BILL:1000 PRELIMINARIES AND GENERAL Contractor's General Obligations Fixed and Time related (as in main Chipata-Mfuwe Rd) Provision of Performance Security (as in main Chipata-Mfuwe Rd) Provision of Insurance (as in main Chipata-Mfuwe Rd) L.sum 1.00
1000 15.03
SECTION:1500 ACCOMODATION OF TRAFFIC (only where necesaary) Allow for movement of traffic through the works at all times including traffic control along all selected roads with temporary works, signs and controls as follows: 1) provison of deviations in built-up areas where necessary 2) accomadation of traffic along half road width where applicable 3) execute earthworks, gravelling for temporary deviation \s if necessary Sub.Total Accomodation of Traffic (To be authorized by Engineer, if required) L. Sum 1.00
1000
N.B: Mostly covered under P&Gs shall be catered for under main Chipata-Mfuwe Road
0.00
Mfuwe Roads
Airport Rd
Bill Item DESCRIPTION No 2000 BILL: 2000 DRAINAGE 21.01(a)i 22.01(a)i Excavating and shaping of new and existing open drains (0 - 1.5m depth) Excavate, prepare bedding in readiness for laying pipe culverts (including end treatments i.e. aprons and wingwalls) Extra over 22.01(a)i but in but for hard material irrespective of depth (provisional, if any) Backfilling of culverts using approved selected material (including culvert in-lets, bedding, etc) Provision of concrete pipe culverts (600mm diameter)
UNIT
QTY
RATE
AMOUNT
m3 m3
979 22.00
0.00 0.00
m3 m
3
m m m3 m
3
(b) Provision of concrete pipe culverts ( 900mm diameter) 22.07(a) 22.07(c) 22.13 23.08 Class 15/20 cast insitu concrete for haunching etc as per Engineer's specs Class C25 cast insitu concrete for end-treatments etc as per Engineer's specs Remove and relaying a full barrel length existing culverts with Engineer's approval Concrete lining for run-off water along the kerb line and spillway as shown on the drawings or as directed by the Engineer. Preparation and grouted stone-pitching to a minimum depth of 100mm or as directed by Engineer (along drains and selected areas)
No
m3
0.00
0.00
25.01(b)
m2
98.00
0.00
0.00
Mfuwe Roads
Airport Rd
Bill Item DESCRIPTION No BILL: 3000 & 4000 EARTHWORKS, PAVEMENT LAYERS AND SEALS 3000 17.01(a) Earthworks & Pavement Layers (Incl.15m from road edge on bell-mouths) Clearing,stripping and grubbing of overburden to a maximum depth of 200mm (incl. rubbles and unsuitable material removal on roadbed up to verge only) Borrow/cut to fill, place & compact to 93% Mod AASHTO into 200mm (loose) layers, including hauling from within 0.5km free-haul distance
UNIT
QTY
RATE
AMOUNT
Ha
3.8
0.00
33.01(a)i
m3
112.00
0.00
34.01( c)i Scarify, water, mix, prepare & compact roadbed (including fill slopes) of a 150mm layer to finished levels, 95% ModAASHTO (imported selected & unstabilised material). 34.01(c)i Spread, scarify, water, mix, prepare and compaction of 150mm imported selected base to 98% ModAASHTO (unstabilised, including hauling from within 10km free-haul).
m3
1100.00
0.00
m3
990.00
0.00
4000 41.01( c)
SEALS (including 2 car-parks and bell-mouths) Prime at 0.8-1.0 litre /m2 on 8.1m wide compacted base only (incl. brooming, watering, blinding etc, in readiness for chipping) Extra over item 41.01 for applying the prime coat in areas accessible only by hand held equipment including bell-mouths 13.2mm aggregate, first chipping seal at required application rate on 8.1m wide compacted base. Supply and apply 80/100, pen. grade bitumen to required application rate on 8.1m wide compacted base. 6.7mm aggregate, second chipping seal at required application rate on 8.1m wide compacted base. Supply and apply 80/100, pen. grade bitumen to required application rate on 8.1m wide compacted base. m2 6200.00 0.00
41.03
m2
150.00
0.00
m2 litre m2 litre
0.00
Mfuwe Roads
Airport Rd
Bill Item DESCRIPTION No 5000 BILL: 5000 ANCILLARY ROAD FURNITURE Signs 54.01(a)i Provide and install new standard warning, prohibitive and informative SATCC road signs (area < 2m2) including 2.5m high steel posts , concrete bases , brackets, lettering, backfilling and drilling the steel plate as directed by Engineer.
UNIT
QTY
RATE
AMOUNT
No
3.00
0.00
Junction and Markings 51.01 Supply and install marker post at location approved by the Engineer No km 4.00 0.37 0.00 0.00
55.01 (a) Prepare road surface and paint white broken or continous 100mm wide road marking line with reflective paint , excluding glass beads as detailed on Drawings, using Plascon or any other paint approved by the Engineer. 55.01 (b) As item 55.01(a) above, but 100 mm wide continuous yellow lines (incl. bell-mouth arcs) 55.02 (d) As item 55.01(a) above, for white characters and symbols (including arrows, pedestrian crossings and lettering) Painting of all culverts end-treatments (headwalls, aprons, wingwalls, etc), including surface preparation, sealing, priming, paint undercoating and finishing
km m2
1.42 2.00
0.00 0.00
59.01(b)
m2
0.00
0.00
0.00
Mfuwe Roads
Airport Rd
UNIT
QTY
RATE
AMOUNT
23.01
Provide & place continuous semi-mountable concrete reinforced kerbs as per Drawings.
100.00
0.00
0.00
Mfuwe Roads
Airport Rd
BoQ SUMMARY
BILL DESCRIPTION
AMOUNT ()
Preliminary & General Items Drainage Earthworks, Pavement and Asphalt Ancillary Road Furniture Concrete and Reinforcement works Sub-total.1 GRAND TOTAL
0.00
Mfuwe Roads