0% found this document useful (0 votes)
353 views

Syllabus Formwork in Construction

This document provides information about the CM 420 Temporary Structures course offered at the University of Washington in winter 2007. The course is an introduction to temporary structures used in construction like formwork, scaffolding, shoring, and dewatering systems. Major objectives are to familiarize students with materials, methods, and techniques for temporary structures. The course will emphasize concrete formwork design and cover topics like scaffolding, falsework, cofferdams, and retaining walls. It will include homework, exams, and be graded based on assignments, quizzes, and two midterm exams.

Uploaded by

Allan Cunningham
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
353 views

Syllabus Formwork in Construction

This document provides information about the CM 420 Temporary Structures course offered at the University of Washington in winter 2007. The course is an introduction to temporary structures used in construction like formwork, scaffolding, shoring, and dewatering systems. Major objectives are to familiarize students with materials, methods, and techniques for temporary structures. The course will emphasize concrete formwork design and cover topics like scaffolding, falsework, cofferdams, and retaining walls. It will include homework, exams, and be graded based on assignments, quizzes, and two midterm exams.

Uploaded by

Allan Cunningham
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

University of Washington Construction Management Winter 2007 CM 420 Temporary Structures TTh 10:00-11:20 am, Condon 135 Section

A, SLN 18716 Professor Kamran M. Nemati Condon 524, VM 685-4439 [email protected] Office Hours: TTh 3:00 4:00 p.m.

Course Description CM 420 is an introductory course in temporary structures used to support construction operations such as concrete formwork, scaffolding systems, shoring systems, cofferdams, underpining, slurry walls, and construction dewatering systems. Major Objectives The objective of the course is to familiarize the student with the materials, methods and techniques associated with temporary structures utilized in various construction operations, such as: concrete formwork construction, scaffolding, falsework/shoring, cofferdams, underpinning, diaphram/slurry walls, earth-retaining structures, and construction dewatering. A major emphasis will be placed on concrete formwork construction covering detailed design analysis of both vertical and horizontal timber formwork systems. Text and/or other Resources On Reserve at Architecture Library: Hurd, M. K. Formwork for Concrete. 6th edition, American Concrete Institute, Detroit, Michigan, 1995. Ratay, Robert T. Handbook of Temporary Structures in Construction. 2nd edition, McGraw Hill, New York, 1996. The course web site is located at: http://courses.washington.edu/cm420/ Submittals Homework assignments will be given at various times throughout the quarter. This work is to be turned in at the beginning of the class period due. Late homework assignments will not be accepted. Failure to hand in a homework assignment on time will result in a grade of 0 points for that particular assignment, however, all assigned homeworks must be submitted. All homeworks should be submitted with clear text and drawings done neatly using straight edge. Exams There will be two midterm exams and three quizzes. First midterm test will be given on Thursday, February 1st and the second one on Thursday, March 8th. Grading The course final grade will be calculated based on the following weights: 25% for homework assignments, 15% for three quizzes, and 30% for each midterm exam. All exams will be closed book. Failure to attend, both physically and mentally, may contribute negatively towards determination of the final grade.

CM 420 Temporary Structures

Winter 2007

Page 2

Schedule Tentative schedule for class meeting topics, pre-reading assignments, and exams is shown below:

Week
1 Course introduction

Topic

Reading Reference
Chapter 1 Chapter 2 Chapter 3 Chapter 4 Chapter 5 Chapter 6 Chapter 6 Chapter 6 Chapter 6 Chapter 7 Chapter 9

General objectives in formwork building 2 Overall Planning for Formwork Materials, accessories, proprietary products 3 Loads and Pressure Form Design 4 Wall form design Slab form design 5 Column form design Design Tables 6 Building and erecting the formwork FIRST EXAM 7 Scaffolding Falsework/shoring 8 9 Cofferdams Underpinning Diaphram/slurry walls 10 Earth-retaining structures Construction dewatering, Ground Freezing 11 SECOND EXAM

Ratay, Chapter 15 Ratay, Chapter 16 Ratay, Chapter 7 Ratay, Chapter 12 Ratay, Chapter 9 Ratay, Chapter 8 Ratay, Chapter 10

Disability Accommodations To request academic accommodations due to disability, please contact Disabled Student Services, 448 Schmitz, (206) 543-8924 (V/TTY). If you have a letter from Disabled Student Services, please present the letter to your instructor so that appropriate accommodations can be made for you.

You might also like