Foot Design (Amine Absorber) Rev.0
Foot Design (Amine Absorber) Rev.0
Foot Design (Amine Absorber) Rev.0
7/31/2013
(Amine Absorber)
OUTPUT SUMMARY
Proposed Footing Size d2 =
2.
2.1
4.876 m
LC
DESIGN DATA
Loading Data
qmax
qmin
5.47
O.K
7.12
O.K
3.09
OK
100%
9.96
O.K
0.79
OK
100%
6.65
O.K
2.65
OK
100%
6.01
O.K
3.98
OK
100%
LC
Fo
999.00
O.K
Item No.
Octagonal Footing
10.72
O.K
Service
3.95
O.K
9.58
O.K
32.07
O.K
Document
Comp Length
---
LC
Fs
---
999.00
O.K
25.90
O.K
10.97
O.K
23.14
O.K
77.47
O.K
Elevation
-
0.30
0.00
0.00
5% Addition
Equipment Weight
Erection weight : Dq
10.87
11.41
ton
19.72
20.70
ton
Test load : Wt
19.49
20.46
ton
5% Addition
Earthquake(operation) : Me
40.81
42.85
t-m
Wind : Mw
14.48
15.20
t-m
0.00
t-m
5% Addition
Earthquake(operation) : Eh
4.55
4.78
ton
Wind : W
1.93
2.02
ton
Dimensions
1066.00
mm
1168.30
mm
Anchor Bolt
0 carbon steel
44.45
mm
to edge of pedestal
267
mm
A.Bolt length
1345
mm
A.Bolt projection
410
mm
A.Bolt embedded : L
935
mm
Number of A.Bolts
nos
Material Strength
Rebar : fy
Concrete compressive strength: f'c
32.14 T-m
Weight (W)=
20.70 T
Shear (V)=
4.78 T
4,218
kg/cm2
281
kg/cm2
(33% Reduced)
Page : 1 of 9 --7/31/2013
7/31/2013
(Amine Absorber)
where M= Moment
12.486 T
0.597 T
f=
44.45 mm
L=
935 mm
W= Wt. Of equipment
D= BCD
a
fc,k=
2
27.59 N/mm
fb,d=
3
1.261 N/mm
fc,d=
4
55 N/mm
55.180 N/mm
fc,r=
4
248 N/mm
fy=
r=
50 mm
a=
150 mm
a=
0.67
2
1552.49 mm
A=
Nbolt=
23.55 T
Nbond=
39.42 T
23.55
OK
15.70
OK
Shape of pedestal :
Octagonal
Shape of Footing
Octagonal
d1
EL+
0.30 m
EL+
h3
0.00 m
h2
h4
hf
df
dw
h1
EL+
-2.00 m
d2
h1 =
0.91
Thickness of footing
h2 =
1.39
Height of pedestal
h3 =
0.30
Projection of pedestal
h4 =
1.09
Soil cover
hf =
2.30
Height of foundation
df =
2.00
dw =
0.00
d1 =
1.60
Diameter of pedestal
d2 =
4.88
Diameter of footing
~~~~~~~~~~~~~
>
L(A.bolt-emb.)+0.1m =
Weight of pedestal
7.07 ton
Weight of footing
43.18 ton
36.67 ton
Buoyancy
20.29 ton
86.92 ton
66.63 ton
1.035
1.6
Page : 2 of 9 --7/31/2013
7/31/2013
(Amine Absorber)
3.
STABILITY CHECK
(A) :
Wop + Dp
Operating condition
(B) :
Wop + Dp + W
(C) :
Wop + Dp + E
(D) :
Dq + Dp + W
Erection + wind
(E) :
Wt + Dp + W/3
Test condition
L/C
##
N (ton)
(A)
87.33 20.70
0.000
0.000
0.000
0.000
(B)
107.62 20.70
2.023
15.202
4.662
19.864
87.33 20.70
2.023
15.202
4.662
19.864
(C)
107.62 20.70
4.778
42.851
11.007
53.858
87.33 20.70
4.778
42.851
11.007
53.858
98.33 11.41
2.023
15.202
4.662
19.864
78.04 11.41
2.023
15.202
4.662
19.864
107.38 11.41
0.674
5.067
1.554
6.621
87.09 11.41
0.674
5.067
1.554
6.621
(D)
##
##
Mo(t-m)
0.000
##
##
H x hf(t-m)
0.000
##
##
M (t-m)
0.000
##
##
H (ton)
107.62 20.70
(E)
##
0.000
(1)
10.763 t/m2
14.31
t/m2
L/C (A)
e = Mo/N =
e/d2 =
0.00 m
0.000
k=
5.47 t/m2
(2)
10.763 t/m2
O.K
S.F : Fs = Hr/H
999.00
>
1.5
O.K
>
2.0
O.K
14.31479 t/m2
52.40 ton
999.00
L/C (B)
e/d2 =
0.18 m
0.038
k=
1.30
7.12 t/m2
<
3.09 t/m2
>
O.K
OK
212.91 t-m
S.F : Fo = Mr/Mo
10.72
52.40 ton
S.F : Fs = Hr/H
25.90
>
1.5
O.K
>
2.0
O.K
14.31479 t/m2
L/C (C)
e = Mo/N =
e/d2 =
0.50 m
0.103
k=
1.82
9.96 t/m2
<
0.79 t/m2
>
<
212.91 t-m
S.F : Fo = Mr/Mo
e = Mo/N =
(3)
1.00
O.K
OK
212.91 t-m
S.F : Fo = Mr/Mo
52.40 ton
3.95
S.F : Fs = Hr/H
10.97
>
1.5
O.K
>
2.0
O.K
Page : 3 of 9 --7/31/2013
7/31/2013
(Amine Absorber)
(4)
L/C (D)
e = Mo/N =
e/d2 =
0.20 m
0.041
k=
6.65 t/m2
<
2.65 t/m2
>
(5)
14.31479 t/m2
0
O.K
OK
190.26 t-m
S.F : Fo = Mr/Mo
46.82 ton
9.58
S.F : Fs = Hr/H
23.14
>
1.5
O.K
>
2.0
O.K
L/C (E)
e = Mo/N =
e/d2 =
0.06 m
0.013
k=
1.10
6.01 t/m2
<
14.31 t/m2
3.98 t/m2
>
1.33
O.K
OK
212.32 t-m
S.F : Fo = Mr/Mo
32.07
52.25 ton
S.F : Fs = Hr/H
77.47
>
1.5
O.K
>
2.0
O.K
Page : 4 of 9 --7/31/2013
7/31/2013
(Amine Absorber)
4.
DESIGN OF REINFORCEMENT
4.1
(A) :
1.4 (Wop + Dp )
(B1) :
(B2) :
(C1) :
1.1(1.2(Wop + Dp ) + 1.0E)
(C2) :
1.1(0.9(Wop + Dp ) + 1.0E)
(D) :
(E1) :
(E2) :
L/C
4.2
N (ton)
H (ton)
M (t-m)
H x hf(t-m)
Mo(t-m)
(A)
150.673
0.000
0.000
0.000
0.000
(B1)
129.148
2.630
19.762
6.060
25.823
(B2)
96.861
2.630
19.762
6.060
25.823
(C1)
142.063
5.255
47.136
12.108
59.244
(C2)
106.547
4.778
47.136
11.007
58.143
(D)
88.501
2.630
19.762
6.060
25.823
(E1)
150.335
0.000
0.000
0.000
0.000
(E2)
128.858
0.877
6.587
2.020
8.608
Nmax=
150.673
Footing Design
L/C
e/d2
N/A(t/m2)
qmax(t/m2)
qsd(t/m2)
0.000
0.000
1.00
7.65
7.65
7.65
7.65
(B1)
0.200
0.041
1.33
6.56
8.71
4.408
8.027
(B2)
0.267
0.055
1.44
4.92
7.07
2.768
6.387
(C1)
0.417
0.086
1.68
7.22
12.15
2.279
10.580
(C2)
0.546
0.112
1.90
5.41
10.26
0.567
8.714
(D)
0.292
0.060
1.48
4.50
6.65
2.343
5.962
(E1)
0.000
0.000
1.000
7.64
7.64
7.637
7.637
(E2)
0.067
0.014
1.110
6.55
7.26
5.828
7.034
qmax =
(2) Bending Moment for Bottom Rebar Design per One meter: Mu (t-m)
L/C
Xn(m)
qmax(t/m2)
q1(t/m2)
l =(d2-d1)/2
12.15
Mup(t-m) Mu(t-m)
7.65
(A)
4.876
7.65
7.65
1.638
10.268
8.03
(B1)
4.876
8.71
7.27
1.638
11.041
6.39
(B2)
4.876
7.07
5.63
1.638
8.841
10.58
(C1)
4.876
12.15
8.84
1.638
14.821
9.813
8.71
(C2)
4.876
10.26
7.00
1.638
12.306
5.96
(D)
4.876
6.65
5.20
1.638
8.272
7.64
(E1)
4.876
7.64
7.64
1.638
10.245
7.03
(E2)
4.876
7.26
6.78
1.638
9.528
4.519
Mumax =
qmin(t/m2)
(A)
2.19
1.95
4.1484
43.18
36.67
79.8492973
9.81 t-m/m
Page : 5 of 9 --7/31/2013
7/31/2013
(Amine Absorber)
Rebar size =
#6
Rebar pitch
Sectional area =
2.84 cm2
150 mm
a = As*fy / (0.85*f'c*b) =
d
Asmin
16.452
As=
18.93 cm2
3.34 cm
=
Design Strength Mn =
86.10 cm
As*fy(d-a/2) =
6068255 kg-cm
=
#6
Rebar pitch
150 mm
60.68 t-m
Sectional area =
q soil+footing =
4.15 t/m
MuM(top)
top ==
7.791 t-m
>
9.81 t-m
O.K
2.84 cm2
As
18.93 cm2
Rn =
1.17
Rho =
As(top) =
O.K
0.000277534
2.39 cm2/m
AsTemp =
16.45 cm2/m
Ast (max) =
16.45 cm2/m
Ast (pro.) =
18.93 cm2/m
0.777 in2/ft
>
16.45 cm2/m
O.K
Bottom
33
- #
150 mm
each way
Top
33
- #
150 mm
each way
Vpu =
38.88 ton
bo =
815.50 cm
alpha
1090389.58 kg
=
1090.39 ton
>
38.88 ton
a =
0.777
q1 =
10.58
Xn=
4.876
-2.88
=
=
If Vu > Vc :
Stirrup size =
#0
-111.60
Nos.
#N/A
ton
m
ton
91980
kg
91.98
ton
>
-2.88 ton
O.K
ton
Spacing = s = Av fy d / Vs =
1.00
Vc = 0.85 x 2 x f'c^0.5 bw d
O.K
shear plane
Vu=(qmax+q1)((d2-d1) / 2-d) - n Rd
20
@ every 2-bars
mm
Sec
area
(Av) =
#N/A
Total area
(Av) =
#N/A
cm2
Page : 6 of 9 --7/31/2013
7/31/2013
(Amine Absorber)
cm2
1.39 m
Dia. Of Footing = d2 =
4.88 m
h2 / d2
0.285 <
3.0
( Design as Pedestal )
54.73 inch
h = d2 ( inches )
191.98 inch
fc ' ( psi )
z = section modulus
4199892.47 lbs =
f Mn
17049376.11 lb-ft
Mu
0.000
Pu / f Pn
38.884 /
1333.605
= 0.029
Mu / f Mn
0 /
17049376.1
= 0.000
Pu / f Pn
Mu / S
Pu / Ag
18.344 T/m2
Mu / f Mn
5 f SQRT (fc') =
38.88 Tons
0 lb-ft
= 0.029 < =
OKIE
S= 0.1016 d^3
= 26.09 Psi
277085.6197 lbs
f Vn = 0.85 Vn =
106.84 Tons
2500 kg/cm2
284.60 Psi
1750.094 in2
1905.15 Tons
Pu
Ab
718864.82 in3
204592513.3 lb-in
.1016 d^3 =
4000.00 Psi
0.828 * (Base Plate OD )^2
Pn
fy (bolt) =
= 126 Tons
>
Vu
= 5.26 Tons
type:
OKIE
124.14 cm2
fy (bolt) / fy' * Ab =
73.58 cm2
Rebar arrangement
Rebar size =
#5
Sectional area
Total area
Required Number =
Ties
37
2.00 cm2
=
Pitch=
10 Nos @
74.0 cm2
>
73.58
128 mm
<
200
cm2
OK
143
Page : 7 of 9 --7/31/2013
7/31/2013
(Amine Absorber)
5.
BILL OF QUANTITY
5.1
Concrete
Structural concrete
Pedestal
2.95 m3
104.065 ft3
Footing
17.99 m3
635.510 ft3
Total
20.94 m3
739.575 ft3
1.1 m3
37.676 ft3
Leveling concrete
5.2
5.3
Mesh form
Pedestal
7.4 m2
79.293 ft2
Footing
14.8 m2
158.896 ft2
Anchor bolt
Type :
5.4
44 mm x
BCD =
1066 mm
Shuttering
0.828 * d2 x 4
=
Pedestal Perimeter "Pp"
16.149 m
5.299 m
17.387 ft
=
Shuttering Area for Pedestal
52.986 ft
0.828 * d1 x 4
=
Shuttering Area for Base Slab =
14.760 m2
158.896 ft2
5.5
nos
7.366 m2
79.293 ft2
Excavation
2 x 0.300 + d2
=
Bottom Width "Wb"
5.476 m
=
Bottom Area " A1 "
=
=
Volume of Excavation
=
=
17.967 ft
2 x 0.300 + d2
5.476 m
17.967 ft
Lb x Wb
29.986576 m2
322.804 ft2
A1 x df
59.973 m3
2118.242 ft3
=
=
Bitumen Coating
Pp x h4
5.755 m2
61.952 ft2
14.760 m2
0.828 x { d2 x d2 - d1 x d1 }
158.896 ft2
17.566 m2
189.101 ft2
38.082 m2
409.948 ft2
Page : 8 of 9 --7/31/2013
Octagonal Footing
Summary
5.25 Ft
1.00 Ft
TOG
4.56 Ft
7.56 Ft
3.00
-6.56 Ft
16.00 Ft
BCD
Slab Reinf
3.50 Ft
#6
#6
6 in
6 in
37 - # 5
Padestal Reinf
Anchor Bolts
#3
dia =
L=
Pj =
n=
Top
Vertical Bars
@
44.45
1345
410
8
Bot
6 in
mm
mm
mm
No's
Ties