Excel Consultant Group Report For BCPS
Excel Consultant Group Report For BCPS
Ms. Gregory: Excel Consultant Group, LLC is pleased to provide the following Summary Report for Battle Creek Public Schools review and consideration. Following a thorough review of the proposals and participating in the Presentations and Interview process; the following report provides technical data and information to identify and distinguish the difference in program pricing and service proposed by Dean Transportation and First Student. As indicated in our original Transportation RFP Analysis Summary cover letter, it will be critical
that any party reviewing the RFP Analysis, must understand the entire proposal(s) offered and not immediately draw conclusions based on bottom line projections and estimations. Depending on the scenario selected, there may be multiple layers of data or formulas which must be applied and calculated prior to establishing a final or total cost projection. Each Company proposal references the fact that the proposals provided estimations, based on certain assumptions and conditions; and are for information only.
For this reason, the following report will integrate the RFP Assumptions, company projections and spread sheets followed by a recommendation by Excel Consultant Group, LLC. It is our goal to assist Battle Creek Public Schools in compiling the data and information necessary to identify the most responsible and cost effective company for consideration. Both companies are able to provide pupil transportation service for the district. They both transport tens of thousands of students daily. However, per the information they provided Battle Creek Public Schools, one will stand out to be more cost effective and provide a higher quality program. As requested in the initial Analysis, both companies had the opportunity to review and adjust the spread sheet compiled by Excel Consultant Group, LLC. It was our desire to make sure the numbers represented in the spread sheets accurately reflected the companys proposal. To that end, there were a few changes made and missing information provided for the final report. These new or modified projections have been integrated into the final spread sheets and calculations for the recommendation. The original Assumptions basically state the same. During the presentation, additional information or clarifications were provided to the interview panel. Any new or relevant information which impacted the cost projections or quality of the transportation service was also compiled within the Final Report for the Districts consideration.
Provided in this Final Report are two (2) Spread Sheets for information and data provided by each of the Contractors. The titled Cost Analysis spread sheet represents all the bid proposal projections and estimations related to cost of service; ( note attached spread sheet Index ). The other spread sheet titled First Year Projections provides a detailed listing of services and additional costs to the School District, not covered in that specific bid, for the first year of operation. This is the spread sheet which Excel Consultant Group, LLC will reference in our explanation and recommendation for the lower cost proposal. As represented on the Final Report spread sheet titled First Year Projections 2012-2013; both services provided and additional cost projections have been listed. Most service costs are imbedded into the proposal bid and are numbered along the left side ( 1-12 ). However within each proposal bid, there are additional costs. The data in each quadrant identifies, in the right cost column, a bid, any additional cost(s), down to the total first year cost. The top two quadrants, on the spread sheet titled: First Year Projections, represent the two companies Base Bids. The Base Bid provided the option for the Contractor to purchase the Districts school bus fleet and provide all the vehicles, drivers, management and fleet mechanics for a total package in pupil transportation. The lower two quadrants on the same spread sheet, represent the two companies Alternate Bids. The Alternate Bid provided all the same services as the Base Bid except for the condition that the school district maintained ownership of the school bus fleet. An up charge represented as an additional cost for new school buses is listed in line 7. At the very bottom of the spread sheet is listed the Bid Assumptions provided by both companies. Please note the last two are different and represent a significant difference in the quality of the service provided to staff and the potential additional cost in fleet maintenance, due to the vehicle life cycle schedule.
Respectfully Submitted,
Sub Total
Annual Contract CPI Increases 2.75% White Fleet Mechanic hourly wage $ 41.10 White Fleet- Parts up charge cost None Bus Fleet - Purchase (63) $ 1,387,500 Proposed New Buses Purchased by Vendor 8 Buses Option 1- Up-charge Per Bus/per day NA Option 2- Up-charge Per Route/per day NA 3.50 Fuel Cost/Wholesale (2011-2012 $267,351.66) $ $10,000,000 Fleet Liability Insurance included Pre/Post Trip & Fueling Cost Routing Software (VersaTrans) Optional Zonar - GPS included Child Reminder Systems included Two Way Radio upgrade District Performance Bond $ 46,000
Total 32 Buses
3.50 included
Sub Total
Annual Contract CPI Increases White Fleet Mechanic hourly wage White Fleet- Parts up charge cost Bus Fleet - Purchase (63) Proposed New Buses Purchased by Vendor Option 1- Up-charge Per Bus/per day Option 2- Up-charge Per Route/per day Fuel Cost/Wholesale-2011-2012 $267,351.66 Fleet Liability Insurance Pre/Post Trip & Fueling Cost Routing Software (VersaTrans) Zonar - GPS Child Reminder Systems Two Way Radio upgrade Performance Bond
2.50% 45.00 $ 10% $ 1,461,960 24 Buses 0 Buses $ 40.20 District $10,000,000 Included Option $16,000 Included Included District $ 11,722.53 $ District Included $ Included Included District
2.50% 46.13 $ 10% 1 Bus 41.21 $ District Included 4,000 $ Included Included District
2.50% 47.28 $ 10% 6 Buses 42.24 $ District Included 4,000 $ Included Included District
2.50% 48.46 $ 10% 4 Buses 43.29 $ District Included 4,000 $ Included Included district
Included
Included 4,000
First Year Projections 2012-2013 Battle Creek Public Schools Dean Transportation - Base Bid
1 Contractor Purchases School District Fleet ( Added Value for district: $1,387,500.00 ) 2 Contractor provides school buses / transportation vehicles 3 Contractor provides all transportation staff ( Includes Staff Benefits ) 4 Contractor provides all General Ed. & Special Ed. Transportation Services 5 Contractor provides all Extra field trips per RFP 6 Contractor provides all Fleet Fuel 7 Contractor provides all Fleet maintenance, including labor and parts 8 Contractor provides 8 new school buses to fleet first year ( Cost Included ) 9 Contractor provides Optional bus safety equipment 10 Contractor provides Performance Bond ( Included in Total $46,000 ) 11 District provides User Agreement for use of district facilities, utilities and care services 12 White fleet: District added cost for wages and parts no mark up on parts
13
$3,006,311.00
$2,908,920.30
$267,351.66
$46,000.00
$12,466.81
$3,052,311.00
$3,188,738.77
$2,186,780.00
$267,351.66
$2,341,714.00
$267,351.66
$56,803.36 $33,000.00
$2,543,935.02
$2,792,522.59
1 2 3 4
1 2 3 4