100% found this document useful (1 vote)
322 views11 pages

Contractor Site Diary Report - 09 April 2013

The document provides manpower reports for finishing works at various construction sites for the North An Khanh New City project in Hanoi, Vietnam. It reports on 413 workers at apartment buildings, 215 workers at terrace houses, and 804 workers total across four villa zones for contractor POSCO E&C on April 9, 2013. It also reports on 640 workers at apartment blocks and 504 workers across two terrace house zones for contractor VINACONEX on the same date.

Uploaded by

laogia202
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
322 views11 pages

Contractor Site Diary Report - 09 April 2013

The document provides manpower reports for finishing works at various construction sites for the North An Khanh New City project in Hanoi, Vietnam. It reports on 413 workers at apartment buildings, 215 workers at terrace houses, and 804 workers total across four villa zones for contractor POSCO E&C on April 9, 2013. It also reports on 640 workers at apartment blocks and 504 workers across two terrace house zones for contractor VINACONEX on the same date.

Uploaded by

laogia202
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 11

Project: North An Khanh New City Location: Hanoi, Vietnam Construction Management: Bureau VERITAS Contractor: POSCO E&C

Building: Apartment
Subject: Manpower Report for Finishing Works

SITE DIARY - APARTMENT


Date: Weather: Main Contractor / Sub-Contractor's Location Name
ICM, Duol ICM Eunmin ICM, Duol ICM Duol Hyundai 9th April 2013

Cold

Work Description
Tiling works Stone works Ceiling works Masonry works ( Plastering, brickworks) Painting works (interior) Painting works (exterior) Aluminum windows & doors Steel doors Wood works (doors,door casing,baseboards ) Wooden floors Skirting Steel works (handrails,canopy,toplight) Furnitures (kitchen , toilet cabinets) Miscellaneous works

Number of Workers

Remarks

60 6 45 8 51 12 28 13 25 5 10 13 13 44 14 26

Posco E & C Apartment (Block 101 - Block 104)

Sing Sung Sunwood ICM Duol Sing Sung Livart

Doori

M&E system (RWDP) M&E system (mechanical system)

DeaJung
M&E system (gas system)

Deashin

M&E system (electrical)

8 381

Grand total

Project: North An Khanh New City Location: Hanoi, Vietnam Client: An Khanh New City Development JVC LTD Construction Management: Bureau VERITAS Construction Supervision: IBST Contractor: POSCO E&C Building: Terrace Houses Subject: Manpower Report for Finishing Works

SITE DIARY - TERRACE


Date : Weather:
Main Contractor / Location Sub-Contractor's Name
NT ICM NT NT

9thApril2013 Cold
Remarks

Work Description
Tiling works Stone works Ceiling works Painting works PVC doors and windows Skirting board and wooden floor Wooden doors (interior and main doors) Wooden staircase (step + handrails) Steel handrails (perimeter) Miscellaneous works

POSCO E&C Terraces - Zone 11(Block 109 Block 112)

Pulse Housing NT Sunwood NT Singsung DeaJung Doori NT ICM NT NT Pulse Housing NT Sunwood NT Singsung DeaJung Doori

M&E system (mechanical system) M&E system (electrical)

Total
Tiling works Stone works Ceiling works Painting works PVC doors and windows Skirting board and wooden floor Wooden doors (interior and main doors) Wooden staircase (step + handrails) Steel handrails (perimeter) Miscellaneous works M&E system (mechanical system) M&E system (electrical)

POSCO E&C Terraces - Zone 12(Block 113- Block 117)

Number of Workers 0 8 36 42 24 2 0 31 8 19 10 18 198 0 10 26 47 34 12 10 18 11 19 10 18

Total Grand Total

215 413

Project: North An Khanh New City Location: Hanoi, Vietnam Client: An Khanh New City Development JVC LTD Construction Management: Bureau VERITAS Construction Supervisor: IBST Contractor: POSCO E&C Building: VILLAS
Subject: Manpower Report for Finishing Works

SITE DIARY - VILLA


Date: Weather:
Main Contractor / Location Sub-Contractor's Name
ICM Doul Auri Auri Pulse housing Pulse housing Sunwood

9th April 2013 Cold


Remarks

Work Description
Tiling works Stone works Ceiling works Painting works PVC doors and windows Aluminum windows Wooden doors (interior and main doors) Wooden staircase (step + handrails) Interior wooden handrails Shower booth Steel handrails (perimeter) Skirting Wooden floor Miscellaneous works

Number of Workers

POSCO E&C Villas - Zone 1

ICM Sing Sung Cosmo ICM ICM Dea Jung Doori ICM Doul Auri Auri Pulse housing Pulse housing Sunwood

M&E system (mechanical system) M&E system (electrical)

Total
Tiling works Stone works Ceiling works Painting works PVC doors and windows Aluminum windows Wooden doors (interior and main doors) Wooden staircase (step + handrails) Interior wooden handrails Shower booth Steel handrails (perimeter) Skirting Wooden floor Miscellaneous works

POSCO E&C Villas - Zone 2

ICM Sing Sung Cosmo ICM ICM Dea Jung Doori Doul Doul Auri Auri Pulse Housing Pulse Housing Sunwood

M&E system (mechanical system) M&E system (electrical)

Total
Tiling works Stone works Ceiling works Painting works PVC doors and windows Aluminum windows Wooden doors (interior and main doors) Interior wooden handrails Shower booth

POSCO E&C Villas - Zone 3

Sing Sung

30 35 16 21 9 10 4 12 5 3 5 7 2 29 8 9 205 33 28 12 18 7 3 4 13 5 3 5 8 3 29 8 9 188 31 31 14 27 5 3 5 5 2

Villas - Zone 3

Duol Cosmo Doul Duol Dea Jung Doori Doul Doul Auri Auri Pulse Housing Pulse Housing Sunwood

Skirting Steel handrails (perimeter) Wooden staircase (step + handrails) Wooden floor Miscellaneous works M&E system (mechanical system) M&E system (electrical)

Total
Tiling works Stone works Ceiling works Painting works PVC doors and windows Aluminum windows Wooden doors (interior and main doors) Interior wooden handrails Shower booth Skirting Steel handrails (perimeter) Wooden staircase (step + handrails) Wooden floor Miscellaneous works

POSCO E&C Villas - Zone 4

Sing Sung Duol Cosmo Doul Duol Dea Jung Doori

M&E system (mechanical system) M&E system (electrical)

Total

Grand total

5 5 11 12 29 8 9 202 28 41 16 28 2 1 5 5 2 6 6 10 13 29 7 10 209 804

Project: North An Khanh New City Location: Hanoi, Vietnam Construction Management: Bureau VERITAS Contractor:VINACONEX Building:Apartment Block
Subject: Manpower Report for Finishing Works

Date: 9/4/2013
Main Contractor / Location Sub-Contractor's Name Work Description Number of Workers Remarks

Tiling works Stone works Ceiling works Masonry works ( Plastering, brickworks) Painting works (interior) Painting works (exterior) Aluminum windows & doors Steel doors

Vinaconex apartment (Block 102 - Block 103)

Wood works (doors,door casing,baseboards ) Wooden floors Steel works (handrails,canopy,toplight) Furnitures (kitchen , toilet cabinets) Miscellaneous works M&E system (RWDP) M&E system (mechanical system) M&E system (gas system) M&E system (electrical) other

Grand total

43 55 25 28 38 26 3 32 40 45 22 45 25 23 26 19 25 120 640

SPLENDORA PROJECT D n KT Bc An Khnh

MANPOWER DAYLY REPORT BO CO NHN CNG TRONG NGY


Date/Ngy: 9/4/2013 Area/Khu vc: Cnh quan ) Subcontractor/n v thi cng: VINACONEX

NR/T T IV

Description/Miu t CNH QUAN

VC6 92

VC9 82

VINHAN 218

Tng cng 392

Contractor Vinaconex Ban iu hnh TC DA KT BAK

NORTH AN KHANH NEW CITY PROJECT An Khanh Commune, Hoai Duc District Hanoi, Vietnam AN KHANH NEW CITY DEVELOPMENT JVC LTD Client (Ch u t): BUREAU VERITAS VIETNAM Construction Management (Qun l xy dng): : CECC - IBST Construction Supervision (GSXD) VINACONEX - VIMECO Contractor ( Nh thu) Item of work/ Hng mc cng vic Project (Cng trnh): Address ( a ch):

SITE DIARY/NHT K CNG TRNG


Ngy lm vic th: Personel Cn b ch huy
Nh thu ph Manager Engineer Filing Clerk Accountant

Work start time: 07:00am Weather: Fair Rainy ( Time: Day Ngy
10 32 1 1

Work finish time: 07:00pm ) Quantity SL


1 8 20 6 4 1 1 0 1

Date

9-Apr-13 Day Ngy


2 20 145 5 5 55 2 13 3 10 260

Night m
0 2

Equipments/Thit b
Roller Compactor/ My m Welding Machine/My hn Concrete Vibrator Dump Truck/ Xe ti Bull Dozer/My lu Level Calibration/My thy bnh Grader/ My san Excavator/ My xc Generator/ My pht in Spreader Machine/ My tri

Labour/Nhn cng
Foreman/c cng Carpenter /CN cp pha Masonry workers/Th n Rebar workers/Th st Electrical workers/Th in Unskilled workers/ LPT Safety Engineer/CB an ton Machanic/ C kh Surveyor/CB trc c Machine operators

Night m
1 0 10 0 1 5 0

TOTAL TODAY

44

17

CUMULATIVE 1. Key-activities this day/ Hot ng chnh trong ngy

3. Material delivered: 4. Items Accomplished: 5. Meetings and significant decisions: 6. Problem Encountered (Vn pht sinh): 7. Action taken to the problem encountered (Bin php x l):

8. Unresolved issues / Factors contributing the delay (Vn cha c x l):

9. Forecasted Activities on the Following Day (D kin cng vic ngy tip theo):

Safety:

a. Accidents: b. Near Misses: c. Injuries: Submitted by (Contractor ): Name: Position: Signature: Date :

d. Unusual Events: e. Others;(Pls specify): Checked by Supervisor: CECC-IBST Nguyen Hong Phong Name: Position: Signature: Date :

Bui Duy Hai

Project: North An Khanh New City Location: Hanoi, Vietnam Construction Management: Bureau VERITAS Contractor:VINACONEX Building: Terrace Houses
Subject: Manpower Report for Finishing Works

Date: 9/4/2013
Main Contractor / Location Sub-Contractor's Name Work Description Number of Workers Remarks

Tiling works Stone works Ceiling works Painting works PVC doors and windows Aluminum windows Wooden doors (interior and main doors)

Vinaconex Terraces - Zone 9 (Block 101 Block 104)

Wooden staircase (step + handrails) Interior wooden handrails Steel handrails (perimeter) Wooden floors Baseboards Miscellaneous works M&E system (RWDP) M&E system (mechanical system) M&E system (gas system) M&E system (electrical)

Tiling works Stone works Ceiling works Painting works PVC doors and windows Aluminum windows Wooden doors (interior and main doors)

Vinaconex Terraces - Zone 10 (Block 105 Block 108)

Wooden staircase (step + handrails) Interior wooden handrails Steel handrails (perimeter) Wooden floors Baseboards Miscellaneous works M&E system (RWDP) M&E system (mechanical system) M&E system (gas system) M&E system (electrical)

20 25 19 15 5 3 35 19 15 15 19 15 7 8 10 12 8 250 25 26 13 19 3 5 30 22 18 10 20 9 13 12 9 12 8 254

Grand total Leadership Total

504 57 561

Project: North An Khanh New City Location: Hanoi, Vietnam Construction Management: Bureau VERITAS Contractor: VINACONEX Building: VILLAS
Subject: Manpower Report for Finishing Works

Date : 9/4/2013
Main Contractor / Location Sub-Contractor's Name Work Description
Tiling works Stone works Ceiling works Painting works PVC doors and windows Aluminum windows Wooden doors (interior and main doors) Wooden staircase (step + handrails)

Number of Workers

Remarks

VINACONEX Villas - Zone 5

Interior wooden handrails Steel handrails (perimeter) Wooden floors Baseboards Miscellaneous works M&E system (RWDP) M&E system (mechanical system) M&E system (gas system) M&E system (electrical)

Total
Tiling works Stone works Ceiling works Painting works PVC doors and windows Aluminum windows Wooden doors (interior and main doors) Wooden staircase (step + handrails)

VINACONEX Villas - Zone 6

Interior wooden handrails Steel handrails (perimeter) Wooden floors Baseboards Miscellaneous works M&E system (RWDP) M&E system (mechanical system) M&E system (gas system) M&E system (electrical)

Total
Tiling works Stone works Ceiling works Painting works

22 24 18 17 5 2 20 18 10 12 18 6 8 8 8 6 5 207 16 18 14 12 2 6 29 18 9 8 17 2 3 5 5 8 5 177 15 15 12 15

Project: North An Khanh New City Location: Hanoi, Vietnam Construction Management: Bureau VERITAS Contractor: VINACONEX Building: VILLAS
Subject: Manpower Report for Finishing Works

Date : 9/4/2013
Main Contractor / Location Sub-Contractor's Name Work Description
PVC doors and windows Aluminum windows Wooden doors (interior and main doors) Wooden staircase (step + handrails)

Number of Workers

Remarks

5 15 15 8 8 19 6 5 8 5 12 8 171 14 15 15 18 5 3 10 10 5 8 18 5 7 8 9 10 12 150 705 107 812

VINACONEX Villas - Zone 7

Interior wooden handrails Steel handrails (perimeter) Wooden floors Baseboards Miscellaneous works M&E system (RWDP) M&E system (mechanical system) M&E system (gas system) M&E system (electrical)

Total
Tiling works Stone works Ceiling works Painting works PVC doors and windows Aluminum windows Wooden doors (interior and main doors) Wooden staircase (step + handrails)

VINACONEX Villas - Zone 8

Interior wooden handrails Steel handrails (perimeter) Wooden floors Baseboards Miscellaneous works M&E system (RWDP) M&E system (mechanical system) M&E system (gas system) M&E system (electrical)

Total

Grand total Leadership Total