Area Electrical Load estimates Phase 1 Block - A, audi, reception, customer care Service block ,Caf, MLCP, recreation, misc 11kV Chiller Plant Phase 2 Block - B, training & library Service block 11kV Chiller Plant Saggrigation of Loads on HT meters HT meter 1 - Block - A, audi, reception, customer care HT meter 2 - Service block(phase 1+2) ,Caf, MLCP, recreation, misc, + 11kV chillers. HT meter 3 - Block - B, training & library(Phase 2)
Connected Load kW
Demand Load kW
2926
3850 3 x 2000 kVA ( n+1) 4392 3 x 2000 kVA ( n+1) 3223 3 x 1600 kVA ( n+1)
3709
2450 LT load in kW
DG Selection 1. Demand Load during phase 1 2. Demand Load during end of phase 2
4861 7066
Project:TCS Infopark,Kochi
EQUIPMENT DESCRIPTION
Phase-I 11 KV Chiller Load 900 TR Water Cooled Chiller - 11 KV Total Load For 11 KV Chiller -Ph-I Phase-I 415 Volt High Side HVAC Load 370 TR Air Cooled Chiller (In case of Water shortage) Primary CHW Pumps - W/C Chillers Primary CHW Pumps - A/C Chillers Cooling Towers Condenser Water Pumps Secondary Pumps - Block A Secondary Pumps - Reception / Audi / Library Secondary Pumps - Caf / Recreation Secondary Pumps - Guesthouse
QTY
2
CONNECTED LOAD
(KW) 1446 1446
DEMAND LOAD
(KW) 1098 1098
TOTAL
2253
1908
* Maximum of Air Cooled Chiller and Water Cooled Chiller operations is considered for arrving at total load. PLANT ROOM EQUIPMENTS - PHASE 2 SR. NO.
1 1.1
EQUIPMENT DESCRIPTION
Phase-II 11 KV Chiller Load 900 TR Water Cooled Chiller - 11 KV Total Load For 11 KV Chiller -Ph-II Phase-II 415 Volt High Side HVAC Load Primary CHW Pumps - W/C Chillers Cooling Towers Condenser Water Pumps Secondary Pumps - Block B Secondary Pumps - Training
QTY
1
CONNECTED LOAD
(KW) 723 723
DEMAND LOAD
(KW) 549 549
1 2 2 3(2W+1S) 2(1W+1S)
409.5
349
SPACE
Blcok A - AHU & HRU Recp / Audi / Lib - AHU & HRU Cafeteria - AHU & HRU Guesthouse - AHU & HRU Blcok A - Fans Audi - Fans Cafeteria Kitchen - Fans Guesthouse - Fans Datacenter - Dual Fluid PAC UPS - Dual Fluid AHU HUB - VRV Utility - Fans
CONNECTED LOAD
(KW) 350 50 80 30 165 30 175 25 408 48 80 250
DEMAND LOAD
(KW) 298 43 68 26 140 26 150 22 306 41 68 215
Standby
1691
1403
SPACE
CONNECTED LOAD
(KW) 275 30 150 15 408 48 40
DEMAND LOAD
(KW) 235 26 128 13 306 41 34
In fire mode
Standby
TOTAL
966
783
Project:TCS Infopark,Kochi
ANNEXURE-E1
Title: Electrical Load Details Date : 09.09.2011 Revision:R0 Area Diversity (Sq. ft.) \ workstations Load in KW Remarks Connected Demand
Sr. No.
Description
A.
A.1 1 1.1 2 2.1 3 3.1 3.2 3.3 4 4.1 4.2 4.3 5 5.1 5.2
Phase-I Substation 1 - Block-A ODC Block (GR+13) + Auditorium + Reception + Customer care
Block A Lighting Load Block A - ODC,IT DEPT, HR,Admin,Fin,Training Dept,Common Areas - 0.9 watt / sq ft Power Load ODC,IT DEPT, HR,Admin,Fin,Training Dept,Common Areas - 0.5 watt / sq ft IT Loads Server Room Loads (Block-A ) Hub Room (ODC Block-A) Workstations , Printer load & AV - (Block- A ) @200 watt/WS HVAC Loads Block 'A' AHUs & HRUs Ventilation fans Datacentre \ UPS \ HUB room Elevators Block 'A' Passenger Elevator Service Elevator Total Load Block-A RECEPTION BLOCK (GR) Lighting Load Secuirty,Waiting & Discussion Room Area 1 Watt/Sq.ft Power Load Secuirty,Waiting & Discussion Room Area 0.5 watt/Sq.ft HVAC Load IT Loads Workstations, Printer load - .200 watt/WS LS Total Load Reception Block Auditorium ( GR+1) Lighting Load Lighting Load @-1 Watt/Sq.ft Power Load Convenience Power @ - 0.5 watt/Sq.ft Equipment load LS Ventilation fans Auditorium Air conditioning loads Total Load Auditorium
421157
0.9
379
341
421157
0.5
211
105
1 1 4976 0.8
As per TCS confirmation Refer ANNEXURE-E 1.1B No. of Workstations-4976 No's ( As per Space matrix dated - 23rd August 2011) AHUs & HRUs for ODC blocks Includes stairwell, liftwell pressurization etc.
0.8 0.8
250 25 4085
8 nos , 20 pax , 2.5 MPS Pass.Elevators 1 nos 1500 Kg,1 MPS Service Elevator
2698
0.9
2698
0.5
1 6
0.8
2 12
7536 7536
8 4 25 13 6 49
7 2 21 11 6 41 0
As per Area Statement Received Dated. 28.02.2011 Toilet Exhaust fans, HRW's, Fire Emergency loads etc.. As per Heat Load Calculation
Customer Care Centre ( GR+2) Lighting Load Meetng Rooms,Discussion Rooms,Board Rooms,Waiting Lobbies Power Load Meetng Rooms,Discussion Rooms,Board Rooms,Waiting Lobbies HVAC Loads Customer care centre and Ex.Dining Dining Electrical Load - LS IT Loads Workstations , AV & Printer load - .200 watt/WS Total Load for Customer Care Centre
23751
0.9
24
23751
12 24 40 24 124
6 24 26 19 97 As per Heat Load Calculation Assumed Misc Kitchen load Considered 120 Workstation Points Needs to clarify
C.
Total For substation 1 Demand Load in KW with simultaneity factor of 0.85 I. TRANSFORMER SELECTION a. Total Demand Load in KVA with 0.95 PF b. Transformer capacity in KVA with 80% loading. Selected 3 x 2000 kVA transformers ( 2 n+1) configuration
4270
Project:TCS Infopark,Kochi
ANNEXURE-E1
Title: Electrical Load Details Date : 09.09.2011 Revision:R0 Area Diversity (Sq. ft.) \ workstations Load in KW Remarks Connected Demand
Sr. No.
Description
B.
B.1 1 1.1 2 2.1 3 3.2 4 4.1 4.2 5 6
B.2 1 1.1 2 2.2 B.3 1 1.1 2 2.2 B.4 1 1.1 2 2.2 2.3 2.4 2.5 B.5 1 1.1 2 2.1 3 3.1 3.2 F. 1 1.1 2 2.1 3 3.1 5
274544 274544
0.5 0.5
69 69 137
34 34 69
6073 6073
0.5 0.5
3 2 5
2 1 2
16561 16561
17 8 25 13 29 63
15 4 20 11 25 50
As per Area Statement Received Dated. 28.02.2011 As per Calculation As per Heat load calculation 0
77678
0.9
78
70
0.7
450
315
0.85 0.85
60 140 728
51 119 555
AHUs & HRUs for ODC blocks HRW's, Kitchen Ventilation fans, Toilet Exhausts Etc
18166 18166
0.9 0.6
18 36
B.
Total For substation 2 (1) Add phase 2 Service block load for transformer selection (2) Demand Load in KW with simultaneity factor of 0.85 I. TRANSFORMER SELECTION Add phase 2 loads a. Total Demand Load in KVA with 0.95 PF b. Transformer capacity in KVA with 80% loading. Selected 3 x 2000 kVA transformers ( 2 n+1) configuration
4110 410
3459 4323
KVA KVA
11 kV Chiller loads on HT meter 2 (Phase 1 +2) Total maximum Demand ( 1 +2 + 3- demand for air cooled chillers) II. DG SELECTION For Phase 1 Demand load on SS 1 + SS2 @ simultanity factor of 0.9 Demand Load in kVA @ 0.8 PF
2170
kW
Air cooled chillers will work only during water shortage Maximum Demand 2 on HT meter 2 at the end of phase 2
Project:TCS Infopark,Kochi
ANNEXURE-E1
Title: Electrical Load Details Date : 09.09.2011 Revision:R0 Area Diversity (Sq. ft.) \ workstations Load in KW Remarks Connected Demand
Sr. No.
Description
Phase-II D
D.1 1 1.1 2 2.2 D.2 1 1.1 2 2.1 3 3.1 3.2 3.3 4 4.1 4.2 4.3 5 5.1 5.2 6
AHUs & HRUs for ODC blocks Includes kitchen & Plant room ventilation, stairwell, liftwell pressurization etc.
8 nos , 20 pax , 2.5 MPS Pass.Elevators 1 nos 1500 Kg,1 MPS Service Elevator
Training Block ( GR+1) Lighting Load Training Rooms, Lounge, Lobby, w/s, Common Areas @ 1watt/sq.ft Power Load Training Rooms,Lounge,Lobby,w/s,Common Areas @ 0.5 watt/sq.ft IT Loads Workstations , Printer load & AV - (Training Centre) @150 watt/WS HVAC Loads-Training Block AHUs & HRUs Total Load For Training Centre Block 35 116 3476 31 95 2882 2450 2579 3223 kW kW kVA kVA Maximum Demand on HT meter 3 at the end of phase 2 AHUs & HRUs for ODC blocks 0.8 53 42 Considered 350 Workstations based on the Space Matrix Details ( 10 Rooms each with Cap of 33 Person) received on 01.03.2011 Needs to be confirmed 18941 0.5 9 5 As per Area Statement Received Dated. 28.02.2011 18941 0.9 19 17 As per Area Statement Received Dated. 28.02.2011
4 4.1
D.
Total For substation 3 Demand Load in KW with simultaneity factor of 0.85 I. TRANSFORMER SELECTION a. Total Demand Load in KVA with 0.95 PF b. Transformer capacity in KVA with 80% loading. Selected 3 x 1600 kVA transformers ( n+1) configuration II. DG SELECTION For Phase 1 + 2 Demand load on SS 1 + SS2 + SS3 @ simultanity factor of 0.9 Demand Load in kVA @ 0.8 PF
7066 8832
Project:TCS Infopark,Kochi
ANNEXURE-E 1.1
Title: UPS selection for Workstation , Hub room & Server room Date : 09.09.2011 Revision: R0
Sr. Description No. Workstations CL kW \ kVA* 1 BPO - BLOCK A No. of Workstations-4976 No's ( 4 Nos. ( 3N+N) 400 KVA UPS, As per Space matrix dated each with 15 Min. battery backup 23rd August 2011) 6 kVA \ Hub room,Mux room 1/Block(6kVA) and 24kVA /block for distribution room as confirmed by TCS. Diversity DL kW \ kVA* UPS selection * KVA Proposed Selection Remark
4976
1125
0.8
900
1111
II
456
1.0
456
570
2 Sets of 300 kVA (N+N) Configuration, each UPS with 15 Min. battery backup
BLOCK B Workstations and Printers ** No. of Workstations- 3817 No's ( 3 Nos. ( 2N+N) 400 KVA UPS, As per Space matrix dated each with 15 Min. battery backup 23rd August 2011) 6 kVA \ Hub room,Mux room 1/Block(6kVA) and 24kVA /block for distribution room as confirmed by TCS.
3817
860
0.8
688
849
312
1.0
312
390
2 Nos of 400kVA (N+N) Configuration, each UPS with 15 Min. battery backup
BLOCK A
520
1.0
520
658
2 Sets of 300kVA (N+N) Configuration, each UPS with 30 Min. battery backup
BLOCK B
520
1.0
520
658
2 Sets of 300kVA (N+N) Configuration, each UPS with 30 Min. battery backup
* UPS Load in kVA for Hub room & server room. Ups load for work station is kW. Selection for Workstation load with 90 % Loading & HUB room UPS selection with 80 % loading . * * Kindly refer Annexure E 1.1A attached for Workstation UPS calculation.
Spectral Services Consultants Pvt Ltd Project : TCS Infopark,Kochi ANNEXURE-E 1.1A Title: Data Center Load Calculations Date : 09.09.2011 Revision:R1
I Zone.a
Block
No of Racks -50 (As per TCS Confirmation) (6kVA /Rack) Power Consumption (kVA) Zone.a Zone.b No of Rack - 10(As per TCS Confirmation) (16kVA /Rack) Power Consumption (kVA) Zone.b Zone.c No of Rack (Network/Voice Equipment) - 10(As per TCS Confirmation) (6kVA /Rack) Power Consumption (kVA) Zone.c Total UPS Load - kVA UPS selection @ 80 % loading 2 Sets of 300kVA (N+N) Configuration, each UPS with 30 Min. battery backup
50
300
10
160
10
60 520 650
Project : TCS Infopark,Kochi ANNEXURE-E 1.1B Title: Hubroom Load Calculations Date : 09.09.2011 Revision:R1
Block A No of distribution / Voice room- 4No's (Considered 1 room for every Four Floors) (24kVA / DR) No of ODC Hubrooms-59No's (6No's Per FloorAs per revised Interior layout Dated-12.08.02011) (6kVA / Hubroom) 4
59
Power Consumption (kVA) for Distribution/Voice rooms 24kVA / DR Power Consumption (kVA) for ODC Hubrooms 6kVA / Rack Power consumption for Mux room (6kVA / Room) Total UPS Load - kVA UPS selection @ 80 % loading 2 Sets of 300 kVA (N+N) Configuration, each UPS with 15 Min. battery backup
96
354
456 570
I 1
Block B No of distribution / Voice room- 4No's (Considered 1 room for every Four Floors) (24kVA / DR) No of ODC Hubrooms-35No's (3No's Per FloorAs per revised Interior layout Dated-(12.08.02011) (6kVA / Hubroom)
35
3 4
Mux room ( 1 per Block) Power Consumption (kVA) for Distribution/Voice rooms 6kVA / DR Power Consumption (kVA) for ODC Hubrooms 6kVA / Rack Power consumption for Mux room (6kVA / Room) Total UPS Load - kVA UPS selection @ 80 % loading 2 Nos of 400kVA (N+N) Configuration, each UPS with 15 Min. battery backup
1 96
210
312 390
Project : TCS Infopark,Kochi ANNEXURE-E 1.1A Title: UPS Load calculation for Workstation area,Data Centre & Hub Rooms Date : 09.09.2011 Revision:R0
Block A, ODCs No. of Workstations-4976 No's ( As per Space matrix dated - 23rd August 2011) 4976 995.2
Power Consumption(KW) @ 200 Watts/ workstation Printer Load ( One Printer per group of 50 workstation and 1 KW per printer as per TCS ) AV load , field power outlets for BAS & Security Assumed Total UPS Load - KW Total Demand Load - KW @0.8 diversity UPS selection @ 0.9 PF & 90 % loading 4 Nos. ( 3N+N) 400 KVA UPS, each with 15 Min. battery backup
100
IV
BLOCK B O.D.C. No. of Workstations- 3817 No's ( As per Space matrix dated - 23rd August 2011) Power Consumption(KW) @ 200 Watts/ workstation Printer Load ( One Printer per group of 50 workstation and 1 KW per printer as per TCS ) AV load , field power outlets for BAS & Security Assumed Total UPS Load - KW Total Demand Load - KW @0.8 diversity UPS selection @ 0.9 PF & 90 % loading 3 Nos. ( 2N+N) 400 KVA UPS, each with 15 Min. battery backup
3817 763.4
76
Project : TCS Infopark,Kochi ANNEXURE-E 1.1A Title: UPS Load calculation for EMERGENCY LTG. Date : 09.09.2011 Revision:R0
Sl.No 1 2
UPS Calculation for Reception & Customer care Connected Demand 20% of Lighting Load Description Lighting/Power Diversity Load in kW Load on UPS. Load in kW Reception 3 0.9 2.7 0.54 Customer Care Lighitng Load 24 0.9 21.6 4.32 Power load (15 Workstations Considered) 3 0.8 2.4 2.4 Total Load on UPS in kVA 7.26 UPS Selected : 1x10kVA UPS Calculation for Auditorium Connected Demand 20% of Lighting Lighting/Power Diversity Load in kW Load on UPS. Load in kW 3 0.9 2.7 0.54 4 0.9 3.6 0.72 1 0.8 0.8 0.16 2.4 2.4 4.775
Sl.No Load Description 1 2 3 4 GF Lighting load 1stF Lighting load 2ndF Lighting load
UPS Load for Auditorium 3 0.8 UPS Selected in kVA Selected UPS: 1x5kVA
Sl.No Load Description 1 2 3 Total Lighting load Assumed Gym Equipment load on UPS
UPS Calculation for Recreation Connected Demand 20% of Lighting Lighting/Power Diversity Load in kW Load on UPS. Load in kW 17 0.9 15.3 3.06
0.8
3.2 2.4
Assumed IT equipments 3 0.8 Total Load on UPS in kVA UPS Selected: 1x10kVA
Total Lighting load Assumed Equipment load on UPS 2 0.8 1.6 1.6 Total Load on UPS in kVA 8.5 UPS Selected: 1x10kVA Emergency UPS Calculation for Block-A Connected Demand 10% of Lighting Sl.No Load Description Lighting Load in Diversity Load in kW Load on UPS. kW 1 Lighting Load 379 0.9 341.1 34.11 Total Load on UPS in kVA 34.11 UPS Selected: 1x60kVA Emergency UPS Calculation for Block-B Connected Demand 10% of Lighting Sl.No Load Description Lighting Load in Diversity Load in kW Load on UPS. kW 1 Lighting Load 284 0.9 255.6 25.56 Total Load on UPS in kVA 25.56 UPS Selected: 1x40kVA
UPS Calculation for MLCP Connected Demand 20% of Lighting Lighting/Power Diversity Load in kW Load on UPS. Load in kW 69 0.5 34.5 6.9