0% found this document useful (0 votes)
63 views10 pages

BUSI410 Lab Session 1

The document contains reports from two different optimization problems solved using Microsoft Excel Solver. The first report is for a production planning problem that maximizes contribution with constraints on labor, metal, glass, and production amounts. It found a solution with 1000 units of Type 1, 800 of Type 2, 400 of Type 3, and 0 of Type 4. The second report is for a production scheduling problem that minimizes total cost with constraints on production amounts, overtime, and ending inventory levels. It determined a solution with 4400 regular units in Period 1, 6000 in Period 2, 4000 in Period 3, and 500 overtime units in Period 3.

Uploaded by

J.Cie Sun
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
63 views10 pages

BUSI410 Lab Session 1

The document contains reports from two different optimization problems solved using Microsoft Excel Solver. The first report is for a production planning problem that maximizes contribution with constraints on labor, metal, glass, and production amounts. It found a solution with 1000 units of Type 1, 800 of Type 2, 400 of Type 3, and 0 of Type 4. The second report is for a production scheduling problem that minimizes total cost with constraints on production amounts, overtime, and ending inventory levels. It determined a solution with 4400 regular units in Period 1, 6000 in Period 2, 4000 in Period 3, and 500 overtime units in Period 3.

Uploaded by

J.Cie Sun
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 10

Microsoft Excel 14.2 Answer Report Worksheet: [Workbook1]Sheet1 Report Created: 1/23/2013 1:08:42 PM Result: Solver found a solution.

All constraints and optimality conditions are satisfied. Solver Engine Engine: Simplex LP Solution Time: 0.65047 Seconds. Iterations: 4 Subproblems: 0 Solver Options Max Time Unlimited , Iterations Unlimited , Precision 0.000001 Max Subproblems Unlimited , Max Integer Sols Unlimited , Integer Tolerance 1%, Solve Without Integer Co

Objective Cell (Max) Cell Name $G$13 Contribution Total

Original Value 15

Final Value 9200

Variable Cells Cell Name $B$15 No. Produced Type 1 $C$15 No. Produced Type 2 $D$15 No. Produced Type 3 $E$15 No. Produced Type 4

Original Value 1 1 1 1

Final Value 1000 800 400 0

Integer Contin Contin Contin Contin

Constraints Cell Name $B$16 Type 1 Constraint Type 1 $C$17 Type 2 Constraint Type 2 $D$18 Type 3 Constraint Type 3 $E$19 Type 4 Constraint Type 4 $G$6 Labor Total $G$7 Metal Total $G$8 Glass Total $E$15 No. Produced Type 4

Cell Value 1000 800 400 0 4000 6000 8000 0

Formula $B$16<=$I$16 $C$17<=$I$17 $D$18<=$I$18 $E$19<=$I$19 $G$6<=$I$6 $G$7<=$I$7 $G$8<=$I$8 $E$15<=$E$16

Status Slack Binding 0 Not Binding 1200 Not Binding 100 Not Binding 1000 Binding 0 Binding 0 Not Binding 2000 Binding 0

ance 1%, Solve Without Integer Constraints , Assume NonNegative

Microsoft Excel 14.2 Sensitivity Report Worksheet: [Workbook1]Sheet1 Report Created: 1/23/2013 1:08:42 PM

Variable Cells Cell $B$15 $C$15 $D$15 $E$15 Name No. Produced Type 1 No. Produced Type 2 No. Produced Type 3 No. Produced Type 4 Final Reduced Objective Allowable Allowable Value Cost Coefficient Increase Decrease 1000 0 6 1E+30 2 800 0 2 1 0.25 400 0 4 2 0.5 0 -0.2 3 0.2 1E+30

Constraints Cell $B$16 $C$17 $D$18 $E$19 $G$6 $G$7 $G$8 Name Type 1 Constraint Type 1 Type 2 Constraint Type 2 Type 3 Constraint Type 3 Type 4 Constraint Type 4 Labor Total Metal Total Glass Total Final Shadow Constraint Allowable Allowable Value Price R.H. Side Increase Decrease 1000 2.00 1000 400 600 800 0.00 2000 1E+30 1200 400 0.00 500 1E+30 100 0 0.00 1000 1E+30 1000 4000 1.20 4000 250 1000 6000 0.40 6000 2000 500 8000 0.00 10000 1E+30 2000

Picasso Frames
Total Type 1 Labor Metal Glass Price Cost Contribution No. Produced Type 1 Constraint Type 2 Constraint Type 3 Constraint Type 4 Constraint 2 4 6 28.5 22.5 6 1000 1000 Type 2 1 2 2 12.5 10.5 2 800 800 400 0 Type 3 3 1 1 29.25 25.25 4 400 Type 4 2 2 2 21.5 18.5 3 0 9200 4000 6000 8000

cost 8 0.5 0.75

Max. 4000 6000 10000

1000 2000 500 1000

Microsoft Excel 14.2 Answer Report Worksheet: [Workbook1]Bammo Manufacturing Report Created: 1/23/2013 1:32:19 PM Result: Solver found a solution. All constraints and optimality conditions are satisfied. Solver Engine Engine: Simplex LP Solution Time: 0.736801 Seconds. Iterations: 7 Subproblems: 0 Solver Options Max Time Unlimited , Iterations Unlimited , Precision 0.000001, Use Automatic Scaling Max Subproblems Unlimited , Max Integer Sols Unlimited , Integer Tolerance 1%, Assume NonNegative

Objective Cell (Min) Cell $E$23 Total Cost

Name

Original Value -822

Final Value 1579

Variable Cells Cell Name $B$9 Production(Regular) Period 1 $C$10 Period 2 $D$11 Period 3 $B$12 Production(Overtime) Period 1 $C$13 Period 2 $D$14 Period 3

Original Value 0 0 0 0 0 0

Final Value 4400 6000 4000 0 0 500

Integer Contin Contin Contin Contin Contin Contin

Constraints Cell Name $B$18 Ending Inventory Period 1 $C$18 Ending Inventory Period 2 $D$18 Ending Inventory Period 3 $B$12 Production(Overtime) Period 1 $B$9 Production(Regular) Period 1 $C$10 Period 2 $C$13 Period 2 $D$11 Period 3 $D$14 Period 3

Cell Value 600 1600 100 0 4400 6000 0 4000 500

Formula $B$18>=$G$18 $C$18>=$G$18 $D$18>=$G$18 $B$12<=$F$12 $B$9<=$F$9 $C$10<=$F$10 $C$13<=$F$13 $D$11<=$F$11 $D$14<=$F$14

Status Slack Not Binding 500 Not Binding 1500 Binding 0 Not Binding 1000 Not Binding 1600 Binding 0 Not Binding 1000 Binding 0 Binding 0

%, Assume NonNegative

Microsoft Excel 14.2 Sensitivity Report Worksheet: [Workbook1]Bammo Manufacturing Report Created: 1/23/2013 1:32:19 PM

Variable Cells Cell $B$9 $C$10 $D$11 $B$12 $C$13 $D$14 Final Reduced Objective Allowable Allowable Name Value Cost Coefficient Increase Decrease Production(Regular) Period 1 4400 0 0.19 0.01 0.02 Period 2 6000 -0.03 0.16 0.03 1E+30 Period 3 4000 -0.06 0.13 0.06 1E+30 Production(Overtime) Period 1 0 0.04 0.23 1E+30 0.04 Period 2 0 0.01 0.2 1E+30 0.01 Period 3 500 -0.02 0.17 0.02 1E+30

Constraints Cell Name $B$18 Ending Inventory Period 1 $C$18 Ending Inventory Period 2 $D$18 Ending Inventory Period 3 Final Shadow Constraint Allowable Allowable Value Price R.H. Side Increase Decrease 600 0 100 500 1E+30 1600 0 100 1500 1E+30 100 0.19 100 1600 500

Bammo Manufacturing
Period 1 Initial Inventory 200 Period 2 600 Period 3 1600 Max

Production(Regular)

4400 6000 4000

Production(Overtime) 500 Demand Ending Inventory Total Production Cost Total Inventory Cost Total Cost 4000 600 440 18 458 5000 1600 600 48 648 6000 100 470 3 473 1579

6000 6000 4000 1000 1000 500

Min

Cost 0.1

0.14

100

0.03

You might also like