PROJECT: YELLOW TOWER SECTION: WATER SUPPLY SYSTEM DATE: 5-May-08 REV.
: 01
COLD WATER FLOW RATE REQUIRED
1. Water Supply Flow Rate Required for pumping system Item 1 2 3 4 5 Description Water Closet Wash Basin Urinal Sink Shower TOTAL: Total Sanitary Fixture Total Flow Rate K Facture Total Water Flow Required for Item 1 2. Pipe Sizing Total Water Flow Required Grand Total Water Flow Required (10%) Pipe Sizing Calculated References: a Water Flow Calculation - Le Formulaire Des Installations Sanitaires, Tome 1, Eau Froide (French Standard) Pipe Sizing - 1997 ASHRAE Fundamentals Handbook : : : 1.901 2.38 40 l/s l/s mm Fixture No. 120 100 40 15 5 280 : : : : U/Flow Rate 0.10 0.10 0.15 0.20 0.15 T/Flow Rate 12.000 10.000 6.000 3.000 0.750 31.750 nos l/s
280.000 31.750 0.060 1.901
l/s
PROJECT: YELLOW TOWER SECTION: WATER SUPPLY SYSTEM DATE: 5-May-08 REV.: 01
COLD WATER FLOW RATE REQUIRED
1. Water Supply Flow Rate Required for pumping system Item 1 2 3 4 5 Description Water Closet Wash Basin Urinal Sink Shower TOTAL: Total Sanitary Fixture Total Flow Rate K Facture Total Water Flow Required for Item 1 2. Pipe Sizing Total Water Flow Required Grand Total Water Flow Required (10%) Pipe Sizing Calculated References: a Water Flow Calculation - Le Formulaire Des Installations Sanitaires, Tome 1, Eau Froide (French Standard) Pipe Sizing - 1997 ASHRAE Fundamentals Handbook : : : 1.437 2.01 50 l/s l/s mm Fixture No. 41 42 1 10 42 136 : : : : U/Flow Rate 0.10 0.10 0.10 0.20 0.15 T/Flow Rate 4.100 4.200 0.100 2.000 6.300 16.700 nos l/s
136.000 16.700 0.086 1.437
l/s