1) The document describes the modeling and analysis of a 5m x 5m reinforced concrete frame structure in SAP2000. Key steps included defining materials, sections, loads, and load combinations. 2) Modal analysis was performed to determine vibration periods and mode shapes. The first vibration period was 1.49 seconds. 3) Force diagrams and member forces were obtained for the main load combination. 4) The structure was then reanalyzed modeling the shear walls as frames to compare member forces. The first vibration period increased to 1.65 seconds.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
100% found this document useful (4 votes)
3K views73 pages

SAP2000

1) The document describes the modeling and analysis of a 5m x 5m reinforced concrete frame structure in SAP2000. Key steps included defining materials, sections, loads, and load combinations. 2) Modal analysis was performed to determine vibration periods and mode shapes. The first vibration period was 1.49 seconds. 3) Force diagrams and member forces were obtained for the main load combination. 4) The structure was then reanalyzed modeling the shear walls as frames to compare member forces. The first vibration period increased to 1.65 seconds.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 73

Kemi marre ne studim nje rame te brendshme qe ndodhet ne largesi 5m

nga ramat fqinje,si ne figure:


5
5
6
1.6
6 6


Per llogaritje fillimisht kemi marre beton C25/30 me modul elasticiteti
E=3*10
7
KN/m
2

Dimensionet fillestare qe jane mare per llogaritje jane :
Kolona: Per kater katet e para 50x50
Per tre katet e dyta 45x45
Per katet e tjera 40x40
Traret: Per te gjitha katet 40x50

Kushti i permasimit paraprak te kolonave eshte:
koll
koll
koll ck
2
nev cd
cd
2 koll
nev
cd
N p n s P 1.5 2Ton
n 10kate
N p n s 1.5 10 25 375Ton
N f 30000
KN
F ku : f 20000
m
0.65 f 1.5 1.5
N 375 10
F 0.288m
0.65 f 0.65 20000



















Parametri qe ndryshon lartesia e katit te pare
4
.
4
3
.
2
3
.
2
3
.
2
3
.
2
3
.
2
3
.
2
3
.
2
3
.
2
3
.
2
6
1.6
6 6





Per te hedhur strukturen ne sap kemi perdorur kete rruge:

- Fillimisht kemi ndertuar rrjet ndihmes(gridin) me pese hapesira
sipas x, 1 sipas y dhe 11 sipas z ku kati i pare ka lartesine 4.4m
dhe katet e tjere kane lartesi 3.2m.

- Kemi krijuar materialin tek Define materials Beton C25/30 me keto
te dhena:
Pesha 25KN,E=3*10
7
,koeficienti Poisonit , f
ck
=25000KN/m
2

- Kemi krijuar seksionet tek Define frame section
K50x50 me armim
,K45x45,K40x40,
T40x50

- Me pas i hedhim keto te dhena ne grid
Komanda qe perdorem eshte draw frame /cable object

- Hedhja e ngarkesave
Na jepet q=5KN/m
2
, q
mur
=8KN/m, p=2KN/m
2

Ngarkesat i kemi hedhur njetrajtesisht te shperndara dhe
konkretisht ;
DEAD: 5KN/m
2
*5m =25KN/m
DEAD: 5KN/m
2
*5m + 8KN/m =33KN/m per ngarkesat ne
brezat e mureve
LIVE: 2KN/m
2*
5m=10 KN/m


Hedhja e tyre behet duke selektuar elementet tra tek
Assing - Frame loads - Distributed dhe duke zgjedhur
opsionin DEAD ose LIVE sipas rastit.

NGARKESA E PERHERSHME:
G=5KN/m
2
*5m =25KN/ml
dhe ne mure G=5KN/m
2
*5m +8KN/ml=33KN/ml
RAMA E STUDIUAR
zona qe shkarkon ne tra
l/2
l/2









NGARKESA E PERKOHSHME:
P=2KN/m
2
*5m=10KN/ml


SPEKTRI (sipas KTP):
- Paraqitja e rezultateve duke perdorur spektrin e dizenjuar sipas
Kushtit Teknik Shqiptar KTP.
Per te ndertuar spektrin kemi perdorur beton me marke C 25/30:
Ndertimi i spektrit:
Per kategorine e truallit II
0.65=0.8/T2.0
S(a)=k
e
*k
r
***g
K
e
-koeficienti i sizmicitetit
g-nxitimi i renies se lire
k
r
- koeficienti i rendesise se objekteve
-koeficienti i structures qe shpreh vetite duktile
k
e
*k
r
**g=0.22*1*0.25*9.81=0.3434


















- Varesia T- paraqitet ne tabele dhe ne grafik:


















Pasi e kemi ndertuar spektrin duhet ta deklarojme tek Define Load
Cases

- Duhet qe tek Define - Mass Source te vendos opsionin
-From loads dhe te shenoj :

DEAD me koeficient 1 dheLIVE me koeficient 0.3.

Arsyeja qe nuk vendos opsionin e trete eshte qe masa e struktures
merret per llogaritje dy here

- Duhet qe tek Load patterns te deklaroj ngarkesat DEAD dhe LIVE
me koeficientet 1 dhe 0.

- Tek load combination krijoj kombinimet
COMB1=1.35p+1.5q
COMB 2=g+0.3q+E


- Studiojme te dhenat qe do marrim nga kombinimi COMB1

- Marr formen e deformuar


- Marr epjurat e forcave te brendshme nga kombinimi kryesor













- Marr epjurat e forcave te brendshme nga kombinimi kryesor

Forca normale

Epjura e momenteve


Epjura e forces prerese

- Marr epjurat e forcave te brendshme nga kombinimi comb2, duke
marre parasysh forcen sizmike

Forca normale

Epjura e momenteve


Epjura e forces prerese

Sipas analizes ne sap:
T=1.491186
Nga analiza modale marrim keto perioda,frekuenca dhe forma
lekundjesh
TABLE: Modal Periods And Frequencies
OutputCase StepType StepNum Period Frequency CircFreq Eigenvalue
Text Text Unitless Sec Cyc/sec rad/sec rad2/sec2
MODAL Mode 1 1.491186 0.67061 4.2135 17.754
MODAL Mode 2 0.455678 2.1945 13.789 190.13
MODAL Mode 3 0.227779 4.3902 27.585 760.91
MODAL Mode 4 0.133896 7.4685 46.926 2202
MODAL Mode 5 0.128213 7.7995 49.006 2401.6
MODAL Mode 6 0.108369 9.2278 57.98 3361.7
MODAL Mode 7 0.096365 10.377 65.202 4251.3
MODAL Mode 8 0.095891 10.428 65.524 4293.4
MODAL Mode 9 0.087525 11.425 71.787 5153.4
MODAL Mode 10 0.06235 16.038 100.77 10155
MODAL Mode 11 0.049175 20.336 127.77 16326
MODAL Mode 12 0.048303 20.703 130.08 16920






FORMA PARE FORMA DYTE





FORMA E TRETE FORMA E KATERT


FORMA E PESTE FORMA E GJASHTE


FORMA E SHTATE FORMA E TETE


FORMA E NENTE FORMA E DHJETE


Forma e NJEMBEDHJETE Forma e DYMBEDHJETE
NDERTIMI I SPEKTRIT TE PROJEKTIMIT TE SHPEJTIMEVE
(sipas eurocode)
Ne rastin e veprimeve sizmike horizontale, vlerat llogaritese te spektrit te
reagimit te shpejtimeve S(T) per sistemet me shume shkalle lirie jepen nga
shprehja:

( )
( )
( )
1
2 1
0
1
1
0
1 2
0 2
2 3
0 3 2
3
( ) 0.25
( ) 1 1 0

= = =

(
| |

= + s >
( |

\ .

= s >

= s >
(

( (

= >
( (

d
d d
g
k
k k
S T PGA a g
T
S T PGA S T T
T q
S T PGA S T T T
q
T
S T PGA S T T T
q T
T T
S T PGA S T T
q T T
|
|
|
|


Vlerat e parametrave S,T1, T2, T3 merren ne tabele ne varesi te kategorise se truallit
,qe ne rastin tone eshte C.
Do te kemi keto vlera:

Kategoria e
truallit
S TB TC TD
B 1.0 0.15 0.60 3.00

ku:
Faktori i sjelljes q llogaritet:
5 . 1
0
> =
W R D
k k k q q
5
0
= q per sistem konstruktiv mix (mure + kolona)
75 . 0 =
D
k per duktilitet mesatar (DC M)
1 =
R
k per objekt te rregullt
0
| = 2.5

1 =
W
k per sistemet konstruktiv vertikal mbajtes ku dominues jane kolonat
1
1
d
k =

2
2
d
k =
5 . 1 375 . 3 1 1 75 . 0 5 . 4 > = = q

2
0.25 0.25 9.81 2.45 /
g
a g m s = = =







LLogaris strukturen duke marre Murin Shear Wall si kolone. Per kete
krijojme nje element me seksion te ndryshem nga ato qe na ofron
programi. Tek menu-ja define-section properties-frame sections krijojme
nje element te ri tek menu-ja e Add new property... Tek Section
Designer krijojme elementin me permasat dhe karakteristikat e
deshiruara. Elementi qe krijova eshte i paraqitur ne fig. e meposhtme:








- Marr epjurat e forcave te brendshme nga kombinimi kryesor

Forca normale

Epjura e momenteve


Epjura e forces prerese


- Marr epjurat e forcave te brendshme nga kombinimi komb2

Forca normale

Epjura e momenteve


Epjura e forces prerese

Sipas analizes ne sap:
T=1.649051
Nga analiza modale marrim keto perioda,frekuenca dhe forma
lekundjesh
TABLE: Modal Periods And Frequencies
OutputCase StepType StepNum Period Frequency CircFreq Eigenvalue
Text Text Unitless Sec Cyc/sec rad/sec rad2/sec2
MODAL Mode 1 1.649051 0.60641 3.8102 14.517
MODAL Mode 2 0.497894 2.0085 12.62 159.25
MODAL Mode 3 0.246096 4.0635 25.531 651.86
MODAL Mode 4 0.145546 6.8707 43.17 1863.6
MODAL Mode 5 0.128444 7.7855 48.918 2392.9
MODAL Mode 6 0.103242 9.686 60.859 3703.8
MODAL Mode 7 0.097841 10.221 64.218 4124
MODAL Mode 8 0.096343 10.38 65.217 4253.3
MODAL Mode 9 0.09521 10.503 65.993 4355.1
MODAL Mode 10 0.071528 13.981 87.843 7716.3
MODAL Mode 11 0.05679 17.609 110.64 12241
MODAL Mode 12 0.048859 20.467 128.6 16538






FORMA PARE FORMA DYTE





FORMA E TRETE FORMA E KATERT


FORMA E PESTE FORMA E GJASHTE


FORMA E SHTATE FORMA E TETE


FORMA E NENTE FORMA E DHJETE


Forma e NJEMBEDHJETE Forma e DYMBEDHJETE
Ne rastin e dyte, pra kur kalojme nga shell ne frame sections, forca
prerese ne baze ne pjesen e murit do te rritet shume, qe do te
sjelle dhe rritjen e momentit. Kjo do te vije nga arsyetimi qe muri
Shear Wall perballon me mire forcen prerese sesa Kolona.


































Rezultatet nga Kombinimi Sizmik i Ngarkesave




Tabelen e zhvendosjeve e marrim te Display > Show Tables. Tek tabelat marrim
Joint Displacement dhe me to vazhdojme llogaritjen e Drifteve (Zhvendosjen
Relative) treguar ne figure:










TABELA: Zhvendosjet e pikave

Pikat U1 U3 R2 Driftet
Driftet e
lejuara
Text m m Radians % %
4 0.055563 0.0008
-
0.000604 0.097781 1.215
5 0.052434 0.0007
-
0.000875 0.124125 1.215
6 0.048462 0.0007
-
0.001074 0.154469 1.215
7 0.043519 0.0007
-
0.001374 0.179844 1.215
8 0.037764 0.0007
-
0.001623 0.204938 1.215
9 0.031206 0.0006
-
0.001797 0.22325 1.215
10 0.024062 0.0005
-
0.001951 0.225719 1.215
11 0.016839 0.0004
-
0.001989 0.219281 1.215
47 0.009822 0.0003
-
0.001837 0.184813 1.215
46 0.003908 0.0002
-
0.001286 0.088818 1.575
56 0 0 0 0

Ne tabelen e mesiperme shihet se zhvendosjet dhe driftet e llogaritura jane me
te vogla se ato te lejuara.

Vlerat e lejuara te drifteve jane llogaritur sipas Eurocode 8 (4.4.3.2) ku thuhet:

Per ndertesat qe kane elemente jo-strukturore duktile

d
r
*v 0.0075*h d
s
*q*v 0.0075*h d
s

0.0075*420
1.575
4*0.5
=

d
s
1.575cm per katin e pare
d
s
1.215cm
ku:
d
r
eshte zhvendosja projektuese midis kateve
h eshte lartesia e katit
v faktor qe mer parasysh rendesine e nderteses
Me poshte eshte ndertuar grafiku i cili shpreh varesine e drifteve nga katet e
nderteses gjithashtu dhe zhvendosjeve:

Zhvendosjet















0
2
4
6
8
10
12
0 0.01 0.02 0.03 0.04 0.05 0.06
Zhvendosjet
Zhvendosjet
Driftet





Te njejtat llogaritje bej per rastin e murit si kolone.

Tabela: Zhvendosjet e pikave

Pika U1 U3 R2 Driftet
Driftet e
lejuara
Text m m Radians % %
4 0.056144 -0.000758 0.000672 0.106563 1.215
5 0.052734 -0.000751 0.000953 0.133156 1.215
6 0.048473 -0.000731 0.001148 0.163 1.215
7 0.043257 -0.000697 0.00144 0.186906 1.215
8 0.037276 -0.000653 0.001681 0.210813 1.215
9 0.03053 -0.000589 0.001842 0.227281 1.215
10 0.023257 -0.000503 0.001971 0.226031 1.215
11 0.016024 -0.000414 0.001975 0.21475 1.215
47 0.009152 -0.000305 0.001766 0.175594 1.215
46 0.003533 -0.000178 0.001235 0.080295 1.575
56 0 0 0





0
2
4
6
8
10
12
0 0.05 0.1 0.15 0.2 0.25
Driftet
Driftet
Zhvendosjet




Driftet



Ne rastin e dyte, pra ne rastin kur muret i marrim si kolone
Zhvendosjet e llogaritura dhe Driftet na dalin me te medha se ne
rastin e pare. Kjo del per shkak te mungeses se mureve te cilet
kane rolin kryesor ne perballimin e forcave horizontale.


0
2
4
6
8
10
12
0 0.01 0.02 0.03 0.04 0.05 0.06
Zhvendosjet
Zhvendosjet
0
2
4
6
8
10
12
0 0.05 0.1 0.15 0.2 0.25
Driftet
Driftet
- Pasqyrimi i epjurave te forcave te brendshme nga kombinimi ma
spektrin 1*G+0.3*Q+1*E
- FORCA NORMALE



- FORCA PRERESE





EPJURA E MOMENTEVE


Ne mur



- Paraqitja ne forme tabelare e forcave te brendshme nga kombinimi
sizmik:

Marr vlerat e forcave ne baze ne tabelat e paraqitura ne program
















Emertimet e elementeve paraqiten me poshte ne figure


Forcat maksimale ne baze
Tabela e forcave maksimale ne baze
(kolona)
Elementi Pozicioni P V2 M3
Text m KN KN KN-m
34 0 -880.841 28.19 45.9124
34 2.2 -894.591 28.19 34.1511
34 4.4 -908.341 28.19 41.0133
85 0 -2008.844 21.506 26.9273
85 2.2 -2022.594 21.506 20.9251
85 4.4 -2036.344 21.506 72.0374
90 0 -982.44 1.182 -32.2443
90 2.2 -996.19 1.182 18.5605
90 4.4 -1009.94 1.182 77.9926


Tabela e forcave te brendshme ne baze (trare)
Elementi Pozicioni P V2 M3
Text m KN KN KN-m
46 0 44.479 -71.028 -7.5022
46 3 44.479 30.972 60.5794
46 6 44.479 132.972 -5.8679
47 0 305.732 -29.381 -17.871
47 0.8 305.732 4.219 -7.798
47 1.6 305.732 37.819
-
18.2202
48 0 76.525 -73.409 -8.4762
48 3 76.525 28.591 58.7549
48 6 76.525 130.591
-
21.6359
49 0 38.518 -82.016
-
40.9818
49 3 38.518 19.984 57.9468
49 6 38.518 121.984
-
29.1906








Armatura do te dali




Per elementin me te ngarkuar tra



Per elementin me te ngarkuar kolone





Kurba e interaksionit per kolonen (elementi 46) per kende te ndryshme
























Paraqis diagramen moment kurbature per kolonen me te ngarkuar te
struktures
Paraqis kete diagrame per piken e rrjedhshmerise














Paraqis diagramen Moment Kurbature per piken e shkaterrimit


Rruga qe ndoqa per te kurba e Moment Kurbature eshte paraqitur ne
figure:

- Paraqis ndryshimet e periodes, zhvendosjeve dhe forcave prerese
ne rastin e variables se dhene.
Kryej analizen per variablen e pare te dhene (per lartesi te pare kati =
4m)
Perioda e modit te pare do te dale si me poshte:


T=1.47038s dhe Zhvendosja max = 0.056m

Diagrama e forces prerese do te jete:

Forca prerese maksimale = 95Kn




E njejta procedure kryhet kur lartesia e katit te pare ndryshon ne 4.2m
Perioda paraqitet ne fig me poshte:

T=1.48073s dhe Zhvendosja max=0.0558m

Epiura e forces prerese:

Forca prerese max=97 kN


Kryej te njejten procedure per variablin 4 me lartesi kati te pare = 4.6 per
shkak se variablin h=4.4 e kam paraqitur me lart ne relacion si vlere te
vecante.

T= 1.50176s dhe Zhvendosjet max= 0.0554m


Epiura e forces prerese eshte si ne figure

Forca prerese max = 100.1 kN




E njejta procedure kryhet dhe per variablin 5 me lartesi kati te pare =
4.8m

T= 1.5125 s dhe Zhvendosjet max = 0.0552m



Epiura e forces prerese eshte


















Forca prerese max = 101.597 kn




Kryej kete procedure dhe per variablin e fundit me lartesi kati =5m

T = 1.52327s dhe Zhvendosjet maksimale = 0.055m


Epiura e forces prerese eshte

Forca prerese max = 103.02 kN



Te dhenat e perftuara i paraqis ne menyre tabelare dhe me to ndertoj
diagramat ne varesi te variablit te ndryshuar.
Varianti H kati T U1 V
1 4 1.47038 0.056 95
2 4.2 1.48073 0.0558 97
3 4.4 1.491 0.05556 98.34
4 4.6 1.50176 0.0554 100.1
5 4.8 1.5125 0.0552 101.597
6 5 1.523 0.055 103.02

Nderkohe diagramat jane:



1.46
1.47
1.48
1.49
1.5
1.51
1.52
1.53
0 1 2 3 4 5 6
Perioda
Perioda
0.0548
0.055
0.0552
0.0554
0.0556
0.0558
0.056
0.0562
0 1 2 3 4 5 6
Zhvendosjet
Zhvendosjet


Arsyetimi eshte se rritja e lartesise se katit do te zvogeloje shtangesine e
struktures dhe ne kete menyre do te rritet perioda. Gjithashtu ndryshimi i
shtangesise ndermjet kateve te struktures krijon perqendrim dhe rritje te
forces prerese ne kolonat e katit i cili krijon kete ndryshim shtangesie.
94
95
96
97
98
99
100
101
102
103
104
0 1 2 3 4 5 6
Forca prerese
Forca prerese

You might also like