0% found this document useful (0 votes)
270 views64 pages

53-Works & Services

This document provides a summary of the annual development programme for 2013-14 of the Works & Services Department of the provincial government. It lists ongoing and new schemes being undertaken in the sub-sectors of normal roads, strategic roads, buildings, and foreign aided projects. The total estimated cost, expenditure to date, allocation for 2013-14, and financial projections for future years are provided for each scheme. Major ongoing schemes include construction/improvement of provincial roads across various districts of Sindh. The document aims to outline the department's planned capital spending on infrastructure development for the financial year.

Uploaded by

mohammad_mohd_3
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
270 views64 pages

53-Works & Services

This document provides a summary of the annual development programme for 2013-14 of the Works & Services Department of the provincial government. It lists ongoing and new schemes being undertaken in the sub-sectors of normal roads, strategic roads, buildings, and foreign aided projects. The total estimated cost, expenditure to date, allocation for 2013-14, and financial projections for future years are provided for each scheme. Major ongoing schemes include construction/improvement of provincial roads across various districts of Sindh. The document aims to outline the department's planned capital spending on infrastructure development for the financial year.

Uploaded by

mohammad_mohd_3
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 64

{290}

SUMMARY
WORKS & SERVICES DEPARTMENT
ANNUAL DEVELOPMENT PROGRAMME 2013-14
(Rs. In million)
Sr
No.

Sub-Sector

ThrowNo. of
forward as
Schemes
on 01.07.13
3

On-Going

New

Capital

Revenue

Total

No. of
Schemes

Capital

Revenue

10

Total
Total

No. of
Schemes

Capital

Revenue

Total

11

12

13

14

15

FPA

16

Grand
Total
(15+16)
17

Financial Projection
2014-15

2015-16

18

19

Works & Services Department


A)

Normal Roads

General

10762.290

26

2391.333

0.000

2391.333

100.000

0.000

100.000

27

2491.333

0.000

2491.333

0.000

2491.333

4218.203

3878.252

Improvement

20742.323

161

2846.060

0.000

2846.060

91

1441.645

15.000

1456.645

252

4287.705

15.000

4302.705

0.000

4302.705

9363.748

7777.239

Construction

19172.159

210

2488.995

0.000

2488.995

226

1906.049

0.000

1906.049

436

4395.044

0.000

4395.044

0.000

4395.044

9501.924

4421.097

Bridges

1458.123

296.264

0.000

296.264

50.000

0.000

50.000

346.264

0.000

346.264

0.000

346.264

595.562

595.562

52134.894

405

8022.652

0.000

8022.652

319

3497.694

15.000

3512.694

Total Normal Roads

724

11520.346

15.000 11535.346

0.000 11535.346 23679.437 16672.151

B)

Strategic Roads

Improvement

421.253

29.000

0.000

29.000

0.000

0.000

0.000

29.000

0.000

29.000

0.000

29.000

196.127

196.127

Construction

9857.839

20

535.589

0.000

535.589

31.430

0.000

31.430

23

567.019

0.000

567.019

0.000

567.019

4679.848

4610.972

Total Strategic Roads

10279.092

22

564.589

0.000

564.589

31.430

0.000

31.430

25

596.019

0.000

596.019

0.000

596.019

4875.975

4807.099

Foreign Aided Project

1790.320

1268.635

0.000

1268.635

0.000

0.000

0.000

1268.635

0.000

1268.635

8860.948 10129.583

2051.024

0.000

1790.320

1268.635

0.000

1268.635

0.000

1268.635

8860.948 10129.583

2051.024

0.000

64204.306

431

9855.876

0.000

9855.876

322

C)

Total Foreign Aided Projects


Total Roads & Bridges:-

0.000

0.000

0.000

3529.124

15.000

3544.124

1268.635

753

13385.000

15.000 13400.000 8860.948

22260.948 30606.436 21479.249

D)

Buildings

Govt. Servants Housing

451.644

54.933

0.000

54.933

20.000

0.000

20.000

74.933

0.000

74.933

0.000

74.933

376.711

0.000

Govt. Offices & Bldgs.

344.405

19.067

0.000

19.067

40.000

0.000

40.000

59.067

0.000

59.067

0.000

59.067

285.338

0.000

Total Buildings

796.049

74.000

0.000

74.000

60.000

0.000

60.000

10

134.000

0.000

134.000

0.000

134.000

662.049

0.000

9929.876

0.000

9929.876

3589.124

15.000

3604.124

763

13519.000

Total W&Services Deptt:-

65000.355

436

327

15.000 13534.000

8860.948 22394.948 31268.485 21479.249

{291}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Target Date
for
Completion
5

Approved
09.05.09

584.750

372.422

33.142

0.000

405.564

179.186

50.000

0.000

50.000

0.000

69

78

129.186

0.000

Approved
18.02.09

2013-14

288.210

266.666

5.386

0.000

272.052

16.158

16.158

0.000

16.158

0.000

94

100

0.000

0.000

Approved
09.05.09

2014-15

507.624

334.600

50.000

0.000

384.600

123.024

72.810

0.000

72.810

0.000

76

90

50.214

0.000

Approved
23.12.06

2015-16

1305.395

717.369

43.500

0.000

760.869

544.526

50.000

0.000

50.000

0.000

58

62

247.263

247.263

Block Scheme for Construction of


Lower Sindh Approved
Rural Access Road in Lower Sindh 260
05.06.08
Kms.
1689 Construction/Improvement of Provincial Lower Sindh Approved
roads in Sindh (Lower Sindh) 200Kms.
18.02.09

2015-16

1462.220

1077.318

10.000

0.000

1087.318

374.902

80.000

0.000

80.000

0.000

74

80

147.451

147.451

2013-14

1141.920

976.541

9.374

0.000

985.915

156.005

156.005

0.000

156.005

0.000

86

100

0.000

0.000

1690

2014-15

615.511

324.960

60.000

0.000

384.960

230.551

70.000

0.000

70.000

0.000

63

74

160.551

0.000

2013-14

548.352

484.642

31.855

0.000

516.497

31.855

31.855

0.000

31.855

0.000

94

100

0.000

0.000

2013-14

492.173

452.036

13.535

0.000

465.571

26.602

26.602

0.000

26.602

0.000

95

100

0.000

0.000

2015-16

564.200

282.496

40.000

0.000

322.496

241.704

50.000

0.000

50.000

0.000

57

66

95.852

95.852

2013-14

401.520

384.445

4.278

0.000

388.723

12.797

12.797

0.000

12.797

0.000

97

100

0.000

0.000

2013-14

1088.268

805.685

20.000

0.000

825.685

262.583

262.583

0.000

262.583

0.000

76

100

0.000

0.000

2013-14

1633.000

1269.992

42.058

0.000

1312.050

320.950

320.950

0.000

320.950

0.000

80

100

0.000

0.000

Estimated
Cost

Est. Exp.
upto
June' 13
10

Throwfwd
as on
01-07-13
11

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19

2014-15

Status
Date of
Approval
4

Allocation for
2013-14
Capital Revenue
Total
12
13
14

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District
3

Revised
Allocation 2012-13
Total
F.P.A.
8
9

Actual
Exp. upto
Jun, 12
7

Gen.
Sr.
No.
1

FPA
15

WORK & SERVICES

General
(On-Going Schemes)
1684 Construction / Improvement of
S.B.A
Provincial roads in N'Shah District 80
Km
1685 Construction/Improvement of
Dadu
Provincial Roads in District Dadu &
Jamshoro (60.00 Km)
1686 Construction / Improvement of
Larkana
Provincial roads in District Larkana 80
Km
1687 Construction of road network for better Lower Sindh
Rural access by Provincial Government
in Lower Sindh 250.0 Kms.
1688

Improvement / Re-alignment of curves


of existing roads
1691 Cosnturction of Various Roads Under
CM Directive 98 Kms

Sindh
Sindh

Approved
16.03.2009
Approved
09.05.2009

1692 Construction of Various roads in Sindh


Sindh
Approved
90.0 Kms
24.12.2009
1693 Emergent restoration of damaged roads
Sindh
Approved
& bridges in Sindh
19.03.09
1694 Construction of rural access road in
Upper Sindh Approved
upper sindh region (100 kms).
25.06.2005
1695 Block Allocation of Construction of road Upper Sindh Approved
network for better rural access by
06.08.2007
Provincial Government in Upper Sindh
250.0 Kms.
1696 Block Schem for constrruction of Rural Upper Sindh Approved
Access Road in Upper Sindh 312 Kms
09.08.12
(Rev).

{292}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Location of
Status
Target Date
Gen.
Sector / Sub-sector /
Scheme/
Date of
for
Sr.
Name of Scheme
District
Approval Completion
No.
2
3
4
5
1
1697 Construction/Improvement of Provincial Upper Sindh Approved
2013-14
roads in Sindh(Upper Sindh) 200Kms.
3.3.2009
1698 Construction of various roads proposed
by MPA's of District Mirpurkhas and
Umerkot (MPA program)

6
1057.165

Actual
Exp. upto
Jun, 12
7
1020.918

Estimated
Cost

Revised
Allocation 2012-13
Total
F.P.A.
8
9
9.061
0.000

Est. Exp.
upto
June' 13
10
1029.979

Throwfwd
as on
01-07-13
11
27.186

Allocation for
2013-14
Capital Revenue
Total
12
13
14
27.186
0.000
27.186

FPA
15
0.000

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
97
100
0.000
0.000

Mirpurkhas

Approved
3.5.12

2015-16

182.275

0.000

62.210

0.000

62.210

120.065

8.000

0.000

8.000

0.000

34

39

56.033

56.033

1699 Construction of schemes proposed by


Dadu &
MPA's of District Dadu & Jamshoro
Jamshoro
(MPA program)
1700 Construction / reconstruction of various
S.B.A
roads in District Shaheed
Benazirabad(MPA program)
1701 Scheme proposed by MPA's of
Hyderabad
Hyderabad Division (MPA program)
1702 Construction of various roads in
Khairpur/ N'
District Khairpur @ N'Feroze (MPA
Feroze
Programme)
1703 Construction / Improvement of
Sukkur /
Provincial Roads in District Sukkur &
Ghotki
Ghotki (MPA Programme).
1704 Construction of various Roads in
Larkana /
District Larkana & Kambar @
Kambar
Shahdadkot (MPA Programme).
Shahdadkot
1705 Construction of various roads in District Shikarpur/
Shikarpur, Jacobabad & Kashmore @
Jacobabad/
Kandhkot (MPA Programme).
Kashmore

Approved
3.5.12

2015-16

130.065

0.000

7.500

0.000

7.500

122.565

15.000

0.000

15.000

0.000

17

53.783

53.783

Approved
3.5.12

2013-14

137.548

0.000

137.548

0.000

137.548

0.000

2.000

0.000

2.000

0.000

100

101

0.000

0.000

Approved
3.5.12
Approved
3.5.12

2015-16

88.748

0.000

37.500

0.000

37.500

51.248

10.000

0.000

10.000

0.000

42

54

20.624

20.624

2015-16

255.939

0.000

41.500

0.000

41.500

214.439

50.000

0.000

50.000

0.000

16

36

82.220

82.220

Approved
3.5.12

2015-16

117.001

0.000

7.500

0.000

7.500

109.501

50.000

0.000

50.000

0.000

49

29.751

29.751

Approved
3.5.12

2013-14

256.989

0.000

30.000

0.000

30.000

226.989

226.989

0.000

226.989

0.000

12

100

0.000

0.000

Approved
3.5.12

2015-16

158.918

0.000

37.500

0.000

37.500

121.418

32.398

0.000

32.398

0.000

24

44

44.510

44.510

1706 Scheme proposed by the MPA's of


Badin &
District Thatta & Badin (MPA
Thatta
program)
1707 Scheme proposed by the MPA's of
Sanghar
District Sanghar (MPA program)
1708 Block schemes for Missing / In-complete Upper Sindh
schemes Upper Sindh
1709 Block schemes for Missing / In-complete Lower Sindh
schemes Lower Sindh

Approved
3.5.12

2015-16

178.392

0.000

70.000

0.000

70.000

108.392

20.000

0.000

20.000

0.000

39

50

44.196

44.196

Approved
3.5.12
Approved

2015-16

85.483

0.000

50.000

0.000

50.000

35.483

10.000

0.000

10.000

0.000

58

70

12.742

12.742

2015-16

3309.760

1669.620

0.000

0.000

1669.620

1640.140

240.000

0.000

240.000

0.000

50

59

674.753

674.753

Approved

2015-16

5539.635

575.614

0.000

0.000

575.614

4964.021

500.000

0.000

500.000

0.000

10

22

2169.077

2169.077

22131.061

11015.324

853.447

0.000

11868.771

10262.290

2391.333

0.000

2391.333

0.000

4018.203

3678.252

Total General (On-Going)

{293}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Gen.
Sr.
No.
1

Sector / Sub-sector /
Name of Scheme
2

Location of
Scheme/
District
3

Status
Date of
Approval
4

Target Date
for
Completion
5

Sindh

UnApproved

2015-16

Revised
Allocation 2012-13
Total
F.P.A.
8
9

500.000

0.000

0.000

0.000

0.000

500.000

100.000

0.000

100.000

0.000

500.000
22631.061

0.000
11015.324

0.000
853.447

0.000
0.000

0.000
11868.771

500.000
10762.290

100.000
2491.333

0.000
0.000

100.000
2491.333

0.000
0.000

Estimated
Cost

Est. Exp.
upto
June' 13
10

Throwfwd
as on
01-07-13
11

Allocation for
2013-14
Capital Revenue
Total
12
13
14

Actual
Exp. upto
Jun, 12
7

FPA
15

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19

General
(New Schemes)
1710 Up-grading of (30 Nos.) Vulnerable Unmanned Level Crossing in Sindh
Total General (New)
Total General

20

200.000

200.000

200.000
4218.203

200.000
3878.252

Improvement
(On-Going Schemes)
1711 Widening / Reconditioning of Tando
Badin
Bago to Dehi Digri road mile 0/0-16/0
(25.76 kms).
1712 Improvement & WR of Talhar Tando
Badin
Bago Pangrio road mile 0/0-28/2 (45.48
Kms)
1713 W/R Khadan Nindo road mile 0/0-9/0
Badin
(15.00 Kms) (Phase -I)
1714 W/R Badin Khoski Wango road mile
Badin
9/0-27/4 (24 ft width with Asphalt Phase1.)
1715 Widening / Reconditioning of road from
Ghotki
Khanpur - Jarwar - Yaru Lund mile 0/017/0 = 17-0 (M) =27.37 Kms.Under
Revision
1716 Widening / Reconditioning to Daharki to
Ghotki
Raja Farm road Mile 0/0-16/2 = 16-2
(M) = 26.16 Kms. Under Revision
1717 Reconditioning of road from Ubaro,
Ghotki
Langho Noorshah road mile 0/0-11/7
(19.0 Kms)
1718 Improvement of Hyderabad Shaikh
Hyderabad
Bhirkio Gulab Leghari road mile 0/027/4 = 27 - 4 (M) = 44.27 Kms.
1719 Widening / Reconditioning of Dilmurad
Jacobabad
Railway Station to Manjihpur 0/0-14/0 =
14-0 (M) = 22.54 KMS.

Approved
19.02.2005

2013-14

86.215

91.500

3.536

0.000

95.036

-8.821

1.000

0.000

1.000

0.000

110

111

0.000

0.000

Approved
30.01.2008

2013-14

146.187

116.187

13.896

0.000

130.083

16.104

1.000

0.000

1.000

0.000

89

90

0.000

0.000

Approved
20.12.2008
Approved
13.02.2010

2013-14

99.755

92.000

7.755

0.000

99.755

0.000

2.000

0.000

2.000

0.000

100

102

0.000

0.000

2013-14

445.904

435.955

9.909

0.000

445.864

0.040

24.000

0.000

24.000

0.000

100

105

0.000

0.000

Approved
06.06.05

2013-14

88.134

99.490

0.000

0.000

99.490

-11.356

2.000

0.000

2.000

0.000

113

115

0.000

0.000

Approved
29.03.07

2013-14

105.794

83.774

5.505

0.000

89.279

16.515

16.515

0.000

16.515

0.000

84

100

0.000

0.000

Approved
02.02.10

2013-14

65.834

37.500

20.000

0.000

57.500

8.334

10.000

0.000

10.000

0.000

87

103

0.000

0.000

Approved
10.01.2005

2013-14

113.584

130.621

0.000

0.000

130.621

-17.037

0.050

0.000

0.050

0.000

115

115

0.000

0.000

Approved
01.04.2003

2013-14

59.079

57.300

1.779

0.000

59.079

0.000

1.000

0.000

1.000

0.000

100

102

0.000

0.000

1720 Widening / Reconditioning of Thull


Tangwani road mile 0/0-16/0 = 16-0 (M)
= 25.76 Kms.

ApprovedR
06.06.2005

2013-14

98.708

77.279

21.429

0.000

98.708

0.000

5.000

0.000

5.000

0.000

100

105

0.000

0.000

Jacobabad

{294}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Location of
Gen.
Sector / Sub-sector /
Scheme/
Sr.
Name of Scheme
District
No.
2
3
1
1721 Widening / Reconditioning of Hamayoon Jacobabad
Thull Byepass i/c link to Mian-jo-Goth
road mile 0/0-18/0 = 18-0 (M) = 28.98
Kms.
1722 Reconditioning of Kambar to Waggan
Kambar
road mile 0/0-7/0 i/c Construction of Bye Shahdadkot
pass road mile 0/0-8/0 = 24.25 KMs
1723 Widening / Reconditioning &
Construction of road from Kandhkot
Malguzar mile 0/0-14/0 = 14-0 (M) =
22.54 Kms.

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2013-14
06.06.2005

6
125.768

Actual
Exp. upto
Jun, 12
7
84.000

Estimated
Cost

Revised
Allocation 2012-13
Total
F.P.A.
8
9
41.768
0.000

Est. Exp.
upto
June' 13
10
125.768

Throwfwd
as on
01-07-13
11
0.000

Allocation for
2013-14
Capital Revenue
Total
12
13
14
1.000
0.000
1.000

15
0.000

FPA

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
100
101
0.000
0.000

Approved
31.12.2005

2013-14

160.198

125.131

8.766

0.000

133.897

26.301

26.301

0.000

26.301

0.000

84

100

0.000

0.000

Kashmore @ Approved
Kandhkot 25.11.2004

2013-14

105.798

105.798

0.000

0.000

105.798

0.000

1.000

0.000

1.000

0.000

100

101

0.000

0.000

1724 Widening / Reconditioning of road from


Kot Diji Tando Mastee up to new
National Highway Mile 0/0-8/6 = 8-6 (M)
= 14.08 Kms.

Khairpur

Approved
7.1.2008

2013-14

125.808

138.308

0.000

0.000

138.308

-12.500

0.500

0.000

0.500

0.000

110

110

0.000

0.000

1725 W/R of Road from Sobhodero to


Sagyoon mile 0/0-7/0 (11.26 kms).
1726 W/R of road Therhi Phatak to Kandhra
via Wari Goth mile 1/4-6/4 (10.4 Kms).

Khairpur

Approved
07.01.2008
Approved
16.01.10

2013-14

61.689

55.000

6.689

0.000

61.689

0.000

5.000

0.000

5.000

0.000

100

108

0.000

0.000

2013-14

76.621

59.509

17.112

0.000

76.621

0.000

5.000

0.000

5.000

0.000

100

107

0.000

0.000

1727 W/R of road from Gambat Agra upto


Razidero road mile 0/0-11/0.
1728 Widening & Reconditioning of Road
from Khuhra to Kamal Dero via Halluja
Bhattyoon Upto Razi Dero (18.0 Kms).

Khairpur

Approved
30.01.2008
Approved
06.08.07

2013-14

126.226

52.300

30.000

0.000

82.300

43.926

45.000

0.000

45.000

0.000

65

101

0.000

0.000

2013-14

36.009

14.750

15.000

0.000

29.750

6.259

8.000

0.000

8.000

0.000

83

105

0.000

0.000

1729 W/R of road from Saeedabad - Bakhar


Jamali Mile 0/0-9/3
1730 Widening / Reconditioning of Road from
Dalipota Station to village Baig
Mohammad Panhwar Road mile 0/0-1/7
(3.0 kms) Taluka Bhiria District
Naushaero Feroze.
1731 Widening / Reconditioning of road from
Saduja Phul-Masarji Wah upto Moro
Bandhi rod mile 0/0-19/0 = 19-0 (M) =
30.59 Kms.
1732 W/R of Road from Bhiria Padidan Road
to Mahram Khan Nagore via Samolabad
Road mile 0/0-4/0.

Matiari

Approved
08.01.08
Approved
27.07.12

2013-14

85.834

65.916

27.834

0.000

93.750

-7.916

2.000

0.000

2.000

0.000

109

112

0.000

0.000

2013-14

22.386

0.000

19.386

0.000

19.386

3.000

3.000

0.000

3.000

0.000

87

100

0.000

0.000

N. Feroze

Approved
06.06.06

2013-14

88.306

63.110

3.880

0.000

66.990

21.316

21.316

0.000

21.316

0.000

76

100

0.000

0.000

N. Feroze

Approved
23.01.12

2014-15

58.004

10.000

20.000

0.000

30.000

28.004

10.000

0.000

10.000

0.000

52

69

18.004

0.000

Khairpur

Khairpur

N. Feroze

{295}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Gen.
Sector / Sub-sector /
Sr.
Name of Scheme
No.
2
1
1733 Widening / Reconditioning Hala
Shahdadpur Sanghar with asphalt
surface Mile 0/0-43/1 = 43-1 = 69.58 Km

Location of
Scheme/
District
3
Sanghar

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2015-16
19.01.2007

6
700.133

Actual
Exp. upto
Jun, 12
7
106.810

Estimated
Cost

Revised
Allocation 2012-13
Total
F.P.A.
8
9
10.000
0.000

Est. Exp.
upto
June' 13
10
116.810

Throwfwd
as on
01-07-13
11
583.323

Allocation for
2013-14
Capital Revenue
Total
12
13
14
15.000
0.000
15.000

15
0.000

FPA

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
17
19
284.162
284.162

1734 Widening / Reconditioning Tando Adam


Sanghar
Shahdadpur Road Mile 0/0 - 11/0 = 110 = (M) = 17.71 Kms.
1735 Construction / Improvement of road
Shikarpur
from Ruk Garhiyaseen amrot new
Sharo Abro Mile 0/0-12/2 Kms. (Under
Rivision)
1736 W/R of road from Bhoosam to Ratodero- Shikarpur
Jacobabad road Mile 0/0-10/0 (16.09
Kms)
1737 Widening / Reconditioning of road from Shikarpur
RQC Highway (N-65) at Jehano to
Faizu Bungalow of Indus Highway (N55) mile 0/0-17/4 17-4 (M) = 28.17 Kms.

Approved
19.01.07

2013-14

168.275

100.768

16.876

0.000

117.644

50.631

35.000

0.000

35.000

0.000

70

91

0.000

0.000

Approved
14.07.08

2013-14

342.152

81.993

34.565

0.000

116.558

225.594

225.594

0.000

225.594

0.000

34

100

0.000

0.000

Approved
07.05.08

2013-14

80.110

65.047

15.063

0.000

80.110

0.000

5.000

0.000

5.000

0.000

100

106

0.000

0.000

Approved
12.06.04

2013-14

229.950

192.643

37.307

0.000

229.950

0.000

3.000

0.000

3.000

0.000

100

101

0.000

0.000

1738 W/R of road from Katch Phattak P.Akil


Sukkur
to Saeed Ali Indher via village illahi Bux
Mangi
(12.0 to
Kms)
1739 W/R
ofmile
road0/0-7/4
from Rohri
Shadi
Sukkur
Shaheed mile 0/4-18/5 (29.76 Kms).
1740 W/R of road from Rohri Arrore
Sukkur
Salehpat mile 0/0-17/0 with Asphalt
1741 W/R of road from Haleji MP Check Post
Sukkur
upto 3/3 MTTS and Watch Tower mile
0/0-19/2. (31 Kms)
1742 W/R of road from Bhillini to Shahpur
Sukkur
mile 0/0-8/0. (12.8 Kms).
1743 W/R of road from Dubar to Rohri Bye
Sukkur
pass via Panhwari Village mile 0/0-8/7
(14.28 Kms)
1744 Widening / Reconditioning Shaikh
T. Allahyar
Bhirkio Tando Allahyar via Bukera
Makan Sharif road mile 0/0-14/0 = 14 -0
(M) = 22.52 Kms.
1745 Reconditioning of road from
S.B.A
Benazirabad to Daur via 60th mile with
Asphalt mile 0/0-20/5 (33.20) (Asphalt
Surface).

Approved
06.12.08
Approved
12.03.09
Approved
12.03.09
Approved
31.03.09

2013-14

76.063

64.000

3.018

0.000

67.018

9.045

9.045

0.000

9.045

0.000

88

100

0.000

0.000

2014-15

342.281

218.200

26.250

0.000

244.450

97.831

65.000

0.000

65.000

0.000

71

90

32.831

0.000

2014-15

294.568

180.250

40.000

0.000

220.250

74.318

50.000

0.000

50.000

0.000

75

92

24.318

0.000

2014-15

252.557

115.790

45.500

0.000

161.290

91.267

20.000

0.000

20.000

0.000

64

72

71.267

0.000

Approved
12.03.09
Approved
12.03.09

2014-15

82.286

55.450

6.709

0.000

62.159

20.127

20.127

0.000

20.127

0.000

76

100

0.000

0.000

2013-14

88.321

80.200

8.121

0.000

88.321

0.000

10.000

0.000

10.000

0.000

100

111

0.000

0.000

Approved
06.06.05

2013-14

64.927

71.472

0.000

0.000

71.472

-6.545

1.000

0.000

1.000

0.000

110

112

0.000

0.000

Approved
02.08.11

2015-16

289.079

145.000

50.000

0.000

195.000

94.079

20.000

0.000

20.000

0.000

67

74

37.040

37.040

{296}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Location of
Gen.
Sector / Sub-sector /
Scheme/
Sr.
Name of Scheme
District
No.
2
3
1
1746 Reconditioning of Arab Machiraod at
S.B.A
mile 67/0 Hasseb Khan Gorchani via
Mohammad Ali Bhurgri mile 0/0-6/0
(1/2 Carpet).
1747 W/R of road from 60 mile to Packi
S.B.A
Choudagi via Buchehri road mile 0/010/3 (1 1/2 Carpet)..
1748 W/R of road from Jam Sahib Malook
S.B.A
Shar to Shahpur Chakar mile 0/0-11/0
(17.70 Kms).
1749 W/R of road from Jam Sahib to
S.B.A
Gupchani road mile 0/0-8/0 (12.87 Kms).

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2015-16
22.05.12

1750 W/R of Nawabshah to 68th mile Mori


mile 0/0-10/6 (17.30 Kms).
1751 Impt: of road from Mehar to Faridabad
mile 0/0-4/0 (6.40 Kms).
1752 Reconditioning of road from Baberloi
Piryaloi road to Hadi Bux Kalhoro via
Ghahno Kalhoro road UC Mahar Ali
road mile 0/0-2/7 (4.62 Kms).
1753 Reconditioning of Landhi Jam Kanda
road from Mazil Petrol Pump, N.H.way
Jam Kando Bin Qasim Town Karachi
mile 0/0-4/3 (7.0 Kms).
1754 W/R of road from Umerkot to Kunri
mile 0/0-21/2 (34.19 Kms)
1755 W/R of road from Kandiaro - Taharu
Shah via Derbelo.
1756 W/R of road from Tando Adam
Shahdadpur - Tando Adam Jhole via
villagers Altaf Hussain Rind road mile
0/0-4/0 (6.44 Kms).
1757 W/R of road from Nasarpur Bus Stop to
the Old Railway Phattak Tando
Allahyar mile 0/0-6/3 (10.25 Kms).
1758 Improvement of road from Al Noor
Sugar Mill to village Hubeeri road mile
0/0-17/5 (28. Kms) UC Shikarpur
Jabanyo, Khar Sawri Hubeeri
1759 Improvement of road from Manhoro
road to village Ghulam Muhammad
Punjabi road mile 0/0-8/1 (13.00 Kms)

6
85.865

Actual
Exp. upto
Jun, 12
7
0.000

Estimated
Cost

Revised
Allocation 2012-13
Total
F.P.A.
8
9
10.000
0.000

Est. Exp.
upto
June' 13
10
10.000

Throwfwd
as on
01-07-13
11
75.865

Allocation for
2013-14
Capital Revenue
Total
12
13
14
20.000
0.000
20.000

15
0.000

FPA

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
12
35
27.933
27.933

Approved
27.04.12

2015-16

171.956

75.000

27.000

0.000

102.000

69.956

15.000

0.000

15.000

0.000

59

68

27.478

27.478

Approved
20.08.04

2013-14

139.372

120.500

18.872

0.000

139.372

0.000

3.000

0.000

3.000

0.000

100

102

0.000

0.000

Approved
20.08.11

2013-14

101.357

86.194

10.163

0.000

96.357

5.000

5.000

0.000

5.000

0.000

95

100

0.000

0.000

Approved
20.08.11
Approved
21.02.11
Approved
12.04.11

2013-14

117.365

95.000

17.365

0.000

112.365

5.000

5.000

0.000

5.000

0.000

96

100

0.000

0.000

2013-14

32.745

12.000

4.436

0.000

16.436

16.309

16.309

0.000

16.309

0.000

50

100

0.000

0.000

2013-14

53.197

50.250

2.947

0.000

53.197

0.000

1.000

0.000

1.000

0.000

100

102

0.000

0.000

Karachi

Approved
08.03.11

2013-14

56.167

25.000

12.500

0.000

37.500

18.667

18.667

0.000

18.667

0.000

67

100

0.000

0.000

Umerkot

Approved
15.08.12
Approved
09.12.11
Approved
12.04.11

2015-16

263.832

0.000

30.000

0.000

30.000

233.832

30.000

0.000

30.000

0.000

11

23

101.916

101.916

2015-16

199.902

25.000

24.750

0.000

49.750

150.152

20.000

0.000

20.000

0.000

25

35

65.076

65.076

2013-14

45.497

34.990

10.000

0.000

44.990

0.507

3.500

0.000

3.500

0.000

99

107

0.000

0.000

T. Allahyar

Approved
16.01.12

2013-14

109.628

65.000

59.628

0.000

124.628

-15.000

1.500

0.000

1.500

0.000

114

115

0.000

0.000

S.B.A

Approved
25.05.11

2015-16

136.811

35.000

35.000

0.000

70.000

66.811

10.000

0.000

10.000

0.000

51

58

28.406

28.406

S.B.A

Approved
25.05.11

2014-15

59.670

15.000

20.000

0.000

35.000

24.670

10.000

0.000

10.000

0.000

59

75

14.670

0.000

S.B.A
Dadu
Khairpur

N. Feroze
Sanghar

{297}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Gen.
Sector / Sub-sector /
Sr.
Name of Scheme
No.
2
1
1760 Improvement of road from Sakrand
Mehrabpur road mile 0/0-9/0 (with
Asphalt concrete)
1761 Repair of link road from Moro Bandi to
village Rais Foto Khan Zardari via
Dunbeer road mile 0/0-3/1 (5.00 Kms)
1762 Reconditioning of road from Tando
Qaiser to Shaikh Bhirkio road via
Hussain Khan Thoro road mile 0/0-6/0
(9.66 Kms)
1763 Reconditioning of Halani Mehrabpur
Road
1764 Reconditioning of road from Malhia to
Mori and internal and Mori (4.00 Kms)

Location of
Scheme/
District
3
S.B.A

1765 W/R of road from Babarloi Mori to


Wada Machayoon (23.00 Kms)
1766 Reconditioning of road from Old
National Highway to Shah Warial and
connect to Osto Gahi and Jagi and
Shaikh (3.00 Kms).
1767 Reconditioning / Construction of road
from Old National Highway Phulpota
Pahore via Lashari (2.50 Kms).
1768 Reconditioning of road from Khan
Mohammad Unar to Punhal Khan
Chandio road mile 0/0-1/5. (2.61 Kms)
1769 Reconditioning of road from NH (04
mile stop) Sakrand Minor via Ismail
Khichi road mile 0/0-2/4
1770 Widening & Construction of road from
Chota Gate to Abdul Karim Gabol and
village Faiz Muhammad Gabol via Haji
Ali Bux Gabol village mile 0/0-3/6 (6.00
Kms)
1771 Improvement of road from Pir Patho to
Darwesh via Gail Mori road mile 0/02/0(3.22 Kms)
1772 W.R of road from 68th mile Mori to 3
Chak via wasni Bitt road mile 0/0-12/0
(19.30 Kms).

Khairpur

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2014-15
24.02.12

6
155.366

Actual
Exp. upto
Jun, 12
7
70.000

Estimated
Cost

Revised
Allocation 2012-13
Total
F.P.A.
8
9
12.000
0.000

Est. Exp.
upto
June' 13
10
82.000

Throwfwd
as on
01-07-13
11
73.366

Allocation for
2013-14
Capital Revenue
Total
12
13
14
35.000
0.000
35.000

FPA
15
0.000

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
53
75
38.366
0.000

N. Feroze

Approved
20.12.11

2013-14

20.635

3.318

7.500

0.000

10.818

9.817

9.817

0.000

9.817

0.000

52

100

0.000

0.000

Hyderabad

Approved
31.12.11

2013-14

46.141

19.425

20.000

0.000

39.425

6.716

6.716

0.000

6.716

0.000

85

100

0.000

0.000

N. Feroze

Approved
24.2.12
Approved
27.01.12

2013-14

74.245

41.043

20.000

0.000

61.043

13.202

18.000

0.000

18.000

0.000

82

106

0.000

0.000

2013-14

17.443

7.200

10.243

0.000

17.443

0.000

1.000

0.000

1.000

0.000

100

106

0.000

0.000

Approved
24.2.12
Approved
12.12.11

2015-16

396.321

41.400

75.425

0.000

116.825

279.496

25.000

0.000

25.000

0.000

29

36

127.248

127.248

2013-14

10.935

0.000

1.384

0.000

1.384

9.551

9.551

0.000

9.551

0.000

13

100

0.000

0.000

Approved
20.12.11

2013-14

18.891

4.500

11.841

0.000

16.341

2.550

4.000

0.000

4.000

0.000

87

108

0.000

0.000

S.B.A

ApprovedR
31.12.11

2013-14

15.396

5.481

7.000

0.000

12.481

2.915

2.915

0.000

2.915

0.000

81

100

0.000

0.000

S.B.A

Approved
05.03.12

2013-14

18.222

8.400

9.822

0.000

18.222

0.000

1.500

0.000

1.500

0.000

100

108

0.000

0.000

Karachi

Approved
20.12.11

2014-15

46.907

12.000

14.000

0.000

26.000

20.907

10.000

0.000

10.000

0.000

55

77

10.907

0.000

Thatta

Approved
17.10.11

2013-14

12.414

5.400

7.014

0.000

12.414

0.000

1.000

0.000

1.000

0.000

100

108

0.000

0.000

S.B.A

Approved
11.01.12

2015-16

205.243

46.817

22.500

0.000

69.317

135.926

20.000

0.000

20.000

0.000

34

44

57.963

57.963

Khairpur

Khairpur

Khairpur

{298}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Gen.
Sector / Sub-sector /
Sr.
Name of Scheme
No.
2
1
1773 W/R of road from Bandhi Shehzado
Dahri to connect ADB road via Chutto
Pitafi road mile 0/0-7/0 (11.26 Kms)

Location of
Scheme/
District
3
S.B.A

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2015-16
11.01.12

6
98.977

Actual
Exp. upto
Jun, 12
7
31.480

Estimated
Cost

Revised
Allocation 2012-13
Total
F.P.A.
8
9
14.166
0.000

Est. Exp.
upto
June' 13
10
45.646

Throwfwd
as on
01-07-13
11
53.331

Allocation for
2013-14
Capital Revenue
Total
12
13
14
9.530
0.000
9.530

15
0.000

FPA

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
46
56
21.901
21.901

1774 W/R of road from Doultpur to Pubjo


S.B.A
road mile 0/0-10/0 (16.10 Km).
1775 W/R of road from Kazi Ahmed Jamal
S.B.A
Shah road to Pubjo road mile 0/0-10/0
(16.10 Kms).
1776 W/R of road from Kazi Ahmed to
S.B.A
Protective Bund via Deran road mile 0/08/2 (13.27 Kms).
1777 W/R of road from Subzi Mundi via
S.B.A
Shakal Jamali to Gupchani road mile 0/015/0 (24.13 Kms)
1778 Reconditioning of road from Ranipur
Khairpur
Bozdar road to village Gul Muhammad
Jamro and Rangal Ali Jamro UC
Jhando Mashaikh (3.0 Kms)

Approved
11.01.12
Approved
11.01.12

2015-16

158.023

63.612

12.000

0.000

75.612

82.411

10.000

0.000

10.000

0.000

48

54

36.206

36.206

2015-16

163.099

73.612

15.000

0.000

88.612

74.487

10.000

0.000

10.000

0.000

54

60

32.244

32.244

Approved
11.01.12

2015-16

126.229

52.959

17.000

0.000

69.959

56.270

10.000

0.000

10.000

0.000

55

63

23.135

23.135

Approved
11.01.12

2015-16

180.448

72.028

20.000

0.000

92.028

88.420

10.000

0.000

10.000

0.000

51

57

39.210

39.210

Approved
11.01.12

2013-14

12.982

4.500

5.000

0.000

9.500

3.482

3.800

0.000

3.800

0.000

73

102

0.000

0.000

1779 Reconditioning of road from Shadi


Shaeed road to Goundro via Markhani
village (3.0 Kms)
1780 W/R of road from Salehpat to
Sikanderabad mile 0/0-25/2 (40.25 Kms)

Khairpur

Approved
12.12.11

2013-14

18.404

4.500

7.000

0.000

11.500

6.904

6.904

0.000

6.904

0.000

62

100

0.000

0.000

Sukkur

Approved
29.05.12

2015-16

714.587

20.000

50.000

0.000

70.000

644.587

50.000

0.000

50.000

0.000

10

17

297.294

297.294

1781 W/R of road from Ghulam Bund to


Sukkur
Dhandi Sangrar via Fakirabad mile 0/010/0 (16.00 Kms).
1782 W/R of road from Shaikh Bhirkio road
Hyderabad
to village Nanger Wassan mile 0/0-5/0
(8.0 Kms)
1783 Reconditioning of road from Jhanda
Khairpur
Shakh to jhango mile 0/0-4/0. (6.44 Kms)

Approved
24.02.12

2015-16

152.176

12.000

12.000

0.000

24.000

128.176

25.000

0.000

25.000

0.000

16

32

51.588

51.588

Approved
01.03.12

2015-16

68.902

3.150

6.000

0.000

9.150

59.752

10.000

0.000

10.000

0.000

13

28

24.876

24.876

Approved
28.1.12

2014-15

25.550

0.000

1.387

0.000

1.387

24.163

10.000

0.000

10.000

0.000

45

14.163

0.000

1784 W/R of National Highway Chandan


Escape to Oderolal Station via Deh Dari
Road 6/1-14/1
1785 Impr:/Rehabilitation of Road Dagaar
Hotel to Khar Nae Road Gadap Town
0/0-5/0 (8.05km)
1786 Reconditioning of road from Johi to
Wahi Pandhi mile 0/0-14/0 (22.54Kms)

Matiari

Approved
20.1.12

2015-16

215.257

14.250

7.500

0.000

21.750

193.507

30.000

0.000

30.000

0.000

10

24

81.754

81.754

Karachi

Approved
16.05.12

2015-16

64.694

18.000

9.000

0.000

27.000

37.694

8.000

0.000

8.000

0.000

42

54

14.847

14.847

Dadu

Approved
13.04.12

2015-16

189.909

13.905

17.000

0.000

30.905

159.004

15.000

0.000

15.000

0.000

16

24

72.002

72.002

{299}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Gen.
Sector / Sub-sector /
Sr.
Name of Scheme
No.
2
1
1787 W/R of road from Main Mirpurkhas Mirwah road to meet Mirwah - Kot
Ghulam Muhammad road via Mir
Khalid Landhi mile 0/0-17/0 (27.37).
1788 W/R of road from 60th Mile Mori to 72
mile road via 68th Mile road mile 0/012/0 (19.30 Kms)
1789 Reconditioning of Bhria Paddidan road
mile 0/0-8/0 (12.88 kms)
1790 Improvement of road from Moro to
New Jatoi (Phase - I) (8.00 Kms)
1791 W/R of road from Thari Mirwah
Bozdar Wada road mile 0/0-8/0 (12.88
Kms)
1792 Re -Conditioning of from Nagaraga to
Naseer Fakir Jalanani mile 0/0-9/0 (18"
Wide) (14.50 Kms).
1793 Re -Conditioning of from Ranipur to
Haji Abdul Raheem Brohi mile 0/0-1/7
(18" Wide) (3.00 Kms).
1794 Reconditioning of road from Jhango to
Babar Wada mile 0/0-4/0 (6.44 Kms)

Location of
Scheme/
District
3
Mirpurkhas

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2015-16
02.06.12

6
207.585

Actual
Exp. upto
Jun, 12
7
32.992

Estimated
Cost

Revised
Allocation 2012-13
Total
F.P.A.
8
9
40.000
0.000

Est. Exp.
upto
June' 13
10
72.992

Throwfwd
as on
01-07-13
11
134.594

Allocation for
2013-14
Capital Revenue
Total
12
13
14
10.000
0.000
10.000

15
0.000

FPA

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
35
40
62.297
62.297

S.B.A

Approved
11.1.12

2015-16

218.669

42.000

45.000

0.000

87.000

131.669

15.000

0.000

15.000

0.000

40

47

58.335

58.335

N. Feroze

Approved
27.1.12
Approved
12.04.12
Approved
12.04.12

2013-14

56.261

11.592

25.000

0.000

36.592

19.669

19.669

0.000

19.669

0.000

65

100

0.000

0.000

2014-15

92.560

40.000

26.000

0.000

66.000

26.560

20.000

0.000

20.000

0.000

71

93

6.560

0.000

2014-15

106.775

24.000

10.000

0.000

34.000

72.775

10.000

0.000

10.000

0.000

32

41

62.775

0.000

Khairpur

ApprovedR
12.04.12

2013-14

98.282

40.000

20.000

0.000

60.000

38.282

40.000

0.000

40.000

0.000

61

102

0.000

0.000

Khairpur

Approved
27.01.12

2013-14

19.618

9.600

5.000

0.000

14.600

5.018

5.018

0.000

5.018

0.000

74

100

0.000

0.000

Khairpur

Approved
27.01.12

2013-14

26.326

9.660

10.000

0.000

19.660

6.666

6.666

0.000

6.666

0.000

75

100

0.000

0.000

Approved
12.12.11

2013-14

14.281

10.000

2.140

0.000

12.140

2.141

2.141

0.000

2.141

0.000

85

100

0.000

0.000

Approved
03.12.12

2013-14

30.389

8.400

1.500

0.000

9.900

20.489

20.489

0.000

20.489

0.000

33

100

0.000

0.000

Approved
03.12.11

2013-14

37.791

15.000

7.000

0.000

22.000

15.791

15.791

0.000

15.791

0.000

58

100

0.000

0.000

Approved
3.12.2011

2015-16

200.000

0.000

30.000

0.000

30.000

170.000

20.000

0.000

20.000

0.000

15

25

75.000

75.000

Approved
20.1.12

2015-16

199.339

0.000

22.500

0.000

22.500

176.839

20.000

0.000

20.000

0.000

11

21

78.420

78.420

Approved
20.1.12

2015-16

192.932

0.000

22.500

0.000

22.500

170.432

20.000

0.000

20.000

0.000

12

22

75.216

75.216

N. Feroze
Khairpur

1795 Reconditioning of road from Fakirabad


Khairpur
Railway Phattak to Faizal Mahar (3.50
Kms).
1796 W/R of road from B.H.U to Sultanpur to
Sukkur
Raujha via Dhani Bux Mahar mile 0/02/4 (4.00 Kms).
1797 W/R of road from Sukkur Bye Pass to
Sukkur
Sukkur Airport i/c link connecting
Airport Bagerji road (with Asphalt 2'
Thick) mile 0/0-2/4 (4.00 Kms).
1798 W/R of road from Lakhi Shikarpur road Shikarpur
to Shikarpur Larkana road (Shikarpur
Bye Pass) mile 0/0-6/0 (Asphalt concrete)
(9.66 Kms)
1799 W/R of Road from Moula Dad Road to
Jacobabad
Dargah Rahmatpur mile 0/0-10/0 (16.09
Kms).
1800 Reconditioning of road from kashmore Kashmore @
to Badani via Gehalpur mile 0/0-20/0
Kandhkot
(32.18 Kms).

{300}

PROVINCIAL
WORKS & SERVICES DEPARTMENT

1806
1807

1808

1809

1810

1811

1812

1813

1814

1815

Location of
Scheme/
District
3
Larkana

15
0.000

28.933

9.600

5.000

0.000

14.600

14.333

14.333

0.000

14.333

0.000

50

100

0.000

0.000

2015-16

220.000

0.000

70.000

0.000

70.000

150.000

12.000

0.000

12.000

0.000

32

37

69.000

69.000

Approved
20.02.12

2015-16

267.390

0.000

117.390

0.000

117.390

150.000

100.000

0.000

100.000

0.000

44

81

25.000

25.000

Shikarpur/ Approved
Jacobabad/
20.02.12
Kashmore
Rehabilitation of various roads in Rain Khairpur, N. Approved
affected or others
Feroze
20.02.12
W/R of road from Digri to Rajo
Badin
Approved
Khanani via Bhudho qambrani Deh-170
30.01.08
Mile 0/0 - 20/4 (33.0 Kms)
Improvement of Hyderabad Tando
Hyderabad Approved
Fazal Seri road mile 0/0-24/0 = 24-0 (M)
26.12.05
= 38.64 Kms.
Widening / Reconditioning of
Mirpurkhas Approved
Mirpurkhas Tando Adam road with
03.03.06
Asphalt Carpet mile 0/0-25/5 (41.25
Kms)
W/R of Kot Gulam Muhammad Jhudo Mirpurkhas Approved
via Sikriery and Tando Jam Mohammad
07.01.08
mile 0/0-31/2 (50.0 Kms)
Improvement Tando Adam Berani
Sanghar
Approved
Kundiari with as sphalt surface Mile 0/025.11.06
26/4 = 26-4 = 42.66 Kms..
Widening / Reconditioning Sanghar
Mirpurkhas/ Approved
Mirpurkhas asphalt surface mile 0/0Sanghar
19.01.07
42/0= 68.00 kms.
Widening / Reconditioning of Bulri Shah T.M. Khan Approved
Karim to Khorwah Chowk mile 0/0-21/0
06.06.05
=21-0 (M) = 33.81 Kms.
Widening / Reconditioning of Tando
T. Allahyar Approved
Allahyar Mirwah road Mile 5/4 - 21/0 =
03.03.07
15-4 (M) = 24.95 Kms.
Improvement National Highway to
Thatta
Approved
Jhampeer via Farm Road Mile 0/0-19/4
03.03.07
= 19-4 (M) = 31.39 Kms.

2013-14

311.808

50.000

130.904

0.000

180.904

130.904

12.000

0.000

12.000

0.000

58

62

0.000

0.000

2014-15

274.479

0.000

150.674

0.000

150.674

123.805

40.000

0.000

40.000

0.000

55

69

83.805

0.000

2015-16

237.985

23.000

5.000

0.000

28.000

209.985

70.000

0.000

70.000

0.000

12

41

69.993

69.993

2015-16

146.744

75.000

5.000

0.000

80.000

66.744

12.000

0.000

12.000

0.000

55

63

27.372

27.372

2015-16

258.331

96.500

1.250

0.000

97.750

160.581

12.000

0.000

12.000

0.000

38

42

74.291

74.291

2015-16

239.104

59.646

5.000

0.000

64.646

174.458

12.000

0.000

12.000

0.000

27

32

81.229

81.229

2015-16

421.403

79.820

5.000

0.000

84.820

336.583

35.000

0.000

35.000

0.000

20

28

150.792

150.792

2015-16

731.415

78.125

5.000

0.000

83.125

648.290

15.000

0.000

15.000

0.000

11

13

316.645

316.645

2015-16

85.238

38.500

5.000

0.000

43.500

41.738

8.000

0.000

8.000

0.000

51

60

16.869

16.869

2015-16

153.130

67.000

1.250

0.000

68.250

84.880

10.000

0.000

10.000

0.000

45

51

37.440

37.440

2015-16

117.651

24.792

5.000

0.000

29.792

87.859

10.000

0.000

10.000

0.000

25

34

38.930

38.930

Sanghar

Badin &
Thatta

Throwfwd
as on
01-07-13
11
113.629

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
35
42
50.815
50.815

2013-14

Approved
27.01.12
Approved
20.02.12

Estimated
Cost

Est. Exp.
upto
June' 13
10
61.500

Allocation for
2013-14
Capital Revenue
Total
12
13
14
12.000
0.000
12.000

6
175.129

Khairpur

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2015-16
28.1.12

Revised
Allocation 2012-13
Total
F.P.A.
8
9
30.000
0.000

Actual
Exp. upto
Jun, 12
7
31.500

Gen.
Sector / Sub-sector /
Sr.
Name of Scheme
No.
2
1
1801 W/R road form Larkana Arija Mahi
Makool Meena road mile 0/0-13/0 (21.00
Kms)
1802 W/R of road from National Highway to
Drib Maher Shah (4.00 Kms)
1803 Rehabilitation of Rain Damages of Road
during 2011 in Sanghar
(Priority-I)
1804 Rehabilitation of Roads Damaged
during rains of year 2011
(Priority-I)
1805 Rehabilitation of Rain affected roads
2011

FPA

{301}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Location of
Gen.
Sector / Sub-sector /
Scheme/
Sr.
Name of Scheme
District
No.
2
3
1
1816 Improvement / Construction of
Thatta
Ghulamullah to Garho road i/c Bridge
over Creek and Construction of link
upto National Highway on west of
Garho Town mile 0/0-25/5 (41.23)
1817 W/R N'Feroze Paddidan Phull meet Kot N. Feroze
Kumb Kot Lalu Road mile 0/0-24/0
(38.61 Kms).
1818 W/R of Road from Shikarpur to Gaheja Shikarpur
mile 0/0-14/4 (23.20 Kms)
1819 W/R of Road from Shikarpur to Jaggan Shikarpur
mile 0/0-14/4 (23.33 Kms)
1820 W/R of road from Nawabshah Daur @
S.B.A
Lashari Stop to Sher Ali Shah Daur
Jamal Shah road including connecting
village Nathani Imamuddin Keerio and
Deen Muhammad Zardari Mile 0/0-8/0
(12.87Kms)
1821 W/R of road from Karachi Thatta
Thatta
Hyderabad road to Jhimpir mile 0/016/0 (25.76 Kms)
1822 W/R of road from 60 mile road to 3 chak
S.B.A
suhello road mile 0/0-13/0 (asphalt)

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2015-16
09.04.08

6
283.362

Actual
Exp. upto
Jun, 12
7
40.295

Estimated
Cost

Revised
Allocation 2012-13
Total
F.P.A.
8
9
5.000
0.000

Est. Exp.
upto
June' 13
10
45.295

Throwfwd
as on
01-07-13
11
238.067

Allocation for
2013-14
Capital Revenue
Total
12
13
14
20.000
0.000
20.000

15
0.000

FPA

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
16
23
109.034
109.034

Approved
29.3.2007

2014-15

139.903

31.210

15.000

0.000

46.210

93.693

12.000

0.000

12.000

0.000

33

42

81.693

0.000

Approved
09.04.08
Approved
7.5.2008
Approved
26.06.12

2013-14

125.840

43.011

10.000

0.000

53.011

72.829

78.000

0.000

78.000

0.000

42

104

0.000

0.000

2015-16

123.934

36.945

2.500

0.000

39.445

84.489

10.000

0.000

10.000

0.000

32

40

37.245

37.245

2015-16

67.786

0.000

8.000

0.000

8.000

59.786

10.000

0.000

10.000

0.000

12

27

24.893

24.893

Approved
26.09.12

2015-16

321.299

0.000

17.000

0.000

17.000

304.299

50.000

0.000

50.000

0.000

21

127.150

127.150

Approved
04.10.12

2015-16

250.854

0.000

8.000

0.000

8.000

242.854

30.000

0.000

30.000

0.000

15

106.427

106.427

Approved
04.09.12
Approved
31.12.12

2015-16

302.260

0.000

10.000

0.000

10.000

292.260

30.000

0.000

30.000

0.000

13

131.130

131.130

2015-16

70.305

0.000

1.000

0.000

1.000

69.305

10.000

0.000

10.000

0.000

16

29.653

29.653

1823 W/R of Thatta Pir Patho to Ghorabari


road (40 Kms)
1824 Reconditioning of road from Mianshoro
via Kally Bux Rind Sakrand City road
mile 0/0-3/5 (5.83 Kms).

Thatta

1825 Reconditioning of road from Daleel


Dero to Allah Ditto Rind road mile 0/02/2
1826 Improvement / Reconstruction of Bridge
over Peerchart Drain Kakar Piaro road
mile 5/0-5/5 (1.00 Kms)
1827 W/R of Johi Bhan road 0/0-11/4 (18.40
Kms).
1828 Improvement of road Indus Highway
(Old Alignment) mile 5/6-17/4 (18.92
Kms) (Asphalt)
1829 W/R of road from Bubak Railway
Station to Shah Bukhari via Talti road
mile 0/0-6/0

S.B.A

Approved
08.01.13

2014-15

34.092

0.000

1.000

0.000

1.000

33.092

20.000

0.000

20.000

0.000

62

13.092

0.000

Dadu

Approved
31.12.12

2013-14

18.687

0.000

5.000

0.000

5.000

13.687

13.687

0.000

13.687

0.000

27

100

0.000

0.000

Dadu

Approved
29.04.13
Approved
29.04.13

2015-16

234.845

0.000

3.000

0.000

3.000

231.845

23.000

0.000

23.000

0.000

11

104.423

104.423

2015-16

293.196

0.000

6.000

0.000

6.000

287.196

20.000

0.000

20.000

0.000

133.598

133.598

Approved
30.01.13

2015-16

117.178

0.000

23.000

0.000

23.000

94.178

20.000

0.000

20.000

0.000

20

37

37.089

37.089

S.B.A

Jamshoro

Jamshoro

{302}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Location of
Gen.
Sector / Sub-sector /
Scheme/
Sr.
Name of Scheme
District
No.
2
3
1
1830 W/R of road from village Muhammad
S.B.A
Khan Mangsi to Hala Branch road mile
0/0-1/7 (3.0 Kms)
1831 Recondition of road from NHW Punhal
S.B.A
Khan Chandio road to Hakim Chandio
connect with Siddique Khaskeli mile 0/01/2 (2.00 Kms).
1832 W/R of road from Nawabshah Kazi
S.B.A
Ahmed road to Waris Ali Shah road
mile 0/0-6/0 (9.65 Kms)
1833 Reconditioning of road from Gupchani
S.B.A
to Shahdadpur road mile 0/0-5/4 (8.80
Kms)
1834 W/R of road from Desert Area road to
S.B.A
Hazrat Hout Fakir via Serai Mohabat
Sethar road mle 0/0-5/4 (8.85 Kms)

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2014-15
8.1.2013

6
44.190

Actual
Exp. upto
Jun, 12
7
0.000

Estimated
Cost

Revised
Allocation 2012-13
Total
F.P.A.
8
9
3.000
0.000

Est. Exp.
upto
June' 13
10
3.000

Throwfwd
as on
01-07-13
11
41.190

Allocation for
2013-14
Capital Revenue
Total
12
13
14
20.000
0.000
20.000

15
0.000

FPA

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
7
52
21.190
0.000

Approved
8.1.2013

2014-15

39.592

0.000

5.000

0.000

5.000

34.592

20.000

0.000

20.000

0.000

13

63

14.592

0.000

Approved
31.12.2012

2015-16

171.423

0.000

5.000

0.000

5.000

166.423

12.000

0.000

12.000

0.000

10

77.212

77.212

Approved
31.12.2012

2015-16

116.958

0.000

10.000

0.000

10.000

106.958

8.000

0.000

8.000

0.000

15

49.479

49.479

Approved
31.12.2012

2015-16

189.202

0.000

5.000

0.000

5.000

184.202

15.000

0.000

15.000

0.000

11

84.601

84.601

1835 W/R road from Jam Sahib to Hazrat


Hout Fakir road mile 0/0-15/0 (24.14
Kms)
1836 W/R of road from Bandhi Manhoro
road to Makkand road mile 0/0-8/6
(14.07 Kms) (1 1/2 Carpet).
1837 Reconditioning of road from Mashakh
to Chattan Shah via Syed Budhal Shah
road mile 0/0-7/0 (11.26 Kms)
1838 W/R of road from Sakrand to var via
Khadhar road mile 0/0-9/0 (14.50 Kms)

S.B.A

Approved
9.1.2013

2015-16

401.935

0.000

5.000

0.000

5.000

396.935

15.000

0.000

15.000

0.000

190.968

190.968

S.B.A

Approved
15.1.2013

2015-16

234.423

0.000

5.000

0.000

5.000

229.423

25.000

0.000

25.000

0.000

13

102.212

102.212

S.B.A

Approved
31.12.2012

2015-16

85.321

0.000

5.000

0.000

5.000

80.321

10.000

0.000

10.000

0.000

18

35.161

35.161

S.B.A

Approved
15.1.2013

2015-16

302.483

0.000

5.000

0.000

5.000

297.483

30.000

0.000

30.000

0.000

12

133.742

133.742

1839 Reconditioning of road from National


Highway Sakrand Bypass to Pir Mahwal
road mile 0/0-4/0 (6.43 Kms)
1840 W/R of road from Nawabshah Airport
Road to Khadhar via Mian Shore road
mile 0/0-8/1 (13.0 Kms)
1841 Reconditioning of road from Daulatpur
Pubjo road @ mile 1/1 to Village Ismail
Dahri via ghaahand road mile 0/0-4/3
(7.0 Kms)
1842 Reconditioning of road from Al-Noor
Sugar Mill Hubeeri road @ mile 7/6 to
Trimore road mile 0/0-5/7 (9.45 Kms)

S.B.A

Approved
8.1.2013

2014-15

46.155

0.000

5.000

0.000

5.000

41.155

20.000

0.000

20.000

0.000

11

54

21.155

0.000

S.B.A

Approved
15.1.2013

2015-16

222.220

0.000

4.000

0.000

4.000

218.220

15.000

0.000

15.000

0.000

101.610

101.610

S.B.A

Approved
31.12.2012

2015-16

69.230

0.000

4.000

0.000

4.000

65.230

8.000

0.000

8.000

0.000

17

28.615

28.615

S.B.A

Approved
31.12.2012

2015-16

94.470

0.000

4.000

0.000

4.000

90.470

8.000

0.000

8.000

0.000

13

41.235

41.235

{303}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Location of
Gen.
Sector / Sub-sector /
Scheme/
Sr.
Name of Scheme
District
No.
2
3
1
1843 Reconditioning of road from Manhoro
S.B.A
Chowdgi Ghulam Muhammad Panjabi
@ mile 6/2 to Village Sonhri via Thull
Minor road mile 0/0-5/6 (9.40 Kms)
1844 Reconditioning of road from Yousif
S.B.A
Dahri mori Regulator to Bandhi via
Manhoro road mile 0/0-10/0 (16.09 Kms)

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2015-16
31.12.2012

6
87.197

Actual
Exp. upto
Jun, 12
7
0.000

Estimated
Cost

Revised
Allocation 2012-13
Total
F.P.A.
8
9
4.000
0.000

Est. Exp.
upto
June' 13
10
4.000

Throwfwd
as on
01-07-13
11
83.197

Allocation for
2013-14
Capital Revenue
Total
12
13
14
8.000
0.000
8.000

15
0.000

FPA

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
5
14
37.599
37.599

Approved
15.1.2013

2015-16

264.024

0.000

4.000

0.000

4.000

260.024

10.000

0.000

10.000

0.000

125.012

125.012

1845 W/R of road from Nationial Highway @


S.B.A
Approved
mile 208 Sarkari Khoh to connect Kazi
31.12.2012
Ahmed Jamal Shah road mile 0/0-7/4
(12.0 Kms)
1846 W/R of road from National Highway @
S.B.A
Approved
mile 209 Nawab Wali Muhammad to
31.12.2012
connect Doulatpur Pubjo road via
Ramzan Rahu road mile 0/0-6/4 (10.40
Kms)
1847 Improvement of road from Mirpurkhas - Mirpurkhas Approved
Sindhri road to Khan road via Lal
1.1.2013
Chand Bungalow mile 0/0-8/0 (12.88
Kms)
1848 Reconditioning of road from MatiariMatiari
Approved
Nasarpur road to village Kot Zainul
1.3.2013
Abidin Shah road mile 0/0-3/1 (5.03
Kms)
1849 W/R of road from Adilpur Qazi Badal
Ghotki
Approved
Road to Dari Chachar mile 0/0-2/0 (3.20
26.2.2013
kms)
1850 W/R o fRoad from National Highway
Ghotki
Approved
Kamoon Shaheed to Khambhra mile 0/019.4.2013
7/0 (11.27 kms)
1851 W/R o fRoad from Retti to Kehar Dahar
Ghotki
Approved
via Marowala mile 0/0-6/0 (66 Kms)
19.4.2013

2015-16

183.893

0.000

4.000

0.000

4.000

179.893

10.000

0.000

10.000

0.000

84.947

84.947

2015-16

157.032

0.000

4.000

0.000

4.000

153.032

10.000

0.000

10.000

0.000

71.516

71.516

2015-16

80.295

0.000

3.000

0.000

3.000

77.295

25.000

0.000

25.000

0.000

35

26.148

26.148

2014-15

31.047

0.000

3.000

0.000

3.000

28.047

8.000

0.000

8.000

0.000

10

35

20.047

0.000

2014-15

33.196

0.000

3.000

0.000

3.000

30.196

30.196

0.000

30.196

0.000

100

0.000

0.000

2015-16

145.149

0.000

3.000

0.000

3.000

142.149

10.000

0.000

10.000

0.000

66.075

66.075

2015-16

110.980

0.000

3.000

0.000

3.000

107.980

10.000

0.000

10.000

0.000

12

48.990

48.990

1852 W/R of Road from Ubauro to Retti mile


0/0-6/4 (10.47 Kms)
1853 W/R of Road from Retti to Kamoon
Shaheed mile 0/0-7/0 (11.27 kms)

Ghotki

Approved
19.4.2.13
Approved
19.04.2013

2015-16

136.321

0.000

3.000

0.000

3.000

133.321

10.000

0.000

10.000

0.000

10

61.661

61.661

2015-16

173.100

0.000

3.000

0.000

3.000

170.100

20.000

0.000

20.000

0.000

13

75.050

75.050

1854 Reconditioning of Road from Mirpur to


Mohammadpur mile 4/0-8/0 (6.40 Kms)

Ghotki

Approved
14.1.2013

2014-15

50.376

0.000

3.000

0.000

3.000

47.376

10.000

0.000

10.000

0.000

26

37.376

0.000

Ghotki

{304}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Location of
Gen.
Sector / Sub-sector /
Scheme/
Sr.
Name of Scheme
District
No.
2
3
1
1855 Reconditioning of Road from Mir
Khairpur
Ghulam Abbas Talpur to Sono Samtio
Road mile 0/0-1/6 (2.80 kms)
1856 Rehabilitation of Dual Carriageway
Khairpur
Roads Begum Nusrat Bhutto Secretariat
Bhagh mile 0/0-0/2 (24' wide) (0.40 Kms)

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2013-14
19.12.2012
Approved
23.1.2013

1857 Reconditioning / Construction of Road


Khairpur
Daud Goth (1.0 Km)
1858 Improvement / Construction of Ghotki
Ghotki
Khanpur Road to village Abdul Sattar
via village changlani & Ahmed Raj Wah
mile 0/0-2/4 (4.0 kms)
1859 Reconditioning of Road Khipro Khahi
Sanghar
via Chanessary Mori to village Mohd
Siddique Abu Bhai mile 0/0-0/5
1860 W/R of Bakiran Bridge to Dokri via
Larkana
Mehrabpur & Z.A Bhutto Agricultur
College road mile 0/0-6/2 (10.0 Kms)
1861 Improvement of road from Sindh Jamat
Karachi
Cooperative Housing Society Qauidabad
and Charan Para over head Tank
Meena Mosque, Ibrahim Hydery
(5Kms) mile 0/0-3/1.
1862 Improvement of 5 Km Katchi Para
Karachi
Internal roads streets mile 0/0-3/1.
1863 W/R of road from G.M.B road to Dual
Hyderabad
Carriageway Zonal Plan road East
Qasimabad mile 0/0-0/6 i/c link to
Graveyard 0/0-0/1.
1864 W/R of road from Majeed Keerio to
S.B.A
Mudd bungalow road mile 0/011/7(19.11 Kms)
1865 Improvement of Construction of road
Khairpur
from Goundaro to village Khan via
Nindo Goundaro (2.5 kms)
1866 Improvement of road from Bhan Talti
Jamshoro
road mile 0/0-6/0
1867 Widening & Reconditioning of road
Jamshoro
from Bhan to Manhayoon road mile 0/04/1
1868 Widening/ Reconditioning of road from
Dadu
Indus Highway to Aminani Sharif via
Cattle Farm road mile 0/0-5/0(8 Km).

Revised
Allocation 2012-13
Total
F.P.A.
8
9
1.500
0.000

Throwfwd
as on
01-07-13
11
17.080

15
0.000

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
8
100
0.000
0.000

6
18.580

2014-15

16.712

0.000

1.500

0.000

1.500

15.212

10.000

0.000

10.000

0.000

69

5.212

0.000

Approved
23.1.2013
Approved
19.12.2012

2013-14

7.905

0.000

2.000

0.000

2.000

5.905

5.605

0.000

5.605

0.000

25

96

0.300

0.000

2014-15

31.803

0.000

3.000

0.000

3.000

28.803

15.000

0.000

15.000

0.000

57

13.803

0.000

Approved
8.11.2012

2013-14

7.099

0.000

0.000

0.000

0.000

7.099

7.099

0.000

7.099

0.000

100

0.000

0.000

Approved
25.6.2010

2013-14

98.417

56.050

42.367

0.000

98.417

0.000

5.000

0.000

5.000

0.000

100

105

0.000

0.000

Approved
6.9.2012

2015-16

48.689

0.000

20.000

0.000

20.000

28.689

10.000

0.000

10.000

0.000

41

62

9.345

9.345

Approved
6.9.2012
Approved
1.3.2013

2015-16

81.618

0.000

20.000

0.000

20.000

61.618

20.000

0.000

20.000

0.000

25

49

20.809

20.809

2013-14

39.274

0.000

39.274

0.000

39.274

0.000

5.000

0.000

5.000

0.000

100

113

0.000

0.000

Approved
22.11.2012

2015-16

374.278

0.000

50.000

0.000

50.000

324.278

50.000

0.000

50.000

0.000

13

27

137.139

137.139

Approved
19.12.2012

2013-14

20.129

0.000

6.000

0.000

6.000

14.129

14.129

0.000

14.129

0.000

30

100

0.000

0.000

Approved
17.12.2012
Approved
17.12.2012

2013-14

109.620

0.000

100.000

0.000

100.000

9.620

15.000

0.000

15.000

0.000

91

105

0.000

0.000

2013-14

79.482

0.000

25.000

0.000

25.000

54.482

58.000

0.000

58.000

0.000

31

104

0.000

0.000

Approved
29.3.2013

2015-16

118.380

0.000

10.000

0.000

10.000

108.380

30.000

0.000

30.000

0.000

34

39.190

39.190

Estimated
Cost

Est. Exp.
upto
June' 13
10
1.500

Allocation for
2013-14
Capital Revenue
Total
12
13
14
17.080
0.000
17.080

Actual
Exp. upto
Jun, 12
7
0.000

FPA

{305}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Gen.
Sector / Sub-sector /
Sr.
Name of Scheme
No.
2
1
1869 Reconditioning of road from Punj Mori
to village Jhalo mile 0/0-6/4 (10.4Km)
UC Siyal.
1870 Reconditioning of road from Johi Bhan
road to Phaka Minor (Bakhrani Minor)
road mile 0/0-6/6 (10.8 Km).
1871 Widening / Reconditioning of road from
village Kolab Jial Taluka Kingri (3.0
Kms)
Total Improvement (On-going)

Location of
Scheme/
District
3
Dadu

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2015-16
15.3.2013

6
80.000

Actual
Exp. upto
Jun, 12
7
0.000

Estimated
Cost

Revised
Allocation 2012-13
Total
F.P.A.
8
9
5.000
0.000

Est. Exp.
upto
June' 13
10
5.000

Throwfwd
as on
01-07-13
11
75.000

Allocation for
2013-14
Capital Revenue
Total
12
13
14
15.000
0.000
15.000

15
0.000

FPA

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
6
25
30.000
30.000

Dadu

Approved
17.12.2012

2013-14

73.193

0.000

20.000

0.000

20.000

53.193

55.000

0.000

55.000

0.000

27

102

0.000

0.000

Khairpur

Approved
23.1.2013

2014-15

37.310

0.000

2.000

0.000

2.000

35.310

20.000

0.000

20.000

0.000

59

15.310

0.000

22459.093

5845.202

2637.345

0.000

8482.547

13976.546

2846.060

0.000

2846.060

0.000

5884.991

5278.865

Improvement (New Schemes)


1872 Improvement of road from Jamshoro
Hyderabad
road National Highway Bye Pass road
via J.J.V.L Gas Company road mile 0/06/0 (9.66 Kms)
1873 Improvement / Construction of road
Hyderabad
from Rajputana Hospital to National
Highway Bypass via Gulistan-e-Sajjad
village Budho Palari Makhdoom Rafiquz-Zaman road dual carriageway road
mile 0/0-2/4 (4.0Kms) Replacement
scheme.
1874 W/R of Road from Khanpur Mahar to
Ghotki
Sardargarh (24 Kms)
1875 W/R of road from Badin Sujawal road
Badin
to Dhadhroko Farm via Tarai mile 0/010/4 (16.89 kms)
1876 Reconditioning of road from Chatto
Badin
Mori to Jhumiro Mori via village Haji
Mohammad Ramzan Chandio road mile
0/0-5/2 (8.45 Kms)
1877 W/R of road from Khorwah to Khorwah
Badin
Chowk mile 0/0-8/0 (12.88)
1878 Improvement of road from KhoskiBadin
Wango road from Navy Petrol Pump to
Pangrion City road mile 0/0-11/5 (18.31
Kms)
1879 Improvement of road from Artillery
Badin
Chak to Eido Nohrio Goth mile 0/0-5/0
(8.00 Kms).

Approved
04.10.12

2015-16

220.567

0.000

0.000

0.000

0.000

220.567

10.000

0.000

10.000

0.000

105.284

105.284

Approved
06.02.13

2015-16

300.548

0.000

0.000

0.000

0.000

300.548

10.000

0.000

10.000

0.000

145.274

145.274

Approved
22.11.2012
Approved
21.2.2013

2015-16

202.901

0.000

0.000

0.000

0.000

202.901

10.000

0.000

10.000

0.000

96.451

96.451

2015-16

227.832

0.000

0.000

0.000

0.000

227.832

10.000

0.000

10.000

0.000

108.916

108.916

Approved
28.11.2012

2015-16

55.176

0.000

0.000

0.000

0.000

55.176

5.000

0.000

5.000

0.000

25.088

25.088

Approved
21.2.2013
Approved
21.2.2013

2015-16

146.217

0.000

0.000

0.000

0.000

146.217

10.000

0.000

10.000

0.000

68.109

68.109

2015-16

286.912

0.000

0.000

0.000

0.000

286.912

20.000

0.000

20.000

0.000

133.456

133.456

ApprovedR
3.1.2013

2015-16

122.766

0.000

0.000

0.000

0.000

122.766

15.000

0.000

15.000

0.000

12

53.883

53.883

{306}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Gen.
Sector / Sub-sector /
Sr.
Name of Scheme
No.
2
1
1880 Improvement / Const: of road from
Nindo Shahar to village Budho Dasti via
Deh Khakhar mile 0/0-7/3 (11.87 Kms).

Location of
Scheme/
District
3
Badin

1881 Improvement of road from Talhar Bye


Pass (Badin road to Tando Bago road)
mile 0/0-1/0 (1.61 Kms).
1882 Improvement of road from Talhar Bye
Pass (Hyderabad road to Tando Bago
road) road mile 0/0-3/6 (6.03 Kms).
1883 Improvement of road form Sujawal Jhati (Khorwah)Chowk to Jati Road
mile 8/0-13/0 (8.00 Kms)
1884 Improvement of Road from Kadhan to
Behdmi road Mile 0/0-8/4
1885 Improvement of Road from Seerani to
Ahmed Raju mile 0/0-18/0
1886 W/R Badin - Kadhan road mile 9/0-16/0
(11.50 Kms) with Asphalt concrete
(Phase-II)
1887 Improvement of road form Dehi to
Tando Jan Muhammad mile 0/0-16/0
(25.76 Kms)
1888 Improvement of road from Kadhan to
Nindo mile 9/0-12/0 (4.83 Kms) (PhaseII)
1889 W/R of road from Tando Bago road to
Olya Raj Seen mile 0/0-8/0 (12.87 Kms)

Badin

Approved
28.11.2012

Badin

Revised
Allocation 2012-13
Total
F.P.A.
8
9
0.000
0.000

15
0.000

2014-15

41.168

0.000

0.000

0.000

0.000

41.168

30.000

0.000

30.000

0.000

73

11.168

0.000

Approved
28.11.2012

2015-16

42.727

0.000

0.000

0.000

0.000

42.727

15.000

0.000

15.000

0.000

35

13.864

13.864

Badin

Approved
24.5.2013

2014-15

108.790

0.000

0.000

0.000

0.000

108.790

10.000

0.000

10.000

0.000

49.395

49.395

Badin

Approved
21.2.2013
Approved
21.2.2013
Approved
3.1.2013

2015-16

208.547

0.000

0.000

0.000

0.000

208.547

20.000

0.000

20.000

0.000

10

94.274

94.274

2015-16

360.582

0.000

0.000

0.000

0.000

360.582

20.000

0.000

20.000

0.000

170.291

170.291

2015-16

271.582

0.000

0.000

0.000

0.000

271.582

50.000

0.000

50.000

0.000

18

110.791

110.791

Badin

Approved
3.1.2013

2015-16

405.919

0.000

0.000

0.000

0.000

405.919

20.000

0.000

20.000

0.000

192.960

192.960

Badin

Approved
21.2.2013

2015-16

61.709

0.000

0.000

0.000

0.000

61.709

20.000

0.000

20.000

0.000

32

20.855

20.855

Badin

Approved
21.2.2013

2015-16

168.948

0.000

0.000

0.000

0.000

168.948

25.000

0.000

25.000

0.000

15

71.974

71.974

1890 Improvement of road from Piaro Station


to Sita road mile 0/0-9/2 (15 Kms).

Dadu

Approved
17.12.2013

2015-16

168.829

0.000

0.000

0.000

0.000

168.829

10.000

0.000

10.000

0.000

79.415

79.415

1891 W/R of road Thana Bula Khan Bypass


mile 0/0-2/4 (4.00 Kms).
1892 W/R of road Kotri Shah Soori road mile
0/0-9/6 (15.70 Kms)
1893 W/R / Const: of road from Karo Khaho
to Sher Shah Soori road mile 0/0-5/3
(8.65 Kms)
1894 Reconditioning of road from Old
National Highway @ 216 to Sangrah
Mori via Raja CNG road mile 0/0-3/1
(5.0 Kms)

Jamshoro

Approved
29.04.13
Approved
29.4.2013
Approved
29.4.2013

2015-16

89.468

0.000

0.000

0.000

0.000

89.468

10.000

0.000

10.000

0.000

11

39.734

39.734

2015-16

193.851

0.000

0.000

0.000

0.000

193.851

8.000

0.000

8.000

0.000

92.926

92.926

2015-16

93.414

0.000

0.000

0.000

0.000

93.414

10.000

0.000

10.000

0.000

11

41.707

41.707

Approved
15.03.2013

2015-16

83.967

0.000

0.000

0.000

0.000

83.967

10.000

0.000

10.000

0.000

12

36.984

36.984

Badin

Thatta
Thatta

S.B.A

Throwfwd
as on
01-07-13
11
147.417

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
0
10
66.209
66.209

6
147.417

Estimated
Cost

Est. Exp.
upto
June' 13
10
0.000

Allocation for
2013-14
Capital Revenue
Total
12
13
14
15.000
0.000
15.000

Actual
Exp. upto
Jun, 12
7
0.000

Badin

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2015-16
3.1.2013

FPA

{307}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Location of
Gen.
Sector / Sub-sector /
Scheme/
Sr.
Name of Scheme
District
No.
2
3
1
1895 Reconditioning of road from Nawabshah
S.B.A
Kazi Ahmed @ mile 16/0 to Dargah
Jamal Shah via Allah Bux Kubar road
mile 0/0-6/5 (10.66 Kms)
1896 Re-construction of Shahdadpur
Sanghar
Gupchani Road mile 0/0-1/1 (1.80 Kms)
(Shahdadpur town Portion)
1897 Re-construction of Shahdadpur Bypass
Sanghar
road mile 0/0-1/4 (2.40 Kms)
1898 Improvement of Kangoro - Tando
Mirpurkhas
Ghulam Ali road mile 0/0-4/0 (6.40 Kms)

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2015-16
15.03.2013

6
121.753

Actual
Exp. upto
Jun, 12
7
0.000

Estimated
Cost

Revised
Allocation 2012-13
Total
F.P.A.
8
9
0.000
0.000

Est. Exp.
upto
June' 13
10
0.000

Throwfwd
as on
01-07-13
11
121.753

Allocation for
2013-14
Capital Revenue
Total
12
13
14
10.000
0.000
10.000

FPA
15
0.000

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
0
8
55.877
55.877

Approved
28.11.2012

2014-15

26.533

0.000

0.000

0.000

0.000

26.533

5.000

0.000

5.000

0.000

19

21.533

0.000

Approved
28.11.2012
Approved
10.10.2012

2014-15

35.903

0.000

0.000

0.000

0.000

35.903

15.000

0.000

15.000

0.000

42

20.903

0.000

2015-16

55.247

0.000

0.000

0.000

0.000

55.247

8.000

0.000

8.000

0.000

14

23.624

23.624

1899 Reconditioning of road from village


Hyderabad
Morio Meerbahar to Molidino Mirbahar
road mile 0/0-3/0 (4.83 Kms)

Approved
23.01.2013

2015-16

53.289

0.000

0.000

0.000

0.000

53.289

8.000

0.000

8.000

0.000

15

22.645

22.645

1900 Reconditioning of road from Zain C,N.G


G.M.B road to Karan Khan Shoro Road
mile 0/0-0/3
1901 Recondition of road from Sehri Sugar
Mills to Norai Sharif mile 0/0-3/6 (6.00
Kms)
1902 Improvement of road from Manzoor Ali
Pitafi to Dad Jarwar Mile 0/0-3/2 (5.02
Kms)
1903 W/R of road from Chamber to
Hyderabad Gulab Laghari Shaikh
Bhirkio road via Miran Khori Jalal
Mori including links to village Abdul
Rehman Memon and Riaz Memon 0/012/4 (20.12 Kms) Asphalt 2" Thick
1904 W/r road from Sijawal road mile to
village Sher Ali Abad mile 0/0-2/4 (4.0
Kms)
1905 Improvement of Larkana Circular of
Road mile 0/0-10/0 (16.09 Kms)
1906 Widening / Reconditioning of Road from
Larkana Koreja via Saidudero Pitafi
Road mile 0/0-4/2 (6.83 Kms).
1907 Reconditioning of Road from Larkana
Ratodero Road to village Zangeja mile
0/0-2/0 i/c Drain Construction of road
from Block and Boundary Wall of Eid
Gah (Non ADP)

Hyderabad

Approved
28.11.2012

2013-14

11.451

0.000

0.000

0.000

0.000

11.451

11.451

0.000

11.451

0.000

100

0.000

0.000

T.M. Khan

Approved
28.11.2012

2015-16

42.610

0.000

0.000

0.000

0.000

42.610

5.000

0.000

5.000

0.000

12

18.805

18.805

T. Allahyar

Approved
28.11.2012

2015-16

35.080

0.000

0.000

0.000

0.000

35.080

5.000

0.000

5.000

0.000

14

15.040

15.040

T. Allahyar

Approved
29.3.2013

2015-16

289.082

0.000

0.000

0.000

0.000

289.082

10.000

0.000

10.000

0.000

139.541

139.541

Thatta

Approved
10.10.2012

2015-16

47.026

0.000

0.000

0.000

0.000

47.026

5.000

0.000

5.000

0.000

11

21.013

21.013

Larkana

Approved
22.01.2013
Approved
22.01.2013

2015-16

307.650

0.000

0.000

0.000

0.000

307.650

15.000

0.000

15.000

0.000

146.325

146.325

2015-16

146.256

0.000

0.000

0.000

0.000

146.256

10.000

0.000

10.000

0.000

68.128

68.128

Approved
10.10.2012

2014-15

21.100

0.000

0.000

0.000

0.000

21.100

5.000

0.000

5.000

0.000

24

16.100

0.000

Larkana

Larkana

{308}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Location of
Gen.
Sector / Sub-sector /
Scheme/
Sr.
Name of Scheme
District
No.
2
3
1
1908 Improvement of Road off taking from
Larkana
Ratoder Shahdadkot Motorway @ mile
17/7 to Dhing Allah Bux Leghari mile 0/06/4 (10.4 Kms).
1909 Improvement Larkana Naudero Road @ Larkana
mile 8/4 to village Gharwar Bhatti mile
0/0-2/4
1910 W/R Nasirabad to Badeh Road mile 0/0Larkana
2/0 (Remaining Work) 2" thick asphalt
(3.2 Kms).
1911 Reconditioning of Road from Ratodero
Larkana
Naudero Road to village Daro Illahi Bux
mile 0/0-1/7 (3.0 kms)
1912 Reconditioing of Road from Nusrat
Larkana
Shahani Road to village Rahooja mile
0/0-0/5 (1.0 km)
1913 Reconditioning of Road from Nusrat
Larkana
Shahani Road to village Inam
Khakhrani mile 0/0-0/4 (0.80 Kms)
1914 Reconditioning of Road from Sukkur
Larkana
Noudero raod to village Narja Mile 0/00/2 (.4 km)
1915 Reconditioning of Road from Ratodero
Larkana
Shahdadkot road near Water supply to
Mosque at Latif Colony mile 0/0-0/2 i/c
Masonry Structure.

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2014-15
28.11.2012

1916 Reconditioning of Road village Khair


Mohammad Joyo to Sajan Joyo mile 0/00/5 (i/c 3000 Rft Retaining Wall)
1917 Reconditioning of road from Kambar
Ratodero Road to Wali dad Veesar mile
0/0-1/2 (2.41 Kms)
1918 Reconditioning of road from Larkana
Naudero Road to village Hassan Wahan
mile 0/0-1/1 (1.81 Kms) (Non ADP).
1919 W/R of Road from Larkana Lakhi Road
mile 12/0 to village Panjo dero via
Dargah Latif Shah mile 0/0-3/0
1920 Reconditioning of Halani Mehrabpur
Road (1.0 Km)
1921 Reconditioning of Mehrabpur Lakha
Road (1.0 Km)

6
27.805

Actual
Exp. upto
Jun, 12
7
0.000

Estimated
Cost

Revised
Allocation 2012-13
Total
F.P.A.
8
9
0.000
0.000

Est. Exp.
upto
June' 13
10
0.000

Throwfwd
as on
01-07-13
11
27.805

Allocation for
2013-14
Capital Revenue
Total
12
13
14
5.000
0.000
5.000

15
0.000

FPA

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
0
18
22.805
0.000

Approved
28.11.2012

2013-14

12.846

0.000

0.000

0.000

0.000

12.846

12.846

0.000

12.846

0.000

100

0.000

0.000

Approved
28.11.2012

2014-15

54.090

0.000

0.000

0.000

0.000

54.090

8.000

0.000

8.000

0.000

15

46.090

0.000

Approved
28.11.2012

2014-15

31.850

0.000

0.000

0.000

0.000

31.850

5.000

0.000

5.000

0.000

16

26.850

0.000

Approved
28.11.2012

2013-14

8.293

0.000

0.000

0.000

0.000

8.293

8.293

0.000

8.293

0.000

100

0.000

0.000

Approved
28.11.2012

2013-14

5.197

0.000

0.000

0.000

0.000

5.197

5.197

0.000

5.197

0.000

100

0.000

0.000

Approved
28.11.2012

2013-14

2.220

0.000

0.000

0.000

0.000

2.220

2.220

0.000

2.220

0.000

100

0.000

0.000

Approved
28.11.2012

2013-14

2.055

0.000

0.000

0.000

0.000

2.055

2.055

0.000

2.055

0.000

100

0.000

0.000

Larkana

Approved
28.11.2012

2014-15

17.021

0.000

0.000

0.000

0.000

17.021

5.000

0.000

5.000

0.000

29

12.021

0.000

Larkana

Approved
28.11.2012

2014-15

17.522

0.000

0.000

0.000

0.000

17.522

3.000

0.000

3.000

0.000

17

14.522

0.000

Larkana

Approved
28.02.2013

2014-15

18.959

0.000

0.000

0.000

0.000

18.959

3.000

0.000

3.000

0.000

16

15.959

0.000

Larkana

Approved
28.11.2012

2013-14

12.417

0.000

0.000

0.000

0.000

12.417

12.417

0.000

12.417

0.000

100

0.000

0.000

N. Feroze

Approved
28.2.2013
Approved
28.2.2013

2014-15

16.660

0.000

0.000

0.000

0.000

16.660

3.000

0.000

3.000

0.000

18

13.660

0.000

2013-14

6.652

0.000

0.000

0.000

0.000

6.652

6.652

0.000

6.652

0.000

100

0.000

0.000

N. Feroze

{309}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Location of
Gen.
Sector / Sub-sector /
Scheme/
Sr.
Name of Scheme
District
No.
2
3
1
1922 Reconditioning of Road from Phull
N. Feroze
Masur Ji Wah Road to village Din
Mohammad Leghari via Budho Leghari
mile 0/0-3/0 (5.0 Kms)
1923 Reconditioning of Road from Lalu
N. Feroze
Maachi to Sahib Khan Chandio mile 0/01/2 (2.0 kms)
1924 Reconditioning of Road from National
N. Feroze
Highway to Jamali Pump to Phul
Bughio mile 0/0-2/4 (4.0 kms)
1925 Reconditioning of Road from National
N. Feroze
Highway Qalandari pump to village
Marri Road mile 0/0-1/7 (3.0 Kms)
1926 Reconditioning of Road from Moro
N. Feroze
Jatoi Road to village Gula Patho Road
mile 0/0-1/2 (2.0 kms)
1927 Reconditioning of Road from Toori
N. Feroze
pump to Jumman Dargah mile 0/0-0/5
(1.0 Km)
1928 Reconditioning of road from Hasib to
N. Feroze
village Mohammad Moosa Bhutto mile
0/0-1/2 (2.0 Kms)
1929 W/R of Road from Shikarpur to Jagir
Sukkur
mile 0/0-1/4 (2.4 Kms)
1930 Reconditioning of Road from Shikarpur Shikarpur
Zarkhail Road to Fakir Din Mohammad
Kehar mile 0/0-2/0 (3.2 Kms)
1931 Reconditioning of Road from Garhi
Jacobabad
Hassan to Mir Abdullah Khan Sarki
Taluka thull (6 Km)
1932 Reconditioning of Road from Thull Jacobabad
Tangwani Road to Kanda Khan
bungulani mile 0/0-0/5 (0.80 kms)
1933 Reconditioning of Road from Daharki
Ghotki
Bye pass road mile 0/0-1/4 (2.40 kms)
1934 W/R of Road from Adilpur to Mathelo
Ghotki
mile 0/0-7/0 (11.20 Kms)
1935 Improvement of Road from jagh
Khairpur
Regulator to villae Mohammad Ibrahim
Jat , Taluka Faiz Gunj, UC Kot Lalu
(2.5 Kms)

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2014-15
23.1.2013

6
40.522

Actual
Exp. upto
Jun, 12
7
0.000

Estimated
Cost

Revised
Allocation 2012-13
Total
F.P.A.
8
9
0.000
0.000

Est. Exp.
upto
June' 13
10
0.000

Throwfwd
as on
01-07-13
11
40.522

Allocation for
2013-14
Capital Revenue
Total
12
13
14
5.000
0.000
5.000

FPA
15
0.000

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
0
12
35.522
0.000

Approved
19.12.2013

2014-15

17.965

0.000

0.000

0.000

0.000

17.965

3.000

0.000

3.000

0.000

17

14.965

0.000

Approved
23.1.2013

2014-15

27.176

0.000

0.000

0.000

0.000

27.176

4.000

0.000

4.000

0.000

15

23.176

0.000

Approved
19.12.2013

2014-15

20.576

0.000

0.000

0.000

0.000

20.576

4.000

0.000

4.000

0.000

19

16.576

0.000

Approved
23.1.2013

2014-15

20.177

0.000

0.000

0.000

0.000

20.177

4.000

0.000

4.000

0.000

20

16.177

0.000

Approved
23.1.2013

2014-15

8.743

0.000

0.000

0.000

0.000

8.743

8.743

0.000

8.743

0.000

100

0.000

0.000

Approved
23.1.2013

2014-15

12.910

0.000

0.000

0.000

0.000

12.910

12.910

0.000

12.910

0.000

100

0.000

0.000

Approved
19.12.2012
Approved
28.11.2012

2014-15

28.528

0.000

0.000

0.000

0.000

28.528

5.000

0.000

5.000

0.000

18

23.528

0.000

2014-15

21.246

0.000

0.000

0.000

0.000

21.246

5.000

0.000

5.000

0.000

24

16.246

0.000

Approved
28.11.2012

2014-15

54.952

0.000

0.000

0.000

0.000

54.952

4.000

0.000

4.000

0.000

50.952

0.000

Approved
25.04.2013

2013-14

6.300

0.000

0.000

0.000

0.000

6.300

6.300

0.000

6.300

0.000

100

0.000

0.000

Approved
19.4.2012
Approved
15.3.2013
Approved
28.2.2013

2014-15

23.337

0.000

0.000

0.000

0.000

23.337

4.000

0.000

4.000

0.000

17

19.337

0.000

2015-16

144.645

0.000

0.000

0.000

0.000

144.645

10.000

0.000

10.000

0.000

67.323

67.323

2013-14

14.231

0.000

0.000

0.000

0.000

14.231

14.231

0.000

14.231

0.000

100

0.000

0.000

{310}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Location of
Status
Target Date
Gen.
Sector / Sub-sector /
Scheme/
Date of
for
Sr.
Name of Scheme
District
Approval Completion
No.
2
3
4
5
1
1936 Rehabilitation of Road from Khanan
Khairpur
Approved
2013-14
Shah Mangi Mohalla Nizamani Road
19.12.2012
upto Hopital Road including Masonry
Structrue (1.20 kms)
1937 Rehabilitation of Road from Old
Khairpur
Approved
2013-14
National Highway near NIC to Sanjar
19.12.2012
Khan Katohar (2.21 Kms)
1938 Rehabilitation of (Dual Carriagway)
Khairpur
Approved
2014-15
road from National Highway near Staff
28.2.2013
Quarters to Jillani Mohalla i/c Asphalt
concrete (1.0 Km)
1939 Recondition of Road from Rahuja
Khairpur
Approved
2014-15
Minor to Kot Pul (3.0 kms)
23.1.2013
1940 Reconditioning / Construction of Road
Khairpur
Approved
2014-15
from N.H.Way to village Abdul Sattar
23.1.2013
Phulpoto (3.0 kms)
1941 Reconditioning of Road from Kandhkot Kashmore @ Approved
2014-15
Saifal Road to Karan Khan Bajkani 0/0- Kandhkot 28.11.2012
2/0 (3.2 Kms)
1942 Improvement / Construction of Road
Sukkur
Approved
2014-15
from Sirgo to Samo Chacar (4.0 km)
17.10.2012
1943 Improvement of Road from Fakir
Sukkur
Approved
2014-15
Mohammad Path Road to Darawahan
19.12.2012
Shakh mile 0/0-2/6 (4.40 kms)
1944 Improvement of Road from Trimunhi
Sukkur
Approved
2014-15
road to Fakir Mohammad Path Road
19.12.2012
mile 0/0-2/4 (4.0 kms)
1945 W/R of Road from N.H.Way to Nabi
Sukkur
Approved
2014-15
Shah Road (5.0 kms)
23.1.2013
1946 Improvement of Road from Kandhra to
Sukkur
Approved
2014-15
Dodanko via Wah Burira mile 0/0-4/0
19.12.2012
(6.44 Kms)
1947 Improvement / Reconditioning of Road
Sukkur
Approved
2014-15
from Salehpat Sikandarabad to Titrohi
19.12.2012
via village Niazri mile 0/0-4/0 (6.83 Kms)
1948 Improvement / Reconditioning of Road
from Patni to Arrore via village
Abeejano mile 0/0-4/0 (6.44 Kms)
1949 Improvement / Construction of Road
from New Bus Terminal to village
Bilawal Khoso mile 0/0-1/0 (1.609 Km)
(i/c C.C Block).

Revised
Allocation 2012-13
Total
F.P.A.
8
9
0.000
0.000

Throwfwd
as on
01-07-13
11
10.412

15
0.000

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
0
100
0.000
0.000

6
10.412

14.725

0.000

0.000

0.000

0.000

14.725

14.725

0.000

14.725

0.000

100

0.000

0.000

24.068

0.000

0.000

0.000

0.000

24.068

5.000

0.000

5.000

0.000

21

19.068

0.000

18.162

0.000

0.000

0.000

0.000

18.162

3.000

0.000

3.000

0.000

17

15.162

0.000

20.954

0.000

0.000

0.000

0.000

20.954

4.000

0.000

4.000

0.000

19

16.954

0.000

22.568

0.000

0.000

0.000

0.000

22.568

5.000

0.000

5.000

0.000

22

17.568

0.000

51.255

0.000

0.000

0.000

0.000

51.255

5.000

0.000

5.000

0.000

10

46.255

0.000

28.470

0.000

0.000

0.000

0.000

28.470

5.000

0.000

5.000

0.000

18

23.470

0.000

31.474

0.000

0.000

0.000

0.000

31.474

5.000

0.000

5.000

0.000

16

26.474

0.000

50.156

0.000

0.000

0.000

0.000

50.156

5.000

0.000

5.000

0.000

10

45.156

0.000

51.428

0.000

0.000

0.000

0.000

51.428

5.000

0.000

5.000

0.000

10

46.428

0.000

51.551

0.000

0.000

0.000

0.000

51.551

5.000

0.000

5.000

0.000

10

46.551

0.000

Estimated
Cost

Est. Exp.
upto
June' 13
10
0.000

Allocation for
2013-14
Capital Revenue
Total
12
13
14
10.412
0.000
10.412

Actual
Exp. upto
Jun, 12
7
0.000

FPA

Sukkur

Approved
19.12.2012

2014-15

52.626

0.000

0.000

0.000

0.000

52.626

5.000

0.000

5.000

0.000

10

47.626

0.000

Sukkur

Approved
28.11.2012

2014-15

15.705

0.000

0.000

0.000

0.000

15.705

15.705

0.000

15.705

0.000

100

0.000

0.000

{311}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Location of
Gen.
Sector / Sub-sector /
Scheme/
Sr.
Name of Scheme
District
No.
2
3
1
1950 Improvement / Construction of Road
Sukkur
from R.Q.C Highway (near Dreha to
village Gill mile 0/0-1/0 (1.609)
1951 W/R of Road from Mathelo to Jarwar
Ghotki
mile 0/0-6/0 (.60 Kms)
1952 Improvement of Road from National
Sukkur
Highway to village Shaheed Abdul Aziz
Bullo (1.0 km)
1953 W/R of Road from National Highway at
Sukkur
Railway Phattak to village Agro (2 Kms)

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2014-15
28.11.2012

1954 W/R of link Road from Gharo coast


Guard post to Ghulamullah via Babro
town mile 0/0-7/4+400' (12.00 kms)
1955 Reconditioning of road from Jhalo road
to Dargah Malkani Sharif road mile 0/01/4 (2.4 Km) UC Siyal.
1956 Reconditioning of road from Johi Bhan
road Mangneja Khudabad Minor mile
0/0-4/2(7.2 Km) UC Yar Muhammad
Kalhoro.

6
25.248

Actual
Exp. upto
Jun, 12
7
0.000

Estimated
Cost

Revised
Allocation 2012-13
Total
F.P.A.
8
9
0.000
0.000

Est. Exp.
upto
June' 13
10
0.000

Throwfwd
as on
01-07-13
11
25.248

Allocation for
2013-14
Capital Revenue
Total
12
13
14
5.000
0.000
5.000

15
0.000

FPA

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
0
20
20.248
0.000

Approved
15.3.2013
Approved
17.1.2012

2014-15

136.599

0.000

0.000

0.000

0.000

136.599

10.000

0.000

10.000

0.000

126.599

0.000

2013-14

8.488

0.000

0.000

0.000

0.000

8.488

8.488

0.000

8.488

0.000

100

0.000

0.000

Approved
23.1.2013

2013-14

49.734

0.000

0.000

0.000

0.000

49.734

5.000

0.000

5.000

0.000

10

44.734

0.000

Thatta

Approved
1.3.2013

2015-16

163.826

0.000

0.000

0.000

0.000

163.826

10.000

0.000

10.000

0.000

76.913

76.913

Dadu

Approved
28.11.2012

2015-16

16.828

0.000

0.000

0.000

0.000

16.828

5.000

0.000

5.000

0.000

30

5.914

5.914

Dadu

Approved
28.11.2012

2015-16

43.788

0.000

0.000

0.000

0.000

43.788

5.000

0.000

5.000

0.000

11

19.394

19.394

1957 Improvement of road from Hatim Jatoi


to Phulji Station 11 km.

Dadu

Un- R
approved

2015-16

162.990

0.000

0.000

0.000

0.000

162.990

4.000

0.000

4.000

0.000

79.495

79.495

1958 Improvement of Road from Phulji


Station to piaro Station road 10 Km

Dadu

Unapproved

2015-16

125.778

0.000

0.000

0.000

0.000

125.778

4.000

0.000

4.000

0.000

60.889

60.889

1959 Renovation / reconditioning of road


from village Rasheed Arain, Taluka
Tando Bagho, Districst Badin to Jhuda
Pharaho of
road
mile 0/0-2/1 (3.5
1960 Sangi
Rehabilitation
Resource-Cum

Badin

Unapproved

2015-16

25.000

0.000

0.000

0.000

0.000

25.000

5.000

0.000

5.000

0.000

20

10.000

10.000

Hyderabad

Unapproved

2015-16

197.380

0.000

0.000

0.000

0.000

197.380

0.000

15.000

15.000

0.000

91.190

91.190

Kamber
Shahdadkot

Unapproved

2015-16

81.860

0.000

0.000

0.000

0.000

81.860

40.000

0.000

40.000

0.000

49

20.930

20.930

Sindh

Unapproved

2015-16

2000.000

0.000

0.000

0.000

0.000

2000.000

600.000

0.000

600.000

0.000

30

700.000

700.000

6765.777
29224.870

0.000
5845.202

0.000
2637.345

0.000
0.000

0.000
8482.547

6765.777
20742.323

1441.645
4287.705

15.000
15.000

1456.645
4302.705

0.000
0.000

3478.758
9363.748

2498.375
7777.239

Training Centre & Road Research


Laboratory @ Hyderabad
1961 Widening and Improvement of road
from Kambar City to village Ber Sharif
(6 Kms)
1962 Block provision for Improvement of
Roads in Sindh

Total Improvement New Schemes


Total Improvement
R

{312}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Gen.
Sr.
No.
1

Sector / Sub-sector /
Name of Scheme
2

Location of
Scheme/
District
3

Status
Date of
Approval
4

Target Date
for
Completion
5
R

Actual
Exp. upto
Jun, 12
7

Estimated
Cost

Revised
Allocation 2012-13
Total
F.P.A.
8
9

Est. Exp.
upto
June' 13
10

Throwfwd
as on
01-07-13
11

Allocation for
2013-14
Capital Revenue
Total
12
13
14

FPA
15

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19

Construction
(On-Going Schemes)
1963 Const: of road from BadinKhoski at
point scape to Luari Mando road via
Village Noor Muhammad Farooqi mile
0/0-6/0 (9.66 Kms).
1964 Construction of road from village Lal
Bux Nautkani road to Pir Fateh shah via
Mazhar Khan Chang 0/0-11/0 (17.71
Kms)
1965 Construction of road from Khalifo
Qasim Jhudo road to Olya Khan Shah
road via Talib Odejo and Noor Kiryo
mile 0/0-6/4 (10.45 Kms)
1966 Constt: / Improvement of road from
N'Feroze to Nawabshah.mile 8/0-38/0 &
48/0-54/0 (57.00 Kms)
1967 Construction of Road from Indus
Highway at Mile 157/0 to Suprio Bund
along Rajwah inspection Park Mile 0/010/0 16 Kms)
1968 Construction of road from Abdul Rahim
Abro to village Chutto Abro via Wasal
Noorani, Idrees Bozdar Gullo Wakan
upto Khara road mile 0/0-4/0

Badin

Approved
17.11.2008

2013-14

68.290

60.000

8.290

0.000

68.290

0.000

5.000

0.000

5.000

0.000

100

107

0.000

0.000

Badin

Approved
17.11.2008

2014-15

126.898

35.651

5.000

0.000

40.651

86.247

90.000

0.000

90.000

0.000

32

103

0.000

0.000

Badin

Approved
17.11.2008

2013-14

74.800

40.000

25.000

0.000

65.000

9.800

9.800

0.000

9.800

0.000

87

100

0.000

0.000

S.B.A

Approved
27.03.2009

2015-16

590.056

191.879

77.100

0.000

268.979

321.077

16.000

0.000

16.000

0.000

46

48

152.539

152.539

Dadu

Approved
06.12.2008

2015-16

117.082

31.000

3.750

0.000

34.750

82.332

10.000

0.000

10.000

0.000

30

38

36.166

36.166

Dadu

Approved
8.11.2009

2013-14

39.121

28.221

7.500

0.000

35.721

3.400

4.500

0.000

4.500

0.000

91

103

0.000

0.000

1969

Const: of road from Mounder to


Mureed Ja Bhan Lukman Shahani via
Alam Shahani via Yakhtiar Shahani i/c
300 Rft Pre - Stressed Bridge mile 0/03/2. (5.20 Kms)
1970 Const: of road from Piaro Sation to
Mullah Jee Kelree via Hasual Chandio
via Muhrai Chandio road mile 0/0-3/4.

Dadu

Approved
03.03.2009

2013-14

60.516

49.950

10.566

0.000

60.516

0.000

4.000

0.000

4.000

0.000

100

107

0.000

0.000

Dadu

Approved
04.02.2009

2013-14

39.121

25.735

7.589

0.000

33.324

5.797

5.797

0.000

5.797

0.000

85

100

0.000

0.000

1971 Const: of road from Kalri to Bachal


Chandi vial Fateh Mohammad Chandio
(4.82 Km)
1972 Const: of road from Gazi Faqir to
Hassal Chandio via Chack Ahmed road
mile 0/0-3/0 (4.82 Kms).

Dadu

Approved
27.01.2009

2013-14

27.328

18.728

2.150

0.000

20.878

6.450

6.450

0.000

6.450

0.000

76

100

0.000

0.000

Dadu

Approved
04.02.2009.

2013-14

29.029

27.029

0.500

0.000

27.529

1.500

4.300

0.000

4.300

0.000

95

110

0.000

0.000

{313}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Location of
Gen.
Sector / Sub-sector /
Scheme/
Sr.
Name of Scheme
District
No.
2
3
1
1973 Construction of road from Kaser Dasti
Ghotki
to Village Wahid Bux Mazari Mangwani
mile 0/0-4/0 (Modified) (6.44 Kms)

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2014-15
04.02.2009

1974 Construction of road from Thano


Ahmed Khan to Astan Ghru Bal Puri
Garh road mile 0/0-9/0 (14.50 Kms).
1975 Construction of road Gadap to Mole
road mile 10/6-33/6 = 23-0 (M) = 37.03
Kms.
1976 Construction of road from Thari
Mirwah to Kathore Connecting
Wassanabad I/c links mile 0/0-25/0
(40.23 KM0
1977 Construction of Khairpur Machi road to
Ahmedpur Manghwari road mile 0/04/1. (6.63 KM)
1978 Construction of road Lakha Kandiyari
(Kondayari road) to Village Zanwar
Khair Mohamamd Lashari Via Haji
Allah Wadhayo Bhanbhan mile 0/0-8/6.

Jamshoro

Approved
17.11.2008

Karachi

Revised
Allocation 2012-13
Total
F.P.A.
8
9
5.625
0.000

Throwfwd
as on
01-07-13
11
40.108

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
52
58
35.108
0.000

6
83.810

2015-16

86.118

28.700

5.000

0.000

33.700

52.418

5.000

0.000

5.000

0.000

39

45

23.709

23.709

Approved
06.06.05

2013-14

95.368

72.242

23.126

0.000

95.368

0.000

2.000

0.000

2.000

0.000

100

102

0.000

0.000

Khairpur

Approved
03.11.2008

2013-14

327.770

267.300

50.000

0.000

317.300

10.470

13.000

0.000

13.000

0.000

97

101

0.000

0.000

Khairpur

Approed
26.12.2009

2013-14

38.692

19.449

21.100

0.000

40.549

-1.857

1.000

0.000

1.000

0.000

105

107

0.000

0.000

Khairpur

Approved
16.1.2010

2014-15

101.630

18.500

1.750

0.000

20.250

81.380

8.000

0.000

8.000

0.000

20

28

73.380

0.000

1979 Bhango Pholare road (Ameer Poto) to


Village Ghulam Rasool Janwari Via
Kamalo Bhango Haji Murad Burdi pir
Bux Jarper & Kalhora Village mile 0/07/4.
1980 Construction of road NHA Via Mehar
Shah Main Drain up to Wada Mehesar
Road road mile 0/0-7/0 (11.26 Kms)

Khairpur

Approved
09.02.2010

2014-15

84.080

23.750

15.000

0.000

38.750

45.330

8.000

0.000

8.000

0.000

46

56

37.330

0.000

Khairpur

Approved
02.02.2010

2014-15

84.527

25.500

12.000

0.000

37.500

47.027

15.000

0.000

15.000

0.000

44

62

32.027

0.000

1981 Construction of road Gul Mohammad


Shaikh to Village Ghulam Nabi
Johoodhi Via Khadim Kharal mile 0/05/0 (8.0 Kms)
1982 Cosntruction of road Khora Kamal
Dero Road to Mohammad Islmail Via
Golo Wahan road mile 0/0-4/4 (7.0
Kms).
1983 Construction of road from Ripri Baharo
to Ramzan - Jo - Ripri road mile 0/0-6/0
(9.65 Kms)

Khairpur

Approved
27.1.2010

2013-14

49.159

25.500

28.159

0.000

53.659

-4.500

1.000

0.000

1.000

0.000

109

111

0.000

0.000

Khairpur

Approved
09.2.2010

2014-15

50.663

11.000

6.000

0.000

17.000

33.663

5.000

0.000

5.000

0.000

34

43

28.663

0.000

Khairpur

Approved
07.5.2010

2013-14

70.346

45.000

25.346

0.000

70.346

0.000

1.000

0.000

1.000

0.000

100

101

0.000

0.000

Estimated
Cost

Est. Exp.
upto
June' 13
10
43.702

Allocation for
2013-14
Capital Revenue
Total
12
13
14
5.000
0.000
5.000

Actual
Exp. upto
Jun, 12
7
38.077

FPA
15
0.000

{314}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Location of
Gen.
Sector / Sub-sector /
Scheme/
Sr.
Name of Scheme
District
No.
2
3
1
1984 Construction of road from Badeh to
Larkana
Radhan via Seehar Railway Station
Sehwani Sarak.
1985 Constt: of road from Haji Jalal Tunio to N. Feroze
Bela Wah including of Bridge over
Dhoro Jalbani mile 0/0-2/4 (4.0 Kms)
1986 Construction of road from Muhammad
Sanghar
Hassan Keerio village Deh Lakha road
mile 0/0-5/5.
1987 Construction of link road from Ghazi
Sanghar
Khan Hingorjo - ADP road to Village
Tar @ Mile 0/0-8/1 13.0 Kms
1988 Construction of road Jamalpur to
Shikarpur
Village Samiullah Shah Rashidi UC
Mirzapur mile 0/0-4/4 (7.0 Kms)
1989 Construction / Recondoitioning of road
Shikarpur
from Noor Mohammad Shujrah road to
Faizul Laro via Vilage Dr. Younis Hyder
Soomro mile 0/0-7/5 (12.26 Kms)
1990 Construction of road from Vass to
Sukkur
Matto Mangrio road mile 0/0-12/4 (20.0
Kms).
1991 Construction of road from Sangrar
Sukkur
Seerahi road to village New Abad mile
0/0-5/0 (8 Kms).
1992 Construction of road from Trimoho to R- Sukkur
99 via Arore Bachal Shah mile 0/0-8/0
(4.22 Kms)
1993 Construction of road from village Water
Sukkur
Malano to Village Bhambhro Malano to
Village Dhani Bux Malik to Village
Adam Gopang via Thath Minor 4 miles
(6.43 Kms).
1994 Construction of road from Long Fakir
Sukkur
to Saleh Pat Nara Canal Bridge mile 0/09/4 (15.2 Kms).
1995 Construction of road from Chachro
Tharparkar
vakiro to Aday-Jo-Tar mile 0/0-44/0 = 440 (M) = 70.84 Kms.

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2013-14
13.6.2006

6
141.967

Actual
Exp. upto
Jun, 12
7
146.400

Estimated
Cost

Revised
Allocation 2012-13
Total
F.P.A.
8
9
3.464
0.000

Est. Exp.
upto
June' 13
10
149.864

Throwfwd
as on
01-07-13
11
-7.897

Allocation for
2013-14
Capital Revenue
Total
12
13
14
1.000
0.000
1.000

15
0.000

FPA

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
106
106
0.000
0.000

Approved
19.3.2009

2013-14

51.266

24.710

10.556

0.000

35.266

16.000

16.000

0.000

16.000

0.000

69

100

0.000

0.000

Approved
27.01.2010

2014-15

51.710

7.494

13.000

0.000

20.494

31.216

5.000

0.000

5.000

0.000

40

49

26.216

0.000

Approved
03.02.2010

2015-16

138.468

13.500

15.000

0.000

28.500

109.968

10.000

0.000

10.000

0.000

21

28

49.984

49.984

Approved
11.12.2009

2014-15

107.107

6.600

5.750

0.000

12.350

94.757

8.000

0.000

8.000

0.000

12

19

86.757

0.000

Approved
19.1.2010

2013-14

63.473

59.000

4.473

0.000

63.473

0.000

1.000

0.000

1.000

0.000

100

102

0.000

0.000

Approved
30.1.2008

2013-14

146.195

82.000

30.000

0.000

112.000

34.195

34.195

0.000

34.195

0.000

77

100

0.000

0.000

Approved
06.12.2008

2013-14

50.802

41.500

9.302

0.000

50.802

0.000

2.000

0.000

2.000

0.000

100

104

0.000

0.000

Approved
12.3.2009

2013-14

95.146

59.915

35.231

0.000

95.146

0.000

10.000

0.000

10.000

0.000

100

111

0.000

0.000

Approved
06.12.2008

2013-14

42.391

39.500

2.891

0.000

42.391

0.000

1.000

0.000

1.000

0.000

100

102

0.000

0.000

Approved
12.3.2009

2014-15

212.383

83.350

37.500

0.000

120.850

91.533

5.000

0.000

5.000

0.000

57

59

86.533

0.000

Approved
10.01.2005

2015-16

392.010

204.400

30.000

0.000

234.400

157.610

8.000

0.000

8.000

0.000

60

62

74.805

74.805

{315}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Location of
Gen.
Sector / Sub-sector /
Scheme/
Sr.
Name of Scheme
District
No.
2
3
1
1996 Construction of road from Kaloi to
Tharparkar
Diplo via Luss Farm mile 0/0-39/2 = 392 (M) = 63.19 Kms. (Under Revision)

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2015-16
31.12.2004

1997 Construction of road from Diplo Sajai


Tharparkar
Gurrah Bah To Naukot road mile 0/035/0 = 35-0 (M) = 56.35 Kms. (Under
Revision)
1998 Construction of road to Mithi Diplo via Tharparkar
Verijhup mile 0/0-22/0 = 22-0 (M) =
35.42 Kms..
1999 (a) Construction of road from Ratnor to Tharparkar
Annupani mile 0/0-13/6 = 13-6 (M) =
22.13 Kms. (b) Construction of Road
from Liakro to Kapuri Jasar mile 0/014/3 = 14-3 (M) = 23.14 Kms. (Under
Revision)
2000 Block Schemes for const of Provincial
Thatta
roads in each District.
2001 Construction of road from Jati - Chach
Thatta
Jehan Khan road at mile 12/4 to Allah
Rakhio Theam via Haji Mohammad
Hashim Jat & Haji Siddique Thareem
road mile 0/0-6/4 (10.44 Kms).

Approved
10.01.2005

2002 Construction of road from Kothi to


Anwar Fazal road mile 0/0-3/6 (6.0 Kms)

Revised
Allocation 2012-13
Total
F.P.A.
8
9
50.000
0.000

Throwfwd
as on
01-07-13
11
186.840

15
0.000

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
65
67
89.420
89.420

6
534.840

2013-14

492.692

345.750

50.000

0.000

395.750

96.942

96.942

0.000

96.942

0.000

80

100

0.000

0.000

Approved
30.03.2006

2013-14

358.036

350.536

8.114

0.000

358.650

-0.614

5.000

0.000

5.000

0.000

100

102

0.000

0.000

Approved
28.12.2004

2013-14

187.202

152.770

22.571

0.000

175.341

11.861

11.861

0.000

11.861

0.000

94

100

0.000

0.000

Approved
17.4.2007
Approved
30.01.2008

2013-14

49.466

37.985

2.120

0.000

40.105

9.361

9.361

0.000

9.361

0.000

81

100

0.000

0.000

2013-14

63.379

30.764

15.000

0.000

45.764

17.616

17.616

0.000

17.616

0.000

72

100

0.000

0.000

Thatta

Approved
13-11-2008

2013-14

37.598

22.000

13.598

0.000

35.598

2.000

2.000

0.000

2.000

0.000

95

100

0.000

0.000

2003 Construction of Sujawal By-Pass (7 Km)

Thatta

Approved
13-05-2010.

2013-14

97.633

68.950

27.683

0.000

96.633

1.000

10.000

0.000

10.000

0.000

99

109

0.000

0.000

2004 Construction of road from Jalo-joChaunro to Khokrapar mile 0/0-21/7 =


21-7 (M) = 35.21 Kms.
2005 Construction of road from Bostan
Nabisar road to Jamal Lashari Via Palio
Khan Rind with link Sawan Khan Rind
& Sultan Chandio Mile 0/0-8/6 (14.0
Kms)
2006 Construction of road from village Gulan
Zardari Allahyar Unar to Anb Junejo,
road mile 0/0-2/7 (4.63 Kms).

Umerkot

Approved
02.03.2006

2015-16

423.650

284.500

7.500

0.000

292.000

131.650

12.000

0.000

12.000

0.000

69

72

59.825

59.825

Umerkot

Approved
01.11.2007

2014-15

78.876

35.091

19.099

0.000

54.190

24.686

3.000

0.000

3.000

0.000

69

73

21.686

0.000

S.B.A

Approved
12.05.2011

2013-14

37.998

9.500

14.578

0.000

24.078

13.920

13.920

0.000

13.920

0.000

63

100

0.000

0.000

Estimated
Cost

Est. Exp.
upto
June' 13
10
348.000

Allocation for
2013-14
Capital Revenue
Total
12
13
14
8.000
0.000
8.000

Actual
Exp. upto
Jun, 12
7
298.000

FPA

{316}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Gen.
Sector / Sub-sector /
Sr.
Name of Scheme
No.
2
1
2007 Construction of road from Dodapur to
village Buxan Katohar Taluka Garhi
Khaso (7.00 Kms).
2008 Construction of road from Indus
Highway to Village Manjhoo via
Makhdoom Saher i/c causeway @ mile
0/0-4/2 in Petaro Taluka Kotri
2009 Construction of road from village
Soomra to Dargah Muhammad Hashim
Bukhari (1.20 Kms) Tando Masti to
village Faqir Muhammad Rind (1.00
Kms) Kandhara road to village Bakhat
Ali Chang (1.50 Kms) Jama Masjid
village Usman Bhayo to Eid Gaah (1.0
Kms) & villa
2010 Construction Bridge on Mir Wah Canal
near Bhurgari Regulator, UC Bhurgari.

Location of
Scheme/
District
3
Jacobabad

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2013-14
12.4.2011

6
47.022

Actual
Exp. upto
Jun, 12
7
20.000

Estimated
Cost

Revised
Allocation 2012-13
Total
F.P.A.
8
9
27.022
0.000

Est. Exp.
upto
June' 13
10
47.022

Throwfwd
as on
01-07-13
11
0.000

Allocation for
2013-14
Capital Revenue
Total
12
13
14
1.000
0.000
1.000

FPA
15
0.000

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
100
102
0.000
0.000

Jamshoro

Approved
17.06.2011

2013-14

41.540

25.000

12.624

0.000

37.624

3.916

3.916

0.000

3.916

0.000

91

100

0.000

0.000

Khairpur

Approved
21.2.2011

2013-14

43.963

25.000

12.500

0.000

37.500

6.463

6.463

0.000

6.463

0.000

85

100

0.000

0.000

Khairpur

Approved
2.4.2011

2013-14

59.784

44.500

3.238

0.000

47.738

12.046

12.046

0.000

12.046

0.000

80

100

0.000

0.000

2011 Construction of road from Talpur Wada Khairpur


to village Khawaja (3.00 Kms).
2012 Construction / W/R of road from
T. Allahyar
Hyderabad - Mirpurkhas road to Tando
Allahyar Mirwah road @ Bhatti Hotel
mile 0/0-2/3 (3.82 Kms).
2013 Construction of village Khair
Larkana
Muhammad unar to village Mir Hassan
Jagirani road mile 0/0-0/5 (1.00 Kms).

Approved
21.2.2011
Approved
26.10.2011

2013-14

19.143

9.143

10.000

0.000

19.143

0.000

1.000

0.000

1.000

0.000

100

105

0.000

0.000

2013-14

70.656

63.790

6.866

0.000

70.656

0.000

2.000

0.000

2.000

0.000

100

103

0.000

0.000

Approved
20.12.2013

2013-14

5.643

1.820

0.500

0.000

2.320

3.323

3.323

0.000

3.323

0.000

41

100

0.000

0.000

2014 Construction of road from Sadhuja


Phull road to Douro B ehan mile 0/0-3/1
(5.00 Kms).
2015 Construction of road from Berani (Jan
Muhammad Rind) road to zardari Farm
road mile 0/0-2/4 (4.00 Kms).
2016 Construction of Flover Bridge at Berani
Railway Phattak at Tando Adam

N. Feroze

Approved
19.03.2009

2013-14

27.981

20.000

7.981

0.000

27.981

0.000

1.000

0.000

1.000

0.000

100

104

0.000

0.000

Sanghar

Approved
08.03.2011

2013-14

23.274

12.000

2.818

0.000

14.818

8.456

8.456

0.000

8.456

0.000

64

100

0.000

0.000

Sanghar

Approved
22.01.2010

2013-14

393.640

279.997

90.000

0.000

369.997

23.643

25.000

0.000

25.000

0.000

94

100

0.000

0.000

2017 Construction of link road Hyderabad Mipurkhras road to Ansari Farm No. 1,
Ansari Farm no. 2, Ansari Farm No. 3,
mile 0/0-4/3

T. Allahyar

Approved
20.07.2011

2014-15

64.923

25.000

14.500

0.000

39.500

25.423

8.000

0.000

8.000

0.000

61

73

17.423

0.000

{317}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Gen.
Sector / Sub-sector /
Sr.
Name of Scheme
No.
2
1
2018 Construction of Road from Al-Noor
Sugar Mill Moro Dour Road to Mukeen
Dahri to Khuda Bux Dahri Road Mile
0/0-3/6
2019 Construction of Vee Hingorja to
Veenjhanihari road mile 0/0-10/0 (16
Kms)
2020 Construction of Mettled road KDA Nali
to Gul Manda road mile 0/0-3/6 (6.00
Kms).
2021 Construction of Sindh Coastal Highway
Sakro / Gaghar Phatak - Keti Bandar Shah Ghorabari/ Bunder - Ali Bunder
(Ghaghar Phatak - Keti Bunder Phase1) of 90.0 Kms
2022 Construction of road Diplo - Islamkot
road to Konral via Verhar Taluka Diplo
(10.00 Kms).
2023 Cosntruction of road from Hussain
Khan Thoro to Ghotana via shah
Khamiso Dargha road mile 0/0-2/4. (4.02
Kms)
2024 Construction of 3 Kms road from village
Bhai Khan Chandio via Kanti Wah to
village Rasool Bux Deh Bhogri, UC
Kotri Allah Rakhio Shah, Taluka Ghora
Bari, (3.22 Kms)
2025 Construction of link road from Thull
Bahu Khoso road to Talani Makam Mir
Ghulam Abbas Jakhrani mile 0/0-2/4
(4.00 Kms)
2026 Construction of road from Mouladad
Phatak Jacobabad to Bye Pass via Haji
Lakhmire Brohi, Taluka Garhi Khairo
(3.00 Kms)
2027 Construction of road Internal road Faiz
Wah and Left Bank Faiz Wah upto
Malha Dhareja (4.00 kms).
2028 Construction of from Mori Choudgi to
village Dost Mohammad Jatoi (4.00
Kms).
2029 Construction of road from Asian Bank
to village Moryo Phulpoto (2.50 Kms.

Location of
Scheme/
District
3
S.B.A

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2013-14
25.5.2011

Tharparkar

Approved
26.09.2012

Thatta

Revised
Allocation 2012-13
Total
F.P.A.
8
9
0.000
0.000

Throwfwd
as on
01-07-13
11
23.458

15
0.000

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
39
115
0.000
0.000

6
38.458

2015-16

299.954

0.000

5.000

0.000

5.000

294.954

10.000

0.000

10.000

0.000

142.477

142.477

Approved
03.12.2011

2013-14

48.064

33.145

7.500

0.000

40.645

7.419

9.000

0.000

9.000

0.000

85

103

0.000

0.000

Thatta

Approved
07.01.2007

2015-16

2407.949

732.893

200.000

0.000

932.893

1475.056

200.000

0.000

200.000

0.000

39

47

637.528

637.528

Tharparkar

Approved
23.05.2012

2015-16

178.406

12.500

0.000

12.500

165.906

10.000

0.000

10.000

0.000

13

77.953

77.953

Hyderabad

Approved
07.01.2012

2013-14

33.262

8.442

16.000

0.000

24.442

8.820

8.820

0.000

8.820

0.000

73

100

0.000

0.000

Thatta

Approved
03.12.2011

2013-14

20.266

6.289

9.500

0.000

15.789

4.478

5.000

0.000

5.000

0.000

78

103

0.000

0.000

Jacobabad

Approved
20.12.2011

2013-14

26.873

5.981

10.000

0.000

15.981

10.892

10.892

0.000

10.892

0.000

59

100

0.000

0.000

Jacobabad

Approved
31.12.2011

2013-14

24.000

3.600

5.200

0.000

8.800

15.200

15.200

0.000

15.200

0.000

37

100

0.000

0.000

Khairpur

Approved
10.3.2012

2013-14

44.097

7.200

36.896

0.000

44.096

0.001

1.000

0.000

1.000

0.000

100

102

0.000

0.000

Khairpur

Approved
31.12.2011

2013-14

27.808

17.200

11.216

0.000

28.416

-0.608

1.000

0.000

1.000

0.000

102

106

0.000

0.000

Khairpur

Approved
12.12.2012

2013-14

17.474

5.250

7.000

0.000

12.250

5.224

5.224

0.000

5.224

0.000

70

100

0.000

0.000

Estimated
Cost

Est. Exp.
upto
June' 13
10
15.000

Allocation for
2013-14
Capital Revenue
Total
12
13
14
25.000
0.000
25.000

Actual
Exp. upto
Jun, 12
7
15.000

FPA

{318}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Location of
Gen.
Sector / Sub-sector /
Scheme/
Sr.
Name of Scheme
District
No.
2
3
1
2030 Cosntruction of road from Dowood
Khairpur
Goth to Razi Goth (2.40 Kms)
2031 Construction of road village Aziz
Khairpur
Phulpoto via Daud Goth (3.00 kms)
2032 Construction of road Moosani Bye Pass
Khairpur
to village Noonari, Malah Sohag (3.00
Kms).
2033 Construction of Internal road Manghan
Khairpur
Wari (2.50 Kms).
2034 Construction of road from Shaikh
Hyderabad
Bhirkio road to Jaffar Khan Bhurgari
via Sher Mohd Bhurgari & Lal Bux UC
Moolan mile 0/0-1/5 ( 2.5 kms)
2035 Construction of road network at Sr. No. Hyderabad
290 & 291 Goth Wahid Bux, Fasadi Wah
Qasimabad, Hyderabad 5.00 Kms

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2013-14
12.12.2012
Approved
2013-14
12.12.2012
Approved
2013-14
12.12.2012

2036 Construction of road network at Sr. No.


144/2 Goth Wahid Bux, Fasadi Wah,
Qasimabad Hyderabad mile 0/0-3/1 (
5.00 Kms)
2037 Construction of road from Super
Highway to Umer Jamot Goth Deth
Chohur UC - 2 Gadap Town (5.00 Kms)

Revised
Allocation 2012-13
Total
F.P.A.
8
9
11.500
0.000

Throwfwd
as on
01-07-13
11
2.306

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
86
100
0.000
0.000

6
16.956
21.778

6.300

12.603

0.000

18.903

2.875

3.000

0.000

3.000

0.000

87

101

0.000

0.000

26.548

6.300

9.000

0.000

15.300

11.248

11.248

0.000

11.248

0.000

58

100

0.000

0.000

Estimated
Cost

Est. Exp.
upto
June' 13
10
14.650

Allocation for
2013-14
Capital Revenue
Total
12
13
14
2.306
0.000
2.306

Actual
Exp. upto
Jun, 12
7
3.150

FPA
15
0.000

Approved
12.12.2012
Approved
7/1/2012

2013-14

23.271

15.250

8.000

0.000

23.250

0.021

1.000

0.000

1.000

0.000

100

104

0.000

0.000

2013-14

19.844

5.625

7.625

0.000

13.250

6.594

7.000

0.000

7.000

0.000

67

102

0.000

0.000

Approved
7/1/2012

2013-14

32.112

5.625

13.000

0.000

18.625

13.487

13.487

0.000

13.487

0.000

58

100

0.000

0.000

Hyderabad

Approved
7/1/2012

2013-14

32.845

5.625

12.595

0.000

18.220

14.625

14.625

0.000

14.625

0.000

55

100

0.000

0.000

Karachi

Approved
24-01-2012

2013-14

33.715

11.250

12.000

0.000

23.250

10.465

10.465

0.000

10.465

0.000

69

100

0.000

0.000

2038 Construction of road from Mubarak


village road to Derya Khan Goth UC 8
Gabo Pat Kiamari Karachi mile 0/0-1/7
(3.0 kms)
2039 Construction of Internal and
Surroundings roads of Faqir
Mohammad Goth Gadap town District
Malir mile 0/0-3/1 (5.00 kms)
2040 Construction of various roads in
GADAP Town Karachi mile 0/0-3/0
(5.00 kms) (Construction of road from
Malir Halt road to Memon Goth via KN
Academy)
2041 Const: of Internal & Surrounding Roads
of Khasti Barohi Goth. = 4.00 kms

Karachi

Approved
24-01-2012

2013-14

19.658

6.750

9.000

0.000

15.750

3.908

4.500

0.000

4.500

0.000

80

103

0.000

0.000

Karachi

Approved
24-01-2012

2013-14

27.194

11.250

12.000

0.000

23.250

3.944

5.000

0.000

5.000

0.000

85

104

0.000

0.000

Karachi

Approved
20.02.2012

2013-14

48.411

29.250

12.000

0.000

41.250

7.161

8.000

0.000

8.000

0.000

85

102

0.000

0.000

Karachi

Approved
20.02.2012

2013-14

37.191

9.000

13.000

0.000

22.000

15.191

15.191

0.000

15.191

0.000

59

100

0.000

0.000

2042 Const: of Road Mevo Khaskheli to Ganj


Bahar via village Lashari mile 0/0-1/7
(3.0kms)

T.M. Khan

Approved
27-01-2012

2013-14

22.051

6.750

10.000

0.000

16.750

5.301

6.000

0.000

6.000

0.000

76

103

0.000

0.000

{319}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Gen.
Sector / Sub-sector /
Sr.
Name of Scheme
No.
2
1
2043 Const: of Road from Bachani to village
Usman Hingoro Taluka Bulri Shah
Karim mile 0/0-1/7 (3.0 kms)
2044 Const: of Road from Rind Oil Field Sim
Nali to village Mitho Chang Taluka
Tando Ghulam Hyder mile 0/0-1/7 =
3.01 kms
2045 Const: of road from Bachal Shah road
to village Ameer Bhaugwar to Hyder
Mehkani road 0/0-1/4 (2.41 km).
2046 Construction of mettled road Indus
Highway to Murad Khushik via Birmani
Bagh Ali Qureshi Palio Lohar mile 0/02/1+330' (3.50 Kms)
2047 Construction of road from Siyal Band to
Ali Bux, Khair Mohammad, Sono
Chandio, Dano Chandio mile 0/0-5/0
(8.05 Kms)
2048 Construction of road from Naein Shakh
to Village Bachal Leghari via Usman
Leghari mile 0/0-3/1 (5.00 Kms)
2049 Construction of road from Mado to
Charo road to Sadhar village mile 0/03/1 (5.00 Kms).
2050 Construction of road from village Charo
to Mado road alongwith Inspection path
M.N.V Drain mile 0/0-1/7 (3.00 Kms)
2051 Construction of road from Super
Highway Bye Pass Hyderabad to Railo
Main via Lakhano Shoro mile 0/0-3/0
4.83 Kms
2052 Construction of roads in UC Bubak
Taluka Sehwan (10 Kms)
2053 Construction of road from Super
Highway Sari road (Habkan) to
Dhamach mile 0/0-3/1 (5.00 Kms)
2054 Constructio of road from Sarwar Pir
road to Ghoram Nohani Goth Taluka
Golarchi mile 0/0-1/7 (3.00 Kms)

Location of
Scheme/
District
3
T.M. Khan

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2013-14
24-01-2012

T.M. Khan

Approved
24-01-2012

T. Allahyar

Revised
Allocation 2012-13
Total
F.P.A.
8
9
9.000
0.000

2013-14

23.234

6.771

9.000

0.000

15.771

7.463

8.500

0.000

8.500

0.000

68

104

0.000

0.000

Approved
7/1/2012

2013-14

19.740

2.603

2.000

0.000

4.603

15.137

15.137

0.000

15.137

0.000

23

100

0.000

0.000

Dadu

Approved
26-10-2011.

2013-14

24.741

3.765

2.500

0.000

6.265

18.476

18.476

0.000

18.476

0.000

25

100

0.000

0.000

Dadu

Approved
26-10-2011.

2013-14

34.121

6.036

11.500

0.000

17.536

16.585

16.585

0.000

16.585

0.000

51

100

0.000

0.000

Dadu

Approved
26-10-2011.

2013-14

32.271

9.681

12.590

0.000

22.271

10.000

11.000

0.000

11.000

0.000

69

103

0.000

0.000

Dadu

Approved
25-01-2012

2013-14

33.865

5.513

13.000

0.000

18.513

15.353

15.353

0.000

15.353

0.000

55

100

0.000

0.000

Dadu

Approved
25-01-2012

2013-14

23.884

3.438

8.500

0.000

11.938

11.947

11.947

0.000

11.947

0.000

50

100

0.000

0.000

Jamshoro

Approved
26-10-2011.

2013-14

19.807

14.942

4.865

0.000

19.807

0.000

1.000

0.000

1.000

0.000

100

105

0.000

0.000

Jamshoro

Approved
3/12/2011
Approved
26-10-2011.

2013-14

66.925

35.202

30.723

0.000

65.925

1.000

2.000

0.000

2.000

0.000

99

101

0.000

0.000

2013-14

26.608

17.981

8.627

0.000

26.608

0.000

1.000

0.000

1.000

0.000

100

104

0.000

0.000

Approved
24-12-2011

2013-14

15.000

1.000

7.000

0.000

8.000

7.000

7.000

0.000

7.000

0.000

53

100

0.000

0.000

Jamshoro

Badin

Throwfwd
as on
01-07-13
11
5.465

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
74
100
0.000
0.000

6
21.215

Estimated
Cost

Est. Exp.
upto
June' 13
10
15.750

Allocation for
2013-14
Capital Revenue
Total
12
13
14
5.465
0.000
5.465

Actual
Exp. upto
Jun, 12
7
6.750

FPA
15
0.000

{320}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Location of
Gen.
Sector / Sub-sector /
Scheme/
Sr.
Name of Scheme
District
No.
2
3
1
2055 Construction of road from Badin Badin
Sujawal road at mile 28/4 to
Rasheedabad road mile 0/0-3/1 (5.00
Kms).
2056 Construction of road from village road
Thatta
from Ahmed Lunjar to Ali Otho mile 0/01/7 (3.00 Kms)
2057 Construction of road from Fateh Wah to
Thatta
Bathoro to Jati Chowk road via village
Haji Mallah and Dargah mile 0/0-2/2 i/c
approach 0/4+400 (4.55 kms) .(Revised)

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2013-14
24-12-2011

2058 Construction of mettled road from


village Qadir Bux Jaro to village Kaber
Khan Chandio mile 0/0-3/1 (5.00 Kms)

6
31.206

Actual
Exp. upto
Jun, 12
7
17.150

Estimated
Cost

Revised
Allocation 2012-13
Total
F.P.A.
8
9
12.000
0.000

Est. Exp.
upto
June' 13
10
29.150

Throwfwd
as on
01-07-13
11
2.056

Allocation for
2013-14
Capital Revenue
Total
12
13
14
2.056
0.000
2.056

15
0.000

FPA

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
93
100
0.000
0.000

Approved
3/12/2011

2013-14

32.271

5.250

8.000

0.000

13.250

19.021

19.021

0.000

19.021

0.000

41

100

0.000

0.000

Approved
25.4.2013

2013-14

47.294

20.253

13.399

0.000

33.652

13.642

13.642

0.000

13.642

0.000

71

100

0.000

0.000

Approved
3/12/2011

2013-14

33.865

14.000

12.000

0.000

26.000

7.865

7.865

0.000

7.865

0.000

77

100

0.000

0.000

2059 Construction of Main Jhullori-Dengan


Mirpurkhas Approved
road to Main Umerkot road, connect 78
24-01-2012
mile Mori road / Sugar Mill road via
Tawakal Lashari, Wagho Kolhi, Dhani
Buksh Malkani & Hemraj Kolhi village
mile 0/0-7/4 (12.08 Kms)
2060 Construction of road from village
Tharparkar Approved
Alamsar to village Jessejopar taluka
23.05.2012
Chachro mile 0/0-3/6 (6.00 Kms)
2061 Construction of road from village
Tharparkar Approved
Jessejopar to village Neblo Taluka
23.05.2012
Chachro mile 0/0-6/2 (10.00 Kms).
2062 Construction of link road from Lundo
Sanghar
Approved
Maqsoodo Rind to village Jado Zardar
7/1/2012
via Haji Bangul Zardari mile 0/0-1/5
(2.60 Kms).
2063 Construction of road from NawabshahS.B.A
Approved
Khadhar (Jaddan Stop) to village
4/1/2012
Dhingano Jamali via village Haji Haron
Brohi and Sanwal Mugheri UC
Khadhar (3.5 Kms)
2064 Construction of road from Fakirabad
Khairpur
Approved
Chudahoo road to Faizal Mahar 3.00
12.12.2011
Kms
2065 Construction of road from Bozdar-Thari Khairpur
Approved
road to village Hashim Gopang (2.80
12.12.2011
Kms)

2015-16

114.061

35.052

15.000

0.000

50.052

64.009

5.000

0.000

5.000

0.000

44

48

29.504

29.504

2015-16

129.996

0.000

5.000

0.000

5.000

124.996

5.964

0.000

5.964

0.000

59.516

59.516

2015-16

163.204

0.000

6.250

0.000

6.250

156.954

8.000

0.000

8.000

0.000

74.477

74.477

2013-14

19.426

4.350

7.000

0.000

11.350

8.076

8.500

0.000

8.500

0.000

58

102

0.000

0.000

2013-14

29.391

6.300

8.000

0.000

14.300

15.091

15.091

0.000

15.091

0.000

49

100

0.000

0.000

2013-14

21.012

6.300

9.000

0.000

15.300

5.712

5.712

0.000

5.712

0.000

73

100

0.000

0.000

2013-14

20.292

5.880

7.412

0.000

13.292

7.000

7.000

0.000

7.000

0.000

66

100

0.000

0.000

Thatta

{321}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Location of
Gen.
Sector / Sub-sector /
Scheme/
Sr.
Name of Scheme
District
No.
2
3
1
2066 Construction of Mund Jamrao
Khairpur
Choundiko road to village Gohram
Jagirani (3.0 Kms)
2067 Construction of road from of road from Khairpur
Kandiari Lakha to Satyaro (5.00 Kms).

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2013-14
12.12.2011
Approved
12.12.2011

2068 Construction of road from Salephat


Sikanderabad road to various villages of
RD - 186 upto Sarwar Shambani to
Sardar Darya Khan Bhmbhro mile 0/01/5 (2.50 Kms)
2069 Construction of road from Chounga
Bridge to Anwar Jatoi to Dayagir
Chowki mile 0/0-1/4 (2.50 Kms)
2070 Construction of road from Maitla to
Hanif Indher via Bado Sher Abdul
Qadir Chachar - Shahmir Indher
Khanan Idher mile 0/0-1/7 (3.00 Kms).
2071 Construction of road from Deveri road
to Ghulam Hyder Rind via Moj Ali Rind
mile 0/0-1/5 (2.60 Kms)
.
2072 Construction of road from Kamoon
Shaheed to Khambhra road to Jindo
Chachar & Janib Chachar mile 0/0-1/3
(2.20 Kms)
2073 Construction of road from National
Highway Bye Pass to Qaimuddin
Kalhoro mile 0/0-2/0 (3.20 Kms).
2074 Construction of road from Kamoon
Shaheed Naseer Dhandhu Village
Muhammad Amin Chachar via Pir
Zurawar Shah (3.0 Kms)
2075 Construction of road from National
Highway at Pir Aziz Kirmani to village
Mattar Kot (3.0 Kms)
2076 Constructrion of road from Jeewan
Khan Pitafi road to Maikhana Khirohi
mile 0/0-3/1 (5.00 Kms).
2077 Construction of road from G.T road to
Reharki Sahib, Poojwadyoon
Deweryoon, Sahib and S.S.D Dham
Raherki Sahib (5.00 Kms).

Sukkur

Revised
Allocation 2012-13
Total
F.P.A.
8
9
8.000
0.000

Throwfwd
as on
01-07-13
11
6.492

15
0.000

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
69
100
0.000
0.000

6
20.792

2013-14

39.212

9.750

12.000

0.000

21.750

17.462

17.462

0.000

17.462

0.000

55

100

0.000

0.000

Approved
30.12.2011

2013-14

18.941

2.800

8.000

0.000

10.800

8.141

8.141

0.000

8.141

0.000

57

100

0.000

0.000

Sukkur

Approved
03.12.2011

2013-14

18.183

5.250

2.000

0.000

7.250

10.933

10.933

0.000

10.933

0.000

40

100

0.000

0.000

Sukkur

Approved
20.12.2011

2013-14

22.686

1.817

7.000

0.000

8.817

13.869

13.869

0.000

13.869

0.000

39

100

0.000

0.000

Ghotki

Approved
03.12.2011

2013-14

20.006

4.679

8.000

0.000

12.679

7.327

7.327

0.000

7.327

0.000

63

100

0.000

0.000

Ghotki

Approved
20.12.2011

2013-14

23.998

8.909

6.181

0.000

15.090

8.908

8.908

0.000

8.908

0.000

63

100

0.000

0.000

Ghotki

Approved
03.12.2011

2013-14

25.524

5.330

9.000

0.000

14.330

11.194

11.194

0.000

11.194

0.000

56

100

0.000

0.000

Ghotki

Approved
03.12.2011

2013-14

23.882

4.500

8.000

0.000

12.500

11.382

11.382

0.000

11.382

0.000

52

100

0.000

0.000

Ghotki

Approved
03.12.2011

2013-14

23.030

4.500

8.000

0.000

12.500

10.530

10.530

0.000

10.530

0.000

54

100

0.000

0.000

Ghotki

Approved
03.12.2011

2014-15

39.485

4.309

13.000

0.000

17.309

22.176

10.000

0.000

10.000

0.000

44

69

12.176

0.000

Ghotki

Approved
03.12.2011

2014-15

40.931

5.250

7.715

0.000

12.965

27.966

10.000

0.000

10.000

0.000

32

56

17.966

0.000

Estimated
Cost

Est. Exp.
upto
June' 13
10
14.300

Allocation for
2013-14
Capital Revenue
Total
12
13
14
6.492
0.000
6.492

Actual
Exp. upto
Jun, 12
7
6.300

FPA

{322}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Location of
Gen.
Sector / Sub-sector /
Scheme/
Sr.
Name of Scheme
District
No.
2
3
1
2078 Construction of road from Mashooque
Shikarpur
Ali Dahani to Alaf Khan Dahani via
Khan Muhammad Dahani mile 0/0-2/2 =
3.60 Kms
2079 Construction of road from Darya Khan
Shikarpur
Detho to Bhutta Goth via Rakhayl Ji
Wandh (5 Kms)
2080 Construction of road from Gaheja road
Shikarpur
to Soomra village (5 Kms)
2081 Construction of road from 10 Mile to
Shikarpur
Sardar Fateh Muhammad Khan Jatoi
(4.00 Kms)
2082 Construction of road from via
Jacobabad
Jacobabad Thull Main road to village
Mir Amir Khan khoso Deh Rahimabad
UC Kot Jangu Taluka Thull (3.00 Kms).

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2013-14
26.01.2012

6
22.376

Actual
Exp. upto
Jun, 12
7
4.350

Estimated
Cost

Revised
Allocation 2012-13
Total
F.P.A.
8
9
10.000
0.000

Est. Exp.
upto
June' 13
10
14.350

Throwfwd
as on
01-07-13
11
8.026

Allocation for
2013-14
Capital Revenue
Total
12
13
14
8.026
0.000
8.026

15
0.000

FPA

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
64
100
0.000
0.000

Approved
20.01.2012

2013-14

33.843

6.000

7.921

0.000

13.921

19.922

19.922

0.000

19.922

0.000

41

100

0.000

0.000

Approved
12.12.2011
Approved
12.12.2011

2013-14

30.859

6.000

7.500

0.000

13.500

17.359

17.359

0.000

17.359

0.000

44

100

0.000

0.000

2013-14

28.045

9.600

2.625

0.000

12.225

15.820

15.820

0.000

15.820

0.000

44

100

0.000

0.000

Approved
03.12.2011

2013-14

21.280

6.300

10.000

0.000

16.300

4.980

4.980

0.000

4.980

0.000

77

100

0.000

0.000

2083 Construction of link road from Thull


Kashmore @ Approved
New Bye Pass @ mile 1/7 to connected
Kandhkot
26.1.2012
Hassanabad road via village Umar Khan
Khoso mile 0/0-1/7 (3.00 Kms).

2013-14

24.870

7.200

10.000

0.000

17.200

7.670

7.670

0.000

7.670

0.000

69

100

0.000

0.000

2084 Construction of link road from Thul


Kashmore @ Approve
Saifal road at mile 11/0 to village Sardar Kandhkot
26.1.2012
Sher Muhammad Khan Mari road to
connect Ghulam Sarwar Khan Sarki
road (5.00 Kms)
2085 Construction of road from Manganhar Kashmore @ Approved
road to village Nazir Ahmed via Buxi
Kandhkot 13.12.2011
Khan Dombki, Sheraz Khan Dombki,
Fareed Khan Dombki, Sikandar Khan
Dombki and Ibrahim Khan Dombki
(4.40 Kms).
2086 Construction of road from Bangul Dero
Larkana
Approved
Ghari Khuda Bux Bhutto road at mile
17.10.2011
0/2 to village Seewo Labani via
Muhammad Labano and Bungul Dero
High School (3.00 Kms)
2087 Construction of road from Naudero
Larkana
Approved
Ratodero road to Koreja via Graveyard
17.10.2011
of Shuhdai (18th October 2007) along
Sim Drain mile 0/0-1/7 3.00 Kms

2013-14

36.390

12.000

15.000

0.000

27.000

9.390

9.390

0.000

9.390

0.000

74

100

0.000

0.000

2013-14

32.818

10.800

12.018

0.000

22.818

10.000

10.000

0.000

10.000

0.000

70

100

0.000

0.000

2013-14

21.048

2.700

10.648

0.000

13.348

7.700

7.700

0.000

7.700

0.000

63

100

0.000

0.000

2013-14

21.104

0.000

2.000

0.000

2.000

19.104

19.104

0.000

19.104

0.000

100

0.000

0.000

{323}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Location of
Status
Target Date
Gen.
Sector / Sub-sector /
Scheme/
Date of
for
Sr.
Name of Scheme
District
Approval Completion
No.
2
3
4
5
1
2088 Construction of road from Kamber
Larkana
Approved
2014-15
Railway Track, new Nazar Mohalla
17.10.2011
alongwith Rice Canal IP Side to
Circular By-Pass 5.00 Kms
2089 Construction of road from Rehmatpur
Larkana
Approved
2013-14
Phatak to Circular By-Pass (Alongwith
17.10.2011
Main Railway Line Larkana to Karachi)
5.00 Kms
2090 Construction of Kotri Sher shah Soori
Thatta
Approved
2013-14
road mile 0/0-8/2 (Priority mile 4/0-8/3
3.12.2011
(7.00 Kms).
2091 Construction of roads in UC Khudadad
Dadu
Approved
2014-15
Taluka Dadu (7.44 Kms)
26-10-2011
2092 Construction of road from village Sayed Mirpurkhas Approved
2013-14
Ghulam Hyder Shah to Sayed Imtiaz Ali
4/1/2012
Shah (2.50 Kms).
2093 Construction of Road from Guddu along Jacobabad Approved
2015-16
Patt Feeder Canal upto RD-109 Shahi
Wah upto Border of Balouchistan
Province mile 0/0-9/0 =90-0 M=144.90
Kms (Taluka Kashmore).

Revised
Allocation 2012-13
Total
F.P.A.
8
9
10.000
0.000

Throwfwd
as on
01-07-13
11
40.963

15
0.000

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
32
37
37.963
0.000

6
59.963

32.165

4.500

15.000

0.000

19.500

12.665

12.665

0.000

12.665

0.000

61

100

0.000

0.000

44.557

30.000

17.000

0.000

47.000

-2.443

1.000

0.000

1.000

0.000

105

108

0.000

0.000

58.475

11.300

22.500

0.000

33.800

24.675

3.000

0.000

3.000

0.000

58

63

21.675

0.000

18.236

9.000

11.500

0.000

20.500

-2.264

0.010

0.000

0.010

0.000

112

112

0.000

0.000

987.500

375.236

5.000

0.000

380.236

607.264

15.000

0.000

15.000

0.000

39

40

296.132

296.132

Estimated
Cost

Est. Exp.
upto
June' 13
10
19.000

Allocation for
2013-14
Capital Revenue
Total
12
13
14
3.000
0.000
3.000

Actual
Exp. upto
Jun, 12
7
9.000

FPA

2094 Construction of Road from Sanhri


Sarak to Noor Wah mile 0/0-18/6 (30.0
Kms)
2095 Constrcution / Repair of road from
Tando Bago Jhudo road at mile 17/0 to
connect Tando Bago Digri road at point
Alamabad mile 0/0-8/6 (14.08 Kms)

Jacobabad

Approved

2014-15

133.129

59.000

0.000

0.000

59.000

74.129

8.000

0.000

8.000

0.000

44

50

66.129

0.000

Badin

Approved
09.04.2008

2015-16

69.146

28.000

5.000

0.000

33.000

36.146

25.000

0.000

25.000

0.000

48

84

5.573

5.573

2096 Construction of road from Dehi Tando


Jan Mohammad road @ point 57 Mori
to Jhudo with link to village Haji
Ibrahim Jalo and village Rori village
Ghulam Mustafa Brohi 0/0-12/0 (19.2
km)
2097 Construction of road from Dumbalo to
Ghulam Shah Mori Road via S.B.
H.B.A. UD Arian mile 5/5-15/0. Phase II (15.95)
2098 Reconstruction of road from Phardo
Jamali to Khudro mile 0/0-7/0 (11.20
Kms)

Badin

Approved
08.01.2008

2015-16

119.388

32.500

5.000

0.000

37.500

81.888

40.000

0.000

40.000

0.000

31

65

20.944

20.944

Badin

Approved
31.01.2008

2015-16

91.486

39.000

5.000

0.000

44.000

47.486

48.000

0.000

48.000

0.000

48

101

0.000

0.000

Badin

Approved
30.01.2008

2014-15

62.523

25.000

5.000

0.000

30.000

32.523

20.000

0.000

20.000

0.000

48

80

12.523

0.000

(R)

(R)

(R)

(RR

(R)

(R)

{324}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Location of
Status
Target Date
Gen.
Sector / Sub-sector /
Scheme/
Date of
for
Sr.
Name of Scheme
District
Approval Completion
No.
2
3
4
5
1
(R) (RR
(R)
2099 Construction of Hyderabad Mirpurkhas Hyderabad Approved
2015-16
Bye pass road mile 0/0-6/4 = 6-4 = 10.46
19.09.2005
Kms.
2100 Construction of Tando Ahmed Khan
Jamshoro
Approved
2015-16
Karchat Center (Kherthar National
27.10.2005
Park) Thano Bulla Khan mile 0/0-45/0 =
45-0 (M) = 72.45 Kms.
2101 Construction of Mirpurkhas By pass
Mirpurkhas Approved
2015-16
road connect Hyderabad road Tando
22.02.2007
Adam road Khan road and Sindhri road
with over head bridge near Ratanabad
Road Mile 0/0-11/0 (M) = 17.71 Kms .
2102 Construction of road from Nawabshah
Shahdadpur Hala Khyber road mile 0/038/4 = 38-4 (M) = 61.98 Kms.
2103 Construction of road from MKhas to
NShah along old alignment Road Mile
0/0-43/0 = 43-0 (M) = 69.23 Kms.

Actual
Estimated
Exp. upto
Cost
Jun, 12
6
7
(R) (R)
(R)
208.123
7.000

Revised
Allocation 2012-13
Total
F.P.A.
8
9
8.000
0.000

Est. Exp.
upto
June' 13
10
15.000

Throwfwd
as on
01-07-13
11
193.123

Allocation for
2013-14
Capital Revenue
Total
12
13
14
10.000
0.000
10.000

15
0.000

FPA

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
7
12
91.562
91.562

167.996

56.000

7.000

0.000

63.000

104.996

30.000

0.000

30.000

0.000

38

55

37.498

37.498

248.017

75.500

5.000

0.000

80.500

167.517

12.000

0.000

12.000

0.000

32

37

77.759

77.759

Sanghar

Approved
03.05.2006

2015-16

251.084

63.000

5.000

0.000

68.000

183.084

10.000

0.000

10.000

0.000

27

31

86.542

86.542

Sanghar

Approved
01.03.2007

2015-16

548.969

54.912

7.500

0.000

62.412

486.557

40.000

0.000

40.000

0.000

11

19

223.279

223.279

2104 Construction of Southern Bypass at


T. Allahyar
Tando Allahyar road mile 0/0-5/4 = 5-4
(M) = 8.85 Kms.
2105 Construction of Naukot By- Pass road
Tharparkar
mile 0/0-7/4 = 7-4 (M) = 12.07 Kms.
2106 Construction of road from Gujjo - Jung
Thatta
Shahi - Nooriabad road mile 2/4-39/0 =
36-4 = (M) = 58.76 Kms.
2107 Construction of Road from Annupani to
Umerkot
Bhittala mile 0/0-17/0 = 17-0 (M) = 27.37
Kms.
2108 Construction / Widening /
Umerkot
Reconditioning & Resurfacing of
Umerkot Bye Pass road mile 0/0-16/6 =
16-6 (M) = 26.96 Kms..
2109 Construction of link road from Cheeta
Umerkot
Chowk to Haji Arab via Mokaryar Haji
Adam Nohri mile 0/0-9/3 (15 Kms)

Approved
10.01.2005

2015-16

140.660

61.500

1.250

0.000

62.750

77.910

12.000

0.000

12.000

0.000

45

53

32.955

32.955

Approved
08.11.2003
Approved
08.11.2003

2014-15

68.456

29.700

1.250

0.000

30.950

37.506

8.000

0.000

8.000

0.000

45

57

29.506

0.000

2015-16

181.193

67.748

5.000

0.000

72.748

108.445

10.000

0.000

10.000

0.000

40

46

49.223

49.223

Approved
08.11.2003

2015-16

237.028

75.090

1.250

0.000

76.340

160.688

10.000

0.000

10.000

0.000

32

36

75.344

75.344

Approved
13.10.205

2015-16

134.432

45.500

1.250

0.000

46.750

87.682

8.000

0.000

8.000

0.000

35

41

39.841

39.841

Approved
07.05.2008

2015-16

121.500

47.900

5.000

0.000

52.900

68.600

8.000

0.000

8.000

0.000

44

50

30.300

30.300

2110 Const: of road from Umerkot to Soofi


Dhoro Naro road on Krowah Path via
Hurabad 7 mile mori 18.00 Kms

Approved
02.01.2008

2015-16

90.000

27.200

1.250

0.000

28.450

61.550

8.000

0.000

8.000

0.000

32

41

26.775

26.775

Umerkot

{325}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Location of
Gen.
Sector / Sub-sector /
Scheme/
Sr.
Name of Scheme
District
No.
2
3
1
2111 Construction of Road from Tajjal Lakh
Khairpur
Shairf Padaro Road mile 0/0-28/4 (14.0
Kms)
2112 Construction of Road from Pholri Road
Khairpur
to RD-463 of Nara Canal upto Pir bux
Gaho with link to village Baseero mile
0/0-36/0 (58.0 Kms)
2113 Construction of Road from Nara Tajjal
Khairpur
Gate Road to Khumbhraho Channel
(Nauabad).
2114 Construction of Road from Pacca Chang Khairpur
Bangho Road to Ranjo Mashori via Pir
Ghulamullah Shah to village Khaskheli
@ Attah Mohammad mashori 11.0 Km

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2015-16
12.3.2007

6
244.060

Actual
Exp. upto
Jun, 12
7
104.645

Estimated
Cost

Revised
Allocation 2012-13
Total
F.P.A.
8
9
1.250
0.000

Est. Exp.
upto
June' 13
10
105.895

Throwfwd
as on
01-07-13
11
138.165

Allocation for
2013-14
Capital Revenue
Total
12
13
14
5.000
0.000
5.000

15
0.000

FPA

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
43
45
66.583
66.583

Approvoed
19.1.2007

2014-15

305.240

107.500

1.250

0.000

108.750

196.490

10.000

0.000

10.000

0.000

36

39

186.490

0.000

Approved
07.3.2008

2014-15

50.713

7.000

1.250

0.000

8.250

42.463

5.000

0.000

5.000

0.000

16

26

37.463

0.000

Approved
20.2.2008

2014-15

63.888

18.005

1.250

0.000

19.255

44.633

5.000

0.000

5.000

0.000

30

38

39.633

0.000

Approved
20.2.2008
approved
20.2.2008

2014-15

64.397

12.800

1.250

0.000

14.050

50.347

5.000

0.000

5.000

0.000

22

30

45.347

0.000

2014-15

65.312

19.500

5.000

0.000

24.500

40.812

10.000

0.000

10.000

0.000

38

53

30.812

0.000

Khairpur

Approved
20.1.2008

2014-15

72.730

9.000

1.250

0.000

10.250

62.480

8.000

0.000

8.000

0.000

14

25

54.480

0.000

2115 Construction of Road from Malak


Chowdagi to Nandi Thari (12.0 Km)
2116 Construction of Road from Kumb Kot
Lalu Jhangu Road to village Talpur
Wadda manzoor Phull to Siyal village
Road mile 0/0-7/0 (11.26 kms)
2117 Construction of Road from Haji
Mohammad Hassan Chang to Fakir
Amir bux majeedano & Wali
Mohammad Majeedano
2118 Construction of road from Kot Lalu
Nawab Shah Road to Wadero Abdullah
Lakhejo Kabool Ahmed Rajper Liaquat
Rajer and Korhi Jalal Ji (13 Km)

Khairpur

Khairpur

Approved
11.1.2008

2014-15

75.704

12.000

1.250

0.000

13.250

62.454

8.000

0.000

8.000

0.000

18

28

54.454

0.000

2119 Construction of Road from Setharija Pir


Budhro Road Haji Rajper via Khaskheli
viallage 14.0 Km
2120 Construction of Road from Palyo Fakir
Chang to Mir Wah Bridge village Fakir
Waryiam Shar to Bungalow Pir Shahb
Pagaro Bungalow Road (12.0 km)

Khairpur

Approved
11.1.2008

2014-15

58.110

19.995

5.000

0.000

24.995

33.115

5.000

0.000

5.000

0.000

43

52

28.115

0.000

Khairpur

Approved
07.1.2008

2014-15

67.379

6.800

1.250

0.000

8.050

59.329

8.000

0.000

8.000

0.000

12

24

51.329

0.000

2121 Construction of Road from Hingorija


Sagyoon road on the left bank of
mahesar Shakh to New N.H.Way via
Safullah Khan Khaskheli (5.0 km)

Khairpur

Approved
11.1.2008

2013-14

34.000

16.000

10.000

0.000

26.000

8.000

9.000

0.000

9.000

0.000

76

103

0.000

0.000

Khairpur

{326}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Gen.
Sector / Sub-sector /
Sr.
Name of Scheme
No.
2
1
2122 Construction of link road Paddidan to
Kot Lalu Road mile 0/0-7/2 (12.0 Kms)
2123 Construction of Road from nooh
Kalhoro to Sher Mohammad Abro (5.0
km) 0/0-13/1 (21.0 Kms)
2124 Construction of Road from Paddian
Phull Road to village Idrees Path (6.0
Km) 0/0-5/0 (8.0 Kms)
2125 Block Schemes for construction of
Provincial Roads in each District (11.8
Kms)
2126 Construction of 2 Km road from Var Ghulamullah road to village Changan
Mallah mile 0/0-1/2 (2.00 Kms).
2127 Construction of Road from Ubauro
Rawanti Road at Mahi Wah Bridge to
village Haji Idrees Chhajjan via Nau
goth mile 0/0-1/4 (2.5 Kms)
2128 Construction of Road from machhka
Road to Miani Road via Ghulam Hyder
Dashti (0/0-2/0 (3.21 Kms)
2129 Construction of road from Sehwan
Jhangara road to Akhari village mile 0/01/2 (2.0 Kms)
2130 Construction of road from Shah
Bukhari road to Lundi Shakh mile 0/04/1
2131 Construction of road from Jhangara
Naing road to Dargah Shaikh Dhaman
mile 0/0-1/7 (3.0 Kms).
2132 Construction of road from Asgharabad
to village Zardari Abad American Farm
to old village Piyaro Faqeer Zardari
road mile 0/0-3/1 (5.00 Kms)
2133 Construction of road from Al-Noor
Sugar Mill @ mile 4/0 to connect
Doulatput Pubjo road mile 0/0-5/0 (8.05
Kms)
2134 Construction of road from Sahib Khan
Zardari road mile 1/5 to village Chakar
Khan Shahani via Zafarullah Dahri
road mile 0/0-2/0 (3.20 Kms)

Location of
Scheme/
District
3
N. Feroze

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2013-14
29.3.2007

6
51.126

Actual
Exp. upto
Jun, 12
7
24.500

Estimated
Cost

Revised
Allocation 2012-13
Total
F.P.A.
8
9
5.000
0.000

Est. Exp.
upto
June' 13
10
29.500

Throwfwd
as on
01-07-13
11
21.626

Allocation for
2013-14
Capital Revenue
Total
12
13
14
21.626
0.000
21.626

15
0.000

FPA

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
58
100
0.000
0.000

N. Feroze

Approved
31.1.2008

2013-14

37.316

13.000

5.000

0.000

18.000

19.316

19.316

0.000

19.316

0.000

48

100

0.000

0.000

N. Feroze

Approved
11.1.2008

2013-14

43.072

16.000

5.000

0.000

21.000

22.072

23.000

0.000

23.000

0.000

49

102

0.000

0.000

Kambar
Shahdadkot

Approved
29.4.2006

2013-14

39.672

29.638

7.863

0.000

37.501

2.171

2.171

0.000

2.171

0.000

95

100

0.000

0.000

Thatta

Approved
13-02-2013.

2013-14

15.715

0.000

2.000

0.000

2.000

13.715

13.715

0.000

13.715

0.000

13

100

0.000

0.000

Ghotki

Approved
23.01.2013

2013-14

23.762

0.000

5.000

0.000

5.000

18.762

18.762

0.000

18.762

0.000

21

100

0.000

0.000

Ghotki

Approved

2014-15

32.670

0.000

5.000

0.000

5.000

27.670

5.000

0.000

5.000

0.000

15

31

22.670

0.000

Jamshoro

Approved
17-10-2012.

2013-14

30.854

0.000

12.000

0.000

12.000

18.854

18.854

0.000

18.854

0.000

39

100

0.000

0.000

Jamshoro

Approved
22.1.2003

2015-16

67.087

0.000

5.000

0.000

5.000

62.087

5.000

0.000

5.000

0.000

15

28.544

28.544

Jamshoro

Approved
13-12-2012.

2015-16

47.290

0.000

13.000

0.000

13.000

34.290

5.000

0.000

5.000

0.000

27

38

14.645

14.645

S.B.A

Approved
31-12-2012.

2015-16

97.737

0.000

5.000

0.000

5.000

92.737

5.000

0.000

5.000

0.000

10

43.869

43.869

S.B.A

Approved
31-12-2012.

2015-16

130.898

0.000

5.000

0.000

5.000

125.898

20.767

0.000

20.767

0.000

20

52.566

52.566

S.B.A

Approved
08-01-2013.

2015-16

44.247

0.000

5.000

0.000

5.000

39.247

8.000

0.000

8.000

0.000

11

29

15.624

15.624

{327}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Location of
Status
Target Date
Gen.
Sector / Sub-sector /
Scheme/
Date of
for
Sr.
Name of Scheme
District
Approval Completion
No.
2
3
4
5
1
2135 Construction of road from Badin Road
T.M. Khan
Approve
2013-14
to Mian Suleman village District Tando
16-01-2013.
Muhammad Khan mile 0/0-0/7+330
(1.50 Kms)
(R) (R
(R)
2136 Construction of metalled road in vilage
Larkana
Approved
2013-14
Dodai mile 0/0-1/2 (2.0 kms)
15.3.2012
2137 Construction of Road from Larkana
Larkana
Approved
2014-15
Ratodero Road at village Fatehpur to
28.11.2012
village Haji Motayo Jagirani via Khair
Mohammad Jagirani (Parellel to
Mirwah) mile 0/0-1/4 (2.40 Kms)
2138 Construction of Road from main Thull / Jacobabad Approved
2014-15
Jacobabad Road (Lakhi Pir) to village
28.11.2012
Amir Khan Khoso via Lal bux Khoso to
link Road Zanglipur / Bahadurpur Road
(Chatri Masjid) (4.5 Kms)

Estimated
Cost
6
18.424

Actual
Exp. upto
Jun, 12
7
0.000

Revised
Allocation 2012-13
Total
F.P.A.
8
9
2.000
0.000

Est. Exp.
upto
June' 13
10
2.000

Throwfwd
as on
01-07-13
11
16.424

Allocation for
2013-14
Capital Revenue
Total
12
13
14
16.424
0.000
16.424

FPA
15
0.000

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
11
100
0.000
0.000

(R) (R)
13.893

(R)
5.767

2.000

0.000

7.767

6.126

6.126

0.000

6.126

0.000

56

100

0.000

0.000

35.898

0.000

3.000

0.000

3.000

32.898

5.000

0.000

5.000

0.000

22

25.900

0.000

52.593

0.000

3.000

0.000

3.000

49.593

15.000

0.000

15.000

0.000

34

34.593

0.000

2139 Construction of Road from over the top


of Kupri minor Tunia Pull to Shahal
Dhani road mile 0/0-1/2 (2.0 kms)

Khairpur

Approved
19.12.2012

2014-15

21.344

0.000

1.500

0.000

1.500

19.844

2.000

0.000

2.000

0.000

16

17.844

0.000

2140 Construction of Road Imam Bux


Katohar to village Mohammad Arab
Katohar Road mile 0/0-2/0 (3.20 kms)
2141 Construction of Road Mahar Pull to
Mithal Jagirani Road mile 0/0-0/7 (2.0
Kms)
2142 Construction of internal Road of Bhano
goth Phulpota (1.60 Kms)
2143 Construction of Road from N.H.Way to
village Allah Dad Hyderi (0.40 km)
2144 Construction of Road and retaining wall
at village Wari Goth (1.40 km)
2145 Construction / Reconditioning of Road
Hajan Shah Primary School to village
Ghulam Rasool Solangi via Buxo Wahan
and villgae Abdul Aziz (2.60 kms)

Khairpur

Approved
23.1.2013

2014-15

16.804

0.000

1.500

0.000

1.500

15.304

2.000

0.000

2.000

0.000

21

13.304

0.000

Khairpur

Approved
23.1.2013

2014-15

53.338

0.000

1.500

0.000

1.500

51.838

5.000

0.000

5.000

0.000

12

46.838

0.000

Khairpur

Approved
23.1.2013
Approved
23.1.2013
Approved
23.1.2013
Approved
19.12.2012

2013-14

5.893

0.000

1.500

0.000

1.500

4.393

4.393

0.000

4.393

0.000

25

100

0.000

0.000

2013-14

3.366

0.000

1.500

0.000

1.500

1.866

1.866

0.000

1.866

0.000

45

100

0.000

0.000

2014-15

29.596

0.000

1.500

0.000

1.500

28.096

5.000

0.000

5.000

0.000

22

23.096

0.000

2014-15

21.543

0.000

1.500

0.000

1.500

20.043

4.000

0.000

4.000

0.000

26

16.043

0.000

2146 Construction of Road from Pir Jo Goth


Road to Madarsa via village Jan
Mohammad Janvri (1.0 Km)
2147 Construction of Road Backside of Atteri
to village Razi Goth (2.40 kms)

Khairpur

Approved
23.1.2013

2013-14

10.956

0.000

1.500

0.000

1.500

9.456

10.000

0.000

10.000

0.000

14

105

0.000

0.000

Khairpur

Approved
23.1.2013

2014-15

25.257

0.000

1.500

0.000

1.500

23.757

4.000

0.000

4.000

0.000

22

19.757

0.000

Khairpur
Khairpur
Khairpur

{328}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Location of
Gen.
Sector / Sub-sector /
Scheme/
Sr.
Name of Scheme
District
No.
2
3
1
2148 Construction of Road from Khadim
Khairpur
Hussain Katohar to Sharaf Din
Shanbhani (1.20 km)
2149 Construction of Road from Khairpur
Khairpur
Machi Road to village Sawan Faqeer
Phulpoto (1.40 Kms)
2150 Construction of Road Talpur Wada to
Khairpur
village Saleem Shah via Ahadi Khan
Rajpar Road mile 0/0-0/7 (1.60 km)
2151 Construction of link road from Mutalib
Khairpur
Phulpoto to village Daud Goth UC
Mehar Ali (1.0 km)
2152 Construction of road from Pir Patho
Thatta
Gail Mori road to Village Nizamani
along udero lal Branch NIP RD 17 to 22
road mile 0/0-1/2 (2.00 Kms)
2153 Construction of road from Khisana
Hyderabad
Mori Muhammad Hussain Panhwar
Agriculture School Late Mazar and
Agricutlre Research Labortary road
mile 0/0-0/5+330 (1.10 Kms).
2154 Construction of road from 2 kms road
Karachi
from Northern by Pass Toll Plaza to
Malang Goth Deh Gondpass Tapo
Gabopat mile 0/0-1/2.
2155 Constrcution of Internal roads different
Karachi
areas of the Constituency No. Ps-128 Ucs
2,3,4,5 Landhi Distt: Malir 0/0-3/1 (5.0
Kms)
2156 Land Acquisition for construction of
Hyderabad
Tando Jam Bye-Pass Road along
Hyderabad Mirpurkhas Road Mile 0/06/0(9.66 km).

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2014-15
19.12.2012

2157 Land Acquisition for construction of


Dualization Tando Allahyar Bye-Pass
road (Northern Side) road mile 0/03/7(6.20 km).
2158 Construction/Improvement of Roads in
Sukkur (NA-198)

6
14.744

Actual
Exp. upto
Jun, 12
7
0.000

Estimated
Cost

Revised
Allocation 2012-13
Total
F.P.A.
8
9
1.500
0.000

Est. Exp.
upto
June' 13
10
1.500

Throwfwd
as on
01-07-13
11
13.244

Allocation for
2013-14
Capital Revenue
Total
12
13
14
13.244
0.000
13.244

FPA
15
0.000

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
10
100
0.000
0.000

Approved
19.12.2012

2013-14

10.590

0.000

1.500

0.000

1.500

9.090

9.090

0.000

9.090

0.000

14

100

0.000

0.000

Approved
23.1.2013

2013-14

14.958

0.000

1.500

0.000

1.500

13.458

13.458

0.000

13.458

0.000

10

100

0.000

0.000

Approved
23.1.2013

2013-14

12.160

0.000

2.000

0.000

2.000

10.160

10.160

0.000

10.160

0.000

16

100

0.000

0.000

Approved
07-02-13.

2013-14

17.483

0.000

5.000

0.000

5.000

12.483

12.483

0.000

12.483

0.000

29

100

0.000

0.000

Approved
30.01.13

2013-14

9.631

0.000

9.631

0.000

9.631

0.000

1.000

0.000

1.000

0.000

100

110

0.000

0.000

Approved
02-11-12.

2013-14

21.440

0.000

10.000

0.000

10.000

11.440

11.440

0.000

11.440

0.000

47

100

0.000

0.000

Approved
02-11-12.

2014-15

50.739

0.000

11.250

0.000

11.250

39.489

5.000

0.000

5.000

0.000

22

32

34.489

0.000

Approved
27.3.2011

2013-14

169.088

10.000

27.750

0.000

37.750

131.338

48.033

0.000

48.033

0.000

22

51

0.000

0.000

T. Allahyar

Approved
27.3.2010

2013-14

120.825

7.500

12.500

0.000

20.000

100.825

53.000

0.000

53.000

0.000

17

60

0.000

0.000

Sukkur

Approved

2013-14

44.762

10.000

24.762

0.000

34.762

10.000

10.000

0.000

10.000

0.000

78

100

0.000

0.000

{329}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Gen.
Sector / Sub-sector /
Sr.
Name of Scheme
No.
2
1
2159 Construction of road from Pholari road
to village Fakir Zafar Ali Hesbani mile
0/0-4/4
2160 Construcstion of Metalled road village
Yousuf Mehar to village Arbab Mehar
(2 km)
2161 Construcstion of road from Pateji
Regulator to Mehar Faridabad raod
mile 3/0 via Ganja Saeed Jo Goth along
Kakol branch mile 0/0-6/2 (10 kms)

Location of
Scheme/
District
3
Khairpur

2162 Construction / Improvement of road


from Mirpurkhas Umerkot road to
Mirpurkhas Sanghar road (Bye pass
road with asphalt concrete mile 0/0-1/7
(3 Kms).
2163 Construcstion of road from Hyderabad
road to meet Mirwah road near Abdin
Pump (Mirpurkhas Southern Byepass )
mile 0/0-7/4 (12.07 kms)

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2013-14
12.12.2011

6
53.803

Actual
Exp. upto
Jun, 12
7
5.000

Estimated
Cost

Revised
Allocation 2012-13
Total
F.P.A.
8
9
10.950
0.000

Est. Exp.
upto
June' 13
10
15.950

Throwfwd
as on
01-07-13
11
37.853

Allocation for
2013-14
Capital Revenue
Total
12
13
14
5.000
0.000
5.000

FPA
15
0.000

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
30
39
0.000
0.000

Ghotki

Approved
12.10.2011

2012-13

13.303

5.960

7.303

0.000

13.263

0.040

0.500

0.000

0.500

0.000

100

103

0.000

0.000

Dadu

Approved
12.12.2011

2013-14

78.157

16.300

13.290

0.000

29.590

48.567

8.700

0.000

8.700

0.000

38

49

0.000

0.000

Mirpurkhas

Approved
22.11.2012

2013-14

86.800

0.000

30.000

0.000

30.000

56.800

24.000

0.000

24.000

0.000

35

62

0.000

0.000

Mirpurkhas

Approved
22.11.2012

2013-14

383.726

0.000

60.000

0.000

60.000

323.726

30.000

0.000

30.000

0.000

16

23

0.000

0.000

2164 Construcstion of road from Shadi Palli


Mirpurkhas Approved
Saindad Station road to village Ramshi
17.10.2012
Kolhi mile 0/0-2/0 (3.22 km)
2165 Construction of road from Shah Jamshoro
Approved
Bukhari road to Lundi Shakh mile 0/028.2.2013
4/1(6.637 Kms).
2166 Construction of road from Mushtaq
Dadu
Approved
Jamali to Makkaki mile 0/0-1/4 (2.4 km)
17.10.2012

2013-14

30.779

0.000

13.200

0.000

13.200

17.579

17.579

0.000

17.579

0.000

43

100

0.000

0.000

2014-15

27.939

0.000

5.000

0.000

5.000

22.939

10.000

0.000

10.000

0.000

18

54

12.939

0.000

2013-14

26.281

0.000

10.000

0.000

10.000

16.281

8.000

0.000

8.000

0.000

38

68

0.000

0.000

2167 Construction of road from Johi Bhan


road to village chakk via Mosa Panhwar,
Gulan Panhwar road mile 0/0-1/2 (2.00
kms)
2168 Construction of road from MNV Drain
to Buthi road mile 0/0-2/0 (3.2 kms)

Dadu

Approved
17.10.2012

2013-14

21.176

0.000

5.000

0.000

5.000

16.176

16.176

0.000

16.176

0.000

24

100

0.000

0.000

Dadu

Approved
17.10.2012

2013-14

28.334

0.000

10.000

0.000

10.000

18.334

3.000

0.000

3.000

0.000

35

46

0.000

0.000

2169 Construction of road from Mudd Sharif


to Jasgeer road mile 0/0-1/4( 2.4 Km)
UC Khudabad.

Dadu

Approved
17.10.2012

2013-14

26.086

0.000

10.000

0.000

10.000

16.086

17.000

0.000

17.000

0.000

38

104

0.000

0.000

{330}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Gen.
Sector / Sub-sector /
Sr.
Name of Scheme
No.
2
1
2170 Construction of road from Jhalo road to
Qadir Machhi via Allahdino Lashari
upto Dargah Malkani Sharif road mile
0/0-2/0 (3.2 kms)
2171 Construction of road from Sukhio Miri
to Amir Peer Mori via Budhar
Babanyoon including links to Qadir Bux
Chahwan, Roshan Chahwani Wadero
Qasim Panhwar Wali Muhammad
Bughio Haji Ali Akber Chahwan
Ghulam Nabi Bughio and Nasurllah
Bughio mile 0/0-5/0 (8 km
2172 Constt: of road from Manghanwari to
village Saleh Suhag to Saeed Khan road
mile 0/0-0/5.
Total Construction (On-Going)

Location of
Scheme/
District
3
Dadu

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2014-15
17.10.2012

6
34.817

Actual
Exp. upto
Jun, 12
7
0.000

Estimated
Cost

Revised
Allocation 2012-13
Total
F.P.A.
8
9
15.000
0.000

Est. Exp.
upto
June' 13
10
15.000

Throwfwd
as on
01-07-13
11
19.817

Allocation for
2013-14
Capital Revenue
Total
12
13
14
10.000
0.000
10.000

15
0.000

FPA

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
43
72
9.817
0.000

Dadu

Approved
17.12.2012

2014-15

124.370

0.000

25.000

0.000

25.000

99.370

39.449

0.000

39.449

0.000

20

52

59.921

0.000

Khairpur

Approved

2013-14

4.934

2.373

0.000

0.000

2.373

2.561

2.561

0.000

2.561

0.000

48

100

0.000

0.000

19570.013

7040.229

2431.388

0.000

9471.617

10098.396

2488.995

0.000

2488.995

0.000

4331.851

2823.456

Construction New
2173 Construction of village Ghani Kehar
pacca road to village Jaffar Jat
Manwani mile 0/0-1/2 (2.0 Kms)
2174 Construction of road from Baranabad
Unner Farm Pacca road to village
Sobharo Moochi mile 0/0-0/5 (1 Km)
2175 Construction of road from Daro Belo to
village Muhammad Ismail Khado mile
0/0-0/5 (1.0 Km)
2176 Construction of road from National
Highway Sayfan Arori to village Manak
Behrani mile 0/0-3/6 (6.00 Kms).

Thatta

Approved
19.12.2012

2015-16

21.140

0.000

0.000

0.000

0.000

21.140

3.000

0.000

3.000

0.000

14

9.070

9.070

Thatta

Approved
28.11.2012

2013.14

10.278

0.000

0.000

0.000

0.000

10.278

10.278

0.000

10.278

0.000

100

0.000

0.000

Thatta

Approved
28.11.2012

2013.14

9.882

0.000

0.000

0.000

0.000

9.882

9.882

0.000

9.882

0.000

100

0.000

0.000

Thatta

Approved
19.12.2012

2014-15

58.517

0.000

0.000

0.000

0.000

58.517

4.000

0.000

4.000

0.000

54.517

0.000

2177 Construction of road from Nadirabad


Ariyana Noor from Babra road to
village Nazir Brohi mile 0/0-2/4 (4.0
Kms)
2178 Construction
of road from Shah Nasir

Thatta

Approved
28.11.2012

2014-15

39.256

0.000

0.000

0.000

0.000

39.256

3.000

0.000

3.000

0.000

36.256

0.000

Thatta

Approved
21.02.2013

2015-16

61.689

0.000

0.000

0.000

0.000

61.689

3.000

0.000

3.000

0.000

29.345

29.345

Thatta

Approved
31-12-2012.

2014-15

20.365

0.000

0.000

0.000

0.000

20.365

2.000

0.000

2.000

0.000

10

18.365

0.000

Thatta

Approved
31-12-2012

2014-15

18.201

0.000

0.000

0.000

0.000

18.201

2.000

0.000

2.000

0.000

11

16.201

0.000

Bridge to Shah Nasir Mazar mile 0/0-1/2


(2.0 Kms)
2179 Construction of road from Jungshahi to
Babrho Jakhro mile 0/0-1/4 (2.41 Kms)
2180 Construction of road from Karachi
National Highway to village Muhammad
Khan Brohi (2.0 Kms)

{331}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Location of
Status
Target Date
Gen.
Sector / Sub-sector /
Scheme/
Date of
for
Sr.
Name of Scheme
District
Approval Completion
No.
2
3
4
5
1
2181 Const. of road from Chuhar Jamali
Thatta
Approved
2014-15
Chach Jehan Khan road at mile 0/6 to
28.11.2012
village Haji Dilawar via Raboo Otho
mile 0/0-3/1 (5.0 Kms)
2182 Const. of National Highway Arbab Bhai
Thatta
Approved
2015-16
Khan Babur to meeting Railway station
21.02.2013
mile 0/0-7/4 (12.06 Kms)
2183 Const. of Road from Karo Kohu to
Thatta
Un2015-16
Syphan Nai Baran Along RBOD link to
Approved
Meer Garhi Amanulla
2184 Const. of road from Saleh Abro Road
Thatta
Approved
2015-16
mile 0/0-3/1 (5.0 Kms)
28.11.2012
2185 Construction of link road from SakroThatta
Approved
2014-15
Garho road upto village Haji Qasim Jat
31-12-2012
Mile 0/0-1/7 (3.00 Kms)
2186 Construction of road from Jafar Boohar
Thatta
Approved
2013-14
to Dargah Shah Qadir Mile 0/0-0/5 (1.00
31-12-2012.
Kms)
2187 Construction of road from Shah Kapoor
Thatta
Approved
2013-14
road to Haji Juman Khoso road mile 0/031-12-2012.
0/5 (1.00 Kms)
2188 Construction of road from Hingorjo to
Thatta
Approved
2014-15
Ghulam Mallah via Ladho Mallah mile
31-12-2012.
0/0-1/2 (2.00 Kms)
2189 Construction of road from Dargah
Thatta
Approved
2013-14
Kachelani to Chakar Mallah mile 0/0-0/5
17.10.2012
(1.00 Kms)
2190 Construction of road from Bai Budhi
Thatta
Approved
2013-14
road to village Wali Muhammad Shah
17.10.2012
mile 0/0-0/5 (1.00 Kms)
2191 Construction of road from Bargah
Thatta
Approved
2013-14
Kachelani to village Ramzan Jat. Mile
17.10.2012
0/0-0/5 (1.00 Kms)
2192 Construction of road from from Village
Thatta
Approved
2013-14
Sahibani Jagir Road to Village Karimi
17.10.2012
Farm mile 0/0-0/5 (1.00 Kms)
2193 Construction of road from Udassi link
Thatta
Approved
2014-15
road to Haji Ibrahim Baloch Taluka
17.10.2012
Ghora Bari road mile 0/0-1/2 (2.00 Kms)
2194 Construction or Road from Bahi Khan
Chandio via Kanti Wah to Village
Rasool Bux Bhogri UC Kotri Allah
Rakhio Shah Ghora Bari (3 Km).

Thatta

Approved
28.11.2012

2014-15

Revised
Allocation 2012-13
Total
F.P.A.
8
9
0.000
0.000

Throwfwd
as on
01-07-13
11
50.369

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
0
10
45.369
0.000

6
50.369

194.372

0.000

0.000

0.000

0.000

194.372

5.000

0.000

5.000

0.000

94.686

94.686

138.234

0.000

0.000

0.000

0.000

138.234

3.000

0.000

3.000

0.000

67.617

67.617

47.251

0.000

0.000

0.000

0.000

47.251

3.000

0.000

3.000

0.000

22.126

22.126

27.867

0.000

0.000

0.000

0.000

27.867

3.000

0.000

3.000

0.000

11

12.434

12.434

10.449

0.000

0.000

0.000

0.000

10.449

10.449

0.000

10.449

0.000

100

0.000

0.000

9.837

0.000

0.000

0.000

0.000

9.837

9.837

0.000

9.837

0.000

100

0.000

0.000

19.193

0.000

0.000

0.000

0.000

19.193

3.000

0.000

3.000

0.000

16

16.193

0.000

12.446

0.000

0.000

0.000

0.000

12.446

12.446

0.000

12.446

0.000

100

0.000

0.000

10.294

0.000

0.000

0.000

0.000

10.294

10.294

0.000

10.294

0.000

100

0.000

0.000

9.851

0.000

0.000

0.000

0.000

9.851

9.851

0.000

9.851

0.000

100

0.000

0.000

9.945

0.000

0.000

0.000

0.000

9.945

9.945

0.000

9.945

0.000

100

0.000

0.000

19.990

0.000

0.000

0.000

0.000

19.990

3.000

0.000

3.000

0.000

15

16.990

0.000

29.222

0.000

0.000

0.000

0.000

29.222

3.000

0.000

3.000

0.000

10

26.222

0.000

Estimated
Cost

Est. Exp.
upto
June' 13
10
0.000

Allocation for
2013-14
Capital Revenue
Total
12
13
14
5.000
0.000
5.000

Actual
Exp. upto
Jun, 12
7
0.000

FPA
15
0.000

{332}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Location of
Gen.
Sector / Sub-sector /
Scheme/
Sr.
Name of Scheme
District
No.
2
3
1
2195 Construction of road from Ahmed Khan
Thatta
Meerani Pandi Khan Zangiani mile 0/01/7 (3.00 Kms)
2196 Construction of road from Village
Thatta
Boohar to Village Hussain Samejo Paka
road Karmalak (2.0 Kms)
2197 Construction of road from Dargah
Jamshoro
Baqar Shah Jilani to Astan Guru
Manghal Gur Mile 0/0-1/7 (3.00 Kms)
2198 Construction of road from village
Thatta
Mureed Memon Ghani Gaad Hotel upto
village Gulam Darhoon Mirbahar
Sultanabad mile 0/0-0/7 (1.40 Kms).

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2015-16
17.10.2012

2199 Construction of road from Super


Highway to Farsi Garden mile 0/0-1/7
(3.00 Kms)
2200 Constrcution of Main Bijli Nagar Road
UC - I Orangi Town, Karchi mile 0/0-1/2
(2.0 Kms)
2201 Construction of road from Bus Stand
Goth Ahmed Khan Almani to Otaq
Ahmed Khan Almani mile 0/0-1/0 (1.61
Km)
2202 Construction / Improvement of road
from Zacha Khana Preatabad to
Mustafa Park road mile 0/0-0/5
2203 Const. / Impt.of road from Mustafaf
Park to Sakhi Pir road via Liaquat
Colony City Hyderabad road mile 0/00/7
2204 Construction of road from J.J.V.L Gas
Company to village Zain Farm road
mile 0/0-1/7 (3.0 Kms).
2205 Construction of road from Village
Bhutto Hajano Darya Baig Mughal road
to Vakri Band Road 0/0-1/0
2206 Construction of road from village Gul
Muhammad Jaffri Khoso to Village
Khawand Bux Khoso Touching to Grid
Tower No. 4 via lands of late Noor
Muhammad Shoro, Saeed Minor, Deh
Shah Bukhari Taluka Qasimabad road
mile 0/0-1/2 (2 Kms).

6
28.186

Actual
Exp. upto
Jun, 12
7
0.000

Estimated
Cost

Revised
Allocation 2012-13
Total
F.P.A.
8
9
0.000
0.000

Est. Exp.
upto
June' 13
10
0.000

Throwfwd
as on
01-07-13
11
28.186

Allocation for
2013-14
Capital Revenue
Total
12
13
14
3.000
0.000
3.000

FPA
15
0.000

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
0
11
12.593
12.593

Approved
17.10.2012

2014-15

19.392

0.000

0.000

0.000

0.000

19.392

3.000

0.000

3.000

0.000

15

16.392

0.000

Approved
17.10.2012

2015-16

41.622

0.000

0.000

0.000

0.000

41.622

3.000

0.000

3.000

0.000

19.311

19.311

Approved
28.11.2012

2013.14

15.777

0.000

0.000

0.000

0.000

15.777

15.777

0.000

15.777

0.000

100

0.000

0.000

Karachi

Approved
28.11.2012

2015-16

40.050

0.000

0.000

0.000

0.000

40.050

8.000

0.000

8.000

0.000

20

16.025

16.025

Karachi

Approved
28.11.2012

2015-16

38.589

0.000

0.000

0.000

0.000

38.589

3.000

0.000

3.000

0.000

17.795

17.795

Hyderabad

Approved
28.11.2012

2014-15

23.700

0.000

0.000

0.000

0.000

23.700

4.000

0.000

4.000

0.000

17

19.700

0.000

Hyderabad

Approved
28.11.2012

2015-16

40.190

0.000

0.000

0.000

0.000

40.190

5.000

0.000

5.000

0.000

12

17.595

17.595

Hyderabad

Approved
28.11.2012

2015-16

47.373

0.000

0.000

0.000

0.000

47.373

5.000

0.000

5.000

0.000

11

21.187

21.187

Hyderabad

Approved
28.11.2012

2015-16

45.535

0.000

0.000

0.000

0.000

45.535

5.000

0.000

5.000

0.000

11

20.268

20.268

Hyderabad

Approved
28.11.2012

2014-15

26.475

0.000

0.000

0.000

0.000

26.475

3.000

0.000

3.000

0.000

11

23.475

0.000

Hyderabad

Approved
28.11.2012

2014-15

27.288

0.000

0.000

0.000

0.000

27.288

3.000

0.000

3.000

0.000

11

24.288

0.000

{333}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Location of
Gen.
Sector / Sub-sector /
Scheme/
Sr.
Name of Scheme
District
No.
2
3
1
2207 Costruction of road from Achar Mallah Hyderabad
(Gundi Belo) on Left Bank of Saeed
Minor to Khawand Bux Khoso UC-4
Deh Saleh Bukhari Taluka Qasimabad
road mile 0/0-1/2
2208 Complete Repair of 5.00 Km Mattled
Hyderabad
Road from 1 mile lined Channel Parallel
to flood protective Bund, crossing the
Akund M.I Kazi. Govt. School across the
B.H.U Hospital, Akhund M.I Kazi
further in Murl Shape road , crossing
the Gul Muhammad Khoso village

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2014-15
28.11.2012

Approved
28.11.2012

2209 Construction of road from Johi Chhinni


road to Kamal Khan Rodnani mile 0/01/3 (2.60 Kms)
2210 Construction of road from Jhalo to
Nazar Muhammad Jamali mile 0/0-2/0
(3.20 Kms)
2211 Construction of road from Faiz
Muhammad Leghari road to Noor
Muhammad Leghari mile 0/0-3/0 (4.80
Kms)
2212 Construction of road from Faiz
Muhammad Leghari road to Village Ali
Murtaza Leghari mile 0/0-1/2 (2.00
Kms)
2213 Construction of road from Chakar
Khan Sahol to Ghulam Muhammad
Sahol mile 0/0-2/0 (3.22 Kms)
2214 Construction of road from Chakar
Khan Sahol Ghulam Muhammad to Gul
Muhammad Khudabad Pathan mile 0/02/0 (3.22 Kms)
2215 Construction of road from Khambher Meer Muhammad Minor via Ohovi
umed Ali Babar village 0/0-2/4 (4.00
Kms)
2216 Construction of road from MaharAghamani road to Basic Health Unit
Aghamani via village Fayaz Kalhoro
road mile 0/0-0/5 (1.0 Kms).

Dadu

Revised
Allocation 2012-13
Total
F.P.A.
8
9
0.000
0.000

Throwfwd
as on
01-07-13
11
24.729

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
0
12
21.729
0.000

6
24.729

2014-15

39.251

0.000

0.000

0.000

0.000

39.251

3.000

0.000

3.000

0.000

36.251

0.000

Approved
17.10.2012

2014-15

24.327

0.000

0.000

0.000

0.000

24.327

3.000

0.000

3.000

0.000

12

21.327

0.000

Dadu

Approved
17.10.2012

2015-16

34.772

0.000

0.000

0.000

0.000

34.772

5.000

0.000

5.000

0.000

14

14.886

14.886

Dadu

Approved
17.10.2012

2015-16

53.401

0.000

0.000

0.000

0.000

53.401

5.000

0.000

5.000

0.000

24.201

24.201

Dadu

Approved
17.10.2012

2014-15

23.328

0.000

0.000

0.000

0.000

23.328

3.000

0.000

3.000

0.000

13

20.328

0.000

Dadu

Approved
17.10.2012

2015-16

36.748

0.000

0.000

0.000

0.000

36.748

5.000

0.000

5.000

0.000

14

15.874

15.874

Dadu

Approved
17.10.2012

2015-16

40.003

0.000

0.000

0.000

0.000

40.003

5.000

0.000

5.000

0.000

12

17.502

17.502

Dadu

Approved
28.11.2012

2015-16

46.682

0.000

0.000

0.000

0.000

46.682

5.000

0.000

5.000

0.000

11

20.841

20.841

Dadu

Approved
17.10.2012

2013-14

11.109

0.000

0.000

0.000

0.000

11.109

11.109

0.000

11.109

0.000

100

0.000

0.000

Estimated
Cost

Est. Exp.
upto
June' 13
10
0.000

Allocation for
2013-14
Capital Revenue
Total
12
13
14
3.000
0.000
3.000

Actual
Exp. upto
Jun, 12
7
0.000

FPA
15
0.000

{334}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Location of
Status
Target Date
Gen.
Sector / Sub-sector /
Scheme/
Date of
for
Sr.
Name of Scheme
District
Approval Completion
No.
2
3
4
5
1
2217 Construction of link road from
Sanghar
Approved
2013-14
Shahdadpur Berani road to Saban
28.11.2012
Thahim mile 0/0-0/4 (0.80 Km)
2218 Construction of link road from Peero
Sanghar
Approved
2013-14
Faqir Shoro to Jan Muhammad Faqir
28.11.2012
Shoro mile 0/0-0/6 (1.20 Kms)
2219 Construction of link road from Tando
Sanghar
Approved
2015-16
Adam Shahdadpur road from Ahmed
28.11.2012
Burra to Old Sutiyar via Khan
Muhammad Thahim mile 0/0-3/2 (5.20
Kms)
2220 Construction of road from Maqsoodo
Sanghar
Approved
2015-16
Rind Nawabshah road to Soomro village
23.1.2013
parallel to Bajhi Rind village alongwith
long approach of furlong to the house of
Mushtaq Rind mile 0/0-1/4+330 (2.50
Kms)
2221 Construction of road form
Sanghar
Approved
2014-15
Shahpurchakar via Pir Wachayo Shah
23.1.2013
to Village Rasool Bux Dahri road mile
0/0-1/0 (1.61 Kms)
2222 Construction of road from Tando Adam
Sanghar
Approved
2014-15
Jhot road to Daim Thahim mile 0/0-1/2
28.11.2012
(2.0 Kms)
2223 Construction of road from Raheem
Sanghar
Approved
2013-14
Malokhani to Khairo Kaloi mile 0/0-1/2
28.11.2012
(2.0 Kms)
2224 Construction of road from village Wali
Sanghar
Approved
2013-14
Muhammd to village Misri Khan Talpur
28.11.2012
mile 0/0-0/6 (1.20 Kms)
2225 Construction of road from village
Sanghar
Approved
2013-14
Jahanzeb Sanjrani, Deh Chamro P.O
23.1.2013
Shahpur Chakar, Taluka Shahdadpur
mile 0/0-1/0 (1.61 Kms)
2226 Construction of road from village Gul
Sanghar
Approved
2014-15
Muhammad Rajar to Dargah Manthar
23.1.2013
Faqir via village Jamd Rajar Taluka
Khipro (2.00 Kms).
2227 Construction of mattled road, from
Umerkot
Approved
2014-15
Diggu Farm to Aarab Rind Village (2
17.10.2012
Kms).
2228 Construction of road from National
Jamshoro
Approved
2014-15
Highway (Gudam) to Ali Murad Shoro
12-02-2013.
mile 0/0-2/4 (4.00 Kms)

Revised
Allocation 2012-13
Total
F.P.A.
8
9
0.000
0.000

Throwfwd
as on
01-07-13
11
7.351

15
0.000

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
0
100
0.000
0.000

6
7.351

12.044

0.000

0.000

0.000

0.000

12.044

12.044

0.000

12.044

0.000

100

0.000

0.000

47.679

0.000

0.000

0.000

0.000

47.679

5.000

0.000

5.000

0.000

10

21.340

21.340

24.640

0.000

0.000

0.000

0.000

24.640

3.000

0.000

3.000

0.000

12

10.820

10.820

17.902

0.000

0.000

0.000

0.000

17.902

2.000

0.000

2.000

0.000

11

15.902

0.000

20.669

0.000

0.000

0.000

0.000

20.669

10.000

0.000

10.000

0.000

48

10.669

0.000

18.783

0.000

0.000

0.000

0.000

18.783

18.783

0.000

18.783

0.000

100

0.000

0.000

14.062

0.000

0.000

0.000

0.000

14.062

14.062

0.000

14.062

0.000

100

0.000

0.000

16.560

0.000

0.000

0.000

0.000

16.560

16.560

0.000

16.560

0.000

100

0.000

0.000

21.781

0.000

0.000

0.000

0.000

21.781

3.000

0.000

3.000

0.000

14

18.781

0.000

21.084

0.000

0.000

0.000

0.000

21.084

3.000

0.000

3.000

0.000

14

18.084

0.000

33.140

0.000

0.000

0.000

0.000

33.140

3.000

0.000

3.000

0.000

30.140

0.000

Estimated
Cost

Est. Exp.
upto
June' 13
10
0.000

Allocation for
2013-14
Capital Revenue
Total
12
13
14
7.351
0.000
7.351

Actual
Exp. upto
Jun, 12
7
0.000

FPA

{335}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Gen.
Sector / Sub-sector /
Sr.
Name of Scheme
No.
2
1
2229 Construction of road from Marvi
Cinema to Karo Khaho Mori along
River Inspection path mile 0/0-1/0 (1.61
Kms)
2230 Const. of road from village Tariq
Khokhar to Jamot Farm mile 0/0-1/6
(2.82 Kms)
2231 Construction of road from village
Mithan Sathio Deh Sathyar road mile
0/0-1/7+330' (1.50 km)
2232 Const. of road 13 Nos. & Const. of
Bridges 03 Nos. Schemes Taluka Tando
Ghulam Hyder road
2233 Const. of road from village Moula Bux
Lashari to Haji Saeed Khan Jamali via
Drigh Mori mile 0/0-1/0
2234 Const. of road from Machi Mori road at
Jamali Sim Nali to connect Kak Sector
mile 0/0-5/0 (8.00 Kms)
2235 Const. of road from Village Muhammad
Hashim Mallah to village Chanesar
Dasti via Amb Mori mile 0/0-6/4 (10.46
Kms)
2236 Const. of road from Nindo Luwari
Sharif road to village Haji muhammad
Boohar Sunhi Gooni inspection path
mile 0/0-4/3 (7.04 Kms)
2237 Const. of road from Badin - Karachi
road western path of Imam Wah to
Village Nangar Nohrio mile 0/0-3/1 (5.00
Kms)
2238 Const. of road from Tando Bago
Pangrio road at Khalifo Qasim to
Pangrio Wango road via AC Chak
Yaqoob Shah mile 0/0-6/2 (10.00 Kms)
2239 Const. of road from village Army Farm
Otaq of Kazi Aijaz road to village Ali
Nawaz Dars UC Dehi Jarkas mile 0/0-4/0
(6.44 Kms)
2240 Const. of road from Talhar Bye pass
road mile 0/0-0/5 (1.00 Kms)
2241 Construction & Extension of road from
Talhar T. Bago to village Khado road
Mile 0/0-1/2 (2.00 Kms)

Location of
Scheme/
District
3
Jamshoro

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2013-14
12-02-2013.

T. Allahyar

Approved
17.10.2012

T.M. Khan

Revised
Allocation 2012-13
Total
F.P.A.
8
9
0.000
0.000

2014-15

43.786

0.000

0.000

0.000

0.000

43.786

5.000

0.000

5.000

0.000

11

38.786

0.000

Approved
21.5.2015

2014-15

17.961

0.000

0.000

0.000

0.000

17.961

3.000

0.000

3.000

0.000

17

14.961

0.000

T.M. Khan

Approved
04-09-2012.

2015-16

63.590

0.000

0.000

0.000

0.000

63.590

5.000

0.000

5.000

0.000

29.295

29.295

T.M. Khan

Approved
17.10.2012

2014-15

23.455

0.000

0.000

0.000

0.000

23.455

3.000

0.000

3.000

0.000

13

20.455

0.000

Badin

Approved
21.2.2013

2015-16

122.515

0.000

0.000

0.000

0.000

122.515

30.000

0.000

30.000

0.000

24

46.258

46.258

Badin

Approved
21.2.2013

2015-16

174.347

0.000

0.000

0.000

0.000

174.347

30.000

0.000

30.000

0.000

17

72.174

72.174

Badin

Approved
22.1.2013

2015-16

89.468

0.000

0.000

0.000

0.000

89.468

20.000

0.000

20.000

0.000

22

34.734

34.734

Badin

Approved
19.12.2012

2014-15

55.326

0.000

0.000

0.000

0.000

55.326

25.000

0.000

25.000

0.000

45

30.326

0.000

Badin

Approved
22.1.2013

2015-16

187.564

0.000

0.000

0.000

0.000

187.564

25.000

0.000

25.000

0.000

13

81.282

81.282

Badin

Approved
22.1.2013

2015-16

94.908

0.000

0.000

0.000

0.000

94.908

5.000

0.000

5.000

0.000

44.954

44.954

Badin

Approved
23.1.2013
Approved
28.11.2012

2013-14

14.633

0.000

0.000

0.000

0.000

14.633

14.633

0.000

14.633

0.000

100

0.000

0.000

2014-15

23.445

0.000

0.000

0.000

0.000

23.445

3.000

0.000

3.000

0.000

13

20.445

0.000

Badin

Throwfwd
as on
01-07-13
11
15.244

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
0
100
0.000
0.000

6
15.244

Estimated
Cost

Est. Exp.
upto
June' 13
10
0.000

Allocation for
2013-14
Capital Revenue
Total
12
13
14
15.244
0.000
15.244

Actual
Exp. upto
Jun, 12
7
0.000

FPA
15
0.000

{336}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Location of
Gen.
Sector / Sub-sector /
Scheme/
Sr.
Name of Scheme
District
No.
2
3
1
2242 Construction of Road from Garhi
Larkana
Khuda Bux Bhutto Bypass
2243 Construction of mettalled Road from the Larkana
Bridge of Dadu Canal at Pir Sher to
Noor Khan Jatoi 0/0-0/7.
2244 Construction of Road in village Lal Bux
Larkana
Shaikh i/c storm Water Drains.
2245 Construction of Road from Ratodero
Larkana
Motorway @ mile 0/5 to Ratodero
Stadium mile 0/0-0/5.
2246 Construction of Road from Bacho
Larkana
Wahan to village Abdul Majeed Chandio
along 5-L Zakria Sim Drain mile 0/0-1/4
(2.4 Kms)
2247 Construction of Road from village
Larkana
Khuda Bux Mohel to Dargah Pir Chozal
ali Shah mile 0/0-1/0 (1.60 Km)
2248 Construction of Road from Sukkur
Larkana
Naudero Road to village Budho
Khokhar mile 0/0-0/4 (0.80 Km)
2249 Construction of Road from Lashari
Larkana
Mohammad to Syed Misri Shah Landhi
at village Phulpota -I mile 0/0-0/4 (0.80
Km).
2250 Construction of Road from Larkana
Larkana
nasirabad to village Illahi Bux Pirzada
Road mile 0/0-0/5 (1.0 Km)
2251 Construction of Road from Larkana
Larkana
naudero Road at Quaid Awam
Agriculture Farm to village Jeewan
Bhutto mile 0/0-1/2 (2.0 Km)
2252 Construction of Road from Thull Bye
Jacobabad
pass (Shahfique Ahmed Khoso ) to
village Hassanabad non inspection of
Moosa Allahabad Shakh (4.0 kms)
2253 Construction of Road from village
Jacobabad
Hassanabad to village Noor Hassan Jafri
/ village Kandrani along inspection path
Moosa Allahabad Shakh (4.0 Kms)

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2014-15
28.11.2012
Approved
2014-15
17.10.2012

2254 Construction of Road from Jacobabad


Shah Ghazi Road to village Mir Ghulam
Abbas Khan Jakhrani U.C Ahmedpur
Taluka Jacobabad (3 Kms)

Jacobabad

Revised
Allocation 2012-13
Total
F.P.A.
8
9
0.000
0.000

19.467

0.000

0.000

0.000

0.000

19.467

2.000

0.000

2.000

0.000

10

17.467

0.000

2014-15

38.503

0.000

0.000

0.000

0.000

38.503

4.000

0.000

4.000

0.000

10

34.503

0.000

2013-14

9.438

0.000

0.000

0.000

0.000

9.438

9.438

0.000

9.438

0.000

100

0.000

0.000

Approved
28.11.2012

2014-15

29.501

0.000

0.000

0.000

0.000

29.501

3.000

0.000

3.000

0.000

10

26.501

0.000

Approved
23.1.2013

2014-15

18.672

0.000

0.000

0.000

0.000

18.672

2.000

0.000

2.000

0.000

11

16.672

0.000

Approved
28.11.2012

2013-14

15.285

0.000

0.000

0.000

0.000

15.285

15.285

0.000

15.285

0.000

100

0.000

0.000

Approved
28.11.2012

2013-14

13.990

0.000

0.000

0.000

0.000

13.990

13.990

0.000

13.990

0.000

100

0.000

0.000

Approved
28.11.2012

2013-14

10.060

0.000

0.000

0.000

0.000

10.060

10.060

0.000

10.060

0.000

100

0.000

0.000

Approved
28.11.2012

2014-15

22.820

0.000

0.000

0.000

0.000

22.820

5.000

0.000

5.000

0.000

22

17.820

0.000

Approved
28.11.2012

2014-15

50.067

0.000

0.000

0.000

0.000

50.067

5.000

0.000

5.000

0.000

10

45.067

0.000

Approved
28.11.2012

2014-15

49.153

0.000

0.000

0.000

0.000

49.153

4.000

0.000

4.000

0.000

45.153

0.000

Approved
28.11.2012

2014-15

37.185

0.000

0.000

0.000

0.000

37.185

4.000

0.000

4.000

0.000

11

33.185

0.000

Approved
28.11.2012
Approved
28.11.2012

Throwfwd
as on
01-07-13
11
50.902

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
0
6
47.902
0.000

6
50.902

Estimated
Cost

Est. Exp.
upto
June' 13
10
0.000

Allocation for
2013-14
Capital Revenue
Total
12
13
14
3.000
0.000
3.000

Actual
Exp. upto
Jun, 12
7
0.000

FPA
15
0.000

{337}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Location of
Gen.
Sector / Sub-sector /
Scheme/
Sr.
Name of Scheme
District
No.
2
3
1
2255 Construction of Road from Dilmurad
Jacobabad
Railway Station Manjhipur Road to
village Haji Rasool Bux Katohar Taluka
Thull (5.0 Kms)
2256 Construction of Road from Irshad Khan Jacobabad
Luhar via Ramzan Dakhan Lal Shah
Bari Taluka Garhi Khairo (5 Kms)

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2014-15
28.11.2012

Approved
28.11.2012

2257 Construction of Road from Dilmurad


Jacobabad
Railway Station Manjhipur Road to
village Sardar Abdul karim Katohar
Taluka Thull (5 Kms)
2258 Construction of Road from Manghar
Jacobabad
Pathak to path Feeder (1.0 Km)
2259 Construction of Road from Dakhan
Jacobabad
Bungalow to Ramdal Jakhrani via
Godho Dashti (2.0 Kms)
2260 Construction of Road from Manghar
Jacobabad
Phatak to Chandol Shakh via Mengal
Chachar and Mohammad Khan
Jakhrani (1.5 Km)
2261 Construction of road from Motal Mahar Kashmore @
to Haji Walayat Pull (2.0 Km)
Kandhkot

Revised
Allocation 2012-13
Total
F.P.A.
8
9
0.000
0.000

2014-15

57.653

0.000

0.000

0.000

0.000

57.653

5.000

0.000

5.000

0.000

52.653

0.000

Approved
28.11.2012

2014-15

59.813

0.000

0.000

0.000

0.000

59.813

5.000

0.000

5.000

0.000

54.813

0.000

Approved
28.11.2012
Approved
28.11.2012

2013-14

11.692

0.000

0.000

0.000

0.000

11.692

11.692

0.000

11.692

0.000

100

0.000

0.000

2014-15

24.413

0.000

0.000

0.000

0.000

24.413

3.000

0.000

3.000

0.000

12

21.413

0.000

Approved
28.11.2012

2014-15

18.354

0.000

0.000

0.000

0.000

18.354

3.000

0.000

3.000

0.000

16

15.354

0.000

Approved
28.11.2012

2014-15

24.067

0.000

0.000

0.000

0.000

24.067

3.000

0.000

3.000

0.000

12

21.067

0.000

2262 Construction of Road from Jacobabad


Jacobabad
Thull road to village Piyaro Arbani via
Dargah Azeem Shah Sachal Mirani
village & Ghulam Shabbir Mirani
village Taluka Jacobabad (3.0 kms)
2263 Construction of Thull Bahu Khoso Road Jacobabad
to village Ghulam Rasool Khoso mile 0/02/0 (3.21 Kms).
2264 Construction of link road from Tunio
Larkana
Ali Shah to main Road Khairo-Dero,
Taluka Ratodero (2.0 kms)
2265 Construction of link road from
N. Feroze
Mehrabpur to Siyalabad Road to village
Fateh Mohammad Arain UC Jiando
Rajpar Taluka Mehrabpur (1.0 Km)

Approved
28.11.2012

2014-15

40.824

0.000

0.000

0.000

0.000

40.824

5.000

0.000

5.000

0.000

12

35.824

0.000

Approved
28.11.2012

2014-15

34.565

0.000

0.000

0.000

0.000

34.565

5.000

0.000

5.000

0.000

14

29.565

0.000

Approved
17.10.2012

2014-15

16.752

0.000

0.000

0.000

0.000

16.752

3.000

0.000

3.000

0.000

18

13.752

0.000

Approved
19.12.2012

2013-14

11.381

0.000

0.000

0.000

0.000

11.381

11.381

0.000

11.381

0.000

100

0.000

0.000

2266 Construction of Road in village Wazir


ali Zardari & Pahalwan Yaqoob Siyal
(2.0 Kms)

Approved
23.1.2013

2014-15

23.585

0.000

0.000

0.000

0.000

23.585

3.000

0.000

3.000

0.000

13

20.585

0.000

N. Feroze

Throwfwd
as on
01-07-13
11
59.202

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
0
8
54.202
0.000

6
59.202

Estimated
Cost

Est. Exp.
upto
June' 13
10
0.000

Allocation for
2013-14
Capital Revenue
Total
12
13
14
5.000
0.000
5.000

Actual
Exp. upto
Jun, 12
7
0.000

FPA
15
0.000

{338}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Location of
Gen.
Sector / Sub-sector /
Scheme/
Sr.
Name of Scheme
District
No.
2
3
1
2267 Construction of metalled road for village N. Feroze
Haji pir bux Zardari UC Khairwah
Taluka Moro from Gajjan Road to
village Haji Pir bux Zardari (2.0 kms)

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2014-15
23.1.2013

2268 Construction of various roads of Villages


of UC-Talti, UC-Bhan and UC-Bubak.

Jamshoro

Approved
19.12.2012

2269 Construction of Road from mehrabpur


Siyal Abad Road to village Chibhar
Banbhan Road mile 0/0-1/7 (3.0 kms)
2270 Construction of Road from Sada Wah
Pacci Mori to Baba Ashique Hussain
Dargah, Taluka Bhiria City, Bhiria
Road (3.0 kms)
2271 Construction of Road from Tharushah
Mithiari Road to village haji Shah
Mohammad Panhwar via village Lutuf
Panhwar mile 0/0-2/4.
2272 Construction of Road from village Sakhi
Abad via village Mohammad Yousif
Brohi Taluka Mehrabpur (2.0 kms)

N. Feroze

Revised
Allocation 2012-13
Total
F.P.A.
8
9
0.000
0.000

15
0.000

2014-15

25.606

0.000

0.000

0.000

0.000

25.606

15.000

0.000

15.000

0.000

59

10.606

0.000

Approved
19.12.2012

2014-15

32.950

0.000

0.000

0.000

0.000

32.950

4.000

0.000

4.000

0.000

12

28.950

0.000

N. Feroze

Approved
19.12.2012

2014-15

33.859

0.000

0.000

0.000

0.000

33.859

4.000

0.000

4.000

0.000

12

29.859

0.000

N. Feroze

Approved
19.12.2012

2014-15

48.276

0.000

0.000

0.000

0.000

48.276

5.000

0.000

5.000

0.000

10

43.276

0.000

N. Feroze

Approved
19.12.2012

2014-15

22.998

0.000

0.000

0.000

0.000

22.998

3.000

0.000

3.000

0.000

13

19.998

0.000

2273 Construction of Road from Dali Mori


link Road to Lakha Mori (2.0 Kms)
2274 Construction of Road from village Fazul
Sahito to village Gul Mohammad Shah
Taluka Kandiaro (1.0 Km)

N. Feroze

Approved
23.1.2013
Approved
19.12.2012

2013-14

23.257

0.000

0.000

0.000

0.000

23.257

3.000

0.000

3.000

0.000

13

20.257

0.000

2013-14

11.334

0.000

0.000

0.000

0.000

11.334

11.334

0.000

11.334

0.000

100

0.000

0.000

2275 Construction of link road from village


Sahib Khan Lund to village Khooh
Meenhon (2 Kms)
2276 Construction of Road from village
Mahram Ali Mahar Thikratho to
Salehpat (1.0 km)
2277 Construction of Road from Old National
Highway Railway Crossing to village
Jan Mohammad Jatoi (1.0 km)

Ghotki

Approved
19.12.2012

2014-15

19.618

0.000

0.000

0.000

0.000

19.618

3.000

0.000

3.000

0.000

15

16.618

0.000

Sukkur

Approved
17.10.2012

2013-14

9.105

0.000

0.000

0.000

0.000

9.105

9.105

0.000

9.105

0.000

100

0.000

0.000

Sukkur

Approved
17.10.2012

2013-14

11.143

0.000

0.000

0.000

0.000

11.143

11.143

0.000

11.143

0.000

100

0.000

0.000

Ghotki

Approved
28.11.2012

2014-15

22.101

0.000

0.000

0.000

0.000

22.101

3.000

0.000

3.000

0.000

14

19.101

0.000

2278 Construction of Road from mathelo


Jarwar to Beero Malano mile 0/0-1/4
(2.40 kms)

N. Feroze

Throwfwd
as on
01-07-13
11
23.425

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
0
13
20.425
0.000

6
23.425

Estimated
Cost

Est. Exp.
upto
June' 13
10
0.000

Allocation for
2013-14
Capital Revenue
Total
12
13
14
3.000
0.000
3.000

Actual
Exp. upto
Jun, 12
7
0.000

FPA

{339}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Gen.
Sector / Sub-sector /
Sr.
Name of Scheme
No.
2
1
2279 Construction of Road from Amir Bux
Unar to village Islam Khan Lashari
Taluka Mirpur Mathelo 0/0-1/0 (1.60
Km)
2280 Construction of road from Khanpur
Mahar-Sardar Garh Road to village
Ganhwar Khan Malik 0/0-1/2 (2.0 kms
2281 Construction of Road from FFC Factory
to connect Mirpur Mathelo road on LP
Path Massu Wah mile 0/0-2/0 (3.32
Kms)
2282 Construction of Road from Goni to
village Chatto Fair (1.61 Kms)
2283 Construction of road from yousif Mahar
to Wadhan mahar mile 0/0-0/6 (1.20
kms)
2284 Construction of Road from Thikratho
Hakal patt Road to Ghari via Janib
Mahar (8.0 Kms)
2285 Construction of Road from village Saleh
Mahar to village Allah Bux Bullo via
village Lal Mohammad Bullo, Taluka
Ghotki (4.0 Kms)
2286 Construction of link Road to village
Kouro Lakhan UC Qadirpur.
2287 Construction of Road from Thari Seneso
to Resident of Ahmed ali Janvri & Fouj
Ali Janvri Road mile 0/0-1/7 (3.0 kms)
2288 Construction of Road from Balouch
Khan Zardar to Government High
School Mohammad Shah Road mile 0/01/6 (2.80 kms)
2289 Construction of Road from Rattal
Mallah to Sui Gas upto Babar Wada
Road mile 0/0-2/0 (3.20 Kms)
2290 Construction of Road from Waryam
Wandhiar to village Mir Khan
Mangnejo Road mile 0/0-1/2 (2.0 kms)

Location of
Scheme/
District
3
Ghotki

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2014-15
28.11.2012

6
16.826

Actual
Exp. upto
Jun, 12
7
0.000

Estimated
Cost

Revised
Allocation 2012-13
Total
F.P.A.
8
9
0.000
0.000

Est. Exp.
upto
June' 13
10
0.000

Throwfwd
as on
01-07-13
11
16.826

Allocation for
2013-14
Capital Revenue
Total
12
13
14
2.000
0.000
2.000

FPA
15
0.000

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
0
12
14.826
0.000

Ghotki

Approved
28.11.2012

2014-15

19.015

0.000

0.000

0.000

0.000

19.015

2.000

0.000

2.000

0.000

11

17.015

0.000

Ghotki

Approved
23.1.2013

2014-15

39.998

0.000

0.000

0.000

0.000

39.998

4.000

0.000

4.000

0.000

10

35.998

0.000

Sukkur

Approved
28.11.2012
Approved
28.11.2012

2013-14

15.144

0.000

0.000

0.000

0.000

15.144

15.144

0.000

15.144

0.000

100

0.000

0.000

2013-14

10.505

0.000

0.000

0.000

0.000

10.505

10.505

0.000

10.505

0.000

100

0.000

0.000

Sukkur

Approved
17.10.2012

2013-14

12.510

0.000

0.000

0.000

0.000

12.510

12.510

0.000

12.510

0.000

100

0.000

0.000

Ghotki

Approved
28.11.2012

2014-15

36.673

0.000

0.000

0.000

0.000

36.673

5.000

0.000

5.000

0.000

14

31.673

0.000

Ghotki

Approved
19.12.2012
Approved
23.1.2013

2013-14

14.841

0.000

0.000

0.000

0.000

14.841

14.841

0.000

14.841

0.000

100

0.000

0.000

2014-15

33.594

0.000

0.000

0.000

0.000

33.594

2.000

0.000

2.000

0.000

31.594

0.000

Khairpur

Approved
23.1.2013

2014-15

30.928

0.000

0.000

0.000

0.000

30.928

2.000

0.000

2.000

0.000

28.928

0.000

Khairpur

Approved
23.1.2013

2014-15

33.680

0.000

0.000

0.000

0.000

33.680

2.000

0.000

2.000

0.000

31.680

0.000

Khairpur

Approved
23.1.2013

2014-15

19.378

0.000

0.000

0.000

0.000

19.378

2.000

0.000

2.000

0.000

10

17.378

0.000

Ghotki

Khairpur

{340}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Gen.
Sector / Sub-sector /
Sr.
Name of Scheme
No.
2
1
2291 Construction of Road from Setharija
Thari Road via Sim Nala village Makan
Kubar Deh Khuda Bux Kubhar UC
Setharija Road mile 0/0-1/0 (1.60 Km)

Location of
Scheme/
District
3
Khairpur

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2014-15
23.1.2013

2292 Construction of Road to village Allah


Dino Jiskani village Sultan Jiskani Road
mile 0/0-2/0 (3.20 Kms)
2293 Construction of Road from Bozdar
Wada Dubi Road (BHU) to village
Bangul Khan Jiskani ali Gulab Jiskani
& village haji Mevo Road mile 0/0-2/1
(3.40 kms)
2294 Construction of Road from village Sain
Bux Zardari to Abid Hussain Zardari
Taluka Moro Road mile 0/0-1/2 (2.0
kms)
2295 Construction of Road from Ripri
Gambat Road to village Bandul Junejo
Road mile 0/0-1/2 (2.0 kms)
2296 Construction of road from newaro
Shahani link road to village Fateh
Mohammad Darban Road mile 0/0-1/0
(1.60 Km)
2297 Construction of Road from Khariri
Road to village Mohammad ali Shar
Taluka thari Mirwah Road mile 0/0-1/0
(1.60 Km)
2298 Construction of Road from village
Rustam Khan Lashari Taluka Faiz Gunj
Road mile 0/0-1/7 (3.0 kms).
2299 Construction of Road from Sagyoon
Khan Wahan road to village gohram
Haryar UC Sagyoon Taluka Sobhodero
Road mile 0/0-1/4 (2.40 kms)

Khairpur

Approved
23.1.2013

Khairpur

2300 Construction of Road from village


Kareem Ali Siyal to Wang Sharif UC
Sagyoon Taluka Sobhodero Road mile
0/0-1/6 (2.80 kms)
2301 Construction of Road from village
Bhambhatpur to Imdad Sahito UC Pir
Hayat Shah Taluka Sobhodero Road
mile 0/0-1/2 (2.0 kms).

Revised
Allocation 2012-13
Total
F.P.A.
8
9
0.000
0.000

Throwfwd
as on
01-07-13
11
18.127

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
0
11
16.127
0.000

6
18.127

2014-15

37.430

0.000

0.000

0.000

0.000

37.430

3.000

0.000

3.000

0.000

34.430

0.000

Approved
23.1.2013

2014-15

36.629

0.000

0.000

0.000

0.000

36.629

3.000

0.000

3.000

0.000

33.629

0.000

N. Feroze

Approved
23.1.2013

2014-15

25.756

0.000

0.000

0.000

0.000

25.756

2.000

0.000

2.000

0.000

23.756

0.000

Khairpur

Approved
23.1.2013

2014-15

21.221

0.000

0.000

0.000

0.000

21.221

2.000

0.000

2.000

0.000

19.221

0.000

Khairpur

Approved
19.12.2012

2014-15

19.203

0.000

0.000

0.000

0.000

19.203

2.000

0.000

2.000

0.000

10

17.203

0.000

Khairpur

Approved
23.1.2013

2013-14

15.328

0.000

0.000

0.000

0.000

15.328

15.328

0.000

15.328

0.000

100

0.000

0.000

Khairpur

Approved
23.1.2013

2014-15

30.347

0.000

0.000

0.000

0.000

30.347

2.000

0.000

2.000

0.000

28.347

0.000

Khairpur

Approved
19.12.2012

2014-15

26.617

0.000

0.000

0.000

0.000

26.617

2.000

0.000

2.000

0.000

24.617

0.000

Khairpur

Approved
23.1.2013

2014-15

32.869

0.000

0.000

0.000

0.000

32.869

2.000

0.000

2.000

0.000

30.869

0.000

Khairpur

Approved
23.1.2013

2014-15

26.258

0.000

0.000

0.000

0.000

26.258

2.000

0.000

2.000

0.000

24.258

0.000

Estimated
Cost

Est. Exp.
upto
June' 13
10
0.000

Allocation for
2013-14
Capital Revenue
Total
12
13
14
2.000
0.000
2.000

Actual
Exp. upto
Jun, 12
7
0.000

FPA
15
0.000

{341}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Location of
Gen.
Sector / Sub-sector /
Scheme/
Sr.
Name of Scheme
District
No.
2
3
1
2302 Construction of Road from N.H.Way to
Khairpur
village Jogi to Watiya UC Hingorija
Taluka Sobhodero Road mile 0/0-1/2 (2.0
kms)
2303 Construction of Pacca metalled road
Khairpur
from village Sakhi Saeed Khan Lakho to
village Nabi Bux Lakho Taluka Bhiria
(1.60 km)
2304 Construction of Road from Thari
Khairpur
Dedano Road to haji Mian Dad Khan
Mandan road mile 0/0-1/7 (3.0 kms)
2305 Construction of Road from kamil
Khairpur
jagirani to Pir Hassan Shah road mile
0/0-2/2 (3.62 kms).
2306 Construction of Road village Pir Koko
Khairpur
Road to Adam Khan mehrani via Rasool
bux Morejo Road mile 0/0-1/7 (3.0 kms)

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2014-15
19.12.2012

2307 Construction of Road from village Haji


Imdad to Waris Ghambheer Goth (2.40
Kms)
2308 Construction of Road from Ali Dost
Khorkhani to village haji Allan Phulpoto
on path of Bazar Wah Road mile 0/0-1/2
(2.40 kms).
2309 Construction of Road from village Shah
Bux & Jumo Phulpoto (1.60 Kms)
2310 Construction of Road from B.Pump
Station to village Nangar Chandio Road
mile 0/0-2/3 (3.82 Kms).
2311 Construction of Road from Sobho Khan
Gabol to Pir Bhalo to Ghazi Khan Gabol
(1.60 Km)
2312 Construction of Road from Danwro to
village Syed (1.60 km)
2313 Constructionof Road from Shadi
Shaheed Road to Pir Chattan Shah
(91.40 Kms)
2314 Construction of Road from village
Miandad Jalbani (1.60 Km)
2315 Construction of Road from Shadi
Shaheed Road to Mohammad Pannah
Morejo (1.40 km)

6
21.495

Actual
Exp. upto
Jun, 12
7
0.000

Estimated
Cost

Revised
Allocation 2012-13
Total
F.P.A.
8
9
0.000
0.000

Est. Exp.
upto
June' 13
10
0.000

Throwfwd
as on
01-07-13
11
21.495

Allocation for
2013-14
Capital Revenue
Total
12
13
14
2.000
0.000
2.000

FPA
15
0.000

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
0
9
19.495
0.000

Approved
19.12.2012

2014-15

18.333

0.000

0.000

0.000

0.000

18.333

2.000

0.000

2.000

0.000

11

16.333

0.000

Approved
23.1.2013

2014-15

45.500

0.000

0.000

0.000

0.000

45.500

5.000

0.000

5.000

0.000

11

40.500

0.000

Approved
23.1.2013

2014-15

45.010

0.000

0.000

0.000

0.000

45.010

3.000

0.000

3.000

0.000

42.010

0.000

Approved
23.1.2013

2014-15

30.963

0.000

0.000

0.000

0.000

30.963

3.000

0.000

3.000

0.000

10

27.963

0.000

Khairpur

Approved
23.1.2013

2014-15

26.640

0.000

0.000

0.000

0.000

26.640

2.000

0.000

2.000

0.000

24.640

0.000

Khairpur

Approved
23.1.2013

2014-15

22.446

0.000

0.000

0.000

0.000

22.446

3.000

0.000

3.000

0.000

13

19.446

0.000

Khairpur

Approved
19.12.2012

2014-15

17.782

0.000

0.000

0.000

0.000

17.782

2.000

0.000

2.000

0.000

11

15.782

0.000

Khairpur

Approved
9.12.2012

2014-15

40.842

0.000

0.000

0.000

0.000

40.842

5.000

0.000

5.000

0.000

12

35.842

0.000

Khairpur

Approved
23.1.2013

2014-15

17.188

0.000

0.000

0.000

0.000

17.188

3.000

0.000

3.000

0.000

17

14.188

0.000

Khairpur

Approved
23.1.2013
Approved
19.12.2012

2013-14

18.330

0.000

0.000

0.000

0.000

18.330

3.000

0.000

3.000

0.000

16

15.330

0.000

2013-14

15.035

0.000

0.000

0.000

0.000

15.035

15.035

0.000

15.035

0.000

100

0.000

0.000

Approved
23.1.2013
Approved
19.12.2012

2014-15

16.881

0.000

0.000

0.000

0.000

16.881

3.000

0.000

3.000

0.000

18

13.881

0.000

2014-15

16.520

0.000

0.000

0.000

0.000

16.520

3.500

0.000

3.500

0.000

21

13.020

0.000

Khairpur

Khairpur
Khairpur

{342}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Gen.
Sector / Sub-sector /
Sr.
Name of Scheme
No.
2
1
2316 Construction of Construction of A.G
Balouch to Ali Hyder Jalbani (1.40 km)

Location of
Scheme/
District
3
Khairpur

2317 Construction of Road Ghulam


Mohammad Burdi to village Sabzal
Khan Burdi Road mile 0/0-1/7 (3.0 kms)

Khairpur

Approved
23.1.2013

2318 Construction of road from Bago Daro


via Iqbal Dasti to Noor Bozdar (3.21
Kms)
2319 Construction of road from byepass
Hingorija to Samyoon (3.21 Kms)
2320 Construction of Road village Tajo Khan
Sakhani to village Saleem Shah (1.60
km)
2321 Construction of internal road village
Jiskani road mile 0/0-1/0 (1.60 Km)
2322 Construction of remaining portion of
road from serai Piyaro Khan to Gambat
(3.41 Kms)
2323 Construction of road from Trimunhi to
Dargah Samita to Shah ali Taluka
Sobhodero
2324 Construction of Road from Sanghar
road to village Shahan Sahito & village
Urs Sahito (3.41 Kms)
2325 Construction of Road from kathore to
Sanghar Road (3.41 Kms)
2326 Construction of Road from Ahmed Bux
Shar to Lakh Mir Shah Road mile 0/01/7 (3.0 kms)
2327 Construction of Road alongwith Bridge
on Mirwah Canal RD-129 Deh Daro (1.0
km)
2328 Construction of Road Gadeji Setharija
Road to hinngorija Minor alongwith
Bridge (1.50 km)
2329 Construction of Road from Gadeji
Setharija road to National Highway
Hingorija (1.0 Km)

Khairpur

Khairpur
Khairpur

Khairpur
Khairpur

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2014-15
23.1.2013

Revised
Allocation 2012-13
Total
F.P.A.
8
9
0.000
0.000

Throwfwd
as on
01-07-13
11
18.040

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
0
17
15.040
0.000

6
18.040

2014-15

31.454

0.000

0.000

0.000

0.000

31.454

3.000

0.000

3.000

0.000

10

28.454

0.000

Approved
23.1.2013

2014-15

33.917

0.000

0.000

0.000

0.000

33.917

3.000

0.000

3.000

0.000

30.917

0.000

Approved
23.1.2013
Approved
23.1.2013

2014-15

58.546

0.000

0.000

0.000

0.000

58.546

5.000

0.000

5.000

0.000

53.546

0.000

2014-15

16.933

0.000

0.000

0.000

0.000

16.933

4.000

0.000

4.000

0.000

24

12.933

0.000

Approved
23.1.2013
Approved
23.1.2013

2013-14

15.523

0.000

0.000

0.000

0.000

15.523

15.523

0.000

15.523

0.000

100

0.000

0.000

2014-15

36.352

0.000

0.000

0.000

0.000

36.352

10.000

0.000

10.000

0.000

28

26.352

0.000

Estimated
Cost

Est. Exp.
upto
June' 13
10
0.000

Allocation for
2013-14
Capital Revenue
Total
12
13
14
3.000
0.000
3.000

Actual
Exp. upto
Jun, 12
7
0.000

FPA
15
0.000

Khairpur

Approved
19.12.2012

2014-15

47.163

0.000

0.000

0.000

0.000

47.163

10.000

0.000

10.000

0.000

21

37.163

0.000

Khairpur

Approved
23.1.2013

2014-15

31.812

0.000

0.000

0.000

0.000

31.812

3.000

0.000

3.000

0.000

28.812

0.000

Khairpur

Approved
23.1.2013
Approved
23.1.2013

2014-15

30.620

0.000

0.000

0.000

0.000

30.620

3.000

0.000

3.000

0.000

10

27.620

0.000

2014-15

30.736

0.000

0.000

0.000

0.000

30.736

3.000

0.000

3.000

0.000

10

27.736

0.000

Khairpur

Approved
23.1.2013

2014-15

32.973

0.000

0.000

0.000

0.000

32.973

2.000

0.000

2.000

0.000

30.973

0.000

Khairpur

Approved
19.12.2012

2014-15

17.913

0.000

0.000

0.000

0.000

17.913

3.000

0.000

3.000

0.000

17

14.913

0.000

Khairpur

Approved
23.1.2013

2014-15

10.611

0.000

0.000

0.000

0.000

10.611

10.611

0.000

10.611

0.000

100

0.000

0.000

Khairpur

{343}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Location of
Gen.
Sector / Sub-sector /
Scheme/
Sr.
Name of Scheme
District
No.
2
3
1
2330 Construction of Road Pir Gul Shah to
Khairpur
Shar Khaskheli Jhindo Wahan road mile
0/0-3/0 (4.82 Kms)
2331 Construction of Road from new
Khairpur
N.H.Way to Abdul Wahid Wassan road
mile 0/0-1/0 (1.60 km)
2332 Construction of road from Hamayoon
Khairpur
IBU Pota road to village Raheem Bux
Road mile 0/0-1/2 (2.0 kms)
2333 Construction of Road from Choudahu
Khairpur
Dargah Shah Rasheed to Sono Khan
Gopang Road mile 0/0-1/2 (2.0 Km)
2334 Construction of Road from Sim Nala to
Khairpur
village Faiz Mohammad Chakrani UC
Deh Sohu Road mile 0/0-1/2 (2.0 km)

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2014-15
19.12.2012

2335 Construction of Road from Old


N.H.Way to Madina Colony Khairpur
Road mile 0/0-1/2 (2.0 km)
2336 construction of road from Pir Wassan
Mehrabpur to village Faiz Mohammad
Jojai Road mile 0/0-1/2 (2.0 kms)

6
53.280

Actual
Exp. upto
Jun, 12
7
0.000

Estimated
Cost

Revised
Allocation 2012-13
Total
F.P.A.
8
9
0.000
0.000

Est. Exp.
upto
June' 13
10
0.000

Throwfwd
as on
01-07-13
11
53.280

Allocation for
2013-14
Capital Revenue
Total
12
13
14
5.000
0.000
5.000

FPA
15
0.000

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
0
9
48.280
0.000

Approved
23.1.2013

2014-15

18.245

0.000

0.000

0.000

0.000

18.245

5.000

0.000

5.000

0.000

27

13.245

0.000

Approved
23.1.2013

2014-15

20.818

0.000

0.000

0.000

0.000

20.818

5.000

0.000

5.000

0.000

24

15.818

0.000

Approved
23.1.2013

2014-15

20.898

0.000

0.000

0.000

0.000

20.898

5.000

0.000

5.000

0.000

24

15.898

0.000

Approved
23.1.2013

2014-15

21.040

0.000

0.000

0.000

0.000

21.040

5.000

0.000

5.000

0.000

24

16.040

0.000

Khairpur

Approved
19.12.2012

2014-15

21.330

0.000

0.000

0.000

0.000

21.330

5.000

0.000

5.000

0.000

23

16.330

0.000

Khairpur

Approved
23.1.2013

2014-15

22.269

0.000

0.000

0.000

0.000

22.269

3.000

0.000

3.000

0.000

13

19.269

0.000

2337 Construction of Road from Ahmedpur


Ripri Road to Fateh Mohammad narejo
via Shakhrani Anwar Ali Shah mile 0/01/0 (91.60 kms)
2338 construction of Road from Sagyoon
Khan Wahan Road to Shah Nawaz
Kalhoro UC Sagyoon Tauka Sobhodero
Road mile 0/0-1/2 (2.0 km)
2339 Construction of Road from Ahmedpur
Road to Sodhal Khan Shar via Malhar
Shar Road mile 0/0-1/2 (2.0 Km)

Khairpur

Approved
23.1.2013

2014-15

17.710

0.000

0.000

0.000

0.000

17.710

4.000

0.000

4.000

0.000

23

13.710

0.000

Khairpur

Approved
23.1.2013

2014-15

25.744

0.000

0.000

0.000

0.000

25.744

4.000

0.000

4.000

0.000

16

21.744

0.000

Khairpur

Approved
23.1.2013

2014-15

17.435

0.000

0.000

0.000

0.000

17.435

3.000

0.000

3.000

0.000

17

14.435

0.000

2340 Construction of Road from Bindho Faiz


Mohammad Road village Almani Narejo
to Chuttal Narejo Road mile 0/0-1/2 (2.0
kms)
2341 Construction of Road from Sanghar
Road to village Mohammad Bachal
Mehrani Taluka Nara (3.0 kms)

Khairpur

Approved
23.1.2013

2014-15

22.620

0.000

0.000

0.000

0.000

22.620

4.000

0.000

4.000

0.000

18

18.620

0.000

Khairpur

Approved
23.1.2013

2013-14

28.869

0.000

0.000

0.000

0.000

28.869

5.000

0.000

5.000

0.000

17

23.869

0.000

{344}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Location of
Gen.
Sector / Sub-sector /
Scheme/
Sr.
Name of Scheme
District
No.
2
3
1
2342 Construction of Road from village
Khairpur
Manghanwari near Khairpur
Ahmedpur to village Soomar Mattlo (1.0
Km)
2343 Construction of road from Wada Bhatti
Khairpur
to Ali gohar and from Bhillo Jo bhit to
village Mohammad Hashim Bhatti from
Main road Bolooji Bhits (2.0 kms)

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2014-15
23.1.2013

Approved
23.1.2013

2344 Construction of Road from Bozdar Dubi


Road to via BHU village Bangal Khan
Jiskani to via Ali Gulab Jiskani, Haji
Muvio Goth Mile 2/1-4/0 (3 Km)
2345 Construction of road namely "New goth
Pathano road village Illahi bux Unar,
Taluka sobhodero (2.0 kms)
2346 Construction of Road from village
Lahiri from Khuhra Guarisabad road to
National Highway village Labiri (1.5
Km)
2347 Construction of Road from Kotri Kabir
Mehrabpur road to RHC / High School
at Kotri Kabir Road mile 0/0-0/5 (1.0
Km)
2348 Construction of Road from nabi Shah to
Larkana Khairpur Road via Mehtani
minor (4.0 kms)
2349 Construction of Road from Saidi lower
to Larkana Khairpur Road, via Ghulam
Rasool Jagirani (1.6 Km)
2350 Construction of Road from village Badal
to Larkana Khairpur Road (1.2 Km)

Khairpur

2351 Construction of Road from village


Mujahid to Larkana Khairpur Road, via
River Bandh (1.0 Km)
2352 Construction of Road from village sono
Bhatti to Larkana Khairpur Road (2.0
km)
2353 Construction of Road from Mehtani to
Larkana Khairpur Road, via River
Bandh, (3.2 kms)
2354 Construction of Road from Khuhro to
Larkana Khairpur Road (3.20 Kms)

Revised
Allocation 2012-13
Total
F.P.A.
8
9
0.000
0.000

Throwfwd
as on
01-07-13
11
11.390

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
0
100
0.000
0.000

6
11.390

2014-15

21.325

0.000

0.000

0.000

0.000

21.325

4.000

0.000

4.000

0.000

19

17.325

0.000

Approved
23.1.2013

2014-15

32.506

0.000

0.000

0.000

0.000

32.506

10.000

0.000

10.000

0.000

31

22.506

0.000

Khairpur

Approved
23.1.2013

2014-15

24.221

0.000

0.000

0.000

0.000

24.221

2.000

0.000

2.000

0.000

22.221

0.000

Khairpur

Approved
28.2.2013

2014-15

23.289

0.000

0.000

0.000

0.000

23.289

2.000

0.000

2.000

0.000

21.289

0.000

N. Feroze

Approved
23.1.2013

2013-14

10.572

0.000

0.000

0.000

0.000

10.572

10.572

0.000

10.572

0.000

100

0.000

0.000

Khairpur

Approved
23.1.2013

2014-15

41.474

0.000

0.000

0.000

0.000

41.474

5.000

0.000

5.000

0.000

12

36.474

0.000

Khairpur

Approved
28.2.2013

2014-15

30.196

0.000

0.000

0.000

0.000

30.196

2.000

0.000

2.000

0.000

28.196

0.000

Khairpur

Approved
28.2.2013

2013-14

13.392

0.000

0.000

0.000

0.000

13.392

13.392

0.000

13.392

0.000

100

0.000

0.000

Khairpur

Approved
28.2.2013

2013-14

12.972

0.000

0.000

0.000

0.000

12.972

12.972

0.000

12.972

0.000

100

0.000

0.000

Khairpur

Approved
28.2.2013

2013-14

15.471

0.000

0.000

0.000

0.000

15.471

15.471

0.000

15.471

0.000

100

0.000

0.000

Khairpur

Approved
23.1.2013

2014-15

32.349

0.000

0.000

0.000

0.000

32.349

5.000

0.000

5.000

0.000

15

27.349

0.000

Khairpur

Approved
23.1.2013

2014-15

26.921

0.000

0.000

0.000

0.000

26.921

3.000

0.000

3.000

0.000

11

23.921

0.000

Estimated
Cost

Est. Exp.
upto
June' 13
10
0.000

Allocation for
2013-14
Capital Revenue
Total
12
13
14
11.390
0.000
11.390

Actual
Exp. upto
Jun, 12
7
0.000

FPA
15
0.000

{345}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Gen.
Sector / Sub-sector /
Sr.
Name of Scheme
No.
2
1
2355 Construction of road tough Tile in UC
Dari, Taluka Kandhkot (1.50 kms)

Location of
Status
Target Date
Scheme/
Date of
for
District
Approval Completion
3
4
5
Kashmore @ Approved
2013-14
Kandhkot
28.2.2013

6
13.258

Actual
Exp. upto
Jun, 12
7
0.000

Estimated
Cost

Revised
Allocation 2012-13
Total
F.P.A.
8
9
0.000
0.000

Est. Exp.
upto
June' 13
10
0.000

Throwfwd
as on
01-07-13
11
13.258

Allocation for
2013-14
Capital Revenue
Total
12
13
14
13.258
0.000
13.258

FPA
15
0.000

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
0
100
0.000
0.000

2356 Construction of Road from Arrore


Bachal Shah road to village Kadan Khan
Chakrani (2.0 kms)
2357 Construction of road from metal Road
from village Faiz Mohammad Kandhro
to village Ali Murad Junejo 92.0 km)

Sukkur

Approved
17.10.2012

2014-15

20.083

0.000

0.000

0.000

0.000

20.083

5.000

0.000

5.000

0.000

25

15.083

0.000

Sukkur

Approved
17.10.2012

2014-15

20.930

0.000

0.000

0.000

0.000

20.930

5.000

0.000

5.000

0.000

24

15.930

0.000

2358 Construction of Road from Salehpat


Sangrar Road to village doulat Chachar
(2.0 kms)
2359 Construction of Road from Bara to
village ali Murad Bhambhro (3.0 kms)
2360 Construction of Road from Lakho
Phulpoto Sim Nala (2.40 km)
2361 Construction of Road from Dinho Malik
Gohar to Bhambhoo Malano via Thatt
minor mile 0/0-1/2 (2.0 km)
2362 Construction of road from latif Dino
Palh to Trimunh Road mile 0/0-1/2 (2.0
kms)
2363 Construction of Road from Primary
School Kanderi to Ruhal Faqir mile 0/01/0 (1.60 Km)
2364 Construction of Road from Kandri to
Pir bukhari mile 0/0-1/4 (2.40 kms)
2365 Construction of road from Rasoolpur to
Patni mile 0/0-2/0 (3.22 Kms)

Sukkur

Approved
19.12.2012

2014-15

19.476

0.000

0.000

0.000

0.000

19.476

3.000

0.000

3.000

0.000

15

16.476

0.000

Sukkur

Approved
19.12.2012
Approved
23.1.2013
Approved
19.12.2012

2014-15

36.826

0.000

0.000

0.000

0.000

36.826

5.000

0.000

5.000

0.000

14

31.826

0.000

2014-15

24.112

0.000

0.000

0.000

0.000

24.112

5.000

0.000

5.000

0.000

21

19.112

0.000

2014-15

23.365

0.000

0.000

0.000

0.000

23.365

5.000

0.000

5.000

0.000

21

18.365

0.000

Sukkur

Approved
19.12.2012

2014-15

20.845

0.000

0.000

0.000

0.000

20.845

5.000

0.000

5.000

0.000

24

15.845

0.000

Sukkur

Approved
19.12.2012

2013-14

14.854

0.000

0.000

0.000

0.000

14.854

14.854

0.000

14.854

0.000

100

0.000

0.000

Sukkur

Approved
17.10.2012
Approved
17.10.2012

2014-15

23.534

0.000

0.000

0.000

0.000

23.534

4.000

0.000

4.000

0.000

17

19.534

0.000

2014-15

34.035

0.000

0.000

0.000

0.000

34.035

5.000

0.000

5.000

0.000

15

29.035

0.000

2366 Construction of Road from Mola ali


Check Post to village Bagro Bullo i/c 30
Rft Bridge over Mahesro Wah (2.0 km)

Sukkur

Approved
17.10.2012

2014-15

22.531

0.000

0.000

0.000

0.000

22.531

4.000

0.000

4.000

0.000

18

18.531

0.000

2367 Construction of Road from Sadhuja to


Shaheed Pul (4.0 kms)

Sukkur

Approved
17.10.2012

2014-15

57.627

0.000

0.000

0.000

0.000

57.627

5.000

0.000

5.000

0.000

52.627

0.000

2368 Construction of road from Gulan Shah


Road to Gudpur (3.0 kms)
2369 Construction of Bachal Bund Phulani
(3.0 Kms)

Sukkur

Approved
17.10.2012
Approved
17.10.2012

2014-15

45.909

0.000

0.000

0.000

0.000

45.909

5.000

0.000

5.000

0.000

11

40.909

0.000

2014-15

46.151

0.000

0.000

0.000

0.000

46.151

5.000

0.000

5.000

0.000

11

41.151

0.000

Sukkur
Sukkur

Sukkur

Sukkur

{346}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Gen.
Sector / Sub-sector /
Sr.
Name of Scheme
No.
2
1
2370 Construction of Road from village
Sadhuja to Piral Chachar via Wahid
Bux Mangi, Syed Arbab ali Shah & Jan
Mohammad solangi (1.60 Km)
2371 Constsruction of road from Ilyas indhar
road to village Mohammad Saleh Malik
(1 km)
2372 Construction of Road from Salehpat
Vass Road to Dhani Bux Kori (1.0 Km)

Location of
Scheme/
District
3
Ghotki

2373 Construction of Pacca road from Qazi


Wah to village Mohammad bux Chachar
92.0 kms)
2374 Construction of Road from village
Khoso to Village Saleh Arain UC
Sultanpur (1.0ofKm)
2375 Construction
road from halaji
Dhandhi link road to village Junnas (1.0
km)
2376 Construction of Byepass from National
Highway to Dadloi Nebahoo Malik lin
road (1.0 Km)
2377 Construction of Road from National
Highway to village Haji Mevo Khan via
Pir Tajjo (1.5 Km)
2378 Construction of road from Dadloi
Chechro Road @ mile 0/2 to Dadloi
minor 0/0-1/7 (3.0 kms)
2379 Construction of Road from Fish Farm to
Dadloi minor mile 0/0-1/4 (2.41 Kms)

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2014-15
17.10.2012

6
15.906

Actual
Exp. upto
Jun, 12
7
0.000

Estimated
Cost

Revised
Allocation 2012-13
Total
F.P.A.
8
9
0.000
0.000

Est. Exp.
upto
June' 13
10
0.000

Throwfwd
as on
01-07-13
11
15.906

Allocation for
2013-14
Capital Revenue
Total
12
13
14
7.000
0.000
7.000

FPA
15
0.000

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
0
63
8.906
0.000

Ghotki

Approved
28.11.2012

2014-15

9.615

0.000

0.000

0.000

0.000

9.615

7.600

0.000

7.600

0.000

79

2.015

0.000

Sukkur

Approved
19.12.2012

2013-14

9.746

0.000

0.000

0.000

0.000

9.746

9.746

0.000

9.746

0.000

100

0.000

0.000

Sukkur

Approved
17.10.2012

2014-15

23.462

0.000

0.000

0.000

0.000

23.462

5.000

0.000

5.000

0.000

21

18.462

0.000

Sukkur

Approved
19.12.2012
Approved
17.10.2012

2013-14

13.795

0.000

0.000

0.000

0.000

13.795

13.795

0.000

13.795

0.000

100

0.000

0.000

2013-14

11.011

0.000

0.000

0.000

0.000

11.011

11.011

0.000

11.011

0.000

100

0.000

0.000

Sukkur

Approved
17.10.2012

2013-14

7.404

0.000

0.000

0.000

0.000

7.404

7.404

0.000

7.404

0.000

100

0.000

0.000

Sukkur

Approved
19.12.2012

2013-14

15.887

0.000

0.000

0.000

0.000

15.887

15.887

0.000

15.887

0.000

100

0.000

0.000

Sukkur

Approved
17.10.2012

2014-15

29.925

0.000

0.000

0.000

0.000

29.925

5.000

0.000

5.000

0.000

17

24.925

0.000

Sukkur

Approved
28.11.2012

2014-15

22.801

0.000

0.000

0.000

0.000

22.801

5.000

0.000

5.000

0.000

22

17.801

0.000

Approved
17.10.2012
Approved
28.2.2013

2014-15

30.799

0.000

0.000

0.000

0.000

30.799

5.000

0.000

5.000

0.000

16

25.799

0.000

2014-15

26.195

0.000

0.000

0.000

0.000

26.195

11.024

0.000

11.024

0.000

42

15.171

0.000

Approved
19.12.2012

2014-15

55.141

0.000

0.000

0.000

0.000

55.141

5.000

0.000

5.000

0.000

50.141

0.000

Approved
28.11.2012

2013-14

54.506

0.000

0.000

0.000

0.000

54.506

5.000

0.000

5.000

0.000

49.506

0.000

Sukkur

2380 Construction of road from Vohri to


Sukkur
Moula Ali mile 0/0-2/0 (3.22 kms)
2381 Construction of Road from Kotpull
Khairpur
Shadi Dhoodan to village Manghelo
Khan Jalbani via Sabul Khan Jalbani
mile 0/0-1/2 (2.0 kms)
2382 Construction of Road from village Khan N. Feroze
Mohammad Khaskheli / Asari to
Mukhtiarabad via Sobho Khan Chang
and Ashique Khaskheli, Taluka
mehrabpur (5.0 Kms)
2383 Construction of link road from village
Larkana
Mavalkot to Warish Dino Machi mile 0/03/0 (4.83 Kms)

{347}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Gen.
Sector / Sub-sector /
Sr.
Name of Scheme
No.
2
1
2384 Construction of link road from
Dhamrah Mahota Saidudero Koreja
Road to Gulsher Gopang (remaining
work) mile 0/0-0/0+330'.
2385 Construction of link road from Kambar
Ratodero Road Labano Khan Khokhar
to connect Panjoo Lorar mile 0/0-1/2

Location of
Scheme/
District
3
Larkana

Larkana

Approved
21.5.2013

2386 Construction of road from RD 97


Takani Regulator to village Mirza Khan
Gabol Mile 0/0-1/7 (3.00 Kms)
2387 Construction of road Bridge over
Jungshahi Nadi near village Mungar
Khan M. Hassan Palijo road mile 0/0-0/6
(1.20 Kms)
2388 Construction of road from Arbab
Masood to village Wali Muhammad
pitafi and onwards to Darrar Hotel
Thagio Stop Mile 0/0-3/0 (4.82 Kms)
2389 Construction of link Road from village
Hoat Khan Jalbani link road Sobho
Chang Taluka mehrabpur (3 kms)
2390 Construction of roads of villages of UCKhudabad and UC-Dal.
2391 Construcstion of road from Torri to
Gaji Shah road mile 0/0-1/6 (2.80 km)
2392 Execution of Development schemes (6
km road proposed by Mrs. Rukhsana
Shah)
a) Construction of road from Jungshahi
to village Aloo Jamadhar UC Jungshahi
taluka sakro mile 0/0-2/4

Thatta

2393 Construction of road from Mir


Mohammad Sehro to village Shafi jo
Thallo mile 0/0-2/6 (4.42 km)
2394 Construction of Road along Khirthar
Canal from Garhi Yasin Disrict
Shikarpur to Garhi Khairo District
Jacobabad mile 0/0-14/4 (23.33 km)
2395 Const. of 100 Rft Bridge at Nasir Canal
Bashirabad Chamber-Mirwah Road
Mile 5/1-5/6 (Approches) 79.752

Revised
Allocation 2012-13
Total
F.P.A.
8
9
0.000
0.000

2014-15

22.629

0.000

0.000

0.000

0.000

22.629

4.000

0.000

4.000

0.000

18

18.629

0.000

Approved
17.10.2012

2015-16

31.005

0.000

0.000

0.000

0.000

31.005

5.000

0.000

5.000

0.000

16

13.003

13.003

Thatta

Approved
3.1.2013

2015-16

67.853

0.000

0.000

0.000

0.000

67.853

5.000

0.000

5.000

0.000

31.427

31.427

Thatta

Approved
17.10.2012

2015-16

51.312

0.000

0.000

0.000

0.000

51.312

8.000

0.000

8.000

0.000

16

21.656

21.656

N. Feroze

Approved
28.2.2013

2014-15

22.444

0.000

0.000

0.000

0.000

22.444

10.000

0.000

10.000

0.000

45

12.444

0.000

Dadu

Approved

2015-16

71.346

0.000

0.000

0.000

0.000

71.346

20.000

0.000

20.000

0.000

28

25.673

25.673

Dadu

Approved
17.10.2012
Approved
9.4.2013

2014-15

23.492

0.000

0.000

0.000

0.000

23.492

5.000

0.000

5.000

0.000

21

18.492

0.000

2015-16

59.196

0.000

0.000

0.000

0.000

59.196

8.000

0.000

8.000

0.000

14

25.598

25.598

Approved
9.4.2013

2015-16

36.914

0.000

0.000

0.000

0.000

36.914

5.000

0.000

5.000

0.000

14

15.957

15.957

Shikarpur & Approved


Jacobabad
17.12.12

2015-16

439.940

0.000

0.000

0.000

0.000

439.940

90.000

0.000

90.000

0.000

174.970

174.970

T. Allahyar

2015-16

79.752

0.000

0.000

0.000

0.000

79.752

5.000

0.000

5.000

0.000

37.376

37.376

Dadu

UnApproved

Throwfwd
as on
01-07-13
11
2.703

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
0
100
0.000
0.000

6
2.703

Estimated
Cost

Est. Exp.
upto
June' 13
10
0.000

Allocation for
2013-14
Capital Revenue
Total
12
13
14
2.703
0.000
2.703

Actual
Exp. upto
Jun, 12
7
0.000

Thatta

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2013-14
28.11.2012

FPA
15
0.000

{348}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Gen.
Sector / Sub-sector /
Sr.
Name of Scheme
No.
2
1
2396 Const. of road from Chamber Mirwah
road Near 32 Mail Mori to Kandiari
Farm Cane Cate Tando Allahyar Sugar
Mills Mile: 0/0-0/5 120.550
2397 Block provision for Construction of
various road in Sind (Upper sindh ) (100
Kms.)
2398 Block provision for Construcstion of
various road in Sindh (Lower Sindh)
(100 Kms.)
Total Construction (New Schemes)
Total Construction
BRIDGES (ON-GOING) SCHEMES
2399 cosn: over head bridge ovre main
Railway at luqman in Coloding
Approach road up to new rohi canal
bridge to pir jo ghot road 4620 RFT
2400 Construction new Bridges on Therhi
Pull Mir Wah & Rohri Canal (450 RFT)
2401 Construction of Bridges in various
district of Province (12 Nos)
2402 Construction of new bridges in Sindh
2403 Construction Bridge over Abul Wah @
Rameja Ghari (130 Rft).
2404 Construction of Over Head Bridge on
Railway Southern Side of Railway
Station Sabzi Mandi Side (1475RFt)
2405 Construction of overhead bridge
including approaches on Railway
Crossing @ 5/3 of TandoAdam Circular
road.
2406 Repair of road of Over Head Bridge of
Railway Line Shaheed Benazirabad.
TOTAL BRIDGES (ON-GOING)
SCHEMES

Location of
Scheme/
District
3
T. Allahyar

Status
Target Date
Date of
for
Approval Completion
4
5
Un2015-16
Approved

6
120.550

Actual
Exp. upto
Jun, 12
7
0.000

Estimated
Cost

Revised
Allocation 2012-13
Total
F.P.A.
8
9
0.000
0.000

Est. Exp.
upto
June' 13
10
0.000

Throwfwd
as on
01-07-13
11
120.550

Allocation for
2013-14
Capital Revenue
Total
12
13
14
5.000
0.000
5.000

15
0.000

FPA

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
0
4
57.775
57.775

Sindh

Unapproved

2015-16

800.000

0.000

0.000

0.000

0.000

800.000

200.000

200.000

0.000

33

200.000

200.000

Sindh

Unapproved

2015-16

800.000

0.000

0.000

0.000

0.000

800.000

200.000

200.000

0.000

33

200.000

200.000

9073.763
28643.776

0.000
7040.229

0.000
2431.388

0.000
0.000

0.000
9471.617

9073.763
19172.159

1906.049
4395.044

0.000
0.000

1906.049
4395.044

0.000
0.000

5170.073
9501.924

1597.642
4421.097

Khairpur

Approved
3.9.2008

2013-14

670.858

551.180

80.000

0.000

631.180

39.678

39.678

0.000

39.678

0.000

94

100

0.000

0.000

Khairpur

Approved
9.2.2010

2013-14

109.633

108.000

15.000

0.000

123.000

-13.367

1.000

0.000

1.000

0.000

112

113

0.000

0.000

Sindh

Approved
22.03.2006
Approved
31.12.2008
Approved
31.12.2011

2014-15

388.437

257.451

89.500

0.000

346.951

41.486

41.486

0.000

41.486

0.000

89

100

0.000

0.000

2015-16

591.259

177.900

28.000

0.000

205.900

385.359

50.000

0.000

50.000

0.000

35

43

200.000

200.000

2013-14

27.203

3.360

10.000

0.000

13.360

13.843

14.000

0.000

14.000

0.000

49

101

0.000

0.000

2015-16

252.893

0.000

50.000

0.000

50.000

202.893

50.000

0.000

50.000

0.000

20

40

76.447

76.447

2013-14

207.490

0.000

107.490

0.000

107.490

100.000

100.000

0.000

100.000

0.000

52

100

0.000

0.000

2013-14

21.139

0.000

21.139

0.000

21.139

0.000

0.100

0.000

0.100

0.000

100

100

0.000

0.000

2268.912

1097.891

401.129

0.000

1499.020

769.892

296.264

0.000

296.264

0.000

276.447

276.447

Sindh
Khairpur
S.B.A

Sanghar

S.B.A

Approved
04.10.2012.
Approved
24.07.2012

Approved
14-02-2013

{349}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Gen.
Sr.
No.
1

Sector / Sub-sector /
Name of Scheme
2

BRIDGES (NEW) SCHEME


2407 Construction of Abdul Salam Thahim
Flyover Bridge at Shahdadpur over
Jatia Railway Phatak
Total Bridge (New Scheme)
TOTAL BRIDGES

2408
2409

2410

2411

2412

Location of
Scheme/
District
3

Status
Date of
Approval
4

Sanghar

Approved
15.3.2013

Sanghar
Sukkur
Sukkur

2416 Construction of road from chachro


Tharparkar
Waori Hirar Vaghiji - Veri Bahroo to
Dano Dhandhal mile 0/0-78/0 = 78-0 (M)
= 125.58 Kms.
2417 Improvement / construction Vijheto Tharparkar
Chelhar Chachro road Phase - I (35
Kms). Under Revision

Approved
22.02.2007
Approved
5.5.2011

Revised
Allocation 2012-13
Total
F.P.A.
8
9

Throwfwd
as on
01-07-13
11

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19

688.231

0.000

0.000

0.000

0.000

688.231

50.000

0.000

50.000

0.000

688.231
2957.143

0.000
1097.891

0.000
401.129

0.000
0.000

0.000
1499.020

688.231
1458.123

50.000
346.264

0.000
0.000

50.000
346.264

0.000
0.000

2015-16

329.830

117.058

50.000

0.000

167.058

162.772

20.000

0.000

20.000

0.000

51

2015-16

268.481

0.000

10.000

0.000

10.000

258.481

9.000

0.000

9.000

0.000

598.311

117.058

60.000

0.000

177.058

421.253

29.000

0.000

29.000

0.000

Estimated
Cost

Est. Exp.
upto
June' 13
10

Allocation for
2013-14
Capital Revenue
Total
12
13
14

Actual
Exp. upto
Jun, 12
7

STRATEGIC ROADS
IMPROVEMENT (ON-GOING)
W/R Sindhri Khipro Hatung with link to
Sanghar
Kamil Hingoro 67.00 Kms
W/R of road from Mithi to Chelhar
Tharparkar
(18.0 Kms)
Total Strategic Improvement (On going)
STRATEGIC ROADS
Construction (On-going)
Construction of road from Channesar to
Ghotki
Yaru Lund mile 0/0-14/0 = 14-0 (M) =
22.54 Kms
Construction of road from Chanesser to
Ghotki
Baghsar via Lanwari Pir Pakhorai mile
27/6-51/6 (38.64 Kms)
Construction of road from Chotiaryoon
Sanghar
to Hathungo Mile 0/0-40/0.

2413 Construction of road from Usman


Behan to Chotiaryoon mile 0/0-57/4.
2414 Construction of road from Dubar to
Bhelani Mile 0/0-12/0 (19.30 KM)
2415 Construction of road from Sangrar Saleh Pat at mile 7/3 FFR Road link to
Old FFR, MTTS mile 0/0-3/3 (5.43 Kms)

Target Date
for
Completion
5

FPA
15

2015-16

319.116

319.116

319.116
595.562

319.116
595.562

57

71.386

71.386

124.741

124.741

196.127

196.127

Approved
31.12.2004

2014-15

103.613

40.637

15.358

0.000

55.995

47.618

20.000

0.000

20.000

0.000

54

73

27.618

0.000

Approved
17.4.2010

2015-16

498.965

125.000

50.000

0.000

175.000

323.965

20.000

0.000

20.000

0.000

35

39

151.983

151.983

Approved
25.09.2006

2015-16

393.329

202.486

70.000

0.000

272.486

120.843

20.000

0.000

20.000

0.000

69

74

50.422

50.422

Approved
25.09.2006
Approved
21.1.2008
Approved
9.2.2010

2015-16

600.138

188.500

50.000

0.000

238.500

361.638

20.000

0.000

20.000

0.000

40

43

170.819

170.819

2014-15

161.628

51.270

49.100

0.000

100.370

61.258

20.000

0.000

20.000

0.000

62

74

41.258

0.000

2013-14

45.090

18.750

15.000

0.000

33.750

11.340

11.340

0.000

11.340

0.000

75

100

0.000

0.000

Approved
10.01.2005

2015-16

812.490

292.598

100.000

0.000

392.598

419.892

20.000

0.000

20.000

0.000

48

51

199.946

199.946

Approved
27.12.2005

2013-14

259.875

188.750

50.000

0.000

238.750

21.125

21.125

0.000

21.125

0.000

92

100

0.000

0.000

{350}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Location of
Gen.
Sector / Sub-sector /
Scheme/
Sr.
Name of Scheme
District
No.
2
3
1
2418 Construction of road from Kunri
Tharparkar
Chelhar Thar Nabisar to Chelchar Road
Mile 0/0-25/0 = 25-0 (M) = 40.25 Kms.

Status
Target Date
Date of
for
Approval Completion
4
5
Approved
2015-16
27.12.2005

2419 Construction of road from Mithi to


Trighatio (Tagai viaGodhgar &
Mahayari mile 0/0-31/0 = 31-0 (M) =
50.0 Kms..
2420 Const: of road from Diplo to IslamKot
77.00 Kms M&MD
2421 Const: of road from Ali Bunder to
Nagarparkar road mile 0/0-129/2 (208.0
Kms)
2422 Construction of road from Mithi
Loonhair Kharo AmroGogasar Katho
to Nohto noon Road Mile 0/0-28/0 = 28-0
(M) = 45.08 Kms.
2423 Construction of road from Mithi Diplo
road at Point Winger Well to Saghror
Taranjowat Bhadoro to Dodo Jat, mile
0/0-40/0 (64.36 Kms).
2424 Construction of Link road from Kaplore
to Jhamrari via Village Manaro Sultan
mile 0/0-13/2.
2425 Construction of road from Thario-joTar to Dano via Pilo mile 0/0-31/6.

Tharparkar

Approved
23.12.2006

Tharparkar

Revised
Allocation 2012-13
Total
F.P.A.
8
9
50.000
0.000

15
0.000

2015-16

426.410

79.500

50.000

0.000

129.500

296.910

20.000

0.000

20.000

0.000

30

35

138.455

138.455

Approved
29.05.2007
Approved
29.05.2007

2013-14

846.466

629.342

100.000

0.000

729.342

117.124

117.124

0.000

117.124

0.000

86

100

0.000

0.000

2015-16

4185.804

410.651

50.000

0.000

460.651

3725.153

40.000

0.000

40.000

0.000

11

12

1842.577

1842.577

Tharparkar

Approved
18.12.2006

2015-16

426.410

147.500

50.000

0.000

197.500

228.910

20.000

0.000

20.000

0.000

46

51

104.455

104.455

Tharparkar

Approved
18.12.2006

2015-16

574.800

162.650

40.000

0.000

202.650

372.150

20.000

0.000

20.000

0.000

35

39

176.075

176.075

Tharparkar

Approved
24.12.2006

2015-16

241.279

34.500

30.000

0.000

64.500

176.779

20.000

0.000

20.000

0.000

27

35

78.390

78.390

Tharparkar

Approved
24.12.2006

2015-16

565.174

31.000

25.000

0.000

56.000

509.174

33.000

0.000

33.000

0.000

10

16

238.087

238.087

2426 Construction of road from Tebhre


Bhambhro to Saeedao via Dodhar
Samoon Road Mile 0/0-53/0 (85.33 Kms)

Umerkot

Approved
14.10.06

2015-16

898.000

132.042

5.000

0.000

137.042

760.958

20.000

0.000

20.000

0.000

15

17

370.479

370.479

2427 Construction of road from New Chore


to Mendhrejopar mile 0/0-28/4.
2428 Construction of road from Kunri to
kantio Cheel Bund Khuri (50.00 Kms)
2429 Construction of Three link roads
connecting Umerkot with Mehander-JOPar. (i) Jaloo-Jo-Chaunro to MehandreJo-Par (28.17 Kms) (ii) Mehandre-jopar to Anupani via Sakhro (14.08 Kms)

Umerkot

Approved
12.09.2006.
Approved
02.01.2008
Approved
20.10.2006.

2015-16

340.316

73.528

25.000

0.000

98.528

241.788

20.000

0.000

20.000

0.000

29

35

110.894

110.894

2015-16

357.067

37.052

25.000

0.000

62.052

295.015

20.000

0.000

20.000

0.000

17

23

137.508

137.508

2015-16

435.259

0.000

25.000

0.000

25.000

410.259

33.000

0.000

33.000

0.000

13

188.630

188.630

12451.465

3024.506

874.458

0.000

3898.964

8552.501

535.589

0.000

535.589

0.000

4042.894

3974.018

Total Strategic Construction (On going)

Tharparkar

Umerkot
Umerkot

Throwfwd
as on
01-07-13
11
50.602

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19
82
89
15.301
15.301

6
279.352

Estimated
Cost

Est. Exp.
upto
June' 13
10
228.750

Allocation for
2013-14
Capital Revenue
Total
12
13
14
20.000
0.000
20.000

Actual
Exp. upto
Jun, 12
7
178.750

FPA

{351}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Gen.
Sr.
No.
1

Sector / Sub-sector /
Name of Scheme
2

CONSTRUCTION (NEW)
2430 Construction of Road from Khenju to
Saand & Gabar mile 0/0-24/0 (38.64
kms)
2431 Construction of Road from Sardar Garh
Rehmat Well Sorah Miano Road to
Dingi Chowk mile 0/0-12/0 (19.32 Kms)
2432 Construction of road from Chachro to
Khinsar mile 0/0-25/0 (40 Kms)
Total Strategic Constgruction (New)
Total Strategic Roads Construction
Foreign Aided Projects
(On-going Schemes)
2433 Sindh Road Sector Development
Program (EX-ADB Assisted Loan
No.1892-1893 Pak(SF) & OPEC 899-P)
2434 Japanese Assisted Rural Road
Construction Project-II Sindh

2435 Reconstruction / Rehabilitation of 2010


Flood affected roads in Lower Sindh &
Upper Sindh areas

Location of
Scheme/
District
3

Status
Date of
Approval
4

Target Date
for
Completion
5

Ghotki

Approved
24.2.2012

Ghotki

Tharparkar

Revised
Allocation 2012-13
Total
F.P.A.
8
9

Throwfwd
as on
01-07-13
11

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19

2015-16

507.014

0.000

0.000

0.000

0.000

507.014

10.000

0.000

10.000

0.000

248.507

248.507

Approved
24.2.2012

2015-16

250.543

0.000

0.000

0.000

0.000

250.543

10.000

0.000

10.000

0.000

120.272

120.272

Approved
24.2.2012

2015-16

547.781

0.000

0.000

0.000

0.000

547.781

11.430

0.000

11.430

0.000

268.176

268.176

1305.338
13756.803

0.000
3024.506

0.000
874.458

0.000
0.000

0.000
3898.964

1305.338
9857.839

31.430
567.019

0.000
0.000

31.430
567.019

0.000
0.000

636.954
4679.848

636.954
4610.972

Estimated
Cost

Est. Exp.
upto
June' 13
10

Allocation for
2013-14
Capital Revenue
Total
12
13
14

Actual
Exp. upto
Jun, 12
7

FPA
15

Sindh

Approved
25.09.2002

2013-14

6268.000

4711.865

1287.500

0.000

5999.365

268.635

268.635

0.000

268.635

0.000

96

100

0.000

0.000

Sindh

Approved
06.11.2008

2014-15

650.880

221.456

50.000

2000.000

271.456

379.424

200.000

0.000

200.000

2500.000

42

72

29.424

0.000

2014-15

1256.900

136.139

294.350

6712.109

430.489

826.411

650.000

0.000

650.000

6060.948

34

86

70.600

0.000

Jacobabad/
Kashmore/
Shikarpur/
Kamber/
Dadu/
Jamshoro/
Thatta

Revised
08.10.2012
Approved
14.04.2011

{352}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Gen.
Sector / Sub-sector /
Sr.
Name of Scheme
No.
2
1
2436 Reconstruction of Nawabshah Sanghar
road 61 km (85% Chinese Loan Rs.
1785.85 Million - 15% GOS funding Rs.
315.15 Million)
TOTAL FOREIGN AIDED
(A)
(B)
(C)
(D)
(E)
(F)
(G)
(H)
(I)

Location of
Scheme/
District
3
S.B.A /
Sanghar

Status
Date of
Approval
4
Approved

Target Date
for
Completion
5
2014-15

General (On-Going Schemes)


General (New Schemes)
Improvement (On-Going Schemes)
Improvement (New Schemes)
Construction (On-Going Schemes)
Construction (New Schemes)
Bridges (On-Going Schemes)
Bridges (New Schemes)
STRATEGIC ROADS
Strategic Improvement (On-Going Schemes)
Strategic Construction (On-Going Schemes)
Strategic Construction (New Schemes)

(J)

TOTAL STRATEGIC ROADS


FOREIGN AIDED PROJECTS
TOTAL ROADS & BRIDGES:-

Allocation for
2013-14
Capital Revenue
Total
12
13
14
150.000
0.000
150.000

( Rs. in million )
Financial
Financial Projection
FPA
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
15
16
17
18
19
300.000
0
47
1951.000
0.000

1790.320

1268.635

0.000

1268.635

8860.948

2051.024

0.000

11868.771
0.000
8482.547
0.000
9471.617
0.000
1499.020
0.000

10262.290
500.000
13976.546
6765.777
10098.396
9073.763
769.892
688.231

2391.333
100.000
2846.060
1441.645
2488.995
1906.049
296.264
50.000

0.000
0.000
0.000
15.000
0.000
0.000
0.000
0.000

2391.333
100.000
2846.060
1456.645
2488.995
1906.049
296.264
50.000

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

4018.203
200.000
5884.991
3478.758
4331.851
5170.073
276.447
319.116

3678.252
200.000
5278.865
2498.375
2823.456
1597.642
276.447
319.116

177.058
3898.964

421.253
8552.501

29.000
535.589

0.000
0.000

29.000
535.589

0.000
0.000

196.127
4042.894

196.127
3974.018

31.430

0.000

6
315.850

Actual
Exp. upto
Jun, 12
7
0.000

Revised
Allocation 2012-13
Total
F.P.A.
8
9
0.000
0.000

Est. Exp.
upto
June' 13
10
0.000

Throwfwd
as on
01-07-13
11
315.850

8491.630

5069.460

1631.850

8712.109

6701.310

22131.061
500.000
22459.093
6765.777
19570.013
9073.763
2268.912
688.231

11015.324
0.000
5845.202
0.000
7040.229
0.000
1097.891
0.000

853.447
0.000
2637.345
0.000
2431.388
0.000
401.129
0.000

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

598.311
12451.465

117.058
3024.506

60.000
874.458

0.000
0.000

Estimated
Cost

1305.338

0.000

0.000

0.000

0.000

1305.338

31.430

0.000

14355.114
8491.630
106303.594

3141.564
5069.460
33209.671

934.458
1631.850
8889.617

0.000
8712.109
8712.109

4076.022
6701.310
42099.288

10279.092
1790.320
64204.306

596.019
1268.635
13385.000

0.000
0.000
15.000

596.019
0.000
1268.635 8860.948
13400.000 8860.948

636.954

636.954

4875.975
2051.024
30606.436

4807.099
0.000
21479.249

BUILDINGS
Government Servant Housing
(On-Going Schemes)
2437 Construcation of Residences for Staff of
Sindh House i/c 2 room apartment
studio app: Police Barrack and Mosque

Islamabad

Approved
16.9.10
Revised

2013-14

112.790

80.468

9.999

0.000

90.467

22.323

22.323

0.000

22.323

0.000

80

100

0.000

0.000

2438 Construction of huts in the prepheral of


Sindh House Murree

Muree

Approved
9/16/2010
Revised
Approved
12/10/09

2013-14

65.264

34.791

16.136

0.000

50.927

14.337

14.337

0.000

14.337

0.000

78

100

0.000

0.000

2014-15

112.450

33.000

30.000

0.000

63.000

49.450

18.273

0.000

18.273

0.000

56

72

31.177

0.000

290.504

148.259

56.135

0.000

204.394

86.110

54.933

0.000

54.933

0.000

31.177

0.000

2439 Re-construcation of Peons Colony


behind Shahbaz Buildings Hyderabad.
Total GSH (O-G)

Hyderabad

{353}

PROVINCIAL
WORKS & SERVICES DEPARTMENT
Gen.
Sr.
No.
1

Sector / Sub-sector /
Name of Scheme
2

Location of
Scheme/
District
3

Status
Date of
Approval
4

Target Date
for
Completion
5

Sindh

UnApproved
UnApproved
UnApproved
UnApproved

Revised
Allocation 2012-13
Total
F.P.A.
8
9

Throwfwd
as on
01-07-13
11

( Rs. in million )
Financial
Financial Projection
Progress in %age
Jun'13 Jun'14
2014-15
2015-16
16
17
18
19

2014-15

200.000

0.000

0.000

0.000

0.000

200.000

5.000

0.000

5.000

0.000

195.000

0.000

2014-15

50.000

0.000

0.000

0.000

0.000

50.000

5.000

0.000

5.000

0.000

10

45.000

0.000

2014-15

57.767

0.000

0.000

0.000

0.000

57.767

5.000

0.000

5.000

0.000

52.767

0.000

2014-15

57.767

0.000

0.000

0.000

0.000

57.767

5.000

0.000

5.000

0.000

52.767

0.000

365.534
656.038

0.000
148.259

0.000
56.135

0.000
0.000

0.000
204.394

365.534
451.644

20.000
74.933

0.000
0.000

20.000
74.933

0.000
0.000

345.534
376.711

0.000
0.000

Estimated
Cost

Est. Exp.
upto
June' 13
10

Allocation for
2013-14
Capital Revenue
Total
12
13
14

Actual
Exp. upto
Jun, 12
7

FPA
15

Government Servant Housing


(New Schemes)
2440 Renovation of B&R Colonies @ T.M
Khan, M'Khas, Badin & Thatta
2441 Asset management Sysytem and
automation of composite schedule of
rates for W&S Deptt.
2442 Constt. Of Chief Engineer Building
Office / residence Sukkur
2443 Constt. Of Chief Engineer Highway
Office / residence Sukkur

Sindh

Sukkur
Sukkur

Total GSH (New)


Total GSH (O.G & New)
Government Office Building
(On-Going Scheme)
2444 Construciton of Office Block for Deputy
Supdt. Of Police Comptroller Resident
Engineer & allied work at Sindh House
Islamabad.
2445 Constt. of Boundary wall for
improvement of security arrangements
at Sindh House Islamabad

Islamabad

Approved
01.04.09

2013-14

27.698

2.500

10.000

0.000

12.500

15.198

15.198

0.000

15.198

0.000

45

100

0.000

0.000

Islamabad

Approved
10.03.12

2013-14

18.869

5.000

10.000

0.000

15.000

3.869

3.869

0.000

3.869

0.000

79

100

0.000

0.000

46.567

7.500

20.000

0.000

27.500

19.067

19.067

0.000

19.067

0.000

0.000

0.000

325.338

0.000

0.000

0.000

0.000

325.338

40.000

0.000

40.000

0.000

285.338

0.000

325.338
371.905
337.071
690.872
1027.943

0.000
7.500
155.759
0.000
155.759

0.000
20.000
76.135
0.000
76.135

0.000
0.000
0.000
0.000
0.000

0.000
27.500
231.894
0.000
231.894

325.338
344.405
105.177
690.872
796.049

40.000
59.067
74.000
60.000
134.000

0.000
0.000
0.000
0.000
0.000

40.000
59.067
74.000
60.000
134.000

0.000
0.000
0.000
0.000
0.000

285.338
285.338
31.177
630.872
662.049

0.000
0.000
0.000
0.000
0.000

107331.537

33365.430

8965.752

8712.109

42331.182

65000.355

13519.000

15.000

31268.485

21479.249

Total GOB (O-G)


Government Office Building
(New Schemes)
2446 Construction of 28 Nos. Suits at Sindh
House Islamabad (right Wing Block-I
and Left Wing Block-II)
Total GOB (New)
Total Govt: Office Buildings
Total (On-Going)
Total (New)
Total Buildings
TOTAL WORKS & SERVICES DEPTT:-

Islamabad

Approved
3.5.2013

2014-15

13534.000 8860.948

12

You might also like