Project: Title: Date: Revision:

TCS Infopark,Kochi Electrical Laod Summary 09.09.2011 R1

Area Electrical Load estimates Phase 1 Block - A, audi, reception, customer care Service block ,Caf, MLCP, recreation, misc 11kV Chiller Plant Phase 2 Block - B, training & library Service block 11kV Chiller Plant Saggrigation of Loads on HT meters HT meter 1 - Block - A, audi, reception, customer care HT meter 2 - Service block(phase 1+2) ,Caf, MLCP, recreation, misc, + 11kV chillers. HT meter 3 - Block - B, training & library(Phase 2)

Connected Load kW

Demand Load kW

Transformer selection LT load in kW LT load in kVA load in kVA Selection @ 0.95 PF @ 80 %

4270 4110 1446 3476 410 723

2926 2989 1098 2450 349 549

4270 6689 3476

2926

2926 3338 2450 LT load in kVA @ 0.8PF 6076 8832

3080 3514 2579

3850 3 x 2000 kVA ( n+1) 4392 3 x 2000 kVA ( n+1) 3223 3 x 1600 kVA ( n+1)

3709
2450 LT load in kW

DG Selection 1. Demand Load during phase 1 2. Demand Load during end of phase 2

4861 7066

5 x 2000 kVA (n+1) 6 x 2000 kVA (n+1)

Project:TCS Infopark,Kochi

Spectral Services Consultant Pvt.Ltd.

Project: Title: Date: Revision:

TCS Infopark,Kochi HVAC Equipment Load 09.09.2011 R0

PLANT ROOM EQUIPMENTS - PHASE 1 SR. NO.


1 1.1

EQUIPMENT DESCRIPTION
Phase-I 11 KV Chiller Load 900 TR Water Cooled Chiller - 11 KV Total Load For 11 KV Chiller -Ph-I Phase-I 415 Volt High Side HVAC Load 370 TR Air Cooled Chiller (In case of Water shortage) Primary CHW Pumps - W/C Chillers Primary CHW Pumps - A/C Chillers Cooling Towers Condenser Water Pumps Secondary Pumps - Block A Secondary Pumps - Reception / Audi / Library Secondary Pumps - Caf / Recreation Secondary Pumps - Guesthouse

QTY
2

CONNECTED LOAD
(KW) 1446 1446

DEMAND LOAD
(KW) 1098 1098

2 2.1 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8

3 4(3W+1S) 4(3W+1S) 3(2W+1S) 5(4W+1S) 3(2W+1S) 2(1W+1S) 2(1W+1S) 2(1W+1S)

1277 134 60 165 225 270 30 74 18.6

1277 100.5 110 180 180 15 37 9.3

TOTAL

2253

1908

* Maximum of Air Cooled Chiller and Water Cooled Chiller operations is considered for arrving at total load. PLANT ROOM EQUIPMENTS - PHASE 2 SR. NO.
1 1.1

EQUIPMENT DESCRIPTION
Phase-II 11 KV Chiller Load 900 TR Water Cooled Chiller - 11 KV Total Load For 11 KV Chiller -Ph-II Phase-II 415 Volt High Side HVAC Load Primary CHW Pumps - W/C Chillers Cooling Towers Condenser Water Pumps Secondary Pumps - Block B Secondary Pumps - Training

QTY
1

CONNECTED LOAD
(KW) 723 723

DEMAND LOAD
(KW) 549 549

2 2.1 2.2 2.3 2.4 2.5

1 2 2 3(2W+1S) 2(1W+1S)

33.5 110 90 165 11

33.5 110 90 110 5.5

TOTAL AHU/FANS - PHASE 1 SR. NO.


1 2 3 4 5 6 7 8 9 10 11 12

409.5

349

SPACE
Blcok A - AHU & HRU Recp / Audi / Lib - AHU & HRU Cafeteria - AHU & HRU Guesthouse - AHU & HRU Blcok A - Fans Audi - Fans Cafeteria Kitchen - Fans Guesthouse - Fans Datacenter - Dual Fluid PAC UPS - Dual Fluid AHU HUB - VRV Utility - Fans

CONNECTED LOAD
(KW) 350 50 80 30 165 30 175 25 408 48 80 250

DEMAND LOAD
(KW) 298 43 68 26 140 26 150 22 306 41 68 215

In fire mode In fire mode

Standby

TOTAL AHU/FANS - PHASE 2 SR. NO.


1 2 3 4 5 6 7 Blcok B - AHU & HRU Training - AHU & HRU Blcok B - Fans Training - Fans Datacenter - Dual Fluid PAC UPS - Dual Fluid AHU HUB - VRV

1691

1403

SPACE

CONNECTED LOAD
(KW) 275 30 150 15 408 48 40

DEMAND LOAD
(KW) 235 26 128 13 306 41 34

In fire mode

Standby

TOTAL

966

783

Project:TCS Infopark,Kochi

Spectral Services Consulatant Pvt.Ltd.

Spectral Services Consultants Pvt Ltd

Detail Electrical Load Calculation-Phase I &II Project : TCS Infopark ,Kochi

ANNEXURE-E1
Title: Electrical Load Details Date : 09.09.2011 Revision:R0 Area Diversity (Sq. ft.) \ workstations Load in KW Remarks Connected Demand

Sr. No.

Description

A.
A.1 1 1.1 2 2.1 3 3.1 3.2 3.3 4 4.1 4.2 4.3 5 5.1 5.2

Phase-I Substation 1 - Block-A ODC Block (GR+13) + Auditorium + Reception + Customer care
Block A Lighting Load Block A - ODC,IT DEPT, HR,Admin,Fin,Training Dept,Common Areas - 0.9 watt / sq ft Power Load ODC,IT DEPT, HR,Admin,Fin,Training Dept,Common Areas - 0.5 watt / sq ft IT Loads Server Room Loads (Block-A ) Hub Room (ODC Block-A) Workstations , Printer load & AV - (Block- A ) @200 watt/WS HVAC Loads Block 'A' AHUs & HRUs Ventilation fans Datacentre \ UPS \ HUB room Elevators Block 'A' Passenger Elevator Service Elevator Total Load Block-A RECEPTION BLOCK (GR) Lighting Load Secuirty,Waiting & Discussion Room Area 1 Watt/Sq.ft Power Load Secuirty,Waiting & Discussion Room Area 0.5 watt/Sq.ft HVAC Load IT Loads Workstations, Printer load - .200 watt/WS LS Total Load Reception Block Auditorium ( GR+1) Lighting Load Lighting Load @-1 Watt/Sq.ft Power Load Convenience Power @ - 0.5 watt/Sq.ft Equipment load LS Ventilation fans Auditorium Air conditioning loads Total Load Auditorium

421157

0.9

379

341

As per Area Statement Received Dated. 28.02.2011

421157

0.5

211

105

As per Area Statement Received Dated. 28.02.2011

1 1 4976 0.8

520 456 1125 622 59 464

520 456 900 446 5 326 200 20 3299

As per TCS confirmation Refer ANNEXURE-E 1.1B No. of Workstations-4976 No's ( As per Space matrix dated - 23rd August 2011) AHUs & HRUs for ODC blocks Includes stairwell, liftwell pressurization etc.

0.8 0.8

250 25 4085

8 nos , 20 pax , 2.5 MPS Pass.Elevators 1 nos 1500 Kg,1 MPS Service Elevator

A.2 1 1.1 2 2.2 2.3 3 3.1

2698

0.9

2 As per Area Statement Received Dated. 28.02.2011

2698

0.5

1 6

1 1 2 6 0 As per Heat Load calculation

0.8

2 12

A.3 1 1.1 2 2.2 2.3 2.4 2.5

7536 7536

0.9 0.5 0.85 0.85

8 4 25 13 6 49

7 2 21 11 6 41 0

As per Area Statement Received Dated. 28.02.2011 Toilet Exhaust fans, HRW's, Fire Emergency loads etc.. As per Heat Load Calculation

A.4 1 1.1 2 2.1 2.2 2.3 3 3.1

Customer Care Centre ( GR+2) Lighting Load Meetng Rooms,Discussion Rooms,Board Rooms,Waiting Lobbies Power Load Meetng Rooms,Discussion Rooms,Board Rooms,Waiting Lobbies HVAC Loads Customer care centre and Ex.Dining Dining Electrical Load - LS IT Loads Workstations , AV & Printer load - .200 watt/WS Total Load for Customer Care Centre

23751

0.9

24

21 As per Area Statement Received Dated. 28.02.2011

23751

0.5 1 0.65 0.8

12 24 40 24 124

6 24 26 19 97 As per Heat Load Calculation Assumed Misc Kitchen load Considered 120 Workstation Points Needs to clarify

C.

Total For substation 1 Demand Load in KW with simultaneity factor of 0.85 I. TRANSFORMER SELECTION a. Total Demand Load in KVA with 0.95 PF b. Transformer capacity in KVA with 80% loading. Selected 3 x 2000 kVA transformers ( 2 n+1) configuration

4270

3442 2926 3080 3850

KW KW KVA KVA Maximum Demand on HT meter 1

Project:TCS Infopark,Kochi

Spectral Services Consultant Pvt.Ltd.

Spectral Services Consultants Pvt Ltd

Detail Electrical Load Calculation-Phase I &II Project : TCS Infopark ,Kochi

ANNEXURE-E1
Title: Electrical Load Details Date : 09.09.2011 Revision:R0 Area Diversity (Sq. ft.) \ workstations Load in KW Remarks Connected Demand

Sr. No.

Description

B.
B.1 1 1.1 2 2.1 3 3.2 4 4.1 4.2 5 6

Substation 2 - Service block, caf, MLCP, recreation, misc


Services Block Lighting Load Lighting Load @1 Watt/Sq.ft Power Load Power Load @0.5 Watt/Sq.ft HVAC Loads High Side Phase-I Ventilation fans Plumbing & Firefighting Plumbing & Drainage Fire fighting External Lighting Load STP Load Total Load for Services Block MLCP (GR+7) Lighting Load Lighting Load @-0.25 Watt/Sq.ft Power Load Convenience Power @ - 0.25 watt/Sq.ft Total Load MLCP MISCELLANIOUS BLDG Lighting Load Lighting Load @-0.5 Watt/Sq.ft Power Load Convenience Power @ - 0.25 watt/Sq.ft Total Load Misc Bldg Recreation Centre Lighting Load Lighting Load @-1 Watt/Sq.ft Power Load Convenience Power @ - 0.5 watt/Sq.ft Equipment loads - LS Ventilation fans load Air conditioning loads Total Load Recreation Centre Cafeteria (GR+1) Lighting Load Siting & Kitchen Area @ 1Watt/Sq.Ft. Power Load Kitchen Electrical Equipment Load For Cafeteria - LS HVAC Loads Cafeteria AHUs & HRUs Cafeteria fans Total Load for Cafeteria Guest House (GR+2) Lighting Load Lighting Load @ 1 Watt/Sq.ft Power Load Power Load @2 Watt/Sq.ft HVAC Loads Guest House AHUs & HRUs Elevators Total Load for Guest House 0.8 12 40 106 10 32 80 AHUs & HRUs for ODC blocks 0.8 1 101 485 60 100 3071 80 40 48 100 2233 21521 21521 0.9 0.5 22 11 2253 40 19 5 1908 32 As per Area Statement Received Dated. 28.02.2011 Air Cooled Chillers,Primary,Secondary,Condenser Pumps & Cooling Towers stairwell, liftwell pressurization etc.- Fire loads

B.2 1 1.1 2 2.2 B.3 1 1.1 2 2.2 B.4 1 1.1 2 2.2 2.3 2.4 2.5 B.5 1 1.1 2 2.1 3 3.1 3.2 F. 1 1.1 2 2.1 3 3.1 5

274544 274544

0.5 0.5

69 69 137

34 34 69

As per Area Statement Received Dated. 28.02.2011 0

6073 6073

0.5 0.5

3 2 5

2 1 2

As per Area Statement Received Dated. 28.02.2011 0

16561 16561

0.9 0.5 0.8 0.85 0.85

17 8 25 13 29 63

15 4 20 11 25 50

As per Area Statement Received Dated. 28.02.2011 As per Calculation As per Heat load calculation 0

77678

0.9

78

70

As per Area Statement Received Dated. 28.02.2011 Assumed Kitchen Load

0.7

450

315

0.85 0.85

60 140 728

51 119 555

AHUs & HRUs for ODC blocks HRW's, Kitchen Ventilation fans, Toilet Exhausts Etc

18166 18166

0.9 0.6

18 36

16 22 As per Area Statement Received Dated. 28.02.2011

B.

Total For substation 2 (1) Add phase 2 Service block load for transformer selection (2) Demand Load in KW with simultaneity factor of 0.85 I. TRANSFORMER SELECTION Add phase 2 loads a. Total Demand Load in KVA with 0.95 PF b. Transformer capacity in KVA with 80% loading. Selected 3 x 2000 kVA transformers ( 2 n+1) configuration

4110 410

2989 349 3286

kW kW kW Maximum Demand 1 on HT meter 2 at the end of phase 2

3459 4323

KVA KVA

11 kV Chiller loads on HT meter 2 (Phase 1 +2) Total maximum Demand ( 1 +2 + 3- demand for air cooled chillers) II. DG SELECTION For Phase 1 Demand load on SS 1 + SS2 @ simultanity factor of 0.9 Demand Load in kVA @ 0.8 PF

2170

1647 2475 5401 4861 6076

kW

Air cooled chillers will work only during water shortage Maximum Demand 2 on HT meter 2 at the end of phase 2

Selected 4 x 2000 kVA, 11 kV prime rated DG sets ( n+1) configuration

Project:TCS Infopark,Kochi

Spectral Services Consultant Pvt.Ltd.

Spectral Services Consultants Pvt Ltd

Detail Electrical Load Calculation-Phase I &II Project : TCS Infopark ,Kochi

ANNEXURE-E1
Title: Electrical Load Details Date : 09.09.2011 Revision:R0 Area Diversity (Sq. ft.) \ workstations Load in KW Remarks Connected Demand

Sr. No.

Description

Phase-II D
D.1 1 1.1 2 2.2 D.2 1 1.1 2 2.1 3 3.1 3.2 3.3 4 4.1 4.2 4.3 5 5.1 5.2 6

Substation 3- Block-B , training + library


Library ( GR) Lighting Load Lighting Load @-1 Watt/Sq.ft Power Load Convenience Power @ - 0.5 watt/Sq.ft Total Load Library Block- 'B' ODC Block ( GR+13) Lighting Load ODC & Common Areas - 0.9 watt / sq ft Power Load ODC & Common Areas - 0.5 watt / sq ft IT Loads Server Room Loads (Block-B ) Hub Room (ODC Block-B) Workstations , Printer load & AV - (BlockB) @200 watt/WS HVAC Loads-Block B AHUs & HRUs Ventilation fans Datacentre \ UPS \ HUB room Elevators Block B Passenger Elevator Service Elevator External Lighting Load Total Load For Block 'B' 1 1 3817 0.8 520 312 860 520 312 688 As per TCS confirmation Refer ANNEXURE-E 1.1B No. of Workstations- 3817 No's ( As per Space matrix dated - 23rd August 2011) 315652 0.5 158 79 315652 0.9 284 256 As per Area Statement Received Dated. 28.02.2011 6016 6016 0.9 0.5 6 3 9 5 2 7

As per Area Statement Received Dated. 28.02.2011 0

367 51 464 0.8 0.8 0.8 250 25 60 3351

328 4 326 200 20 48 2780

AHUs & HRUs for ODC blocks Includes kitchen & Plant room ventilation, stairwell, liftwell pressurization etc.

8 nos , 20 pax , 2.5 MPS Pass.Elevators 1 nos 1500 Kg,1 MPS Service Elevator

D.3 1 1.1 2 2.1 3 3.3

Training Block ( GR+1) Lighting Load Training Rooms, Lounge, Lobby, w/s, Common Areas @ 1watt/sq.ft Power Load Training Rooms,Lounge,Lobby,w/s,Common Areas @ 0.5 watt/sq.ft IT Loads Workstations , Printer load & AV - (Training Centre) @150 watt/WS HVAC Loads-Training Block AHUs & HRUs Total Load For Training Centre Block 35 116 3476 31 95 2882 2450 2579 3223 kW kW kVA kVA Maximum Demand on HT meter 3 at the end of phase 2 AHUs & HRUs for ODC blocks 0.8 53 42 Considered 350 Workstations based on the Space Matrix Details ( 10 Rooms each with Cap of 33 Person) received on 01.03.2011 Needs to be confirmed 18941 0.5 9 5 As per Area Statement Received Dated. 28.02.2011 18941 0.9 19 17 As per Area Statement Received Dated. 28.02.2011

4 4.1

D.

Total For substation 3 Demand Load in KW with simultaneity factor of 0.85 I. TRANSFORMER SELECTION a. Total Demand Load in KVA with 0.95 PF b. Transformer capacity in KVA with 80% loading. Selected 3 x 1600 kVA transformers ( n+1) configuration II. DG SELECTION For Phase 1 + 2 Demand load on SS 1 + SS2 + SS3 @ simultanity factor of 0.9 Demand Load in kVA @ 0.8 PF

7066 8832

Selected 6 x 2000 kVA, 11 kV Prime rated DG sets ( n+1) configuration

Project:TCS Infopark,Kochi

Spectral Services Consultant Pvt.Ltd.

Spectral Services Consultants Pvt Ltd

Project : TCS Infopark,Kochi

ANNEXURE-E 1.1
Title: UPS selection for Workstation , Hub room & Server room Date : 09.09.2011 Revision: R0
Sr. Description No. Workstations CL kW \ kVA* 1 BPO - BLOCK A No. of Workstations-4976 No's ( 4 Nos. ( 3N+N) 400 KVA UPS, As per Space matrix dated each with 15 Min. battery backup 23rd August 2011) 6 kVA \ Hub room,Mux room 1/Block(6kVA) and 24kVA /block for distribution room as confirmed by TCS. Diversity DL kW \ kVA* UPS selection * KVA Proposed Selection Remark

Workstations and Printers **

4976

1125

0.8

900

1111

II

Hub Room-BPO & IT ***

456

1.0

456

570

2 Sets of 300 kVA (N+N) Configuration, each UPS with 15 Min. battery backup

BLOCK B Workstations and Printers ** No. of Workstations- 3817 No's ( 3 Nos. ( 2N+N) 400 KVA UPS, As per Space matrix dated each with 15 Min. battery backup 23rd August 2011) 6 kVA \ Hub room,Mux room 1/Block(6kVA) and 24kVA /block for distribution room as confirmed by TCS.

3817

860

0.8

688

849

Hub Room-BPO & IT ***

312

1.0

312

390

2 Nos of 400kVA (N+N) Configuration, each UPS with 15 Min. battery backup

Data Centre ( PH-I)

BLOCK A

520

1.0

520

658

2 Sets of 300kVA (N+N) Configuration, each UPS with 30 Min. battery backup

based on TCS confirmation to include future loads

Data Centre ( PH-II)

BLOCK B

520

1.0

520

658

2 Sets of 300kVA (N+N) Configuration, each UPS with 30 Min. battery backup

based on TCS confirmation to include future loads

* UPS Load in kVA for Hub room & server room. Ups load for work station is kW. Selection for Workstation load with 90 % Loading & HUB room UPS selection with 80 % loading . * * Kindly refer Annexure E 1.1A attached for Workstation UPS calculation.

Project: TCS Infopark,Kochi

Spectral Services Consultant Pvt.Ltd.

Spectral Services Consultants Pvt Ltd Project : TCS Infopark,Kochi ANNEXURE-E 1.1A Title: Data Center Load Calculations Date : 09.09.2011 Revision:R1

UPS SELECTION -DATA CENTER


Sr.No Description

I Zone.a

Block

No of Racks -50 (As per TCS Confirmation) (6kVA /Rack) Power Consumption (kVA) Zone.a Zone.b No of Rack - 10(As per TCS Confirmation) (16kVA /Rack) Power Consumption (kVA) Zone.b Zone.c No of Rack (Network/Voice Equipment) - 10(As per TCS Confirmation) (6kVA /Rack) Power Consumption (kVA) Zone.c Total UPS Load - kVA UPS selection @ 80 % loading 2 Sets of 300kVA (N+N) Configuration, each UPS with 30 Min. battery backup

50

300

10

160

10

60 520 650

Project: TCS Infopark,Kochi

Spectral Services Consultant Pvt.Ltd.

Spectral Services Consultants Pvt Ltd

Project : TCS Infopark,Kochi ANNEXURE-E 1.1B Title: Hubroom Load Calculations Date : 09.09.2011 Revision:R1

UPS SELECTION -FOR HUB ROOM


Sr. No. I 1 Description

Block A No of distribution / Voice room- 4No's (Considered 1 room for every Four Floors) (24kVA / DR) No of ODC Hubrooms-59No's (6No's Per FloorAs per revised Interior layout Dated-12.08.02011) (6kVA / Hubroom) 4

59

Mux room ( 1 per Block)

Power Consumption (kVA) for Distribution/Voice rooms 24kVA / DR Power Consumption (kVA) for ODC Hubrooms 6kVA / Rack Power consumption for Mux room (6kVA / Room) Total UPS Load - kVA UPS selection @ 80 % loading 2 Sets of 300 kVA (N+N) Configuration, each UPS with 15 Min. battery backup

96

354

456 570

I 1

Block B No of distribution / Voice room- 4No's (Considered 1 room for every Four Floors) (24kVA / DR) No of ODC Hubrooms-35No's (3No's Per FloorAs per revised Interior layout Dated-(12.08.02011) (6kVA / Hubroom)

35

3 4

Mux room ( 1 per Block) Power Consumption (kVA) for Distribution/Voice rooms 6kVA / DR Power Consumption (kVA) for ODC Hubrooms 6kVA / Rack Power consumption for Mux room (6kVA / Room) Total UPS Load - kVA UPS selection @ 80 % loading 2 Nos of 400kVA (N+N) Configuration, each UPS with 15 Min. battery backup

1 96

210

312 390

Project: TCS Infopark,Kochi

Spectral Services Consultant Pvt.Ltd.

Spectral Services Consultants Pvt Ltd

Project : TCS Infopark,Kochi ANNEXURE-E 1.1A Title: UPS Load calculation for Workstation area,Data Centre & Hub Rooms Date : 09.09.2011 Revision:R0

UPS SELECTION -FOR Work station


Sr. No. I Description

Block A, ODCs No. of Workstations-4976 No's ( As per Space matrix dated - 23rd August 2011) 4976 995.2

Power Consumption(KW) @ 200 Watts/ workstation Printer Load ( One Printer per group of 50 workstation and 1 KW per printer as per TCS ) AV load , field power outlets for BAS & Security Assumed Total UPS Load - KW Total Demand Load - KW @0.8 diversity UPS selection @ 0.9 PF & 90 % loading 4 Nos. ( 3N+N) 400 KVA UPS, each with 15 Min. battery backup

100

30 1125 900 1111

IV

BLOCK B O.D.C. No. of Workstations- 3817 No's ( As per Space matrix dated - 23rd August 2011) Power Consumption(KW) @ 200 Watts/ workstation Printer Load ( One Printer per group of 50 workstation and 1 KW per printer as per TCS ) AV load , field power outlets for BAS & Security Assumed Total UPS Load - KW Total Demand Load - KW @0.8 diversity UPS selection @ 0.9 PF & 90 % loading 3 Nos. ( 2N+N) 400 KVA UPS, each with 15 Min. battery backup

3817 763.4

76

20 860 688 849

Project: TCS Infopark,Kochi

Spectral Services Consultant Pvt.Ltd.

Spectral Services Consultants Pvt Ltd

Project : TCS Infopark,Kochi ANNEXURE-E 1.1A Title: UPS Load calculation for EMERGENCY LTG. Date : 09.09.2011 Revision:R0

Sl.No 1 2

UPS Calculation for Reception & Customer care Connected Demand 20% of Lighting Load Description Lighting/Power Diversity Load in kW Load on UPS. Load in kW Reception 3 0.9 2.7 0.54 Customer Care Lighitng Load 24 0.9 21.6 4.32 Power load (15 Workstations Considered) 3 0.8 2.4 2.4 Total Load on UPS in kVA 7.26 UPS Selected : 1x10kVA UPS Calculation for Auditorium Connected Demand 20% of Lighting Lighting/Power Diversity Load in kW Load on UPS. Load in kW 3 0.9 2.7 0.54 4 0.9 3.6 0.72 1 0.8 0.8 0.16 2.4 2.4 4.775

Sl.No Load Description 1 2 3 4 GF Lighting load 1stF Lighting load 2ndF Lighting load

UPS Load for Auditorium 3 0.8 UPS Selected in kVA Selected UPS: 1x5kVA

Sl.No Load Description 1 2 3 Total Lighting load Assumed Gym Equipment load on UPS

UPS Calculation for Recreation Connected Demand 20% of Lighting Lighting/Power Diversity Load in kW Load on UPS. Load in kW 17 0.9 15.3 3.06

0.8

3.2 2.4

3.2 2.4 8.66

Assumed IT equipments 3 0.8 Total Load on UPS in kVA UPS Selected: 1x10kVA

Sl.No Load Description 1 2

Total Lighting load Assumed Equipment load on UPS 2 0.8 1.6 1.6 Total Load on UPS in kVA 8.5 UPS Selected: 1x10kVA Emergency UPS Calculation for Block-A Connected Demand 10% of Lighting Sl.No Load Description Lighting Load in Diversity Load in kW Load on UPS. kW 1 Lighting Load 379 0.9 341.1 34.11 Total Load on UPS in kVA 34.11 UPS Selected: 1x60kVA Emergency UPS Calculation for Block-B Connected Demand 10% of Lighting Sl.No Load Description Lighting Load in Diversity Load in kW Load on UPS. kW 1 Lighting Load 284 0.9 255.6 25.56 Total Load on UPS in kVA 25.56 UPS Selected: 1x40kVA

UPS Calculation for MLCP Connected Demand 20% of Lighting Lighting/Power Diversity Load in kW Load on UPS. Load in kW 69 0.5 34.5 6.9

Spectral Services Consultant Pvt.Ltd. Project:TCS Infopark,Kochi