1328699325305-Gr B Ans PT 2

Download as pdf or txt
Download as pdf or txt
You are on page 1of 93

[k.

M ^lh^ odZ'kkWi Part C Workshop


Oghy izsl e'khu }kjk D;k dk;Z fd;k tkrk gS\ Oghy izsl e'khu dk dk;Z fl)kar D;k gS] blds esaVsusal 'ksM~;wy fy[ksa\
Q.1 What work is done by wheel press? Write down the working principle & maintenance Schedule of wheel press. Answer:- Wheel press is a special purpose machine which is used to assemble and disassemble of wheels and Axles. It is a hydraulic operated machine which has a hydraulic power pack for creation of hydraulic pressure. The hydraulic pressure is transmitted through solenoid valves for different operations. The controlling system of hydraulic pressure is automated through computerized system. The wheel disc are machined on VTL machine and Axle are machined on axle turning machine. The machining of disc and axles are done considering required interference fit for the pressing of wheels. Working principle :- The machining of wheel seat of Axle are done on axle turning lathe and surface finish is kept as per specified limit and diameter of wheel seat is kept as per interference fit allowance + Wheel disc bore. similarly wheel disc bore are done on vertical turret lathe considering the interference allowance. Wheel disc are clamped in a hanger and Axle wheel seat are placed in the wheel disc bore. Axle and wheel disc are kept at 90 Degree and parallel to axis. Required pressure is applied on axle and wheel disc are kept stationary. The axle is mounted on wheel with pressure app. 80-100 ton. Same action is repeated the second disc is kept stationary and another part of axle wheel seat & axle is pressed on second disc. Thus assemble of wheel is done. In case of disassemble/dismantling of condemn wheel disc/Axle, the disc are clamped with the help of fixture and pressure is applied on the axle. The axle pressure applied on the wheel disc and wheel disc is separated from the axle. Another wheel disc is also dismantled with the same process. Required pressure for dismantling is higher than the assemble pressure. The main parts of this machine are 1. Pressure head and Main head. 2. Rear head. 3. Bed. 4. Control panel. 5. Hoisting system for loading and unloading of wheel set. The defective wheels and Axles are dismantled by the wheel press and serviceable axle/disc is reclaimed by machining. Required pressure is considered as per the requirement of dismantling/Assembly of the wheels. The capacity of the wheel press is 500Ton. Preventive maintenance schedule for wheel press. DAILY 1. Clean the dirt on the ramp and machine. 2. Check the machine for sequence of operation and functioning of limit switches. 3. Check the leakage of oil if any. WEEKLY 1. Check the hydraulic fluid levels and top up, if necessary. 2. Observe the machine for unusual noise and operation. 3. Grease all the bearings. 4. Check pressure gauge &pressure recording system. MONTHLY 1. Tighten all the structural fasteners.

2. Check and adjust the drive chain, sprockets and die rod, nuts and grease. 3. Check the hydraulic system for leakages and smooth operation. 4. Check the filter for clogging indications and renew, if necessary. 5. Check the hydraulic pressure of both the pumps. YEARLY 1. Check the condition of the hydraulic oil and renew, if necessary. 2. Renew hydraulic filters. 3. Check the system pressure. 4. Check the alignment of machine.

Q.2 lh-,u-lh- rFkk daosa'kuy e'khu esa D;k varj gS\ lh-,u-lh- e'khu dk j[k&j[kko fdl

izdkj djsaxs\
What is the difference between CNC and Conventional Machine? How will you do the maintenance of CNC machine? Difference between conventional machine and CNC machine :S.No. Description Conventional machine CNC machine 1 Method Having a fixed sequence of This is a lesser flexible operation with little variation to method in which the sequence machine a part of the operations can be changed to machine a new part. 2 Programmed The program or sequence of In these machine program is operations is built in to the built in the software. hardware. 4 Variation It has less scope for variation as The machines have large it is too costly scope for variation of different products without involvement of high costs. 5 Setting of The m/c requires more time for Complex setting up m/c setting up. procedures are almost by passed in these machines. 6 Floor area More floor area required for Lesser floor area required tooling and working holding 7 Productivity Less productivity compared to Productivity higher CNC 8 Quality Irregular quality Consistent quality achieved 9 Operation Reliable time taken More reliable than conventional m/c and less time taken 10 Cycle time Long cycle time compare to Shorter cycle CNC 11 Man power Required more man power Less man power 12 Accuracy Less accuracy Higher accuracy 13 Material Manual or some auto hand Fully auto handling 14 Lead time More Less 15 Scrap Optimum scrap generate Scrap rate is reduced 16 Initial cost Less High

Skill/personn Less required More skilled man power is el required 18 Nature of Frequent Sophisticated m/c 20 Maintenance Less High & more skill is required cost Maintenance of CNC machines The following steps are to be carried out at the time of maintenance of CNC machines:Weekly cleaning of bed tool post drives, check leakage if any. Sensor: - Firstly the sensors are to be inspected and checked Sensor If there is fault in a measurement system then the sensor might be at fault. A simple test is to substitute the sensor with a new one and see what effect it has on the results given by the system of the result change then it is likely that the original sensor was faulty. If the result do not change then the fault is elsewhere in the system. Switches and Relays: - The switches and relays are inspected, checked and cleaned the dirt and particle of waste material between switch contacts is common source in correct functioning of mechanical switches. Motors: - The maintenance of both motors AC & DC involves correct lubrication. In DC motors if the brushes wearied, replace them a single phase capacitor start AC motor that is sluggish in starting probably needs a new starting capacitor. The three phase induction motor requires only regular maintenance is periodic maintenance. Hydraulic and pneumatic systems: - A common cause of faults with hydraulic and pneumatic systems is dirt, small particles of dirt can damage seals, block orifice causes valve spools to jam. Thus the filters are to be regularly checked & cleaned. Oil also changed. Damage to seals can result in hydraulic and pneumatic cylinder leaking, beyond that which is normal and result in a drop the pressure in system. To prevention of it, replace the seals in the cylinders, in the case of vane type motors, vans are replaced, and hose pipe & all fittings are checked and repaired. All schedule maintenance of CNC machines should be done in time to prevent any break down.

17

Q.3 e'khuksa dh dksMy ykbZQ ls D;k vfHkizk; gS\ dksMy ykbZQ iwjh dj pqdh e'khuksa ds
uohuhdj.k izf;k dks fy[ksa\
What do you understand by Codal life of Machine? Write down the process of replacement of the Machine, which have completed codal life. Codal life of machine Codal life of any machine/asset is term as working life/normal life criteria for deciding Codal life of any asset/machine is based on utilization of particular machine/asset. It may be 1. Working of machine may be based on single and double shift utilization. 2. Working of machine may be based on round o clock utilization. When any machine/asset is utilized round o clock. Its codal life will be 0.6 times of normal life Normal average life of machine/Equipments as per working shift is known as the codal life of assets. The normal life of the various classes of railway assets are given below s. no. 1 2 3 Class of Asset Power generation machinery and switches General purposes light machinery e.g. band saws nibbling. air comp., floor grinder etc Cranes Average life in years 15 15

EOT 30 Steam 10 Diesel 15 4 Light mobile machinery (tractors fork lifts, 10 portable compressors and welding sets etc). 5 Steam Locomotives 40 6 Boiler and Tender 20 7 Diesel electric/ hydraulic loco 36 8 Diesel engine 18 9 I. R. S. Coaches 30 10 Bogie Wagons 35 This life span of 15 years is for single and double shifts, for round the clock working the life recommended is 15X0.6=9years. Process for procurement of machine on replacement account For procuring any machine/asset on replacement account completing its codal life , following procedure is adopted. For procurement of any machine M&P proposal with estimated cost of more than 10 lakhs requires sanction of railway board. Whereas the items with individuals cost of up to 10 lakhs each are sanction by GM from the lump-sum grant received from the railway board. In order to submission of proposal of railway board are as under:1. Narrative justification:- Narrative justification is prepared considering following points:i. Necessity of machine ii. Codal life of machine iii. Condition of machine, extent utilization iv. Total expenditure incurred on repairs and maintenance over past 5 years including AMC, if any v. Why can not the expenditure be avoided or postponed Justification is also consisting total cost & quantity and location in (hard and soft copy) routed through PHOD/HOD of the department in the month of April. 2. Administrative approval:- Before submission of proposal to headquarter. It should be administratively approved by DRM in division and by CWM in workshop. 3. GM Approval:- after selection of proposal headquarter approval of GM .field unit are inform for preparation of complete vetted proposal in the month of June. 4. Submission of vetted proposal: - After vetting of proposal from division fianc proposal is submitted to headquarter in the month of August. 5. Headquarter finance concurrence:- headquarter will take finance concurrence from zonal finance in the month between August and October. 6. After submission to Railway board:- concurred proposal will be submitted to railway board in the last week of October for sanction under PH-41. 7. Process for procurement of machine under GM lamp sum grant (cost up to 10 lakhs):- under this grant producer is similar and justification is submitted to headquarter and sanction authority is GM.

Q.4 Oghy dh izksQkbZy dh D;ksa vko';drk gksrh gS rFkk Oghy dh izksQkbZy dSls dh tkrh gS\
Why profiling of Wheel is necessary? How the profile of wheel is carried out. Wheel profile is necessary as wheels are fitted in wagons, coaching stocks after running on track within certain time. There are some wheel defects developed during running, it is

necessary to remove these defects otherwise wagon/coach will derailed or resulting damage to track, therefore wheel profile is necessary. In service some of the wheel developed defects beyond the permissible limit for the safe running. Such wheels are to be withdrawn from service for removing the defects. The wheel requires re-profiling shall be turned to worn wheel profile or to intermediate profile to RDSO Drg. No. WD-88021 or WD-89060/S2 respectively. Wheel profiling is done on the Wheel lathe, CNC & conventional Machines. Wheel turning on Non CNC Machine is done with the help of template copying turning. Profiling of wheel In wheel lathe there is a system of gripping of wheel, wheels are received on bed of wheel lathe with the help of crane or turn-table. The wheel is lifted by jack and centralized by tail stock on wheel lathe and move towards head stock with the help of centre, after centralization, centers are removed & wheel disc are clamped with the help of clamping Jaw. The wheel rotates, two nos. tool post fitted with cutting tool are inched forward & assessed the cut is to be taken to remove minimum material for good profiling. Wheels are started making and coping profiling is done. There are template of 22 mm, 24, 25, 26, 28.5 mm. the profile is assessed by operator seeing the condition of flange & template is set accordingly. During profiling operation of both wheel disc, it is ensured that dia. difference of both disc should not be beyond specified limit. By this method wheel profiling is done on conventional machine. All these functions are done through programming in CNC machine. The quality of turning is better in CNC machine.

Q.5 sV LVkWd esa fo;fjax fdrus izdkj dh iz;ksx gksrh gSA flysaMhdy jksyj fc;fjax rFkk

dkVsZt Vsij jksyj fc;fjax esa D;k varj gS] nksuksa ds xq.k&nksk crkb,\
What types of bearings are used in freight stock? What is the difference between cylindrical Roller Bearing and Cartridge Taper Roller Bearing? Explain the advantage & disadvantage of both? Ans : Following types of bearing are used in freight stock : Cylindrical Roller Bearing (20.3T) Cylindrical Roller Bearing (22.9T) Cartridge taper roller bearing (22.9T) Comparison between Cartridge taper roller bearing ( CTRB) and Cylindrical roller bearing and advantage/disadvantageS.N o 1 2 3 Attribute Grease leakage Grease amount Assembly/ disassembly Vandalism Installation CTRB None 450 gm Easy & Speedy assembly / Disassembly unit cone assembly None Single pre assembled, pregreased sealed cartridge unit High (faster to dismount & no heat required ) 125 bearings in 8 hrs double Cylindrical roller bearing Some 2 kg/Axle Box Take time to assembly & disassemble inner races, mounted with shrunk fit Some due to grease leakage Multi compound assembly, takes time to assemble & disassemble Low (need to heat the bearing before application may have to wait for one hrs before bearing on axle cool down

4 5

Productivity

7 8

Safety

9 10

11

Burn injury possible due to heating of bearing, slippage from grease. Technology New & proven technology Older technology US railroad Ability to with rail road & loco motive abandoned this design during 1960 s stand wagon used 100% Clearance is adjustable:- to No adjustment:- no adjustment for use of various size spacer size between the roller & race length allowed for option components. This increases required clearance adjustment compound inventory & cost. leaping flexibility high & cost low. Tapered high axle Cylindrical low axle capacity:- a capacity:- a 100% axle 100% axle load results in the entire load results in only 18% of 100% of load going into frication and the load going into friction heat per roller axle load is more than & heat pre roller axle load 6%. is less than 1%. Taper high radial Cylindrical high radial capacity:capacity:-roller/race cone roller/race cone contact. contract Bearing Less weight More weight apox 3 times weight Other Low purchase price, low advantage & installation cost, no field disadvantage maintenance cost, no field lubrication Conclusion CTRB are primary for rail Cylindrical bearing application around the Cost are inherent world. Weakness with very low axle load capacity.

ended press Vary safe

Q.6 Vsu ikfVaZx fdls dgrs gSaA Vsu ikfVZax gksus ds eq[; dkj.k D;k&D;k gSA dkj[kkuk esa ih-vks,p ds nkSjku bldks jksdus ds mik; fyf[k,A
What is train Parting? What are the main reasons of train parting? Explain the measures to be taken to reduce train parting, During POH in workshop. Train Parting When a train after formation, during run, shunting operation or while starting / stopping divides itself into two or more parts, is termed as train parting. This is termed as J Class Accident In such cases the driver should keep the front portion moving as far as possible until rear portion has stopped to avoid any possibility of collision between the two parts of the train and cause of derailment. Guard should immediately try to stop the rear portion of the train by applying the hand brakes to avoid collision with front portion. Then driver & guard shall act accordingly to provision of G & SR to clear the block section in case of train parting occurred in the block section. The Reason Of Train Parting:- Incidence of train parting is an accident as per accident manual. The train parting takes place mainly due to following reasons: Operational reason

Such as bad engineman ship by driver Brake binding due to emergency application of the brakes. Bad driving technique such as fast notching up of locomotive, sudden application of brakes, bad driving on gradient, improper road knowledge etc. can also contribute to train parting. Due to defective signal Train parting mostly occurs on up gradient followed with down gradient. The most important location where the cases are more is near the home signal where drivers while starting from home signal after stopping are not ensuring releasing of brake resulted shock load on knuckles. Poor Maintenance of P Way Track Analysis of section wise occurrence of train parting on railway indicates that bad section can be identified such as poor rail joints, mud accumulated track create uneven height with CBC coupler resulted train parting due to vertical slipping of knuckle and driver should be counseled for pre drive techniques. Improper maintenance of rolling stock Train parting takes place in goods train due to following improper maintenance of rolling stock. Causes & their remedial action for AAR CBC: Sl. No. Defects Causes Remedial Action 1. Excessive wear Improper maintenance. CBC Knuckle nose wear of knuckle gauge No.- 2 must be apply at nose. any schedule of maintenance. 2. Expansion of Ineffective anti-creep During POH & other repairs guard arm. mechanism. it should be checked by CBC gauge No.- 2. 3. Excessive CBC Excessive wear on shank It should be replaced in sick drooping. wear plate/ missing of line & yard examination shank wear plate. 4. Cracks on Defective material/ It should be replaced during Coupler Body. Weak draft gear. POH & ROH 5. Cracked More Slack/ Weak draft It should be replaced during knuckle gear. POH & ROH 6. Bent operating Excessive projection of It should be checked and handles. operating handles more replaced by examining staff in than 75. sick line and yard. 7. Dropping of Yoke pin support plate. Improper/ Partial locking of knuckles Breakage of front & rear stoppers. Deficiency of lock lifting components Loose & deficient rivets. It should be secured properly by rivets

8.

Locking piece dislodged. Ensure proper locking of knuckles by examining staff Dead gear. or weak draft Check the damaged draft gear. bent Ensure that all the components lock lift assembly is intact.

9.

10.

Defective and operating gear.

11.

12.

Excessive wear on the lock and knuckle at locking face. Stretched knuckle. Dropping of the operating handle on run. Breakage of the operating lever support bracket Excessive wear of the yoke pin support plate. Breakage/ Perished rubber pads in draft gear.

Ineffective anti creep mechanism. Lock seat worn out or lug broken Defective or sudden draw and buffing forces. Improper securing bearing piece.

During POH & other repairs it should be checked by CBC gauge No.- 2.

13.

During POH & other repairs it should be checked by CBC gauge No.- 1. of It should be ensured at every attention by examining staff.

14.

15.

16.

17.

18.

Bent/ Damaged Ensure proper riveting & bent operating lever and lever to be replaced. loose riveting of support plate. Yoke pin hole elongated. Check any excessive rubbing marks on the bottom of the yoke. Excessive play in draft Proper attention during POH gear. & ensure proper fitment of rubber pads & check for damaged draft gear by examining staff. Failure of anti- Excessive wear of CBC Ensure all the components of creep components. CBC body/ lock lift assembly mechanism. are intact. Self rotating Anti rotation lug not CBC available or non Operating standard. (Standard size Handle 270 X 16 X 16mm). CBC operating handle bearing piece slot more wear and tear (Standard size17.5 X 17.5 mm

. In addition to above following measures should be taken during POH of wagon to reduce/remove train parting case : Use of proper size of operating rod lug. Replace bearing piece. Provide Anti-pilferage device Replace worn-out knuckle Repair/Replace Lock lift assembly Replace / Repair Anti creep device Ensure yoke pin support plate rivet properly. Replace worn out/crack yoke. Ensure proper riveting of draft support plate. Ensure CBC back stopper plate rivets. Q.7 VSad oSxu dh lajpuk] oSjy fQfVaXl] ekLVj okWYo ds ikVZl dk o.kZu dhft,\ bldh Hkki

}kjk lQkbZ djus dk o.kZu dhft,A


Explain the construction of Tank Wagon, Barrel Fitting & Master Valve components. Write down the steam Cleaning process of Tank Wagon. The barrel of BTPN fabricated from cylindrical vessel, is radiography welding quality from carbon structure steel to IS-2062 Fe 410 CuS. concavial part are made by pressing dead steal IS 3747. Concavial part is added with cylindrical part by welding. These wagon comes to the service after fully radiography testing. barrel fittings Safety valves- Working pressure 1.4 k/sq.cm Filling pipe cap with flap- 100mm dia Vapor extractor cock, with cap- 51 mm dia Master valve hand operated -100 mm dia Dip road pipe flap with plug- 25 mm dia Bottom discharge valve- 100 mm dia Ladder -both side Master Valve Master Valve is situating in bottom of barrel from where petroleum material are taken out. Two masters Valve is fitted in long vehicle BTPN etc and one master valve is fitted in small vehicle. TP etc Master valves are opened 35 mm above and below. On the tapper seat of Master valve, valve is fitted to prevent the leakage of petroleum product. Earlier Master was made from Brass, but now these are made from cast iron to avoid the theft cases. There are valve in valve seat in master valve in eight wheeler wagons. Master valve is guided by valve spindle and bracket is fitted between them and one GM nut is provided on bottom side. Steam Cleaning Of Tank Wagon The tank requiring steam cleaning should be placed as near the steam supply line as possible and protected against any movement. The berthing siding should be completely isolated from all other traffic. Tanks as pressure vessels, tanks for petroleum, other highly inflammable products, vegetable oils, bitumen, coal tar and molasses are cleaned by steam. In case of pressure vessels, it should be ensured that all the gas has been discharged to the atmosphere. After ensuring that the tank barrel is no longer under pressure, the following sequence should be followed: i. Remove the manhole cover together with manhole housing, valves etc. and leave the tank exposed to atmosphere for 24 hours. ii. Entry of staff in the tank barrel should be strictly prohibited and signs with suitable legends displayed at a reasonable distances away from the tank to be steam cleaned. iii. Insert pipe through man hole and steam interior of barrel for 12 hours. In order that the tank barrel is thoroughly steamed from inside, the steam pipe should be provided with a T connection at its lower end and so directed as to blow steam towards both ends. iv. Remove condensed steam collected in the tank barrel and keep the barrel exposed to atmosphere for another 24 hours. v. Ascertain if the tank barrel is free from gas fumes. This may be done as follows: (a) AMMONIA TANK BARREL Fill the tank barrel with water and take a specimen of the same in a clean glass bottle since ammonia is readily soluble in water. The specimen of water should be tested for any traces of

ammonia with red litmus paper. Any trace of ammonia in water would turn red litmus blue. Another very sensitive method known as Nessler's test may be applied to find out if the specimen of water contains any traces of ammonia. In this test, the reagent used is a solution of potassium mercuric iodide with potassium hydroxide. This reagent gives a brown color when mixed with the specimen of water containing even a minute trace of ammonia. If ammonia is detected, empty out the tank barrel and refill with fresh water. This process may be repeated till the tank barrel is free from ammonia traces completely. (b) CHLORINE TANK WAGONS Fill the tank barrel with water and take a specimen of the same in a clean glass bottle. Since chlorine is readily soluble in water, specimen of water taken out should be tested for any traces of chlorine Any trace of chlorine in water would have a bleaching effect on colored litmus paper. If chlorine is present, the tank should be repeatedly emptied and refilled wit h fresh water till free from chlorine traces completely. (C) LPG TANK WAGONS A clean bottle filled with fresh water is lowered through the manhole. A string is attached to the bottom of the bottle before lowering. Tilt the bottle at the bottom of the tank to allow its water to flow out and the gas in the tank to take its place. The bottle should be left in this position for about 5 minutes and then withdrawn away from the tank. A lighted match stick should then be brought near the mouth of the bottle or applied to the air or gas inside and bottle. If there is no flame the tank is free from injurious gas. But, in case it gives out a flame, the tank should again be steam cleaned. After ascertaining that there is no trace of gas in the barrel the tank should be dried out by blowing in hot compressed air before proceeding with inspection and repair.

Q.8 osfYMax fMQsDV~l ls vki D;k le>rs gSa\ osfYMax ds vkarfjd ,oa ckg~; nkskksa dk foLrkj ls

o.kZu djsa rFkk buds nwj djus ds mik; fy[ksaA


What are the welding defects? Explain the internal & external welding defects and remedial action to remove these defects. Answer: - Welding procedure is the important for fabrication/manufacturing of rolling stock. Due to improper welding. There are many reasons of poor performance of rolling stock. Following are important welding defects, reason/cause of defect and there remedial actions:Defect Causes Remedies 1. Lack of Fusion (It is the i) Dirty Surface i) Cleaning the edges to be failure of the adjacent layers of ii) Improper cleaning welded. the weld metal.) of weld bead. ii) Proper cleaning of each iii) Current too low. bead. iv) Excessive welding iii) Maintaining proper speed. current & welding speed. v) . Long Are length vi) Indigent slag removal of joint i) ii) of iii) Proper joint preparation. Suitable size of electrode as per root gap. Proper heat input & welding speed.

2. Lack of penetration (It is i) Inadequate caused when the weld metal preparation. does not completely fill the ii) Wrong size weld cavity. ) electrode. iii) Low heat input.

iv) High welding speed. v) Long are length vi) wrong polarity of D.C Supply vii) Too large dia of electrode 3. Overlap (It is the i) Wrong angle of i) overlapping of weld metal electrode. beyond the toe or root of weld.) ii) Too large deposition in ii) a single run. iii) Faulty electrode manipulation. iv) Insufficient current 4. Undercut (It. is cutting of a i) groove into the base metal i) Too fast welding speed parallel to the of weld) ii) ii) Long arc length.

Keep correct angle of electrode. Use proper size of electrode.

Use proper current & polarity in case of DC. Use proper diameter electrode. iii) Proper angle of electrode.

iii) High current. iv) Higher diameter of electrode used. v) Wrong electrode angle . 5. Slag Inclusion Faulty electrode. Wrong current. Rapid rate of welding. Defective weld design. Improper technique. Improper manipulation of flux Bad tack weld Improper removal of slag. 6. Porosity (It is a development i) Wrong arc length. of a group small gas pocket in ii) Inadequate gas the weld.) shielding due to clogging, jamming or hose leaking iii) Too high current iv) Excessive moisture in the electrode. v) High rate of weld freezing vi) Dirty joint 7. Blow holes. (Porosity or a) Improper electrode cavity are called blow boles.) b) Less current c) Excessive moisture in electrode d) Improper grove

i)

Proper current & heat input ii) Proper design & technique iii) Proper cleaning of weld.

i)

Maintain proper arc length & correct polarity when welding with DC. ii) Clean the surface properly iii) Check for proper gas supply & leakage

-do-

8. Cracks.

9 CRATER (It is a depression caused at the termination of a weld bead.)

10 SPETTER (It consists of metal particles expelled from welding.)

formation in butt weld. i) Rapid cooling ii) Improper composition parent metal. iii) High welding speed. iv) Electrode with high H2. v) Excusive localized stress. vi) High rigidity of the joint vii) Concave, wide or shallow bead. viii) High carbon sulphur and silicon content in metal. i) high current ii) Wrong size of electrode iv) Wrong electrode angle v) Rapid withdraw of electrode. i) high current ii) moisture in electrode iii) Long arc length

i)

Avoid rapid cooling by preheating. ii) Maintain proper welding parameter iii) Use low hydrogen electrodes.

i)Set proper current ii) Select proper size of electrode as per thickness of plate & proper angle i) ii) Proper Current Baking of electrode set proper arc length

11 Warping (To twist from true a) Improper sequence of direction ) welding and presetting. per sequence of welding c) Incorrect preparation. edge

iii)

Q.9 Mku gS.M oSfYMax ls vki D;k le>rs gSa] blds xq.k&nks"k fyf[k, rFkk Mkmu gSaM osfYMax djus ds fy, D;k&D;k mik;A
What do you understand by down-hand welding? Write down the advantages and Disadvantages of down-hand welding. What are the measures of down-hand welding? Ans. Down hand welding is one of the welding position in which the work pieces is welded. welding position :- Welding position gives an idea about location of the work piece which is to be welded. Location of work piece is generally decided with respect to weld slope and weld rotation. slope:- It is the angle between weld root line (W.R.L.)and a horizontal reference plane(H.R.P). rotation:- It is the angle between the bisecting the angle of weld cross-section(B.L.) and upper portion of a vertical reference plane(V.R.P.)passing through the weld root line. According to American standards there are four welding position namely flat (Down hand) , Horizontal, Vertical and Over head . British and Indian standard add one more , name as Inclined position. flat (down hand) position :- In this position the face of the weld is horizontal, welding carried out from above electrode pointing downward and weld bead is horizontal. In this position both slope and rotation are limited within 100

Advantages :- 1) It is the simplest and best position of welding. 2) It is natural and most convenient position of welding. 3) Excellent welded joints are obtained at fast speed with Minimum fatigue of welder. If the structure does not permit welding in down-hand position and if possible to rotate it, then different measures such rotators, fixtures and petitioners are using to carry out welding in down-hand position. There is no disadvantage of down hand welding Measures to facilitate down hand welding Template: - Its a clamping & guiding device for the job can be mounted which guide to welding operation. Manipulator:-it is a device which can clamp job &can be rotated, can be hold at any desired location to facilitate down hand welding. Manipulators are used for manufacturing of side wall, end all under frame roof of wagon

Q.10. ch-,y-lh- rFkk ch-,Q-ds-vkbZ- oSxu esa D;k varj gS\ ch-,y-lh- oSaxu dks ih-vks-,p djus

dh fof/k dk foLrkj ls o.kZu dhft,\


What is the difference between BLC and BFKI? Explain the process of POH of BLC wagon in details

13 BEARING CTRB ROLLER BEARING POH PROCEDURE OF BLC WOGON The period between POH repairs will be 6 year for first POH. Period for subsequent POH shall be 4.5 years . This defines that ROH period is 18 month and POH period is 4.5 years. The general procedure laid down for POH of BOX N wagon and other wagon is applicable to these wagons. As these wagons are as unit of 5 wagons containing 2 car A and 3 car B. The container wagons may be sent to nominated wagon repair workshop for POH in rake so that the shop can turn out the wagons as rakes for service. Receive the load in repair ways. Disconnect 5 car units into separate consisting five cars. Each car requires to undergo POH individually. Remove the bogie brake rigging arrangement. Remove Centre Pivot split pin lock pin etc Lift the body through lifting pads Run out the bogie. After removing the side frame key and lifting the bogie remove wheel sets Dismantle the bogie replace the pin and bushes in brake gear

After proper cleaning examine the bogie side frame and other castings for check Attend all parts for repair of bogie Check the spring & replace the defective ones. All the spring are required to be tested as per load test chart. Check the S/B parts, C/P and its liners . All liners including C/P liner must be replaced All brake gear components should be dismantled, cleaned and necessary repair are to be carried out . all pins and bushes required renewal Attend to wheel sets for new tread profile . all roller bearing need thorough attention and ultra sonic testing of axle Assembly the bogie and check for leading dimensions and tolerance Set to 16mm clearance on tare load on the load sensing device of bogie and tack weld of pasterns Side bearer spring must be replace if the height are not within specified limits examine all draft &buffing gear, CBC, uncoupling gear etc. attend to defective and worn out part as per G-76 of RDSO instruction . examine the slack less draw bar , key stone draft gear and replace the defective one . Dimensions 25mm clearance of the wedge block on the yoke should be maintained. Check the under frame and defect re attend before primer coat paint Air brake equipment are attend to by replacing all rubber item and defective parts Attend all parts of Air brake as per instruction laid by G-96 RDSO instructions Remove SAB dismantle and change the worn out part grease the item inside and attend to as per RDSO instruction G-92 Lowering down of under frame on the bogie after attending to all repairs. Height in car A and car B and other leading dimension are to be maintained after repair .6mm thick washer should be ensure under all the springs of the bolster at draw bar end bogie of A car Automatic locks should be checked for operation and defective parts require renewal .Preferably all locks should be dismantle and re assembled with new rubber springs of locks Check the distance from S/F top liner to S/B seat 131+0,-.5 mm at all four side bearer point under tare condition of the wagon Ensure all APD measure are incorporate after assembly Rearrange to 5 wagon unit (2 A car& 3 B car) Paint the bogie ,stencil (station code, date of POH, return date etc) Special instruction the draw bar height &CBC height should not be more than 845 mm & 1105 mm. no packing be given over axle box adopter. Final inspection by NTXR and out the wagon for traffic check air brake testing on SWTR and fill up format.

Q.11 ckWDl,u rFkk ckWDl,u vkj- esa D;k varj gS\ ckWDl,u ls ckWDl,u vkj oSxu cukus dh

fof/k dk foLr`r o.kZu dhft,\


What is the difference between BOXN & BOXN R? Explain the process for conversion of BOXN to BOXN R. Answer Rehabilitation of BOXN wagon using stainless steel IRSM44 side wall End wall & floor with stregthening of under frame is called BOXNR. difference between BOXN in BOXNR Capacity S.N Description BOXN BOXNR o 1 Volumetric capacity 56.29 m3 61.47 m3

2 No of wagons/train 3 Pay load/train 4 Gross Load/train Strength 5 Estimated tare load 6 Payload 7 Gross load 8 Axle load 9 Ratio(Pay load/tear)( 10 Body structure complete OTHERS 11 Material

58 3369T 4714T 23.2T 58.08T 81.28T 20.32T 2.5T 5.212T

58 4083.2 T 5313T 21.2 T 70.4 T 91.6T 22.9t 3.32t 6.3T

Stainless steel(IRS.M-44) 12 Side Stanchion 06 Nos built with 8 09 Nos built with 6 mm thick hat mm thick CRF Hat section section 13 Inside height 1950mm 2177mm 14 Side wall seat 5mm 3.15mm 15 Side stanchion fitted Riveted Huck bolted with sole bar End wall 16 End stanchion8(at each 04 nos with ISMC- 02 and half side end) 150 stanchion and two middle coping of hat section 6mm thickness 17 End top coping Channel of ISMC- CRF section of box 150 of 100x100x6 mm thickness 18 End seat 5mm thickness 3.15 mm thickness floor and door plate 1 Floor plate 6mm thickness 4 mm thickness 2 Door plate 5 mm thickness of 4mm thickness of MS SS

Mild steel

Conversion process for BOXNR- BOXN wagon which are above the age group 12-18 years are to be taken up for rehabilitation and up gradation for the conversion into BOXNR. Unless condition of particular detects the wagon found with damage of centre sill and camber, less than 2mm should not be considered for up gradation. After the rehabilitation and up gradation the wagon shall be marked of BOXNR in place of BOXN conversion:-The rehabilitation and up gradation of BOXN wagon to BOXNR for increasing capacity and resistance to corrosion There scope of work involves fabrication of new side walls, end walls replacement of floor plate ,door and damage under frame member Stripping:-In process of BOXNR is first step is taken the entire body is strip out from wagon(Removal of a body parts are respectively given below

Removal of side wall end wall panels(wall) corner stanchion by Cutting all rivets crib angles from the side and headstock. Remove the floor plate from under frame Cleaning of under frame Cleaning/F is carried out by placing three U/f on trestles. Both cleaning and derusting is carried out simultaneously.(The members are to be made rust free by scrapping and hammering so that it can be checked if any member is heavily corroded or deformed requiring replacement Before taken up the repair work is inspected with respect to the following Cracks: horizontal and vertical cracks are inspected and rectified by specified repairing process The Alignment: - If alignment is not in proper is carried out realignment with specified procedure. -Replacement:- If any other member under frame is found is beyond repair it is replaced with new one Addition of cross members:-To increase the capacity of wagon the under frame needs to be strengthened and additional cross member are to be provided to make integrated structure of body and under frame as per RDSO DRG Manufacturing/assembly of body:-The Mfg. of body at shop floor is carried out as procedure given below : The specified sheet for side wall, end wall, doors and CRF section are assembled on a fixture to facilitate don hand welding. side-wall, end-wall are manicured on fixtures of side-wall and end-wall on under-frame with the respective lifting procedure with the help of crane .the holes of side stanchions and end stanchions with the holes of sole bar and head stock matching to ensuring fitment . side and end stanchion are tightened with the help of Nut-bolt attachment temporarily and joints all four corners through gusset plate Ensure no sagging or distortion on side wall & End wall. It is assembled to under frame temporary Nut-Bolt assembly is removed & huck bolted in each hole as per drg and welding of floor sheets in side of the body on the frame. After that crib angle is welded between floor sheet and walls inside. Finishing & Painting: - At last the all surfaces of wagon (Body, UF, CBC, Brake system etc). Need to finish and painting are painted as specified manner stenciling on the body as per rdso drg. After conversion of wagon all the procedure are followed for POH of under gear ,wheel, bearings air brake,trolly as other wagon are pohed finally wagons are placed on pit line after complet POH for NCWS inspection.

Q.12. bZ-vks-Vh- su dk fizosaVho esaVsusal f'kM~;qy fyf[k,\ bZ-vks-Vh- su dk czsd Mkmu de djus

ds fy, vki D;k mik; djsaxsA


Write down the maintenance Schedule of E.O.T Crane? What measures you will take to reduce the brake down of E.O.T. Crane. Maintenance of E.O.T Cranes. To achieve specified level of quality and reliability of product, it is essential to ensure efficient working maintenance of equipment. Plant maintenance is an important factor of an efficient production system. It helps in increasing the operational efficiency of plant and, thus contributes of revenue by reducing the maintenance time and increasing the effectiveness of production. Maintenance Objective of E.O.T Cranes. Maintenance in any activity is designed to keep the resources in good working condition or restore them to operating status.

The objectives of plant maintenance are: To increase functional reliability of production facilities. To enable product or service quality to be achieved through correctly adjusted, serviced and operated equipment. To maximize the useful life to the equipment. To minimize the frequency of interruption to production by reducing brake-downs. To maximize the production capacity from the given equipment resources. To enhance the safety of man power. Preventive Maintenance System of E.O.T Cranes. The preventive maintenance policy is a system of planed and schedule maintenance. The Basic principal involved in this system is-Prevention is better than cure . Preventive maintenance includes: Proper identification of all items, their documentation and coding. Inspection of plant and equipment at regular interval ( Periodic Inspection ) Proper cleaning, lubrication of equipments. To up keep the machine through minor repairs, major over hauls etc. Failure analysis and planning for their elimination. Daily Oil level of gear unit, the level should not be less or more than the level mark. Check bearing temperature by feeling by hand any discolorizations /overheating sign on the housing. Weekly Check for brake operation, if necessary adjust, lubricate brake articulations. Monthly (Hook block) Check hook for any deformation and cracker. Quarterly (Couplings) Check couplings and tighten if necessary. (Hook blocks) Check hooks for any deformation and cracker. (Wire rope) Wire rope examination. Yearly Check LT wheel bearing and replace grease. Check CT wheel bearing and replace grease (Rope sheaves) Check shear groove for wear, check ball bearing of pulleys and provide grease. CT gear box change oil. LT gear box change oil. Hoist gear box change oil.

Q.13 pDds esas fofHkUu izdkj ds dkSu&dkSu ls nksk gksrs gSa] izR;sd dk Oghy fMQsDV xst dh

lgk;rk ls o.kZu djsaA


What are the different types of wheel defects? Explain each defect with the help of wheel defect gauge. WHEEL DEFECTS

Thin Flange

Sharp Flange

Radius

too

small

at

the

root

of

flange

Deep Flange

Flat faces on Tyre

Hollow Tyre

Thin Tyre

Wheel Defects Thin Flange

Causes When the flange thickness reduces from 28.5mm (New) to 16 mm (Condemn) or less, then the flange is called thin flange. Flange thickness is measured at a depth of 13 mm from the tip of the flange. Repercussion: - Chances of bursting of point due to entering of flange between Tongue rail and Stock rail. Sharp Flange When the radius given at the tip of flange is worn out from 14.5mm (New) to 5 mm (Condemn) or less is called Sharp Flange. Repercussion: - Shearing of fish plate bolts at rail joints. Radius too small New Radius of flange at the root is 16R, when it is reduced to 13R at the root of or below, it is called Radius too small at the root of flange. flange Repercussion: - Excessive lateral play result in chances of mounting of flange over rail. Deep Flange The New height of the flange is 28.5mm, when it increased up to 35mm or more is called Deep Flange Repercussion: - Shearing of fish plate bolts at rail joints. Flat faces on Flatness on wheel circumference is called Flat faces on tyre. Tyre 1. For Coaching Stock it is allowed up to 50 mm 2. For Goods Stock it is allowed up to 60 mm Repercussion: - Chances of rail fracture due to hammering effect on rail. Hollow Tyre If the groove on the wheel tread is up to 5 mm or more, it is called Hollow tyre. Repercussion:- Chances of entanglement of tongue rail nose with wheel. Thin Tyre If the remaining thickness of tyre is less than 25 mm, it is called thin tyre. Repercussion: - probability of breakage of tyre.

Q.14 Oghy fMLd rFkk ,Dlsy dh ef'kfuax djus dh f;k dk o.kZu djsa rFkk budks izsl djus

dh fof/k dk foLrkj ls o.kZu djsaA


Explain the machining process of Wheel disc & axle and also explain the wheel pressing process in details? Axle and wheel disc are assembled on wheel press m/c new axles are received in semi finish condition from RWF Bangalore. Old serviceable axle are received by machining of wheel seat it is ensued that axle is good condition axle wheel sheet is machined on axle Turing

lathe (CNC ATL) surface finished N7. Now wheel disc is bored considering minimum removal material & old serviceable disc are reclined after boring. It is ensuring that old reclined axle is used new disc and new axles are used in old disc by this method optimum utilization of axle and disc can be done. Disc are bore considering particular axle wheel sheet dia and interferes allowance is calculate accordingly the disc and axle wheel seat left/right are mark which will be fitted on the same axle since interference in given accordingly . Wheel pressing processi) The Axle shall be fully machined & finished as per drawing. ii) The Wheel disc bore shall be fully machined & finished as per drawing to ensure its selective assembly with the Axle. Considering interference allowance. iii) The disc and the wheel seat area of the Axle must be cleaned carefully to remove dust, grit, chips & grease before assembly. iv) The surface finish of the disc bore & the wheel seat area of the Axle shall be as indicated in the drawing. v) Record of actual measurement of Wheel disc bore & wheel seat dia of the Axle shall also be maintained and there assembly shall be identified with the wheel & Axle numbers. vi) Both, Wheel seat & disc bore must be coated with mixture of basic carbonate while lead & boiled linseed oil. The proportion should be 1.2 Kg. of While lead paste to one liter of boiled linseed oil. vii) The Assembly of the wheel disc with the axle must be carried with a hydraulic press taking all suitable precaution to prevent deformation of the components and damaged to the machined parts, specially the journal. viii) The wheel press used for the wheel disc and axle assembly shall be equipped with a pressure indicating gauge and a graph recording facility to show the progressive development of pressure during pressing on operation including the final pressure at which the wheel disc are pressed on to the axle. ix) The pressing pressure must 10Ton/inch dia of axle at wheel seat. x) Wheel seat pressure should be recorded xi) Record of disc bore R.H.S.and L.H.S., wheel seat dia L.H.S. R.H.S.,mounted pressure on each wheel ,wheel no.are recorded in the register.

Q.15 lh-,u-lh- e'khu D;k gSA ;g daos'kuy e'khu ls fdl izdkj fHkUu gksrh gS rFkk mPp

xq.koRrk ds fy, dkSu lh e'khu dks iz;ksx esa yk;k tk,xkA


What is CNC machine? How it differ from conventional machine, which machine will be used for high quality and precision work Introduction :CNC machine-tools and other CNC equipment, robots, etc are becoming more and more popular in the manufacturing industry these days. Even in other fields, CNC operations are visible. Such as in metrology. CAT scan and computer-aided surgery. In fact, wherever precise movement or positioning is desired, we look to CNC operations. In conventional machine tools the operator moves the slides along their slide-ways either manually or by engaging the automatic feed mechanism or by special cams. The operator also performs other actions necessary for machining. Viz. starting/stopping rotation of spindle, changing speed or feed rates. Turning on or off the coolant, etc. Each of these actions requires

the operator to exercise judgment and make a decision. These decisions are repeated even if the parts are identical to one another. Difference between conventional machine and CNC machine S.N Description Conventional Machine CNC Machine o. 1 Method Having a fixed sequence of This is a lesser flexible operation with little variation to method in which the machine a part sequence of the operations can be changed to machine a new part. 2 Programmed The program or sequence of In these machine program operations is built in to the is stared as the software. hardware. 3 Production Suitable for mass production This can be applied to having identical parts. short batch production runs or even a single part. 4 Variation It has less scope for variation as The machines have large it is too costly scope for variation of different products without involvement of high costs. 5 Setting of m/c The m/c requires more time for Complex setting up setting up. procedures are almost by passed in these machines. 6 Floor area More floor area required for Lesser floor area required tooling and working holding 7 Productivity Less productivity comparatively Productivity can be CNC increased. 8 Quality Irregular quality can CNC Consistent quality achieved 9 Operation Reliable time taken More reliable than conventional m/c and less time taken 10 Cycle time Long cycle time compare to CNC Shorter cycle time compare conventional 11 Man power Required ore man power Reduced man power compare CNC 12 Accuracy Less accuracy Higher accuracy 13 Material Manual or some auto hand Fully auto mat. Hand is handling possible 14 Lead time More Can be reduced 15 Scrap Optimum scrap generate Scrap rate is reduced 16 Initial cost Less compare CNC High compare to conventional 17 Skill/personnel Less required Ore skilled man power is

Nature of m/c Frequent Maintenance Less comp. CNC cost CNC is more identical than conventional CNC machine is used for high quality and precision work.

18 20

required Sophisticated Net suitable for long run

Q.16 lh-,y-MCY;w balsfVo Ldhe dh izeq[k fo'kskrk,a fyf[k, ;g xzqi balsafVo Ldhe ls fdl

izdkj fHkUu gSA nksuksa ds xq.k nksk fyf[k,A


Write down the salient features of CLW incentive scheme. How it differ from group incentive Scheme? Explain the merits & demerits of both. Introduction :- The need to improve productivity in Rly Workshops for ensuring better utilization of man power, machinery and plant and covered area was being felt even prier to independence. Piece work bonus system in existence in certain workshops of Indian Railways like Jamalpur, Kanchrapara and Perumbur prier to independence. The bonus system adopted in each workshop however varied from w/s to w/s. The Railway Bd took a decision in 1949 to introduce some form of incentive scheme in railway workshops to offered direct financial incentive to workers who exceeded a minimum level of performance. The first formal incentive scheme was introduced in CLW in December 1954.Time was the basis of this scheme and the time standards used were predetermined after systematic work measurement. The scheme was considerable success and it was extended to ICF in 1960. The justification for the introduction of incentive scheme in Rly w/s, as realized at the time of its introduction, was as under: It was realized that the output of an average worker was much blow his normal performance. It was felt that this hidden capacity could be harnessed only through the introduction of a wage incentive scheme. There was no measure to assess the ratio of input and output, which is so essential for the determination of a fare days work. The better utilization of M&P and other facilities could be made by increasing labor productivity. Higher productivity will in turn result in reduction of post. Some kind of wage incentive scheme will help the workers to do their job regularly, throughout the wage period. Increased wages as a result of higher productivity will raise their standard of living. Salient features of the CLW pattern of incentive scheme Under the incentive bonus scheme, the basic wages are guaranteed to all the workers. Time is the yard-stick for measuring work. The various operations in the workshops are subjected to time study is accordance with the standard practices of work measurement. The allowed time are so fixed that the workman of normal ability may earn 33-1/3% bonus over and above his basic wages in respect of period spent on piece-work jobs. This allowed time includes all allowances such as fatigue, general handling gauging and production bonus allowance. The ceiling limit of profit is fixed at 50%. The incentive workers are classified as Direct, Essential Indirect and Indirect Workers : Direct workers are those engaged in work which can be assessed through time studies. Essential Indirect workers are those who contribute to the continuity of the work and whose services are essential but whose work cannot be accessed through time studies. Supervisor up to the rank of Charge man are also included in this category. Indirect Workers are those who are provided for cleaning etc. do not contribute directly or

indirectly to production and do not earn any incentive bonus. There is a provision for investigating cases of excessive profit or loss made by the workers. Administration reserves the right to alter the timings. However, this should be done with due care and with proper justification. All workers and supervisors up to the level of charge men Gr A are covered under this scheme. There is a provision for penalty on the supervisors for excessive booking of idle time. However, with the latest modification in the scheme, SSE level supervisor are also eligible to earn up to 15% of bonus incentive. CLW pattern incentive is not overall success; the quality of work is suffered since all staff is not responsible for performance of workshop/production unit product. He is responsible for his own work. However, in case of group incentive scheme, incentive bonus is given as per overall performance of the unit. In case of CLW pattern, individual output of the worker can be increased but overall outturn of the unit/ product is suffered. Therefore, he group incentive scheme is better than the CLW pattern scheme. Merits of incentive To Introduction of incentive scheme higher productivity could be achieve though the availed rescores. production cast could be reduce to by increase Earning capacity of labor will increase and production also increase? Quality of production will be increase as required. Shelf inspection capacity will develop in workers. Planning in controlling of production presses will be easier. Absentee can be control. Shelf discipline will be developing into the workers. Execs labor can be recons noise and utilize in other works. Mature corporation and group working will be developing in workers. Demerits Out turn of month is shown in another with a view to increase the overall incentive payment to the workers. Incentive staff is booked on overtime in spite of a blanket ban imposed by Railway Board. The job cards on which losses occur are destroyed and not accounted for. Hand written job cards are issued. They can be manipulated Time entry on job cards is done by hand. Time can be manipulated. Direct workers are shown as EIW and IW, without much justification and authority. Allowed times are not revised even on ht introduction of advanced machine tools with better tooling. Allowed times are claimed for complete machining operation even if the casting is rejected on the very first cut. Excess repairs are certified by stage inspectors. Management has often failed to arrange the raw material, tools, M&P and material handing equipments. The job cards are not punched-in immediately on punching out of the job card of immediately preceding job. This leads to missing hours. At a time more than one job card is issued to a worker. This is manipulated by booking all time losses against one job card. This job card, with heavy time losses, is released in one particular month. Plus cards are issued without proper check. Allowed times are not linked with the learning curve.

False issues are shown against the finishing shops. Excess allowed time is given by the rate fixing (Especially on non-stock requisition and out-station work orders.) Penalty for booking of excessive idle time is not imposed. Stores department does not issue work orders unless previous work orders are completed. This affects the continuity of production in manufacturing shops. Stores department issues the work order to the workshop without ensuring availability of raw material. Alternate raw material is often offered by the stores department forcing rate fixing section to issue plus card, thereby reducing shop capacity. Job cards are not kept properly by the time office clerks. Time booths are not manned throughout the shift. Tally sheets are not submitted by the accounts clerk in time. The missing hours are never highlighted by the accounts. Correlation between GAC hours, TT hours and idle time hours is not made by the accounts. The supervisors of mechanical and electrical maintenance departments do not sign the idle time cards, even when there is work stoppage on their account. Management has failed to monitor incentive scheme. The attention paid to PCO is minimal at officers level. The best workers and supervisors are not relieved for PCO postings from shop floor. Quotas in terms of physical units have not been fixed for various manufacturing shop. Therefore, there is no check on the actual out-turn of these shops. Management has often shied away from taking hard decisions.

Q.17 fMLVkWjlu D;k gS\ ;g fdl dkj.k ls gksrk gS\ bldks nwj djus ds mik; fy[ksaA
What is distortion? Write down the reason of distortion. Write down the methods to eliminate distortion? Distortion Answer:- Distortion in the vicinity of welded joints is a natural and inevitable consequence of the non-uniform heating and cooling that occurs during the welding thermal cycle. This note identifies the factors affecting distortion and provides some brief guidance to Fabricators on practical approaches to controlling and correcting distortion during the fabrication of metal structures. Thermal distortion occurs when a process generates thermal gradients resulting in strains, due to non-uniform expansion or contraction that exceed the local yield point of the material. During the rapid heating cycle of a fusion welding process, material in the vicinity of the weld heats, expands in all directions and is compressed by the constraints of the much larger and cooler surrounding structure. The heated volume has a lower yield point than the cooler surrounding structure and is more readily upset to a smaller dimension, i.e. the heated volume yields in compression. On cooling, the weld deposit & the heated volume of the adjacent parent material contracts in all directions, creating tensile strains that are constrained by the attached cool structures that did not reach a yield point strain during the entire heating and cooling process. This localized contraction results in buckling, localized tensile yielding, or development of residual stress. On thinner members localized buckling will occur. On thicker members less localized distortion is evident, however residual stresses tend to be higher. For a structural steel with a yield point of 250 MPa, a thermal differential of just 100C will result in a thermal strain that approaches tensile yield point under fully constrained conditions. For a structural steel with a yield point of 400 MPa, a thermal differential of 160C

will result in a thermal strain that approaches yield point under fully constrained conditions. The volume change of a structural steel weld during a fusion welding cycle occurs in two parts. Firstly the molten weld volume reduces by approximately 3% on solidification. We see this solidification shrinkage as craters at weld run terminations. Secondly the volume of the of the solidified weld metal reduces by a further 7% as its temperature falls from the melting point to room temperature. These, two volume changes always occur and distortion control depends on developing an understanding of how to manage the process to minimize any detrimental effects. Distortion in a weld results from the expansion and contraction of the weld metal and adjacent base metal during the heating and cooling cycle of the welding All welders have faced the problem of weld distortion at one time or another. The parts start off straight and square, and after welding, the finished part is warped. Thinner material is more susceptible, as it has less stiffness. Also stainless steels are more susceptible, as it has greater thermal expansion and lower thermal conductivity than carbon steels. First, let's discuss why distortion occurs. Weld metal is deposited at a high temperature, above the melting point of material. For steel, this is around 2,500F (1,370C). As the weld cools to room temperature, it shrinks, but is restrained from doing so by the adjacent cold base metal, resulting in high-residual tensile stress. The weld is now like a stretched rubber band, with the work piece holding the ends. This is the reason that the base metal moves, or springs back, when the clamps holding the work piece are removed, distorting the part. When the weld shrinks across its width, it causes groove welds to wing-up or fillet welds to close up. When the weld shrinks along its length, it causes base metal to twist around the weld. To minimize weld distortion, design and welding should be addressed. Weld shrinkage cannot be prevented, but it can be controlled. These are recommended steps for minimizing weld distortion: Avoid over welding The bigger the weld, the greater the shrinkage. Correctly sizing a weld not only minimizes distortion, but also saves weld metal and time. Intermittent welding To minimize the amount of weld metal, use intermittent welds instead of continuous welds where possible. Fewer weld passes A fewer number of big passes results in less distortion than a greater number of small passes with small electrodes. Shrinkage accumulates from each weld pass. Place welds near the neutral axis or the center of the part Distortion is reduced by providing less leverage for the shrinkage forces to pull the plates out of alignment. Balance welds around the neutral axis Welding on both sides of the plate offsets one shrinkage force with another, to minimize distortion. Use the back step welding technique In the back step technique, the general progression of welding may be left to right, but each bead segment is deposited from right to left. As each bead segment is placed, the heated edges expand, with successive beads; the plates expand less and less because of the restraint from the prior welds. Presetting the parts presetting parts before welding can make shrinkage work for you. The required amount of preset can be determined from a few trial welds. Alternate the welding sequence A well-planned welding sequence involves placing weld metal at different points of the assembly so that, as the structure shrinks in one place, it counteracts the shrinkage forces of welds already made. An example of this is welding alternately on both sides of the neutral axis in making a complete joint penetration groove weld in a butt joint. Clamping Clamps, jigs, and fixtures that lock parts into a desired position and hold

them until welding is finished are probably the most widely used means for controlling distortion in small assemblies or components. While there is some movement or distortion after the welded part is removed from the jig or clamps, it will be lower compared to the amount of movement that would occur if no restraint were used during welding. Peening Peening the weld bead stretches it and relieves the residual stresses. However, peening must be used with care. For example, a root bead should never be peened, because of the increased risk of concealing or causing crack. Also, peening is not permitted on the final pass, because it can cover a crack and interfere with visual inspection. Before peening is used on a job, engineering approval should be obtained. Thermal stress relieving Another method for removing shrinkage forces is thermal stress relieving, i.e., controlled heating of the weldment to an elevated temperature, followed by controlled cooling.

Q.18 ckWDl,u] ^vkj^ oSaxu D;k gS] LVsuysl LVhy osfYMax djus dh izf;k dk o.kZu djsaA
What is BOXN R wagon? Write down the welding process of stainless steel. Bogie open wagon with Stainless steel side wall, End wall& floor on MS under frame by rehabilitation of BOXN High Axle load High volume High capacity This wagon is upgraded and rehabilitation of BOXN wagon by replacement of side wall, end wall by stainless steel IRS-M44 which is non corrosive and non magnetic steel. Also its height is increased from 1950 mm to 2127 mm due to which its volume and capacity had been increased. modification as per RDSO The requirement of BOXN R wagon is due to heavy corrosion in BOXN wagon due to which BOXN wagons are always in heavy repair and even marks sick. Due to which it causes lack of availability of wagons which causes effect on revenue of Railways. Therefore by rehabilitation of BOXN wagon into BOXN R wagon Stainless Steel Welding Process- Manual Arc Welding (MMAW) and Gas metal Arc Welding (MIG & MAG). Both welding process are used to weld IRS M-44. Manual Metal Arc Welding (SMAW, MMA) :- Direct Current Electrode Positive) electrical characteristics is made up of route of consumables electrode or basic flux coating. Generally gives priority because it reduces the slag inclusion. Correct storage of electrode and pre-heat should be followed strictly. 1) At the time of welding process short Arc length should be maintained because it avoid to electrode to overheat this alloy present in flux are not burnt. 2) Weaving of electrode should not be done by doing this heat input is reduced. 3) To use stringer weed technique. 4) Current setting: - Current should be adjusted according to the range given by producers of the electrode. 5) To gain exact penetration lead angle should be low. Changes according to position: - follow presentation of producer in all conditions. Gas Metal Arc Welding (GMAW) or MIG/MAG: - In MIG welding versatile higher range should be included according to the thickness and position of the material by MIG welding the work done is quickly and perfectly. To avoid melting of side-walls adjust the arc angle. Electrical characteristics: - DCEP (Direct Current Electrode Positive) Consumables :Filler wire :-

Austenitic stainless Steel: - The assembly of consumable as follows AWS ER 309 L, ER 312 & ER 316 L or wire of high silicon increases the merits or goodness in welding and melting spatters. At the time of MIG/MAG welding following values should be follow Table. Type of Arc Positio Wire Diameter Current (Amps) Voltage Speed n (mm) (Volts) mm/Sec Short Arc Flat 0.8 130 140 22 24 3 4.5 Vertica 0.8 110 130 20 22 3 4.5 l Spray Arc Flat 1.6 325 - 375 25 28 3 4.5 Gas :- Shielding gas at the time of welding 1) Mixture of Argon gas 1 2% and oxygen gas 2) In organ base shielding gas maximum 5% mixture of CO2 is successfully used. When mixture of CO2 is more than 5% is used the process procedure is necessary. 3) In shielding welding rate of gas flow should be less than 14 liter/min (On high or low rate flow of gas quality of flow welding should be influence) F) Gas Tungsten Arc Welding (GTAW/TIG) :- This process is applicable on 2.5mm sheet welding. TIG welding is used in very thick and high M.P. Weldments. For correct welding of Ductility suitable Austenitic filler wire should be used. G) Electrical characteristics: - DCEP (Direct current electrode positive) Electrode :- At the time of 1 2% of aortic electrode current should be very low for deep penetration (Pointed tip) Wax angel should be between 30 0 to 60 0. Gas :- Pure Argon gas should be used as shield gas rate of gas flow should be 18 to 14 liter per min. According to IRSM 44 technique for welding of two different metal filler wire should be used. Joint Design and preparation: - In fabrication design edge preparation is item joint important for good and strong joint. Position of Job at the time of work. 1) It should be at flat position. 2) Before take welding the angle of group, gape, corner joint all are in right position. 3) At the time of welding Size of electrode, kinds of electrodes voltage, ampere range, weld speed, thickness of material should be checked properly. The type of welding joint and welding position should be decided at the time of welding. 4) Current setting should be very low but it should be according to the range procedure of filler wire and electrode. 5) Basic coated electrode should be taken off before / Hrs and kept in oven at 1500 C to 2000C for heating. It can be used with in hrs. 6) Arc strike on welding joint should be done very precautionary. Arc strike should not be away from the weld joint because spot of Arcs trite is very hard which is effective for the mechanical property and corrosion resistance. Weaving of Electrode:1) Break stripping method should not be used to control overheating. 2) For the 3mm thick plate in reverse side of weld. Welding should be done after grinding and gauging due to this full penetration should be gained 3) When more than one run is expected temperature should not be more 1500C. 4) Before 6 sec. weed run slag should be cleaned properly by stainless steel wire brush. This process is not only done for first weed and second weed but also used for changing electrode when it is finished or also used before cater.

5) After welding dusting of weld weed removal of scale (Mechanical, Chemical) desolation of welding weed should be avoided, corrosion resistance of weld Metal should be maintained. weld repairs :- To get rid of weld metal and any position should be done by chipping machining, grinding and gauging on base metal. To use this method this should be kept in mind that no spot or under-cut is present on base metal. Precaution of Stainless Welding:1) Because in stainless steel the coefficient of thermal expansion is very high and very low heat conductivity. Main precaution should be done that is current is lower than its expected range, electrode of small gauge, input of low heat. 2) Before welding base should be cleaned, dry dust free oxide film and avoid of grease oil. 3) Always tack small arc alloy are used to less damage.. To avoid weld and to make strong weed. 4) After finishing welding lift electrode very comfortably and before finishing arc crater should be filled. 5) Stainless steel wire brush should be used to clean welding. 6) Electrode is used with DC priority 7) Before welding every Bead should be cleaned properly. 8) Welding should be done in flat position. 9) Correct shape of electrode, current length of arc speed of motion and angle of electrode is according to the standard value. 10) Welding arc should not be fixed near the welding place. 11) To check right gap welding place should be proper. 12) To avoid internal tension correct welding process should be done and structure spiral should be reduces. 13) Always welding is done from its free hand. Electrode of welding:Material to be welded wire 1) IRSM 44 to IRSM 44 with 9 LR 16 (IS : 5206.83) or To use Electrode filler IRS class M1 IS: is E-19 along 308 I (MIG) is used as AWS 2) IRSM 44 to IS: 2062/5986/1079 hydrogen coating as per 5426 H3JX & like EB5424 H3 JX 814-91 Less than IRS class M2, the type of IS : code EB

Q.19 ,d vPNs ,oa lQy lqijokbZtj dh D;k fo'ks"krk, gksuh pkfg,] foLr`r o.kZu dhft,A
What qualities a supervisor should have to become a good and successful supervisor. Explain in details. SUPERVISORY SKILLOF GOOD & SUCCESSFUL SUPERVISOR Indian Railways have a vast network. It is the largest under a single management. At the turn of the 21st Century, it carried over 14 million passengers a day and more than a million tons of freight every day. This is done by management skills of good & successful supervisor There are some tools for successful supervisor - Five Eyes are Integrity (both professional & personal) Be honest, upright, trustworthy, truthful.

Involve yourself in the job. Let there be congruence between your thoughts, words and deed when character is lost, everything is lost. Impartiality- treats everybody fairly. Do not show undue favor, just to demonstrate your authority and status. But be bold to assist and help in deserving cases. Inquisitiveness - Be ready always to learn and gain mastery over your job. To improve your own knowledge, ask question irrespective of the status of the persons; peers, seniors or juniors. Remember the Chinese saying, ask a question, regret forever Innovation In whatever job you are, you can improve the methods of work through new ideas, new gadgets, and new techniques. Try to innovate by intensifying application to your work. You will have the joy of improving productivity, quantity, quality and reduce boredom and fatigue in many work practices. Informative Keep those concerned, aware of your goals and objectives. Develop the capacity to impart knowledge to the staff working with you and improve their skills. Update your knowledge constantly. Keep abreast of the latest developments, especially in your field of work. Five c are Commitment Identify yourselves with the objectives of the organization. This means a willingness to go beyond the standard demands of your job or the call of duty. It is giving more than you get. It means making a sacrifice for the job. Competence Do your best in whatever post you may hold. Be thorough in your field of activity. Take pride to be a pioneer. People forget how fast you did a job but they always remember how well you did it. Consistency In your behavior and practice; avoid being a weathercock. Be principlecentered. Cultivate the ability to take a well-considered stand, after evaluating alternatives and adhere to it. Compassion Be ready to help someone in distress but make sure that your compassion is not misplaced. Communication Cultivate the skill to express yourself in simple direct language. More than that cultivates the ability to listen to others. Communication is more of hearing than speaking. Empathies while communicating with appropriate body language. Personal Attributes Develop a positive approach in the workplace. It is the only successful approach to survival. Be bold enough to say No to a request or demand (politely of course), which you consider incorrect or unreasonable. Encourage decision-making. Recognize the right to be wrong. Encourage creativity. This will increase your prestige and earn loyalty. In-house innovations enhance image and productivity. Introduction recognition awards like Man of the Month, Rail person of the year etc. & publicize. Do not lose your temper even when provoked, especially when in a group. Keep your cool and guard your language. If you keep a level head while others around are losing their heads, your authority will always exceed theirs. Never compromise with self-respect Delegate authority. Tell your team what you expect out of them. Avoid excessive monitoring and allow your men to perform. Avoid criticism while the task is being performed. Be visible and accessible to your colleagues and staff. Keep your doors open. It promotes a feeling of kinship (Relation).

Never compromise in discipline. Come down heavily and promptly on acts of indiscipline. Willingness to learn improves your endowments (Knowledge bank). You can improve your skills and expertise. Learn, even from your subordinates by asking questions if necessary. Learning from staff can invest in them a sense of pride and bonding with you. Recognize and appreciate good work. Let your praise be genuine. Point out faults in a constructive way without criticism which tends to kill initiative and creativity. Encourage your subordinates in constructive discussions Avoid raising the level to find solutions to a problem. Try to see that problems are solved at appropriate levels and not thrown up unnecessarily. Keep your knowledge updated. Read journals and magazines relating to Railway working and technology to constantly keep in touch with improvements and developments In your service career, you may have to meet with failure. Handle failure with courage. The only real failure is giving up. If you have done a mistake, the best way out is to accept gracefully, instead of becoming defensive. Consider failure as an opportunity to begin afresh. Support your boss with loyalty in discharging legitimate duties. Remember your boss has a boss. Dont demand something that will put your boss in an awkward position with his/her superior. Work Ethics: Be punctual in attending office. Your example can go a long way in motivating punctuality in your office. Time is precious. Use every minute productively. Avoid gossiping in office. Manage your time well. You can either use your time or lose your time. You can never save time. . Your reputation, your personal attributes and your way of dealing with men and matters travel faster than you think and reach mach before your arrive at a new location. Leadership Commitment To lead effectively you must belong to the organization. Your commitment should be total. Demonstrate personal discipline and integrity. If you have to be effective with others you need to be more effective with yourself. Be broad minded and generous. Be able to communicate clearly. Be able to spot, develop and deploy talent effectively. Be willing to delegate authority. Be ready to accept change with an open mind. Be proactive. Teach your staff how to get things done and do not encourage unacceptable excuses for non-performance. Encourage telling the truth however bitter it might be. Develop a vision for the organization. Captain Of The Team Railway is a multidisciplinary organization. Railway Managers and supervisors are expected to be good Team Leader. For leading a team effectively, you have to develop trust in your team. Trust has mainly four elements- integrity, loyalty, communication and shared vision that establishes the support-net needed by each member of the team, to work productively. Honesty, reliability, supportive nature, consistency in treating others, loyalty to the task, performance at meeting and feelings of mutual respect. Explain the goals and objectives you want to achieve to the members of your team as well

as the type of information you would like to have. Before finalizing views, give them an opportunity to make their inputs. Avoid being authoritarian. Accept difference of opinion. Your self confidence shows when you accept constructive criticism gracefully. Be friendly and humane but let not personal friendship or bias cloud your decisions about what is in the best interests of the organization. Your task as a team leader is to synergies the efforts of the team towards realizing the vision of the organization. You and your team succeed or fail together. As the captain of the team, you may delegate authority not the leadership Team Work Railway produces and provides Transportation which is essentially a group activity. Success depends on effective teamwork. Curb your ego, self-righteousness and tendency of one-upmanship. Seek cooperation by reasoning, persuasion and motivation. Rise above all feelings of regionalism and communalism. Appreciate and recognize the difficulties of your colleagues in other departments. Every department has its own problems. Do not try to exploit the weaknesses of others. While the team is accountable as a whole, individual accountability cannot be ignored. There are three sides to every controversy- yours, the other persons and the right one. Recognition of the user department as an internal customer can result in a well coordinated performance. Self- centered individuals make poor members for a team activity. You have to maintain proper alignment with others. No matter how great your skills are or how hard you work and how well you perform, if you cannot get along with others in the team and in the organization, you are likely to derail in your career. Quality Do not compromise on quality. Quality is actually cost effective. It saves a lot, all around. Quiz the staff occasionally to ascertain their knowledge of rules, regulations and proper working procedures. In work centers like workshops, Depots, check occasionally, the actual work done against the time sheets. This will improve quality & reduce malpractice. There may be some resentment (anger) at the start, but if you are fair and firm, the staff will give you all the support and in fact appreciate your work ethics. Good training improves quality. Provide enough opportunities to train your staff. If you want to get good quality of work done through your people, you have to develop people through work. Staff Welfare Do not forget that the most important asset of the organization is its employees. One of your prime duties is to look after the welfare of staff working under you. It is essential that you learn the working of personal/Medical Department thoroughly, irrespective of the department you belong to. Good knowledge of regulations relating to staff welfare e.g. Pass Rules, withdrawal from Provident Fund, medical facilities available to staff etc. can help you to improve staff welfare and therefore high Label of satisfaction of staff working under you. Be fair and equitable in interpreting rules and regulations, and try to give the benefit of doubt, whenever it is possible to do so. Be generally helpful and sympathetic, though no favours should be shown at the expense

of work. It is a good practice to enquire about the welfare of the family and domestic problems occasionally. It is a good practice to coordinate with the Railway Doctor, to get information about serious health problems of employees or their families and to visit the hospital to enquire about their welfare. Follow the motto Do unto others what you expect others to do unto you. It creates great confidence in staff when you monitor progress of their grievance systematically. Discipline Punishment is given to refine a person. It has to be selective and swift. Apply your mind carefully while deciding to give a charge sheet instead of making it a routine habit. Once you give a charge sheet, make sure action is not delayed. Follow the Discipline and Appeal Rules meticulously so that the punishment is not set aside later, on procedural grounds. For minor offences it is more effective to talk to the employee in person and make him realize where he went wrong. Take a serious view if anyone taking liberties with the safe running of trains. Safety is sacrosanct. Inspections Inspections is the most essential part of your work Carrying out joint-inspections with your department colleagues will be very useful to improve efficiency. While inspecting, listen to the person in charge of the work place, but be worry of being mislead. To the extent possible, take decisions on the spot. Make it a point to talk to the staff emphasizing the goals and objectives of the organization, importance of the quality of work, time consciousness and technical aspects of working. At places where attendance is recorded by clocks at a time booth, occasionally check the staff while they punch their cards. In sheds, depots and workshops, random inspection of final product, improves quality and quantity. For work which has not been done properly, get it redone. Safety-related inspections have to be done thoroughly as no chances should be taken with safe running of trains or the industrial safety in workshops/sheds/depots. Safety inspections are best done as surprise inspections at unusual hours (like midnight to 0400 hrs.). This is the time when sleeping on duty is common, endangering safety. The object of inspection is to make sure that rules and regulations, instructions and procedures etc. are correctly followed. It is necessary to explain to the staff the consequences of flouting them.

Q.20 osfYMax djus ds fy, bySDVM dk p;u fdl izdkj fd;k tkrk gSk dkjkuk es iz;x

gus okys fofHkUu bySDVM dk o.kZu djsaA


How the selection of electrode for welding is done? Explain different type of electrode used in workshop. Ans 9 In general, all electrodes are classified into five main groups: 1. Mild steel 2. High-carbon steel 3. Special alloy' steel

4. Cast iron 5. Nonferrous

\ \.

. The widest range of arc welding is done with electrodes in the mild steel group. Electrodes are manufactured for use in specific positions and for many different types of metal. They also are specially designed to use with ac or dc welding . Machines. Some manufacturer electrodes work identically on either ac or dc, while others are best suited for flat-position welding. Another type.js made primarily for vertical and overhead welding, and some can be used in any position. Types of Electrodes Electrodes are classified as either bare or shielded. The original bare electrodes were exactly as their name implied-bare. Today, they have a light covering, but even with this improvement they are rarely used be cause of their limitations. They are difficult to weld with, produce brittle welds, and have low strength. Just about all welding is done with shielded electrodes. The shielded electrode has a heavy coating of several chemicals, such as cellulose, titanium sodium, low-hydrogen sodium, or iron powder. Each of these chemicals in the coating serves a particular function in the welding process. In general, their main purposes are to induce easier arc starting, stabilize they are, improve weld appearance and penetration, reduce spatter, and protect the molten metal from oxidation or contamination by the surrounding atmosphere. Electrode Identification Electrodes are often referred to by a manufacturer's trade name. The American Welding Society (A WS) and the American Society for Testing and Materials (ASTM) have set up certain requirements for e1ectrodes to assure some degree of uniformity in manufacturing electrodes. In this classification, each type of electrode is assigned a specific symbol, such as E-60 I 0, E70 I 0, and E-80 I O. The "prefix E identifies the electrode for electric-arc welding. The first two digits in the symbol represent minimum allowable tensile strength. The third digit of the symbol indicates the joint position for which the electrode is designed. Two numbers are used for this purpose: 1 and 2. Number 1 designates an electrode that can be used for welding in any position. Number 2 represents an electrode restricted for welding in the horizontal and flat positions only. The fourth digit of the symbol represents special characteristics of the electrode, such as weld quality, type of current, and amount of penetration. The numbers range from 0 through 8. Since the welding position is dependent on the manufacturer's characteristics of the coating, the third and fourth numbers are often identified together. Electrode Selection Several factors are critical while choosing a welding electrode. The welding position is particularly significant. As a rule of thumb, never use an electrode that has a diameter larger than the thickness of the metal being welded. Some operators prefer larger electrodes because they permit faster travel, but this takes a lot of expedience to produce certified welds. Position and the type of joint are also responsible determining the size of the electrode. For example, in thick-metal section with a narrow vee, a small. Diameter electrode is always used to run the frost weld 0 root pass. This is done to ensure full penetration at the root of the weld. Successive passes are then mad, with larger electrodes. For vertical and overhead welding, 3/16 inch is the largest diameter electrode that should be

used regardless of plate thickness. Larger electrodes make it too difficult to control the deposited metal. For economy, 81 ways use the largest electrode that is practical for the, work It takes about one half of the time to deposit 81 equal quantity of weld metal from 1/4-inch electrode as it does from 3/16-inch electrodes of the same type The larger sizes not only allow the use of higher CUI rents but also require fewer stops to change electrode! Deposit rate and joint preparation are also important in the selection of an electrode. Low-hydrogen type electrodes constitute another group developed for welding high-sulfur and high-carbon steel. These electrodes produce X-ray quality deposits b reducing the absorption of hydrogen that causes porosity and cracks under the weld- bead. Welding stainless steel requires an electrode containing chromium and nickel. All stainless steels have 1ow thermal conductivity that causes electrode over-heating and improper arc action when high currents al used. In the base metal, it causes large temperature differentials between the weld and the rest of the work which warps the plate. A basic rule in welding stainless steel is to avoid high currents and high heat. Another reason for keeping the weld cool is to avoid cal bon corrosion. There are also many special-purpose electrodes for surfacing and welding copper and copper alloys, aluminum, cast iron, manganese, nickel alloys, and nickel-manganese steels. The composition ( these electrodes is designed to match the base meta The basic rule in selecting electrodes is to pick On that is similar in composition to the base metal.

Q.21 odZ'kkWi esa ihlhvks D;k gS\ blds D;k&D;k dk;Z gS] vkids fopkj ls blds fofHkUu foHkkx

fdl lhek rd izHkkoh gSA dk;Z n{krk dks c<+kus ds ckjs esa vki D;k lq>ko nsaxsA
What P.C.O. is prescribed for different type of workshops? What are the functions of various organs of the P.C.O? In your opinion, to what extent each organ is able to function effectively in your workshop? Answer: - Production Control Organization is mainly responsible for smooth working and timely availability of man material. This is mainly divided into three parts. Headed by Senior Section Engineer of each part. Rate Fixing& Planning Progress Office and Field Inspection The broad functions of this department comprise of: Rate Fixing& Planning Planning activity: These comprise of study of drawings and specifications, preparation of cost and details. These comprise of scrutiny of drawings received; preparation of part drawings to facilitates manufacturing operations, designing various jigs and fixtures. These comprise of planning the various activities connected with production in manner which would ensure maximum use of man & machinery Making all arrangements work as smoothly and efficiently as possible. The function of this office are broadly divided as under: Processing: The function include preparation of scroll process sheets indicating sequence of operation, quantity of material to be used. The section or load center where the operation is to be carried out; the requirement of machine groups, jigs, fixture and gauges, etc. The functions include maintenance of synthetic data for fixing rates (time) for individual operation, indicating allowed time in the process sheet for each of the operation involved;

to scrutinize all completed piece work cards, issue of excess time cards etc. This section deals with matters of general efficiency of the shops. Its activities comprise of review of existing practices, suggest improvement, keeping constant watch on off cuts and rejected materials lying on the shop floor or stores scrap-yard in order to suggest suitable usages of that materials etc. Time study of new work, time study for revision of allot time Time to time suggests improve method of working. Progress Office and Field These comprise of release of work orders for components assemblies of stock item if not available in the store/ Non stock item etc. In advance of the schedule of production; preparation of production schedule . Preparation of route card as per manufacturing process. Making arrangement of stock item revision of stock item as per requirement. Drawl of stock item from store and supply to the shop in time. Time to time co-ordination meeting with store for timely procurement of store item. Making of stock proposal for newly introduce but regular consumption item with justification. Distribution thereof in advance to all concerned for their guidance, arranging with stores departments for reservation of required material before actual release of work orders etc. As per schedule laid down, preparation of monthly report of production and their deliveries. Keeping liaison with shops and stores departments in the drawls of raw material and finished parts. Intersection and inter shop movement of component; maintenance of records for number of orders received, orders completed etc. for each batch etc. Inspection : Pre-inspection of wagon/coach/any component and check the work content Marking of the work to be carry doubt on the wagon. Marking condemnation of wagon/component if found condemn. Stage inspection of components like trolley, Airbrake, Wheels, Wagon building etc. and check as per procedure. And guide accordingly. On Completion of each operation to ensure the production as per drawings and specification, Bringing to the notice of concerned authorities of deviation from drawings and specifications for rectification and rejection; Certification on the job card and Route cards regarding quantities passed of rejected in respect of each operation etc. Final passing of the material physically and take its counter on the record. Final offer of wagons to NTXR for final fitment Opinion : In the opinion the function the function above departments is not satisfactory due to following reason The inspection department doesnt pre-inspect the work content and work done by the operator and not physically check the work done by operator He records the allot time & quantity as advice by the section supervisor. The Bonus percentage is not given has per actual work content but adjusted reasonable bonus %age to avoid conflict from unions. The main problem in workshop to do the work fast which sacrifice the quality and absconding from working place.

The technological improvement as well as training to the staff for operation and maintenance of machine and plant is required. The policy of management in regarding to staff should be positive for motivation. Improvement / change of incentive system such as group incentive should be introduced.

Q.22 D;k vki le>rs gSa fd izksRlkgu i)fr ftl m|s'; ls ykxw dh xbZ Fkh] og m|s'; iwjk dj jgh gSA orZeku Ldhe dks vkSj vf/kd izHkkoh cukus ds fy, D;k vki D;k lq>ko nsaxsA
Do you think that present incentive scheme has served the purpose for which it was introduced? Suggest any changes which will make the present scheme more effective Incentive Scheme ANS- CLW Pattern incentive scheme introduce in 1961 the main purpose of incentive scheme was to increase the productivity without increasing man power and proper utilization of assets by giving incentive bonus to the worker. The purpose of the scheme was good quality of work but it has not serve the purpose. The quality of the work is totally decreasing day by day and earning of bonus is the main issue of interference of union. The job cards on which losses occur are destroyed & not accounted for. Hand written job cards are issued. They can be manipulated. Time entry on job cards is done by hand. This can be manipulated. Direct workers are shown as EIW & IW, without much justification and prejudice of the worker. Allowed times are not revised even on the introduction of advance machine tools with better tooling. Allowed times are claimed for complete machining operation even if the casting is rejected on the very first cut. Excess repairs are certified by stage inspectors. Right quantity of the job are not mentioned Proper inspection of the material is not and allots time and quantity is given by understanding brotherhood. Management has often failed to arrange the raw material, tool, M&P & material handling equipments. Suggestion for more effective of incentive scheme CLW Pattern of incentive scheme is very old and required to be review & should be replaced by Group incentive scheme. Whether a list of items to be manufactured or repaired in the sections/shop should be counted physically and record of the same should be maintained which incentive scheme is proposed to be introduce, has been prepared. Adequate load to meet the increased capacity generated as result of introduction of incentive scheme should be ensured. Computation & the time studies have been carried out should be implemented. Issue of job card on work order should be review properly. Work of inspection department should be review and quality as well as quantity work should be look after by the shop supervisor/worker itself. It will give the system of quality control to the quality insurance. Allowed times should be reviewed time to time as and when new technology is introduce. Whether the strength & categories indirect workers & essential indirect workers have been approved by Chief Mechanical Engineer. Whether the strength & the categories of staff of indirect workers including those declared essentially, indirect have been fixed as a result of proper analysis. Whether the strength & categories of staff of direct workers have been determined with

reference to the work load on the different load centers & sections. The No. of effective hours, available per shift peer month will be taken as 200 & with the addition of 33.3% representing the average efficiency under incentive scheme, 267 man hours per man per month shall be the basis for working out the number of direct workers. Whether the number of supervisors has been determined according to actual need keeping in view of the overall ratio of supervisor to 18 workers. Whether regular supply of raw materials has been ensured. Also whether arrangements have been made with the stores departments for their reservation before the release of work orders. Whether a system of periodical oiling of machines, tools & plants & other preventive maintenance measures have been introduced. Whether a proper system of inspection has been introduced. Whether the punching clocks have been installed & booth erected.

Q.23 dkj[kkus esa flfj;l ,DlhMsaV] ftlesa ,d deZpkjh dh e`R;q gks xbZ gks] ogk igqapus okys

vki igys vf/kdkjh gSa] bu ifjfLFkfr esa vki D;k dk;Z djsaxsA
You are the first officer to arrive at the site of a serious accident in a workshop in which some workmen have lost their lives. What actions will you take under the circumstance? Ans- Duties Of Officer At The Site Of Accident First of all protection of site will be insured render first-aid services to the injured Immediately call the railway doctor from nearby railway hospital/Dispensary any other doctor Asked the doctor report whether employees are surviving or otherwise. In case of death of employee Immediately inform the next officers of the concerned shop. Call on RPF at spot. Inform the families of the affected persons. Give all concerned message to all officers. Inform local Police Station with the help of RPF. Take 2 eye witnesses/ statement from available employees at the accident site. Call Safety Officer of workshop informing him about the details of accident and place of accident site and ask him to put up factual report with his remark. and Prepare the accident report indicating small diagram/Sketch of the accident. Arrange to save the life of injured employee is any. To preserve the clues and evidences at the site of accident, if required, photographs also may be taken which may also help to ascertain the cause of accident. To access the prima-facie cause of accident in consultation with other representative. To draw a neat rough sketch of site of accident indicating the affected area. Position of other damaged machines or other railway material. Collect other details of availability of safety equipments, personal protection

equipments, safety instruction, etc. Other details of causes of accident. Get medical report on death/injury from the doctors. Arrange the staff to accompany in ambulance to safely and carefully take the injured persons to hospital Arrange vehicles for postmortem of dead persons. Get Police punch nama. Inform Welfare Inspector for arrangement of employees welfare Inform the Chief Inspector of Factories of the area about the details of accident with reason within 48 hours of the incident. Give the complete report of accident in Form no 18 (Sec 88, Rule 110) giving particulars of Name, Age, Place of accident, Employer, Date, Time and cause/ nature of accident and whether the person is injured or dead Take down the particulars of duties including the leave taken during last 12 months by the affected persons. No. of years of services, basic pay etc. for wage calculations. Collect the medical report of each affected person from concerned hospital for compensation calculations. Depute Welfare inspector for arranging/ lessoning with civil authorities for getting postmortem of the body and provide suitable vehicle for sending postmortem and collecting from postmortem house to deceased house. Arrange for the ex gratia payment to the family of deceased Through WI. Collect all the evidence and causes of the accident and put up the report to the CWM.

Q.24 odZ'kkWi ds ijQkWjesal ds fy, fdu iSjkehVj dks laKku esa fy;k tkrk gSA odZ'kkiW ds

ijQkWjesal lq/kkj ds fy, D;k mik; djsaxsA


What parameters are considered for the performance of workshop? What step you will take to improve the performance of workshop. The following parameters are consider for performance of workshop :o 90 Days Sick Marking o Wagon become unloadable o Unit Cost of POH/NPOH o Unit Cost of Rehabilitation of Wagon o Man power Ratio o Man hours per wagon o POH Cycle o Outturn of the shop o Over time booking o Incentive percentage o Accident cases/IOD cases o Local passing of wagon

o Break down %age of machinery & plant o Inventory of Material o The main causes of performance of workshop are quality of the outturn which reflect in 90 days sick. o The main reasons of 90 days sick marking are as under. Defects code Defects Head A1-A8 Wheel defects B1-B9 Suspension defects C1-C4 Spring gear defects D1-D4 Cartridge bearing defects E1-E8 CBC, Draft gear defects F1-F13 Brake gear & air brake sys. defects G1-G17 Body defects Measures to improve performance. Quality of welding should be ensured down hand welding should be done on fixtures and template should be used proper size of patches and proper preparation of welding edge ,proper current ,pre heating of electrode replacement of damage/worn out component Quality of Riveting: The wagon components fitted by the staff where not cleaned properly and the gap between the rivet and the wagon component hence during run rivets get loosened which result in failure. o Control of expenditure discard handmade work orders Reduces IOD cases. Reduces brake down time of machine. o Inventory control of store o Implement better work better study o Reduce oven time booking. o Conduct of quality audit. o Energy conservation. Improve repair quality of wagon components. All components should be repair as per procedure let done by RDSO.

Q.25 fuEufyf[kr esa fdUgha pkj dk mRrj nsaA


Answer any four of the following.

d Dok;fyax ds fy, ckj dks xeZ djus ds fy, okfdax foe QusZ'k dh D;ksa vko';drk gS\
Why walking beam furnace is necessary for heating the bar for Coiling? Answer :Walking Beam Furnace is necessary for heating of bar for coiling because in walking beam bar are heated & can be run from started loading point to end of the furnace with desirable speed. The speed of bar is so designed that soaking time of bar is adequate. Bar can also rotate in furnace for heating at controlled atmosphere. As per RDSO specification deference of hardness of core and surface should not be more than 20BHN to make uniform hardness of bar from surface and core and to charge Austenite/ Pearlite structure to Marten site. Heating at controlled temperature and proper soaking time is required for controlling the time. Therefore walking beam is necessary for heating of bar for coiling.

[k

Dok;y Lizhax cukus ds le; 'kkWV fifuax dh izf;k D;ksa viukbZ tkrh gS\

Why Shot peaning process is adopted for manufacturing of coil spring? What quality the shot pining process imparts to the coil spring during its manufacture? Answer :Fatigue life of spring is improve by shot Peening. continues style shot peening is done during manufacturing of coil spring. During shot Penning it should be ensured that springs are shot Peened uniformly over the entire area of spring. The intensity of shot should be checked by Almin strip. Intensity should be minimum .40mm.

vkbZ-lh-,Q-cksxh fLizax ds fy, eSxuht LVhy D;ksa mi;qDr ugha ekuk tkrk gS] tcfd ;g dSluc cksxh Lizhax ds fy, mi;qDr ekuk tkrk gSA
Why manganese steel is not considered suitable for manufacturing of ICF Bogie spring. However it is considered suitable for Casnub Bogie? :- Why manganese steel is not considered adequate for ICF bogie? Mn Steel is not considered adequate for manufacturing of ICF spring because hardness of Manganese steel bar untreated condition is 255BHN Max. and Annelid condition is 245 BHN max. Whereas the chrome Vanadium steel having hardness 310 BHN Max. and 255 BHN Max. Respectively. The material use for Casnub Bogie is 60Si-7 which is not considered high value of hardness and toughness as compare to chrome Vanadium Spring Steel. Material is use for ICF Bogie is 52 Cr4 Mo2V were chemical composition of the material is different in which Chromium, Molybdenum and Vanadium is used other than this as per RDSO specification material use for less than 32 mm bar dia is silco-magnige steel and above 32mm chrome Vanadium Spring steel is to be used. Due to high hardness and toughness after heat treatment the chrome Vanadium steel is suitable for ICF bogies.

/k

Dok;y fLizax cukus ds fy, ckj ]fifyax dk D;k egRo gS\


What is the significance of bar peeling for manufacturing of coil spring? Bar Peeling of spring The straightened Bar are peeled before manufacturing of spring. The peeling of bar is done as per RDSO specification i.e. 3% of bar dia or 1 mm which ever is more. Peeling is important before manufacturing of the spring because all surface defects such as Seams, Cracks, Folds are removed by the peeling. Which improve the performance of the spring. If Peeling will not be done the surface crack will propagate during service and spring will be crack i.e. why peeling is important.

M+

dSEcj ywt gksus ij Dok;y fLizax dh is;fjax djuk D;ksa lgh ugha ekuh tkrh gS\

Why pairing of coil spring is not considered suitable after losing its Camber? Pairing of Coil Spring. 100% of the spring shall be compressed with specified Working load and the loaded height of the individual spring shall be measured. The working height of the spring shall be within the tolerance limit. Any spring which dose not confirm to the test of the specification should be rejected. If the spring loss it chamber the elastic properties of the spring will not be maintained and permanent set will take place and if the permanent set take place it spring action will not be there so there is no use of pairing of the spring when it loose the camber.

Q.26 ,d vkn'kZ odZ'kkWi ftlesa 20 oSxu izfrfnu dk ihvks,p gksuk gS] dk ys vkV cukb;s

rFkk vko';d bakLVDpj dh fyLV cukb;sA


Make Layout of an ideal workshop having P.O.H capacity of 20 wagons perday. Please

made out and list of required infrastructure.


Lay out & Infrastructural Facilities for POH of 20 Wagons per Day Workshop should have following facilities Yard Capacity 200 Wagons Holding Striping Section 50 Wagon Holding Repair Body Section 100 Wagon Holding. Pit-line 50 Wagons Covered Accommodation :- Workshop should have a heavy repair bay with a covered accommodation capable of accommodating required No of wagons considering five repair days this purpose each wagon should be provided with a minimum of 15 meters of track length to leave adequate space on either side of the wagon for running out its bogies and then wheels and still leave some free room for workers to move around the wagon. For easy placement of removal as well as adjusting wagon at work places in the workshop where possible. The length of line under the covered accommodation should not generally be more than 10 wagons length in other words length of carried accommodation where possible should generally be limited to 150 meters. The covered accommodation should consist of base normally 15 meters wide each bays covering two tracks under the tracks should thus the 7.5 meters apart to permit free movement of material transport vehicles, movement of wheels by fork lifters and also work space for attending to the components if when also provided for keeping some commonly required space materials at the side of work ready for use on wagon as required. To attend the under gear of the wagon is under-frame, flooring etc. Minimum 50% of covered lines should have examination pits. Arrangement to provide pit over the entire length of half the numbers of lines under the covered accommodation is preferable. It should be ensured that floor is given an adequate slope in such a way that the water from floor drain out efficiently in to the examination pit and the drainage of the pit is efficient and effective where low place are not available near by the drainage purpose a minimum of two drains wells of adequate depth and size are provided with proper an adequate plumbing arrangements to ensure the examination pits remaining dry all the time besides providing number of main holes along with dirt muck traps. A minimum of 10% slope should be provided in the under ground drain pipes to prevent them from getting silted and chocked making their cleaning also very difficult. Covered accommodation should have EOT crane covering the entire track in each bay for Movement of wheel and heavy materials lifting of bogies etc. Entire covered accommodation must have adequate lighting arrangement for workers to work without eye strain. Flooring:- Taking in to account the load that is to be carried and component that are likely to be drooped on the floor as also the type of material handling equipment that are to move, it is necessary that the entire covered area and the path ways are passed with the minimum 150 reinforced concrete so that the floor can with stand having stresses and the impact to which it is likely to be subjected to in the normal course of working. The store room Air-brake over hauling section machine section and similar rooms where heavy loads are to be dealt with should be laid with 150 mm reinforced concrete. The rest of the room should be laid with 40 mm concrete flooring. Layout: 1) Uni- directional flow of yard wagon should be taken for POH from one way and should be handed over to traffic after POH by another way, so as to avoid the delay in taking and handing over the wagon. 2) Stripping shop:- holding capacity of 50 wagons for stripping the wagons having facilities of EOT cranes, Air pressure, Rivet cutters, Buster 3) Repair bays capacity 100 wagons considering 10 wagons in each bay. 4) Trolley Repair Shop capacity 50 trolleys per day unit exchange of trolley. Adjacent to repair bays so that no extra requirement of cranes. 5) Air-Brake Shop:- with modern repair equipment D.V. testing bench, Brake cylinder testing bench,

Air-Hose testing bench, Angle Cock testing bench, Dirt Collector testing bench, A.R. testing bench, unit exchange of each component of Air-brake equipment. 6) SAB shop for repair of 50 SABs per day SAB testing bench, spring, Grouping, Fixture, Cleaning bench. 7) Wheel shop one directional wheel flow shop wheels should come one line for profiling and repaired wheel should supply to another side from the same line minimum involvement of crane for placement of wheels on wheel lathes. Facilities Wheel lathes, AJTB, Wheel press, Axle turning lathe, Disc boring machine, EOT cranes 8) Bearing Dismounting Bearing should be dismounted before profiling and should be mounted after profiling on the same line and supplied to repaired bays. 9) CTRB Repair Shop dust free shop dismantling of cup, cone assembly, cleaning of each component dust free inspection room with adequate light inspection of each component assembly of CTRB & packing for supply for mounting. 10) CMA Lab. for non destruction testing, chemical analysis of receipt material Ultra Sonic testing of axles. 11) Draft Gear Section :- press machines, Draft gear cutting machine, repair bays 11) Mill-Wright Shop near machine shop and wheel shop where vital machines are located proper tooling for maintenance for machines. 12) Vehicle Section for fork lift, lister, Tractor, Dumper, Road Mobile Cranes for material handling. 13) Compressors sufficient Nos. to supply the air pressure to repair shop Air-brake stripping shop, Bogie Repair Shop, Leak proof Compressed Air supply system 14) Welding Booth for fabrication of in house built items having sufficient items of No. of Rectifiers, MIG Plants. 15) Mani-fold leak proof supply of D.A. & Oxygen to repair bays and stripping shop. 16) Paint Shops covered shed for holding 60 wagons with cat walk. With spry painting facilities

17) Pit-line having capacity of 50 wagons with testing facilities SWTR, Welding facilities. 18) Machine shop having sufficient lathes, Milling, Drilling, Shaper M/C for manufacturing of new items and repairing / Reclamation of serviceable items. 19) Panel Plate with sufficient No. of shearing machines for cutting of patches and bending machine for bending the patch for roof. 20) Black Smithy Shop:- for reclamation of coupler, plank, paring of springs manufacturing of doors stiffener. Store :- Raw Material Store, Steel Yard for steel Sheets, channels, Plates, Reclamation Yard, Scrap Yard for Condemn Safety office: - Ambulance, Safety, Fire Extinguishers, Sand Buckets etc. Dispensary: - First aid equipment Administrative Building :- With advance office facilities Planning Office, Inspection office, Progress office, Sub store of material, RF&P office, SSE office in each shop. Welfare Activities :- Canteen, Water cooler, Tea booth, Toilet, Ladies changing room, Staff changing room.

Q.27 flaxy oSxu VsLV fjx ls D;k psd fd;k tkrk gS] VsfLVax djus dh izf;k dk vkjMh,lvks izQkWekZ ds lkFk o.kZu djsa\
What do you understand by Single wagon test ring? Write down the testing procedure on RDSO Performa?

SWTR

Air brake testing of a wagon is carried out on Single wagon test rig the figure is given above Necessary Equipments:Test rig fitted with all necessary equipment. Dummy palm with gauge (separate for BP &FP). CR, AR , BC are tested with pressure gauge with flexible hose & adopter. Stop Watch. Measuring scale./gauge Teflon tap & soap solution. Tool kit with different types of tools. Compressor (minimum operating pressure is 7 kg/cm2) Test Procedure:Visual examination. Adjustment of A dimension & piston stroke for correct brake power application. At rear end, dummy palm end with gauge is used. Attach & join the coach with the test rig. Join test rig with compressor. Connect the pressure reducing valve at compressor end with test rig. Performa for SWTR WAGON No. _______________ Type Of DV _______________

BP Pressure ______________ FP Pressure ______________ Sl. No. 1. Checks Leakage a) BP pressure Specified 0.25kg/cm2/minute (max.) Result (Actual)

2.

3. 4.

a) Brake Cylinder Filling Time (from 0 3.6 kg/cm2) 18 to 30 sec (Goods) b) Maximum BC Pressure 3.8 +/- 0.1 kg/cm2 Brake Cylinder Release Time (From 45 to60sec 3.8 -0.4 kg/cm2) Sensitivity & Insensitivity a) Brake application when BP pressure is reduced at the rate of 0.6 kg/cm2 in 6 sec. b) Brake application when BP is reduced at the rate of 0.3 kg/cm2 in 60 sec. Emergency Brake Application & Release a) Maximum brake cylinder pressure Brake should be applied

Brake should not be applied

5.

3.8 kg/cm2

6.

b) Manual release of brake cylinder Brake cylinder get fully after emergency released Graduated Application & Release a) Application BP pressure decrease in steps & BC pressure builds up in steps

b) Leakage in BC pressure in 5 min. 0.1 kg/cm2 in 5min. after emergency application c) Release BP pressure increases in steps & BC pressure reduced in steps For Chg. :- 90 10 mm For Goods:Empty:- 85 10 mm Loaded:- 130 10 mm

7.

Piston stroke

Q.28 ckWDlu oSxu dh gsfydy DokW;y fLizax cukus rFkk fujh{k.k djus dh izf;k dk o.kZu
djsaA
Write down the manufacturing and inspection procedure of BOXN helical Spring. AnsThere are 03 types of springs are used in BOXN wagon and all three are coded by

RDSO as given belowS.No. 1Type of spring Outer Code X01 Material

Silicon manganese steel (IS: 3195) 2Inner X02 Silicon manganese steel (IS: 3195) 3Snubber X03 Silicon manganese steel (IS: 3195) Spring dia less than 33mm are manufactured from silico manganese spring steel (IS: 3195) gr. 60Si7 and more than 33mm dia chrome vanadium spring steel is used. Manufacturing Process Generally the steel bar manufacturer supply the spring steel round to the specified length and composition ordered by the spring manufacturer. After receiving of material at site the bar is to be checked or examined by the chemical and metallurgical lab. Successfully of material examination for manufacturing of spring. The procedure of manufacturing of spring step by step as below. o End cutting of bars :- Generally the spring bars are supplied by the supplier. During transportation bar gets cracks on its edges. It is necessary that bars end must be crack less. At this stage bars may be cut to length by shearing carefully so as to prevent cracking at the ends. o Straightening: - Straight bar is required for spring manufacturing. So each bar is straightened at bar straightening machine. o Peeling:- The bar is peeled off at peeling machine for a good, regular and defect free surface. 3% of bar dia or 1mm whichever is more to be peeled. o Centre less Grinding:- Peeled bar again grinded by a centre less grinding machine because this bar takes a shape of coil at coiling machine. Before coiling it is mandatory that surface finish of the grinded bar is 5 microns. o Bar crack deduction:- After peeled and grinded the bar is sand for the crack detection at crack detection machine . This is done in magna flux machine. The bar passed through magnetized portion. If there is any type of surface crack present in bar is deducted in this machine. o End Tapering:- Both of the ends of grinded bar are tapered either by taper rolling or by die forging. Tipe thickness not less than 1/4 of bar dia o Stamping:- It is a process of coding on spring which is applied at in-effecting coil. The serial order in which the particulars are stamped as below XX XXX XXXX XXXX. From left 02 digit for internal name (CV, SM), 03 digit for manufacturing code like X01, X02 ,X03 etc. Next 04 digits for month and year i.e. 0112(for jan 2012) and last 04 digit referred to Drg no. o Bar heating:- Tapered ends bar is heated in bar heating furnace at walking beam up to specified heating temperature in walking beam Furness temperature 830-860 0C to give sufficient soaking. o Coiling:- A red heated bar comes out from bar heating furnace and rest on a preheated mandrel which is the part of high speed automatic coiling machine. Bar is guided by a guide roller in automatic coil operation. Bar takes a shape of specified uniform pitch. o Quenching:- A red heated coil is a very mild condition so it need to be hard for this the

o o o o

o o o

spring is quenched in oil bath or suitable medium conforming to standard specification. Quenching media temperature should not be 80 0C. martensite structure is achieved minimum 90%. Tempering:- During the coiling process the grain structure of bar is deformed due to twisting and internal stresses developed. Hardness 650 BHN toughness less. To achieve a homogeneous fine grain structure in the spring. It need to temper in tempering furnace below lower critical temperature of steel. temperature at 4500C hardness decrees 380420 BHN and toughness increases. Hardness testing:- Tempered springs are dipped in a water tank. After heat treatment, the hardness of the spring is tested by lab staff by using brinell hardness tester(BHN). The hardness of the spring should be in the range 380 BHN to 420 BHN for silico manganese steel core hardness should not be vary 10 BHN of surface hardness. End Grinding:- After hardness testing , both the end faces of the spring are grinded the actual grinded surface is kept at least 75% of mean coil circumference of the spring. Shot Penning:- Now springs takes into continuous type shot penning machine where it shot peened by high intensed shot to improve fatigue strength of spring. Magna Flux Testing of spring :- Springs are tested by magna flux testing machine to detect the surface and sub surface crack in the springs. Scragging :- Each and every spring is scragged at home. In this operation spring is compressed 05 times holding it at the home load. All the coils of spring is contact with another. Excluding the inactive coils. These should not be permanent setting of spring. load testing :- The spring placed on a flat rigid metal support is subjected to incremental increasing load up to the specified bearing load so each spring is tested on its load , and loaded height of the individual spring is measured. Black paint :- After the above operation springs are painted by black paint in the painting plant. Grouping of colour :- The spring is painted with a suitable colour code for identification as per specified in the document. Dispatch :- In the last stage, springs are packed in suitable box with its RDSO code . Now springs are ready to dispatch.

Q.29 flaxy ikbZi ,;j czsd flLVe ds dk;Z fof/k dk fp= lfgr o.kZu djsa\
Explain the working principle of single pipe Air Brake System with the help of schematic diagram. Answer :systematic diagram of single pipe air brake system

The air brake system is the standard, fail-safe, train brake used by railways over the world. It is based on the simple physical properties of compressed air. Here is a simplified description of the air brake system. Fundamentals A moving train contains kinetic energy, which needs to be removed from the train in order to stop it. This energy is converted into heat by applying a contact material to the rotating wheels or to disc attached to the axles. The material creates friction and converts the kinetic energy into heat. This results in slowing down the wheel and eventually stoppage of the train. The material used for braking is normally in the form of a block or pad. The braking systems, which use compressed air as the force to push block onto wheels or pad onto disc, are known as Air Brakes or Pneumatic Brakes. The compressed air is transmitted along the train through a brake pipe. Changing the level of air pressure in the pipe causes a change in the state of the brake on each vehicle. It can apply the brake, release it or hold it ON after partial application.

The system is in widespread use throughout the world. The Principal Parts of the Air Brake System The diagram above shows the principal parts of the air brake system. Compressor. Main Reservoir. Drivers Brake Valve Feed Valve. Equalizing Reservoir Brake Pipe dia. 32 mm (for goods) Angle Cocks Coupled Hoses Brake Cylinder Auxiliary Reservoir - 100 liter (Goods) 5 kg/cm2 Brake Block Brake Rigging Triple Valve or Distributor Valve Control Reservoir - 6 liter (Goods) 5 kg/cm2 Common Pipe Bracket Manual Release Handle Where the brake pipe pressure is reduced in steps as shown above, the air from AR is sent into BC to a maximum pressure of 3.8 + 0.1 kg/cm2 during full service application as well as emergency application. During minimum reduction and service application the admission of air from AR in to BC is directly proportional to the reduction in the BP pressure. (i.e. 1.5 times charging of BC as per reduction in BP The CR pressure should constant at 5.0 kg/cm2. However there may be a little drop CR pressure during brake application due to the design. During The Releasing / Recharging During release the BP pressure is increased in steps. When the BP pressure is increased in steps the brake cylinder is disconnected from AR and in turn connected to exhaust. The air from Brake cylinder is released / vented progressively depending upon the increase in the brake pipe pressure. When the brake pipe pressure is brought to 5.0 kg/cm2 the from brake cylinder is completely exhausted and the brakes are released fully. Manual Release Whenever the loco is detached BP pressure is brought to zero and brake application takes place due to the existence of CR pressure at the bottom of the main diaphragm to release the brakes manually the hollow stem in the DV should be brought to the normal position by releasing the air from CR. To facilitate this, the release valve provided at the bottom of the DV is given a brief pull. During this operation the air from CR is released which in turn brings the hollow stem to the normal position to connect BC with exhaust for releasing of brakes. Brake Application This diagram shows condition of the brake cylinder, triple valve & auxiliary reservoir in brake application position. The driver has placed the brake valve in the

Application position. This causes air pressure in the brake pipe to escape. The loss of pressure is detected by the slide valve in the triple valve. Because the pressure on one side (the brake pipe side) of the valve has fallen, the auxiliary reservoir pressure on the other side has pushed the valve (towards the right) so that the feed groove over the valve is closed. The connection between the brake cylinder and the exhaust underneath the slide valve has also been closed. At the same time a connection between tha auxiliary reservoir and the brake cylinder has been opened. Auxiliary reservoir air now feeds through into the brake cylinder. The air pressure forces the piston to move against the spring pressure and caused the brake blocks to be applied to the wheels. Air will continue to pass from the auxiliary reservoir to the brake cylinder until the pressure in both is equal. This is the maximum pressure the brake cylinder will obtain and is equivalent to a full application. To get a full application with a reasonable volume of air, the volume of the brake cylinder is usually about 40% of that of the auxiliary reservoir.

Q.30. oSxu dh 90 Mst fld ekfdZax D;k gS] 90 Mst fld ekfdZax dks de djus dk mik;

lq>kb;sA
What is 90 days sick marking of wagon? Suggest the measures to reduce the 90 days sick marking. :- 90 days sick marking 90 days sick marking is the reliability performance of workshop. If the wagon mark sick within the 90 days period after POH is known as 90 days sick marking. 90 days sick marking is done by IRCA The wagon marked sick under the following defects: Defect Defect code Wheel defect A Suspension defect B Spring gear defect C Cartridge bearing effect D CBC draft gear defect E Beak gear defect F Body defect G Following Measure Should Be Taken To Reduced The 90 days Sick Marking. Wheel defect: The percentage of sick marking is represented the quality of work. To reduce the sick marking under this category, the defects i.e. sharp flange, thin flange skidded wheel, radius less as root, hollow tyre, flange broken, bent axle and other defect should be attend properly during POH .All wheels should be profiled properly. Suspension defect: Under this category the defect observed in suspension system i.e. axle guard crack, bridle bar crack, pivot top broken, side bearer rubber pad perished, wage block broken, EM pad perished, wear liner crack and bolster pocket liner/column worn out all above item should be properly attend during POH as per repair practices/RDSO Manual. And worn out component should be replaced Spring gear The defect in spring gear that is outer, inner and snubber spring should be paired with properly and other defect observed in spring ie crack or dent, spring should be replaced. Cartridge bearing defect: The defect in CTRB i.e. hot axle, grease seal defect, outer cage broken and other defect

CTRB should be properly attended during POH, mounting pressure, lateral clearance should be checked properly, grease seal should be replaced 100%, Non HT axle cap screw should not be used .Bearing should be repaired as per RDSO manual. All defective components should be replace. CBC, Draft gear defects: The defect in CBC and Draft gear component should be examine and repair properly. Only HT draft gear i.e. RF361,Mark 50 should be use. all defective components should be replaced. Brake gear & Air brake system defect: The defect under this category i.e. slack adjuster defect, brake cylinder defect, DV defect, angle cock broken, leakage in drain plug, leakage in brake pipe should be properly attended during POH .All air brake equipment should be repaired and tested as per RDSO manual and record should be maintained Body defect: The defect of wagon body i.e. head stock sole bar, roof , side wall, end wall, floor and door defect should be properly attended during POH to minimize the sick marking under this category. The quality of the welding during POH should be improve by proper selection of current, selection of the welding material, preheating of the electrode, using MIG welding set.

Q.31 izhosaVho esaVhusal rFkk czsd Mku esVhusal esa D;k varj gS\ jksM eksckbZy su dh izhosaVho

esaVhusal djus esa vki D;k dne mBk;saxs] la{ksi esa fy[ksaA
What is the difference between preventive maintenance and break down maintenance? Write down the step to be taken for maintenance of road mobile crane, explain in brief. Ans-1 S.No. Preventive Maintenance Break-down Maintenance 1 It is planned maintenance It is unplanned maintenance 2 Schedule of maintenance can No schedule can be prepared be prepared 3 Spares will be available for Spares will be arranged as per maintenance requirement 4 Assessment of man power can No assessment of man power. be done 5 Maintenance time can be fixed Time can not be fixed it depends upon brake-down condition and damage. 6 Production of plant is not Production of plant is held due to effected due to the systematic breakage. planning 7 Spares M/C and man involve No spare machine is required. for planning 8 Preventive maintenance is Productivity is effected when any increase productivity by breakage is occurred. reducing break-down 9 It is a routine maintenance Its an emergency maintenance. process 10 It requires more fund to keep It requires only emergency spares. large inventory of spare parts and spare M/C

Preventive maintenance Break-down maintenance provide increases the useful life of M/C the maximum utilization period of & Plants. M/C for production. 12 Lay-out of shop requires more The lay-out of shop requires less space to housed spare M/C space. 13 More space required for storage Only emergency spares are required. of number of spare parts. It involves more man power & money. 14 It is a systematic process to No information of break-down is give the information of prior to inform. condition of M/C Maintenance of Road Mobile Crane The road mobile crane is a automobile diesel operated crane. It involves lifting, lowering and turning function by hydraulic operating system. The preventive maintenance of the crane is as under :1 Daily Maintenance :- a) Checking of oil level in engine sump, full in diesel tank And hydraulic oil. b) Checking battery connection. c) Checking water level in radiator. d) Checking of any loose part and abnormal sound after Starting as well as break functions. e) Check tyres & proper inflation pressure. 2 Weekly Maintenance :- a) Check air cleaner and remove oil if working under Dusty condition. b) Grease the following paints. c) Lift jack pivot pin. d) Boom pivot pin. e) Steering jack pivot pin. f) Clutch shaft and linkage. i) Main frame and yoke pivot pin. 3) Monthly Schedule Weekly Schedule and following :a) Clean and adjust fan belt tension. b) Check brake fluid level in the master cylinder. c) All over screws of the seal retainers on hydraulic jacks Should be tightened. d) Clean E.O. Filter e) Grease the following points a) Clutch bearing f) Brake pedal shaft.

11

4) Quarterly Maintenance :- a) Clean fuel tank. b) Replace fuel feed filter. c) Check pedal free play and adjust if necessary. d) Re-clean E.O. filter. e) Clean hydraulic oil filter element. f) Adjust front hydraulic break and rear mechanical

brake 5) Half Yearly Maintenance :- a) Check tappet clearance and adjust if necessary. b) Change lube oil filter. c) Change lube oil. 6) Yearly Maintenance :- a) Drain flush and refill lube oil. b) Change oil for transmission housing and reduction. c) Dismantling hydraulic jack and inspect oil seal Piston and housing rigs combustion chambers. d) Grind valve and seal if necessary. e) Remove wheels and grease all axles and refit.

Q.32 odZ'kkWi ds VSad oSxu 'kkWi esa vkx yxus dh fLFkfr esa vki D;k dk;Zokgh djsaxs rFkk Hkfo; esa bl rjg dh ?kVuk dh iqujko`fRr u gks] blds fy, vki D;k mik; djsaxs\
What action you will take in case of fire in tank wagon shop .What precaution/remedial action you will take to avoid such type of incidents in future Ans- In case of Fire in Tank Wagon Shop following Action should be taken :Immediately Eliminate the source of ignition. Immediately Cut-off source of leakage to extinguish fire. Immediately organize dispersal of vapor. Allow the fire to continue under controlled conditions, till the fuel is burnt. Use water spray to cool equipment on fire and adjacent equipments. Not to extinguish flame at leak to avoid un-controlled explosive re-ignition. Inform immediate and call fire brigade if not in your control. Inform all concerned depending upon gravity of fire. Identify the type of Fire viz. dry, oil, gaseous, electric and use the right type of Fire Extinguishers / Extinguishing method. For Fires involving flammable liquids where a blanketing effect is essential to extinct the Fire, foam, dry powder and carbon dioxide extinguishers should be used to extinct the Fire. For Fires involving flammable gases including liquefied gases, where it is necessary to inhibit the burning gas, dry powder and carbon di oxide extinguishers should be used to extinct the Fire. As early as possible the information should be relayed to Railway control, emergency control of oil companies / LPG bottling plants, district administration, fire fighting agencies which are capable of containing and combating fire in petroleum / gas products. Start Fire Fighting Operation From available Resources. To avoid Fire Incidents in Tank Wagon Shop in future following Precautions / Remedial Actions should be taken :Staff of Tank wagon Shop should be properly trained in Fire Fighting. Fire fighting capabilities with breakdown staff along with fire fighting suits and other equipments should be readily available. MOC Drills / Procedure with Fire Agencies / oil companies for attending and if need be decanting the affected wagon. Fire Hydrants / Fire fighting special BTPN wagons (which are unfit for oil loading ) filled with water along with pump, nozzle, hose pipe and foam can be kept ready. No light, fire should exist in the vicinity of leaky wagon in the Shop. Only non sparking special tools should be used while attending the Tank Wagon. Protective / Safety Equipments should be available in the Shop. No smoking / Fire making should be allowed in the Shop.

Cardin off the area to keep spectators away from the Shop. Oil lanterns or signal lamps used for signaling must be kept far away. Keep fire extinguisher / water buckets in readiness. Clean oil day to day bases.

Q.33 dkVsZt Vsij jksyj fc;fjax dks odZ'kkWi esa ejEer djrs le; D;k&D;k [kjkfc;k ik;h

tkrh gSa\ bu [kjkfc;ksa dks nwj djus ds fy, D;k mik; viuk;s tkrs gSa\
What kind of defects are observed during Workshop maintenance of Cartridge taper Roller Bearings and what are the remedial measures to be adopted to prevent such defects ? CATRIDGE TAPERED ROLLER BEARING DEFECT OF CATRIDGE TAPER ROLLER BEARING 1.Cone assembly defect Stain discoloration, corrosion, pitting and rust Flaking or spilling Smearing and peeling Pitting marks on roller surface Wear & tear of cage The clearance between cage pocket & roller is more than 1.5 mm. Internal diameter of cage more than 144.4879 mm. 2. Double cup defect Stain discoloration, corrosion, pitting and rust Brinelling Flaking or spalling Pitting Electric burns Cracks and fracture Decrease in outer diameter Increase in counter bore 3. Wear ring defect Breakage in contact route of lip. Scratches or cracks on outer face. 4. Grease Seal defect Hardened cracked cut seal lip. 5. Backing ring defect Pitting marks Cracks, fracture or heavy corroded Loose wear ring in counter bore of backing ring Increase internal diameter i.e. more than 178.562 mm. Sr. No. defect Possible cause Remedial measure 1. Flaking Entry of foreign particles, Improve the sealing water & poor lubrication mechanism, use the lubricant with proper viscosity 2. Peeling Rough surface due to poor Use proper lubricant, Improve lubrication, entry of debris the sealing mechanism into lubricant 3. Scoring Excessive load, shaft bending Check the size of load, check

4.

Smearing

5.

Fracture

High speed & light load, sudden acceleration/deceleration Impact during mounting, poor handling Heat generation due to creep, excessive interference Poor mounting, excessive rotation speed, shock & large vibration Debris caught in the surface, shock during transport or mounting Exposure to moisture in the atmosphere, poor lubrication Progression from rust & electrical corrosion, sliding due to irregular motion of rolling elements Vibration with small amplitude, in sufficient interference Oscillation & vibration of a stationary bearing during transporting, oscillation motion with the small amplitude Insufficient interference or loose fit, insufficient sleeve tightening

the precision of shaft Improved the preload, check bearing clearances Improved mounting methods, provide enough back up & support for bearing rib Correct the interference, use & appropriate shaft shape Check mounting method, check the rotation & load condition, reduce the vibration Wash the housing, improve the mounting & handling methods Filter lubricating oil, improve sealing method Improve the sealing methods, prevent misalignment

6. 7.

Cracks Cage damage

8.

Denting

9. 10.

Pitting Wear

11.

Fretting

12.

False brinelling

Check the interference fit, apply a film of lubricant to the fitting surface Secured the shaft & housing during transporting, reduce vibration while preloading

13.

Creep

14.

Seizure

Check the interference & prevent rotation, correct sleeve tightening, tighten the raceway ring side race, apply adhesive to the fitting surface Excessive small internal Check precision of shaft & clearance, poor precision of housing. Study preload, shaft & housing bearing clearances & fittings Electric potential difference Design electric circuit which between inner & outer rings prevent current flow through the bearings, insulation of the bearing & Entry of corrosive gas & Improve the sealing methods, water, poor rust prevention anti-rust treatment for periods treatment of long running Inclination of inner & outer Use appropriate jig & tool, rings during mounting or avoid a shock load by use of a dismounting, shock load press machine, center the

15.

Electric corrosion

16.

Rust corrosion Mounting flaws

17.

18.

Discoloration

during mounting or relative matting parts during dismounting mountings Poor lubrication, oil stain due Improve lubrication methods. to reaction with lubricant

Q.34. dSluc cksxh fdrus izdkj dh gksrh gS\ ,u-,y-ch- dSluc cksxh dks fjis;j djus dk foLr`r o.kZu dhft,\
How many type of casnub bogies are used? Explain the repair procedure of NLB casnub bogie in detailthe various types of casnub bogie versions developed areas under: i. CASNUB -22W ii. CASNUB -22W (Retrofitted) iii. CASNUB -22W(M) iv. CASNUB -22NL v. CASNUB -22NLB vi. CASNUB -22HS CASNUB 22W Introduced in 1972 Weight 5.35 T Provision of adapter retainer bolt in outer jaw E M pad not provided Provision of wide jaw adapter Provision of floating bolster IRS pivot riveted and welded or casted Clearance roller type side bearer Sliding packet type brake beam Fitted with CTRB CASNUB 22 W (M) Retrofitted Introduced in 1986 Weight 5.7 T Provision of adapter retainer bolt in outer jaw E M pad provided Provision of wide jaw adapter Provision of floating bolster IRS pivot riveted and welded constant contact metal bonded rubber pad in side bearer Hanger type brake beam Fitted with CTRB CASNUB 22 NL Introduced in 1989-90 Weight 5.5 T Narrow jaw adapter provided Adapter retainer bolt not provided E M pad provided Provision of floating bolster IRS pivot riveted and welded constant contact metal bonded rubber pad in side bearer Sliding packet type brake beam Fitted with CTRB CASNUB 22 NLB

Introduced in 1990-91 Weight 5.4 T Narrow jaw adapter provided Adapter retainer bolt not provided E M pad provided Fish belly shaped bolster Weight reduced Spherical type centre pivot Constant contact type mental bonded rubber pads in side bearer Sliding pocket type bake beam Fitted with CTRB CASNUB 22 HS Introduced in -1993 Weight 5.4 T Narrow jaw adapter provided Adapter retainer bolt not provided E M pad provided Spherical type centre pivot Spring loaded side bearer Sliding pocket type bake beam Fitted with CTRB MAINTENANCE OF BOGIE Bogie from body repair section Dismantling of Bogie in Bogie shop. Remove the brake beam, springs. Visual inspection of Bogie. Remove wear, cracked liners (side frame liners, jaw liners, bolster liners etc.) with the help of gas cutting. Check the plank if plank is bending then sends to black smithy shop For repair New liners are welded by arc welding with specified procedure. Change the side bearer housing. Checks the center pivots if worn out then change it. In mark I safety bracket and push rod bracket are changed and in other Bogie only push rod bracket will be change if worn-out. Grouping of springs Assemble the Bogie and send to under frame. Springs are fitted in under frame. During POH of wagon in shops, all the wearing surfaces of Bogie shall be brought to as new condition.

Q.35. VSad oSxu dks ihvks,p djus ls igys LVhfeax djus dh D;ksa vko';drk gS\ VSad oSxu dks

ihvks,p djus dh fof/k dk foLrkj ls o.kZu djsaA


Why steaming is necessary for POH of tank wagon? Explain the POH procedure of tank wagon in details. Answer:-Steaming of Tank Wagon is necessary before POH. If there is any pressure/Residual petroleum product in the tank and work is started without steaming there may be accident due to fire catching in sparking/welding that is why Stem cleaning is necessary. It is cleaning of Tank Barrel from inside with the help of High Pressure Steam.

For safe entry of Staff in Tank Barrel before repairs to be carried out Up gradation of Tank Wagons for Loading Procedure of Steam Cleaning Place the Tank Wagon under Steam Pipe Line. Open the Man Hole Domes & leave tank wagon exposed to atmosphere for 24 hours. Keep the Danger Board near tank wagon indicating Prohibition of working on tank wagon. Insert the Steam Pipe of T section inside the tank wagon barrel. Pass the High Pressure Steam inside the tank wagon barrel for 12 hours. Remove condensed steam collected in tank wagon barrel at interval of 2 hours by opening of bottom discharge valve. Fill the tank with water & drain completely. Ascertain the tank wagon barrel free from gases by performing Bottle Test. Bottle Test Lower the bottle filled with fresh water inside the tank wagon barrel. Tilt the bottle with the help of strings inside the tank wagon barrel to drain water & to fill gases inside it. Leave the bottle inside for about 5 minutes & then withdrawn it. Light up the match stick near the mouth of the Bottle at some distance from wagon. If there is no flame, the tank wagon barrel is free from gases. If there is flame, the tank wagon barrel should be steam cleaned again in same manner. Up gradation It is cleaning of tank wagon barrel to load higher purified product in it. Tank wagons are loaded by furnace oil, coal tar, molasses, etc. If such wagons are to be loaded by higher purified products such as petrol, diesel, kerosene then such wagons are Upgraded for loading Procedure Steam cleaning of tank wagon barrel. Scrap & remove residuals with the help of scrappers & cotton waste. Apply Moiya Oil (EF) from inside the tank wagon barrel. Re-steam cleaning of tank wagon barrel. Apply Moiya Oil (EF) from inside the tank wagon barrel. Clean the tank wagon barrel with high pressure water jet. Clean & dry up the tank wagon barrel with the help of cotton cloth, cotton waste. POH procedure of tank wagon- after streaming of tank wagon it is feed to repair body. Tank barrel are lifted with lifting pad. Trolley/ wheel are taken out. Place tank wagon under frame on trestle Repair, wheel, bearing Repair/grouping spring Repair bogies as per procedure Repair axle guard of four wheeler tank. Dismantle DV brake cylinder/ Air brake equipment and replace with repaired components. Lift wagon and take repair trolley. Lower the wagon. Fit all repair component as per procedure Repair barrel if any as per procedure. Test air brake testing. Other prescribed necessary procedure for final testing.

Q.36 V~ohu ikbZi ,;j czsd flLVe ds dk;Z fof/k dk fp= dh lgk;rk ls o.kZu djsa\
Explain the working principle and system of Twin Pipe Air Brake System with the help of Schematic diagram.

Extra Fitting For Coaching:1) Feed Pipe Dia. 25 mm & pressure: 6 kg/cm2 2) Non Return Valve with Choke: dia. 3 mm 3) Isolating Cock & Dirt Collector for FP 4) Branch Pipe for PEAV & PEASD. 33 PEAV choke dia.: 8 mm (NEW) 34 PEAV choke dia.: 4 mm (OLD) 5) Isolating Cock for PEAV & PEASD 6) Vertical Pipe for Guard Van Valve 7) Guard Valve with Handle & choke dia.: 8 mm 8) Guard Van Valve BP & FP gauge Working Principle Of Air Brake System: Under normal conditions the Brake pipe is charged with 5kg/cm2 from the loco. The control reservoir and the Auxiliary reservoir are also charged with 5 kg/cm2 from BP through Distributor valve in case of single pipe system. In twin pipe system the auxiliary reservoir is charged to 6 kg/cm2 through feed pipe. When the brake pipe is charged at 5 kg/cm2 the brake cylinder is connected to exhaust through distributor valve in order to keep the brake in released position fully. Whenever the brake pipe pressure is reduced below the CR pressure, the DV connects the auxiliary reservoir with the brake cylinder and the air from AR is sent into the brake cylinder to apply the brake. Whenever the brake pipe pressure is equal to CR pressure the DV disconnects the BC from AR and in turn connects the BC with Exhaust for the release of brakes fully. The different processes involved in working of Air brake system:- The processes involved in working of Air brake are a. Charging

b. Application c. Release d. Manual Release During Charging: 35 Brake pipe is charged at 5 kg/cm2 by the drivers brake valve from the Loco. 36 Feed pipe is charged with 6 kg/cm2 37 AR is charged at 6 kg/cm2 (Up to 5 kg/cm2 is charged from both brake pipe and feed pipe. Beyond 5 kg/cm2 & up to 6 kg/cm2 it is exclusively charged from feed pipe. 38 The CR is charged through the distributor valve at 5 kg/cm2 from BP. 39 During charging Brake cylinder is connected to exhaust through distributor valve to keep the brakes in released condition. During Brake Application The brake pipe is reduced in steps as given below When the brake pipe pressure is reduced in steps as shown above, the air from AR is sent into BC to a maximum pressure of 3.8 + 0.1 kg/cm2 during full service application as well as emergency application. During minimum reduction and service application the admission of air from AR in to BC is directly proportional to the reduction in the BP pressure. (i.e. 2.5 times charging of BC as per reduction in BP but it is applicable only up to 1.5 kg/cm2 of pressure drop in B.P.) During The Releasing / Recharging:- During release the BP pressure is increased in steps. When the BP pressure is increased in steps the brake cylinder is disconnected from AR and in turn connected to exhaust. The air from Brake cylinder is released / vented progressively depending upon the increase in the brake pipe pressure. When the brake pipe pressure is brought to 5.0 kg/cm2, air from the brake cylinder is completely exhausted and the brakes are released fully. Manual Release:- Whenever the loco is detached BP pressure is brought to zero and brake application takes place due to the existence of CR pressure at the bottom of the main diaphragm. To release the brakes manually the hollow stem in the DV should be brought to the normal position by releasing the air from CR. To facilitate this, the release valve is given a brief pull which is provided at the bottom of the DV. During this operation the air from CR is released which in turn brings the hollow stem to the normal position to connect BC with exhaust for releasing of brakes.

fofHkUu izdkj ds osfYMax fMQsDV~l D;k gS\ izR;sd dk dkj.k rFkk mldks nwj djus dh fof/k dk o.kZu dhft,A
Q.37. What are the different types of welding defects? Write down the reason and remedial action of each defect? :-Welding Defect, Causes and remedy :These are a number of welding defects which are observed when checking the quality of weld joints. These welding defects result in poor wild appearance and reduction in strength of weld joint. These defects very be divided in to two type. I) External defects ii) internal defects. Welding procedure is the important for fabrication/manufacturing of rolling stock. Due to improper welding. There are many reasons of poor performance of rolling stock. Following are important welding defects, reason/cause of defect and there remedial actions are:Defect Causes Remedies 1. Lack of Fusion (It is the vii) Dirty Surface iv) Cleaning the edges to be

failure of the adjacent layers of the weld metal.)

viii)

Improper cleaning of welded. weld bead. v) Proper cleaning of each ix) Current too low. bead. x) Excessive welding vi) Maintaining proper speed. current & welding xi) . Long Are length speed. xii) Indigent removal of slag

2. Lack of penetration (It is viii) Inadequate joint caused when the weld metal preparation. does not completely fill the ix) Wrong size of electrode. weld cavity. ) x) Low heat input. xi) High welding speed. xii) Long are length xiii) wrong polarity of D.C Supply xiv) Too large dia of electrode 3. Overlap (It is the v) Wrong angle of overlapping of weld metal electrode. beyond the toe or root of vi) Too large deposition in a weld.) single run. vii) Faulty electrode manipulation. viii) Insufficient current 4. Undercut (It. is cutting of a groove into the base metal vi) Too fast welding speed parallel to the of weld) vii) Long arc length.

iv) Proper joint preparation. v) Suitable size of electrode as per root gap. vi) Proper heat input & welding speed.

iii) Keep correct angle of electrode. iv) Use proper size of electrode.

viii) High current. ix) Higher diameter of electrode used. x) Wrong electrode angle . 5. Slag Inclusion Faulty electrode. Wrong current. Rapid rate of welding. Defective weld design. Improper technique. Improper manipulation of flux Bad tack weld Improper removal of slag. 6. Porosity (It is a vii) Wrong arc length. development of a group viii) Inadequate gas small gas pocket in the shielding due to weld.) clogging, jamming or

iv) Use proper current & polarity in case of DC. v) Use proper diameter electrode. vi) Proper angle of electrode.

iv) Proper current & heat input v) Proper design & technique vi) Proper cleaning of weld.

iv) Maintain proper arc length & correct polarity when welding with DC. v) Clean the surface

7. Blow holes. (Porosity or cavities are called blow boles.)

8. Cracks.

9 CRATER (It is a depression caused at the termination of a weld bead.)

hose leaking ix) Too high current x) Excessive moisture in the electrode. xi) High rate of weld freezing xii) Dirty joint a) Improper electrode b) Less current c) Excessive moisture in electrode d) Improper grove formation in butt weld. xii) Rapid cooling xiii) Improper composition parent metal. xiv) High welding speed. xv) Electrode with high H2. xvi) Excusive localized stress. xvii) High rigidity of the joint xviii) Concave, wide or shallow bead. xix) High carbon sulphur and silicon content in metal. i) high current ii) Wrong size of electrode ix) Wrong electrode angle x) Rapid withdraw of electrode.

properly vi) Check for proper gas supply & leakage

-do-

vi) Avoid rapid cooling by preheating. vii) Maintain proper welding parameter viii) Use low hydrogen electrodes.

i)Set proper current ii) Select proper size of electrode as per thickness of plate & proper angle

10 SPETTER (It consists of i) high current metal particles expelled from ii) moisture in electrode welding.) iii) Long arc length 11 Warping (To twist from a) Improper sequence of true direction ) welding and presetting. per sequence of welding c) Incorrect edge preparation.

Proper Current Baking of electrode set proper arc length

Q.38 ,uMhVh D;k gS\ fLizax ckj dh VsLV djus dh ukWu MsLVsDVho VsfLVax D;k&D;k gSaA

DokW;y fLizax dh esXusfVd ikVhZdy dh VsfLVax djus dh fof/k dk o.kZu djsaA


What is NDT? What is the non destructive testing for testing of spring bar? Explain the magnetic particle testing method of coil spring.

Ans :N.D.T. is a po werful tool for reducin g costs. Improved product quality an d maintaining quality level. It is an accep ted decision m aking tool of scien tific managem en t. Quality is the totality of featu res and characteristics of a product o r service that bears on its ab ility to satisfy a given n eed. This definition is based on Fitness fo r u se concep t of product quality. In sprin g m anu facturin g pro cess the NDT used in two stages. Before manufacturing of spring the raw m aterial (steel b ar)is tested b y edd y curren t testin g ,the process of Edd y Current Testing is follows:Edd y cu rrent tests can be carried ou t on all materials which condu ct electricity. They h ave been used for crack d etection .The part to b e in sp ected is placed or ad jacent to an electric co il in which an alternating current is flowing. This alternating current, called th e exciting current, causes edd y cu rrents to flow in th e part as a result of electromagn etic induction. The change in flow of eddy current , is caused by the presence of a crack in a bar. When the bar travels along the length of the inspection coil and if no crack is present, the flow of eddy currents is symmetrical, where a crack is present in the bar the eddy current changes significantly changes in the impedance of the primary coils. The defective bar is automatically discarded by automatic plant . After manufacturing of coil spring the quality of spring is checked by magnetic particle inspection method. In this method the surface and sub surface cracks are present, is to be detected. magnetic particle inspection (magna flux) principle :Magnetic particle inspection is a technique used for testing ferromagnetic materials. The technique is basically simple and easy to operate. The spring is suitably magnetized and magnetic lines of force or magnetic flux of enough density is made available. Discontinuities in the path of the magnetic flux create a disturbance in the uniform magnetic field causing flux leakage. The flux leakage set up of magnetic poles attracts iron oxide powder when dusted over the testing zone and form a line on discontinuity. Testing Method :(i) Head shot method In this method, current is passed through the spring and this induced directly a circular field. In this position the iron oxide powder suspended in kerosene or in other carrier liquid is spread on the spring. If the crack is present perpendicular to the magnetic field, is detected in this examination. (ii) Central conductor method This is used for hollow components like coil springs. A circular field is generated and induced indirectly in to the components and can be used for detecting discontinuities that are parallel to the central axis of the springs. Testing is done always on two directions to ensure that the discontinuities in different directions are suitable covered. The defective springs are rejected. Demagnetization:- Springs tested by this method retain some residual magnetism. It is necessary that springs should be demagnetized. For this purpose reversing magnetizing force sufficient to overcome the original field. It is done by reversing current direction. Advantages(i) It is simple, cheap and fast method to detect surface cracks. (ii) This test can be carried out in finished condition. (iii) It is the best method to detect cracks of all directions. LimitationsThere are certain limitations for using MPT methods. It can detect only surface opening and sub surface in ferromagnetic materials .For best results, the magnetic field must be in a direction that will intercept the discontinuity at 900.

Q.39 czsd ckbaZfMax D;k gS\ czsd ckbaZfMax dh leL;k ls futkr ikus ds fy, mlds dkj.k rFkk

fuokj.k dk foLr`r o.kZu djsaA


What is brake binding? Explain the reasons of brake binding and remedial action to overcome this problem. BRAKE BINDING BRAKE BINDING: It is the phenomenon of binding the wheels by the brake gear system or when brake block is in contact with wheel tread while the drivers brake valve is kept in released position. Hence undesired braking of wheels by brake blocks is called Brake Binding. Implication of Brake Binding in the Railway System: It has the direct bearing on the punctuality of trains. Nearly 30% cases of C&W punctuality losses were only on account of Brake Binding. Besides punctuality loss, other consequences of brake binding on the Railway System are as under:Damage to the wheels & sometimes coach detachments resulting revenue loss. Harassment to the passengers due to coach detachments resulting in their stranding in midsection or change of coach. Poor Riding quality. Damage to the track. Damage to the Rolling Stock components such as Roller Bearings, springs etc. More tractive force needed to the locomotive. Unpleasant sound to the passengers. Following are the factors causing Brake Binding in the coaches:C&W: Mal function of DV causing late release or leakage. Improper mounting of DV on common pipe bracket. Mal functioning of SAB. Isolating cock not working. Leakage in the brake system. Improper release of the rake while attaching/detaching/loco change by TXR staff at TXR stations. Defects in brake cylinder. Defects in dirt collector. Defects in brake gear. LOCO & ITS OPERATION: Not giving proper release time after application. Variation of pressure/vacuum level during run/loco change. Malfunctioning of air flow meter resulting in non indication of ACP/leakage in brake system. Not stopping and resetting ACP/leakage after noticing air leakage through AFI. Inadequate pressure/vacuum creation/maintenance capacity of locomotive resulting in higher release time of the brakes. Driver misreporting brake binding to camouflage some other failure. Improper release of the rake while attaching/detaching/loco change by driver at non-TXR station. OPERATING: Guard misreporting brake binding to camouflage some other failure. Improper release of the rake while attaching/detaching/loco change by guard at non-TXR station. Attachment of unexamined/untested stock after train maintenance and testing, especially

VPUs and other special stock. Not locking SLR guard cabin resulting in unauthorized persons traveling and tempering with Guard valve and hand brake. LAW & ORDER Frequent ACP operation. Operations of DV handle for brake application during run. Closing of angle cock in the coach ends. Operation of hand brake from SLR by unauthorized occupants. MISCELLANEOUS: Hitting by ballast/foreign material resulting in breakage of dirt collector/ drain plug of AR/other brake system components. Cattle run over resulting in damage to brake system. Following measures should be taken to minimise brake binding incidences:Ensure proper maintenance of DV a. Check holes of common pipe bracket are one-to-matched with the corresponding location on the Common Pipe Bracket (CPB) seal. b. Check collars provided on the CPB seals are uniformly projected. c. Use small quantity of hard grease on the CPB before positioning of the seal to avoid displacement while mounting. d. Check that release choke is clear. e. Overhaul/Repair distributor valve with intermediate flange as a single unit. f. Check holes of Intermediate flange seal are one-to-one matched with respective location in the distributor valve. g. Check collars provided on the seal are uniformly projected. h. Check the valve is free from rubber bulging or debonded for valve plate (10) in KE type or valve (37) in C 3W type. i. Check for smooth movement of hollow stem in its guide during assembly. This may be ascertained by: i. Movement of hollow stem. Check that hollow stem is not bent. ii. Check that outer surface of the hollow stem is polished. iii. Apply light coat of thin grease on the hollow stem. Check the condition of CPB filter. This is ascertained by: j. Clean CPB filter in every schedule. k. Clean vertical passage in CPB. i. Identification of late releasing DVs during maintenance. ii. Locking of Distributor Valve isolating handle. iii. In the POH phosphate and re waxing of the Distributor Valve Body to be done to avoid corrosion. Proper inspection of dirt collector l. Clean Dirt collector in every schedule. m. Provision of Dirt Collector cover. Proper inspection of brake regulator n. Identification of sluggish Slack Adjuster. o. Check that the barrel has no dent. p. Confirm that Traction sleeve passes smoothly inside the entire length barrel during assembly. q. Check axial play of the Adjuster nut with the spindle. Since actual measurement is difficult, excessive play must be felt while assembly. r. Make sure that the adjuster nut falls freely along the spindle when held vertical.

Brake gear system s. Adjust end pull rod hole and maintain length of pull rod such that the Equalising levers be in near vertical in brake applied position. t. Ensure that the Z-lever pins used with Equalising levers are polished. u. Ensure the corresponding bushes are without any oblong deformation. v. Radial clearance is maintained within 0.75 mm. w. Ensure that the Actuating rod is not twisted. The straightness is realized by smooth fitment of the Actuating rod with the both Equalising levers with the pins. Brake Cylinder x. Identification of sluggish brake cylinders during maintenance. y. Breathing passage clearing can be ascertained by avoiding greasing of Trunk during assembly and cleaning annular space between Trunk and Front cover Locomotive z. Check for fluctuation in BP pressure. aa. Check for moisture/oil/dirt content in compressed air. bb. Dynamic Brakes of the locomotive should be operative. cc. Ensure proper working of air flow indicator and audio visual system. dd. Locked axle of the locomotive is avoided. Train Handling ee. Wait for one minute at least after moving brake valve handle to release position after emergency application. ff. Avoid extended application of the pressure surge to avoid over charging. gg. Keep close watch in the air flow indicator to monitor incidence of excess leakage. hh.Keep close watch in the Ampere meter reading for high current. ii. Keep vigilant on tampering DV isolating handle position. jj. Drain condensate from air reservoir, oil separator and filter. kk. Open drain cock slowly so that condensate is carried out with the air. Modification in coaches ll. Brake Binding Indicator should be provided on every coach. mm. Hand Brake application indicator should be provided on every SLR. ACP system nn.Oversize choke of the ACP be eliminated. oo. Resetting key should be welded on the coach itself to properly reset the ACP. pp. Proper releasing of coaches should be ensured after every ACP on the adjoining coaches also. Training to the staff C&W as well as operating & loco staff. BP/FP pipes qq. The B.P. & F.P. should be secured with T bolts to avoid decoupling en-route. rr. Proper examination of feed pipe &brake pipes during maintenance. System Improvement ss. Introduction of Rolling out Examination to detect the coaches which are going in Brake binding condition. Also Rolling-In-Examination be ensured. tt. Moisture separator/Air Dryer should be provided in all the locomotives & R.T.R pipe lines to avoid ingress of moisture in the air Brake system. uu.Proper releasing of rakes on the platform and on washing lines after maintenance. vv. Pre-tested slack Adjuster and Distributor Valves should be replaced on the coaches, ww. Coaches attached from the yard should be tested with the rake on W/Line.

Others xx. Provisions of Quick Release pull rods. yy. Pressure relief valve on the pipe line between Distributor Valve &the brake cylinder should be fitted so that the excessive pressure beyond 308 kg/cm2 is avoided. Pad locking of Guard cabin of the front SLR should be ensured by the Operating.

Q.40 ckWDl ,u oSxu dh ihvks,p djus dh fof/k dks la{ksi esa o.kZu dhft,A 90 Mst fld

ekfdZax dks de djus ds fy, vki D;k dne mBk;saxsA


Explain the process of POH of BOXN Wagon. What step would you take during POH to reduce the 90 days sick marking? POH of BOXN wagon The train has been offered for POH by Traffic Department. The following pre inspection by inspection department:-Inspection of running gear fittings. -Inspection of brake gear and spring gears. -Inspection of draw and buffing gear. Checking and marking the deficiency of safety fittings, safety brackets, safety loops, etc. Identified Plain bearing warm axle box should be opened for examination. -Look for abnormal and /or unequal buffer heights/CBC height, wear plate knuckle, etc. to the extent it is possible to detect by visual examination. In case of doubt, the buffer height/CBC height should be measured. Meticulous check of brake cylinders, distributor valves, auxiliary reservoir control chambers and other pipe points should be carried out to . The wheel profile should be examined visually. If any defect is noticed, it should be checked with tyre defect gauge and wagon to be marked. The bogies, complete side frames and bolsters to be visually examined for cracks and missing parts. Bolster springs, snubber, spigots, centre pivots fastening, roller side bearer in case of CASNUB 22 bogie to be checked for defects, if any. Examine brake rigging components with special attention to break beam deformation and wear on integral brake shoe bracket. Check intactness of the pull and push rods with pins, washers, split pins and cotters, etc. Hand brakes must be checked for smooth and effective operation. Visual examination of under frame members, body, door mechanism, CBC wear or deficiency of parts to be marked. After this inspection the inspection department categorized the wagon into light and heavy repair wagon. According to this light and heavy repair wagon, distributed to nominated section. Yard Section:-shunting of wagon from yard to nominated section Striping section :- heavy repair wagons comes to this section for cleaning and cutting the defected/rusted patch aces, roofs, floors & other marked parts. After cleaning and cutting of those marked portion wagons are shunted to the nominated section. Wagon Body The superstructure attached to the under frame of a wagon is called wagon body. Apart of superstructure of wagons involved in accidents or other serious mishaps, attention is normally in this shop. In this shop body is dismantled from bogie and kept on tarsal for body repair work.

Body Underframe It constitutes the main load bearing sub-assembly for the vehicle Thorough inspection of under frame is to be carried out. Major repairs as well as all defects and deficiencies that come to the notice must be given meticulous, thorough attention and attend Bogies And Suspension in bogie section the bogie should be dismantled. Dismantling and assembly procedure is given in parameter. All the wearing surfaces of bogie shall be brought to As New condition, the bogie clearances and tolerances should be checked and rectified, if found necessary Re-assemble the bogie by re-raising the procedure as above. Assembled bogie Inspected all the load and snubber springs for proper seating after wagon body is on bogies Wheel Assembly: - An axle is a long steel bar to hold a pair of wheels in position. Examination and maintenance of Axle, CTRB and wheels should be done as per IRCA parameter. Air Brake System : - The Air Brake goods stock on BOXN is at present fitted with single pipe graduated release air brake system. In single pipe, brake pipes of all wagons are connected. Overhauling of Distributor valve, Common pipe bracket with control reservoir, Auxiliary reservoir.(100 Liters), Three way centrifugal dirt collector, Isolating cock, Brake cylinder (355mm diameter), Cut off angle cock (32mm size on either ends of brake pipe), Air brake hose coupling (32mm for brake pipe), Brake pipe (32mm dia), Branch pipes from BP to brake equipment (20mm bore) as per guideline of RDSOs G-97. Use new rubber items for joints between pipe and equipment irrespective of condition of old items. Brake Rigging: - The Brake Rigging is provided to control the speed of a wagon by transferring the braking force from Brake Cylinder to wheel treads. All Body Under frame Components are examined and inspect visually as per guideline of RDSO and attend any type of problem. DRAW AND BUFFING GEAR: - Check all draw gear components for correctness and ensure that they are properly assembled. These are done by as per guideline of RDSO G-80 for workshop staff Inspection and Maintenance of Centre Buffer Couplers BG stock. When all parts are repaired as per given parameters we started Re-assemble of all parts by re-raising the procedure as above. Finally NTXR check the wagon thou rally. Then wagon shunted to painting shop for paint it. 90 days sick marking 90 days sick marking is the reliability performance of workshop. If the wagon mark sick within the 90 days period after POH is known as 90 days sick marking. The wagon marked sick under the following defects: Defect Defect code Wheel defect A Suspension defect B Spring gear defect C Cartridge bearing effect D CBC draft gear defect E Beak gear defect F Body defect G Following Measure Should Be Taken To Reduced The 90 days Sick Marking.

Wheel defect: The percentage of sick marking is represented the quality of work. To reduce the sick marking under this category, the defects i.e. sharp flange, thin flange skidded wheel, radius less as root, hollow tyre , flange broken, bent axle and other defect should be attend properly during POH .All wheels should be profiled properly. Suspension defect: Under this category the defect observed in suspension system i.e. axle guard crack, bridle bar crack, pivot top broken, side bearer rubber pad crashed, wage block broken, EM pad pressed, wear liner crack and bolster pocket liner/column worn out all above item should be properly attend during POH as per repair practices/RDSO Manual. Spring gear The defect in spring gear that is outer inner and snubber spring should be paired with proper load test and other defect observed in spring (crack or dent) spring should be replaced to minimize the sick marking under this category. Cartridge bearing defect: The defect in CTRB i.e. hot axle grease, seal defect, outer cage broken and other defect CTRB should be properly attended during POH period, mounting pressure, lateral clearance should be checked properly, grease seal should be replaced 100%, Non HT axle cap screw should not be used .Bearing should be repaired as per RDSO manual. CBC, Draft gear defects: The defect in CBC and Draft gear i.e. draft gear broken/dead, sank broken, sticker casting liner, support plate rivets broken or cracked and yoke broken/cracked should be examine and repair properly. Only HT draft gear i.e. RF361, Mark 50 should be use. Brake gear & Air brake system defect: The defect under this category i.e. slack adjuster defect, brake cylinder defect, DV defect, angle cock broken, leakage in drain plug, leakage in brake pipe should be properly attended during POH .All air brake equipment should be repaired and tested as per RDSO manual and record should be maintain. Body defect: The defect of wagon body i.e. head stock sole bar, roof , side wall, end wall, floor and door defect should be properly attended during POH to minimize the sick marking under this category. The quality of the welding during POH should be improve by proper selection of current, selection of the welding material, preheating of the electrode, using MIG welding set.

Q.41. dksjkstu D;k gS\ blds D;k&D;k dkj.k gSa] bldks de djus@jksdus ds fy, D;k&D;k

mik; fd;s tkrs gSa] foLr`r o.kZu dhft,\


What is corrosion? What are its causes? Describe the measures to be taken to reduce/minimize the corrosion Definition Of Corrosion: Corrosion may be defined in several ways: (1) Destruction or deterioration of a material and consequent loss of solid material, through a chemical or electrochemical attack by its environment, starting at its surface. (2) Destruction of materials by means other than straight mechanical. (3) Extractive metallurgy in reverse. Definition (1) and (2) are preferred because they cover ceramics, plastics, rubber, and other nonmetallic materials. For example, deterioration of paints and rubber by sunlight or chemicals, fluxing of the lining of a steel-making furnace is all considered to be corrosion. 2. Classification Of Corrosion Corrosion has been classified in many ways. One method divides corrosion into (a) low

temperature and (b) high- temperature corrosion. Separates corrosion into (a) Direct Chemical Corrosion or Dry Corrosion. (b) Electrochemical corrosion or Wet Corrosion. Dry or direct chemical corrosion This type of corrosion occurs through the direct chemical action of environment/atmospheric gases as oxygen, halogen, hydrogen, and hydrogen sulphide, sulphur dioxide, and nitrogen with metal surface in immediate proximity. There are two main types of direct chemical corrosion. i) Oxidation corrosion. ii) Corrosion by other gases. i) Oxidation corrosion: It is brought about by the direct action of oxygen at low or high temperature on metals, usually in the absence of moisture. At ordinary temperatures, metals, in general, are very slightly attacked. However, alkali metals (Li, NA, K, Rb, etc.) are rapidly oxidized at low temperatures. At high temperature all metal (except Ag, Au, Pt,) are oxidized. The reactions in the oxidation are: 2M2Mn+ +2ne(Loss of electron) Metal ion nO2 + 2ne- 2nO2(Gain of electron) Oxide ion or 2M+ nO2 2Mn+ + 2nO2Metal ion Oxide ion |__________| Metal oxide Absorption of oxygen : Rusting of iron in neutral aqueous solution of electrolytes (like NaCI solution) in the presence of atmospheric oxygen is a common example of this type of corrosion. The surface of iron is coated with a thin film of iron oxide. However, if this iron oxide film develops some cracks, anodic areas are created on the surface; while the wellmetal parts acts as cathodes. It follows that the anodic areas are small surface parts; while nearly the rest of the surface of the metal forms large cathodes. At the anodic areas of the metal (iron) dissolve as ferrous ions with liberation of electrons. Fe Fe2+ + 2e(Oxidation) The liberated electrons flow from anodic to cathode areas, through iron metal, where electrons are intercepted by the dissolved oxygen as: O2 + H2 O +2 e--2OH(Reduction) + The Fe ions (at anode) and OH ions (at cathode) diffuse and when they meet, ferrous hydroxide is precipitated. Fe+ +2OH-Fe (OH) 2 If enough oxygen is present, ferrous hydroxide is easily oxidized to ferric hydroxide. 4Fe (OH) 2 + O2 +2H2O4Fe (OH) 3 Measure to be taken for Corrosion Prevention: Since corrosion is essentially due to attack by environment, the basic approach to prevent corrosion involves control of the metal or control of the environment or providing a suitable barrier between the metal and the environment. Also control on the electrochemical nature of corrosion and finally the design consideration plays a major role to reduce corrosion. The corrosion can be prevented & controlled by the following methods. 1) Material Selection. 2) Protection by design & Fabrication procedure. 3) Alteration / modifying corrosive environment. 4) Cathodic protection. 5) Sacrificial anode Method. 6) Application of protective coatings. 7) Purification & alloying of elements.

8) Latest Anti-corrosion modifications are as followed :a. Plugging of holes (Drain holes) provided on floors b. Use of drip trip plate on sole bar at the location of all doors. c. Provision of BOX section stiffener above doors and three vertical channels on it d. Provision of crib angle at bottom site of the floor adjoining with side & end-wall. e. Provision of stiffener (Gusset Plate) from inside and outside at the top corner of the wagon body.

Q.42. fLizax LVhy ckj ls Lfizax cukus rd dh laiw.kZ izf;k dk o.kZu dhft,] blesa viuk;s

tkus okys lHkh ekinaMksa dk o.kZu djsa


Write down the complete manufacturing process of spring from spring steel bar. Explain all parameters to be considered during this process? Ans. The springs are made of round bars of fine grained special quality spring steel ( The material may be consist of chrome vanadium, chrome molybdenum or silico-magnaese spring steel Bar is converted in a coil shape by various operations. Generally the steel bar manufacturer supply the spring steel round to the specified length and composition ordered by the spring manufacturer. After receiving of material at site the bar is to be checked or examined by the chemical and metallurgical lab. The procedure of manufacturing of spring step by step as below. 1) End cutting of bars :- Generally the spring bars are supplied by the supplier. During transportation bar gets cracks on its edges. It is necessary that bars end must be crack less. At this stage bars may be cut to length by shearing carefully so as to prevent cracking at the ends. 2) Straightening :- Straight bar is required for spring manufacturing . So each bar is straightened at bar straightening machine. 3) Peeling:- The bar is peeled off at peeling machine for a good, regular and defect free surface. 4) Centre less Grinding:- Peeled bar again grinded by a centre less grinding machine before this bar takes a shape of coil at coiling machine. Before coiling it is mandatory that surface finish of the grinded bar is 5 microns. Grinding shall be 3% of nominal bar dia. or 1.0 mm whichever is higher 5) Bar crack deduction:- After peeled and grinded the bar is sand for the crack detection at crack detection machine . This is done in magna flux machine. The bar passed through magnetized portion. If there is any type of surface crack present in bar is deducted in this machine. 6) End Tapering:- Both of the ends of grinded bar are tapered either by taper rolling or by die forging. 7) Stamping:- It is a process of coding on spring which is applied at in-effecting coil. The serial order in which the particulars are stamped as below 8) XX XXX XXXX XXXX. From left 02 digit for internal name (CV,SM), 03 digit for manufacturing code like X01, X02 ,X03 etc. Next 04 digit for month and year i.e. 0112(for jan 2012) and last 04 digit referred to Drg no. 9) Bar heating:- Tapered ends bar is heated in bar heating furnace up to specified heating temperature . The heating temperature is 830 0 C to 8600 C. 10) Coiling:- A red heated bar comes out from bar heating furnace and rest on a preheated mandrel which is the part of high speed automatic coiling machine. Bar is guided by a guide roller in automatic coil operation. Bar takes a shape of specified uniform pitched

coil . 11) Quenching:- A red heated coil is a very mild condition so it need to be hard for this the spring is quenched in oil bath or suitable medium conforming to standard specification.The temperature of quenching bath not more than 800C.It should be necessary to achieve 90% martensite structure 12) Tempering:- During the coiling process the grain structure of bar is deformed due to twisting and internal stresses developed. To achieve a homogeneous fine grain structure in the spring. It need to temper in tempering furnace below lower critical temperature of steel . The tempering temperature is 3500C to 4500C. 13) Hardness testing:- Tempered springs are dipped in a water tank for a carburizing process. After heat treatment, the hardness of the spring is tested by lab staff by using Brinel hardness tester(BHN). The hardness of the spring should be in the range 380 BHN to 440 BHN for silico manganese steel and 415 BHN to 460 BHN for chrome vanadium/chrome molybdenum spring steel. 14) End Grinding:- After hardness testing , both the end faces of the spring are grinded the actual grinded surface is kept at least 75% of mean coil circumference of the spring. 15) Shot Penning:- Now springs takes into continuous type shot penning machine where it shot penned by high intense shot to improve fatigue strength of spring. 16) Magna Flux Testing of spring :- Springs are tested by magna flux testing machine to detect the surface and sub surface crack in the springs. 17) Scragging :- Each and every spring is scragged at home. In this operation spring is compressed 03 times holding it at the home load. All the coils of spring is contact with another. Excluding the inactive coils. 18) Pre load testing :- The spring placed on a flat rigid metal support is subjected to incremental increasing load up to the specified bearing load so each spring is tested on its load , and loaded height of the individual spring is measured. 19) Black paint :- After the above operation springs are painted by black paint in the painting plant. 20) Grouping of colour :- The spring is painted with a suitable colour code for identification as per specified in the document. 21) Dispatch :- In the last stage, springs are packed in suitable box with its RDSO code . Now springs are ready to dispatch.

Q.43 fLizax cukus ds fy, eVsfj;y dk p;u dSls fd;k tkrk gS\ vkbZ-lh-,Q cksxh dh cksysLVj fLizax cukus ds fy, dkSu lh lkexzh dk iz;ksx gksxkA fLizax cukus dh fof/k dk foLr`r o.kZu dhft,\
How material is selected for manufacturing of spring? What material is used for manufacturing of ICF bolster spring? Explain the spring manufacturing process in details. Following step should be taken for Manufacturing of Helical Spring Selection of Spring steel bar to IS-3195 grade crome vanadium spring steel Cut the bar as per specified length Straitening the bar as per specified value 1.5 mm/met. Peeling of bar peeled bar 3% of bar dia or 1mm which ever is more Centre less Grinding Grind the peeled bar for smooth surface roughness should be less then 5 micron. Magnetic Particle testing:-The peeled and ground bar shall be subjected to magnetic particle

testing by florescent wet method. The test procedure for detecting surface and sub surface defect should be as per IS 3703. End Tapering: - Both the end of the ground bar shall be tapered by taper rolling machine to give the finish of spring about 75% firm bearing. The taper face should be smooth and should not have step pits or cracks. The tip thickness of taper end bar end grinding should not less than one fourth of nominal bar dia up to 33mm and 1/5 th beyond of 33mm. it is to ensure that the tip thickness of the finish spring does not in any way affect the load test requirement. Stamping :- The following material code shall be followed for Stamping: CM for chrome molybdenum SM - for silico manganese The serial no, drawing no, drawing code, month and year of production and manufacture code is also stand. Heating and Coiling: The spring steel bar with taper end should be heated in oil fired walking beam furnace with variable speed and soaked sufficiently at temperature in a controlled atmosphere so that excessive scaling and decarburization do not take place. The furnace in which the bar heated for coiling and heat treatment should be equipped with automatic temperature indicator, controller and recorder. Temperature of Quenching media should not exceed more than 800C Tempering the spring: After Quenching shall be conveyed immediately through a continuous conversed tempering furnace. During the tempering spring shall be treated to desire predetermine temperature and for a sufficient length of time to produce the require spring hardness throughout the section. The furnace should be oil fired with automatic temperature indicator, controller and recorder. In order to ensure proper heat treatment of spring as specified. The total depth of decarburization partial plus completed on the finish spring in the quench and tempered condition shall not exceed 0.5% of bar dia. The hardness of the steel 415 to 460 BHN for chrome molybdenum. END Grinding: Both the end faces of spring should be ground to ensure square seating of the spring. The actual ground and surface shall be at least 75% of the mean coil circumference coil spring. Scragging : Each and every spring should be scrag 3 times in quick succession . The scragging load should not exceed 1.5 times the theoretical axial load. For long during scragging the spring shall be compressed 3 times holding it at home load for 2 min for first 2 stroke and 48 hours at the last stroke. The scragged spring should not so further permanent set on subsequent loading. Crack Detection: 100% springs shall be tested for crack detection by the megna flux test Shot peening: All the spring shall be shot peened in a continuous type shot peening machine in accordance with IS-7001 to fatigue life of spring. Load Testing, Grouping and Colour coding: 100% of spring shall be compressed with specified working load and the loaded height of the individual spring shall be measured. The spring shall be grouped and painted with suitable colour code for identification. Any spring which is found to be defective or which does not confirmed the test should be rejected.

Q.44 fdUgha nks vk/kqfud osfYMax rduhdksa dk o.kZu djsa] bu osfYMax rduhdksa ds nkSjku osfYMax

ds nks"kksa ls cpus ds fy, D;k&D;k lko/kkfu;k cjrh tkuh pkfg,] foLrkj ls fy[ksa \
Explain any two modern welding techniques. What precautions should be undertaken to ensure that welding defects are avoided during these welding processes? Ans:- Modern welding techniques are :- Submerge are welding, Plasma are welding. Submerge are welding :- SAW is an arc welding process that produces a coalescence of metals by heating then with an are or arc between a bare metal electrode a electrodes and the work pieces. The arc and molten metal are shielded by a blanket of granular fusible material on the work pieces. The filter metal is obtained from melting the solid electrode wire and sometimes from alloying elements in the flux. The submerged arc welding process is capable of welding low and medium carbon steels, nickel and nickel alloys, low alloy and high strength steels and many stainless steels. It is also used for hand surfacing and overlay operations. Steel up to 12.5 mm thick can be welded without edge preparation. The process is normally limited to the flat and horizontal fillet positions because of the flux used to shield the weld puddle. The Process produces a smooth weld bead with no spatter. Plasma are welding :- Plasma are welding is an are welding process that produces coalescence of metals by heating them with a constricted are between an electrode and the work piece so that electrode and the constricting nozzle. Shielding is obtained from the hot ionized gas issuing from the torch which may be supplemented by auxiliary sources of shielding gas. Shielding gas may be an inert gas or a mixture of gases. Pressure may or may not be used and filler metal may or may not be used. Precaution to avoid defects: Plasma are welding:Inert gas usually argon is used as the plasma gas. Filter metal composition should be match the base metal. The size of filter metal rod should be taken as the current and joint thickness. Torch protection devices include water and plasma gas pressure switches which interlock with the container. Precaution to avoid defect during submerge are welding: Dry the flux and feed wise and degrease the work piece. Clean the joint edges immediately before welding. Ensure welding current is sufficient for the weld pool to prevent penetrate fully the root. Wire feed speed and travel speed should be adjusted as per the thickness of job and size of joint. Filler wire composition should be matching the base metal.

Q.45 orZeku esa jsyos dkj[kkusa esa ykxw izksRlkgu Ldhe esa D;k&D;k dfe;k gSa] bu dfe;ksa dks

nwj djus ds mik; ds ckjs esa vius lq>ko fy[ksa] d`i;k bl ckr dk [;ky j[ksa fd blls deZpkfj;ksa dh vk; esa dksbZ deh u gks \
What are the demerits of existing incentive scheme in workshop, suggest your views to remove these demerits. Ensuring that there should be no reduction of earning of the employee Answer :- Incentive Scheme CLW Pattern incentive scheme introduce in 1961 the main purpose of incentive scheme was to increase the productivity without increasing man power and proper utilization of assets by giving incentive bonus to the worker. The purpose of the scheme was good quality of work but it has not serve the purpose. The quality of the work is totally decreasing day by

day and earning of bonus is the main issue of interference of union. The job cards on which losses occur are destroyed & not accounted for. Hand written job cards are issued. They can be manipulated. Time entry on job cards is done by hand. This can be manipulated. Direct workers are shown as EIW & IW, without much justification and prejudice of the worker. Allowed times are not revised even on the introduction of advance machine tools with better tooling. Allowed times are claimed for complete machining operation even if the casting is rejected on the very first cut. Excess repairs are certified by stage inspectors. Right quantity of the job are not mentioned Proper inspection of the material is not and allots time and quantity is given by understanding brotherhood. Management has often failed to arrange the raw material, tool, M&P & material handling equipments. Suggestion for more effective of incentive scheme CLW Pattern of incentive scheme is very old and required to be review & should be replaced by Group incentive scheme. Whether a list of items to be manufactured or repaired in the sections/shop should be counted physically and record of the same should be maintained which incentive scheme is proposed to be introduce, has been prepared. Adequate load to meet the increased capacity generated as result of introduction of incentive scheme should be ensured. Computation & the time studies have been carried out should be implemented. Issue of job card on work order should be review properly. Work of inspection department should be review and quality as well as quantity work should be look after by the shop supervisor/worker it self. It will give the system of quality control to the quality insurance. allowed times should be reviewed time to time as and when new technology is introduce. Whether the strength & categories indirect workers & essential indirect workers have been approved by Chief Mechanical Engineer. Whether the strength & the categories of staff of indirect workers including those declared essentially, indirect have been fixed as a result of proper analysis. Whether the strength & categories of staff of direct workers have been determined with reference to the work load on the different load centers & sections. The No. of effective hours, available per shift peer month will be taken as 200 & with the addition of 33.3% representing the average efficiency under incentive scheme, 267 man hours per man per month shall be the basis for working out the number of direct workers. Whether the number of supervisors has been determined according to actual need keeping in view of the overall ratio of supervisor to 18 workers. Whether regular supply of raw materials has been ensured. Also whether arrangements have been made with the stores departments for their reservation before the release of work orders. Whether a system of periodical oiling of machines, tools & plants & other preventive maintenance measures have been introduced. Whether a proper system of inspection has been introduced. Whether the punching clocks have been Installed & booth erected.

Q.46 ckWDl,u oSxu ds vuyksMscy gksus ls vki D;k le>rs gSa\ bl leL;k ls funku ikus ds

fy, vki D;k lq>ko nsaxs


What do you understand by unloadable of BOXN Wagon? What will you suggest to over come these problems? Ans :- wagon comes in a workshop for NPOH/POH/ROH. After one of these operation/ process, the wagon. is handed over to trafic deptt of concerning railway If with this performance guaranty that wagon will perform with reliable, respective manner at least 90 days without failure. if wagon is get sick this is called 90 days sick marking& same is reflected in IRCA Report. schedule repair of POH &ROH is done at the schedule interval if wagon become sick due to any reason &not fit for running before schedule repair of POH &ROH is called unloadable. In this situation the freight/good cannot be loaded in the wagon. The main reason of unloadable is body damage the wagon is booked for NPOH non schedule overhauling if POH is not carried out in a proper manner and due Attention problem of unloadable will continue and performance of workshop will be effected adervers .in addition to this railway revenue will be loose Man power loss- the man power is increase due to unloadable wagon more man power is again need of to the particular previous work. suggestionthe main reason of unloadable areBody defect- wagon body damage due to mishandling on tipplers side wall should be replaced if more than two side stanchion are defective /damage during POH material must be checked before use according to RDSO specification poor material quality is also one cause of sick wagon. All anti corrosion modification should be carried out during POH/ROH CBC and draft gear proper overhauling of CBC component &draft gear component worn out component should be replaced In view of unloadable wagon above preventive steps, can be taken to avoid the problem of unloadable wagons.

Q.47 vkidk jsyos esa orZeku esa D;k jksy gS\ vkidk vius dk;Z dh n{krk rFkk laLd`fr c<+kus

esa D;k ;ksxnku gS\ vki ,d vf/kdkjh dh Hkwfedk dks fdl izdkj ns[krs gSa] ;fn vki p;fur gq, rks fdu eq[; {ks=ksa esa lq/kkj djsaxsA
What is your role at present in railways? What is your contribution to increase production and efficiency in your work? How you see the role of an Officer if you are selected which area you will improve? Productivity can be defined as ratio of out-put and Input. The productivity of a coaching depot or diesel shed or workshop is dependent upon the utilization of man power, material, machinery and other infrastructural facilities available in the unit. The productivity of a field unit can be judged from cost of maintenance per unit (Unit can be coach or wagon or loco). Or man power required per unit out-put. To improve the productivity, optimum utilization of all the resources is required. The increase in productivity can be achieved if there is a) An increase in out-turn with the same staff or budget without effecting the quality Or b) A decrease in cost of maintenance per unit without effecting quality Or c) The out-turn and quality remaining same, the staff is reduced Or d) The quality level is improved without any additional input. For improving the productivity of a field unit, the following steps will be taken :1) Bench marking of all the activities comparing with the best field unit and incorporating the best practices. 2) Motivating the people through positive and negative enforcement like rewards and punishments. 3) Creating high jobs satisfaction among employees. Job satisfaction is a set of favorable or un-

favorable feelings with which the employees view their work. The job satisfaction among employees can be measured with the help of surveys. This is a method by which the employees report their feelings towards the job and work environment. The management can increase job satisfaction by taking appropriate measures. 4) Participation of staff in decision making. 5) Proper delegation of authority and division of work to avoid duplication of work. Each person should do his duty. The day to day functioning should be left to supervisors and officers should devote time to achieve long term goals, system improvement and strategic planning only. 6) By creating conditions for team work. 7) Providing job in enrichment to staff. There are five core dimensions to job enrichment:i) Task variety Different options to perform. ii) Task identity Performing a complete piece of work and not a part. iii) Task significance it refers to the amount of impact, as perceived by the worker, that the work has on other people. iv) Autonomy some control by employee over their own affairs. v) Feedback information about performance. 8) Effective grievance redressed system. 9) Employee counseling to reduce job stress . 10) Premium on innovation and initiative to solve long standing problems. 11) Human resource development with emphasis on training on weaker areas, adult education programmed and keep abreast of staff regarding latest technological improvements . Identification of training needs of staff through ABC analysis of staff through regular questionnaires. 12) To adopt maintenance friendly techniques :a) To ensure passenger satisfaction such as (Water level indicator, water bridging, operation cleanliness, best aesthetic fittings etc. b) To ensure safety such as distributor valve protection cover, brake binding alarm, jammed hand brake indicator, buffer gapping device etc. c) To reduce man power requirement time for the existing maintenance/repair practices such as Buffer changing device, Distributor valve changing device etc. 13) Analysis of equipments failures and re-medical steps. 14) Improved communication with staff regarding latest instructions and provision of better communication facilities like Walky-Talky sets, internet, etc. 15) Preventive maintenance/A.M.C. of M&P and other costly machines. 16) Inventory control of the stores & periodical review of store imprest through ABC analysis. 17) Hiving off of non-core activities like cleaning of coaches, repair of brake block shoe, etc to reduce cost of maintenance. 18) Multi-skilling 19) Performance review of the staff & supervisors. 20) Avoiding upsetting of the rolling stock. 21) Proper documentation & flow of information at the grass root level. 22) Timely planning according to future increase in work load. 23) Organizing quiz competitions etc to create awareness among staff. 24) Organizing housekeeping contest, best performing section contest, etc to inculcate among staff the pride in their work.

Q.48 gkWV ckWDl D;k gS\ ,d ,-,e-bZlh-,.M MCY;w@Mh-'ksM@,-MCY;w-,e gksus ds ukrs vki

vius fMiks esa gkWV ckWDl dh ?kVukvksa dks de djus ds fy, D;k dne mBk;saxsA

What is Hot Box? What step you will initiate to reduce the hot box cases if you are an AME (C&W)/Diesel Shed/AWM. Wheel set become unusable due to bearing failure is known Hot Box Main reason of Hot Axles/Box1) Improper earthing during welding of wagon body/bogie. 2) Improper handling of new bearing resulting in brinelling of raceways. 3) Improper handling of bearings during servicing in workshop. 4) Mishandling of bearing in transporting 5) Grease oozing due to Damage of grease seal use of old seal 6) Grease leaking between backing ring and the axle dust guard. 7) In correct mounting 8) Inadequate lubrication 9) Dirt if foreign particles enter the bearing they are often pressed into the tracks and the rolling elements and resulting flaking started. 10)Smearing Smearing is a king of seizing in its early state, cause by two surfaces sliding each other under load. 11)Wear foreign particles like dust which may cause wear may enter the bearing either together with the lubricant or via in adequate seals or in adequate care during mounting 12)Rust /Corrosion: - Bearing rings and rolling element being made of steel & cages of brass & steel are affected by water & acid. 13)Fretting corrosion: - A special type of wear occurs in the form of fretting corrosion with a relatively loose fit or due to deformation causing continues rubbing between no lubricated surfaces. 14)Creaks & Fracture: - Creaks and fracture are due to errors of the shape of journal axle Box. Suggestions for Remedial Action. proper earthling of bogies should be carried out as per clause 16 of RD 50 pamphlet G-81 Palletized strapped packing container set of rounded 32 new bearings should be unloaded by fork lifter or some other convenient device this strapped packed. Boxes should not be thrown from the track/ wagon during unloading. Bearing dismounted from the axle in ROH Depot/workshop should be handled carefully and should not be thrown one over the other. They should be properly stacked and should again unloading one by one instead of unloading then by tilting the trolley Movement of bearing from ROH depots to workshop and beck should only be is containers as per G-81 Handling of wheel sets mounted with bearing should be properly done. As per Instruction in G-81 Avoid damage to seals by careful handling of the wheel set. Sliding of wheel set over the bearings is an un acceptable practice Old seal should not be reused after servicing as grease can lock from worn fluid lip of seal. Grease locking between the cup counter bore and the seal major dia location may be an indication of loose seal. Grease leaking between barking ring on the axle dust grand location is an indication of a loose bearing ring and loose bearing ring should be remand If the grease looking gives doubt of any unusual happening the following procedure should be followed

Detached the wagon Remove the wheel set Rotate the cup to observe any unusual sound which may indicate loss of grease or damage to bearing raceways. If any unusual sound is noticed the bearing should be discontinued from service

Q.49 jsfM;ksxzkQh osfYMax DokfyVh D;k gS\ ;g osfYMax dgk iz;ksx dh tkrh gSA ,d ;k nks

mnkgj.k lfgr o.kZu djsA


What is radiographic welding quality? Where this welding is used. Explain one or two with the help of example. Ans :- The quality of weld joint which is inspected by radiography is called Radiographic welding quality. Radiography is one of the most useful NDT which can be applied by assigning the quality of the weld joint. it is use to impact all type and thickness ranging from minute weld to weld up to 0.5m thick. This quality of weld can be detected flaws and discontinuities in joint such as cracks, porosity and blow holes slag flux or oxide inclusion, lack of fusion between the weld metal and the parent metal, incomplete penetration. Radio-graphic technique is based upon exposing the component to sort wave length in the form of X rays & Gama rays. From a suitable source. Both rays are electromagnetic wave which penetrates opaque materials and obtain a permanent record on the result on sensitized film. The contrast on the developed film between the images of an area of the specimen permits the observer to distinguish the flows. He X rays & Y rays passing through less denser parts of the objects observed to the smaller extent the ray passing through the adjacent sound material. The light sensitive film is called radiograph. X-rays are generated when high energy electron strike a metal target in X ray tube the cathode emits electrons by thermo ionic emission these electrons are accelerated by the tube voltage and strike against the anode in the process X-rays are generated Gama rays are emitted from radioactive isotopes that are used for industrial radiography are cobalt 60, iridium 192, Cesium 137 etc. Use of Radio graphic quality of weld If a crack occurs in an area where the plate is wasted and of inadequate strength, the defective portion should be cut out and replaced with a let in patch. It must be ensured that the let in patch is of the same material and thickness as the parent metal. Corners of patches should be rounded to a minimum radius of 25mm and edges must be carefully prepared to obtain a V butt weld. Weld deposits should be smoothened flush with the parent metal. Perform DP test and radiography of barrel plate. The radio graphic quality weldments are used in boilers pressure vessels pressure piping gas pipe-line and component which are used in dynamic loading. The lowest permissible ambient temperature which making welds in carbon steel material with less 0.24% carbon and in low alloy manganese and silicon manganese steels for example the boiler component should be tested by radio graphic inspection as percentage of the weld length for prelatic or martens tic steel The film by exposure to X- rays, Gama rays is made visible and permanent; processing is called out under subdued light of color to which the film is relatively sensitive. The film first immersed in a developer solution after developing a film is rinsed in a sell filled with water.

Interpretation of radio graph shows on film and size of each flaw in measured in mm by applying a rule to its image on the radio graph. Examples: Heat Exchanger, Boilers, Pressure Vessels, Boilers Components, Bridges, Aircrafts, Railway Rolling Stock(chemical & fuel tanks, motive engines, wagons & coaches etc)

Q.50 odZ'kkWi esa LSi fdl izdkj tfur gksrk gS\ ;g LVksj dSls Hkstk tkrk gS rFkk blds

QkbZuy fMLiksty dk iwjh izf;k dk o.kZu djs\


How scrap is generated in workshop? How it is sent to store explain the process of final disposal of condemn wagon? Ans : In workshop wagons for POH, NPOH, and ROH are received in pocket yard. For the above work pre-inspection of the wagon is done in the Yard. During Pre-inspection the wagons are expected and quantum of work is noted only those wagons are considered for overhauling which are in the financially justified and technically sound for POH/NPOH. The wagons which are found beyond economic repair are again inspected for overage/underage. man hours and material required for POH are calculated and justification is made for condemnation. Overage wagons are condemned by CWM and report of underage wagons with justification is vetted by finance department and send to HQ for CMEs approval of condemnation. After receipt of approval of Condemnation wagons are dumped in suitable place of store dumping yard and DS8 of condemn wagons are issued very same day after dumping. Wagons which are found repairable, POH/NPOH of wagons is done. Wagons body under frame sole bar floor is stripped as per requirement/replacement. Most of the scrap is generated in striping shop. After striping of wagon these are sending to the repair bays where trolley, Air Brake, Wheels are removed and send to the respective shops for repair. each components are inspected in respective shop and serviceable components are used and condemned components are replaced by new. Thus the Scrap is generated in every repair shops by replacement of condemn components and in striping shop by striping of body is send to store on D S 8. In addition to this scrap is also generated by condemnation of machines, tools, equipments etc. The scrap material is send to store department on DS-8 and account of the same is maintained by each shop and store department. lot of the scrap is made by store and sold the scrap by auction .from the condemn wagons serviceable parts are received back by the store in reclamation yard and these are received and use by the workshop as and when required.

Q.51 fuEufyf[kr esa fdUgha pkj ij fVIi.kh fy[ksa % Write down short notes on any four of the following.

1-

Oghy fMQsDV Wheel defects


Thin Flange :- When the flange thickness reduces from 28.5mm (New) to 16 mm (Condemn) or less, then the flange is called thin flange. Flange thickness is measured at a depth of 13 mm from the tip of the flange. Repercussion: - Chances of bursting of point due to entering of flange between Tongue rail and Stock rail. Sharp Flange:- When the radius given at the tip of flange is worn out from 14.5mm (New) to 5 mm (Condemn) or less is called Sharp Flange. Repercussion: - Shearing of fish plate bolts at rail joints. Radius too small at the root of flange :- New Radius of flange at the root is 16R, when it is reduced to 13R or below, it is called Radius too small at the root of flange. Repercussion: - Excessive lateral play result in chances of mounting of flange over rail. Deep Flange :- The New height of the flange is 28.5mm, when it increased up to 35mm or more is called Deep Flange Repercussion: - Shearing of fish plate bolts at rail joints. Flat faces on Tyre :- Flatness on wheel circumference is called Flat faces on tyre. 1. For Coaching Stock it is allowed up to 50 mm 2. For Goods Stock it is allowed up to 60 mm Repercussion: - Chances of rail fracture due to hammering effect on rail. Hollow Tyre:-If the groove on the wheel tread is up to 5 mm or more, it is called Hollow tyre. Repercussion:- Chances of entanglement of tongue rail nose with wheel. Thin Tyre :- If the remaining thickness of tyre is less than 25 mm, it is called thin tyre. Repercussion: - probability of breakage of tyre. ,l- MCy;-w Vh- vkj- SWTR

2-

Air brake testing equipment for testing of single wagon is known SWTR When To Be Conducted:- Single wagon test is done only , if there is

any major repair / replacement is carried out with air brake components or during POH / ROH. Necessary Equipments:i) Test rig fitted with all necessary equipment. ii) Dummy palm with gauge . iii) CR, AR , BC are tested with pressure gauge with flexible hose & adopter. iv) Stop Watch. v) Measuring scale. vi) Teflon tap & soap solution. vii) Tool kit with different types of tools. viii) Compressor (minimum operating pressure is 7 kg/cm2) Test Procedure:a. Visual examination. b. Adjustment of A dimension & piston stroke for correct brake power application. c. At rear end, dummy palm end with gauge is used. d. Attach & join the wagon with the test rig. e. Join test rig with compressor. f. Connect the pressure reducing valve at compressor end with test rig. g. check air brake system as per Performa 3-

VSad oSaxu LVhfeax Tank Wagon Steaming


It is cleaning of Tank Barrel from inside with the help of High Pressure Steam. Purpose: For safe entry of Staff in Tank Barrel before repairs to be carried out Up gradation of Tank Wagons for Loading Procedure of Steam Cleaning Place the Tank Wagon under Steam Pipe Line. Open the Man Hole Domes & leave tank wagon exposed to atmosphere for 24 hours. Keeps the Danger Board near tank wagon indicating Prohibition of working on tank wagon? Insert the Steam Pipe of T section inside the tank wagon barrel. Pass the High Pressure Steam inside the tank wagon barrel for 12 hours. Remove condensed steam collected in tank wagon barrel at interval of 2 hours by opening of bottom discharge valve. Fill the tank with water & drain completely. Ascertain the tank wagon barrel free from gases by performing Bottle Test. Bottle Test Lower the bottle filled with fresh water inside the tank wagon barrel. Tilt the bottle with the help of strings inside the tank wagon barrel to drain water & to fill gases inside it. Leave the bottle inside for about 5 minutes & then withdrawn it. Light up the match stick near the mouth of the Bottle at some distance from wagon. If there is no flame, the tank wagon barrel is free from gases. If there is flame, the tank wagon barrel should be steam cleaned again in same manner.

It is cleaning of tank wagon barrel to load higher purified product in it. Tank wagons are loaded by furnace oil, coal tar, molasses, etc. If such wagons are to be loaded by higher purified products such as petrol, diesel, kerosene then such wagons are Upgraded for loading Steam cleaning of tank wagon barrel. Scrap & remove residuals with the help of scrappers & cotton waste. Apply Moiya Oil (EF) from inside the tank wagon barrel. Re-steam cleaning of tank wagon barrel. Apply Moiya Oil (EF) from inside the tank wagon barrel. Clean the tank wagon barrel with high pressure water jet. Clean & dry up the tank wagon barrel with the help of cotton cloth, cotton waste. 4-

e'khuksa dh fjd.Mh'kfuax Reconditioning of machine


Reconditioning of machine is major maintenance schedule. preventive and brake-down maintenance is done at regular bases. The machine which under goes brake-down time to time the record of failure/brake-down is taken from the past and machines are reconditioned to avoid frequent brake-down. In reconditioning of wear lines are replaced with new, components like limit switch, tool post, and bed sliding parts are changed. Reconditioning is done if machines have completed at least 60 80% of codal life. It is also considered that reconditioning is financially viable. Machine is total dismantle and all parts are checked thoroughly, if can be reclaimed with minor repair these are used otherwise old components are replaced. After careful fitment of components machine is assembled. Reconditioned machine works as good as new with low cost. It should also be considered that reconditioning cost of machine should not be more than 60% of cost of new machine. okWuZ Oghy izksQkbZy Worn Wheel Profile Worn wheel profile is a special profile on wheel disc derived out of standard wheel profile suitable to worn shape of rail head . This is to minimize condemnation of disc to avoid frequent wheel changing reprofiling & enhance the life of the wheel. Average Wheel Wear: 2.5 to 3 mm per year for mail/Exp train. Three intermediate worn wheel profile are developed to increase the life of wheel 25 mm, 22 mm & 20 mm TABLE INTERMEDIATE WORN WHEEL PROFILE Thickness of D1 D2 D3 R1 R2 R3 R4 Flange (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) 25 22 20 38.5 35.5 33.5 65.5 65.5 65.5 91 91 91 11.5 10 9 14 14 14 100 100 100 330 330 330

5-

Worn Wheel Profile 20 mm flange Thickness

6-

Benefits of Worn Wheel Profile: It increases the life of wheel. It decreases machining cost. Less fuel consumption of the engine. It increases the wheel lateral oscillation dsl gkMZfuax Case hardening:- In many Engineering applications, it is desirable that a steel to be used should have a hardened surface to resist wear & tear. At the same time, it should have soft & tough interior or core so that it is able to absorb any shocks etc. This is achieved by hardening the surface layers of the article, while the rest of it is left as such. This type of treatment is applied to gears, ball bearing, railway wheels etc. Following are the various case hardening process by means of which is the surface layer is hardened (i) Carburizing :- The process of introducing carbon , to low carbon steels in order to give it a hard surface , is called carburizing. The surface is made hard only up to a certain depth. (ii) Nitriding :- It is a process of case hardening in which is nitrogen gas is employed in order to obtain hard surface of the steel. This process is commonly used for those steels, which are alloyed with chromium, molybdenum, Aluminum, Manganese, etc. (iii) Cyaniding :- The cyaniding is a process of case hardening in which both carbon & nitrogen are absorbed by metal surface to get it hardened. In this process , the piece of low carbon steel is immersed in a bath of cyanide salts such as a NaCN , KCN maintained at 850 0 C to 9500 C. (iv) Induction Hardening :- It is a process of case hardening in which the surface , to be hardened , is surrounded by an inductor block which acts as a primary coil of transformer. A high frequency current is passed through this block. Heat is produced due to induced eddy current . It is automatically spray quenched under pressure. (v) Flame Hardening :- In this process , the portion , to be hardened , is heated with the help of flame of oxy-acetylene flame above it critical temperature. The heated portion is then immediately quenched by spay water.

7-

LVkWd vkbVe ,oa ukWu LVkWd vkbVe Stock Item & Non stock Item
Stock items Non stock items

These are generally those items of the stores having regular turn over caused by constant demands by the user and are stocked in stores depots. Generally these items are recouped on the basis of an annual review conducted on a time table basis, taking up different groups of items in different months thus spreading the work around

These are the items, which are not stocked and are not required regularly>for the purpose of purchase of non stock items the indenter shall submit the requisition is standard form this include detailed specification of the demand material>the requirement of a non stock item costing more than 40000 shall be got vetted by the associate finance and shall have the approval of the competent authority as per delegation of powers

8-

ljQsl fQfu'k Surface finish


Ans The articles produced through various machining operations such as turning, boring, drilling, planning, shaping and milling etc. are fairly accurate in size but do not carry high degree of surface finish. As such these are subjected to one are more further operations to obtain the desired surface finish. These precision surface finishing operations, employed for producing extremely high surface finish, are called micro-finishes for the' reason that the surfaces finished through these processes are specified in micro-units such .as microns. A mechanical produced, i.e. mechanical surface may conveniently be considered to comprise a plane, curved, or wavy based portion on which are superposed a surface roughness or texture due to the tool or abrasive particle marks. In addition there may also be a better services of small irregularities due to other causes. 1) Primary Texture and 2) Secondary Texture 1) Primary Texture: - is that component of the surface texture which results from the normal action of the tool in production process. 2) Secondary Texture or Waviness denotes those components of the surface texture which results from imperfections in the performance of the machine, for example untrue of the rotary cutter error in gear wheels or the like. The turn lay is used to denote the dominant direction of the tool marks or scratches in surface texture. RoughnessN1 N2 N3 N4 N5 N6 N7 N8 N9 N10 N11 N12 Value Ra Um 0.025 0.05 0.1 0.2 0.4 0.8 1.6 3.2 6.3 12.5 25 50 Roughness symbol ~ Unit of Measurement :- The finish production process surface irregularity depth are of the order of millions of an inch or one micro-inch = 0.000001 inch This unit is sometimes abbreviated to 1 m-inch or inch. In metric unit is micron () which is equal to 0.001 millimeter or 0.000001 meter. Specification of texture: - The peaks and valleys are of varying vertical depths following no rigid roles of variation. It is necessary, therefore to adopt some satisfactory method of indicating, numerically. The surface texture so that the standard of surface roughness can be adopted for basic or comparison purposes. It will be obvious that there must be several alternative method of expressing surface texture, eg.

Average or maximum vertical height of peak to valley, average of heights & Depths from a mean center line etc. Methods for Measure Surface Texture :CLA (Center Line Average) Method. CLA = A1+A2+A3+A4+A5+A6 Micro inch L Where L is the length of surface measured Root means square method (RMS) ______________________ A1 2+ A2 2 A3 2+ A4 2 A5 2+ A6 2
6

Sum of square of these ordinates is divided by their number and the square root of the result is calculated this gives the RMS value of the surface i If the CLA & RMS methods are used for the same length of the same contour it will be found that the RMS surface Roughness value is rather greater, usually by about 10-20% than the CLA . The peak valley Method :- This is based upon measurement of distance between top & bottom limit lines, drawn parallel to contour center lines. The top limit line cut off 5% of the peak and the bottom line 10% of the valleys in order to exclude extreme peaks & valleys.

9-

baosUVh daVksy vkWQ LVksj

Inventory Control of Store ABC analysis: - ABC analysis is applied to an inventory situation, it determines the importance of items and the level of controls placed on the items. By dividing a companys inventory into different classification- A, B, or C, managers can focus on the items that account for the majority of the inventory. The adaptation of Paretos law of the vital few and trivial many follows a pattern: a. A inventory accounts for about 20% of the items and 80% of the Rupee usage. b. B inventory accounts for about 30% of the items and 15% of the Rupee usage. c. C inventory accounts for about 50% of the items and 5% of the Rupee usage. ABC analysis provides the means for identifying those items that make the largest impact on a companys overall inventory cost performance. Since a company be applied to managing their A items. VED analysis: - It means vital, essential and desirable. This is a device to measure service level and to avoid the stock-out cost. Under this analysis, the working of equipment is given priority to achieve the higher service level. Vital Items without which the equipment stops working and there is no time left for procurement. Essential Items without which the equipment may work but with less efficiency and there is time left for procurement e.g. grease and oil. Desirable Without which the equipment can work e.g. passenger amenities in coaches. FSN analysis: - This is for Fast, Slow and Non-moving items. Under this method, the

10-

11-

materials are analyzed according to the speed of consumption, frequency of demand and their utility. ,aVh dksfjtsu ekWfMfQds'ku Anti Corrosion Modification Measure to be taken for Corrosion Prevention: - To avoid bulging of wagon body 1. Modification To reduce corrosion five no. modification in BOXN wagon body. i) Plugging of drain hole in wagon i) To prevent under frame components floor from corrosion ii) Strengthening of side wall over ii) To welded three vertical channels with doorways stiffener above door wall iii) Provision of dip and trip in door iii) To protect sole bar ways iv) Provision of gusset corner plate iv) To strengthen side wall and end wall v) Provision of crib angle v) To stop water inside of under-frame /sole (50x50x06mm) bar jLlk VsfLVax Wire Rope Testing Ans- The periodic testing of wire ropes is as under:1. The number of broken wires should not exceed 10% of the total number of wires, for length of the rope equals to 8 times the rope diameter. 2. The number of broken wires should not exceed 50% of the number of wires in the strand, for length of rope equals to six round of one strand. 3. The rope should be replaced by the new rope if it accidentally falls down from drum or pulley and gets damaged by jamming between some parts. 4. Proof load of Wire rope is checked at 1.5 times of safe working load there should not elongation

12-

Iyktek dfVax Plasma Cutting

Plasma cutting is a process that is used to cut steel and other metals of different thicknesses (or sometimes other materials) using a plasma torch. In this process, an inert gas (in some units, compressed air) is blown at high speed out of a nozzle; at the same time an electrical arc is formed through that gas from the nozzle to the surface being cut, turning some of that gas to plasma. The plasma is sufficiently hot enough to melt the metal being cut and moves sufficiently fast to blow molten metal away from the cut. PROCESS The HF Contact type uses a high-frequency, high-voltage spark to ionize the air through the torch head and initiate an arc. These require the torch to be in contact with the job material when starting, and so are not suitable for applications involving computer numerical controlled (CNC) cutting. The Pilot Arc type uses a two cycle approach to producing plasma, avoiding the need for initial contact. First, a high-voltage, low current circuit is used to initialize a very small high-intensity spark within the torch body, thereby generating a small pocket of plasma gas. This is referred to as the pilot arc. The pilot arc has a return electrical path built into the torch head. The pilot arc will maintain itself until it is brought into proximity of the work-piece where it ignites the main plasma cutting arc. Plasma arcs are extremely hot and are in the range of 25,000 C (45,000 F). Plasma is an effective means of cutting thin and thick materials alike. Hand-held torches can usually cut up to 2 inches (51 mm) thick steel plate, and stronger computer-controlled torches can cut steel up to 6 inches (150 mm) thick. Since plasma cutters produce a very hot and very localized "cone" to cut with, they are extremely useful for cutting sheet metal in curved or angled shapes. SAFETY Proper eye protection such as welding goggles and face shields are needed to prevent eye damage called arc eye as well as damage from debris. It is recommended to use a low level shade like for cutting to prevent the retina of your eye being "flashed" or burned.

13-

osfYMax lqj{kk midj.kA Welding safety equipment

1. Safety Helmet for head protection 2. Dust Mist Respirator for breathing protection 3. Safety shoes for foot protection 4. Face shield for face protection 5. Welding arc shield for eye protection 6. Welding goggle for eye protection in gas welding/cutting. 7. Ear muff for ear protection against noise 8. Barrier cream for hand protection 9. Boiler suit for body protection 10. Leg guards for welders 11. Safety belt for working at height against fall protection 12. Hand gloves for hand protection 14-

dSluc cksxh Casnub Bogie


Salient features Of CASNUB Bogie S.N Items o. 1 Gauge 2 Axle load 3 Wheel Dia. 4 5 6 7 8 Description

9 10 11 12 13

1676 mm 22.9 ton 1000 mm New, (956 mm New for 22W Retrofitted) Wheel Base 2000 mm Type of Roller Bearing Standard AAR Cartridge taper roller Bearing Distance between General 2260 mm Centers Distance between side bearer 1474 mm Type of side bearer Roller type clearance in casnub 22 W Spring loaded constant contact in casnub 22 HS Constant contact Metal bonded rubber pads in NLB PU pad IN BOXN M1 & BOXNEL Anti rotation feature Anti rotation lugs have been provided between bogie bolster and side frame Type of Brake beam Unit type cast steel brake beam suspended from side frames Casnub 22W (M) Center Pivot 1) IRS Spherical type for 22W only 2) Spherical type (UIC concept) for others. Suspension details Long travel helical springs Elastomeric Pad Elastomeric Pad has been provided between adopter and side frames pedestal roof to reduce wheel flange wear.

types of CASNUB BOGIE VERSIONS DEVELOPED ARE AS UNDER: CASNUB -22W CASNUB -22W (Retrofitted) CASNUB -22W(M) CASNUB -22NL CASNUB -22NLB

CASNUB -22HS MAINTENANCE OF BOGIE Bogie from body repair section Dismantling of Bogie in Bogie shop. Remove the brake beam, springs. Visual inspection of Bogie. Remove wear, cracked liners (side frame liners, jaw liners, bolster liners etc.) with the help of gas cutting. Check the plank if plank is bending then sends to black smithy shop For repair New liners are welded by arc welding with specified procedure. Change the side bearer housing. Checks the center pivots if worn out then change it. In mark I safety bracket and push rod bracket are changed and in other Bogie only push rod bracket will be change if worn-out. Grouping of springs Assemble the Bogie and send to under frame. Springs are fitted in under frame. During POH of wagon in shops, all the wearing surfaces of Bogie shall be brought to as new condition 15-

Mh-oh- VsfLVax D.V.Testing


Set brake pipe pressure at 5 Kg/cm2. Perform entire testing in single pipe working. Rectify the defects observed during single pipe working.. Record all the test parameters. Perform the following test. Isolating test: Mount DV on test bench. Keep DV in isolated position. Open compressed air line and keep Drivers brake valve in charging position. Wait for five minutes.. There must not be any rise of CR or AR pressure. Air tightness test: Keep isolating handle in normal position. Charge the system for at least five minutes. Apply soap solution along the joints with soft nylon brush. There must not be air bubble. CR/AR charging time: Empty distributor valve, Recharge the system. During the process of charging, Check time required to rise of CR/AR pressure from 0 to 4.8 Kg/cm2 this should be within 160 to 280 seconds. Brake application time : Drop brake pipe pressure by 1.6 Kg/cm2 Check time required to rise of BC pressure from 0 to 3.6 Kg/cm2. Maximum BC pressure: In continuation to above, check the max. BC pressure attained. It should be within 3.8 Kg/cm2plus/minus 0.1 Kg/cm2. Further drop of BC pressure will not affect in increase of BC pressure. Brake release : Recharge BP pressure to 5 Kg/cm2. Check time to release of BC pressure from 3.8 to 0.4Kg/cm2. This should be within 15 to 20 seconds in coaching stock and 45 to 60 seconds in freight stock. Sensitivity test : Recharge the system Close main supply open Sensitivity choke bk. Should apply within 6 second Insensitivity Test : Recharge the system Close main supply Open Insensitivity choke bk. Should not apply Backflow test: Recharge the system. Close main supply Apply emergency brake. Wait for one minute. Check that there is no drop of CR, AR and BC pressure or

increase of BP pressure, Be careful to observe the pressure changes. Manual release test: In continuation to above test (with emergency application), make a single pull to quick release valve. Check that CR and BC pressure drops to zero. 16-

fMlVkWjlu Distortion
Distortion in the vicinity of welded joints is a natural and inevitable consequence of the non-uniform heating and cooling that occurs during the welding thermal cycle. This identifies the factors affecting distortion and provides some brief guidance to Fabricators on practical approaches to controlling and correcting distortion during the fabrication of metal structures. Thermal distortion occurs when a process generates thermal gradients resulting in strains, due to non-uniform expansion or contraction that exceed the local yield point of the material. During the rapid heating cycle of a fusion welding process, material in the vicinity of the weld heats, expands in all directions and is compressed by the constraints of the much larger and cooler surrounding structure. The heated volume has a lower yield point than the cooler surrounding structure and is more readily upset to a smaller dimension, i.e. the heated volume yields in compression. On cooling, the weld deposit & the heated volume of the adjacent parent material contracts in all directions, creating tensile strains that are constrained by the attached cool structures that did not reach a yield point strain during the entire heating and cooling process. This localized contraction results in buckling, localized tensile yielding, or development of residual stress. On thinner members localized buckling will occur. On thicker members less localized distortion is evident, however residual stresses tend to be higher. For a structural steel with a yield point of 250 MPa, a thermal differential of just 100C will result in a thermal strain that approaches tensile yield point under fully constrained conditions. For a structural steel with a yield point of 400 MPa, a thermal differential of 160C will result in a thermal strain that approaches yield point under fully constrained conditions. The volume change of a structural steel weld during a fusion welding cycle occurs in two parts. Firstly the molten weld volume reduces by approximately 3% on solidification. We see this solidification shrinkage as craters at weld run terminations. Secondly the volume of the of the solidified weld metal reduces by a further 7% as its temperature falls from the melting point to room temperature. These, two volume changes always occur and distortion control depends on developing an understanding of how to manage the process to minimize any detrimental effects.

17-

ih-,-lh- vkbVe PAC - proprietary articles certificate


This certificate shall be issued as per Performa given in Rly board later no. 2007 Rs (G) /779/55 in 2008 and shall be signed an officer of the consuming department for when the stores are procured of the appropriate level depending on the value of material indented. Thus certified that a similar article which could be used in lieu is not manufactured or sold by any other firm. only one firm manufacture the said item and nonvoter make component can be used Item purchased through PAC can be processed by single tender where it is certified that a similar article which could not be manufactured or sold by any other firm item will be limited it his normal purchase power. Power to sign the proprietary article certificate s is depend on value of items are as given

18-

value of item level of officer is sign the PAC 1- up to Rs. 25,000 Indenting officer. 2- up to Rs. 75,000 JAG/ SG 3- up to Rs. 3 lakh HOD /SAG officer 4- above Rs. 3 lakh P HOD /CHOD officer vkj-,Q-&361 R.F. 361 Draft Gear Draft gear is an important part of the CBC assembly. It absorbs the shocks which obtain on coupler during transportation. It is present at the wagon pocket on the under frame of the wagon which is fitted between the striker casting and back striker with yoke and front follower. HT draft gear are1. Mk-50 2. Rf-361 S Type of Weight Capacity Travel Reaction Performance .No Draft Gear in Kg kg/m mm force capacity 1 Mark-50 170.3 5385 81.5 3.7 86 2 RF-361 138.0 5725 67.8 3.23 79.6 RF361 Draft Gear It s high capacity draft gear. This type of draft gear is connected to each other apart with compressed rubber pad in tight position. A. Inspection a. Rubber Pad:- Crack should be discarded and maximum four pad can be reused. b. Draft gear forging:-In forged compound seem. lap, , pits etc should be checked. c. Housing (Cylinder):-The inner surface of the fixed bar should be smooth and uniform and bar taper should not be smooth. In housing it should be free from cracks. Lag and housing is passed by housing box gauge. B. Inspection After assembly:- after passing hammer test every draft gear should be visually inspected in following manner. a. Insert:-Every insert should be at proper location. b. Shoes:-It should be in proper position. c. Housing(cylinder):-It should be free from cracks and bulge. component:-component (shoe and wedge) should be in tight position. Hammer testing of draft gear RF361:It is compulsory to test repaired draft gear by 12.25 ton draft hammer. For above purpose the draft gear must be kept on draft hammer .After that each draft gear should be pressed 1 drop 15/380mm or 2 drop 18/460 mm. If gear comes in solid condition, it must be rejected otherwise it should be passed. Repairing procedure of draft gear RF 361:The Repairing procedure of draft gear RF 361:1. First place the draft gear on press table .After proper management-Rear wall plate is cut. 2. After this the runner rubber pads and internal follower kept away from housing(cylinder) 3. Check the rectified height by housing using gauge N0. 27244. 4. A ring is placed at press table and housing is placed vertically on the ring in the position which friction bar in down direction. 5. In back side of housing wedge lag and housing lag is aligned. 6. The shoe fitted between friction bar and wedge.

19-

7. Internal follower is inserted in housing 8. RF rubber pad is placed over follower. 9. Pre heating of Rear wall plate and housing. 10. Draft gear assembly is placed at center of the press and after rear wall plate is pressed where it contact with housing No.1 .The alignment of rear wall plate sides with housing base plate with housing base side is to be checked. 11. Root run welding is done. 12. Filter that filler pass welding is done. 13. Grind the material deposited n weld joints. 14. After this the hammer testing of draft gear. 15. After that the pre-shortening of draft gear and final length is checked using gauge no.27207. osfYMax fMQsDV Welding defect Following are important welding defects, reason/cause of defect and there remedial actions are:Defect Causes Remedies 1. Lack of Fusion i) Dirty Surface i. Cleaning the edges to be ii) Improper cleaning of weld welded. bead. ii. Proper cleaning of each iii) Current too low. bead. iv) Excessive welding speed.. iii. Maintaining proper current & welding speed. 2. Lack of i) Inadequate joint i. Proper joint preparation. penetration. preparation. ii. Suitable size of electrode ii) Wrong size of electrode. as per root gap. iii) Low heat input. iii. Proper heat input & welding iv) High welding speed. speed. 3. Overlap i. Wrong angle of electrode. i. Keep correct angle of ii. Too large deposition in a electrode. single run. ii. Use proper size of iii. Faulty electrode electrode. manipulation. 4. Under-cut i) High current. i) Use proper current & ii) Higher diameter of polarity in case of DC. electrode used. ii) Use proper diameter iii) Wrong electrode angle. electrode. iii) Proper angle of electrode. 5. Slag inclusion. i) Faulty electrode. i) Proper current & heat ii) Wrong current. input iii) Rapid rate of welding. ii) Proper design & technique iv) Defective weld design. iii) Proper cleaning of weld. v) Improper technique. 6. Porosity i) Wrong arc length. i) Maintain proper arc length ii) Inadequate gas shielding & correct polarity when due to clogging, jamming or welding with DC. hose leaking ii) Clean the surface properly iii) Check for proper gas supply & leakage

20-

-doi) Avoid rapid cooling by preheating. ii) Maintain proper welding parameter iii) Use low hydrogen electrodes. 9 CRATER i) high current i)Set proper current ii) Wrong size of electrode ii) Select proper size of iii) Wrong electrode angle electrode as per thickness of plate & proper angle 10 SPETTER i) high current i. Proper Current ii) moisture in electrode ii. Baking of electrode set iii) Long arc length proper arc length izh ghfVax ,.M iksLV ghfVax Pre-heating & Post heating Preheat:- Preheat is a type of heat treatment which is done before welding to remove the harmful effect of welding. This treatment is done mainly in high carbon steel and cast iron before welding. Preheat temperature is different for different metals. Mild steel is preheated up to 150 C to 250 C Advantages of preheat: Cracks do not develop in the job during welding Job is not distorted during welding process Penetration is good during welding. During welding of high heat conducting metal In minimum expenditure. It minimizes the arc blow effect during welding. Post Heat :- It is heat treatment process which is carried after welding process. During welding on job , The internal stresses develop in job after welding process, post heating process is done to remove the internal stress and brittleness. The mechanical property is improved. This process is mainly applying in tool steel, high carbon steel, cast iron after welding process.. Post heat treatment is different for different metal for high carbon steel it is 450 C to 600C Advantages 1. The ductility and toughness restores in job 2. Hardness and brittleness does not increase . 3. The internal stress is relieved .

7. Blow holes. 8. Cracks

-doi) Rapid cooling ii) Improper composition parent metal. iii) High welding speed. iv) Electrode with high H2.

You might also like