Costing Format

The document contains cost estimation sheets for various parts of a hydraulic robot project. It lists materials, machining processes, labor, and transportation costs for building different wooden links and components of the robot. The total cost for purchased small parts is estimated to be 870 rupees. Cost sheets are provided for a base plate, circular link, vertical link, and other connecting links, with dimensions, materials, and individual cost breakdowns.

Uploaded by

Gopal Jetani
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views9 pages

Costing Format

The document contains cost estimation sheets for various parts of a hydraulic robot project. It lists materials, machining processes, labor, and transportation costs for building different wooden links and components of the robot. The total cost for purchased small parts is estimated to be 870 rupees. Cost sheets are provided for a base plate, circular link, vertical link, and other connecting links, with dimensions, materials, and individual cost breakdowns.

Uploaded by

Gopal Jetani
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 9

COST ESTIMATION SHEET

PROJECT : HYDRAULIC ROBOT (JCB) NAME OF PART: BASE PLATE (18 MM) YEAR:2010 -2011 PART NO:1 MATERIAL : WOOD CLASS: MECHANICAL (6 TH SEM / 2NDSHIFT)

MATERIAL COST
LENGTH *WIDTH RATE/MM QTY TOTAL
3*2 44 1

260

MACHINING COST
PROCESS CUTTING SLOTTING DRILLING TOTAL COST/ HOUR 20 10 60 15 75 MINS 20 10 NET COST

30

LABOUR COST
LABOUR COST 50

TRANSPROTATION COST
TRANSPROTATION 20

(ALL DIMENSION IN FOOT)

COST ESTIMATION SHEET


PROJECT : HYDRAULIC ROBOT (JCB) NAME OF PART: CIRCULER LINK(12MM) PART NO:2 CLASS: MECHANICAL (6 TH SEM / 2NDSHIFT) YEAR:2010 -2011 MATERIAL : WOOD

MATERIAL COST
LENGTH *WIDTH RATE/MM QTY TOTAL
2*2 45 1 180

MACHINING COST
PROCESS CUTTING TURNING DRILLING TOTAL COST/ HOUR 20 10 60 15 75 MINS 20 10 NET COST

30

LABOUR COST
LABOUR COST 50

TRANSPROTATION COST
TRANSPROTATION 20

(ALL DIMENSION IN FOOT)

COST ESTIMATION SHEET


PROJECT : HYDRAULIC ROBOT (JCB) NAME OF PART: VERTICAL LINK (18MM) PART NO:3 CLASS: MECHANICAL (6 TH SEM / 2NDSHIFT) YEAR:2010 -2011 MATERIAL : WOOD

MATERIAL COST
LENGTH *WIDTH RATE/MM QTY TOTAL
3*3 60 2 540

MACHINING COST
PROCESS CUTTING DRILLING TOTAL COST/ HOUR 20 60 60 MINS 20 NET COST

20

LABOUR COST
LABOUR COST 50

TRANSPROTATION COST
TRANSPROTATION 20

(ALL DIMENSION IN FOOT)

COST ESTIMATION SHEET


PROJECT : HYDRAULIC ROBOT (JCB) NAME OF PART: HORIZONTAL LINK-1 (8MM) PART NO:4 CLASS: MECHANICAL (6 TH SEM / 2NDSHIFT) YEAR:2010 -2011 MATERIAL : WOOD

MATERIAL COST
LENGTH *WIDTH RATE/MM QTY TOTAL
3*3 27 2 245

MACHINING COST
PROCESS CUTTING DRILLING TOTAL COST/ HOUR 20 60 60 MINS 20 NET COST

20

LABOUR COST
LABOUR COST 50

TRANSPROTATION COST
TRANSPROTATION 20

(ALL DIMENSION IN FOOT)

COST ESTIMATION SHEET


PROJECT : HYDRAULIC ROBOT (JCB) NAME OF PART: HORIZONTAL LINK-2 (6MM) PART NO:5 CLASS: MECHANICAL (6 TH SEM / 2NDSHIFT) YEAR:2010 -2011 MATERIAL : WOOD

MATERIAL COST
LENGTH *WIDTH RATE/MM QTY TOTAL
3*3 23 2 210

MACHINING COST
PROCESS CUTTING DRILLING TOTAL COST/ HOUR 20 60 60 MINS 20 NET COST

20

LABOUR COST
LABOUR COST 50

TRANSPROTATION COST
TRANSPROTATION 20

(ALL DIMENSION IN FOOT)

COST ESTIMATION SHEET


PROJECT : HYDRAULIC ROBOT (JCB) NAME OF PART: TOOL LINK-1(6MM) YEAR:2010 -2011 PART NO:6 MATERIAL : WOOD CLASS: MECHANICAL (6 TH SEM / 2NDSHIFT)

MATERIAL COST
LENGTH *WIDTH RATE/MM QTY TOTAL
2*2 7 2 30

MACHINING COST
PROCESS CUTTING SHAPING DRILLING TOTAL COST/ HOUR 20 20 60 15 75 MINS 20 20 NET COST

40

LABOUR COST
LABOUR COST 50

TRANSPROTATION COST
TRANSPROTATION 20

(ALL DIMENSION IN FOOT)

COST ESTIMATION SHEET


PROJECT : HYDRAULIC ROBOT (JCB) NAME OF PART: TOOL LINK-2 (6MM) YEAR:2010 -2011 PART NO: 7 MATERIAL : WOOD CLASS: MECHANICAL (6 TH SEM / 2NDSHIFT)

MATERIAL COST
LENGTH *WIDTH RATE/MM QTY TOTAL
0.5*0.5 7 2 30

MACHINING COST
PROCESS CUTTING DRILLING TOTAL COST/ HOUR 20 30 30 MINS 20 NET COST

20

LABOUR COST
LABOUR COST 50

TRANSPROTATION COST
TRANSPROTATION 20

(ALL DIMENSION IN FOOT)

COST ESTIMATION SHEET


PROJECT : HYDRAULIC ROBOT (JCB) CLASS: MECHANICAL (6 TH SEM / 2NDSHIFT) NAME OF PART: CONNECTING LINK-1/2 (6MM) YEAR:2010 -2011 PART NO:8 MATERIAL : WOOD

MATERIAL COST
LENGTH *WIDTH RATE/MM QTY TOTAL
1*1 7 4 45

MACHINING COST
PROCESS CUTTING DRILLING TOTAL COST/ HOUR 20 60 60 MINS 20 NET COST

20

LABOUR COST
LABOUR COST 50

TRANSPROTATION COST
TRANSPROTATION 20

(ALL DIMENSION IN FOOT)

COST ESTIMATION SHEET


PURCHASED PART ESTIMATION SHEET
PURCHASED SMALL GEAR BIG GEAR THREADED SHAFT RACK SYRINGE FLEXIBLE PIPE (HARD) BOLT NUT AND OTHER FASTERNES HOOK MATERIAL PLASTIC PLASTIC M.S. PLASTIC FIBER P.V.C M.S. M.S. QTY 1 2 12 2 12 6 FOOT AS PER USE 10 RS 30 120 200 30 350 60 30 50

TOTAL

870

(ALL DIMENSION IN FOOT)