This is the process that you must undertake when you are setting up a new intranet site, or extensively upgrading an existing site.
Phase/Objective Task Checklist
1. Planning
Goal: Complete a plan
Define the project owner Project owner defined Define goals and limitations Goals and limitations defined Define project team Project team defined Time frame defined Define time frame Plan in place 2. Content and functionality
Goal: Complete information
architecture, navigation and content templates Prepare workshop Workshop planned Complete workshop Workshop completed Quality control workshop after the fact Sum up workshop with report that includes sketches of Report in place architecture, navigation and content Circulate the report among decision-makers Receive feedback and make necessary changes Report approved by all relevant parties Establish consensus around the report in the organization A report that includes an information architecture, navigation and content templates in place 3. Establish information owners
Goal: Determine who shall have
responsibility for uploading and maintaining information on the pages or in the sections Make an information ownership matrix based on results from the Information owner matrix complete workshop Ensure that all relevant people understand their responsibilities Information owner matrix recognized vis-a-vis the information owner by staff and accepted matrix Clarify which resources are necessary for publishing and Resources clarified maintenance Ensure that the necessary Management accepts allocation of positions and work force is resources available to take on each task Internal training completed Complete in-house training on making and adapting content for Everybody in the organization knows web his or her role with respect to the new intranet, and has received formal authorization to fulfill the new role 4. External orders
Goal: Make orders for necessary
technical solutions and design solutions Redevelop the contents in the report from phase 2 into a Technical specification and creative technical specification document brief in place and a creative brief Identify possible suppliers Possible suppliers identified Send out requests for bids Requests for bids sent out Consider the offers from suppliers Choose a supplier Supplier chosen Place the order Order placed 5. Implementation
Goal: Fill the technical solution with
content, implement design templates and begin using the intranet Build up a new structure in the Structure built up new solution Implement templates in the new Templates implemented solution Log editorial users into the Editorial users logged on system Complete in-house course in In-house course completed use of the system Content published (by respective Place content in database information owners) Approve external suppliers Test to ensure that the technical properties, design and content function according to plan Intranet is operational and full of content 6. Launch
Goal: Draw attention to
establishment of new intranet Launch activity planned Plan launch activity
Establish budget for launch
activity and get approval for Budget for launch activity approved costs Launch activity completed Complete launch activity Intranet is "officially launched" and in use 7. Operations
Goal: Ensure that the intranet is
active and continuously improved Establish routines for receiving Feedback from users regularly and handling feedback from received and considered users Establish routines for checking Statistics regularly checked and and following up on statistics followed up Establish routines for regular User surveys completed regularly user surveys Analyze results of feedback, statistics and user surveys Suggest concrete improvements Improvements approved Complete improvements Test to ensure that improvements have had desired Intranet is regularly improved effect (regularly, as part of operational routine)
Ultimate Microsoft Power Automate Desktop: Leverage Microsoft's Robotic Process Automation Capabilities to Automate Routine Tasks for Enhanced Efficiency and Productivity (English Edition)
Carl Olson-Zen and The Art of Postmodern Philosophy - Two Paths of Liberation From The Representational Mode of Thinking-State Univ of New York PR (2000)
Hands-on Data Virtualization with Polybase: Administer Big Data, SQL Queries and Data Accessibility Across Hadoop, Azure, Spark, Cassandra, MongoDB, CosmosDB, MySQL and PostgreSQL (English Edition)