible solutions. One solution is to add another 900 watt power string, which results in an availability of 0.971821224, a mean flow of 1,451.79 watts, at a cost of $33,872,015.09. 12. A node can be designated as a choke point by de-selecting the unrestricted flow check box from the Capacity tab of the Node Properties dialog box.

Chapter 15: Events 1. The zoom feature focuses the Workspace view on the node that is causing the dialog box to appear. The Go Back button allows a user to change the k-value of a
Appendix A A-17

node that has previously been set via the Node Paths dialog box. For users that have large RBDs with many nodes, this feature can be most useful. 2. The left configuration is more reliable regardless of the reliability value since it contains two more possible paths that keep the system in a functional state, yet it contains the same amount of equipment as the configuration on the right. 3. Left Configuration Right Configuration
2

Rsubsystem = 1 (1 R )
R subsystem = 2 R R 2

Rsubsystem = 1 1 R 2
R system = 2 R 2 R 4

Rsystem = 2 R R 2 2 R R 2 = 4 R 2 4 R 3 + R 4

)(

R
1-out-of-2

R
1-out-of-2

R
1-out-of-2

R R

Thus, it must be shown that 4R 2 4R 3 + R 4 > 2R 2 R 4 4 4R + R 2 > 2 R 2

(1 R )(2 2 R ) > 0
1 R > 0

or

2 2R > 0

which indicates that


1 > R true 1 > R true

Thus, the configuration on the left is always more reliable than the configuration on the right except for when R equals one, which is a trivial solution. 4. 100,000 trials. A general rule of thumb is described in the following equation:

Appendix A

A-18

# trials = 10 (digit of concern )+1


5. Rsystem 0.9749

6. Rsystem 0.8229

7. Rsystem 0.9926

Appendix A

A-19

. n 1 The mean reliability is 0.85, as shown in Figure 15.6, so we have X = 0.85 . We know that this means that the trial was successful 170 times out of the 200, and unsuccessful 30 times, hence X i = 1.0 for 170 of the is and X i = 0.0 for 30 of the is. Thus

8. The equation for population standard deviation is =

i =1

( X i X )2

200 i =1

( X i 0.85) 2 199

170(1.00 0.85) 2 + 30(0.00 0.85) 2 = 0.357967462 199

To compute the standard error of the mean, the equation is / n . So we have

SEM = 0.357967462 / 200 = 0.025312122

9. Using the t distribution, the lower bound is 0.800085576 and the upper bound is 0.899914424. 10. An event cannot go to standby. The three paths must have been set to be of equal priority (or the path with the event is a higher priority), and the event-path is the one receiving the go to standby message. One could correct this by setting the event-path to be the highest priority.

Chapter 16: Hierarchy 1. Upon modifying the Capacity3.rbd file and simulating, one finds availability of 0.949169788 and MDT of 9.412975, which does indeed match the results found in Figure 14.22. This is not surprising. Since the new RBD was created by collapsing existing blocks into hierarchies, the underlying ID numbers of all blocks has remained the same, hence one would expect the simulation results to be the same as in the RBD without the hierarchies. 2. The Electronics subsystem is yellow with a red Descendent Status Indicator. Thus, at a level below the main subsystem, there is a failure that produces the red DSI. This failure does not fail the main subsystem however, since this hierarchy is yellow opposed to red. Since the only redundancy of the Electronics subsystem is in the n25 node, who needs one of the two of the Batteries and AC-Power subsystems, there must be a failure of either the Batteries or the AC-Power. This could be caused by the failures of Batt-2A and Batt-2B. The Motors subsystem is yellow, hence it has some loss of redundancy that does not cause a failure. This could be due to a failure of the WindingOffset. The Mechanisms subsystem is

Appendix A

A-20

orange, which indicates that the subsystem is down due to preventive maintenance. This could be a scheduled maintenance of the Dashpot component. This figure can nearly be achieved in Failure Effects View, by failing the components mentioned above. However, Failure Effects View cannot send a component to preventive maintenance, so the orange color of the Mechanisms subsystem will not be seen in this view. 3. The Electronics subsystem is red, which means it has had a failure that prevents it from operating. As an example, this could be from a failure of the CPU in its Computer subsystem. The Motors subsystem is brown which means it is idle. In the current configuration of the Hierarchy4 RBD there is no dependency. To make this situation occur in the Failure Effects View, one would have to define some dependency in the Motors subsystem. For example, defining all the components in the Motors subsystem to be locally dependent, then making the Motors hierarchy element itself system dependent would create this situation.

Chapter 17: Phasing 1. Yes. Since a simulation length for a failure-truncated simulation is a random variable, the number of phases completed per trial is also a random variable. 2. Components that are not phased have stress 1.0. 3. 20 hours on average.
phase mean life = 4. 500 hours on average. average mean life 100hrs = = 20.0 hrs stress 5.00

phase mean life =

average mean life 100hrs = = 500.0 hrs stress 0.20

5. No. Over the long run (i.e., this phase occurring repeatedly), the mean life would average 50 hours, but a particular instance may or may not be exactly 50 hours. 6. Phase two, simulation time equal to 60 hours.
40 hrs consumed Stress = 1.0 80 hrs consumed Stress = 4.0

40 hours

20 hours

0
Appendix A

Phase 1

40 60 Simulation time

Phase 2

120
A-21

7. A linked node represents a subsystem that cannot cause a system failure but does drain logistic resources and thus incurs costs. 8.
Success Success Success by Proxy by Proxy Failed Failed by Proxy Linked Failed by Proxy

Phase 1 Phase 2 Phase 3 Phase 4 Phase 5 Phase 6 Phase 7

9. Yes. Repairs are not stopped once they start. 10. The component costs $45 per hour, regardless of the state in which it is in. 11. The first component still registers as a failed path. It will complete its repair, then will become operational and will not accumulate any life throughout the new phase. Since the second component is linked, the path of which it is a part will register good. It will complete its repair, then turn green, but it too will not accumulate any life during this new phase. 12. Recall that the three components in the 500path power string are all locally dependent, with a 90% chance that they go idle, 10% chance that they fail. Each component is cut when the system enters phase 1. In the top figure, these three components are idle. Since any time the system enters phase 1 the components are cut, so the 500path node is necessarily down, these components receive the message to conduct their dependence action. All three in this case went idle. In the second figure, we see that the first two components are orange while the Bus_UR is brown. The SolarP_500W and the BatteriesNiCd must have been in preventive maintenance when this phase was entered. All maintenance activities, once begun, will be completed, hence they are completing their preventive maintenance. The Bus_UR has gone idle upon receiving its dependence message. In the third figure, we see the first two components are brown and the third is red. There are two ways this could occur. First, upon receiving the call to dependence, the first two went idle, and the third must have had its 10% draw which told it to suffer a failure. Or, the Bus_UR could have been repairing when it entered this phase. There is no way that the fourth figure could occur unless one changes the dependence settings in the RBD. 13. The color of the block will be blue, and the color of the node will be green, if the standby node uses priority return. If it does not use priority return, the block will remain green and the node will be green. 14. The block and node will both be green.

Appendix A

A-22

15. The cost for one day of operation is 20% that of one month because the initial acquisition costs are charged as soon as a simulation, of any length, is begun. 16. Yes. This is a method to change the status of elements during a phased simulation. Some might think this is being done when cuts or links are assigned to an element but recall cuts and links are not status changes but inactive situations. 17. If the phases are of fixed length, one could compute the amount of time required to complete a whole cycle, and run a time-terminated simulation with the termination time divisible by the cycle length. One could also conduct a cycleterminated simulation, which will guarantee whole cycles being simulated whether the phases are of fixed length or not. 18. The average cycle length is 3010 hours, and the average mission length is 10 hours. 19. The average cycle length is 28 hours and the average mission length is 9.05 hours. Note that the average mission length would be 9.5 hours if the simulation was of near infinite duration. 20. The average cycle length is 35 hours and the average mission length over a 300 hour simulation is 28.33 hours. 21. The node is standby but the Tether block is independent. Hence, the TethPath path is being sent the message to go standby, but the Tether block is expressing attitude and will not listen. This could be corrected by making the Tether block locally dependent. 22. If a block is independent, and is up at the time the phase is entered, then there is no difference. If the block is repairing at the time the phase is entered, in the A:0.00 case it will remain failed making the path through the block bad until it repairs. If the phase were L:0.00, the block would continue to repair but the path through that block would be treated by the system as up. Also, if a block is dependent and set to A:0.00, it could go to the Idle state and cause the path through it to go down.

Chapter 19: Simulation Mechanics


1.

Availability =

(55 + 1 + 7.2) uptime = = 0.842666 uptime + downtime (55 + 1 + 7.2) + (1.8 + 10)

2.

Appendix A

A-23

MTBDE =

(55 + 1 + 7.2) = 31.60 hours uptime = 2 number of system failures (1.8 + 10) = 5.90 hours downtime = 2 number of system failures

MDT =

3. Yellow time is defined to be the time when components are failed but a system is not down. There are three periods when the system was yellow. % Yellow =

(4.6 + 1.0 + 2.2) *100 = 10.40 % Yellow time * 100 = 75 Total time
uptime Block B (75 4.6) = 70.40 hours = number of failures Block B 1

4.
MTBDE Block B =

5.

Availability =

(19 + 32.4 + 1 + 13.2) uptime = = 0.874666 uptime + downtime (19 + 32.4 + 1 + 13.2 ) + (4.6 + 0.8 + 4) (19 + 32.4 + 1 + 13.2) = 21.87 hours uptime = 3 number of system failures (4.6 + 0.8 + 4) = 3.13 hours downtime = 3 number of system failures

6.

MTBDE =

MDT =

7. There are four periods when the system is yellow. % Yellow =

(1 + 1 + 6 + 2.2) *100 = 13.60 % Yellow time *100 = 75 Total time


uptime Block B (55 + 1 + 7.2) = 31.60 hours = number of failures Block B 2

8.
MTBDE Block B =

Appendix A

A-24

Chapter 20: Miscellaneous Topics


1. All values will be displayed based on the current preference setting. The distribution parameter for Block A will be displayed as 0.005. 2. The number of pages down will be calculated based on the aspect ratio of the RBD. A short, wide RBD may be three pages across but still be one page down. 3. The formula for linear growth is:

new = [(Slope # of failures ) + 1] base new = [(1 2 ) + 1] 100 = 300 hours


4. The various growth or decay options and stress changes from phasing can each affect the mean life of a block simultaneously. In this case, the mean life would be 600 hours since the block is operating at half its normal stress. 5. If two identical blocks are set to the same independent steam, they will fail and repair at exactly the same time throughout the simulation. If these two blocks are in series, this is no different than having only one block. 6. Preferences are saved in a separate file and are in effect for any RBD that is opened. System settings and block defaults are saved into an RBD file and are unique to that particular reliability block diagram. 7. When a failure-truncated simulation is set to run until X failures have occurred, it will actually run until X repairs have been completed. The results, in most simulations, are the same number. Counting the first failure could result in the final results being based on X repair times but only X-1 failure times if the system starts down.

Appendix A

A-25

Appendix A

A-26

Appendix B

Menus and Button Bars

Workspace View Menu Bar File Menu

New menu item: Opens a new and therefore empty RBD file. If a modified RBD file is currently open, a save file dialog box will appear before closing the current file. This allows a user to save the changes incorporated in the currently opened RBD file. Open menu item: Opens an existing RBD file. If a modified RBD file is currently open, a save file dialog box will appear before opening another RBD file. Then the Windows open file dialog box appears. This allows a user to select an RBD file from a storage location (i.e., C-drive, A-drive, etc.). If the open file process is canceled, a new RBD file is loaded into the Workspace. Save menu item: Saves the RBD file currently displayed within the Workspace with the same filename it previously possessed. If an RBD file has not been previously saved, Raptor prompts the user for a filename. All RBD files are saved with an RBD filename extension.

Appendix B

B-1

Save As menu item: Saves the currently displayed RBD file with a new filename. Save Window as Bitmap menu item: Saves the image of the window currently displayed within the Simulation View to a bitmap file. The default size of the bitmap is determined by the number of grids an RBD image spans. Each grid represents 25 pixels by 25 pixels in the bitmap file. The size can be adjusted through the Bitmap Size dialog box. However, the original aspect ratio of the image must always be maintained. Save Tables menu item: Opens the Save.TXT Options dialog box, which allows the tables of the currently displayed RBD file to be saved in text form. For each file selected, the Windows save file dialog box will appear allowing a user to name each file. Print submenu: The Print submenu (shown below) allows the user to select from four different print options (Tables, Window, Tree, or Selection).

Print Tables menu item: Opens the Print Selections dialog box, which allows the printing of tables of the currently displayed RBD file. Print Window menu item: Allows the user to print the currently displayed window to their default printer. Print Tree menu item: Prints the hierarchy tree of the currently displayed RBD.

Appendix B

B-2

Print Selection menu item: Prints the highlighted portion of the currently displayed window. A portion of a window can be selected via the rubber-band box by clicking and holding the left mouse button down and then dragging the mouse over a portion of the window. Another method of selection is to depress the Crtl key while selecting different elements with the left mouse button. Print Setup menu item: Opens the Windows printer setup dialog box so that a default printer and page orientation can be chosen. Library submenu: The Library submenu (shown below) allows the user to select from one of two different library options (Import or Export).

Import menu item: Displays the Windows open file dialog box which allows a user to load a library file. A loaded library can provide a set of block templates to create new blocks with pre-specified data fields. Export menu item: Exports the characteristics of all the blocks within the Workspace to a library file. The Windows save file dialog box appears and allows a user to name the library file. Import RBD menu item: Merges a pre-existing, Raptor 7.0 RBD file into the currently displayed RBD file. The RBD is brought in as a hierarchy, whose default name is the same as that of the RBD.

Appendix B

B-3

Close menu item: Clears the Workspace. If a modified RBD file is currently open, a save file dialog box will appear before closing the current file. Exit menu item: Exits a user from the Raptor software. If a modified RBD file is currently open, a save file dialog box will appear before closing the current file. Recently used RBD file list: Contains a list of the last six RBD files that have been opened in Raptor.

Edit Menu

Add submenu: The Add submenu (shown below) allows the user to add one of five types of elements to the Workspace.

Add Block menu item: Changes the Workspace to the block cursor mode, which allows a user to add new blocks to an RBD file. The normal pointer cursor changes to the block cursor and will add a block at the location of a left click of the mouse. Once a block is placed within the Workspace, the Block Properties

Appendix B

B-4

dialog box will be displayed awaiting input. The Workspace remains in add block mode until a right mouse click occurs. Add Node menu item: Changes the Workspace to the node cursor mode, which allows a user to add new nodes to an RBD file. The normal pointer cursor changes to the node cursor and will add a node at the location of a left click of the mouse. Once a node is placed within the Workspace, the Node Properties dialog box will be displayed awaiting input. The Workspace remains in add node mode until a right mouse click occurs. Add Link menu item: Changes the Workspace to the link cursor mode, which allows a user to draw new links within an RBD file. Links are drawn by selecting a block, node, event, or hierarchy (left mouse click and hold), dragging a link to a second block, node, event, or hierarchy, and then releasing the held mouse button while over the second object. The Workspace remains in add link mode until a right mouse click occurs. Add Event menu item: Changes the Workspace to the event cursor mode, which allows a user to add new events to an RBD file. The normal pointer cursor changes to the event cursor and will add an event at the location of a left click of the mouse. Once an event is placed within the Workspace, the Event Properties dialog box will be displayed awaiting input. The Workspace remains in add event mode until a right mouse click occurs. Add Hierarchy menu item: Changes the Workspace to the hierarchy cursor mode, which allows a user to add new hierarchies to an RBD file. The normal pointer cursor changes to the hierarchy cursor and will add a hierarchy at the location of a left click of the mouse. Once a hierarchy is placed within the Workspace, the Hierarchy Properties dialog box will be displayed awaiting input. The Workspace remains in add hierarchy mode until a right mouse click occurs. Select all menu item: Highlights all blocks, nodes, events, and hierarchies contained within the Workspace. Cut menu item: Removes any highlighted elements from the Workspace while placing the removed items into the Raptor paste buffer. Copy menu item: Copies the selected elements into the Raptor paste buffer. Paste menu item: Workspace. Pastes elements from the Raptor paste buffer into the

Clear menu item: Removes any selected elements from the Workspace without placing the removed items into the Raptor paste buffer.

Appendix B

B-5

Properties menu item: Opens the selected item's Block, Node, Event, or Hierarchy Properties dialog box as appropriate. This menu item is deactivated if more than one element is highlighted. Collapse menu item: Places the selected objects into a new hierarchy. Once the hierarchy is placed within the Workspace, the Hierarchy Properties dialog box will be displayed awaiting input. Block Defaults menu item: Opens the Block Properties dialog box and allows the default block attributes to be modified. Any blocks added to the Workspace after a change to the block defaults will possess the new block default characteristics. Mass Edit menu item: Opens the Mass Edit dialog box. This menu item is deactivated if fewer than two elements are selected.

Options Menu

Tables submenu: The tables submenu (shown below) allows the user to view one of six table types as well as save these tables as text files.

View Block Inputs menu item: Opens the Block Input Tables dialog box. This menu item is deactivated if the RBD does not contain any blocks.

Appendix B

B-6

View Node Inputs menu item: Opens the Node Input Tables dialog box. This menu item is deactivated if the RBD does not contain any nodes. View Event Inputs menu item: Opens the Event Input Tables dialog box. This menu item is deactivated if the RBD does not contain any events. View Hierarchy Inputs menu item: Opens the Hierarchy Input Tables dialog box. This menu item is deactivated if the RBD does not contain any hierarchies. View System Inputs menu item: Opens the System Input Tables dialog box. View Outputs menu item: Opens the Output Tables dialog box. This menu item is deactivated if a simulation has not been conducted since the currently displayed RBD was last opened. Save As Text Files menu item: Opens the Save.TXT Options dialog box, which allows the tables of the currently displayed RBD file to be saved in text form. For each file selected, the Windows save file dialog box will appear allowing a user to name each file. Spares menu item: Opens the Spare Pools dialog box. Resources menu item: Opens the Resource Pools dialog box. Triggers menu item: Opens the Define Triggers dialog box. System Settings menu item: Opens the System Settings dialog box. Phases menu item: Opens the Phasing dialog box. Analyses submenu: The Analyses submenu (shown below) allows the user to turn the Weak Link Analysis, Capacity Analysis, and Cost Analysis features on or off.

Appendix B

B-7

Enable/Disable Weak Link menu item: Turns the Weak Link Analysis feature on/off. Enable/Disable Capacity menu item: Turns the Capacity Analysis feature on/off. Enable/Disable Cost menu item: Turns the Cost Analysis feature on/off. Preferences menu item: Opens the Preferences dialog box.

Navigate Menu

Home menu item: When inside a hierarchy, instructs Raptor to return to the top level. This button is deactivated if the current window is not inside a hierarchy. Up menu item: When inside a hierarchy, instructs Raptor to go to the level immediate above the current window. This button will be deactivated if the current window is not inside a hierarchy. Goto menu item: Instructs Raptor to change the view to that of the hierarchy specified in the Goto Hierarchy drop down list box. Zoom In menu item: Decreases the amount of grids displayed by 5% or a decrease of 6 grids in width. Zoom Out menu item: Increases the amount of grids displayed by 5% or an increase of 6 grids in width. Zoom Percent menu item: Instructs Raptor to change the view to that specified in the Zoom Percent dialog box. Find Item menu item: Opens the Find Item dialog box that contains a drop-down list box of all blocks, nodes, events, and hierarchies contained within the RBD.

Appendix B

B-8

Display Tree menu item: Opens the Tree dialog box that displays the hierarchical structure of the current RBD.

Launch Menu

Simulation menu item: Opens the Simulation Options dialog box allowing a simulation to be conducted. Failure Effect View menu item: This menu item switches from the Workspace View to the Failure Effects View. The Failure Effects View is a view in which the user can choose which components to fail to see what affect that has on the system. Weak Link View menu item: This item switches from the Workspace view to the Weak Link Analysis view. The Weak Link Analysis View is a post Simulation view that displays red, yellow and green color threshold information from the previous simulation. This menu item is deactivated if a simulation with weak link analysis has not been conducted during the current Raptor session.

Help Menu

Help Index menu item: Opens the Raptor help file. About menu item: Opens a scrolling dialog box that displays the current developers, past developers, and testers. The list also includes groups or persons that have provided inspiration or humor during those difficult times associated with the development of Raptor. Visit Raptor Webpage menu item: Transports a user to the Raptor home page by using their default web browser. The latest training and consulting information are provided on this web page.
B-9

Appendix B

Raptor Reference Manual menu item: Opens the Raptor Reference Manual in pdf format. Adobe Acrobat reader must be installed for this option to work.

Simulation View Menu Bar File Menu

Print Window menu item: Opens the Print Window dialog box, which allows printing of the window that is currently displayed. Print Setup menu item: Opens the Windows printer setup dialog box so that a default printer and page orientation can be chosen. Save Window as Bitmap menu item: Saves the image of the window currently displayed within the Simulation View to a bitmap file. The default size of the bitmap is determined by the number of grids an RBD image spans. Each grid represents 25 pixels by 25 pixels in the bitmap file. The size can be adjusted through the Bitmap Size dialog box. However, the original aspect ratio of the image must always be maintained. Return to Workspace menu item: Returns focus from the Simulation View to the Workspace View. This menu item is deactivated until a simulation is completed or early terminated.

Control Menu

Resume or Pause menu item: Resumes or pauses a simulation.


B-10

Appendix B

Step menu item: This menu item is only activated while a simulation is paused. If selected, the simulation clock is advanced to the next simulation event that results in a color change of a block, node, or event. Jump menu item: This menu item is only activated while a simulation is paused. If selected, the simulation is advanced to the beginning of the next trial. Early Terminate menu item: Terminates a simulation before a pre-specified ending simulation condition. Results accumulated until the termination point are calculated and are available. Restart menu item: Restarts a simulation without returning to the Workspace. Displays the Resimulate Options dialog box which contains a subset of alternatives available in the Simulation Options dialog box. Increase Sim Speed menu item: Increases the simulation speed by a factor of ten times the previous speed setting. The maximum simulation speed is 10,000,000. This menu item is deactivated if a simulation without graphics is conducted or when a simulation has been terminated. Decrease Sim Speed menu item: Decreases the simulation speed by a factor of ten times the previous speed setting. The minimum simulation speed is 0.000001. This menu item is deactivated if a simulation without graphics is conducted or when a simulation has been terminated.

Options Menu

View Outputs menu item: This menu option is only available after a simulation is completed or early terminated. When selected, the Output Tables dialog box is displayed. Color Thresholds menu item: This menu item is only available following the completion of a simulation that conducted Weak Link analysis. Selecting this item displays a System Settings dialog box with only the fourth tab available. This option provides a capability for changing the red, yellow and green color thresholds.

Appendix B

B-11

Show/Hide Status Indicator menu item: This menu item allows the user to show or hide the system status indicator. The default is shown. Resize Status Indicator submenu: This submenu (shown below) allows the user to select the size of the status indicator. There are four different sizes that a status indicator can be. The default size is Medium.

Change Status Indicator submenu: This submenu (shown below) allows the user to change which status indicator is displayed during a simulation. There are 19 different images that the status indicator can be. The default image is the Equalizer.

Appendix B

B-12

Navigate Menu

Home menu item: When inside a hierarchy, instructs Raptor to return to the top level. This button is deactivated if the current window is not inside a hierarchy. Up menu item: When inside a hierarchy, instructs Raptor to go to the level immediate above the current window. This button will be deactivated if the current window is not inside a hierarchy. Goto menu item: Instructs Raptor to change the view to that of the hierarchy specified in the Goto Hierarchy drop down list box. Zoom In menu item: Decreases the displayed view space by 5%, equivalent to a decrease of 6 grids in width. Zoom Out menu item: Increases the displayed view space by 5% equivalent to an increase of 6 grids in width. Zoom Percent menu item: Instructs Raptor to change the view to that specified in the Zoom Percent dialog box. Find Item menu item: Opens the Find Item dialog box that contains a drop-down list box of all blocks, nodes, events, and hierarchies contained within the RBD. Display Tree menu item: Opens the Tree dialog box that displays the hierarchical structure of the current RBD.

Help Menu

Appendix B

B-13

Help menu item: Opens the Raptor help file to a specific page concerning simulation capabilities. Visit Raptor Webpage menu item: Transports a user to the Raptor home page by using their default web browser. The latest training and consulting information are provided on this web page.

Weak Link View Menu Bar File Menu

Print Window menu item: Opens the Print Window dialog box, which allows printing of the window that is currently displayed. Print Setup menu item: Opens the Windows printer setup dialog box so that a default printer and page orientation can be chosen. Save Window as Bitmap menu item: Saves the image of the window currently displayed within the Simulation View to a bitmap file. The default size of the bitmap is determined by the number of grids an RBD image spans. Each grid represents 25 pixels by 25 pixels in the bitmap file. The size can be adjusted through the Bitmap Size dialog box. However, the original aspect ratio of the image must always be maintained. Return to Workspace menu item: Returns focus from the Weak Link View to the Workspace View. This menu item is deactivated until a simulation is completed or early terminated.

Options Menu

Appendix B

B-14

View Outputs menu item: When selected, the Output Tables dialog box is displayed. Color Thresholds menu item: Selecting this item displays a System Settings dialog box with only the fourth tab available. This option provides a capability for changing the red, yellow and green color thresholds.

Navigate Menu

Home menu item: When inside a hierarchy, instructs Raptor to return to the top level. This button is deactivated if the current window is not inside a hierarchy. Up menu item: When inside a hierarchy, instructs Raptor to go to the level immediate above the current window. This button will be deactivated if the current window is not inside a hierarchy. Goto menu item: Instructs Raptor to change the view to that of the hierarchy specified in the Goto Hierarchy drop down list box. Zoom In menu item: Decreases the amount of displayed view space by 5%, equivalent to a decrease of 6 grids in width. Zoom Out menu item: Increases the amount of displayed view space by 5%, equivalent to an increase of 6 grids in width. Zoom Percent menu item: Instructs Raptor to change the view to that specified in the Zoom Percent dialog box. Find Item menu item: Opens the Find Item dialog box that contains a drop-down list box of all blocks, nodes, events, and hierarchies contained within the RBD. Display Tree menu item: Opens the Tree dialog box that displays the hierarchical structure of the current RBD.

Appendix B

B-15

Help Menu

Help Index menu item: Opens the Raptor help file to a specific page concerning weak link analysis capabilities. Visit Raptor Webpage menu item: Transports a user to the Raptor home page by using their default web browser. The latest training and consulting information are provided on this web page.

Failure Effects View Menu Bar File Menu

Open or Close Interactive Log menu item: This menu item toggles between the open and close functions for an interactive log. If one is not already opened, it reads Open Interactive Log and upon selection, will open an interactive log. If an interactive log is already opened, this menu item reads Close Interactive Log and will close the interactive log upon selection. Write To Failure Effects Log menu item: Upon selection, the affects on the system of the currently failed components will be written to the interactive log. This menu item is deactivated if an interactive log is not already opened. Create Single Point Failure File menu item: Upon selection, requests a file name and creates a text file listing all of the single points of failure in the system, and their criticality toward system failures.

Appendix B

B-16

Print Window menu item: Opens the Print Window dialog box, which allows printing of the window that is currently displayed. Print Setup menu item: Opens the Windows printer setup dialog box so that a default printer and page orientation can be chosen. Save Window as BMP menu item: Saves the image of the window currently displayed within the Simulation View to a bitmap file. The default size of the bitmap is determined by the number of grids an RBD image spans. Each grid represents 25 pixels by 25 pixels in the bitmap file. The size can be adjusted through the Bitmap Size dialog box. However, the original aspect ratio of the image must always be maintained. Return to Workspace menu item: Returns focus from the Failure Effects View to the Workspace View.

Control Menu

Fail Item menu item: Opens the Fail Item dialog box, which contains a drop-down list box of all blocks and events within the RBD. Upon selection of a component, if that component is operating, it will fail. If it is already failed, no action is taken. Repair Item menu item: Opens the Repair Item dialog box, which contains a dropdown list box of all blocks and events within the RBD. Upon selection of a component, if that component is failed, it will be repaired. If it is already repaired, no action is taken. Decrease Phase menu item: Decreases the current phase by one. This menu item is deactivated if no phases are defined within the RBD. Increase Phase menu item: Increases the current phase by one. This menu item is deactivated if no phases are defined within the RBD.

Appendix B

B-17

Goto Phase submenu: This submenu (shown below) provides a list of all defined phases so the user can select a specific phase to go to.

Refresh Phase menu item: Refreshes all components like new, but remains in the current phase. This menu item is deactivated if no phases are defined. Refresh All menu item: Refreshes all components like new and returns to the first phase. This menu item is deactivated if no phases are defined.

Options Menu

Display Failure Effects menu item: Displays how the currently failed components affect the system. Show/Hide Status Indicator menu item: This menu item allows the user to show or hide the system status indicator. The default is shown. Resize Status Indicator submenu: This submenu (shown below) allows the user to select the size of the status indicator. There are four different sizes that a status indicator can be. The default size is Medium.

Appendix B

B-18

Change Status Indicator submenu: This submenu (shown below) allows the user to change which status indicator is displayed during a simulation. There are 19 different images that the status indicator can be. The default image is the Equalizer.

Appendix B

B-19

Navigate Menu

Home menu item: When inside a hierarchy, instructs Raptor to return to the top level. This button is deactivated if the current window is not inside a hierarchy. Up menu item: When inside a hierarchy, instructs Raptor to go to the level immediate above the current window. This button will be deactivated if the current window is not inside a hierarchy. Goto menu item: Instructs Raptor to change the view to that of the hierarchy specified in the Goto Hierarchy drop down list box. Zoom In menu item: Decreases the amount of grids displayed by 5% or a decrease of 6 grids in width. Zoom Out menu item: Increases the amount of grids displayed by 5% or an increase of 6 grids in width. Zoom Percent menu item: Instructs Raptor to change the view to that specified in the Zoom Percent dialog box. Find Item menu item: Opens the Find Item dialog box that contains a drop-down list box of all blocks, nodes, events, and hierarchies contained within the RBD. Display Tree menu item: Opens the Tree dialog box that displays the hierarchical structure of the current RBD.

Help Menu

Appendix B

B-20

Help Index menu item: Opens the Raptor help file to a specific page concerning failure effects capabilities. Visit Raptor Webpage menu item: Transports a user to the Raptor home page by using their default web browser. The latest training and consulting information are provided on this web page.

Ao Graph Menu Bar File Menu

Print submenu: The Print submenu (shown below) allows the user to select from four different print options (Per trial Ao, Interval Ao, Multi-run Ao, All Ao Graphs).

Per Trial Ao menu item: Prints the Per Trial Ao plot as it appears within the graph window. Interval Ao menu item: Prints the Interval Ao plot as it appears within the graph window. Multi-run Ao menu item: Prints the Multi-run Ao plot as it appears within the graph window. All Ao menu item: Prints all Ao plots as they appear within the graph window. Print Setup menu item: Opens the Windows printer setup dialog box so that a default printer and page orientation can be chosen.

Appendix B

B-21

Close menu item: This option removes the graph window from the screen. The Simulation view is then expanded to fill the entire screen. Any re-simulations started will not display the graph window.

Control Menu

Change Y-Axis menu item: Displays the Set Y-Axis Values dialog box and allows the minimum and maximum values of the y-axis to be modified. View Per Trial Ao menu item: Displays the Per Trial Ao plot in the graph window. This is a plot of the red, yellow, and green percentage values versus the simulation time for the current run. The line separating the red region from the yellow and green regions represent the system availability versus simulation time. View Interval Ao menu item: Displays the Interval Ao plot in the graph window. This is a plot of the availability of a system during the previous interval. For example, if the user selects an Ao plot sample rate of 50.0 hours the value plotted at simulation time 150 is the availability observed between times 100 and 150. View Multi-run Ao menu item: Displays the Multi-run Ao plot in the graph window. This plot reflects data obtained from each run of simulation. For each time displayed on the x-axis, the minimum, maximum, and average availability obtained from all runs are plotted. As these lines converge and become parallel, the plot is indicating that a system is approaching a steady-state condition.

Help Menu

Help Index menu item: Opens the Raptor help file to a specific page concerning graphing availability during a simulation.

Appendix B

B-22

Visit Raptor Webpage menu item: Transports a user to the Raptor home page by using their default web browser. The latest training and consulting information are provided on this web page.

Workspace View Toolbar


New button: Opens a new and therefore empty RBD file. If a modified RBD file is currently open, a save file dialog box will appear before closing the current file. This allows a user to save the changes incorporated in the currently opened RBD file. Open button: Opens an existing RBD file. If a modified RBD file is currently open, a save file dialog box will appear before opening another RBD file. Then the Windows open file dialog box appears. This allows a user to select an RBD file from a storage location (e.g., C-drive). If the open file process is canceled, a new RBD file is loaded into the Workspace. Save button: Saves the RBD file currently displayed within the Workspace with the same filename it previously possessed. If an RBD file has not been previously saved, Raptor prompts the user for a filename. All RBD files are saved with an RBD filename extension. Print Window button: Opens the Print Window dialog box, which allows printing of the window that is currently displayed. Cut button: Removes any highlighted elements from the Workspace while placing the removed items into the Raptor paste buffer. Copy button: Copies the selected elements into the Raptor paste buffer. Paste button: Workspace. Pastes elements from the Raptor paste buffer into the

Properties button: Opens the selected item's Block, Node, Event, or Hierarchy Properties dialog box as appropriate. This button is deactivated if more than one element is highlighted. Add Block button: Changes the Workspace to the block cursor mode, which allows a user to add new blocks to an RBD file. The normal pointer cursor changes to the block cursor and will add a block at the location of a left click of the mouse. Once a block is placed within the Workspace, the Block Properties dialog box will be displayed awaiting input. The Workspace remains in add block mode until a right mouse click occurs.

Appendix B

B-23

Add Node button: Changes the Workspace to the node cursor mode, which allows a user to add new nodes to an RBD file. The normal pointer cursor changes to the node cursor and will add a node at the location of a left click of the mouse. Once a node is placed within the Workspace, the Node Properties dialog box will be displayed awaiting input. The Workspace remains in add node mode until a right mouse click occurs. Add Link button: Changes the Workspace to the link cursor mode, which allows a user to draw new links within an RBD file. Links are drawn by selecting a block, node, event or hierarchy (left mouse click and hold), dragging a link to a second block, node, event or hierarchy, and then releasing the held mouse button while over the second object. The Workspace remains in add link mode until a right mouse click occurs. Add Event button: Changes the Workspace to the event cursor mode, which allows a user to add new events to an RBD file. The normal pointer cursor changes to the event cursor and will add an event at the location of a left click of the mouse. Once an event is placed within the Workspace, the Event Properties dialog box will be displayed awaiting input. The Workspace remains in add event mode until a right mouse click occurs. Add Hierarchy button: Changes the Workspace to the hierarchy cursor mode, which allows a user to add new hierarchies to an RBD file. The normal pointer cursor changes to the hierarchy cursor and will add a hierarchy at the location of a left click of the mouse. Once a hierarchy is placed within the Workspace, the Hierarchy Properties dialog box will be displayed awaiting input. The Workspace remains in add hierarchy mode until a right mouse click occurs. View Block Inputs button: Opens the Block Input Tables dialog box. This button is deactivated if the RBD does not contain at least one block. View Outputs button: Opens the Output Tables dialog box. This button is deactivated if a simulation has not been conducted since Raptor was last opened. Spares button: Opens the Spare Pools dialog box. Resources button: Opens the Resource Pools dialog box. Triggers button: Opens the Triggers dialog box. Phasing button: Opens the Phasing dialog box.

Appendix B

B-24

Weak Link Analysis button: Instructs Raptor to perform a weak link analysis during the next simulation. The color thresholds assigned in the System Settings dialog box will be used. Capacity Analysis button: Instructs Raptor to perform a capacity analysis during the next simulation. Cost Analysis button: Instructs Raptor to perform a cost analysis during the next simulation. Home button: When inside a hierarchy, instructs Raptor to return to the top level. This button is deactivated if the current window is not inside a hierarchy. Up button: When inside a hierarchy, instructs Raptor to go to the level immediate above the current window. This button will be deactivated if the current window is not inside a hierarchy. Goto Hierarchy button: Instructs Raptor to change the view to that of the hierarchy specified in the Goto Hierarchy drop down list box. Zoom Out button: Increases the amount of grids displayed by 5% or an increase of 6 grids in width. Zoom In button: Decreases the amount of grids displayed by 5% or a decrease of 6 grids in width. Zoom to Fit button: Changes the zoom level to one in which the entire RBD fits on the screen. Find Item button: Opens the Find Item dialog box that contains a drop-down list box of all blocks, nodes, events and hierarchies within an RBD. Display Tree button: Opens the Tree dialog box that displays the hierarchical tree structure of the current RBD. Simulate button: This button opens the Simulate Options dialog box, allowing a simulation to be conducted. Failure Effects View button: This button switches from the Workspace View to the Failure Effects View. The Failure Effects View is a view in which the user can choose which components to fail to see what affect that has on the system. Weak Link Analysis View button: This button switches from the Workspace View to the Weak Link Analysis View. The Weak Link Analysis View is a post Simulation view that displays red, yellow and green color threshold

Appendix B

B-25

information from the previous simulation. This button is deactivated if a simulation with weak link analysis has not been conducted during the current Raptor session. Help button: Opens the Raptor help file.

Simulation View Toolbar


Print Window button: Opens the Print Window dialog box, which allows printing of the window that is currently displayed. Return to Workspace button: Returns focus from the Simulation View to the Workspace View. This button is deactivated until a simulation is completed or early terminated. Pause button: Pauses and resumes a simulation. Step button: This button is only activated while a simulation is paused. If selected, the simulation clock is advanced to the next simulation event that results in a color change of a block, node, or event. Jump button: This button is only activated while a simulation is paused. If selected, the simulation is advanced to the beginning of the next trial. Early Terminate button: Terminates a simulation before a pre-specified ending simulation condition. Results accumulated until the termination point are calculated and are available. Restart button: Restarts a simulation without returning to the Workspace. Displays the Resimulate Options dialog box which contains a subset of alternatives available in the Simulation Options dialog box. Decrease Sim Speed button: Decreases the simulation speed by a factor of ten times the previous speed setting. The minimum simulation speed is 0.000001. This button is deactivated if a simulation without graphics is conducted or when a simulation has been terminated. Increase Sim Speed button: Increases the simulation speed by a factor of ten times the previous speed setting. The maximum simulation speed is 10,000,000. This button is deactivated if a simulation without graphics is conducted or when a simulation has been terminated. View Outputs button: This button is only available after a simulation is completed or early terminated. When selected, the Output Tables dialog box is displayed.

Appendix B

B-26

Color Thresholds button: This button is only available following the completion of a simulation that conducted weak link analysis. Selecting this button displays the System Settings dialog box with only the fourth tab available. This option provides a capability for changing the red, yellow and green color thresholds. Home button: When inside a hierarchy, instructs Raptor to return to the top level. This button is deactivated if the current window is not inside a hierarchy. Up button: When inside a hierarchy, instructs Raptor to go to the level immediate above the current window. This button will be deactivated if the current window is not inside a hierarchy. Goto Hierarchy button: Instructs Raptor to change the view to that of the hierarchy specified in the Goto Hierarchy drop down list box. Zoom Out button: Increases the displayed view space by 5%, equivalent to an increase of 6 grids in width. Zoom In button: Decreases the displayed view space by 5%, equivalent to a decrease of 6 grids in width. Zoom to Fit button: Changes the zoom level to one in which the entire RBD fits on the screen. Display Tree button: Opens the Tree dialog box that displays the hierarchical tree structure of the current RBD. Help button: Opens the Raptor help file to a specific page concerning simulation capabilities.

Weak Link View Toolbar


Print Window button: Opens the Print Window dialog box, which allows printing of the window that is currently displayed. Return to Workspace button: Returns focus from the Weak Link View to the Workspace View. View Outputs button: displayed. When selected, the Output Tables dialog box is

View Color Thresholds button: Selecting this button displays the System Settings dialog box with only the fourth tab available. This option provides

Appendix B

B-27

the capability to change the red, yellow and green color thresholds. Home button: When inside a hierarchy, instructs Raptor to return to the top level. This button is deactivated if the current window is not inside a hierarchy. Up button: When inside a hierarchy, instructs Raptor to go to the level immediate above the current window. This button will be deactivated if the current window is not inside a hierarchy. Goto Hierarchy button: Instructs Raptor to change the view to that of the hierarchy specified in the Goto Hierarchy drop down list box. Zoom Out button: Increases the amount of displayed view space by 5%, equivalent to an increase of 6 grids in width. Zoom In button: Decreases the amount of displayed view space by 5%, equivalent to a decrease of 6 grids in width. Zoom to Fit button: Changes the zoom level to one in which the entire RBD fits on the screen. Display Tree button: Opens the Tree dialog box that displays the hierarchical tree structure of the current RBD. Help button: Opens the Raptor help file to a specific page concerning weak link analysis capabilities.

Failure Effects View Toolbar


Print Window button: Opens the Print Window dialog box, which allows printing of the window that is currently displayed. Return to Workspace button: Returns focus from the Failure Effects View to the Workspace View. Open Interactive Log button: Opens an interactive log. deactivated if an interactive log is already opened. This button is

Write to Log button: Writes the affects on the system of the currently failed components to the interactive log. This button is deactivated if an interactive log is not already opened. Close Interactive Log button: Closes the interactive log. This button is deactivated if an interactive log is not already opened.

Appendix B

B-28

Decrease Phase button: Decreases the current phase by one. This button is deactivated if no phases are defined within the RBD. Increase Phase button: Increases the current phase by one. This button is deactivated if no phases are defined within the RBD. Refresh Phase button: Refreshes all components like new, but remains in the current phase. This button is deactivated if no phases are defined. Refresh All button: Refreshes all components like new and returns to the first phase. This button is deactivated if no phases are defined. Display Failure Effects button: components affect the system. Displays how the currently failed

Home button: When inside a hierarchy, instructs Raptor to return to the top level. This button is deactivated if the current window is not inside a hierarchy. Up button: When inside a hierarchy, instructs Raptor to go to the level immediate above the current window. This button will be deactivated if the current window is not inside a hierarchy. Goto Hierarchy button: Instructs Raptor to change the view to that of the hierarchy specified in the Goto Hierarchy drop down list box. Zoom Out button: Increases the amount of grids displayed by 5% or an increase of 6 grids in width. Zoom In button: Decreases the amount of grids being shown by 5% or an increase of 6 grids in width. Zoom to Fit button: Changes the zoom level to one in which the entire RBD fits on the screen. Display Tree button: Opens the Tree dialog box that displays the hierarchical tree structure of the current RBD. Help button: Opens the Raptor help file to a specific page concerning failure effects capabilities.

Appendix B

B-29

Appendix C

Files and Reports

All system failure times: A file that contains the lengths of time between system downing events. The time that a system is down (red time) is not included within these values. This file is often used to aggregate sub-system RAM attributes into higher-level Raptor models.
377.924387 133.810374 90.734946 185.974263 11.006692 222.373303 408.772419 91.508274 392.889487 196.878277 254.110766 145.727042 231.634401

In this example, a simulation was conducted for ten trials of 730.5 hours. A review of the Detailed Event Log would reveal that the system failed three times during the first trial. The figure below represents the first three values of this file.
Up 377.924387 133.810374 90.734946

Down 18.989760 0.0 47.993078 22.860418 730.5

Simulation Time

Results from multiple trials are included in a single list of values. Since there are 13 values in this file for the ten trials, the system experienced an average of 1.3 failures per trial. Censored operating times (i.e., ending simulation time is reached before a system downing event) are not included in this file.

All system down times: A file that contains the lengths of time a system was down. This file is often used to aggregate sub-system RAM attributes into higherlevel Raptor models.
18.989760 47.993078 22.860418 2.470410 10.463316 37.179109 43.448759 39.429741 23.439194 23.748975 17.525759 22.381383 12.811535

In this example, the simulation was conducted for ten trials of 730.5 hours. A review of the Detailed Event Log would reveal that the system failed three times during the first trial. The figure below shows what the first three values of this file represent.
Up 377.924387 133.810374 90.734946

Down 18.989760 0.0 47.993078 22.860418 730.5

Simulation Time

Results from multiple trials are included in a single list of values. Censored down times (i.e., simulation terminates while system is in a down status) are not included in this file.

Appendix C

C-1

Key parameters: A file that contains eight of the key system-level parameters for each trial. The file writes system availability, dependability, reliability, conditional reliability, mean time between downing events (MTBDE), mean down time (MDT), mean time between maintenance (MTBM), and mean maintenance time (MMT). See Appendix F for the precise definitions of these parameters.
Ao 0.939145220 0.990475825 0.926284876 1.000000000 1.000000000 0.932465037 0.925293153 0.882976377 0.933212629 0.918749961 Do 0.939145220 0.990475825 0.926284876 1.000000000 1.000000000 0.932465037 0.925293153 0.882976377 0.933212629 0.918749961 R 0.000000000 0.000000000 0.000000000 1.000000000 1.000000000 0.000000000 0.000000000 0.000000000 0.000000000 0.000000000 RCond 0.000000000 0.000000000 0.000000000 1.000000000 1.000000000 0.000000000 0.000000000 0.000000000 0.000000000 0.000000000 MTBDE 686.045584 723.542590 169.162776 730.500000 730.500000 227.055236 337.963324 161.253561 340.855913 167.786712 MDT MTBM 44.454416 85.755698 6.957410 80.393621 13.462224 48.332222 N/A 146.100000 N/A 66.409091 16.444764 75.685079 27.286676 45.061777 21.371439 71.668249 24.394087 85.213978 14.838288 61.013350 MMT 39.932971 43.578551 51.683069 53.200951 45.804751 49.187865 49.492804 39.850200 49.115646 35.567465

If a simulation is terminated early after the first trial has been completed, the key parameter results for the clipped trial are discarded and not written to this file. If the simulation is terminated early before the first trial is completed, the cumulative values for the key parameters at the point of termination are written to this file. The MTBDE parameter is the average operating time between failures that result in a system being in a down condition for each trial. If a trial is completed without a system-downing event, the ending simulation time is written to this file as MTBDE. Caution is warranted when the file contains ending simulation times as MTBDEs since these values can be shown to be poor estimators of a systems true MTBDE. The MDT parameter is the average length of time a system was down or in a red condition. MDT includes logistical delays as well as actual repair times. If a trial is completed without a system-downing event, an estimate of a systems MDT cannot be determined and thus N/A is written for MDT. The MTBM parameter is the average operating time between any maintenance occurring in a system including events that do not bring a system down. For example, failure of redundant components will cause maintenance activities to occur but it may not bring a system down. If a trial is completed without a maintenance event occurring, the ending simulation time is written to this file for MTBM. Caution is warranted when the file contains ending simulation times as MTBMs since these values can be poor estimators of a systems true MTBM. The MMT parameter is the average maintenance time of a system, for either repair or preventive maintenance activities. Logistical delays are not included in the MMT values. If a maintenance activity is begun but not completed before the end of a trial, it is not included, as the clipped maintenance time is viewed as an incomplete and inaccurate data point. If a trial is completed without a maintenance event occurring, an estimate of the systems MMT cannot be determined and thus N/A is written for MMT.

Appendix C

C-2

Ending simulation times: A file that contains the time a simulation terminated for each trial. This file is predominately used when conducting failure-truncated simulations since the ending simulation time is a random variable.
396.914147 129.680388 712.809064 493.009966 123.861389 225.707158 132.429639 654.708392 187.794444 57.437747

This file is always comprised of a single column of values with n number of rows; where n is the number of trials. If this file is used when conducting a time-truncated simulation, each value will equal the ending simulation time specified in the Simulation Options dialog box and thus the worth of this file would be questionable.

Availability plot data: A file that contains values that can be used to plot the availability of a system versus simulation time. These values are identical to those displayed when the display Ao plot simulation option is engaged (via the Advanced tab of the Simulation Options dialog box). This file can only be generated for time-truncated simulations.
SimulationTime 50.000000 100.000000 150.000000 200.000000 250.000000 300.000000 350.000000 400.000000 450.000000 500.000000 550.000000 600.000000 650.000000 700.000000 730.500000 Ao 0.990000 0.995000 0.996667 0.997500 0.998000 0.996667 0.997143 0.997500 0.997778 0.998000 0.998182 0.998333 0.997692 0.997857 0.997947 Green 0.214048 0.107024 0.264509 0.448382 0.558705 0.531598 0.455655 0.427717 0.491304 0.542174 0.583794 0.618478 0.644401 0.598372 0.573389 Yellow 0.775952 0.887976 0.732158 0.549118 0.439295 0.465069 0.541487 0.569783 0.506474 0.455826 0.414388 0.379855 0.353292 0.399485 0.424558 Red 0.010000 0.005000 0.003333 0.002500 0.002000 0.003333 0.002857 0.002500 0.002222 0.002000 0.001818 0.001667 0.002308 0.002143 0.002053 Interval 0.990000 1.000000 1.000000 1.000000 1.000000 0.990000 1.000000 1.000000 1.000000 1.000000 1.000000 1.000000 0.990000 1.000000

*********************End_of_Run_1************************ 50.000000 100.000000 150.000000 200.000000 250.000000 300.000000 0.990000 0.995000 0.996667 0.997500 0.998000 0.850493 0.859251 0.429626 0.286417 0.302649 0.319019 0.274784 0.130749 0.565374 0.710250 0.694851 0.678981 0.575710 0.010000 0.005000 0.003333 0.002500 0.002000 0.149507 0.990000 1.000000 1.000000 1.000000 1.000000 0.112959

Appendix C

C-3

The first column is the simulation time in increments of 50 units. The increment value is the Ao plot sample rate and is set on the Advanced tab of the Simulation Options dialog box. The second column is the cumulative availability at the simulation time shown in the first column. The third, fourth and fifth columns are the percent of accumulated simulation time that the system was in fully functional, degraded and failed status, respectively. The last column is the availability during the specific interval. If a simulation is not early terminated, the last line of the file is the ending simulation time and the availability at that instant. The interval availability is not provided on the last line of the file since there is no guarantee that the last interval is equal in length to the previous intervals. If the simulation time can be evenly divided by the Ao plot sample rate, then the last line will be identical to the previous line (without the interval availability). If more than one trial is simulated, the results from each trial are included.

Capacity plot data: A file that contains values that can be used to plot the throughput of a system and the capacity of a system for all times during a simulation for which a change in SimulationTime Flow Capacity capacity occurs. Thus, when the 0.000000 1500.000000 2050.000000 39.824560 0.000000 0.000000 configuration of a system changes in 42.824560 0.000000 0.000000 a manner that affects the amount of 62.983326 0.000000 0.000000 flow handled by a system, a line of 65.983326 1500.000000 2050.000000 capacity information is written to this 272.518642 1500.000000 1550.000000 file.
272.768642 340.186423 340.436423 384.955400 385.205400 438.085577 438.335577 1500.000000 1500.000000 1500.000000 1400.000000 1400.000000 1400.000000 1500.000000 1550.000000 1550.000000 2050.000000 1400.000000 1400.000000 1400.000000 2050.000000

Flow is the amount of throughput (e.g., manufactured items, messages, liquid flow, etc.) per unit time that is being processed by a system. Capacity is the maximum amount of throughput that a system is capable of processing at any given time.

**********End_of_Run_1************* 0.000000 397.978146 398.228146 426.557192 426.807192 1500.000000 1500.000000 1500.000000 1500.000000 1500.000000 2050.000000 1550.000000 1550.000000 1550.000000 2050.000000

Appendix C

C-4

Final results. The final results report contains information summarized from across all trials conducted in a simulation. This file always contains a summary section, which is identical to the Summary tab of the Output Tables dialog box.
***SUMMARY*** Minimum 20991314.84 1071511.67 1488.210652 2771.951837 0.997222222 179.500000 0.500000 0.997222222 0.000000000 0.000000000 0 720.0 Mean 21934833.58 1075667.35 1493.982436 3274.460623 0.998611111 >443.600000 0.500000 0.998611111 0.200000000 0.200000000 2 720.0 Maximum 23263835.52 1079250.00 1498.958333 3526.606291 1.000000000 >720.000000 0.500000 1.000000000 1.000000000 1.000000000 4 720.0 St.Dev 861016.27 3570.77 4.959399 292.125549 0.001098013 N/A 0.000000 0.001098013 0.447213595 0.447213595 1.581139 0.0 SEM 385058.18 1596.90 2.217911 130.642517 0.000491046 N/A 0.000000 0.000491046 0.200000000 0.200000000 0.707107 0.0

Total_Cost Units_Produced Mean_Flow Mean_Capacity Availability MTBDE MDT(4-runs) Dependability Reliability Conditional_Reliability System_Failures Ending_Sim_Time

The logistics section is always included in the final results file. The information in this section is identical to that on the Logistics tab of the Output Tables dialog box.
***LOGISTICS*** Minimum Mean Maximum 51.285714 131.750476 239.833333 51.285714 131.750476 239.833333 N/A N/A N/A 36.260029 49.946663 62.804070 36.260029 49.946663 62.804070 N/A N/A N/A 1.928992 31.811250 55.535492 44.464508 68.049862 97.793230 0.000000 0.138889 0.277778 1.928992 31.811250 55.535492 44.464508 68.049862 97.793230 0.000000 0.138889 0.277778 St.Dev 72.710236 72.710236 N/A 12.675939 12.675939 N/A 24.052237 23.945248 0.109801 24.052237 23.945248 0.109801 SEM 32.517006 32.517006 N/A 5.668852 5.668852 N/A 10.756488 10.708640 0.049105 10.756488 10.708640 0.049105

MTBM MTBMu MTBMs MMT MMTu MMTs Green_Percent Yellow_Percent Red_Percent Mission_Green_Percent Mission_Yellow_Percent Mission_Red_Percent

The sparing section is also always included within the final results file. The spares utilization subsection provides data on how many spares were used by each block contained within an RBD. The AveUsed column displays the average number of spares used by a block across all trials. The MinUsed and MaxUsed columns display the minimum and maximum number of spares used by a block for a particular trial, respectively. The StDev column is the sample standard deviation of the spares used by a block across all trials.

Appendix C

C-5

***SPARING*** Spares_Utilization blockName Attitude BatteriesNaS BatteriesNiCd BatteriesNiH Bus_FR Bus_QR Bus_UR HighGain LowGain Nuclear_Reactor SolarP_500W SolarP_650W SolarP_900W Tether Thermal SpareSource MinUsed AveUsed MaxUsed StDev Infinite 0 0 0 0 Cells 0 0.6 1 0.55 Cells 0 0.4 1 0.55 Cells 0 0.8 2 0.84 Electronics 0 0.2 1 0.45 Electronics 0 0.6 2 0.89 Electronics 0 1 3 1.22 Infinite 0 2 4 1.58 Infinite 0 0 0 0 Infinite 0 1.2 3 1.3 PhotoVPanels 0 0.2 1 0.45 PhotoVPanels 0 0 0 0 PhotoVPanels 0 0 0 0 Custom 0 0.2 1 0.45 Custom 0 0 0 0

The sparing section is expanded to provide statistics on custom sparing and spare pools if these replacement strategies are used in a simulation. Values such as MinStock that are normally integers, are displayed as real numbers since the value is the average of the minimum stock levels observed from all trials simulated. The NumDelays column is the average number of delays observed. Delays are times when a block was put into a hold status because a spare was unavailable.
Custom_Sparing blockName Tether Thermal SparePool_Sparing_Information poolName PhotoVPanels Cells Electronics InitNumSpares NewSpares MinStock AveStock MaxStock EndStock NumDelays 2 0 1.8 1.98 2 1.8 0 3 0.6 1.4 2.05 3 1.8 0.2 2 0.6 0.8 1.17 2 0.8 0.6 InitNumSpares NewSpares MinStock AveStock MaxStock EndStock NumDelays 0 0.2 0 0 0 0 0.2 1 0 1 1 1 1 0

The resources section of the final results file is included if a resource pool has been defined.
***RESOURCES*** Resource_Information resourceName Astronauts InitNumRes MinNumRes AveNumRes MaxNumRes EndNumRes NumDelays 5 0.4 3.84 5 4 1.6

Appendix C

C-6

The capacity section of the final results file is included if the capacity analysis option has been selected for a simulation.
***CAPACITY*** FlowGenerated UnitsProduced FlowLoss 1500 1075667.35 MinLostFlow AveLostFlow MaxLostFlow 0 6.02 1400 MinFlow SystemCapacity NodeCapacity MinFlow 500path 650path 900path end n1 n2 NukePath Power TethPath 0 0 0 100 100 100 0 100 0 AveFlow MaxFlow UsageRate 200.14 500 0.46 210.2 530 0.38 242.71 740 0.28 1493.98 1500 N/A 1493.98 1500 N/A 1493.98 1500 N/A 659.28 920 0.54 1493.98 1500 0.25 181.65 500 1 MinCapacity 100 130 360 N/A N/A N/A 0 4500 0 AveCapacity 436.87 568.79 859.36 N/A N/A N/A 1231.69 5913.69 182 MaxCapacity 500 650 900 N/A N/A N/A 1500 6500 500 CapableRate 0.87 0.88 0.95 N/A N/A N/A 0.82 0.91 0.36 100 AveFlow MaxFlow UsageRate MinCapacity AveCapacity MaxCapacity CapableRate 1493.98 1500 0.46 100 3274.46 4050 0.81

The cost section of the final results file is included if the cost analysis option has been selected for a simulation. The first three subsections are costs associated with blocks. The first subsection delineates the various state costs for each block, the second subsection lists sparing costs, and the third subsection incorporates the state costs and sparing costs along with initial and disposal cost into a life cycle cost summary.
***COST*** Operating Block Attitude BatteriesNaS BatteriesNiCd BatteriesNiH Bus_FR Bus_QR Bus_UR HighGain LowGain Nuclear_Reactor SolarP_500W SolarP_650W SolarP_900W Tether Thermal Totals InHier 0 38 32 35 38 35 32 0 0 0 32 35 38 0 0 Good Repair 107850.00 0.00 206245.58 16619.29 235907.79 24881.12 220514.81 28019.10 79060.81 2449.21 78755.29 14587.71 91217.68 32111.20 2024.99 13869.37 1063.77 0.00 171823.39 119137.61 141544.68 4068.04 141759.52 0.00 137497.05 0.00 17710.01 1051.97 10800.00 0.00 Idle 52.00 831.36 9821.81 5882.88 605.03 1513.58 1366.20 0.00 0.00 0.00 2837.55 2968.60 1072.99 0.00 0.00 RepHold 0.00 9.90 59.03 2237.49 86.40 112.00 500.89 76.07 0.00 65281.57 6.80 0.00 0.00 96.00 0.00 PM PMHold 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Standby Done 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1014.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1014.49 0.00

1643775.4 256794.63 26951.99 68466.14 0.00

Appendix C

C-7

Sparing Block InitSpares NewSpares EmerShip Attitude 0.00 0.00 0.00 BatteriesNaS 0.00 0.00 0.00 BatteriesNiCd 0.00 0.00 0.00 BatteriesNiH 0.00 0.00 0.00 Bus_FR 0.00 0.00 0.00 Bus_QR 0.00 0.00 0.00 Bus_UR 0.00 0.00 0.00 HighGain 0.00 440.00 0.00 LowGain 0.00 0.00 0.00 Nuclear_Reactor 0.00 64800.00 0.00 SolarP_500W 0.00 0.00 0.00 SolarP_650W 0.00 0.00 0.00 SolarP_900W 0.00 0.00 0.00 Tether 0.00 256.00 400.00 Thermal 5185.00 0.00 0.00 Totals 5185.00 65496.00 400.00

Life_cycle_cost Block Attitude BatteriesNaS BatteriesNiCd BatteriesNiH Bus_FR Bus_QR Bus_UR HighGain LowGain Nuclear_Reactor SolarP_500W SolarP_650W SolarP_900W Tether Thermal Block_Totals Purchase 6500.00 9000.00 4000.00 8000.00 11000.00 12000.00 10000.00 1500.00 900.00 83650.00 3125.00 3125.00 3125.00 2250.00 85000.00 Operating 107902.00 223706.13 270669.74 256654.28 82201.45 94968.58 125195.97 15970.43 2078.26 356242.57 148457.07 144728.13 138570.04 18857.98 10800.00 Sparing Disposal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 440.00 0.00 0.00 0.00 64800.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 656.00 0.00 5185.00 0.00 0.00 Total 114402.00 232706.13 274669.74 264654.28 93201.45 106968.58 135195.97 17910.43 2978.26 504692.57 151582.07 147853.13 141695.04 21763.98 100985.00 2311258.62

243175.00 1997002.62 71081.00

The next subsection summarizes the costs associated with the events in the RBD.
Event InHier Initial Success Failure Total Colorado_Springs 0 1.00 22.40 7.60 31.00 Inspection 0 1.00 57.00 3.00 61.00 Event_Totals 2.00 79.40 10.60 92.00

The next subsection summarizes the costs by subsystem.

Appendix C

C-8

Hierarchy HierNum Purchase Operating Sparing Disposal Events Total 500path 32 17125.00 544322.79 0.00 0.00 0.00 561447.79 650path 35 23125.00 496350.98 0.00 0.00 0.00 519475.98 900path 38 23125.00 444477.62 0.00 0.00 0.00 467602.62

The next two subsections summarize the pool costs associated with any spare or resource pools that were defined for an RBD.
SparePools PhotoVPanels Cells Electronics Initial NewSpares EmerShip Total 6250.00 0.00 0.00 6250.00 9225.00 2460.00 135000.00 146685.00 17570.00 5271.00 351300.00 374141.00 7731.00 486300.00 527076.00

SparePool_Totals 33045.00

Resources Astronauts

Initial PerUseCost PerTimeCost Total 18750000.00 513.00 208561.31 18959074.31 513.00 208561.31 18959074.31

Resource_Totals 18750000.00

The last cost subsection is a summary of all costs incurred from each of the previous subsections. System down cost is included within this report only if the system red time cost is greater than zero. The system lost flow cost is included within this report only if a simulation has been conducted that implemented the cost and capacity analysis options.
Cost_Summary Blocks Events SparePools Resources SystemDownCost SystemLostFlowCost ________________________________ Grand_Total 2311258.62 92.00 527076.00 18959074.31 133000.00 4332.65

21934833.58

The weak link analysis section of the final results file is included if the weak link analysis option has been selected for a simulation. This section reports on the availability, dependability, and reliability of the nodes, blocks, events and hierarchies. For each parameter, it gives the min, the mean, the max, the standard dev and the SEM. This is the same data that can be found in the Output Tables dialog box. It also gives information on the percent of time that each element spent in the various states. A sample of the weak link analysis section is shown below.

Appendix C

C-9

***WEAK_LINK_ANALYSIS*** NODE_ANALYSIS

Reliability_Data Node 500path 650path 900path Comm n1 n2 NukePath Power TethPath State_Data Node 500path 650path 900path Comm n1 n2 NukePath Power TethPath

RMin RMean RMax RStdDev RSEM 0.000000000 0.200000000 1.000000000 0.447213595 0.200000000 0.000000000 0.200000000 1.000000000 0.447213595 0.200000000 0.000000000 0.400000000 1.000000000 0.547722558 0.244948974 0.000000000 0.200000000 1.000000000 0.447213595 0.200000000 1.000000000 1.000000000 1.000000000 0.000000000 0.000000000 1.000000000 1.000000000 1.000000000 0.000000000 0.000000000 0.000000000 0.000000000 0.000000000 0.000000000 0.000000000 1.000000000 1.000000000 1.000000000 0.000000000 0.000000000 0.000000000 0.000000000 0.000000000 0.000000000 0.000000000

%Green %Yellow %Red %Blue %Brown %Orange 87.373256 0.000000 12.626744 0.000000 0.000000 0.000000 87.505878 0.000000 12.494122 0.000000 0.000000 0.000000 95.484066 0.000000 4.515934 0.000000 0.000000 0.000000 70.311997 29.549114 0.138889 0.000000 0.000000 0.000000 99.861111 0.000000 0.000000 0.000000 0.138889 0.000000 100.000000 0.000000 0.000000 0.000000 0.000000 0.000000 82.112821 0.000000 17.887179 0.000000 0.000000 0.000000 29.522961 70.477039 0.000000 0.000000 0.000000 0.000000 36.400057 0.000000 63.599943 0.000000 0.000000 0.000000

BLOCK_ANALYSIS Availability_Data Block Attitude BatteriesNaS BatteriesNiCd BatteriesNiH Bus_FR Bus_QR Bus_UR HighGain LowGain Nuclear_Reactor SolarP_500W SolarP_650W SolarP_900W Tether Thermal

AoMin AoMean AoMax AoStdDev AoSEM 0.997222222 0.998611111 1.000000000 0.001098013 0.000491046 0.890170906 0.954840656 1.000000000 0.046349647 0.020728192 0.615723503 0.873732562 1.000000000 0.153226566 0.068525004 0.694379650 0.875058778 1.000000000 0.113949994 0.050959987 0.890170906 0.954840656 1.000000000 0.046349647 0.020728192 0.694379650 0.875058778 1.000000000 0.113949994 0.050959987 0.615723503 0.873732562 1.000000000 0.153226566 0.068525004 0.406866515 0.703119970 1.000000000 0.280969998 0.125653603 1.000000000 1.000000000 1.000000000 0.000000000 0.000000000 0.690660440 0.867794877 1.000000000 0.147307977 0.065878130 0.615723503 0.873732562 1.000000000 0.153226566 0.068525004 0.694379650 0.875058778 1.000000000 0.113949994 0.050959987 0.890170906 0.954840656 1.000000000 0.046349647 0.020728192 0.919448438 0.983889688 1.000000000 0.036023753 0.016110312 1.000000000 1.000000000 1.000000000 0.000000000 0.000000000

Caution is warranted when this section is used to interpret results in conjunction with failure-truncated simulations. Since a failure-truncated simulations ending time is a random variable, and usually not consistent across multiple trials, the utility of this section is questionable. For example, a trial that lasts 500 hours with a nodes percent green time of 50%, and a trial that lasts 50 hours with a nodes percent green time of 100%, will yield an average percent green time of 75%. Although the first trial lasted ten times longer, the non-time-weighted averages calculated in this report disregards this information.

End of run: A report that contains summary, sparing, resource, capacity, cost and node analysis results for each trial of a simulation. The format of this report is the same as the final results report. This report can be large if numerous trials are conducted. This report provides useful insight into the variability between trials

Appendix C

C-10

while the final results report provides summaries across trials. The first two sections of this report are shown below.
***Run_1*********************************************************************

***SUMMARY*** Availability MTBDE MDT Reliability ConditionalReliability EndingSimTime NumberOfSystemFailures NumberOfComponentFailures 0.794316121 3.917911 1.014522 0.000000000 0.000000000 365.0 74 347

***LOGISTICS*** MTBM MTBMu MTBMs MMT MMTu MMTs GreenPercent YellowPercent RedPercent 0.835520 0.835520 N/A 0.380829 0.380829 N/A 62.957009 16.474603 20.568388 Minimum 0.299331 0.013038 0.000161 0.011279 Mean Maximum 3.862710 15.414227 1.014522 3.571355 1.047954 5.514521 0.380829 2.595407 St.Dev 2.973433 0.829151 0.936055 0.333877

TBDE DT TBM RT

***SPARING*** Spare_Utilization blockName 1553card AC_power apple_filler batteries boxer cherry_filler computer crust_former crust_former crust_former emerg_switch folder_motor main_motor mixer mixer mixer oven rhubarb_filler Failures SpareSource Consumed 12 Custom 12 12 Infinite 12 42 Infinite 42 3 Custom 3 10 Infinite 10 44 Infinite 44 3 Infinite 3 32 Infinite 32 30 Infinite 30 24 Infinite 24 7 Infinite 7 13 motor_parts 13 37 motor_parts 37 3 mixer_parts 3 3 mixer_parts 3 1 mixer_parts 1 11 Infinite 11 60 Infinite 60

Appendix C

C-11

Detailed event log: A report that contains every significant event that transpires during each simulation trial. All block and event failures, block repairs, logistics aspects, node conditions and phasing information are provided in this file. The file is often used to facilitate the verification and validation of a particular RBD or software module.
Column 1 of this log contains the simulation time that an event line was written. Column 2 contains the type of element that the line is referring to and column 3 contains the name of that element. Column 4 contains the new state that the referenced element is in and column 5 contains a pertinent comment concerning the element. The information in column 5 varies depending on the action.
0.000000 0.000000 0.000000 0.000000 0.000000 0.000000 0.000000 0.000000 0.000000 0.000000 0.000000 0.000000 0.000000 0.000000 0.000000 0.000000 0.000000 0.000000 0.000000 0.000000 0.000000 0.000000 0.000000 0.000000 0.000000 0.000000 0.000000 0.000000 908.938960 908.938960 908.938960 908.938960 908.938960 908.938960 1531.094330 1531.094330 1531.094330 1531.094330 1531.094330 4046.782428 4046.782428 System Block Block Block Block Block Block Block Block Block Block Block Block Block Block Block Block Block Block Block Block Block Block Block Block Block Block Block Block Block Node Block Block Node Block Block Block Node System Block Block Begin_Run_1 Engine Tractor_Ele Fuel_Tank1 Fuel_Tank2 Fuel_Pump Cooling Transfer_Drive Brakes_1 Brakes_2 Gearbox Tractor_Structure LeftFront_Tire RightFront_Tire Trailer_Structure Trailer_Ele Tire_Outside_1 Tire_Outside_2 Tire_Outside_3 Tire_Outside_4 Tire_Outside_5 Tire_Outside_6 Tire_Outside_7 Tire_Outside_8 Tire_Inside_1 Tire_Inside_2 Tire_Inside_3 Tire_Inside_4 Tire_Outside_6 Tire_Outside_6 n8 Tire_Outside_6 Tire_Outside_6 n8 Tire_Outside_8 Tire_Outside_8 Tire_Outside_8 n9 State_change Brakes_2 Brakes_2

Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Failed Repairing Degraded Repaired Good Good Failed Sparing Done Degraded Yellow Failed Done

InitializeStress=1.000000 InitializeStress=1.000000 InitializeStress=1.000000 InitializeStress=1.000000 InitializeStress=1.000000 InitializeStress=1.000000 InitializeStress=1.000000 InitializeStress=1.000000 InitializeStress=1.000000 InitializeStress=1.000000 InitializeStress=1.000000 InitializeStress=1.000000 InitializeStress=1.000000 InitializeStress=1.000000 InitializeStress=1.000000 InitializeStress=1.000000 InitializeStress=1.000000 InitializeStress=1.000000 InitializeStress=1.000000 InitializeStress=1.000000 InitializeStress=1.000000 InitializeStress=1.000000 InitializeStress=1.000000 InitializeStress=1.000000 InitializeStress=1.000000 InitializeStress=1.000000 InitializeStress=1.000000 Operating_time=908.938960 No_resources_used 2-2/3_df32_ur33_ur43 MaintTime=0.000000 Stress=1.000000 3-2/3_ur32_ur33_ur43 Operating_time=1531.094330 No_spare_in_stock-Outside_Tires No_spares 2-2/3_ur36_df37_ur45 _d23 Operating_time=4046.782428 No_repair

Appendix C

C-12

Interim cost log: A report that contains the same cost information included in the end of run and final results reports at each interval defined by a frequency value. This report is often used to facilitate the post processing of the cost information into a time-valued money analysis. Cost information is written to this report for each trial that the frequency value is less than a simulation's ending simulation time.
The report is only available to be written when a cost analysis simulation is conducted. If this report is used in conjunction with delayed statistics gathering, only costs that occur after the delay point are written to this report.

Appendix C

C-13

Appendix D
Block Colors
Image Status
Condition
Up

Raptor Colors and Statuses

Class
Functioning

State
Running

Description
Block is actively running, accumulating time towards its next failure. Block is actively running in an under-stressed condition, accumulating time at a lesser than normal rate towards its next failure. (Also Workspace color) Block is actively running in an over-stressed condition, accumulating time at a greater than normal rate towards its next failure. Block is in cold standby (i.e., time is not accumulated toward failure). Block is in warm standby (i.e., time is accumulated at a rate less than typical operating failure rate). Block is in hot standby (i.e., time is accumulated at a rate greater than or equal to typical operating failure rate). Block is not operating because it is dependent on another element or the system which is down (i.e., time is not accumulated toward failure). Block is actively undergoing scheduled preventive maintenance. Block is waiting for a spare or resource to arrive for preventive maintenance to be performed. Block has failed but is not actively repairing since it is waiting for a spare or resource to arrive or a logistic delay to expire.

Up

Functioning

Running

Up

Functioning

Running

Up

Reserved

Standby

Up

Reserved

Standby

Up

Reserved

Standby

Down

Constrained

Idle

Down

Scheduled

PM

Down

Scheduled

PM-hold

Down

Failed

Hold

Down

Failed

Repairing Block is actively repairing (i.e., hands-on maintenance). Block has permanently failed and will not be repaired again within the current simulation trial.

Down

Failed

Done

Appendix D

D-1

Image

Status
Phase
Linked

State
Running

Description
Block is linked and actively running, accumulating time towards its next failure. Block is linked and actively running in an under-stressed condition, accumulating time at a lesser than normal rate towards its next failure. (Also Workspace color) Block is linked and actively running in an over-stressed condition, accumulating time at a greater than normal rate towards its next failure. Block is linked and in cold standby (i.e., time is not accumulated toward failure). Block is linked and in warm standby (i.e., time is accumulated at a rate less than typical operating failure rate). Block is linked and in hot standby (i.e., time is accumulated at a rate greater than or equal to typical operating failure rate). Block is linked and not operating because it is dependent on another element or the system which is down (i.e., time is not accumulated toward failure). Block is linked and actively undergoing scheduled preventive maintenance. Block is linked and waiting for a spare or resource to arrive for preventive maintenance to be performed. Block is linked and has failed but is not actively repairing since it is waiting for a spare or resource to arrive or a logistic delay to expire.

Linked

Running

Linked

Running

Linked

Standby

Linked

Standby

Linked

Standby

Linked

Idle

Linked

PM

Linked

PM-hold

Linked

Hold

Linked

Repairing Block is linked and actively repairing (i.e., hands-on maintenance). Block is linked and has permanently failed and will not be repaired again within the current simulation trial.

Linked

Done

Appendix D

D-2

Image

Status
Phase
Cut

State
Running

Description
Block is cut and actively running, accumulating time towards its next failure. Block is cut and actively running in an under-stressed condition, accumulating time at a lesser than normal rate towards its next failure. (Also Workspace color) Block is cut and actively running in an over-stressed condition, accumulating time at a greater than normal rate towards its next failure. Block is cut and in cold standby (i.e., time is not accumulated toward failure). Block is cut and in warm standby (i.e., time is accumulated at a rate less than typical operating failure rate). Block is cut and in hot standby (i.e., time is accumulated at a rate greater than or equal to typical operating failure rate). Block is cut and not operating because it is dependent on another element or the system which is down (i.e., time is not accumulated toward failure). Block is cut and actively undergoing scheduled preventive maintenance. Block is cut and waiting for a spare or resource to arrive for preventive maintenance to be performed. Block is cut and has failed but is not actively repairing since it is waiting for a spare or resource to arrive or a logistic delay to expire.

Cut

Running

Cut

Running

Cut

Standby

Cut

Standby

Cut

Standby

Cut

Idle

Cut

PM

Cut

PM-hold

Cut

Hold

Cut

Repairing Block is cut and actively repairing (i.e., hands-on maintenance). Block is cut and has permanently failed and will not be repaired again within the current simulation trial.

Cut

Done

Appendix D

D-3

Image

Description
The block's weak link parameter is greater than or equal to the green color threshold. The block's weak link parameter is greater than or equal to the yellow color threshold, yet less than the green color threshold. The block's weak link parameter is less than the yellow color threshold.

The block is running due to the lack of induced effects.

The block is in opportunistic preventive maintenance due to induced effects.

The block is idle due to induced effects.

The block has failed due to induced effects.

The standard (non-phased) block color in the Workspace View.

A phased block will display as a hatched block in the Workspace View.

Appendix D

D-4

Node Colors

Image

Status
Condition
Up

Class
Functioning

State
Good

Description
The number of inbound functional links (j) is equal to the total number of inbound links (n).

Up

Functioning

The number of inbound functional links (j) is greater than Degraded or equal to the number required (k), but less than the total number of inbound links (n). Standby Node is in standby (i.e., enough inbound links are in standby to allow switchover if called upon). Node is not operating because upstream blocks are dependent on another element or the system, which is down. Node is down since the number of inbound functional links (j) is less than the number required (k) due to upstream elements undergoing preventive maintenance. Node is down since the number of inbound functional links (j) is less than the number required (k) due to failed or cut elements. The number of inbound functional links (j) is equal to the total number of inbound links (n).

Up

Reserved

Down

Constrained

Idle

Down

Scheduled

PM

Down

Failed

Bad

Up

Functioning

Good

Up

Functioning

The number of inbound functional links (j) is greater than Degraded or equal to the number required (k), but less than the total number of inbound links (n). Standby Node is in standby (i.e., enough inbound links are in standby to allow switchover if called upon). Node is not operating because upstream blocks are dependent on another element or the system, which is down. Node is down since the number of inbound functional links (j) is less than the number required (k) due to upstream elements undergoing preventive maintenance. Node is down since the number of inbound functional links (j) is less than the number required (k) due to failed or cut elements.

Up

Reserved

Down

Constrained

Idle

Down

Scheduled

PM

Down

Failed

Bad

Appendix D

D-5

Image

Description
The node's weak link parameter is greater than or equal to the green color threshold. The node's weak link parameter is greater than or equal to the yellow color threshold, yet less than the green color threshold. The node's weak link parameter is less than the yellow color threshold.

The standard (non-phased) node color in the Workspace View.

A phased node will display as a hatched block in the Workspace View.

Event Colors

Image

Status
Condition
Up

State
Success

Description
Event has fired successfully (random draw was less than or equal to the event's p-value).

Up

Armed

A phased event that has not yet been fired.

Down

Failed

Event has fired unsuccessfully (random draw was greater than the event's pvalue).

Appendix D

D-6

Image

Status
Phase
Linked

State
Success

Description
Event is linked and the localized path is by definition good. Event cannot fire but maintains its previous state.

Linked

Armed

Event is linked and the localized path is by definition good. Event cannot fire but maintains its previous state.

Linked

Failed

Event is linked and the localized path is by definition good. Event cannot fire but maintains its previous state.

Cut

Success

Event is cut and the localized path is by definition bad. Event cannot fire but maintains its previous state.

Cut

Armed

Event is cut and the localized path is by definition bad. Event cannot fire but maintains its previous state.

Cut

Failed

Event is cut and the localized path is by definition bad. Event cannot fire but maintains its previous state.

Appendix D

D-7

Image

Description
The event's weak link parameter is greater than or equal to the green color threshold.

The event's weak link parameter is greater than or equal to the yellow color threshold, yet less than the green color threshold.

The event's weak link parameter is less than the yellow color threshold.

The standard (non-phased) event color in the Workspace View.

A phased event will display as a hatched block in the Workspace View.

Appendix D

D-8

Hierarchy Colors
Image Status
Condition
Up

Class
Functioning

State
Good

Description
Hierarchy is operating with no loss of redundancy.

Up

Functioning

Degraded

Hierarchy is operating with some loss of redundancy.

Up

Reserved

Standby

Hierarchy is in standby.

Down

Constrained

Idle

Hierarchy is not operating because certain internal elements are idle.

Down

Scheduled

PM

Hierarchy is not operating because certain internal elements are undergoing preventive maintenance.

Down

Failed

Bad

Hierarchy is not operating because certain internal elements are failed or cut.

Appendix D

D-9

Image

Status
Phase
Linked

State
Good

Description
Hierarchy is linked and operating with no loss of redundancy.

Linked

Degraded

Hierarchy is linked and operating with some loss of redundancy.

Linked

Standby

Hierarchy is linked and in standby.

Linked

Idle

Hierarchy is linked and not operating because certain internal elements are idle.

Linked

PM

Hierarchy is linked and not operating because certain internal elements are undergoing preventive maintenance.

Linked

Bad

Hierarchy is linked and not operating because certain internal elements are failed or cut.

Appendix D

D-10

Image

Status
Phase
Cut

State
Good

Description
Hierarchy is cut and operating with no loss of redundancy.

Cut

Degraded

Hierarchy is cut and operating with some loss of redundancy.

Cut

Standby

Hierarchy is cut and in standby.

Cut

Idle

Hierarchy is cut and not operating because certain internal elements are idle.

Cut

PM

Hierarchy is cut and not operating because certain internal elements are undergoing preventive maintenance.

Cut

Bad

Hierarchy is cut and not operating because certain internal elements are failed or cut.

Appendix D

D-11

Image

Description
The hierarchy's weak link parameter is greater than or equal to the green color threshold.

The hierarchy's weak link parameter is greater than or equal to the yellow color threshold, yet less than the green color threshold.

The hierarchy's weak link parameter is less than the yellow color threshold.

The standard (non-phased) hierarchy color in the Workspace View.

A phased hierarchy will display as a hatched block in the Workspace View.

Appendix D

D-12

Hierarchy DSI Colors

Image

Status
Condition
Up

Class
Functioning

State
Good

Description
The hierarchy displaying this DSI and all internal hierarchies are up, in a non-degraded state.

Up

Functioning

Degraded

The hierarchy displaying this DSI and all internal hierarchies are up. However, at least one is in a degraded state. The hierarchy displaying this DSI and all internal hierarchies are up. However, at least one is in a standby state.

Up

Reserved

Standby

Down

Constrained

Idle

Either the hierarchy displaying this DSI or at least one of the internal hierarchies is idle.

Down

Scheduled

PM

Either the hierarchy displaying this DSI or at least one of the internal hierarchies is down due to preventive maintenance.

Down

Failed

Bad

Either the hierarchy displaying this DSI or at least one of the internal hierarchies is down.

N/A

N/A

N/A

The hierarchy displaying this DSI is cut. See the Hierarchy Colors section for more information. This is also the color of the DSI in the Workspace View.

N/A

N/A

N/A

The hierarchy displaying this DSI is linked. See the Hierarchy Colors section for more information.

Appendix D

D-13

Marker Colors

Image

Status
Condition
N/A

Class
N/A

State
N/A

Description
Start marker. This marker is black in all views.

N/A

N/A

N/A

End marker. This marker is black in all views.

N/A

N/A

N/A

Hierarchy In marker (All views).

N/A

N/A

N/A

Hierarchy Out marker (Workspace View).

Up

Functioning

Good

Hierarchy is operating with no loss of redundancy.

Up

Functioning

Degraded Hierarchy is operating with some loss of redundancy.

Up

Reserved

Standby

Hierarchy is in standby.

Down

Constrained

Idle

Hierarchy is not operating because certain internal elements are idle. Hierarchy is not operating because certain internal elements are undergoing preventive maintenance. Hierarchy is not operating because certain internal elements are failed or cut.

Down

Scheduled

PM

Down

Failed

Bad

Appendix D

D-14

Link Colors
Image Status
Condition
Up

Class
Functioning

State
Good

Description
Path is functioning properly. W hen capacity analysis is implemented, the link is carrying no amount of flow. (Also link W orkspace color)

Up

Reserved

Standby

At least one element in the string is in a cold standby state. All others are functioning or in standby.

Down

Constrained

Idle

Link is down because elements within its string are down due to dependency.

Down

Constrained

Switching

Link is down because standby elements within its string are switching from a primary to an alternate.

Down

Scheduled

PM

Link is down because elements within its string are down due to preventive maintenance.

Down

Failed

Bad

Link is down because elements within its string have failed or have been cut.

System Colors

Image

Status
Condition
Up

Class

Description

Fully The system is completely functional; no elements are down. Functional

Up

Degraded The system is operating with some loss of redundancy.

Down

Failed

The system has an element or combination of elements that resulted in a system downing event.

Appendix D

D-15

System Status Indicators

Image
Aircraft

Fully Functional

Degraded

Failed

Artillery

Bull's Eye

Circuit Card

Computer

Equalizer

Helicopter

Meter

Missile

Appendix D

D-16

Image
Network

Fully Functional

Degraded

Failed

Radio

Radome

Satellite

Ship

Stoplight

Tank

Train

Truck

Appendix D

D-17

Status Diagrams Block


Element E lement

Block Statuses

Condition

Up

Down

Class

Functioning

Reserved

Constrained

Scheduled

Failed (Induced)

State

Running
Nominal Under-stressed Over-stressed

Standby

Idle

PM

PM-Hold

Hold

Repairing

Done

Basic Color Alternate colors

Nominal Under-stressed Over-stressed

Node
Element

Node Statuses

Condition

Up

Down

Class

Functioning

Reserved

Constrained

Scheduled

Failed

State

Good

Degraded

Standby

Idle

PM

Bad

Color

j+s = n

k j+s < n

j+s > k > j

j+s+i k > j+s

j+s+i+p k > j+s+i

j<k

k = the number of good paths required n = the number of total paths j = the number of good paths currently available s = the number of standby paths i = the number of idle paths p = the number of PM paths

Appendix D

D-18

Event
Element

Event Statuses

Condition

Up

Down

State

Success

Armed

Failed

Color

R pvalue

R0

R > pvalue

Where R is uniform real random number between zero and one

Hierarchy
Element

Hierarchy Statuses

Condition

Up

Down

Class

Functioning

Reserved

Constrained

Scheduled

Failed

State

Good

Degraded

Standby

Idle

PM

Bad

Color

Appendix D

D-19

Link
Element

Link Statuses

Condition

Up

Down

Class

Functioning

Reserved

Constrained

Scheduled

Failed

State

Good

Standby

Idle

Switching

PM

Bad

System
Element

System Status

Condition

Up

Down

Class

Functioning

Degraded

Failed

State

Mission

Non-Mission

Mission

Non-Mission

Mission

Non-Mission

Appendix D

D-20

Appendix E
Elemental
1. 2. 3. 4. 5. 6. 7. 8. 9.

Raptor Rules

RBDs must have at least one block or event to begin a simulation. RBDs can be saved without links, but cannot be simulated. Blocks can only possess one inbound link. Blocks can only possess one outbound link. Events can only possess one inbound link. Events can only possess one outbound link. Hierarchies can only possess one inbound link. Hierarchies can only possess one outbound link. A link cannot connect into the start marker or an in marker.

10. Only one link can connect out of the start marker or an in marker. 11. Only one link can connect into the end marker or an out marker. 12. A link cannot connect out of the end marker or an out marker. 13. Any number of links can connect into a connect node. 14. Any number of links can connect out of a connect node.

Distributional
1. When the Extreme Value, Laplace or Normal distributions are used, it is possible to obtain a negative number for a failure or repair time. When this occurs, a warning message is displayed stating that a negative random number has been modified to 0.000001. 2. If a failure occurs and repairs immediately, it is still consider a failure.

Appendix E

E-1

Logistics
1. If a block with a pre-logistic delay time fails and needs to order a spare, a spare will be ordered at the same time its logistics delay time begins. A block will request a spare once its pre-logistics delay time has been exhausted. 2. If a block requires two or more resources and only one is available, a block will acquire the available resource and continue to wait for additional resources. If another block fails or enters preventive maintenance during this waiting period and only requires one resource, it will go into a hold status and therefore cannot use the resource being held by the first block. Resources are assigned in a "first asked first gets" priority scheme. 3. The blocks request for resources does not go into the queue until the block has obtained its spare. 4. If a block has used resources for its repair, and then it has a post-logistic delay time, the resources will be released at the completion of the hands-on repair. 5. Logistics delay time does not apply to preventive maintenance actions, only unscheduled maintenance actions. 6. If a spare pool (or custom sparing) is set to use stock level ordering, and the initial stock pile is less than the stock level ordering level, spares will not be ordered. Stock level ordering places its order when and only when the number of spares is reduced to exactly the stock level order level.

Cost
1. The initial cost of a block is accrued at time zero of a simulation.

2. A block using either the custom or pooled sparing replacement strategy will be charged at the beginning of a simulation for each spare of their respective stockpiles. 3. If the infinite sparing replacement strategy is selected for a block, a charge for the initial stockpile is not assessed. 4. A charge for a new spare occurs when ordered from a block using either the infinite, custom or pooled sparing replacement strategy. 5. Cost for spares that arrive at regular intervals is accrued when the spares arrive.

Appendix E

E-2

6. Cost for spares that arrive via stock level ordering or as an emergency order, are accrued at the time the order was placed. 7. A block being linked or cut has no affect on the costs accumulated by that block. 8. A disposal or rebate cost is assessed when a block has permanently failed. The user can specify that the disposal or rebate costs for all blocks are assessed at the end of a simulation whether a particular block has permanently failed or not. 9. Partial or pro-rated costs are assessed at the end of a simulation for all possible block statuses. For example, if a block is partially through a repair when a simulation trial terminated, only the partial repair cost will be assessed. 10. Any fixed costs associated with repair or preventive maintenance are assessed at the point at which maintenance begins.

Phasing
1. If a phase change is due to occur exactly at the end of a simulation, a simulation will terminate prior to that phase change. 2. The k-value for a node can be set to zero for any phased node. This situation creates a maintenance drain. 3. The random numbers associated with the phase lengths are drawn from the ancillary number stream. 4. For the purposes of dependence, cut and linked have the affect of failed and operating, respectively. If a block is dependent upon a block that is cut, it will enter its dependency state. Conversely, if a block is dependent upon a block that is linked, and the linked block fails and enters repair, the dependent block will not enter its dependency state.

Growth and Decay


1. If decay is implemented without a limit specified for the lower bound, a limit of 0.000001 is imposed. 2. If growth is implemented without a limit specified for the upper bound, a limit of 999,999,999.999999 is imposed.

Appendix E

E-3

Standby
1. If all blocks within a standby structure have the same priority, then the order the blocks were placed within the Workspace will determine which blocks are primaries and which are alternates at the start of a simulation trial. 2. Automatic switchover is always attempted before a block's manual switchover time is implemented. 3. Automatic switchover with a probability less than one will acquire a random number from the ancillary stream to determine if the switchover is successful. 4. If automatic switchover fails, and the path does not have manual switchover, the switch is assumed permanently failed and the path will be failed (red) for the remainder of the trial, regardless of the condition of the block. If automatic switchover fails and the path does have manual switching, then once a manual switch has occurred the automatic switch will be reset. 5. The stress on a block in warm or hot standby is the standby stress only. Phase stress and growth decay stress do not affect the time to failure.

Capacity
1. If a node has several outbound paths with the same priority and the Use Any Available Path checkbox is deselected, the flow amount is distributed evenly among the available paths. 2. If the "Use Any Available Path" option is checked for directing outbound flow through a node, then flow is not divided evenly among outbound paths but sent down paths that can handle the flow. If capacity information is not relevant through a portion of an RBD, this option is preferred since the algorithm that distributes flow is slower than the use any available path algorithm.

Random Start-ups
1. Blocks that start down will obtain spares or resources prior to beginning their repairs. If blocks share resources or spares, some blocks may start a simulation in hold status if sufficient logistics are not available.

Appendix E

E-4

2. If a block starts a simulation trial with a specified number of hours completed that exceed a block's failure distribution maximum, then that block will fail at simulation time 0.000001.

Appendix E

E-5

3. If a block starts a simulation trial with a specified number of hours completed that is near the extreme right edge of a block's failure distribution, then that block will fail at simulation time 0.000001 if an appropriate time to failure cannot be determined. One hundred random number attempts will be made to determine an appropriate failure time before the default failure time of 0.000001 is implemented. 4. If a block starts a simulation trial in one of three random conditions (i.e., random up, random down, or completely random), two random numbers are immediately used from a block's designated random number stream to determine its starting conditions.

Preventive Maintenance
1. Triggered preventive maintenance that occurs while a block is repairing is assumed to be accomplished while the repair is occurring with no additional time added. 2. The time to preventive maintenance is unaffected by any pi factors such as operating stress, standby stress, or block growth/decay. 3. If a blocks preventive maintenance comes due during non-mission time, but the block cannot start the maintenance due to lack of a spare or resource, the block goes to preventive maintenance hold status. This initiates the preventive maintenance cycle, which then takes priority and will be completed. Even if the block is set to have its preventive maintenance deferred during a mission phase and a mission phase begins, the block will not interrupt the PM cycle and will continue in PM hold and PM until the maintenance is complete. 4. Triggers draw their random numbers from the ancillary stream.

Appendix E

E-6

Appendix F
System-level Parameters
Operational Availability (Ao)

Raptor Definitions

AO =

Uptime Fully Functionin g + Degraded Green +Yellow = = Total Time Total Time Green+Yellow + R ed

Mean Time Between Downing Events (MTBDE)


Uptime Green +Yellow = # of Downing Events # of System Red Events

MTBDE =

Mean Down Time (MDT)


Downtime Red = # of Downing Events # of System Red Events

MDT =

Dependability (Do)
Mission Uptime Mission Green + Mission Yellow = Mission Total Time Mission Green + Mission Yellow + Mission Red

DO =

Reliability (R)
# of missions completed without a system failure # of missions attempted

R=

Appendix F

F-1

Conditional Reliability (RC)


# of missions completed successfully when the system was up at the start of the mission # of missions attempted when the system was up at the start of the mission

RC =

Mean Time Between Maintenance (MTBM)


Uptime Green + Yellow = # of Maintenance Events # of Component Downing Events

MTBM =

Mean Time Between Maintenance Unscheduled (MTBMu)


Uptime Green + Yellow = # of Failure Maintenance Events # of Component Failures

MTBMu =

Mean Time Between Maintenance Scheduled (MTBMs)


Uptime Green + Yellow = # of Preventive Maintenance Events # of Component Preventive Mai ntenance Events

MTBMs =

Mean Maintenance Time (MMT)


Total Mai ntenance Time # of Mai ntenance Events

MMT =

Mean Maintenance Time Unscheduled (MMTu)


Total Unscheduled Mai ntenance Time # of Unscheduled Mai ntenance Events

MMTu =

Appendix F

F-2

Mean Maintenance Time Scheduled (MMTs)


Total P reventive Mai ntenance Time # of P reventive Mai ntenance Events

MMTs =

Note: Each of these parameters is calculated at the end of each run. For simulations with multiple runs, the lowest observed value for each of these parameters is denoted as the minimum. The highest value observed across the multiple trials is denoted as the maximum. The standard deviation of the values of each parameter is calculated using the equation for population standard deviation, where n denotes the number of runs.

population st andard deviation = =

n i =1

( X i X )2

n1

From the standard deviation, the standard error of the mean is calculated.
SEM =

Weak Link Analysis Parameters


Node Availability ( An )
Good + Degraded + Cold (Good + Degraded + Cold ) + ( Idle + P reventive Mai ntenance + Bad )

An =

Uptime Uptime + Downtime

Green + Yellow + Blue (Green + Yellow + Blue ) + ( Brown + Orange + Red )

Appendix F

F-3

Node Dependability ( Dn )
Good + Degraded (Good + Degraded ) + Down

Dn

P rincipal Uptime P rincipal Uptime + P rincipal Downtime

Green + Yellow (Green + Yellow ) + Red

Node Reliability ( Rn )

Rn

# of missions completed without a node failure # of missions attempted

Block Availability ( Ab )
Good + Cold (Good + Cold ) + ( Idle + P reventive Mai ntenance + Bad + Done )

Ab =

Uptime Uptime + Downtime

Green + Blue (Green + Blue ) + ( Brown + Orange + Red + IndianR ed )

Block Dependability ( Db )

Db

P rincipal Uptime P rincipal Uptime + P rincipal Downtime

Good Good + ( Down + Done )

Green Green + ( Red + IndianR ed )

Appendix F

F-4

Block Reliability ( Rb )

Rb

# of missions completed without the block going down # of missions attempted

Event Availability ( Ae )
Success + Armed ( Success + Armed ) + Failure

Ae =

Uptime Uptime + Downtime

Green + LightBlue (Green + LightBlue ) + Red

Event Dependability ( De )

De

P rincipal Uptime P rincipal Uptime + P rincipal Downtime

Success Success + Failure

Green Green + Red

Event Reliability ( Re )

Re

# of missions completed without an event failure # of missions attempted

Appendix F

F-5

Hierarchy Availability ( Ah )
Good + Degraded + Cold (Good + Degraded + Cold ) + ( Idle + P reventive Mai ntenance + Bad )

Ah =

Uptime Uptime + Downtime

Green + Yellow + Blue (Green + Yellow + Blue ) + ( Brown + Orange + Red )

Hierarchy Dependability ( Dh )
Good + Degraded (Good + Degraded ) + Down

Dh

P rincipal Uptime P rincipal Uptime + P rincipal Downtime =

Green + Yellow (Green + Yellow ) + Red

Hierarchy Reliability ( Rh )

Rh

# of missions completed without a hierarchy failure # of missions attempted

Growth and Decay Formulas


Linear
new
= [( Slope # of failures ) + 1] base

Appendix F

F-6

Geometric
new
= ( Base # of
failures

) base

Asymptotic
new
= Limit + ( base Limit ) e ( rate # of
failures )

Capacity Formulas
Flow = substance gallons cars chlorine atoms messages > > > > time minute hour seconds nano - seconds

gallons cars messages Capacity = max(Flow ) > max > max > max minute hour second

Usage rate

Average Flow Average Capacity

Capability

Average Capacity Maximum Capacity

Appendix F

F-7