1.1 INTRODUCTION
Wind energy is a renewable form of energy resource which is plentiful, widely distributed, clean, and produces no greenhouse gas emissions during operation. Because of these reasons wind energy has always been a reliable form of energy for ages. Wind power technology dates back many centuries. There are historical claims that wind machines which harness the power of the wind date back beyond the time of the ancient Egyptians. Hero of Alexandria used a simple windmill to power an organ whilst the Babylonian emperor, Hammurabi, used windmills for an ambitious irrigation project as early as the 17th century BC. The Persians built windmills in the 7th century AD for milling and irrigation and rustic mills similar to these early vertical axis designs can still be found in the region today. In Europe the first windmills were seen much later, probably having been introduced by the English on their return from the crusades in the Middle East or possibly transferred to Southern Europe by the Muslims after their conquest of the Iberian Peninsula. It was in Europe that much of the subsequent technical development took place. By the late part of the 13th century the typical European windmill had been developed and this became the norm until further developments were introduced during the 18th century. At the end of the 19th century there were more than 30,000 windmills in Europe, used primarily for the milling of grain and water pumping.
www.final-yearproject.com | www.finalyearthesis.com
To a lesser degree, there has been a parallel development in small-scale wind generators for supplying electricity for battery charging, for stand-alone applications and for connection to small grids. Table shows the classification system for wind turbines. Scale Rotor Diameter Power Rating Micro <3 m 50 W to 2 kW Small 3 m to 12 m 2 kW to 40 kW Medium 12 m to 45 m 40 kW to 999 kW Large >46 m >1 MW
www.final-yearproject.com | www.finalyearthesis.com
CHAPTER 2
2.1 Working of Wind Turbine
A wind turbine is a machine that converts the kinetic energy in wind into mechanical energy. If the mechanical energy is used directly by machinery, such as a pump or grinding stones, the machine is usually called a windmill. If the mechanical energy is converted to electricity, the machine is called a wind generator, or more commonly a wind turbine (wind energy converter WEC). A wind turbine works the opposite of a fan. Instead of using electricity to make wind, like a fan, wind turbines use wind to make electricity. The wind turns the blades, which spin a shaft, which connects to a generator and makes electricity. Utility-scale turbines range in size from 50 to 750 kilowatts. Single small turbines, below 50 kilowatts, are used for homes, telecommunications dishes, or water pumping.
The various components of a wind turbine are given below: Anemometer: Measures the wind speed and transmits wind speed data to the controller. Blades: Most turbines have either two or three blades. Wind blowing over the blades causes the blades to "lift" and rotate. Brake: A disc brake which can be applied mechanically, electrically, or hydraulically to stop the rotor in emergencies.
www.final-yearproject.com | www.finalyearthesis.com
Controller: The controller starts up the machine at wind speeds of about 8 to 16 miles per hour (mph) and shuts off the machine at about 65 mph. Turbines cannot operate at wind speeds above about 65 mph because their generators could overheat. Gear box: Gears connect the low-speed shaft to the high-speed shaft and increase the rotational speeds from about 30 to 60 rotations per minute (rpm) to about 1200 to 1500 rpm, the rotational speed required by most generators to produce electricity. The gear box is a costly (and heavy) part of the wind turbine and engineers are exploring "direct-drive" generators that operate at lower rotational speeds and don't need gear boxes. Generator: Usually an off-the-shelf induction generator that produces 60-cycle AC electricity. High-speed shaft: Drives the generator. Low-speed shaft: The rotor turns the low-speed shaft at about 30 to 60 rotations per minute. Nacelle: The rotor attaches to the nacelle, which sits atop the tower and includes the gear box, low- and high-speed shafts, generator, controller, and brake. A cover protects the components inside the nacelle. Some nacelles are large enough for a technician to stand inside while working. Pitch: Blades are turned, or pitched, out of the wind to keep the rotor from turning in winds that are too high or too low to produce electricity. Rotor: The blades and the hub together are called the rotor. Tower: Towers are made from tubular steel (shown here) or steel lattice. Because wind speed increases with height, taller towers enable turbines to capture more energy and generate more electricity. Wind direction: This is an "upwind" turbine, so-called because it operates facing into the wind. Other turbines are designed to run "downwind", facing away from the wind. Wind vane: Measures wind direction and communicates with the yaw drive to orient the turbine properly with respect to the wind. Yaw drive: Upwind turbines face into the wind; the yaw drive is used to keep the rotor facing into the wind as the wind direction changes. Downwind turbines don't require a yaw drive, the wind blows the rotor downwind. Yaw motor: Powers the yaw drive.
www.final-yearproject.com | www.finalyearthesis.com
CHAPTER 3
3.1 Classifications of wind turbines
Wind turbines can be separated into two types based on the axis about which the turbine rotates. They are horizontal axis wind turbines and vertical axis wind turbines. Turbines that rotate around a horizontal axis are more common. Vertical-axis turbines are less frequently used. Wind turbines can also be classified by the location in which they are to be used. Onshore, offshore, or even aerial wind turbines have unique design characteristics. 3.1.1 Horizontal axis Horizontal-axis wind turbines (HAWT) have the main rotor shaft and electrical generator at the top of a tower, and must be pointed into the wind. Small turbines are pointed by a simple wind vane, while large turbines generally use a wind sensor coupled with a servo motor. Most have a gearbox, which turns the slow rotation of the blades into a quicker rotation that is more suitable for generating electricity. Since a tower produces turbulence behind it, the turbine is usually pointed upwind of the tower. Turbine blades are made stiff to prevent the blades from being pushed into the tower by high winds. Additionally, the blades are placed a considerable distance in front of the tower and are sometimes tilted up a small amount. Downwind machines have been built, despite the problem of turbulence, because they don't need an additional mechanism for keeping them in line with the wind, and because in high winds, the blades can be allowed to bend which reduces their swept area and thus their wind resistance. Because turbulence leads to fatigue failures and reliability is so important, most HAWTs are upwind machines. There are several types of HAWT: These four- (or more) bladed squat structures, usually with wooden shutters or fabric sails, were developed in Europe. These windmills were pointed into the wind manually or via a tailfan and were typically used to grind grain. In the Netherlands they were also used to pump water from low-lying land, and were instrumental in keeping its polders dry. Windmills were also located throughout the USA, especially in the North-eastern region. 3.1.1.1 Modern Rural Windmills These windmills, invented in 1876 by Griffiths Bros and Co (Australia), were used by Australian and later American farmers to pump water and to generate electricity. They typically had many blades, operated at tip speed ratios (defined below) not better than one, and had good starting torque. Some had small direct-current generators used to charge storage batteries, to provide a few lights, or to operate a radio receiver. The American rural electrification connected many farms to centrally-generated power and replaced individual windmills as a primary source of farm power in the 1950's. Such devices are still used in locations where it is too costly to bring in commercial power.
www.final-yearproject.com | www.finalyearthesis.com
Wind turbines near Aalborg, Denmark A standard doorway can be seen at the base of the pylon for scale
3.1.1.2 Common modern wind turbines Usually three-bladed, sometimes two-bladed or even one-bladed (and counterbalanced), and pointed into the wind by computer-controlled motors. The rugged three-bladed turbine type has been championed by Danish turbine manufacturers. These have high tip speeds of up to 6x wind speed, high efficiency, and low torque ripple which contribute to good reliability. This is the type of turbine that is used commercially to produce electricity. The blades are usually coloured light gray to blend in with the clouds and range in length from 20 to 40 metres (60 to 120 feet) or more. 3.1.2 Vertical axis 12 m Windmill with rotational sails in the Osijek Croatia. Vertical-axis wind turbines (or VAWTs) have the main rotor shaft running vertically. Key advantages of this arrangement are that the generator and/or gearbox can be placed at the bottom, near the ground, so the tower doesn't need to support it, and that the turbine doesn't need to be pointed into the wind. Drawbacks are usually pulsating torque that can be produced during each revolution and drag created when the blade rotates into the wind. It is also difficult to mount vertical-axis turbines on towers, meaning they must operate in the often slower, more turbulent air flow near the ground, resulting in lower energy extraction efficiency. 3.1.2.1 Windmill with rotational sails This is a new invention. This windmill starts making electricity above a wind speed of 2m/s. Its sails contract and expand as the wind speed changes. This windmill has three sails of variable surface area. The speed is controlled through a magnetic rev counter that expands or contracts the sails according to wind speed. A (microprocessor type) control unit controls the sails either manually or automatically. In case of a control unit failure, strong winds would tear the sails, but the frame would remain intact.
www.final-yearproject.com | www.finalyearthesis.com
3.1.2.2 Neo-AeroDynamic This has an airfoil base designed to harness the kinetic energy of the fluid flow via an artificial current around its centre. It is differentiated from others by its capability to unitize most of the air mass passing through redirecting it to flow over the upper chamber of the airfoils, and causing a lift force all around. It is applicable not only to wind, but also to a variety of hydroelectric applications, including free-flow (rivers, creeks), tidal, oceanic currents and wave motion, via ocean wave surface currents.
30 m Darrieus wind turbine in the Magdalen Islands 3.1.2.3 Darrieus wind turbine "Eggbeater" turbines. They have good efficiency, but produce large torque ripple and cyclic stress on the tower, which contributes to poor reliability. Also, they generally require some external power source, or an additional Savonius rotor, to start turning, because the starting torque is very low. The torque ripple is reduced by using 3 or more blades which results in a higher solidity for the rotor. Solidity is measured by blade area over the rotor area. Newer Darrieus type turbines are not held up by guy wires but have an external superstructure connected to the top bearing. 3.1.2.4 Giromill A type of Darrieus turbine, these lift-type devices have vertical blades. The cycloturbine varieties have variable pitch to reduce the torque pulsation and are self-starting. The advantages of variable pitch are: high starting torque; a wide, relatively flat torque curve; a lower blade speed ratio; a higher coefficient of performance; more efficient operation in turbulent winds; and a lower blade speed ratio which lowers blade bending stresses. Straight, V, or curved blades may be used. 3.1.2.5 Savonius wind turbine These are drag-type devices with two- (or more) scoops that are used in anemometers, the Flettner vents (commonly seen on bus and van roofs), and in some high-reliability lowefficiency power turbines. They always self-starting if there are at least three scoops. They sometimes have long helical scoops to give a smooth torque. The Banesh rotor and especially
www.final-yearproject.com | www.finalyearthesis.com
the Rahai rotor improve efficiency with blades shaped to produce significant lift as well as drag.
3.1.2.6 Windstar turbines These lift-type devices made by Wind Harvest have straight, extruded aluminum blades attached at each end to a central rotating shaft and are operated as Linear Array Vortex Turbine Systems (LAVTS). Vertical-axis rotors each with their own 50-75kW generator are placed in three to any number of rotors in linear arrays with each rotors blades passing within two feet of its neighbor. In this configuration, the center rotors gain an increase in output and efficiency (reaching the high efficiencies of HAWTs). This increased efficiency is protected under patent (number 6784566) as the "vortex effect". Each rotor unit has a dual braking system of pneumatic disc brakes and blade pitch. The newest Windstar LAVTS stand 50 feet tall, have 1500 and 3000 square feet of swept area per rotor and are designed to be placed in the turbulent winds within the understory of wind farms. 3.1.3 Offshore Offshore wind turbines near Copenhagen Offshore wind development zones are generally considered to be ten kilometres or more from land. Offshore wind turbines are less obtrusive than turbines on land, as their apparent size and noise can be mitigated by distance. Because water has less surface roughness than land (especially deeper water), the average wind speed is usually considerably higher over open water. Capacity factors (utilisation rates) are considerably higher than for onshore and near-shore locations which allow offshore turbines to use shorter towers, making them less visible. In stormy areas with extended shallow continental shelves (such as Denmark), turbines are practical to install Denmark's wind generation provides about 25-30% of total electricity demand in the country, with many offshore wind farms. Denmark plans to increase wind energy's contribution to as much as half of its electrical supply. In most cases offshore environment is more expensive than onshore. Offshore towers are generally taller than onshore towers once the submerged height is included, and offshore foundations are more difficult to build and more expensive. Power transmission from offshore turbines is generally through undersea cable, which is more expensive to install than cables on land, and may use high voltage direct current operation if significant distance is to be covered which then requires yet more equipment. The offshore environment can also be corrosive and abrasive in salt water locations but locations such as the Great Lakes are in fresh water and do not have many of the issues found in the ocean or sea. Repairs and maintenance are usually much more difficult, and generally more costly, than on onshore turbines. Offshore wind turbines are outfitted with extensive corrosion protection measures like coatings and cathodic protection however some of these measures may not be required in fresh water locations. While there is a significant market for small land-based windmills, offshore wind turbines have recently been and will probably continue to be the largest wind turbines in operation, because larger turbines allow for the spread of the high fixed costs involved in offshore operation over a greater quantity of generation, reducing the average cost. For similar reasons, offshore wind farms tend to be quite largeoften involving over 100 turbinesas opposed to onshore wind farms which can operate competitively even with much smaller installations.
www.final-yearproject.com | www.finalyearthesis.com
There are some conceptual designs that might make use of the unique offshore environment. For example, a floating turbine might orient itself downwind of its anchor, and thus avoid the need for a yawing mechanism. One concept for offshore turbines has them generate rain, instead of electricity. The turbines would create a fine aerosol, which is envisioned to increase evaporation and induce rainfall, hopefully on land. 3.1.4 Near-shore Near-shore turbines are generally considered to be within a zone that is on land three kilometers of a shoreline and on water within ten kilometers of land. Wind speeds in these zones share wind speed characteristics of both onshore wind and offshore wind. Issues that are shared within near-shore wind development zones are ornithological (including bird migration and nesting), aquatic habitat, transportation (including shipping and boating) and visual aesthetics. Sea shores also tend to be windy areas and good sites for turbine installation, because a primary source of wind is convection from the differential heating and cooling of land and sea over the course of day and night. Winds at sea level carry somewhat more energy than winds of the same speed in mountainous areas because the air at sea level is denser. Near-shore wind farm sitting can sometimes be highly controversial as coastal sites are often picturesque and environmentally sensitive (for instance, having substantial bird life). 3.1.5 Onshore Wind turbines near Walla Walla in Washington Onshore turbine installations in hilly or mountainous regions tend to be on ridgelines generally three kilometres or more inland from the nearest shoreline. This is done to exploit the topographic acceleration where the hill or ridge causes the wind to accelerate as it is forced over it. The additional wind speeds gained in this way make large differences to the amount of energy that is produced. Great attention must be paid to the exact positions of the turbines (a process known as micro-sitting) because a difference of 30 m can sometimes mean a doubling in output. Local winds are often monitored for a year or more with anemometers and detailed wind maps constructed before wind generators are installed. For smaller installations where such data collection is too expensive or time consuming, the normal way of prospecting for wind-power sites is to directly look for trees or vegetation that are permanently "cast" or deformed by the prevailing winds. Another way is to use a windspeed survey map or historical data from a nearby meteorological station, although these methods are less reliable. Wind farm sitting can sometimes be controversial, particularly as the hilltop, often coastal sites preferred are often picturesque and environmentally sensitive (for instance, having substantial bird life). Local residents in a number of potential sites have strongly opposed the installation of wind farms, and political support has resulted in the blocking of construction of some installations. 3.2.1 Advantages of vertical wind turbines Easier to maintain because most of their moving parts are located near the ground. This is due to the vertical wind turbines shape. The airfoils or rotor blades are
www.final-yearproject.com | www.finalyearthesis.com
connected by arms to a shaft that sits on a bearing and drives a generator below, usually by first connecting to a gearbox. As the rotor blades are vertical, a yaw device is not needed, reducing the need for this bearing and its cost. Vertical wind turbines have a higher airfoil pitch angle, giving improved aerodynamics while decreasing drag at low and high pressures. Mesas, hilltops, ridgelines and passes can have higher and more powerful winds near the ground than up high because of the speed up effect of winds moving up a slope or funnelling into a pass combining with the winds moving directly into the site. In these places, VAWTs placed close to the ground can produce more power than HAWTs placed higher up. Low height useful where laws do not permit structures to be placed high. Smaller VAWTs can be much easier to transport and install. Does not need a free standing tower so is much less expensive and stronger in high winds that are close to the ground. Usually have a lower Tip-Speed ratio so less likely to break in high winds.
3.2.2 Disadvantages of vertical wind turbines Most VAWTs produce energy at only 50% of the efficiency of HAWTs in large part because of the additional drag that they have as their blades rotate into the wind. This can be overcome by using structures to funnel more and align the wind into the rotor (e.g. "stators" on early Windstar turbines) or the "vortex" effect of placing straight bladed VAWTs closely together. There may be a height limitation to how tall a vertical wind turbine can be built and how much sweep area it can have. Most VAWTS need to be installed on a relatively flat piece of land and some sites could be too steep for them but are still usable by HAWTs. Most VAWTs have low starting torque. A VAWT that uses guyed wires to hold it in place puts stress on the bottom bearing as all the weight of the rotor is on the bearing. Guyed wires attached to the top bearing increase downward thrust in wind gusts. Solving this problem requires a superstructure to hold a top bearing in place to eliminate the downward thrusts of gust events in guyed wired models. 3.2.3 Advantages of horizontal wind turbines Blades are to the side of the turbine's center of gravity, helping stability. Ability to wing warp, which gives the turbine blades the best angle of attack. Allowing the angle of attack to be remotely adjusted gives greater control, so the turbine collects the maximum amount of wind energy for the time of day and season. Ability to pitch the rotor blades in a storm, to minimize damage. Tall tower allows access to stronger wind in sites with wind shear. In some wind shear sites, every ten meters up, the wind speed can increase by 20% and the power output by 34%. Tall tower allows placement on uneven land or in offshore locations. Can be sited in forests above the treeline. Most are self-starting. Can be cheaper because of higher production volume, larger sizes and, in general higher capacity factors and efficiencies.
www.final-yearproject.com | www.finalyearthesis.com
3.2.4 Disadvantages of horizontal wind turbines HAWTs have difficulty operating in near ground, turbulent winds because their yaw and blade bearing need smoother, more laminar wind flows. The tall towers and long blades (up to 180 feet long) are difficult to transport on the sea and on land. Transportation can now cost 20% of equipment costs. Tall HAWTs are difficult to install, needing very tall and expensive cranes and skilled operators. Supply of HAWTs is less than demand and between 2004 and 2006, turbine prices increased up to 60%. At the end of 2006, all major manufacturers were booked up with orders through 2008. The FAA has raised concerns about tall HAWTs effects on radar in proximity to air force bases. Their height can create local opposition based on impacts to viewsheds. Offshore towers can be a navigation problem and must be installed in shallow seas. HAWTs can't be floated on barges. Downwind variants suffer from fatigue and structural failure caused by turbulence. Horizontal-axis wind turbine aerodynamics The aerodynamics of a horizontal-axis wind turbine are complex. The air flow at the blades is not the same as the airflow far away from the turbine. The very nature of the way in which energy is extracted from the air also causes air to be deflected by the turbine. In addition, the aerodynamics of a wind turbine at the rotor surface includes effects that are rarely seen in other aerodynamic fields.
www.final-yearproject.com | www.finalyearthesis.com
CHAPTER 4
4.1 Wind Power generation in India
The development of wind power in India began in the 1990s, and has significantly increased in the last few years. Although a relative newcomer to the wind industry compared with Denmark or the US, India has the fifth largest installed wind power capacity in the world. As of 31 October 2009 the installed capacity of wind power in India was 11806.69 MW, mainly spread across Tamil Nadu (4900.765 MW), Maharashtra (1945.25 MW), Gujarat (1580.61 MW), Karnataka (1350.23 MW), Rajasthan (745.5 MW), Madhya Pradesh (212.8 MW), Andhra Pradesh (132.45 MW), Kerala (46.5 MW), Orissa (2MW), West Bengal (1.1 MW) and other states (3.20 MW). It is estimated that 6,000 MW of additional wind power capacity will be installed in India by 2012. Wind power accounts for 6% of India's total installed power capacity, and it generates 1.6% of the country's power. India is the world's fifth largest wind power producer, with an annual power production of 8,896 MW. The worldwide installed capacity of wind power reached 157,899 MW by the end of 2009. USA (35,159 MW), Germany (25,777 MW), Spain (19,149 MW) and China (25,104 MW) are ahead of India in fifth position. The short gestation periods for installing wind turbines, and the increasing reliability and performance of wind energy machines has made wind power a favoured choice for capacity addition in India. Suzlon, as Indian-owned company, emerged on the global scene in the past decade, and by 2006 had captured almost 7.7 percent of market share in global wind turbine sales. Suzlon is currently the leading manufacturer of wind turbines for the Indian market, holding some 52 percent of market share in India. Suzlons success has made India the developing country leader in advanced wind turbine technology. 4.2 State-level wind power There is a growing wind energy installation in number of states across India. Tamil Nadu (4889.765 MW) Tamil Nadu is the state with the most wind generating capacity: 4889.765 MW at the end of March 2010. Not far from Aralvaimozhi, the Muppandal wind farm, the largest in the subcontinent, is located near the once impoverished village of Muppandal, supplying the villagers with electricity for work. The village had been selected as the showcase for India's $2 billion clean energy program which provides foreign companies with tax breaks for establishing fields of wind turbines in the area. In February 2009, Shriram EPC bagged INR 700 million contracts for setting up of 60 units of 250 KW (totalling 15 MW) wind turbines in Tirunelveli district by Cape Energy. Enercon is also playing a major role in development of wind energy in India. In Tamil Nadu, Coimbatore and Tiruppur Districts having more wind Mills from 2002 onwards, especially, Chittipalayam, Kethanoor, Gudimangalam, Poolavadi,Murungappatti (MGV Place),Sunkaramudaku,KongalNagaram,Gomangalam, Anthiur are the high wind power production places in the both districts.
www.final-yearproject.com | www.finalyearthesis.com
Maharashtra (1942.25 MW) Maharashtra is second only to Tamil Nadu in terms of generating capacity. Suzlon has been heavily involved. Suzlon operates what was once Asia's largest wind farm, the Vankusawade Wind Park (201 MW), near the Koyna reservoir in Satara district of Maharashtra. Gujarat (1782 MW) Samana &sadodar in jamanagar district is set to host energy companies like China Light Power (CLP) and Tata Power have pledged to invest up to Rs.8.15 billion ($189.5 million) in different projects in the area. CLP, through its India subsidiary CLP India, is investing close to Rs.5 billion for installing 126 wind turbines in Samana that will generate 100.8 MW power. Tata Power has installed wind turbines in the same area for generating 50 MW power at a cost of Rs.3.15 billion. Both projects are expected to become operational by early next year, according to government sources. The Gujarat government, which is banking heavily on wind power, has identified Samana as an ideal location for installation of 450 turbines that can generate a total of 360 MW. To encourage investment in wind energy development in the state, the government has introduced a raft of incentives including a higher wind energy tariff. Samana has a high tension transmission grid and electricity generated by wind turbines can be fed into it. For this purpose, a substation at Sadodar has been installed. Both projects are being executed by Enercon Ltd, a joint venture between Enercon of Germany and Mumbai-based Mehra group. ONGC Ltd has commissioned its first wind power project. The 51 MW project is located at Motisindholi in Kutch district of Gujarat. ONGC had placed the EPC order on Suzlon Energy in January 2008, for setting up the wind farm comprising 34 turbines of 1.5-mw each. Work on the project had begun in February 2008, and it is learnt that the first three turbines had begun production within 43 days of starting construction work. Power from this Rs 308 crore captive wind farm will be wheeled to the Gujarat state grid for onward use by ONGC at its Ankleshwar, Ahmedabad, Mehsana and Vadodara centres. ONGC has targeted to develop a captive wind power capacity of around 200 MW in the next two years. Karnataka (1340.23 MW) There are many small wind farms in Karnataka, making it one of the states in India which has a high number of wind mill farms. Chitradurga, Gadag are some of the districts where there are a large number of Windmills. Chitradurga alone has over 20000 wind turbines. The 13.2 MW Arasinagundi (ARA) and 16.5 MW Anaburu (ANA) wind farms are ACCIONAS first in India. Located in the Davangere district, they have a total installed capacity of 29.7 MW and comprise a total 18 Vestas 1.65MW wind turbines supplied by Vestas Wind Technology India Pvt. Ltd. The ARA wind farm was commissioned in June 2008 and the ANA wind farm, in September 2008. Each facility has signed a 20-year Power Purchase Agreement (PPA) with Bangalore Electricity Supply Company (BESCOM) for off-take of 100% of the output. ARA and ANA are Accionas first wind farms eligible for CER credits under the Clean Development Mechanism (CDM).
www.final-yearproject.com | www.finalyearthesis.com
ACCIONA is in talks with the World Bank for The Spanish Carbon Fund which is assessing participation in the project as buyer for CERs likely to arise between 2010 and 2012. An environmental and social assessment has been conducted as part of the procedure and related documents have been provided. These are included below, consistent with the requirement of the World Bank's disclosure policy. Rajasthan (738.5 MW) Gurgaon-headquartered Gujarat Fluorochemicals Ltd is in an advanced stage of commissioning a large wind farm in Jodhpur district of Rajasthan. A senior official told Projectmonitor that out of the total 31.5 mw capacity, 12 mw had been completed so far. The remaining capacity would come on line shortly, he added. For the INOX Group Company, this would be the largest wind farm. In 2006-07, GFL commissioned a 23.1-mw wind power project at Gudhe village near Panchgani in Satara district of Maharashtra. Both the wind farms will be grid-connected and will earn carbon credits for the company, the official noted. In an independent development, cement major ACC Ltd has proposed to set up a new wind power project in Rajasthan with a capacity of around 11 mw. Expected to cost around Rs 60 crore, the wind farm will meet the power requirements of the company's Lakheri cement unit where capacity was raised from 0.9 million tpa to 1.5 million tpa through a modernisation plan. For ACC, this would be the second wind power project after the 9-mw farm at Udayathoor in Tirunelvelli district of Tamil Nadu. Rajasthan is emerging as an important destination for new wind farms, although it is currently not amongst the top five states in terms of installed capacity. As of 2007 end, this northern state had a total of 496 mw, accounting for a 6.3 per cent share in India's total capacity. Madhya Pradesh (212.8 MW) In consideration of unique concept, Govt. of Madhya Pradesh has sanctioned another 15 MW project to MPWL at Nagda Hills near Dewas. All the 25 WEGs have been commissioned on 31.03.2008 and under successful operation. Kerala (26.5 MW) The first wind farm of the state was set up at Kanjikode in Palakkad district. It has a generating capacity of 23.00 MW. A new wind farm project was launched with private participation at Ramakkalmedu in Idukki district. The project, which was inaugurated by chief minister V. S. Achuthanandan in April 2008, aims at generating 10.5 MW of electricity. The Agency for Non-Conventional Energy and Rural Technology (ANERT), an autonomous body under the Department of Power, Government of Kerala, is setting up wind farms on private land in various parts of the state to generate a total of 600 mw of power. The agency has identified 16 sites for setting up wind farms through private developers. To start with, ANERT will establish a demonstration project to generate 2 mw of power at Ramakkalmedu in Idukki district in association with the Kerala State Electricity Board. The project is slated to cost Rs 21 crore. Other wind farm sites include Palakkad and Thiruvananthapuram districts. The contribution of non-conventional energy in the total 6,095 mw power potential is just 5.5 per cent, a share the Kerala government wants to increase by 30 per cent. ANERT is engaged in the field of development and promotion of renewable sources of energy in Kerala. It is also the nodal agency for implementing renewable energy programmes of the Union ministry of non-conventional energy sources.
www.final-yearproject.com | www.finalyearthesis.com
West Bengal (1.10MW) The total installation in West Bengal is just 1.10 MW as there was only 0.5 MW addition in 2006-2007 and none between 20072008 and 20082009 Bengal - Mega 50 MW wind energy project soon for country. Suzlon Energy Ltd plans to set up a large wind-power project in West Bengal Suzlon Energy Ltd is planning to set up a large wind-power project in West Bengal, for which it is looking at coastal Midnapore and South 24-Parganas districts. According to SP Gon Chaudhuri, chairman of the West Bengal Renewable Energy Development Agency, the 50 MW project would supply grid-quality power. Gon Chaudhuri, who is also the principal secretary in the power department, said the project would be the biggest in West Bengal using wind energy. At present, Suzlon experts are looking for the best site. Suzlon aims to generate the power solely for commercial purpose and sell it to local power distribution outfits like the West Bengal State Electricity Board (WBSEB). Suzlon will invest around Rs 250 crore initially, without taking recourse to the funding available from the Indian Renewable Energy Development Agency (Ireda), said Gon Chaudhuri. He said there are five wind-power units in West Bengal, at Frazerganj, generating a total of around 1 MW. At Sagar Island, there is a composite wind-diesel plant generating 1 MW. In West Bengal, power companies are being encouraged to buy power generated by units based on renewable energy. The generating units are being offered special rates. S Banerjee, private secretary to the power minister, said this had encouraged the private sector companies to invest in this field.
www.final-yearproject.com | www.finalyearthesis.com
India has a coastal area of more than 6000 km. So this makes the availability of wind energy, with considerable speed, at a really high value. The factors which depend on the capacity of electricity that could be generated are: 1. Quality of wind potential. 2. Land availability for wind power generation 3. Seasonal changes in the wind speed and availability. According to an assessment of AWS Truewind, India has a wind potential of 65000MW. There are land areas with excellent wind project potential where wind speeds exceeds 9 m/s at 80m hub height in same of the higher elevations. Lower elevation areas also show promise with speeds at 100m height ranging from 6.5 m/s to 8 m/s. The significant resource coupled with continued government support makes India a very attractive location for wind development. 4.4 Environmental concerns Wind power is a clean renewable energy source. There are, however some environmental considerations to keep in mind when planning a wind power scheme. They include the following: Electromagnetic interference - some television frequency bands are susceptible to interference from wind generators. Noise - wind rotors, gearboxes and generators create acoustic noise when functioning; this needs to be considered when sitting a machine. Visual impact - modern wind machines are large objects and have a significant visual Impact on their surroundings. Some argue that it is a positive visual impact, others to the contrary. 4.5 Cost - economics The cost of producing electricity from the wind is heavily dependent on the local wind regime. As mentioned earlier the power output from the wind machine is proportional to cube of the wind speed and so a slight increase in wind speed will mean a significant increase in power and a subsequent reduction in unit costs. Capital costs for wind power are high, but running costs are low and so access to initial funds, subsidies or low interest loans are an obvious advantage when considering a wind-electric system. If a hybrid system is used a careful cost-benefit analysis needs to be carried out. A careful matching of the load and energy supply options should be made to maximise the use of the power from the wind - a load which accepts a variable input is ideally matched to the intermittent nature of wind power.
www.final-yearproject.com | www.finalyearthesis.com
CHAPTER 5
5.1 Conclusion
In India, renewable energy sources are in abundance, which can contribute significantly to its growing energy demand. Wind energy technology is currently making a significant contribution to the electric power generation in India; however, recently China has overtaken India to the fourth position in the world in terms of installed wind power capacity. Therefore, if India has to match the growth rate in the global wind energy sector, outstanding regulatory and policy issues need to be urgently addressed. Wind power penetration is not constrained by technical problems with wind power technology, but by regulatory, institutional, and market barriers. It is observed that the presence of such non-economic barriers have a significant negative impact on the effectiveness of policies to develop wind power, irrespective of the type of incentive scheme. At present, there are several financial and fiscal incentives provided to the wind power producers at the federal and state government level; however, unstable policies of the state governments as observed in the past and poor institutional framework increase the risk associated in the wind sector. A preliminary assessment of the status of wind power development in potential states of India indicates that there should be a stable and uniform national policy to make wind power projects financially attractive across the country. For the large-scale penetration of wind energy in India it is critically important to assess realistic potential estimates and identify niche areas to exploit the wind energy resource. It is observed that in India, even with highly favourable assumptions, the dissemination of wind energy for power generation is not likely to reach its maximum utilization potential in another 20 years. The growth trends of wind power development in the six Indian states indicate that more than 90% of wind energy potential in India can be exploited by 2030. Apart from the above, installation of high-powered wind turbines in the place of old, lower capacity machines, intercropping of small windmills among bigger machines, development of offshore wind farms and development of hybrid turbines are some of the important needs toward the rapid growth of wind industry in India.