Above introductory figure shows typical well testing layout for a very complete set of equipment. The equipment
requirements and design for successful well testing obviously vary according to the specific requirement of operators.
PARVEEN
Well Test Equipment
Capacity : 100 BBL ( Twin Compartment) Capacity : 100 BBL (Twin Compartments)
Features : Features :
Supplied with Centrifugal pump with electric driven Design pressure : 150 PSI / W.P. : 50 PSI
motor (chemical proof) w/ HP Flame proof console. Magnetic level controllers with High/Low level alarm.
Complete with piping, flanges, valves , instrumentation Complete with piping, flanges, valves, instrumentation
& union Connections. & union connections With automatic control valve to
control pressure in tank up to 50 psi.
Supplied with Centrifugal pump with electric driven
motor (chemical proof) w/ HP Flame proof console.
PARVEEN
Well Test Equipment
Choke Manifold