132 Testing - Power Transformer

1. A field test report was conducted on a 132/33 kV power transformer located at the Lamki substation. 2. Various tests were performed including insulation resistance, breakdown voltage, turn ratio, vector grouping, short circuit, winding and oil temperature settings, and bushing current transformer tests. 3. The test results showed that the transformer was in good working condition and met the specifications for the different tests like the vector grouping was verified to be YNyn0 and the insulation resistances were above the minimum requirements.

Uploaded by

Santosh Gairhe
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
1K views3 pages

132 Testing - Power Transformer

1. A field test report was conducted on a 132/33 kV power transformer located at the Lamki substation. 2. Various tests were performed including insulation resistance, breakdown voltage, turn ratio, vector grouping, short circuit, winding and oil temperature settings, and bushing current transformer tests. 3. The test results showed that the transformer was in good working condition and met the specifications for the different tests like the vector grouping was verified to be YNyn0 and the insulation resistances were above the minimum requirements.

Uploaded by

Santosh Gairhe
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

132/33 kV Transformer Bay at Lamki S/S

FIELD TEST REPORT OF POWER TRANSFORMER Test Date:

1. Equipment Detail
Equipment Circuit Position Manufacturer Serial No Vector Group Type of Cooling Rated Power : 132/33 kV Power Transformer : 132/33 kV Transformer Bay : : : : :

1.1 General check


SN 1 2 3 4 5 6 Test Items Inspection Secondary Wiring Tightness Equipment and Structure Earthing Results Remarks

Ratio Selection Spare Core


Polarity Oil leakage Oil Level

As per NEA requirement All spare core are short circuited

Between Min and Max position

1.2 Insulation Resistance Test


Connection HV-E HV-LV LV-E IR Value (5000V) M - 1 Min IR Value (5000V) M - 3 Min Remarks

1.3 BDV Test


Sample Top Bottom Reading - 1 Reading -2 Average

1.4 Turn Ratio Tester


Tap no. Primary Voltage Actual Ratio Observed Ratio Percentage Error 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Remarks

Field Test Report of 132 kV Power Transformer

Page 1 of 3

132/33 kV Transformer Bay at Lamki S/S

1.5 Vector Group Test Test Items Measured Voltage Verifying condition Result 1V-2V 1W-2W Ok 1V-2W 1W-2V Power Transformer Vector Group Testing (YNyn0) : R-r Shorted Tap position = 9 , three phase voltage applied on the primary side.

R R Y B N r y b n
X

Y
X

B
X

N
X

r
X

y
X

b
X

X X

X X X

X X X X

X X X X X

X X X X X X

1.6 Short Circuit Test R-Y-B-N Supplied and r-y-b-n shorted


Tap Position 1 Primary Current R= Y= B= N= R= Y= B= N= R= Y= B= N= Primary Voltage RN= YN= BN= Secondary Current r= y= b= n= r= y= b= n= r= y= b= n=
Field Test Report of 132 kV Power Transformer Page 2 of 3

Remarks

RN= YN= BN=

17

RN= YN= BN=

132/33 kV Transformer Bay at Lamki S/S

1.7 Winding Temperature Setting


S.N 1 2 3 4 Test Item Setting Fan Group -1 Fan Group -2 Alarm Trip Remarks

1.8 Oil Temperature Setting


S.N Test Item 1 Alarm 2 Trip Setting Remarks

1.9 Bushing Current Transformer


Phase Ratio R Y B N HV Side Ratio Measured Polarity Remark

Phase Ratio r y b n Ratio Measured

LV Side Polarity

Remark

Tested by:

Witnessed by:

HTSG

... Nepal Electricity Authority

Field Test Report of 132 kV Power Transformer

Page 3 of 3