White Flint Station Access Plan
White Flint Station Access Plan
May 5, 2009
2
White Flint Station
Project Scope
3
White Flint Station Area
4
White Flint Station
Existing Conditions
5
White Flint Station
• Station Issues
– Visibility
– At-grade crossing at
Marinelli Road
– Narrow sidewalks
– Lack of Kiss & Ride space
– Potential queuing
between escalator and
faregates
• Station Findings
– Station has adequate
capacity to serve
projected 2020 ridership
6
White Flint Station
Projected Growth
• By 2020, substantial
growth within ½ mile of
station:
– 211% increase in
households
– 79% increase in
commercial space (an
additional 3 million GSF
of non-residential space)
– One of the fastest
growing station areas in
the region
7
White Flint Station
Existing and Future Ridership
30,000
25,197
25,000
20,000
15,000
5,000
2,813 2,865
0
Daily AM Peak Hour PM Peak Hour
2008 2020
Source: WMATA Faregate data, May 2008 and WMATA Station Access and Capacity Study, 2007
8
White Flint Station – Access Improvements for All Alternatives
• Third level
– Fourth level
» Fifth level
1 Improve crossing 3
5
4
2 Widen sidewalk
3 Create new openings
6
4 Reconfigure bike and
newspaper facilities
5 Update directional signs
6 Improve crosswalks 9
9
White Flint Station
Station Improvement Options
• Option 1: Modified
existing entrance
– Reconfigure existing
entrance to provide
direct access from
the east and west to
improve access and
visibility
– Additional faregates
at existing station
entrance to relieve
queuing
10
White Flint Station
Station Improvement Options
11
White Flint Station
Existing Conditions with Proposed Development
Assumptions
• New roadway
along east side of
Metro station
• Improved
sidewalks to east
• New Ride-On
bus bays on east
side
• New auto bridge
over station
platform
12
White Flint Station
Alternative 1 – Modified Existing Entrance
Assumptions
• New openings
into Station
• One additional
faregate
• Relocated
farecard machines
• Relocated
bicycle racks and
vending
• Clearer sidewalk
areas at Entrance
13
White Flint Station
Alternative 1 – Modified Existing Entrance
14
White Flint Station
Alternative 1 – Modified Existing Entrance
15
White Flint Station
Existing Conditions with Proposed Development
16
White Flint Station
Alternative 1 – Modified Existing Entrance
17
White Flint Station
Alternative 2 – New Entrance
Assumptions
• New station
entrance at north
end
• New platform
canopy
• Upgraded
sidewalks and
crosswalks at new
entrance
18
White Flint Station
Alternative 2 – New Entrance
Assumptions
• New elevator to
platform
• New stair and
escalator to
platform
• New bike racks
and vendors
19
White Flint Station
Alternative 2 – Modified Existing Entrance
West Elevation
North Elevation
20
White Flint Station
Alternative 1 – Modified Existing Entrance
Section at Platform
Section Near End
Near Bridge
of Platform
21
White Flint Station
Alternative 2 – Modified Existing Entrance
West Elevation
22
White Flint Station
Alternative 2 – New Entrance
23
White Flint Station
Alternative 2 – New Entrance
24
White Flint Station
Alternative 2A – New Entrance with Pedestrian Tunnel
25
White Flint Station
Alternative 2A – New Entrance with Pedestrian Tunnel
26
White Flint Station
Alternative 2B – New Entrance with Diagonal Tunnel
27
White Flint Station
Alternative 2C – New Entrance with Pedestrian Bridge
28
White Flint Station
Alternative 2C – New Entrance with Pedestrian Bridge
29
Comparison of Alternatives
Alternatives
Performance
Measure 1 2 2A 2B 2C
•Project
Cost are 1.2–1.4
Cost order of15 magnitude
– 20 25 – 30 estimates
35 - 40 for20 - 25
FY08$ (M)
comparative purposes only
Questions or comments?
31