Power Flow Control
Power Flow Control
org
A2 206
CIGRE 2006
Power Flow Control on the Italian network by means of phase-shifting transformers Enrico Maria Carlini*, Gabriele Manduzio*, Dietrich Bonmann**
* TERNA Italy ** ABB Germany
SUMMARY
This paper presents the Italian experience in the installation of PSTs in the 380 kV Rondissone substation, with particular regard to the characteristics of these devices, to the single line diagram and lay-out adopted, to the operational strategy and maintenance considerations. Design restraints such as maximum switching power of on-load tap changers, short circuit withstand and transportation are briefly discussed. The special challenges in performing dielectric and thermal factory testing on such large units are presented. Insulation coordination of the PST with the surrounding network deserves special attention, since a PST is a series connected network element. The selection of the station surge arresters protecting the PST is highlighted. The operational strategy of a PST needs to determine criteria for the control of the phase angle. The automatic tap changer controller allows different control modes: maintaining a remotely set power flow or remote control of the tap position. The insertion and de-insertion of the PST requires special switching sequences. A description of the operational impact of the PSTs is also provided as well as elements on the coordination with other PSTs already installed. The paper finally describes solutions adopted by other utilities in the world in similar PSTs projects.
KEYWORDS
PST, Phase shifting Transformers, power flow control, NTC, maintenance, operation experience.
1 General Considerations About Import and Load Flows Between Italy, France and Switzerland
The exploitation of the deregulated electricity market implies the utilization of the interconnection transmission capacities wherever available under security conditions and this to happen within a global European market, in the perspective of a pan-European real political/economic entity. Considering the present and near future structural situation of power generation facilities in Italy (by far, expectedly more expensive than in EU countries), the already high import capacity could be further increased, both by better use of existing interconnections and also by the construction of new interconnectors. The northern Italian grid is interconnected to the neighboring countries with 17 circuits (8 circuits at 380 kV, 8 circuits at 220 kV and 1 circuit at 132 kV). These interconnections can be ideally grouped in 3 corridors connecting Italy to France, Switzerland and Austria-Slovenia. In 2004, the net yearly import to Italy through the northern interconnection has been equal to about 44 TWh. Each of mentioned corridors is influenced by the protection scheme and by the dispatching criteria of the TSOs of the neighbor countries.
Fig. 1: Power flow (GWh) exchange between Italy and other countries. Year 2004. Compared to a total theoretical gross transfer capacity during winter period, equal to more than 12000 MW, the net transfer capacity (NTC) available today in import direction to Italy is actually equal to 7150 MW in winter peak hours and 6050 MW in summer peak hours. These NTC values are calculated on the basis of the ETSO (European Transmission System Operators) endorsed methodologies and are assessed for different typical time frame (peak and off-peak hours) and different grid scenarios (in terms of statistical distribution of power flows on the interconnection). The grid constraints are firstly determined by the electrical characteristics of the lines and the n-1 security operation of the meshed interconnection operation; loop flows, transient overloads, as well as the transmission reliability margin (TRM) are also taken into consideration. During the process of NTC assessment, the availability of operative countermeasures to solve grid congestions, occurring in case of normal operating condition or consequently to the loss of grid elements, are checked as well. These strategies usually include: automatic or manual tripping for the breakers of parallels of the bus bars, where possible; automatic or manual connecting of power flow control devices as Phase shifting Transformers (PSTs); automatic or manual opening of internal lines a 132-220 kV for local congestions resolutions; automatic or manual disconnection by using short time acting devices for generators placed on keylocations for congestions, introduced by occurring disturbances or system contingencies; modulation of the generation reserve for every national transmission grid. 2
In this framework, therefore, PSTs actually represent one of the available tools to relieve congestion and, in general, to reduce the effects of the parallel flows and optimize the flows distribution on the interconnection. This can significantly increase the level of operational security, within long and medium-term system planning as well as in day-ahead operational planning and real-time operation level.
Table I: Main items of the functional specification for the phase-shifting transformers Limited space available in the substation led to the requirement of one three-phase unit for each of the two transmission lines. The units had to meet the dimensional limits of the Italian railway since road transportation had to be limited to an absolute minimum. The regulation angle was specified in a functional manner as 12, under a line current of 70% of rated current. This allowed the potential suppliers to find the best design compromise between minimum short circuit impedance needed for short circuit withstand of windings and tap changer and a minimum no-load regulation angle for smallest possible physical size. The N-1 criterion was applied to the operation of the coolers, and in addition an emergency operation at 120% rated load with N-1 coolers as well as operation at rated load without coolers for 20 minutes each were specified. The asymmetric quad booster concept for the PST was selected because it allows maximizing the utilization of the on-load tap changers switching capacity. The moderate variation of output voltage with angle regulation in the asymmetric quad booster concept could be tolerated by the system in this case.
V V1S u1inj V2S
V1L
V1S
V3S
U1reg
Series unit
U1reg
Main (shunt, exciting) unit
u1inj
Fig. 1a: Exciter and booster transformers, winding connection. Voltage Phasor diagram. Since the asymmetric quad booster concept does not need a 400 kV centre tap in the series windings, the connections between series and shunt transformer are greatly simplified.
As pointed out in the general considerations, the PSTs have to be manoeuvred from a stand-by operation to maximum advance phase shift in the shortest possible time in order to relieve overloads on transmission lines in case of certain contingencies.
The optimisation of the electrical design led to the following results: Each PST consists of a three-phase series transformer with six 400 kV oil/air bushings and a threephase shunt transformer with three 400 kV oil/air bushings. The connections between the regulation windings of the shunt transformer and the excited windings of the series transformer are made via oil/oil bushings in an oil filled duct. This solution allows separate handling and factory testing of the transformers with well-defined interfaces and minimum exposure of the windings to the atmosphere during transportation and on-site assembly. Electromagnetic forces due to external fault currents were dimensioning for the minimum achievable short circuit impedance of the series transformer. The short circuit impedance of the shunt transformer was designed as low as possible in order to minimize the no-load phase angle. Short circuit forces in the shunt transformer were not a challenge. Transient oscillations could be well controlled by proper winding design, such that no internal surge arresters were necessary. The on-load tap changer consists of three single-phase units with a common motor drive with coarse/fine-regulation and 33 positions. It fulfils the requirements regarding speed of operation, short circuit withstand and overload ability.
Series transformer Rated voltage induced in series winding Rated current through series windings Two-winding rated power Shunt transformer Rated voltage Rated current through series windings Two-winding rated power Complete PST Short circuit impedance rel. to 1630 MVA at 0 angle regulation Short circuit impedance rel. to 1630 MVA at 18 angle regulation Load losses No-load losses Total weight Dimensions L x W x H 11% 13.5% 2596 kW 269 kW 734000 kg 18.2 x 12.6 x 10.25 m 400000 V 725.8 A 502.8 MVA 74875 V 2353 A 528.5 MVA
Factory Testing
Where applicable the type and special tests according to IEC 60076 were applied. Lightning and switching impulse tests were applied to the individual units. The switching impulse on the series transformer could only be performed as a potential test, i.e. with source and load side bushings connected together, as described in IEEE C57.135, since the transformation ratio of the series transformer would have led to very high voltages in the excited windings. In normal operation the voltage that can occur across the excited windings is limited by the connection to the regulating windings of the shunt transformer. Power frequency voltage withstand tests and sound level tests were performed on the individual units as well as on the complete PST. The test winding in the exciter transformer has permanent bushings suitable for induced voltage and partial discharge testing of the complete PST as well. Under normal operation a metallic cover protects these bushings. Load loss and temperature rise tests up to 120% of rated load could be performed on the individual transformers. Due to the very high currents through the HV bushings of the series transformer this test is often a challenge for transformer test rooms. Measurements of phase angle regulation and zero sequence impedance voltages were performed on the complete PST.
At the end of the electrical design stage a transient model of the PST for implementation in ATP was created. Various single-phase and three-phase switching events as well as lightning strokes at various locations of the system were simulated in order to verify the dimensioning of the station surge arresters located on both sides of the PSTs. Special consideration was given to the fact while a lightning hits one end of a series winding the opposite end of the series winding may be at the peak of opposite polarity of the operating AC voltage.
The scheme adopted for the phase shifter, installed on the 380 kV double line Rondissone Albertville, is shown in the figure below.
Fig. 3: Single line diagram adopted for the PST installation on the 380 KV double circuit line Rondissone Albertville This type of configuration allows to have the following advantages. 1. When the PST is out of order, every 380 kV connection with Albertville is on service. 5
2. The normal operation of connection with the open by - pass and PST in stand - by is assured. 3. It is possible: to insert the PST when the line is in service, without interruptions of grid connection; the return of PST in stand by, when the line is in service and without interruptions of grid connection; to put the PST out of order, when the line is in service. With regard to the PST and by pass control system, the following conditions can be obtained: PST in stand by connected on the busbar A and by pass closed on busbar A; PST in stand by connected on the busbar B and by pass closed on busbar B; PST closed on busbar A and open by pass; PST closed on busbar B and open by pass; open PST; open by pass.
Hot Spot temperatures Moisture in oil Thermal balance tank Thermal balance for the on-load tap-changers (OLTC) Top oil temperature in the OLTC OLTC needs maintenance OLTC contacts need to be replaced
The bushing monitoring system measures voltages, leakage currents and their phase at the nine 400 kV bushings of each PST. The system calculates capacitances and loss factors of the bushings. Based on an internal expert system software the bushing monitoring system issues alarm signals of three levels of urgency for the SCADA system. Error codes at the local display of the monitoring system give further indications of the type of bushing problem. Further alarms are generated by the gas-in-oil sensor (Hydran): Gas-in-oil concentration high and Gasin-oil concentration high-high; In case of a condition monitoring alarm signal the remote operator has the option to view detailed information and recommendations for action via intranet access to the TEC and bushing monitoring systems.
Fig. 4a: Main parameters recorded by TEC for the PST 2 series unit
Fig. 4b: Main parameters recorded by TEC for the PST 2 exciter unit 7
Fig. 4c: Main parameters recorded by TEC for the on-load tap changer. The tap changer consists of three single phase units. In order to support diagnostic measurements in case of need the PSTs design allows access to the connections between exciting and regulating windings. After draining just very few 1000 liters of oil from the short oil duct between series and exciter transformers the connections between exciting and regulating windings can be opened. The terminals are then accessible for low voltage tests of the individual transformers: ratio, impedance, and resistance. The 15 kV test winding in the exciter transformer has permanent bushings suitable for induced voltage and partial discharge testing of the complete PST. In normal operation a metallic cover protects these bushings.
further degree of flexibility in achieving the interconnection security, without recurring to reduction of exchange programs or curative redispatching actions.
S W IT ZE R LA N D 4499 M W 4053 M W
A irolo
A U S T R IA 198 M W
Lienz
189 M W
S LO V E N IA
Soverzene R edipuglia D ivaca
A lb ertville
V illarodin
856 M W 824 M W
V enaus
Padriciano
FRANCE 1597 M W
Le B roc-C arros
R on d issone
IT A L IA C am porosso
2087 M W
Fig. 5: Re-distribution of the power flows in import direction to the Italian system, as determined by the operation at extreme taps of the two Rondissone PSTs (PSTs in stand-by position, PSTs tap 33) The experience of the possible impact of Rondissone PSTs operation on neighboring systems have suggested the need of an appropriate and deep co-ordination of PSTs operation between the TSOs involved. Co-ordination covers a crucial role to optimize the efficiency of PSTs utilization and guarantee the best standards of operational security. With this purpose, the Italian and French System Operators have set-up a joint procedure for the coordinated operation of the PSTs installed in 380 kV Rondissone substation and La Praz (F). In fact, due to the grid topology, one of the circuits of the 380 kV Rondissone-Albertville interconnector is electrically close to the 380 kV La Praz-Villarodin-Venaus corridor, on which the La Praz PST is installed. Therefore, the uncontrolled variation of the Rondissone PST taps in question could result in a direct and opposite effect on the La Praz corridor and vice versa. The procedure allows the optimized utilization of the available means for congestion while increasing the level of operational security of the northern interconnection and, in particular, of the F-I border. The common objectives and the tasks and actions of the NCCs during the possible scenarios of operation are specified. The co-ordination results also in reducing the risk of tap-change hunting by TSOs when operating conditions change and in the increase reliability of PSTs operation in case of unavailability of one of the transformers. In normal operation, two of the three PSTs are operated to manage flows on F-I interconnection. In case of very unbalanced flows on the Northern Italian grid and specifically of very low flows on F-I border, the simultaneous operation of the three PSTs is undertaken to push flows on that border. Co-ordination in PSTs handling is implemented at three stages: | Long and medium-term system planning, to perform joint security analyses on the impact of all the PSTs operation on the interconnected grid. | Day-ahead operational planning, to optimise the PSTs utilisation based on the day-ahead loadflow calaculations and n-1 security analyses | Real-time operation, to relieve security violations through a co-ordinated congestion management strategy. This modality can be undertaken under fully meshed grid conditions (preventive way) or following the loss of one grid element (corrective way). The co-ordination in PSTs operation is based on the mutual exchange of information regarding the system state and the objectives of the TSOs in optimising PSTs taps. The real-time exchange of PSTs selected taps represents an effective mean to monitor the switching margins available for relieving 9
congestion and to increase the accuracy of the security analyses as far as the PST simulation is concerned. Such level of co-ordination between TSOs represents at the moment a unique example in the UCTE community.
9 Single line diagrams adopted from other utilities in the world in similar project
PSTs devices can be adopted to fit the need of liberalized electricity market requiring ever more global interconnected electricity networks. Interesting feasibility studies by introducing PST in strategic European electric nodes to optimize\increase the power flow among different countries, are going on. To point out : Netherlands-Germany Interconnection (Meeden substation) France-Italy interconnection (La Praz substation) UK National Grid (Keadby substation)
9.1 PST Meeden substation. [1] In recent years the liberalization of the European market has pointed out the need to strengthen the interconnection between Netherlands and Germany. TenneT, the Dutch Transmission System Operator (TSO), has been faced therefore with the desire of the market to increase the available cross-border capacity. The installation of PSTs at the Dutch 380 kV substation Meeden in series with the two interconnections to the grid of E.ON Netz, allows to upgrade the NTC of the cross-border line Meeden-Diele/Conneforde with about 1100 MVA. The Netherlands has five interconnections, comprising 10 circuits, with two neighboring countries. Because of the geographical and electro technical location of the country, main interconnection flows are directed from Germany to the Netherlands. The loading of the circuits in the South border, is often causing a transfer limitation. Installing phase shifters in the 380 kV substation Meeden at the German border in the North would be most beneficial regarding import capacity.
Fig. 6: Single line diagram adopted for the PST installation at the Meeden substation 9.2 PST La Praz substation. [2] As mentioned beforehand, the 400 kV interconnection between France and Italy consists of a high capacity two circuit 400 kV line (north Albertville Rondissone line) and a weaker one circuit 400 kV line (south Venaus Villarodin). The south line has a far lower capacity than the north line, which raises two problems, It does not allow optimum use of the water resources in the Alps region and does not enable to increase the European exchanges.
10
Fig. 7: Single line diagram adopted for the PST installation at the La Praz substation The PST has been thought with a rating of 1181 MVA and the maximum phase shift has been specified to be 15, so as to enable the power system to remain stable after the loss of the double north line. An automatic controller will alter the phase shift according to the situation and the kind of event occurring: in normal operating conditions, the phase angle will be set near to zero so as to avoid disturbances for the Italian TSO. The phase angle will be shifted to its maximum for the most severe contingency (loss of the double line). The scheme in figure 7, consisting of a PST with a by pass disconnector, allows: use of tap changer in real time; easy utilizations of the PST in the different conditions; a reasonable flexibility of operation.
9.3 PST Keadby substation. [2] The main difference between French and United Kingdom scheme is use of a circuit breaker at the bottom of circuit.
Fig. 8 Single line diagram adopted for PST installation at the Keadby substation The largest quadrature boosters in the UK are connected in the 400 kV system and have a throughput rating of 2750MVA and the ability to shift the angle by up to 11.3 degrees in either direction by means of 19 voltage taps in each direction. The Quadrature Booster in question is a 2750 MVA, 400/400 kV +/-j80 kV unit to be installed at the National Grid Transco (NGT) 400 kV substation at Keadby, near Scunthorpe on Humberside. 11
10 Conclusion
In the deregulated European electricity market the trading of electrical power over larger distances as well as the installation of new generation, especially wind power, create new load flow patterns that often challenge the capacity or security of existing transmission lines. PSTs can be inserted into a line with just two extra disconnectors for less demanding applications or with a bypass and two or three extra circuit breakers for the highest demands of flexibility and protection. Different modes of angle control can be chosen. The design and installation of two PSTs at Rondissone substation near Torino is an example of an application in a strategically important network node and is described in some detail. The special considerations given to maintenance and condition monitoring are described. The modality of PSTs operation is described as well as its impact and sensitivity on the redistribution of flows across the northern Italian interconnection; elements on the co-ordination with La Praz PST are also provided. Three further applications of PSTs are briefly highlighted. Phase-shifting transformers are a demanding yet well-proven means of controlling quasi-stationary load flows.
BIBLIOGRAPHY [1]
W.L. Kling, D.A.M. Klaar, J.H. Schuld, TenneT bv A.J.L.M. Kanters, C.G.A. Koreman, TenneT bv H.F. Reijnders, C.J.G. Spoorenberg, Smith Transformatoren B.V. Cigr paper C2-207, 2004
[2] M.H. Baker, Reason to prefer a Phase-shifting transformer (PST) and which studies are required.
Cigr SC 14, Paris session, 2002
12