Resume

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 9

TENGKU SYAAREE BIN TENGKU ABU BAKAR

Mobile: +6 013 9341761 PERSONAL DETAIL NRIC: Permanent Address: 850117-11-5401 Lot 108,Kampung Bukit Gasing, Seberang Marang, 21600 Marang,Terengganu Date & Place of Birth: Gender: Marital Status: Religion: Race: Citizenship: Age: PCN No. CSWIP Cert. No. CSWIP Cert No. NIOSH Oil & Gas Safety Passport No. International Passport No. OG004569N A22769699 17/01/1985 (Kuala Terengganu, Terengganu) Male Married Islam Melayu Malaysia 26 years old 303181 37596 (Visual Welding Inspectors 3.0) 49360 (Manual & Encoded Phased Array Ultrasonic Level 2) e-mail: [email protected]

HIGHEST EDUCATION: Foundation Course For HND In Engineering, Terengganu Advanced Technical Institute, TATI. (Final CGPA: 2.69) Higher National Diploma In Electrical and Electronics, Terengganu Advanced Technical Institute, TATI. (Final CGPA: 3.16)

TECHNICAL COURSE / TECHNICAL COURSE: PCN Level II in Dye Penentrant Testing (Ruane-TATI sdn.bhd, Kemaman, Terengganu). PCN Level II in Magnetic Particle Testing, (Ruane-TATI sdn.bhd, Kemaman, Terengganu). PCN Level II in Ultrasonic Testing, (Ruane-TATI sdn.bhd, Kemaman, Terengganu). CWISP 3.0 Visual Welding Inspectors, (TWI sdn.bhd, Sungai Buloh, Selangor). In-House Training Course for Phased Array Ultrasonic Testing (Harfang x32), conducted by SGS (M) sdn. Bhd. Confined Space Entry conducted by Shell Refining Company,(FOM) Bhd.

In-House Training for Phased Array Ultrasonic Testing using Sonatest Veo. Manual & Encoded Phased Array Ultrasonic Testing CWISP Level II, ( TWI Sdn. Bhd,Sungai Buloh,Selangor)

COMPUTER SKILLS Good knowledge and practical in Microsoft office. Good knowledge and practical in AutoCAD R14. Good knowledge and practical in Pro-Engineer. Good knowledge and practical in C++. Tomoview Software in Interpretion Phase Arrays.

OTHERS
Possess excellent verbal and written communication skills, Determine, dedicated, confident, and organized. Strong analytical mind, initiative and able to work independently. Able to interpret Engineering Drawing Language Proficiency Willing to travel Willing to Relocate Possess Own Transport Expected Monthly Salary International Passport B. Malaysia (Writing & Spoken) English (Writing & Spoken) : Yes : Will Considered : Yes : Negotiable : Yes

SUMMARY OF EXPERIENCE
Application and exercise of QA/QC and welding and NDT in fabrication, piping, structure, vessel, skid, refinery, power plant, onshore and engineering industries according to code & standard / specification applied, familiars and ability to used all ASME Code, API (1104, 510. 570 and 5L). Experience NDT in fabrication, piping, structure, vessel, skid, onshore before this I join PAUT and Tofd inspection in refinery, Power Plant Shell, Petronas Cari Gali and ExxonMobil Malaysia and have qualified with Phase Array Ultrasonic Testing (PAUT), familiar in PAUT Machine (Omniscan, harfang,Veo Sonatest) also have experience in TOFD Inspection, as a Long Range Guided Wave assistant. Ability to used all ASME Code and API (1104 and B31.3, A16).

STRENGTHS
Flexible and dedicated attitude, demonstrating the ability to communicate and relate comfortably with all level of people, active, well disciplined, quick leaner, able to work in-group and accomplish task systematically, able to work under pressure and willingness to work hard to achieve goals as well as to accept new challenges.

EMPLOYMENT HISTORY
1. Company Position Period : SGS Petrotechnical Inspection (M) Sdn Bhd : Engineering Inspector : March 2008 March 2011

Project During This Period: Project Owner Period Position Duties : Sand Monitoring Spool,3 1502 5 Run : IICORR ASIA Sdn. Bhd,Subang Jaya. : 14th March 2008 16th March 2008 : Engineering Inspector : Check/monitor and witness the hydrostatic test. (Third party Inspector), Hydrostatic test in KSB (DJ Yard), Witness pump alignment and other mechanical works,Come out with final report for final documentation and certificate of Hydrostatic Test a Spool, Check material and NDT, Line check and hydrotest. Project Owner Period Position Duties : Major Turn Around 2008 : SHELL Refining Company (FOM),Port Dickson : June 2008 July 2008 : Engineering Inspector : Carried out NDT task (DPI,MPI,UTTG,UT-Flaw & Visual Inspection) during turnaround. Prepare final documentation, summary and filling of reports accordance to client reporting and documentation system.

Project Owner Period Position Duties

: Storage tank Inspections : Petronas Dagangan Berhad,Prai,Penang Terminal. : August 2008 : NDT /Piping/Storage Tank Inspector : Tank settlement survey, Ultrasonic Thickness and Flow Roundness,Plumbness and calibration, Writing of report and also liaising with the client for any further requirement of inspections and come out the final document.

Project Owner Period Position Duties

: Turn Around 2008 : Petronas Gas Berhad (PGB), at GPP A, Terengganu. : September 2008 : NDT Inspector : Carried out DPI, UTTG, and UT-Flaw on requested. Prepared final document and report.

Project Owner Period Position Duties Project Owner Period Position Duties

: Flare Structure Inspections. : Titan PetroChemical, Pasir Gudang : September 2008 : NDT Inspector : Carried out UTTG on Flare profile structure and reporting. : Underwater Pipe With Sabah Govenrment Project (Spiral Pipe) : Pipe Technology System Sdn. Bhd. Bentong,Pahang. : November December 2008 : Advanced UT (TOFD) / Phased Array (PAUT) Assistant & NDT Inspector. : Assist carried out Ultrasonic Time Flight Diffraction (TOFD) and assist carried Phased Array (PAUT) for under seas pipes. also carried out UT-Flaw for cross check pipes based on API 1104 and reporting.

Project Owner Period Position Duties

: Side Shell Plate Of Tank Inspection. : Mammoet Salvage Marine Shipyard Linggi : January 2009 : NDT Inspector. : Perform UT-Flaw Detection on side shell plate of tank no. 3 (ship) Based on AWS D1.1 Code and reporting.

Owner Period Position Duties

: Terminal Sandakan, Malaysia : February 2009 : UT-Phased Array Assistant. : Assist to carried out UT-Phased Array on repaired 8 piping based on ASME B31.3 Code Case 181 and reporting.

Project Owner Period

: PSR-2 Revamp Project. : OGPP Sdn. Bhd. : 25 February 28 February 2009

Position Duties

: Third Party Inspector : As a Third Party Inspection, to review and witness Hydrotest for Heat Exchanger and trace piping line as per ASME VIII for Petronas Penapisan Melaka to updated in P & ID.

Project Owner Period Position Duties

: Preventives Maintenances,Corrosion Under Insulation (CUI) & Project. : Shell Refinery Company (FOM), Port Dickson : March November 2009 : Engineering Inspector and LRUT Assistant. : To perform Die Penentrant Inspection (DPI), Magnetic Particle Inspection (MPI), UTTG, UT-Flaw Detection and Visual at piping and equipment (Heat Exchanger, Column, Vesssel, Furnace and Tank) as per request by monthly schedule & client. find for identification prescription, corrosion loop description, prepare drawing and others related documentation for site visit purpose. Carried out UT C-scan, UT Grid and assist LRUT as per request by client. Seek insulation and scaffolding parties for respective purpose. Also carried out Ultrasonic Thickness Measurement on tank shell, roof, bottom plate and nozzle.

Project Owner Period Position Duties

: Visual Inspection per API 570 : Tanjung Langsat Port. : December 2009 : Phased Array & Piping Inspector Assistant. : Assist to scanning UT Phased Array on pipeline weld, condition pipieline as mark (Client). Assist Piping Inspector to perform visual inspection on piping as per API 570, evaluate UTTM Data, calculate piping remaining life as per API 570 and compiled reports.

Project Owner Period Position Duties

: Boom Lift Structure Inspection. : Mammoet Romstar Marine Shipyard Linggi. : December 2009 : NDT Inspectors. : To perform UT-Flaw Detection on boom lift structure as per AWS D1.1 Code and prepared reporting.

Project Owner Period Position Duties

: Riser Pipeline OD 21 Scanning. : Aker Kavinier PKFZ, Klang (Client DNV Singapore And Frontier). : January 2010 : Assistant PAUT Inspector. : Assist to scanning Riser Pipeline OD 21 at female and male weld joint and subsea riser product, final report comes out in image, Interpreted in Tomoview software, acceptance criteria B13 Code case 181 and 16A.

Project Owner Period Position Duties

: Economic Shutdown. : Shell Refinery Company (FOM), Port Dickson : February 2010 : NDT Inspectors. : Perform UT-Flaw, Magnetic Particle Inspection and Dye Penentrant Inspection at Chiller, Furnace (F-101A) and Piping. Prepared final reports.

Project Owner Period Position Duties

: New Pipelines Scanning. : ExxonMobil Borneo, Terminal Tawau, Sabah : March 2010 : PAUT & TOFD Inspectors. : Carried out Phased Array and Tofd on new 4 pipelines Based on ASME B31.3 Code Case 181 and prepared reporting.

Project Owner Period Position Duties

: Tank Annular Plates Due To Repairs. : Shell Timur, Terminal Labuan, Sabah. : March 2010 : PAUT Inspectors. : Perform Phased Array on Post-Repaired Annular Plates Tank No.1 based on API 650 and prepared reporting.

Owner Period Position Duties

: City Gas, Senoko : April 2010 : PAUT Inspectors Assistant. : Assist to carried out Phased Array on the spheres tank (T-joints with total 82 joints) based on Code Case 2235 and prepared final reporting.

Project Owner Period Position Duties Project Owner Period Position Duties

: Shut Down 2010 : KLK Oleomas Sdn. Bhd., Klang. : August 2010 : PAUT and TOFD Inspector. : To perform Phased Array Ultrasonic and Tofd testing on piping and prepared the final report. : Preventives Maintenances,Corrosion Under Insulation (CUI) & Project. : Shell Refinery Company (FOM), Port Dickson : April October 2010. : NDT Inspector and Visual Welding Inspector. : To perform Die Penentrant Inspection (DPI), Magnetic Particle Inspection (MPI), UTTG, UT-Flaw Detection and Visual at piping and equipment (Heat Exchanger, Column, Vessels, Furnace and Tank) as per request by monthly schedule & client. find for identification prescription, corrosion loop description, prepare drawing and others related documentation for site visit purpose. Carried out UT C-scan, UT Grid and assist LRUT as per request by client. Seek insulation and scaffolding parties for respective purpose. Also carried out Ultrasonic Thickness Measurement on tank shell, roof, bottom plate and nozzle. Visual the welding profile after welding was completed. And final report.

Project Owner Period Position Duties

: Phased Array On 6 stainless steel nozzle Of Heat Exchanger. : Shell Refinery Company (FOM), Port Dickson : October 2010 : Phased Array Inspectors and TOFD Asisstant. : To perform Phased Array and assist Tofd on 6 stainless steel nozzle via pad plate for very limited area scanning as per code CC 22359 and the coating.

Project Owner Period Position Duties

: Phased array On New Joint Of Annular Plates Tank No. 7. : Exxon Mobil Sdn. Bhd. Terminal Bagan Luar, Pulau Pinag : October 2010. : Phased Array Inspectors. : To perform phased array on 15 new joints of annular plates for tank no.7 during post repair as per API 650.

Project Owner Period Position

: Tank Inspection For Tank No. 3 : New Terminal Shell Sdn. Bhd. At WestPorts, Port Klang : 10 November 2010. : Phased Array Inspector.

Duties Project Owner Period Position Duties Project Owner Period Position Duties

: To perform corrosion mapping at bottom to shell plate using GE Phasor Xs equipment.


: Tank Inspection For Tank No. 2 : Terminal Shell Sdn. Bhd. At Bagan Luar, Pulau Pinang : 20 December 2010. : NDT Inspector. : To perform Dye Penetrant testing at shell plate joints and prepare final report. : Stainless Steel of Bracket Roof for Doha Airport. : Sumber Khazanah Sdn. Bhd. At Balakong, Selangor : 13 January 2011. : NDT Inspector. : To perform Dye Penetrant testing at fillet weld of stainless steel bracket and prepare final report.

Project Owner Period Position Duties

: 8 x 6 x 5 Pipe Line to Suction Pump. : ExxonMobil Terminal Sdn. Bhd. At Kuantan Port, Pahang. : 18 January 2011. : NDT Inspector. : To perform Dye Penetrant testing and UTTG at pipeline of suction pump and prepared final report : Tank Inspection For Tank No. 0310 : BASF Petronas Chemical Sdn. Bhd. At Kuatan Port, Pahang. : 20 January 2011. : NDT Inspector. : To perform UTTG at Roof, Bottom Plate and Nozzle of Stainless Steel Tank also perform Dye Penetrant testing at circumference joint Shell to Bottom and prepared final report. : Frame Beam Inspection. : Mammoet Romstar (M) Sdn. Bhd. : 9 February 2011. : NDT Inspector. : To perform the Magnetic Particle testing on 8 joint of beam frame and prepared the final report.

Project Owner Period Position Duties

Project Owner Period Position Duties

2.

Company Position

: Protection Rigging Access (Malaysia) Sdn. Bhd. : Advanced UT & NDT Inspector.

Period Duties

: March Present 2011 : To perform Advanced UT inspection (Phased Array/Tofd technician) and NDT inspection (DPI, MPI and UT) on piping, pressure vessel equipments etc.

REFERENCES: Mr. Mohd Faizal Anuar ( Lecturer Ruane-TATI sdn.bhd) Mr. Mohd Ramaeh Paul ( Lecturer Ruane-TATI sdn.bhd) Mr. Shahrul (Lecturer-TWI sdn. bhd.) Tengku Jamal Abdul Nassier ( Manager Jariz Technologies sdn.bhd) Mohd Asrul Bin Othman ( Advanced UT Inspector ) Shahrizan Shukor ( Advances UT Inspector) Muhammad Aizuddin Sulong ( Lead PAUT Inspector, SGS Sdn. Bhd. ) Hassan Kavarodi ( NDT Lecturer & Consultant, TWI Training & Cert. S.E Asia Sdn. Bhd. Sungai Buloh, Malaysia ) +6 013-9284547 +6019-9468993 +6 012-3373408 +6 0196061178 +6 03-78451155 +6 019-9214251 +6 017-7158108 +6 012-9093096

You might also like