Contractor Site Diary Report - 09 April 2013
Contractor Site Diary Report - 09 April 2013
Building: Apartment
Subject: Manpower Report for Finishing Works
Cold
Work Description
Tiling works Stone works Ceiling works Masonry works ( Plastering, brickworks) Painting works (interior) Painting works (exterior) Aluminum windows & doors Steel doors Wood works (doors,door casing,baseboards ) Wooden floors Skirting Steel works (handrails,canopy,toplight) Furnitures (kitchen , toilet cabinets) Miscellaneous works
Number of Workers
Remarks
60 6 45 8 51 12 28 13 25 5 10 13 13 44 14 26
Doori
DeaJung
M&E system (gas system)
Deashin
8 381
Grand total
Project: North An Khanh New City Location: Hanoi, Vietnam Client: An Khanh New City Development JVC LTD Construction Management: Bureau VERITAS Construction Supervision: IBST Contractor: POSCO E&C Building: Terrace Houses Subject: Manpower Report for Finishing Works
9thApril2013 Cold
Remarks
Work Description
Tiling works Stone works Ceiling works Painting works PVC doors and windows Skirting board and wooden floor Wooden doors (interior and main doors) Wooden staircase (step + handrails) Steel handrails (perimeter) Miscellaneous works
Pulse Housing NT Sunwood NT Singsung DeaJung Doori NT ICM NT NT Pulse Housing NT Sunwood NT Singsung DeaJung Doori
Total
Tiling works Stone works Ceiling works Painting works PVC doors and windows Skirting board and wooden floor Wooden doors (interior and main doors) Wooden staircase (step + handrails) Steel handrails (perimeter) Miscellaneous works M&E system (mechanical system) M&E system (electrical)
215 413
Project: North An Khanh New City Location: Hanoi, Vietnam Client: An Khanh New City Development JVC LTD Construction Management: Bureau VERITAS Construction Supervisor: IBST Contractor: POSCO E&C Building: VILLAS
Subject: Manpower Report for Finishing Works
Work Description
Tiling works Stone works Ceiling works Painting works PVC doors and windows Aluminum windows Wooden doors (interior and main doors) Wooden staircase (step + handrails) Interior wooden handrails Shower booth Steel handrails (perimeter) Skirting Wooden floor Miscellaneous works
Number of Workers
ICM Sing Sung Cosmo ICM ICM Dea Jung Doori ICM Doul Auri Auri Pulse housing Pulse housing Sunwood
Total
Tiling works Stone works Ceiling works Painting works PVC doors and windows Aluminum windows Wooden doors (interior and main doors) Wooden staircase (step + handrails) Interior wooden handrails Shower booth Steel handrails (perimeter) Skirting Wooden floor Miscellaneous works
ICM Sing Sung Cosmo ICM ICM Dea Jung Doori Doul Doul Auri Auri Pulse Housing Pulse Housing Sunwood
Total
Tiling works Stone works Ceiling works Painting works PVC doors and windows Aluminum windows Wooden doors (interior and main doors) Interior wooden handrails Shower booth
Sing Sung
30 35 16 21 9 10 4 12 5 3 5 7 2 29 8 9 205 33 28 12 18 7 3 4 13 5 3 5 8 3 29 8 9 188 31 31 14 27 5 3 5 5 2
Villas - Zone 3
Duol Cosmo Doul Duol Dea Jung Doori Doul Doul Auri Auri Pulse Housing Pulse Housing Sunwood
Skirting Steel handrails (perimeter) Wooden staircase (step + handrails) Wooden floor Miscellaneous works M&E system (mechanical system) M&E system (electrical)
Total
Tiling works Stone works Ceiling works Painting works PVC doors and windows Aluminum windows Wooden doors (interior and main doors) Interior wooden handrails Shower booth Skirting Steel handrails (perimeter) Wooden staircase (step + handrails) Wooden floor Miscellaneous works
Total
Grand total
Project: North An Khanh New City Location: Hanoi, Vietnam Construction Management: Bureau VERITAS Contractor:VINACONEX Building:Apartment Block
Subject: Manpower Report for Finishing Works
Date: 9/4/2013
Main Contractor / Location Sub-Contractor's Name Work Description Number of Workers Remarks
Tiling works Stone works Ceiling works Masonry works ( Plastering, brickworks) Painting works (interior) Painting works (exterior) Aluminum windows & doors Steel doors
Wood works (doors,door casing,baseboards ) Wooden floors Steel works (handrails,canopy,toplight) Furnitures (kitchen , toilet cabinets) Miscellaneous works M&E system (RWDP) M&E system (mechanical system) M&E system (gas system) M&E system (electrical) other
Grand total
43 55 25 28 38 26 3 32 40 45 22 45 25 23 26 19 25 120 640
NR/T T IV
VC6 92
VC9 82
VINHAN 218
NORTH AN KHANH NEW CITY PROJECT An Khanh Commune, Hoai Duc District Hanoi, Vietnam AN KHANH NEW CITY DEVELOPMENT JVC LTD Client (Ch u t): BUREAU VERITAS VIETNAM Construction Management (Qun l xy dng): : CECC - IBST Construction Supervision (GSXD) VINACONEX - VIMECO Contractor ( Nh thu) Item of work/ Hng mc cng vic Project (Cng trnh): Address ( a ch):
Work start time: 07:00am Weather: Fair Rainy ( Time: Day Ngy
10 32 1 1
Date
Night m
0 2
Equipments/Thit b
Roller Compactor/ My m Welding Machine/My hn Concrete Vibrator Dump Truck/ Xe ti Bull Dozer/My lu Level Calibration/My thy bnh Grader/ My san Excavator/ My xc Generator/ My pht in Spreader Machine/ My tri
Labour/Nhn cng
Foreman/c cng Carpenter /CN cp pha Masonry workers/Th n Rebar workers/Th st Electrical workers/Th in Unskilled workers/ LPT Safety Engineer/CB an ton Machanic/ C kh Surveyor/CB trc c Machine operators
Night m
1 0 10 0 1 5 0
TOTAL TODAY
44
17
3. Material delivered: 4. Items Accomplished: 5. Meetings and significant decisions: 6. Problem Encountered (Vn pht sinh): 7. Action taken to the problem encountered (Bin php x l):
9. Forecasted Activities on the Following Day (D kin cng vic ngy tip theo):
Safety:
a. Accidents: b. Near Misses: c. Injuries: Submitted by (Contractor ): Name: Position: Signature: Date :
d. Unusual Events: e. Others;(Pls specify): Checked by Supervisor: CECC-IBST Nguyen Hong Phong Name: Position: Signature: Date :
Project: North An Khanh New City Location: Hanoi, Vietnam Construction Management: Bureau VERITAS Contractor:VINACONEX Building: Terrace Houses
Subject: Manpower Report for Finishing Works
Date: 9/4/2013
Main Contractor / Location Sub-Contractor's Name Work Description Number of Workers Remarks
Tiling works Stone works Ceiling works Painting works PVC doors and windows Aluminum windows Wooden doors (interior and main doors)
Wooden staircase (step + handrails) Interior wooden handrails Steel handrails (perimeter) Wooden floors Baseboards Miscellaneous works M&E system (RWDP) M&E system (mechanical system) M&E system (gas system) M&E system (electrical)
Tiling works Stone works Ceiling works Painting works PVC doors and windows Aluminum windows Wooden doors (interior and main doors)
Wooden staircase (step + handrails) Interior wooden handrails Steel handrails (perimeter) Wooden floors Baseboards Miscellaneous works M&E system (RWDP) M&E system (mechanical system) M&E system (gas system) M&E system (electrical)
20 25 19 15 5 3 35 19 15 15 19 15 7 8 10 12 8 250 25 26 13 19 3 5 30 22 18 10 20 9 13 12 9 12 8 254
504 57 561
Project: North An Khanh New City Location: Hanoi, Vietnam Construction Management: Bureau VERITAS Contractor: VINACONEX Building: VILLAS
Subject: Manpower Report for Finishing Works
Date : 9/4/2013
Main Contractor / Location Sub-Contractor's Name Work Description
Tiling works Stone works Ceiling works Painting works PVC doors and windows Aluminum windows Wooden doors (interior and main doors) Wooden staircase (step + handrails)
Number of Workers
Remarks
Interior wooden handrails Steel handrails (perimeter) Wooden floors Baseboards Miscellaneous works M&E system (RWDP) M&E system (mechanical system) M&E system (gas system) M&E system (electrical)
Total
Tiling works Stone works Ceiling works Painting works PVC doors and windows Aluminum windows Wooden doors (interior and main doors) Wooden staircase (step + handrails)
Interior wooden handrails Steel handrails (perimeter) Wooden floors Baseboards Miscellaneous works M&E system (RWDP) M&E system (mechanical system) M&E system (gas system) M&E system (electrical)
Total
Tiling works Stone works Ceiling works Painting works
22 24 18 17 5 2 20 18 10 12 18 6 8 8 8 6 5 207 16 18 14 12 2 6 29 18 9 8 17 2 3 5 5 8 5 177 15 15 12 15
Project: North An Khanh New City Location: Hanoi, Vietnam Construction Management: Bureau VERITAS Contractor: VINACONEX Building: VILLAS
Subject: Manpower Report for Finishing Works
Date : 9/4/2013
Main Contractor / Location Sub-Contractor's Name Work Description
PVC doors and windows Aluminum windows Wooden doors (interior and main doors) Wooden staircase (step + handrails)
Number of Workers
Remarks
Interior wooden handrails Steel handrails (perimeter) Wooden floors Baseboards Miscellaneous works M&E system (RWDP) M&E system (mechanical system) M&E system (gas system) M&E system (electrical)
Total
Tiling works Stone works Ceiling works Painting works PVC doors and windows Aluminum windows Wooden doors (interior and main doors) Wooden staircase (step + handrails)
Interior wooden handrails Steel handrails (perimeter) Wooden floors Baseboards Miscellaneous works M&E system (RWDP) M&E system (mechanical system) M&E system (gas system) M&E system (electrical)
Total