QUALITY CONTROL PLAN ( Q.C.P ) CA - Chemical Analysis RT - Running Test MT - Mechanical Test ( Sample) VC - Visual Checking DIM- Dimensional Checking TT - Thermal treatment DP - Die penetrant MP - Magnetic particle test US - Ultra Sonic Test RD - Radiography SC - Specific Control Manufacturing Operations o N phases Operations 1.0 RAW MATERIAL 1.1 Physical & Chemical Properties Interventions C-Witness Point A-Hold point Participants 1.Contractor (L&T) Documents
Plant department: Crushing Shop & Long Belt Conveyor (Field quality plan for Strl / Tech.str Fabrication & Erection) Equipment: Q.C.P ref: QP for strl&tech. Str. Supplier: Part designation: Drawing No. Specification Ref. Item No. Interventions Participants Date Report no. Remarks Remarks Completed Observations: Date 31.05.03 Revision 0 CR- Control Report CC-Conformity certificate
VC
1&2
CC No 1
1.2
VC
1&2
CR No 1
IS-2062,IS-8500,IS-1162,IS-3502 BDS 878 : 1978, BDS 1355 : 1992 Grades as per approved drgs. Review of Mill TC's for chemical mechanical properties ASTM A 435 / AWSD1.1 Review of Mill T.C No surface Defects Inspection Report
1.3
Visual Examination
VC
CR No 1
2.0
DIM
CR No 2
Approved drg.
3.0 3.1
3.2
DIM
CR No 2
- Do -
Page 1 of 64
LAFARGE
QUALITY CONTROL PLAN ( Q.C.P ) CA - Chemical Analysis RT - Running Test MT - Mechanical Test ( Sample) VC - Visual Checking DIM- Dimensional Checking TT - Thermal treatment DP - Die penetrant MP - Magnetic particle test US - Ultra Sonic Test RD - Radiography SC - Specific Control Manufacturing Operations o N phases Operations fillet weld,as per standard. 4.0 4.1 Pre heating and PW HT Ensure Preheating and PW HT as per approval WSP/ Tech.spcc Welding Welding procedures and Welders Qualification test. VC VC Interventions C-Witness Point A-Hold point Participants 1.Contractor (L&T) Documents
Plant department: Crushing Shop & Long Belt Conveyor (Field quality plan for Strl / Tech.str Fabrication & Erection) Equipment: Q.C.P ref: QP for strl&tech. Str. Supplier: Part designation: Drawing No. Specification Ref. Item No. Interventions Participants Date Report no. Remarks Remarks Completed Observations: Date 31.05.03 Revision 0 CR- Control Report CC-Conformity certificate
CR No 3
5.0 5.1
CR No 4
5.2 Ensure welding consumables are used as per approval electrodes list 5.3 Ensure proper storage backing and Handing of Electrodes Ensure proper Sequence of welding Non Destructive Testing (SHOP AND SITE WELDS) Butt Welds
VC
CR No 4
VC
CR No 4
5.4 6.0
VC
CR No 4
6.1
Page 2 of 64
LAFARGE
QUALITY CONTROL PLAN ( Q.C.P ) CA - Chemical Analysis RT - Running Test MT - Mechanical Test ( Sample) VC - Visual Checking DIM- Dimensional Checking TT - Thermal treatment DP - Die penetrant MP - Magnetic particle test US - Ultra Sonic Test RD - Radiography SC - Specific Control N phases a b (i) (ii)
o
Plant department: Crushing Shop & Long Belt Conveyor (Field quality plan for Strl / Tech.str Fabrication & Erection) Documents CR- Control Report CC-Conformity certificate Interventions C-Witness Point A-Hold point Participants 1.Contractor (L&T) 2-Lafarge/Insp. agency Type Of Inspection DP RD / US RD / US Item No. Interventions Participants 1 1&2 1&2 Date Report no. CR No 5 CR No 5 CR No 5 Remarks Remarks AWSD1.1/ Tech.Sepc. AWSD1.1/ Tech.Sepc. AWSD1.1/ Tech.Sepc. Completed Supplier: Part designation: Drawing No. Specification Ref. Observations: Equipment: Q.C.P ref: QP for strl&tech. Str. Date 31.05.03 Revision 0
Manufacturing Operations Operations DPT on root Run after back gauging Radiography or ultrasonic test on compression zone Butt welds at fabrication shop. R.T or UT on tension zone Butt welds at fabrication shop. Fillet welds Check size and visual defects Dye penetration test
6.2 a) b)
VC + DIM VC
1 1
CR No 5 CR No 5
Approved drawing ASWD 1.1 and Tech. Specn. No liner and round indications ASME sectron IX/WSD 1.1
c)
MACRO Eich. Examination on production test coupon Check individual structure for Dimensional tolerances, match mark length, camber, sweep marking of holes for fitment etc. as per Technical Specification IS 7215 Check cleaning & painting & dry
MT
1&2
CR No 6
7.0
DIM
CR No 7
8.0
VC + DIM
CR No 8
Page 3 of 64
LAFARGE
QUALITY CONTROL PLAN ( Q.C.P ) CA - Chemical Analysis RT - Running Test MT - Mechanical Test ( Sample) VC - Visual Checking DIM- Dimensional Checking TT - Thermal treatment DP - Die penetrant MP - Magnetic particle test US - Ultra Sonic Test RD - Radiography SC - Specific Control Manufacturing Operations o N phases Operations film thickness,including final coat. 9.0 Shop Assy ( trial assy) before despatch for Erection ERECTION Documents Reviews, completeness of tests Interventions C-Witness Point A-Hold point Participants 1.Contractor (L&T) Documents
Plant department: Crushing Shop & Long Belt Conveyor (Field quality plan for Strl / Tech.str Fabrication & Erection) Equipment: Q.C.P ref: QP for strl&tech. Str. Supplier: Part designation: Drawing No. Specification Ref. Item No. Interventions Participants Date Report no. Remarks Remarks Completed Observations: Date 31.05.03 Revision 0 CR- Control Report CC-Conformity certificate
DIM
CR No 9
Approved drawing
10.1
VC
1&2
CR No 10
10.2 a)
HSFG/HT Bolts tightening Ensure HSFG bolts are tightened by part turn method at Reqd. torquee Welding and NDT Checking of Erection tolerances as during Erection of steel structures as per IS-12843/appd. Drg
VC
CR No 10
10.3 10.4
VC DIM
1&2 1
10.5
Touch up painting
VC
CR No 11
Tech. Specification
Page 4 of 64
LAFARGE
QUALITY CONTROL PLAN ( Q.C.P ) CA - Chemical Analysis RT - Running Test MT - Mechanical Test ( Sample) VC - Visual Checking DIM- Dimensional Checking TT - Thermal treatment DP - Die penetrant MP - Magnetic particle test US - Ultra Sonic Test RD - Radiography SC - Specific Control Manufacturing Operations o N phases Operations I Excavation a) Nature of soil / rock b) Initial Ground Level c) Dimensions of Excavated pit d) Final Pit / Bed level e) Side slope during excavation II a) b) Filling with earth Suitability of fill material Grain size Analysis Liquid limit & Plastic Limit ( Test for soil) Interventions C-Witness Point A-Hold point Participants 1.Contractor (L&T) Documents
Plant department: Crushing Shop & Long Belt Conveyor (Field quality plan for Civil Works) Equipment:
Q.C.P ref:QP FOR CIVIL WORKS
CR- Control Report CC-Conformity certificate Supplier: Part designation: Drawing No. Specification Ref. Item No. Interventions Participants 1&2 1 1 1&2 1&2 Date Report no. CR CR CR CR CR No No No No No 1a 1a 1a 1a 1a Site register - Do - Do - Do - Do Observations:
Date 31.05.03
Revision 0
Remarks Remarks
Completed
MT MT
1 1
CR No 1b CR No 1b
IS 2720/BNBC - 1993 Part 6 : 3.4 One in every 5000 M3 for each type and each source of fill material subject to a minimum of 1 sample One in every 9000 M3 for each type and each source of fill material
c)
Shrinkage Limit
MT
CR No 1b
d) e)
Free Swell Index Chemical Analysis i) Organic Matter ii) Calcium Carbonate iii) Ph. Value iv) Total Soluble sulphate
MT CA CA CA CA CA
1 1 1 1 1 1
CR CR CR CR CR CR
No No No No No No
1b 1b 1b 1b 1b 1b
Page 5 of 64
LAFARGE
QUALITY CONTROL PLAN ( Q.C.P ) CA - Chemical Analysis RT - Running Test MT - Mechanical Test ( Sample) VC - Visual Checking DIM- Dimensional Checking TT - Thermal treatment DP - Die penetrant MP - Magnetic particle test US - Ultra Sonic Test RD - Radiography SC - Specific Control N phases III.
o
Plant department: Crushing Shop & Long Belt Conveyor (Field quality plan for Civil Works) Documents CR- Control Report CC-Conformity certificate Interventions C-Witness Point A-Hold point Participants 1.Contractor (L&T) 2-Lafarge/Insp. agency Type Of Inspection MT Item No. Interventions Participants 1 Date Report no. CR No 1b Remarks Remarks IS 2720 Part VIII BNBC - 1993 Part 6 : 3.12.5.2,3.4 Once in every 5000 M3 for each type and each source of fill malt IS 2720 Part II BNBC - 1993 Part 6 : 3.12.5.2,3.4 One in every 5000 M2 for each type and each source of fill material Completed Supplier: Part designation: Drawing No. Specification Ref. Observations: Equipment:
Q.C.P ref:QP FOR CIVIL WORKS
Date 31.05.03
Revision 0
Manufacturing Operations Operations STANDARD PROCTOR TEST TO DETERMINE OPTIMUM MOISTURE CONTENT AND DRY DENSITY OF FILL.
IV.
MT
CR No 1b
V.
COMPACTION TEST IS 2720 Part xxix/ BNBC 1993 Part 6:3.4 , 6 : 3.12.5.2 a) for foundation filling one for every 25 found. For each compacted layer. However each layer for loca- tion of important & heavily loaded
a)
DRY DENSITY BY CORECUTIER METHOD OR DRY DENSITY INPLACE BY SAND DISPLACEMENT METHOD
MT
CR No 1b
Page 6 of 64
LAFARGE
QUALITY CONTROL PLAN ( Q.C.P ) CA - Chemical Analysis RT - Running Test MT - Mechanical Test ( Sample) VC - Visual Checking DIM- Dimensional Checking TT - Thermal treatment DP - Die penetrant MP - Magnetic particle test US - Ultra Sonic Test RD - Radiography SC - Specific Control N phases
o
Plant department: Crushing Shop & Long Belt Conveyor (Field quality plan for Civil Works) Documents CR- Control Report CC-Conformity certificate Interventions C-Witness Point A-Hold point Participants 1.Contractor (L&T) 2-Lafarge/Insp. agency Type Of Inspection Item No. Interventions Participants Date Report no. Remarks Remarks found. testing on fill shall be tested For Plinth b) for each filling one for every 5000M3 for each compacted layer IS 2720 Part xiv / BNBC Part 6:3.4 , 6: 3.12.5 As above (a) & (b) Random on each compacted layer Completed Supplier: Part designation: Drawing No. Specification Ref. Observations: Equipment:
Q.C.P ref:QP FOR CIVIL WORKS
Date 31.05.03
Revision 0
b)
FOR COHESIONLESS SOILS ( SAND FILLING) Relative Density (Density Index) Dry Density By proctor Needle penetration PILING FOUNDATION Setting out Pile points
MT
CR No 1b
c) VI . a)
MT
CR No 1b
DIM
1&2
Sketch
BNBC Part 6 : 3.11 IS : 2911 (Part I /Sec 2 ) -1979 BNBC Part 6 : 3.11.5 IS : 2911 (Part I /Sec 2 ) -1979 BNBC Part 6 : 3.11.3 IS : 2911 (Part I /Sec 2 ) -1979
b)
Check load bearing capacity at time of test piles Check installation procedure
MT
1&2
CR No 1c
c)
DIM
1&2
CR No 1c
Page 7 of 64
LAFARGE
QUALITY CONTROL PLAN ( Q.C.P ) CA - Chemical Analysis RT - Running Test MT - Mechanical Test ( Sample) VC - Visual Checking DIM- Dimensional Checking TT - Thermal treatment DP - Die penetrant MP - Magnetic particle test US - Ultra Sonic Test RD - Radiography SC - Specific Control N phases d)
o
Plant department: Crushing Shop & Long Belt Conveyor (Field quality plan for Civil Works) Documents CR- Control Report CC-Conformity certificate Interventions C-Witness Point A-Hold point Participants 1.Contractor (L&T) 2-Lafarge/Insp. agency Type Of Inspection VC + DIM Item No. Interventions Participants 1&2 Date Report no. CR No 1c Remarks Remarks BNBC Part 6 : 3.11.4 IS : 2911 (Part I /Sec 2 ) -1979 Completed Supplier: Part designation: Drawing No. Specification Ref. Observations: Equipment:
Q.C.P ref:QP FOR CIVIL WORKS
Date 31.05.03
Revision 0
1.0 1.1
SC (Review of T.C.S)
1&2
CR No. 2
Setting time and Compressive strength 1.2 If stored for more than 3 months of original receipt, test for following : - Setting time and Compressive strength MT 1&2 CR No. 2
IS:269-1989, IS:4031-1988 One for each batch & test inhouse at random IS : 269 - 1989, IS : 4031 1988 One sample from each lot of 250MT or part thereof
CR No. 2
1.3
Ensure that cement is stored in covered storages on raised platform REINFORCING STEEL Physical and Chemical properties of reinforcement steel for each consignment / lot
VC
2.0 2.1
SC (Review of T.C.S)
1&2
CR No. 3
Page 8 of 64
LAFARGE
QUALITY CONTROL PLAN ( Q.C.P ) CA - Chemical Analysis RT - Running Test MT - Mechanical Test ( Sample) VC - Visual Checking DIM- Dimensional Checking TT - Thermal treatment DP - Die penetrant MP - Magnetic particle test US - Ultra Sonic Test RD - Radiography SC - Specific Control Manufacturing Operations o N phases Operations 2.2 Visual examination to ensure free from cracks, surface flaws and Dimensional check 2.3 Cutting, bending placing of reinforced steel bars and lapping WATER Interventions C-Witness Point A-Hold point Participants 1.Contractor (L&T) Documents
Plant department: Crushing Shop & Long Belt Conveyor (Field quality plan for Civil Works) Equipment:
Q.C.P ref:QP FOR CIVIL WORKS
CR- Control Report CC-Conformity certificate Supplier: Part designation: Drawing No. Specification Ref. Item No. Interventions Participants 1 Date Report no. CR No. 3 Observations:
Date 31.05.03
Revision 0
Remarks Remarks IS : 1786 - 1985 Site register and approved drg.BDS 1313 Drawing / Bar bending schedule Site register
Completed
DIM
CR No. 3
3.0
3.1
Water is free from excess acid. alkali or salt & harmful subst- ances
CA
CR No 4
IS : 456 1978, IS : 3025,BNBC Part 5 : 2.4.4 IS: 516 - 1959 Once per source or after monsoon - Do - Do -
Permissible limits of solids PH Value FINE AGREEGATES Sieve analysis, Particle size and shape
CA CA
1 1
CR No 4 CR No 4
MT
CR No. 5
IS : 383 - 1970, IS : 2386 1963 Part - I , BDS 285 : 1963 Once for 2000 Cum or change of source whichever is earlier
Page 9 of 64
LAFARGE
QUALITY CONTROL PLAN ( Q.C.P ) CA - Chemical Analysis RT - Running Test MT - Mechanical Test ( Sample) VC - Visual Checking DIM- Dimensional Checking TT - Thermal treatment DP - Die penetrant MP - Magnetic particle test US - Ultra Sonic Test RD - Radiography SC - Specific Control Manufacturing Operations o N phases Operations 4.2 Silt and Clay content,deleterious materials, soundness,acid/alkali reactivity, mortar making properties Interventions C-Witness Point A-Hold point Participants 1.Contractor (L&T) Documents
Plant department: Crushing Shop & Long Belt Conveyor (Field quality plan for Civil Works) Equipment:
Q.C.P ref:QP FOR CIVIL WORKS
CR- Control Report CC-Conformity certificate Supplier: Part designation: Drawing No. Specification Ref. Item No. Interventions Participants 1 Date Report no. CR No. 5 Observations:
Date 31.05.03
Revision 0
Remarks Remarks IS : 2386 - 1963, IS : 383 Part - 2,5,6 and 7 BDS 281 : 1963 Once per source (to be repeated if source is changed) IS : 383 - 1970, IS : 2386 1963, IS : 383 BDS 284 : 1963 Once in 20 weeks or change of source whichever is earlier IS : 383 - 1970Site register/ IS : 2386 - 1963 and Log Book Part - 3 BDS 284:1963 To be done everyday before start- ing work IS : 2386 - 1963 & IS:383 Test certificate Part - 5 and 8 BDS 243 :1963 Once per source
Completed
4.3
MT
CR No. 5
4.4
MT
CR No. 5
4.3
Petrographic examination
MT
CR No. 5
5.0 5.1
COARSE AGGREGATE : Sieve analysis, Particle size & shape MT 1 CR No. 5 IS : 2386 - 1963 IS : 383 Part - I BDS 285 :1963
Page 10 of 64
LAFARGE
QUALITY CONTROL PLAN ( Q.C.P ) CA - Chemical Analysis RT - Running Test MT - Mechanical Test ( Sample) VC - Visual Checking DIM- Dimensional Checking TT - Thermal treatment DP - Die penetrant MP - Magnetic particle test US - Ultra Sonic Test RD - Radiography SC - Specific Control N phases
o
Plant department: Crushing Shop & Long Belt Conveyor (Field quality plan for Civil Works) Documents CR- Control Report CC-Conformity certificate Interventions C-Witness Point A-Hold point Participants 1.Contractor (L&T) 2-Lafarge/Insp. agency Type Of Inspection Item No. Interventions Participants Date Report no. Remarks Remarks One sample per 1000cum Completed Supplier: Part designation: Drawing No. Specification Ref. Observations: Equipment:
Q.C.P ref:QP FOR CIVIL WORKS
Date 31.05.03
Revision 0
5.2
MT
CR No. 5
IS : 2386 - 1963 and IS : 383 Part - 3 BDS 243 :1963 Once in 20 weeks change of source whichever is earlier IS : 2386 - 1963 and IS : 383 Part - 2,4,5 & 7 BDS 279:1963 ,BDS 243 :1963 BDS 283:1963 Once per source
5.3
Crushing value, impact value, soundness, reacting with acid/ alkali, flakiness indes, deleterious materials
MT
CR No. 5
5.4
Moisture content
MT
CR No. 5
IS : 2386 - 1963 and IS : 383 Part - 3 BDS 243 :1963 One sample per 1000cum / change of source which ever is earlier During rains everyday before start of work IS : 2386 - 1963 andcertificate Test IS : 383 Part - 2 BDS 243 :1963
5.5
Petrographic examination
MT
CR No. 5
Page 11 of 64
LAFARGE
QUALITY CONTROL PLAN ( Q.C.P ) CA - Chemical Analysis RT - Running Test MT - Mechanical Test ( Sample) VC - Visual Checking DIM- Dimensional Checking TT - Thermal treatment DP - Die penetrant MP - Magnetic particle test US - Ultra Sonic Test RD - Radiography SC - Specific Control N phases
o
Plant department: Crushing Shop & Long Belt Conveyor (Field quality plan for Civil Works) Documents CR- Control Report CC-Conformity certificate Interventions C-Witness Point A-Hold point Participants 1.Contractor (L&T) 2-Lafarge/Insp. agency Type Of Inspection Item No. Interventions Participants Date Report no. Remarks Remarks Once per source Completed Supplier: Part designation: Drawing No. Specification Ref. Observations: Equipment:
Q.C.P ref:QP FOR CIVIL WORKS
Date 31.05.03
Revision 0
6 6.1
MT
1&2
CR No 6
IS: 456 - 1978 IS: 516 - 1959 As per clause 14.2.2 of IS: 456-1978 ASTM C 39 - 86 IS : 1199 - 1959 IS : 456-1978 BDS 1044 : 1983, ASTM C 172 - 90 One sample every four hours from each mixer IS : 1199 - 1959 , BNBC Part 5 : 5.6.3 IS : 1199 - 1959 , BNBC Part 5 : 5.6
6.2
MT
CR No 6
Water Cement ratio Cement content BRICKS Check for dimension, soundness colour, warpage and efforescence
MT MT
1 1
CR No 6 CR No 6
VC+ DIM
CR No 7
Page 12 of 64
LAFARGE
QUALITY CONTROL PLAN ( Q.C.P ) CA - Chemical Analysis RT - Running Test MT - Mechanical Test ( Sample) VC - Visual Checking DIM- Dimensional Checking TT - Thermal treatment DP - Die penetrant MP - Magnetic particle test US - Ultra Sonic Test RD - Radiography SC - Specific Control N phases
o
Plant department: Crushing Shop & Long Belt Conveyor (Field quality plan for Civil Works) Documents CR- Control Report CC-Conformity certificate Interventions C-Witness Point A-Hold point Participants 1.Contractor (L&T) 2-Lafarge/Insp. agency Type Of Inspection Item No. Interventions Participants Date Report no. Remarks Remarks min.for each lot of 10000 or part thereof Completed Supplier: Part designation: Drawing No. Specification Ref. Observations: Equipment:
Q.C.P ref:QP FOR CIVIL WORKS
Date 31.05.03
Revision 0
7.2
Compressive strength
MT
1&2
CR No 7
IS : 1077 - 1992 IS : 3495 - 1992 BDS 1249:1989, BNBC Part 4 : 4.3.2 A set of 20 bricks min.for each lot of 80000 or part thereof IS : 1077 - 1992 IS : 3495 - 1992 BDS 1249 -1989
7.3
Water absorption
CA
CR No 7
EMBEDDED PARTS Position and level of embedded parts Position, depth and size of bolt holes Location, verticality of pipe sleeves/opening for bolt hole Welding / tieing of embedment to reinforcement DIM DIM DIM 1 1 1&2 CC No 1 CC No 1 CC No 1 Drawing / Specification - Do - Do -
8.4
VC
CC No 1
- Do -
Page 13 of 64
LAFARGE
QUALITY CONTROL PLAN ( Q.C.P ) CA - Chemical Analysis RT - Running Test MT - Mechanical Test ( Sample) VC - Visual Checking DIM- Dimensional Checking TT - Thermal treatment DP - Die penetrant MP - Magnetic particle test US - Ultra Sonic Test RD - Radiography SC - Specific Control Manufacturing Operations o N phases Operations 9 FORM WORK : SHUTTERING 9.1 9.2 Check for material Position, dimension and verticality of form work before concreting CHECK FOR JOINTS : To avoid loss of liquid the joints should be leak proof as for as possible STAGING : Checking for durability, strength soundness, joints, adequacy of its foundation, specific level CONCRETING : Quantity of cement and aggregates Water cement ratio Cleanliness, provision of chute and arrangement for transport- ation and placement of conc. MASONRY CONSTRUCTION Strength of stone Interventions C-Witness Point A-Hold point Participants 1.Contractor (L&T) Documents
Plant department: Crushing Shop & Long Belt Conveyor (Field quality plan for Civil Works) Equipment:
Q.C.P ref:QP FOR CIVIL WORKS
CR- Control Report CC-Conformity certificate Supplier: Part designation: Drawing No. Specification Ref. Item No. Interventions Participants Date Report no. Observations:
Date 31.05.03
Revision 0
Remarks Remarks
Completed
VC DIM
1 1
CC No 2 CC No 2
- Do - Do -
9.3
VC
1&2
CC No 2
- Do -
9.4
VC
CC No 2
- Do -
MT MT VC
1 1 1
CR No 8 CR No 8 CR No 8
Appro. Conc. mix Design Appro. Conc. mix Design Appro. Conc. mix Design
11 11.1
MT
CR No 9
Page 14 of 64
LAFARGE
QUALITY CONTROL PLAN ( Q.C.P ) CA - Chemical Analysis RT - Running Test MT - Mechanical Test ( Sample) VC - Visual Checking DIM- Dimensional Checking TT - Thermal treatment DP - Die penetrant MP - Magnetic particle test US - Ultra Sonic Test RD - Radiography SC - Specific Control N phases 11.2 11.3 12 12.1 12.2 12.3
o
Plant department: Crushing Shop & Long Belt Conveyor (Field quality plan for Civil Works) Documents CR- Control Report CC-Conformity certificate Interventions C-Witness Point A-Hold point Participants 1.Contractor (L&T) 2-Lafarge/Insp. agency Type Of Inspection VC VC Item No. Interventions Participants 1 1 Date Report no. CR No 9 CR No 9 Specification Specification Remarks Remarks Completed Supplier: Part designation: Drawing No. Specification Ref. Observations: Equipment:
Q.C.P ref:QP FOR CIVIL WORKS
Date 31.05.03
Revision 0
Manufacturing Operations Operations Proper jointing, providing sufficient bond stone Proper mixing of cement mortar TESTING ON HARDENDED CONCRETE Rebound Hammer test Load test on structures Core test ( if required)
MT MT MT
CR No 10 CR No 10 CR No 10
IS : 13310 / BNBC Part 6 : 5.12 IS:456./ BNBC Part 6 : 5.12 IS:456./ BNBC Part 6 : 5.12
Page 15 of 64
CR No 1
1 of 1
PREPARED BY ( L &T)
APPROVED BY (LAFARGE)
CR No 2 1 of 1
PREPARED BY ( L &T)
APPROVED BY (LAFARGE)
CR No 3 1 of 1
PREPARED BY ( L &T)
APPROVED BY (LAFARGE)
CR No 4 1 of 1
Note :
PREPARED BY ( L &T)
APPROVED BY (LAFARGE) CR No 5
31.05.03
1 of 1
CR No 6 1 of 1
Check list for Control Desk, Relay Panel, Thyrister Panel, Switchgear/MCC/PLC Pre-erection
SL NO. 1 2 3 4 5 6 7 8 9 Checks Area. Location. Tag No. Voltage grade. No. of verticals. No. of transport sections. Details of loose items supplied. Availability of all materials as BOM and drawing. Remarks. Observation
PREPARED BY ( L &T)
APPROVED BY (LAFARGE)
CR No 7 1 of 1
Check list for Control Desk, Relay Panel, Thyrister Panel, Switchgear/MCC/PLC Erection
SL NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Checks Area. Location. Tag No. Voltage grade. Fabrication of base frame and primer coating. Alignment and levelling of base frame. Grouting of base frame. Erection of panels sequence wise. Alignment of panels. Tightening of inter panel bolting. Inter panel wiring. Inter panel earthing. Mounting of accessories. Fixing of danger board. Mounting of shock hazard chart in the room. Mounting of fire extinguishers. Cleaning of panels. Earth grid connection. Rubber mat laying. Plugging of unused holes. Tighting of all terminals / connections. Check continuty & IR. Remarks. Observation
PREPARED BY ( L &T)
APPROVED BY (LAFARGE)
CR No 8 1 of 1
PREPARED BY ( L &T)
APPROVED BY (LAFARGE)
CR No 9 1 of 1
Erection
Observation
PREPARED BY ( L &T)
APPROVED BY (LAFARGE)
CR No 10 1 of 1
PREPARED BY ( L &T)
APPROVED BY (LAFARGE)
CR No 11 1 of 1
9 10 11 12
13
PREPARED BY ( L &T)
APPROVED BY (LAFARGE)
CR No 12 1 of 1
PREPARED BY ( L &T)
APPROVED BY (LAFARGE)
CR No 13 1 of 1
PREPARED BY ( L &T)
APPROVED BY (LAFARGE)
CR No 14 1 of 1
PREPARED BY ( L &T)
APPROVED BY (LAFARGE)
CR No 15 1 of 1
PREPARED BY ( L &T)
APPROVED BY (LAFARGE)
CR No 16
Pre-erection
Observation
PREPARED BY ( L &T)
APPROVED BY (LAFARGE)
CR No 17 1 of 1
Erection
Observation
PREPARED BY ( L &T)
APPROVED BY (LAFARGE)
CR No 18 1 of 1
Pre-erection.
Observation
PREPARED BY ( L &T)
APPROVED BY (LAFARGE)
CR No 19 1 of 1
Erection.
Observation
PREPARED BY ( L &T)
APPROVED BY (LAFARGE)
CR No 20 1 of 1
Pre Erection
Observation
PREPARED BY ( L &T)
APPROVED BY (LAFARGE)
CR No 21 1 of 1
Erection
Observation
Checks Area. Location. Voltage grade HT / LT / DC. Voltage. Make. Srl. No. RPM. Wattage. Alignment of motor centerline and coupling centerline. Tightening of foundation bolts. Alignment of motor centerline and coupling centerline (final) IR value of motor. P I for HT motor. Winding resistance. Clearing for cabling / termination. Clearence for earthing connection. Clearence for control cabling and termination. Mounting of aux. Devices. Remarks.
PREPARED BY ( L &T)
APPROVED BY (LAFARGE)
CR No 22 1 of 1
Pre Erection
Observation
PREPARED BY ( L &T)
APPROVED BY (LAFARGE)
CR No 23 1 of 1
Erection
Observation
PREPARED BY ( L &T)
APPROVED BY (LAFARGE)
CR No 24 1 of 1
Pre Erection
Observation
PREPARED BY ( L &T)
APPROVED BY (LAFARGE)
CR No 25 1 of 1
Erection
Observation
PREPARED BY ( L &T)
APPROVED BY (LAFARGE)
CR No 26 1 of 1
Check List for Limit Switch, Pull Cord, Belt Sway,Zero Speed - Pre Erection
SL NO. 1 2 3 4 5 6 7 Checks Area. Location. Tag no. Drawing no. Clearence for installation. Availability of material. Remarks. Observation
PREPARED BY ( L &T)
APPROVED BY (LAFARGE)
CR No 27 1 of 1
Check List for Limit Switch, Pull Cord, Belt Sway,Zero Speed - Erection
SL NO. 1 2 3 4 5 6 7 8 9 10 11 12 Checks Area. Location Tag no. Drawing no. Competing of Testing / Calibration. Mounting of Base frames for Grouting / Welding. Mounting of Instrument. Tightening of Bolts and alignment. .Mounting of accessories. Cabling. Grounding. Remarks. Observation
PREPARED BY ( L &T)
APPROVED BY (LAFARGE)
LARSEN & TOUBRO LIMITED CRUSHING SHOP & LBC FOR LAFARGE
ELECTRICAL & INSTRUMENTATION 31.05.03
CK-LST 1 of 1
PREPARED BY(L& T)
APPROVED BY(LAFARGE)
LAFARGE
QUALITY CONTROL PLAN ( Q.C.P ) CA - Chemical Analysis RT - Running Test MT - Mechanical Test ( Sample) VC - Visual Checking DIM- Dimensional Checking TT - Thermal treatment DP - Die penetrant MP - Magnetic particle test US - Ultra Sonic Test RD - Radiography SC - Specific Control N phases A) 1) a) I) ii) iii) b) I) ii)
o
Plant department: Crushing Shop & Long Belt Conveyor (Field quality plan for electrical works.) Documents CR- Control Report CC-Conformity certificate Interventions C-Witness Point A-Hold point Participants 1.Contractor (L&T) 2-Lafarge/Insp. agency Type Of Inspection Item No. Interventions Participants Date Report no. Remarks Remarks Completed Supplier: Part designation: Drawing No. Specification Ref. Observations: Equipment: Q.C.P ref: QP for Electrical Erecn Date 31.05.03 Revision 0
Manufacturing Operations Operations PRE-ERECTION & ERECTION PRE- ERECTION TRANSFORMER / DG SETS Availability of instalation Drg / Manual, Tools & Tackles, Test Report Foundation & Layout Name Plates Detailes CONTROL DESK / THYRISTER PANEL / SWITCHGEAR / MCC / PLC Availability of instalation Drg / Manual, Tools and Test Equipment's(as applicable), Test Reports. Civil foundation, if any & embedments of Chanels/Plates & Bolts.
VC DIM VC
1 1 1
CR No 04 CR No 04 CR No 04
VC VC
1 1
CR No 06 CR No 06
Page 44 of 64
LAFARGE
QUALITY CONTROL PLAN ( Q.C.P ) CA - Chemical Analysis RT - Running Test MT - Mechanical Test ( Sample) VC - Visual Checking DIM- Dimensional Checking TT - Thermal treatment DP - Die penetrant MP - Magnetic particle test US - Ultra Sonic Test RD - Radiography SC - Specific Control Manufacturing Operations o N phases Operations c) CABLE i) Bending Redius, Check IR ii) Redius iii) IR iv) Layout Drawings / Cable Schudle v) Tools & Tackles vi) Proper Rollers vii) Jacks viii) Direction & Rotation d) i) e) i) ii) f) i) ii) g) I) EARTHING General Physical Inspection Illumination Availability of all items alongwith type and ratings Layout Drawings, Tools & tackles CABLE TRAY AND SUPPORT General Physical Inspection Straightene, allgnmint BUS DUCT Availability of all items alongwith type and ratings Interventions C-Witness Point A-Hold point Participants 1.Contractor (L&T) Documents
Plant department: Crushing Shop & Long Belt Conveyor (Field quality plan for electrical works.) Equipment: Q.C.P ref: QP for Electrical Erecn Supplier: Part designation: Drawing No. Specification Ref. Item No. Interventions Participants 1 1 1 1 1 1 1 1 Date Report no. Remarks Remarks Completed Observations: Date 31.05.03 Revision 0 CR- Control Report CC-Conformity certificate
VC
CR No 02
VC VC
1 1
CR No 10
VC VC
1 1
CR No 08 CR No 08
VC
CR No 12
Page 45 of 64
LAFARGE
QUALITY CONTROL PLAN ( Q.C.P ) CA - Chemical Analysis RT - Running Test MT - Mechanical Test ( Sample) VC - Visual Checking DIM- Dimensional Checking TT - Thermal treatment DP - Die penetrant MP - Magnetic particle test US - Ultra Sonic Test RD - Radiography SC - Specific Control Interventions C-Witness Point A-Hold point Participants 1.Contractor (L&T) Documents
Plant department: Crushing Shop & Long Belt Conveyor (Field quality plan for electrical works.) Equipment: Q.C.P ref: QP for Electrical Erecn Supplier: Part designation: Drawing No. Specification Ref. Item No. Interventions Participants 1 Date Report no. CR NO 8 Remarks Remarks Completed Observations: Date 31.05.03 Revision 0 CR- Control Report CC-Conformity certificate
Manufacturing Operations o N phases Operations h) G I PIPES i) Availability of all items alongwith type and ratings I) I) j) I) k) (a) I) ii) iii) iv) v) (b) I) ii) iii) iv) v) ACDB & DCDB Availability of all items alongwith type and ratings JUNCTION BOXES Availability of all items alongwith type and ratings MOTORS HT Foundation Availability of installation Drg./Manual Motor Name Plate Details Shaft & terminal box position to idetify correct Motor IR Value of the Motor LT Foundation Availability of installation Drg./Manual Motor Name Plate Details Shaft & terminal box position to identify correct Motor IR Value of the Motor
VC
CR No 16
VC
CR No 22
VC VC VC VC SC VC VC VC VC SC
1 1 1 1 1 1 1 1 1 1
CR CR CR CR
No No No No
20 20 20 20 BY INSTRUMENT
CR No 20 CR CR CR CR No No No No 20 20 20 20
CR No 20
Page 46 of 64
LAFARGE
QUALITY CONTROL PLAN ( Q.C.P ) CA - Chemical Analysis RT - Running Test MT - Mechanical Test ( Sample) VC - Visual Checking DIM- Dimensional Checking TT - Thermal treatment DP - Die penetrant MP - Magnetic particle test US - Ultra Sonic Test RD - Radiography SC - Specific Control N phases (C) I) ii) iii) iv) v) l) I) ii)
o
Plant department: Crushing Shop & Long Belt Conveyor (Field quality plan for electrical works.) Documents CR- Control Report CC-Conformity certificate Interventions C-Witness Point A-Hold point Participants 1.Contractor (L&T) 2-Lafarge/Insp. agency Type Of Inspection Item No. Interventions Participants Date Report no. Remarks Remarks Completed Supplier: Part designation: Drawing No. Specification Ref. Observations: Equipment: Q.C.P ref: QP for Electrical Erecn Date 31.05.03 Revision 0
Manufacturing Operations Operations DC MOTORS Foundation Availability of installation Drg./Manual Motor Name Plate Details Shaft & terminal box position to idetify correct Motor IR Value of the Motor Limit Switches,Pull cord,Belt Sway & Speed Switches etc. All Items & their Ratings / Size Layout Drg. ,Tools & Tackles, Test Equipment if any VIBRATION MONITORING SYSTEMS Identification Foundation Base Plate Fixing & Grouting Mounting & Alignment Testing of Foundation Block
VC VC VC VC SC
1 1 1 1 1
CR CR CR CR
No No No No
20 20 20 20
CR No 20
VC VC
1 1
CR No 26 CR No 26
VC VC VC VC VC
1 1 1 1 1
CR CR CR CR CR
No No No No No
24 24 24 24 24
Page 47 of 64
LAFARGE
QUALITY CONTROL PLAN ( Q.C.P ) CA - Chemical Analysis RT - Running Test MT - Mechanical Test ( Sample) VC - Visual Checking DIM- Dimensional Checking TT - Thermal treatment DP - Die penetrant MP - Magnetic particle test US - Ultra Sonic Test RD - Radiography SC - Specific Control Manufacturing Operations o N phases Operations 2) ERECTION a) TRANSFORMER/ DG SETS I) Mounting , Leveling & Alignment ii) Termination, Connection & Cable entry iii) Control & Protection Wiring iv) Oil Level / oil Leakage v) BDV & PPM vi) IR b) I) i) ii) iii) iv) c) I) ii) iii) iv) CONTROL DESK, THYRISTER PANEL, SWITCHGEAR / MCC / PLC Mounting & Base Channel Level & Alignment Tightness Of Bolts & Clams, interbolting ( if applicable ) Position of chequered plates to cover trench / opening IR Value of MCC, Bus Bar, Control Transformer CABLE Physical Inspection of Cable Laying of Cable as per Routing / Schedule Proper dressing & clamping of Cable Cable Jointing & Termination / IR value. Jointing Interventions C-Witness Point A-Hold point Participants 1.Contractor (L&T) Documents
Plant department: Crushing Shop & Long Belt Conveyor (Field quality plan for electrical works.) Equipment: Q.C.P ref: QP for Electrical Erecn Supplier: Part designation: Drawing No. Specification Ref. Item No. Interventions Participants Date Report no. Remarks Remarks Completed Observations: Date 31.05.03 Revision 0 CR- Control Report CC-Conformity certificate
DIM VC SC VC SC SC
1 1 1 1 1&2 1&2
CR CR CR CR CR CR
No No No No No No
05 05 05 05 05 05
DIM VC VC SC
1 1 1 1&2
CR No 07 CR No 07 CR No 07 CR No 07
VC VC VC SC
1 1 1 1&2
CR CR CR CR
No No No No
19 19 19 19
Page 48 of 64
LAFARGE
QUALITY CONTROL PLAN ( Q.C.P ) CA - Chemical Analysis RT - Running Test MT - Mechanical Test ( Sample) VC - Visual Checking DIM- Dimensional Checking TT - Thermal treatment DP - Die penetrant MP - Magnetic particle test US - Ultra Sonic Test RD - Radiography SC - Specific Control Manufacturing Operations o N phases Operations by experinced jointer only v) Tagging & marking vi) Sealing through floor / wall opening vii) Proper ferruling & termination and sealing d) I) e) I) ii) iii) f) I) ii) iii) iv) v) vi) vii) EARTHING General Physical Inspection ILLUMINATION Mounting of lighting fixture Identification, Electrical,Continuty,Permanent earthing cable termination & connection IR Value & function of switches, Control Gear etc CABLE TRAY AND SUPPORT Fixing , Grouting of Inserts Span of Support Welding , Coating of Painting Tightening of Coupler plates Tray Numbering Completion of cable Routes Grounding Interventions C-Witness Point A-Hold point Participants 1.Contractor (L&T) Documents
Plant department: Crushing Shop & Long Belt Conveyor (Field quality plan for electrical works.) Equipment: Q.C.P ref: QP for Electrical Erecn Supplier: Part designation: Drawing No. Specification Ref. Item No. Interventions Participants 1 1 1 Date Report no. CR No 19 CR No 19 CR No 19 Remarks Remarks Completed Observations: Date 31.05.03 Revision 0 CR- Control Report CC-Conformity certificate
VC
CR No 03
VC VC SC
1 1 1
CR No 11 CR No 11 CR No 11
VC DIM VC VC VC VC SC
1 1 1 1 1 1 1
CR CR CR CR CR CR CR
No No No No No No No
09 09 09 09 09 09 09
Page 49 of 64
LAFARGE
QUALITY CONTROL PLAN ( Q.C.P ) CA - Chemical Analysis RT - Running Test MT - Mechanical Test ( Sample) VC - Visual Checking DIM- Dimensional Checking TT - Thermal treatment DP - Die penetrant MP - Magnetic particle test US - Ultra Sonic Test RD - Radiography SC - Specific Control Manufacturing Operations o N phases Operations g) BUSDUCT I) Cleaning, Alignment ii) Support iii) Assembling iv) Coupler / Flexible Fixing v) Vaccum Cleaning vi) Earthing h) I) ii) iii) iv) I) I) ii) iii) iv) v) vi) vii) GI PIPES Radius of bend Edge of Pipes Alingnment, level, Support Plugging open end ACDB , DCDB Foundation Completion Alignment Inter panel Connection Earth , Earthgrid Wiring of components Cabling Blanking of unused holes Interventions C-Witness Point A-Hold point Participants 1.Contractor (L&T) Documents
Plant department: Crushing Shop & Long Belt Conveyor (Field quality plan for electrical works.) Equipment: Q.C.P ref: QP for Electrical Erecn Supplier: Part designation: Drawing No. Specification Ref. Item No. Interventions Participants 1 1 1 1 1 1 Date Report no. CR CR CR CR CR CR No No No No No No 13 13 13 13 13 13 Remarks Remarks Completed Observations: Date 31.05.03 Revision 0 CR- Control Report CC-Conformity certificate
DIM VC VC VC
1 1 1 1
CR CR CR CR
NO NO NO NO
9 9 9 9
VC VC VC VC VC VC VC
1 1 1 1 1 1 1
CR CR CR CR CR CR CR
No No No No No No No
17 17 17 17 17 17 17
Page 50 of 64
LAFARGE
QUALITY CONTROL PLAN ( Q.C.P ) CA - Chemical Analysis RT - Running Test MT - Mechanical Test ( Sample) VC - Visual Checking DIM- Dimensional Checking TT - Thermal treatment DP - Die penetrant MP - Magnetic particle test US - Ultra Sonic Test RD - Radiography SC - Specific Control Manufacturing Operations o N phases Operations j) JUNCTION BOXES I) Idetification ii) Alignment of Frame iii) Mounting of JB iv) Mounting Of Accessorious v) Blanking of unused holes Vi Connectioning of Cables vii) Connecting Of Earthing k) (a) I) ii) iii) iv) v) vi) vii) viii) MOTORS HT Cleanliness, Mounting of Motor, level & Alignment Terminal marking & Earthing Electrical connection with cable, Termination / Connection Protection Devices & Fuses RTD / BTD Connection ( as applicable ) IR Value Motor & Space Heater Continuty of Space Heater Free running of Shaft Interventions C-Witness Point A-Hold point Participants 1.Contractor (L&T) Documents
Plant department: Crushing Shop & Long Belt Conveyor (Field quality plan for electrical works.) Equipment: Q.C.P ref: QP for Electrical Erecn Supplier: Part designation: Drawing No. Specification Ref. Item No. Interventions Participants 1 1 1 1 1 1 1 Date Report no. CR CR CR CR CR CR CR No No No No No No No 23 23 23 23 23 23 23 Remarks Remarks Completed Observations: Date 31.05.03 Revision 0 CR- Control Report CC-Conformity certificate
VC VC SC VC VC SC SC SC
1 1 1 1 1 1&2 1&2 1
CR No 21 CR No 21 CR No 21 CR No 21 CR No 21 CR No 21 CR No 21 CR No 21
CONTINUITY CHECK
Page 51 of 64
LAFARGE
QUALITY CONTROL PLAN ( Q.C.P ) CA - Chemical Analysis RT - Running Test MT - Mechanical Test ( Sample) VC - Visual Checking DIM- Dimensional Checking TT - Thermal treatment DP - Die penetrant MP - Magnetic particle test US - Ultra Sonic Test RD - Radiography SC - Specific Control N phases b) I) ii) iii) iv) v) vi) vii)
o
Plant department: Crushing Shop & Long Belt Conveyor (Field quality plan for electrical works.) Documents CR- Control Report CC-Conformity certificate Interventions C-Witness Point A-Hold point Participants 1.Contractor (L&T) 2-Lafarge/Insp. agency Type Of Inspection Item No. Interventions Participants Date Report no. Remarks Remarks Completed Supplier: Part designation: Drawing No. Specification Ref. Observations: Equipment: Q.C.P ref: QP for Electrical Erecn Date 31.05.03 Revision 0
Manufacturing Operations Operations LT Cleanliness, Mounting of Motor, level & Alignment Terminal marking & Earthing Electrical connection with cable, Termination / Connection Protection Devices & Fuses IR Value Motor & Space Heater Continuty of Space Heater Free running of Shaft
VC VC SC VC SC SC SC
1 1 1 1 1 1 1
CR No 21 CR No 21 CR No 21 CR CR CR CR No No No No 21 21 21 21
DC Cleanliness, Mounting of Motor, level &Alignment Terminal marking & Earthing Electrical connection with cable, termination / connection Carbon brushes in Holder / Cleanliness of Commutator Protection Devices & Fuses IR Value Motor & Space Heater Continuty of Space Heater Free running of Shaft
VC VC SC VC VC SC SC SC
1 1 1 1 1 1 1 1
CR No 21 CR No 21 CR No 21 CR No 21 CR CR CR CR No No No No 21 21 21 21
Page 52 of 64
LAFARGE
QUALITY CONTROL PLAN ( Q.C.P ) CA - Chemical Analysis RT - Running Test MT - Mechanical Test ( Sample) VC - Visual Checking DIM- Dimensional Checking TT - Thermal treatment DP - Die penetrant MP - Magnetic particle test US - Ultra Sonic Test RD - Radiography SC - Specific Control N phases
o
Plant department: Crushing Shop & Long Belt Conveyor (Field quality plan for electrical works.) Documents CR- Control Report CC-Conformity certificate Interventions C-Witness Point A-Hold point Participants 1.Contractor (L&T) 2-Lafarge/Insp. agency Type Of Inspection Item No. Interventions Participants Date Report no. Remarks Remarks Completed Supplier: Part designation: Drawing No. Specification Ref. Observations: Equipment: Q.C.P ref: QP for Electrical Erecn Date 31.05.03 Revision 0
LIMIT SWITCHES, PULL CORD, BELT SWAY & SPEED SWITCHES As per Drawings / Specification / Manufacturer's Recommendation Proper mounting & positioning, Cable Entry, Termination & connection Operation VIBRATION MONITORING SYSTEM Alignment Cable connection Earthing Identification Taging Cable Taging Mounting & Alignment Tighting of Foundation Block Calibration
VC VC VC
1 1 1
CR No 27 CR No 27 CR No 27
VC VC VC VC VC VC VC DIM
1 1 1 1 1 1 1 1&2
CR CR CR CR CR CR CR CR
No No No No No No No No
25 25 25 25 25 25 25 25
Page 53 of 64
LAFARGE
QUALITY CONTROL PLAN ( Q.C.P ) CA - Chemical Analysis RT - Running Test MT - Mechanical Test ( Sample) VC - Visual Checking DIM- Dimensional Checking TT - Thermal treatment DP - Die penetrant MP - Magnetic particle test US - Ultra Sonic Test RD - Radiography SC - Specific Control No phases A 1) 2) Manufacturing Operations Operations PRE-ERECTION OF CONVEYOR SYSTEM & EQUIPEMENT Available of Drg. Manual, tools & tackles test reports. Name plate det. Layout check & Foundation check Dimension level, Orientation, marking of reference points & foundation bolts Erection scheme (if applicable) ERECTION CONVEYING SYSTEM Comprising of Technological structures, Belt , Idlers, Pulleys, Plummer block with bearing, Gear box, coupling, breaks, screws, take up components counter weight & chutes STRINGERS , SUPPORTS & DRIVE BASE FRAME Contour Alignment Centre distance Leveling Squareness of holes Weld quality Interventions C-Witness Point A-Hold point Participants Documents
Plant department: Crushing Shop & Long Belt Conveyor ( Field quality plan for Mech. Equipment Erection) Equipment: Q.C.P ref: QP for MECH EQPT. Date 31.05.03 Observations: Revision 0
CR- Control Report CC-Conformity certificate Supplier: Part designation: Drawing No. Specification Ref. Item No. Interventions Participants Date Report no.
Completed
VC VC + DIM
1 1 CR No 1
3) B 1) i)
SC VC + DIM
1&2 1 CR No 2
CR No 3
Page 54 of 64
LAFARGE
QUALITY CONTROL PLAN ( Q.C.P ) CA - Chemical Analysis RT - Running Test MT - Mechanical Test ( Sample) VC - Visual Checking DIM- Dimensional Checking TT - Thermal treatment DP - Die penetrant MP - Magnetic particle test US - Ultra Sonic Test RD - Radiography SC - Specific Control No phases Manufacturing Operations Operations Interventions C-Witness Point A-Hold point Participants Documents
Plant department: Crushing Shop & Long Belt Conveyor ( Field quality plan for Mech. Equipment Erection) Equipment: Q.C.P ref: QP for MECH EQPT. Date 31.05.03 Observations: Revision 0
CR- Control Report CC-Conformity certificate Supplier: Part designation: Drawing No. Specification Ref. Item No. Interventions Participants Date Report no.
Completed
IDLERS Mounting, alignment spacing of idlers,proper tightening of bolts & nuts troughling angle of idlers Free rotation of idler rolls PULLEYS Mounting of pulley frame Alignment of plummer block, bearing, pulley & proper tightening of bolt and nut Lubrication of bearing & Free rotation BELTING Mounting of Belt drum & Belt lapping Splicing & Vulcanisation of belt joint GEAR BOX Mounting on frame / Base levelling & alignment Flushing & filling of gear box with oil Tightening of Base bolt FLUID COUPLING
VC + DIM
CR No 4
VC
CC No 1
VC VC + DIM VC
1 1 1
CR No 5 CC No 1
VC + DIM VC + DIM
1 1&2
CR No 6 CC No 2
VC + DIM VC VC
1&2 1 1
CR No 7 CC No 3 CC No 3
Page 55 of 64
LAFARGE
QUALITY CONTROL PLAN ( Q.C.P ) CA - Chemical Analysis RT - Running Test MT - Mechanical Test ( Sample) VC - Visual Checking DIM- Dimensional Checking TT - Thermal treatment DP - Die penetrant MP - Magnetic particle test US - Ultra Sonic Test RD - Radiography SC - Specific Control No phases i) ii) iii) 8) i) 9) i) ii) 10) i) Manufacturing Operations Operations Axial run out of input & out shaft Radial run out of Input & Out shaft Distance bet. Input & Output shaft GEARED & OTHER COUPLINGS Mounting & Alignment BRAKES Mounting & Alignment Adjustment / Setting FINAL INSPECTION Free running of Gearbox,fluid coupling Geared coupling, Brake & Pulley, Assy. TAKEUP ARRANGEMENT, SCRAPER, COUNTER WEIGHT ETC Mounting, Squareness with centre line & levelling Interventions C-Witness Point A-Hold point Participants Documents
Plant department: Crushing Shop & Long Belt Conveyor ( Field quality plan for Mech. Equipment Erection) Equipment: Q.C.P ref: QP for MECH EQPT. Date 31.05.03 Observations: Revision 0
CR- Control Report CC-Conformity certificate Supplier: Part designation: Drawing No. Specification Ref. Item No. Interventions Participants 1&2 1&2 1&2 Date Report no. CR No 7 CR No 7 CR No 7
1.Contractor (L&T) 2-Lafarge/Insp. agency Type Of Inspection DIM DIM DIM Remarks Remarks
Completed
DIM
1&2
CR No 7
VC + DIM VC
1 1
CR No 8 CR No 8
VC + DIM
1&2
CC No 4
11) i)
VC + DIM
CR No 9
Page 56 of 64
LAFARGE
QUALITY CONTROL PLAN ( Q.C.P ) CA - Chemical Analysis RT - Running Test MT - Mechanical Test ( Sample) VC - Visual Checking DIM- Dimensional Checking TT - Thermal treatment DP - Die penetrant MP - Magnetic particle test US - Ultra Sonic Test RD - Radiography SC - Specific Control No phases Manufacturing Operations Operations Interventions C-Witness Point A-Hold point Participants Documents
Plant department: Crushing Shop & Long Belt Conveyor ( Field quality plan for Mech. Equipment Erection) Equipment: Q.C.P ref: QP for MECH EQPT. Date 31.05.03 Observations: Revision 0
CR- Control Report CC-Conformity certificate Supplier: Part designation: Drawing No. Specification Ref. Item No. Interventions Participants Date Report no.
Completed
CHUTE, SKIRT BOARD, FLAP GATE WITH ACTUATOR Fitment & Squareness with centrline, proper tightening of bolt & nut, levelling Travel of flap gate Limit switches for travel & its adjustability (for flap gates) MONORAIL HOISTING ARRANGEMENT Fitment & alignment smooth operations MAINTENANCE VEHICLE Squareness of wheels Levelling of vehicle Check vibration during free run test Tightening of bolts, nuts and other loose fittings
DIM VC VC
CR No 10
VC
CC No 5
VC DIM VC VC
Page 57 of 64
LAFARGE
QUALITY CONTROL PLAN ( Q.C.P ) CA - Chemical Analysis RT - Running Test MT - Mechanical Test ( Sample) VC - Visual Checking DIM- Dimensional Checking TT - Thermal treatment DP - Die penetrant MP - Magnetic particle test US - Ultra Sonic Test RD - Radiography SC - Specific Control No phases 15) i) ii) iii) iv) v) Manufacturing Operations Operations APRON FEEDER Squareness Centering Levelling Coupling & drive alignment To be tested for normal functioning of all accesories & controls CRUSHER Pad levels Centering of frame Level. bearing surface of frame Levelling of rotor shaft Alignment with drive NO LOAD TEST OF INDIVIUAL SYSTEM Check speed, vibration, effectiveness of speed control by hydraulic & coupling leakage Interventions C-Witness Point A-Hold point Participants Documents
Plant department: Crushing Shop & Long Belt Conveyor ( Field quality plan for Mech. Equipment Erection) Equipment: Q.C.P ref: QP for MECH EQPT. Date 31.05.03 Observations: Revision 0
CR- Control Report CC-Conformity certificate Supplier: Part designation: Drawing No. Specification Ref. Item No. Interventions Participants Date Report no.
Completed
1 1 1
1
CR N0 11 CC N 0 6
1&2
1 1 1 1 1&2
CR N0 12
RT
1&2
CC N 0 7
Page 58 of 64
LAFARGE
QUALITY CONTROL PLAN ( Q.C.P ) CA - Chemical Analysis RT - Running Test MT - Mechanical Test ( Sample) VC - Visual Checking DIM- Dimensional Checking TT - Thermal treatment DP - Die penetrant MP - Magnetic particle test US - Ultra Sonic Test RD - Radiography SC - Specific Control No phases 18) a) i) ii) b) i) ii) iii) iv) c) i) ii) d) i) Manufacturing Operations Operations D.E SYSTEM, VENTILATION & FIRE FIGHTING, DETECTION & ALARM SYSTEM EQUIPMETNS Completeness of system as per approved dwg Run out & alignment of fans, pumps with drives PIPING Dimensional & pipe route layout Welding checks Proper location of valves / strainers & fittings Hydraulic test of piping system DUCTS & GRILLS Routing / layout Leakage while the system is on trial operation PAINTING OF MS PARTS To be checked for completeness and uniformity of coating BAG FILTER Condition of Bags Interventions C-Witness Point A-Hold point Participants Documents
Plant department: Crushing Shop & Long Belt Conveyor ( Field quality plan for Mech. Equipment Erection) Equipment: Q.C.P ref: QP for MECH EQPT. Date 31.05.03 Observations: Revision 0
CR- Control Report CC-Conformity certificate Supplier: Part designation: Drawing No. Specification Ref. Item No. Interventions Participants Date Report no.
Completed
VC + DIM VC + DIM
1 1&2
CC N 0 8 CR N 0 13
VC + DIM DP VC SC
1 1 1 1&2
CR N 0 14
CC N 0 7
VC RT
1 1&2
CR N 0 15 CC N 0 7
DIM
1&2
CC N 0 7
e)
VC
CC N 0 7
Page 59 of 64
LAFARGE
QUALITY CONTROL PLAN ( Q.C.P ) CA - Chemical Analysis RT - Running Test MT - Mechanical Test ( Sample) VC - Visual Checking DIM- Dimensional Checking TT - Thermal treatment DP - Die penetrant MP - Magnetic particle test US - Ultra Sonic Test RD - Radiography SC - Specific Control No phases f) i) Manufacturing Operations Operations CONTROL ROOM Control room ventilation shall be checked for proper pressurisation and effectiveness of the gravity loaded back draft dampers BELT WEIGHER Fitment & alignment Display in totaliser & rate flow indicator Calibration with zero to rated load MAGNETIC SEPARATOR /METAL DETECTOR IR & HV of magnet before erecn. Fitment & alignment Running of magnetic separator belt. Break down voltage check for oil. Sample load lifting capacity test at given height Throwing of reject to ramp iron chute Functional check for accessories like temparature indicator oil level indicator etc Interventions C-Witness Point A-Hold point Participants Documents
Plant department: Crushing Shop & Long Belt Conveyor ( Field quality plan for Mech. Equipment Erection) Equipment: Q.C.P ref: QP for MECH EQPT. Date 31.05.03 Observations: Revision 0
CR- Control Report CC-Conformity certificate Supplier: Part designation: Drawing No. Specification Ref. Item No. Interventions Participants Date Report no.
Completed
RT
1&2
CC N 0 7
DIM VC SC
1 1 1&2
CR N 0 16 CR N 0 16 CC N 0 8
VC DIM RT MT RT RT RT
1 1 1 1
2 2 2 2
CR N 0 17 CR N 0 17 CC N 0 9 CC N 0 9 CC N 0 9 CC N 0 9 CC N 0 9
NOTE:- GENERAL - A.COMMISSIONING PROCEDURES WILL BE SUBMITTED AS PER CLASUSE NUMBER 10.2.VIII 4) UNDER SECTION 3 OF SPECIAL CONDITION OF THE CONTRACT B.PERFORMANCE GUARANTEE TEST PROCEDURES WILL BE SUBMITTED AS PER 11.2.1 UNDER SECTION 3 OF SPECIAL CONDITION OF THE CONTRACT
Page 60 of 64
STORAGE TYPE/CONDITION LAFARGE CRUSHING SHOP & LBC PKG (MECHANICAL ITEMS)
ANENXURE - I SL.NO ITEM STORAGE TYPE II REMARKS
BELTING
BELTING STORAGE AREA SHALL BE SUCH THAT BELT ROLLS ARE PROTECTED FROM DIRECT SUNLIGHT & RAIN
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
IDLERS PULLEYS GEAR BOXES APRON FEEDER CRUSHER FLUID COUPLING GEARED & FLEXIBLE COUPLING PLUMMBER BLOCK BEARING ROD GATES BELT VULCANISER AIR CONDITIONERS CHAIN PULLEY BLOCK ELECTRIC HOIST PUMPS, VALVES, STRAINERS, NOZZLES, VENTILATION SYSTEM, EQUIPMENT ETC. PIPE FITTINGS, TECH. STRUCTURE AND MISC. FABRICATED ITEMS PRECOATED SHEETS METAL DETECTOR BELT WEIGHER MAGNETIC SEPARATOR BRAKES SCRAPPER - EXTERNAL - INTERNAL
LAFARGE
QUALITY CONTROL PLAN ( Q.C.P ) CA - Chemical Analysis RT - Running Test MT - Mechanical Test ( Sample) VC - Visual Checking DIM- Dimensional Checking TT - Thermal treatment DP - Die penetrant MP - Magnetic particle test US - Ultra Sonic Test RD - Radiography SC - Specific Control No phases 1 A Interventions C-Witness Point A-Hold point Participants Documents
Plant department: Crushing Shop & Long Belt Conveyor (Mech & Elect. Storage Quality Plan) Equipment: Q.C.P ref:Storage Quality plan Supplier: Part designation: Drawing No. Specification Ref. Item No. Type Of Inspection Participants Interventions Date Report no. Remarks Remarks Observations: Date 31.05.03 Revision 0 CR- Control Report CC-ConformIty certificate
MATERIAL RECEIPT MECHANICAL ITEMS Equipments (Conveying) such as Belting, Idlers, Pulleys, Gear Boxes, Crusher, Fluid couplings, Geared couplings, Flexible coupling, Plummer blocks, Bearing, Apron feeder, Scraper, Belt vulcaniser Electric Hoist, Pumps, Air-conditioner, Chain pulley block, Metal detector, Magnetic separator etc. VC 1 CR NO - 1
LAFARGE
QUALITY CONTROL PLAN ( Q.C.P ) CA - Chemical Analysis RT - Running Test MT - Mechanical Test ( Sample) VC - Visual Checking DIM- Dimensional Checking TT - Thermal treatment DP - Die penetrant MP - Magnetic particle test US - Ultra Sonic Test RD - Radiography SC - Specific Control No phases Interventions C-Witness Point A-Hold point Participants 1.Contractor (L&T) 2-Lafarge/Insp. agency Item No. Type Of Inspection Participants Interventions Date Report no. Remarks Remarks Manufacturing Operations Operations Part designation: Drawing No. Specification Ref. Observations: 31.05.03 0 Plant department: Crushing Shop & Long Belt Conveyor (Mech & Elect. Storage Quality Plan) Documents CR- Control Report CC-ConformIty certificate Supplier: Equipment: Q.C.P ref:Storage Quality plan Date Revision
Fabricated and other items Rod gates Piping, Valves,(For DE System, SW System, CW System & PW System ) Ventilation system Technological structures and misc. fabricated items Pre-coated sheets MATERIAL STORAGE VC VC VC VC VC 1 1 1 1 1 CR NO - 1 CR NO -1 CR NO - 1 CR NO -1 CR NO -1
A B
Check up for Storage type and condition Check during storage period for all items as per Annex-I
VC VC
1 1
CR NO - 2 CR NO -2
A I)
For Electrical Receipt & Storage Storage type I, for the following thyristor pannel, PLC pannel, Lighting fixures, Anemometer controldesk, Control panel, Mimic panel & Annunciation panel conveyor switches, Limit switchs & Proximity switches. Cable joining kits & Termination kits. Tilt switches P.A System ultrasonic level detector Vibration monitoring system Instrumentation like pressure gauges, Switches, Load Cell etc. Receipt Document Check physical condition on receipt Storage Storage type-II for the following H.T switch gear, DC Motor, power & Lighting transformer HT Load brake Switch, MCC pannel, Distribution boards Junction box, Local control stations, HT Fuses, Bus duct, Hooter, all cables stall torque motor, LT Motor current collector, Geared motor, Electrical Actuators, HT Motor Receipt
VC
CR NO -2
A 1 2 B II
VC VC VC
1 1 1
CR NO -1 CR NO -1 CR NO -2
LAFARGE
QUALITY CONTROL PLAN ( Q.C.P ) CA - Chemical Analysis RT - Running Test MT - Mechanical Test ( Sample) VC - Visual Checking DIM- Dimensional Checking TT - Thermal treatment DP - Die penetrant MP - Magnetic particle test US - Ultra Sonic Test RD - Radiography SC - Specific Control No phases 1 2 B III Document Check physical condition on receipt Storage Storage type-III for the following Lighting poles & Mast, Cable trays Receipt Document Check physical condition on receipt Storage VC 1 CR NO -2 Interventions C-Witness Point A-Hold point Participants 1.Contractor (L&T) 2-Lafarge/Insp. agency Item No. Type Of Inspection Participants VC VC 1 1 Interventions Date Report no. CR NO -1 CR NO-1 Remarks Remarks Manufacturing Operations Operations Part designation: Drawing No. Specification Ref. Observations: 31.05.03 0 Plant department: Crushing Shop & Long Belt Conveyor (Mech & Elect. Storage Quality Plan) Documents CR- Control Report CC-ConformIty certificate Supplier: Equipment: Q.C.P ref:Storage Quality plan Date Revision
A 1 2 B
VC VC VC
1 1 1
CR NO -1 CR NO-1 CR NO -2
Type I storage : All side covered storage (i.e,TOP & SIDE COVER) storage on raised platform and in packed condition. Type II storage : Top covered storage area , storage on raised platform either in packed condition or taurpaulin covered. Type III storage:Open storage on a raised Platorm with tarpaulene cover