PIP Line List
PIP Line List
GENERAL
(See PIP PIC001 Appendix A-1 for additional abbreviations) AMB - Ambient ATM - Atmospheric BAS - Basis F - Degrees Fahrenheit C - Degrees Celsius GALV - Galvanized IN - Inch N/R - Not Required OPER - Operating PRES - Pressure PSIG - Pounds Per Sq. Inch (Gage) PWHT - Post Weld Heat Treatment REL - Relief REV - Revision SERV - Service STR - Stress TEMP - Temperature THK - Thickness Y/N - Yes/No
Fluid State/Condition:
L M S SF SL V Liquid Multiphase Solid Slug Flow Slurry Vapor
1)
Pressure - Temperature limitations for flanges shall conform to the following: a) ASME B16.1 for 125 and 250 lb. cast iron flanges. b) ASME B16.5 for all steel flange sizes & ratings up to 24 inches. c) ASME B16.47 for steel flange sizes & ratings above 24 inches Unless noted otherwise, the following shall conform to ASME B31.3 or other industry standards as applicable: a) Determination of piping design pressure and temperature. b) Calculation of pipe wall thickness. c) Determination of piping test pressure. d) Pipe fabrication, heat treatment (when required), inspection, and leak testing. Wall thicknesses for pipe in vacuum services and lines which are jacketed shall be calculated for external pressure per Note 2. All buried pipe shall be protected against corrosion in accordance with the requirements of the applicable job specification. For all transitions between above ground and below ground piping, protective coating requirements shall be maintained for 12" minimum above grade.
2)
3)
Paint Systems:
(See PIP CTCE1000 for detailed environment selection criteria for pipe.) 4)
5)
Test Method:
(See PIP PNSC0021 for detailed description) P - Pneumatic S - In Service test at normal operating pressure H - Hydrotest O - Other (see remarks)
Letter designation indicates operating condition outside of short term limits. A - Relief accumulation pressure (A, A1, A2 or A3 case, see above for definition) B - Maximum pump suction plus normal D P (B, B1, B2 or B3 case, see above for definition) C - Normal pump suction plus maximum D P (C, C1, C2 or C3 case, see above for definition) D - Maximum pump suction, plus maximum D P (Tower OH pumps only) (D, D1, D2 or D3 case, see above for definition) E - Steam out conditions (E, E1, E2 or E3 case, see above for definition) F - Compressor maximum discharge pressure (F, F1, F2 or F3 case, see above for definition) G - Operating and safety margin (G, G1, G2 or G3 case, see above for definition) H - Other (See Remarks) (H, H1, H2 or H3 case, see above for definition) R - Auto refrigeration (R, R1, R2 or R3 case, see above for definition)
CLIENT: PROJECT TITLE: PROJECT LOCATION: UNIT NUMBER: PROJECT NUMBER: CLIENT PROJECT NUMBER:
SERVICE CODE UNIT/ AREA NO. LINE NO. LINE SIZE LINE CLASS (SPEC) INSULATION P&ID NUMBER FLUID CATEGORY FLUID STATE FROM TO
THK (in)
PRES (psig)
TEMP (F)
MIN (F)
MAX (F)
PRES (psig)
TEMP (F)
BASIS CODE
PRES (psig)
METHOD
(in/sch)
(in)