CO S ALR 87099932 JPN Compare Variances Between Costing Runs
CO S ALR 87099932 JPN Compare Variances Between Costing Runs
CO S ALR 87099932 JPN Compare Variances Between Costing Runs
Purpose Standard report Variances between Costing Runs (S_ALR_87099932) is used to compare the costing results of two different costing runs. Materials with extremely high variances between the values of both costing runs can be highlighted with red traffic lights. Trigger Perform this transaction when you need to Compare Variances Between Costing Runs on SAP ECC 6.0. Menu Path Use the following SAP Easy Access menu path(s) to begin this transaction: Accounting > Controlling > Product Cost Controlling > Product Cost Planning > Information System > Summarized Analysis > Analyze Costing Run > S_ALR_87099932 -Variances Between Costing Runs
1/30
Work Instruction
Screen Flow
2/30
Work Instruction
Procedure 1. In SAP, start the transaction using the menu path or transaction code. SAP Easy Access
2. Double-click the Accounting node 3. Double-click the Controlling node 5. Double-click the Product Cost Planning node 6. Double-click the Information System node
Wednesday, July 15, 2009 CO_S_ALR_87099932_JPN_Compare Variances Between Costing Runs.udc
. . . . .
3/30
Work Instruction
7. Double-click the Summarized Analysis node 8. Double-click the Analyze Costing Run node .
9. Double-click the S_ALR_87099932 - Variances Between Costing Runs node . You can also enter S_ALR_87099932 in the Command field " " and click Enter " transaction. Analyze/Compare Material Cost Estimates " to access this
4/30
Work Instruction
5/30
Work Instruction
A tool R/O/C that provides the opportuni ty to cost multiple materials at the same time. In Product Cost Planning, costing runs are used to cost materials based on planning data. This type of costing run is based on a userdefined name and a date. In Actual Costing/M aterial Ledger, costing
Wednesday, July 15, 2009
Description
6/30
Work Instruction
runs are used to cost materials with actual data. This type of costing run is based on a costing run profile and a period. Field Example: Z_UNT001 R Costing Run Name under which the costing run is carried out. Click on the possible entries icon beside the Costing Run field to choose from a list of existing costing runs in the system. When you select one costing run from the list, this will automatically copy the name of the costing run to the Costing Run field and its corresponding costing date to the Costing Date field. 11 Click the Costing Date edit field . .
7/30
Work Instruction
Date from R/O/C which a costing run is valid. Field Example: 01.04.2008 R Costing Date
Description
This is the date from which a costing run is valid. This date has two uses: as a default value for scheduling in the cost estimate as a criterion for reorganizing the costing runs 13 Click the Costing Run edit field . .
8/30
Work Instruction
A tool R/O/C that provides the opportuni ty to cost multiple materials at the same time. In Product Cost Planning, costing runs are used to cost materials based on planning data. This type of costing run is based on a userdefined name and a date. In Actual Costing/M aterial Ledger, costing
Wednesday, July 15, 2009
Description
9/30
Work Instruction
runs are used to cost materials with actual data. This type of costing run is based on a costing run profile and a period. Field Example: Z_UNT004 R Costing Run 15 Click the Costing Date edit field . .
16 As required, complete/review the following fields: . Date from R/O/C which a costing run is valid. Field Example: Description
10/30
Work Instruction
04.04.2008 R Costing Date 17 Click the Intersection of Runs 1 and 2 check box . . This indicator controls the scope of the results list when two costing runs are being compared. If this indicator is not selected, the materials that are in at least one of the two costing runs are displayed. If this indicator is selected, only the materials that are in both costing runs are displayed. 18 Click the Threshold Red [Amount] edit field . 19 As required, complete/review the following fields: . .
11/30
Work Instruction
A R/O/C requireme nt for an object that is checked in the evaluatio n. If the object meets the requireme nt, the system displays the icon of the severity that is assigned to the threshold value, in the evaluatio n. Red traffic light appears if the date for a project element passed more than
Wednesday, July 15, 2009
Description
12/30
Work Instruction
one week ago. Field Example: 1000 R Threshold Red [Amount] Calculated variances or anticipated revaluation amounts exceeding this threshold value are flagged with the corresponding traffic light symbol. 20 Click the Threshold Yellow [Amount] edit field . 21 As required, complete/review the following fields: . A R/O/C requireme nt for an object that is checked in the evaluatio n. If the object meets the requireme nt, the system displays the icon of the severity that is assigned
Wednesday, July 15, 2009
Description
13/30
Work Instruction
to the threshold value, in the evaluatio n. Yellow traffic light appears if the date for a project element passed up to one week ago. Field Example: 500 R Threshold Yellow [Amount] Calculated variances or anticipated revaluation amounts exceeding this threshold value are flagged with the corresponding traffic light symbol. Note that if you enter values for both Threshold Amount fields, the threshold amounts to be marked by red traffic lights must be higher than the amounts to be marked by yellow traffic lights. These fields work in connection with the Display Positive and Negative Variances indicator . If this checkbox is selected, all cost estimates that reach the given
14/30
Work Instruction
15/30
Work Instruction
If the Only Display Exceptions checkbox is selected, only the cost estimates for which yellow and red traffic lights were set based on the defined exceptions are displayed. Notice that the system defaults the Cost Component View field in the Output area to 1 Costof Goods Manufactured. This field indicates which cost components are displayed and passed on to other areas of the SAP System. You may choose from the following existing views:
Review the data displayed on the screen. Note: It is possible to manipulate the data displayed by selecting any one of the following icons: - View details of a selected vendor account. This will require you to position your cursor on an item in the report before you click on the button - Sort data in ascending order
16/30
Work Instruction
- Sort data in descending order - Set filter Note: It is possible to manipulate the data displayed by selecting any one of the following icons:
17/30
Work Instruction
- Export the data to a local file in one of several formats that you can choose from
- Send the resulting report to another user - Change layout - Choose layout - Save layout You may also click on the following buttons to view details reports on the following: - Cost Estimates - Multilevel BOM
18/30
Work Instruction
19/30
Work Instruction
. button.
24 Click the Detailed Report: Cost Estimate . This screen is divided into three areas:
Overview of the Cost Estimate (the top half of the right side of the screen) Detailed Lists (bottom half of the right side of the screen), hide/show this area using the buttons respectively and
Costing Structure (left side of the screen), hide show this area using the buttons respectively. and
This screen area also contains tab pages which provide the following cost estimate data: Costs Contains the calculated costs. The costs displayed are based on the costing lot size. However, you can also see the costs based on the price unit in the material master, or based on a figure you have already defined, by selecting a cost base from the list field. Note that if a cost base is changed, all costing items are adjusted proportionally, including those that contain fixed costs (such as setup costs). The button displays the log containing the messages for the material. The button displays the itemization.
20/30
Work Instruction
The
The Partner button displays the partner cost component split with cost component groups The button displays the costed multilevel BOM (displayed in the screen area costing structure)
21/30
Work Instruction
Costing data Contains the costing variant and costing version used in the cost estimate.
22/30
Work Instruction
Dates Contains the costing dates used for the cost estimate.
23/30
Work Instruction
Qty Struct. Contains the quantity structure data used for the cost estimate.
24/30
Work Instruction
Valuation Contains the following: Currency in which the costing results are displayed Costing sheet, overhead key, and template used to calculate overhead
25/30
Work Instruction
History Contains information on who created, marked, and released the cost estimate.
26/30
Work Instruction
27/30
Work Instruction
31 End of simulation. .
28/30
Work Instruction
29/30
Work Instruction
Scenario Instructions In this simulation you are required to: Compare Variances Between Costing Runs Report on SAP ECC 6.0. Required Data This section provides the field data required to complete this exercise. Refer to this data sheet as necessary while performing the exercise. 1 500 1000 04.04.2008 Z_UNT004 01.04.2008 Field Cost Component View Threshold Yellow [Amount] Threshold Red [Amount] Costing Date Costing Run Costing Date Z_UNT001 Costing Run Value
30/30