WBS Dictionary
Section Title
Volume II
02_1007 BMDSTB
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
4-4
WBS Dictionary
Section Title
Excavate, trench and backfill to a point 5 feet outside the building lines; furnish, place and compact aggregate base course. Includes all structures below and up to grade; all concrete formwork and reinforcing steel; and placement, curing and weather protection of structural concrete and slab on grade. Furnish and install all structural steel, base plates and anchor bolts. Furnish and install the exterior concrete composite wall panels, doors and hardware, pipe bollard at the overhead doors. Furnish and install the entire roofing system, including the roof coverings, insulation and flashings and trim. Furnish and install fixed partitions, interior windows, standard interior doors, compartments and cubicles, toilet and bath accessories, identifying devices, lockers, fire extinguisher cabinets, counters, sliding and folding doors, overhead doors, tile and terrazzo wall finishes, painting and wall covering, tile floor finishes, resilient flooring, carpet flooring, access flooring, gypsum wallboard ceiling finish, acoustical ceiling tiles and panel; paint and stain ceilings; and provide prefinished ceiling panels, drinking fountains and coolers. Furnish and install pipe and fittings, valves and hydrants, domestic water supply equipment, insulation, water pipe and fittings, vent pipe and fittings, floor drains, and non-potable water system. Furnish and install the HVAC system, including air distribution, cooling, hangers for ductwork, hot water distribution system, chilled water distribution system, exhaust system, unit heaters, fin tube radiation and computer room air cooling unit. Design and install an automatic fire detection and alarm system. Provide two fire alarm control panels. One fire alarm control panel is located outside of the HEMP enclosure and one is located inside the HEMP enclosure. The building requires a wet pipe and dry pipe sprinkler system along with a fire detection and alarm system. Fire detection systems include control, notification, air sampling and protection, interlocks with HVAC systems, interface with control and monitoring system and security alarms. Provide and install complete power distribution system including, lighting, outlets, branch wiring, fire alarm system, communication systems, fiber optic data transmission system, grounding, lightning protection system, UPS systems and access to the site monitoring and control system. Fabricate, install and test the HEMP shield plate, including all features and accessories. Testing also includes the EMP shielding. None
I. Electrical
Volume II
02_1007 BMDSTB
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
4-5
WBS Dictionary
Section Title
BALLISTIC MISSILE DEFENSE SYSTEM TEST BED WBS DICTIONARY MISSILE ASSEMBLY BUILDING WBS 3.03.1.1.3 (TEST PRIMARY FACILITIES)
The Missile Assembly Building is a one-story structure with wind shelters at the exterior personnel entrances. It provides spaces for assembly of missile stages, personnel support spaces for the assembly operation, and mechanical and electrical equipment spaces. The total building area is approximately 13,392 square feet. The process areas include the High Bay Area where the missile assembly work is performed. The facility is not designed to be accessible to physically disabled persons A. Substructure Excavate, trench and backfill to a point 5 feet outside the building lines; furnish, place and compact aggregate base course. Includes all structures below and up to grade; all concrete formwork and reinforcing steel; and placement, curing and weather protection of structural concrete and slab on grade. Furnish and install all structural steel framing and miscellaneous steel. Includes crane runway members. Furnish and install the exterior concrete composite wall panels, insulated metal wall panels, doors and hardware, and pipe bollard at the overhead doors. Furnish and install the entire roofing system, including the standing seam metal roof panels, flashing and fasteners. Supply and install fixed partitions, interior windows, standard interior doors, toilet and bath accessories, identifying devices, fire extinguisher cabinets, overhead doors, tile and terrazzo wall finishes, painting and wall covering, tile floor finishes, gypsum wallboard ceiling finish, acoustical ceiling tiles and panel and one 40-ton bridge crane; paint and stain ceilings. Includes below-slab plumbing with blockouts in the risers and WBC penetrations in the upper portion of the floor slab. At each phase, the plumbing will be leak tested, flushed and disinfected. Also includes compressed air piping, water heaters, plumbing fixtures, piping and fittings for potable hot/cold water service and lowtemperature heating water system. Furnish and install the HVAC and associated ducting and piping. Includes fabrication of the air supply, distribution, ventilation and exhaust system. Design and install fire detection and alarm system. Install power distribution systems. Included is power distribution, grounding system, lightning protection system, fire alarm system, conduit fittings, P A system, communication system and security system. None
F. Plumbing
B. Superstructure
Volume II
02_1007 BMDSTB
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
4-6
WBS Dictionary
Section Title
EKV ASSEMBLY AND CHECKOUT FACILITY WBS 3.03.1.1.6 (TEST PRIMARY FACILITIES)
The EKV Assembly and Checkout Facility is a one-story structure with wind shelters at the exterior personnel entrances. It provides spaces for installation of fuel and oxidizer tanks in the EKV, vessel pressurization, storage of materials, personnel support spaces and mechanical and electrical rooms. The total building area is approximately 11,541 square feet. The facility is not designed to be accessible to physically disabled persons. A. Substructure Excavate, trench and backfill to a point 5 feet outside the building lines; furnish, place and compact aggregate base course. Includes all structures below and up to grade; all concrete formwork and reinforcing steel; and placement, curing and weather protection of structural concrete and slab on grade. Fabricate and erect structural steel and roof joists. Accessories include fittings, end supports and bridging. Furnish and install roof deck, including adjusting plates, and complete touch-up painting. Fabricate and install miscellaneous metal items, access doors and panels, expansion and seismic joint covers, floor grating and frame, handrail, ladders, and surface-mounted floor mats. Design, fabricate and install precast concrete exterior panels; furnish and install interior sealant at floor joints, general caulking, horizontal joints in concrete walks and pavements; and install aluminum sandwich doors, tracks, and electrically powered door operator. Includes doors, tracks, hardware, counterbalancing weather stripping and operating mechanisms. Furnish, install and test the entire roofing system - the standing seam metal roof panels, fasteners, connectors and roof securement components. Supply and install fixed partitions, interior windows, standard interior doors, toilet and bath accessories, identifying devices, fire extinguisher, tile and terrazzo wall finishes, painting and wall covering, tile floor finishes, resilient flooring, conductive flooring, ceramic tile, gypsum wallboard ceiling finish, acoustical ceiling tiles and panel and a 5-ton bridge crane; and paint and stain ceilings. Furnish and install the hot-water heating system and the non-potable water system.
B. Superstructure
C. Exterior Closure
F. Plumbing
Volume II
02_1007 BMDSTB
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
4-7
WBS Dictionary
Section Title
None
EKV HYPERGOLIC FUEL STORAGE FACILITY WBS 3.03.1.2.4 (TEST SUPPORT FACILITIES)
The Hypergolic Fuel Storage Facility is a small one-story structure with a loading dock/wind shelter. It provides spaces for storage of EKV fuel canisters and mechanical and electrical equipment to support the facility. The total building area is approximately 507 square feet. The facility is not designed to be accessible to physically disabled persons. A. Substructure B. Superstructure C. Exterior Closure D. Roofing E. Interior Construction F. Plumbing G. HVAC (Mechanical) H. Fire Protection Systems I. Electrical J. Special Construction (Shielding) K. Other Costs Excavate, trench and backfill to a point 5 feet outside the building lines; furnish, place and compact aggregate base course; and furnish and place an elevated slab over the blast area, including all walls and footings. Fabricate and erect structural steel, with accessories including fittings, end supports and bridging. Fabricate and install miscellaneous metal. Furnish and install exterior skin, doors and hardware. Furnish and install the entire roofing system, including coverings, flashing and trim. Supply and install identifying devices, fire extinguishers including cabinets, painting and wall coverings, doors and frames; paint and stain ceilings and paint structural steel. The EKV Fuel Storage Facility has no plumbing. Furnish and install electrical and electronic control devices for the HVAC system. The control systems are direct digital control (DDC) with monitoring and control at the Readiness and Control facility. Design and install fire detection and alarm system. Fire detection systems include control, notification, air sampling, protection, interlocks with HVAC systems, interface with control and monitoring system and security alarms. All site facility controllers are to be looped for notification at all locations. Furnish and install power as required to all interior and exterior systems, including ground system, lightning protection, fiber-optics, control and communications tie-ins. Not applicable
None
Volume II
02_1007 BMDSTB
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
4-8
WBS Dictionary
Section Title
BALLISTIC MISSILE DEFENSE SYSTEM TEST BED WBS DICTIONARY EKV OXIDIZER STORAGE FACILITY WBS 3.03.1.2.5 (TEST SUPPORT FACILITIES)
The EKV Oxidizer Storage Facility is a small one-story structure with a loading dock/wind shelter. It provides spaces for storage of EKV oxidizer canisters and mechanical and electrical equipment to support the facility. The total building area is approximately 507 square feet. The facility is not designed to be accessible to physically disabled persons and is not provided with air conditioning. A. Substructure Excavate, trench and backfill to a point 5 feet outside the building lines; furnish, place and compact aggregate base course. Includes all structures below and up to grade; all concrete formwork and reinforcing steel; and placement, curing and weather protection of structural concrete and slab on grade. Fabricate and erect structural steel. Furnish and install steel joists. Accessories include fittings, end supports and bridging. Furnish and install the exterior skin, doors and hardware. Furnish, install and test the entire roofing system - the standing seam metal roof panels, fasteners, connectors, and roof securement components. Supply and install identifying devices, fire extinguishers including cabinets, painting and wall coverings, doors and frames; paint and stain ceilings and paint structural steel. The EKV Oxidizer Facility has no plumbing. Furnish and install the HVAC system including louvers, ducts and fan. Design and install fire detection and alarm system. Fire detection systems include control, notification, air sampling, protection, interlocks with HVAC systems, interface with control and monitoring system and security alarms. All site facility controllers are to be looped for notification at all locations. Furnish and install power and lighting as required to all interior and exterior systems, including ground system, lightning protection, fiber-optics, control and communications tie-ins. Not applicable
B. Superstructure C. Exterior Closure D. Roofing E. Interior Construction F. Plumbing G. HVAC (Mechanical) H. Fire Protection Systems I. Electrical J. Special Construction (Shielding) K. Other Costs
None
Volume II
02_1007 BMDSTB
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
4-9
WBS Dictionary
Section Title
F. Plumbing
Furnish and install the below-slab plumbing with blockouts in the risers. At each phase, the plumbing will be leak tested, flushed and disinfected. Includes compressed air piping, water heaters, plumbing fixtures, piping and fittings for potable hot/cold water service and low-temperature heating water system Furnish and install the HVAC system, and associated ducting and piping. Includes fabrication of the air supply, distribution, ventilation and exhaust system. Design and install fire detection and alarm system. Fire detection systems include control, notification, air sampling, protection, interlocks with HVAC systems, interface with control and monitoring system and security alarms. All site facility controllers are to be looped for notification at all locations. Furnish and install power as required to all interior and exterior systems, including ground system, lightning protection, fiber-optics, control and communications tie-ins. Not applicable
G. HVAC (Mechanical) H. Fire Protection Systems I. Electrical J. Special Construction (Shielding) K. Other Costs
None
B. Superstructure
Volume II
02_1007 BMDSTB
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
4-10
WBS Dictionary
Section Title
None
B. Superstructure
C. Exterior Closure D. Roofing E. Interior Construction F. Plumbing G. HVAC (Mechanical) H. Fire Protection Systems I. Electrical J. Special Construction (Shielding) K. Other Costs
None
Volume II
02_1007 BMDSTB
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
4-11
WBS Dictionary
Section Title
BALLISTIC MISSILE DEFENSE SYSTEM TEST BED WBS DICTIONARY SITE PREPARATION WBS 3.03.1.3.1 (GENERAL SITE CONSTRUCTION)
Existing soils are to be removed within the entire footprint of heated buildings to at least one foot below existing grade and replaced with classified fill. At heated buildings, granular material with less than 12% fines shall be provided to a depth of at least 2 feet below footings and 3 feet below slabs. At unheated buildings and tanks, material containing less than 12% fines shall be provided to a depth of at least 8 feet below finish grade. All fill required below buildings will be classified fill compacted to 80% relative density/95 percent of ASTM D 1557. Construction excavation slopes in native soils are not to exceed 1.5 (H) to 1 (V) for stability. Finished embankment slopes do not exceed 2 (H) to 1 (V). A. Site Clearing Skim the tundra vegetation layer just before excavation begins. Remove and dispose of stumps, roots and matted roots. After a sufficient area of vegetation has been removed, peat will then be excavated to top of soil (sand and gravel), and the process will be repeated until the work is complete and accepted. Not applicable Excavate and backfill all miscellaneous items not covered elsewhere, i.e., excavation beyond 5 feet outside building lines. None None
B. Site Demolition and Relocation C. Site Earthwork D. Site Cleanup E. Other Site Preparation
B. Parking Lots
C. Walks, Steps, Ramps and Terraces D. Site Development E. Landscaping F. Special Construction G. Other Site Improvements
Not applicable Landscaping in terms of trees, shrubs and specimen plantings is not included in this contract. Only selected areas around the Readiness and Control facility will be seeded. Not applicable Not applicable
Volume II
02_1007 BMDSTB
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
4-12
WBS Dictionary
Section Title
BALLISTIC MISSILE DEFENSE SYSTEM TEST BED WBS DICTIONARY SITE CIVIL/MECHANICAL UTILITIES WBS 3.03.1.3.3 (GENERAL SITE CONSTRUCTION)
Provide for water and sewer service, including water supply and distribution system, sanitary sewer system, storm sewer system, heating and cooling distribution systems and other civil/mechanical systems as required.
B. Superstructure
C. Exterior Closure
D. Roofing
Volume II
02_1007 BMDSTB
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
4-13
WBS Dictionary
Section Title
None
Volume II
02_1007 BMDSTB
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
4-14
WBS Dictionary
Section Title
BALLISTIC MISSILE DEFENSE SYSTEM TEST BED WBS DICTIONARY PASS-THROUGH COST WBS 3.03.1.12
This includes all construction equipment, spare parts, utilities, temporary facilities and consumables. Similarly, all contractor travel and costs associated with the movement, storage, and sale of personal effects, household goods, and vehicles, as allowed by the FAR 31.205-35, are included. General and administrative expenses in accordance with the disclosed cost accounting practices are included. Fee is not applicable to costs in this WBS item.
SITE PREPARATION WBS 3.03.3.1.1 (BMC3 FACILITIES GENERAL SITE CONSTRUCTION - FT. GREELY)
Site preparation at Ft. Greely includes site clearing and grubbing, earthwork, cleanup and any other general site work. A. Site Clearing Skim the tundra vegetation layer just before peat excavation begins. Remove and dispose of stumps, roots and matted roots. After a sufficient area of vegetation has been removed, peat will then be excavated to top of soil (sand and gravel), and the process will be repeated until the work is complete and accepted. None Includes excavation and backfill for all miscellaneous items not covered elsewhere. As required None
B. Site Demolition and Relocation C. Site Earthwork D. Site Cleanup E. Other Site Preparation
SITE IMPROVEMENTS/ROADS WBS 3.03.1.3.2 (BMC3 FACILITIES GENERAL SITE CONSTRUCTION - FT. GREELY)
Both asphalt-paved and aggregate-surfaced roads are provided. All roads and paved areas are constructed over 2 feet of classified fill. All asphalt paved roads and parking areas consist of a 2-inch asphaltic concrete surface course over a 4-inch aggregate base course over an 8-inch aggregate sub-base. A. Roadways Excavate and remove peat soil above the final design elevation. Provide aggregate roads, including bases and shoulders, all paved surfaces, curbs and signs and sidewalks. Excavate peat soil above the final design elevation. Provide a parking area large enough to accommodate two maintenance vehicles near the IDT building entrance and a parking area large enough to accommodate at least three maintenance vehicles near the entrance to the DSCS facility. Provide a perimeter patrol road 10-feet wide with a 2-foot shoulder on each side on the outside of the perimeter fence. Pedestrian access to the Ft. Greely site is not provided.
B. Parking Lots
Furnish and install a crash barrier perimeter fence and a security fence complete with gate. Provide and install lights for detection of intruders. Clear the perimeter patrol road and 50 feet outside of the perimeter road of all trees and stumps. Furnish topsoil, seed, fertilizer and mulch to all areas disturbed by construction that are not covered with aggregate surfaces. None None
Volume II
02_1007 BMDSTB
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
4-15
WBS Dictionary
Section Title
BALLISTIC MISSILE DEFENSE SYSTEM TEST BED WBS DICTIONARY MOB & DEMOB WBS 3.03.3.1.3 (BMC3 FACILITIES GENERAL SITE CONSTRUCTION - FT. GREELY)
This item consists of providing a mobilization plan, including weights and sizes, for shipping of material, tools, personnel and equipment, and developing and implementing a safety action plan. The demob plan is to include total cleanup of facilities to original condition. In addition, the temporary power infrastructure will be developed and installed.
SITE CIVIL/MECHANICAL UTILITIES WBS 3.03.3.2.1 (BMC3 FACILITIES UTILITIES - FT. GREELY)
This item consists of providing for water and sewer service, including water supply and distribution systems, sanitary sewer system, storm sewer system, heating and cooling distribution systems. and other civil/mechanical systems as required.
SITE ELECTRICAL UTILITIES WBS 3.03.3.2.2 (BMC3 FACILITIES UTILITIES - FT. GREELY)
This item consists of providing substations, electrical power, grounding, and site communications systems as required.
B. Superstructure C. Exterior Closure D. Roofing E. Interior Construction F. Plumbing G. HVAC (Mechanical) H. Fire Protection Systems I. Electrical
Volume II
02_1007 BMDSTB
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
4-16
WBS Dictionary
Section Title
BALLISTIC MISSILE DEFENSE SYSTEM TEST BED WBS DICTIONARY DSCS FACILITY WBS 3.03.3.7 - (FT. GREELY)
The DSCS facility is a one-story structure consisting of an Equipment Protection Building (EPB) and one radome. The facility provides spaces for one GF/GI communications enclosure, maintenance area, supply storage and mechanical and electrical support equipment. The total building area is approximately 5,066 square feet. The facility is designed to be accessible to physically disabled persons. A. Substructure Excavate, trench and backfill to a point 5 feet outside the building lines; furnish, place and compact aggregate base course. Includes all structures below and up to grade; all concrete formwork and reinforcing steel; and placement, curing and weather protection of structural concrete and slab on grade. Includes roads and fences. Fabricate and erect structural steel; furnish and install steel joists. Accessories include fittings, end supports and bridging. Design, fabricate and install precast concrete exterior panels; furnish and install interior sealant at floor joints, general caulking, horizontal joints in concrete walks and pavements; and install pressed steel doors, hardware, weatherstripping and insulation. Furnish and install the entire roofing system. Supply and install concrete slab floors with sealer, all interior walls, doors, toilet, ceiling, and painting. Furnish and install all plumbing, including one handicapped-accessible unisex toilet. Furnish and install the HVAC system, including supply air louver, exhaust fan, unit heater and associated piping. Furnish and install an automatic fire detection and alarm system. Furnish and install exterior power distribution system, interior power distribution system, motor control center, switchboard, transformer, power system metering and monitoring, exterior lighting, interior lighting, emergency/egress lighting, grounding, lightning protection, and communications systems. Provide and install two air-handling units with heating water coils, EMP and pressure doors. Provide empty conduits, pull wires, and penetrations for all security devices. The security system devices are not included in this contract.
D. Roofing E. Interior Construction F. Plumbing G. HVAC (Mechanical) H. Fire Protection Systems I. Electrical
Volume II
02_1007 BMDSTB
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
4-17
WBS Dictionary
Section Title
BALLISTIC MISSILE DEFENSE SYSTEM TEST BED WBS DICTIONARY COMMISSIONING WBS 3.03.1.12 - (FT. GREELY)
This item covers the execution, as required , of the preliminary pre-functional checklists and functional performance tests.
AWARD FEE WBS 3.03.3.13 - (FT. GREELY) PASS-THROUGH COST WBS 3.03.3.14 - (FT. GREELY)
This item includes all construction equipment, spare parts, utilities, temporary facilities and consumables. Similarly, all contractor travel and costs associated with the movement, storage, and sale of personal effects, household goods, and vehicles, as allowed by the FAR 31.205-35, are included. General and administrative expenses in accordance with the disclosed cost accounting practices are included. Fee is not applicable to costs in this WBS item.
SITE PREPARATION WBS 3.03.3.1.1 (BMC3 FACILITIES GENERAL SITE CONSTRUCTION EARECKSON AIR STATION)
This item covers site clearing and grubbing, earthwork, cleanup and any other general site work. A. Site Clearing Skim the tundra vegetation layer just before peat excavation begins. Remove and dispose of stumps, roots and matted roots. After a sufficient area of vegetation has been removed, peat will then be excavated to top of soil (sand and gravel), and the process will be repeated until the work is complete and accepted. None Excavate and backfill all miscellaneous items not covered elsewhere. As required None
B. Site Demolition and Relocation C. Site Earthwork D. Site Cleanup E. Other Site Preparation
SITE IMPROVEMENTS/ROADS WBS 3.03.1.3.2 (BMC3 FACILITIES GENERAL SITE CONSTRUCTION EARECKSON AIR STATION)
A. Roadways B. Parking Lots Excavate and remove peat soil above the final design elevation. Provide aggregate roads, including bases and shoulders, all paved surfaces, curbs and signs and sidewalks. Excavate and remove peat soil above the final design elevation. Provide a parking area large enough to accommodate two maintenance vehicles and a perimeter patrol road 10-feet wide with a 2-foot shoulder on each side on the outside of the perimeter fence. Pedestrian access to the site is not provided.
Furnish and install a crash barrier perimeter fence and a security fence complete with gate. Provide and install lights for detection of intruders. Clear the perimeter patrol road and 50 feet outside of the perimeter road of all trees and stumps. Furnish topsoil, seed, fertilizer and mulch to all areas disturbed by construction that are not covered with aggregate surfaces. None None
Volume II
02_1007 BMDSTB
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
4-18
WBS Dictionary
Section Title
BALLISTIC MISSILE DEFENSE SYSTEM TEST BED WBS DICTIONARY MOB & DEMOB WBS 3.03.3.1.3 (BMC3 FACILITIES GENERAL SITE CONSTRUCTION EARECKSON AIR STATION)
This item consists of providing a mobilization plan, including weights and sizes, for shipping of material, tools, personnel and equipment, and developing and implementing a safety action plan. The demob plan is to include total cleanup of facilities to original condition. In addition, the temporary power infrastructure will developed.
SITE CIVIL/MECHANICAL UTILITIES WBS 3.03.3.2.1 (BMC3 FACILITIES UTILITIES CONSTRUCTION EARECKSON AIR STATION)
This item consists of providing water and sewer service, including water supply and distribution system, sanitary sewer system, storm sewer system, heating and cooling distribution systems and other civil/mechanical systems as required.
SITE ELECTRICAL UTILITIES WBS 3.03.3.2.2 (BMC3 FACILITIES UTILITIES - EARECKSON AIR STATION)
This item consists of providing electrical power, grounding, and site communications as required.
B. Superstructure
C. Exterior Closure
Volume II
02_1007 BMDSTB
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
4-19
WBS Dictionary
Section Title
Provide empty conduits, pull wires, and penetrations for all security devices. The security system devices are not included in this contract.
B. Superstructure
C. Exterior Closure
D. Roofing E. Interior Construction F. Plumbing G. HVAC (Mechanical) H. Fire Protection Systems I. Electrical
Volume II
02_1007 BMDSTB
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
4-20
WBS Dictionary
Section Title
BALLISTIC MISSILE DEFENSE SYSTEM TEST BED WBS DICTIONARY BUILDING 600 WBS 3.03.3.8 (EARECKSON AIR STATION)
Existing Building 600 is a multi-story building of permanent construction. The facility contains spaces for On-Site Support Center (OSSC), a Site Control and Monitoring System (SCMS) area, arms storage and dispensing rooms, guard check-in and security shift leader rooms, an Element Site Communications Node (ESCN) and IDT support space, administrative/technical/engineering support spaces and a Central Security Center (CSC). The total building area is approximately 5,066 square feet. The facility is designed to be accessible to physically disabled persons. No special accessible design features are included in the administrative spaces on the ground floor. A. Site Clearing B. Superstructure C. Exterior Closure D. Roofing E. Interior Construction F. Plumbing G. HVAC (Mechanical) H. Fire Protection Systems I. Electrical J. Special Construction There is no civil work associated with this renovation. Remove and renovate portions of the existing building interior walls as required. Renovate as required. Renovate as required. Renovate as required. Renovate as required. Renovate as required. The building is equipped with a conventional fire detection and alarm system. Furnish and install additional smoke detectors as required. Renovate as required. Demolish as required.
Volume II
02_1007 BMDSTB
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
4-21
WBS Dictionary
Section Title
BALLISTIC MISSILE DEFENSE SYSTEM TEST BED WBS DICTIONARY AWARD FEE WBS 3.03.3.13 (EARECKSON AIR STATION) PASS-THROUGH COST WBS 3.03.3.14 (EARECKSON AIR STATION)
This item covers all construction equipment, spare parts, utilities, temporary facilities and consumables. Similarly, all contractor travel and costs associated with the movement, storage, and sale of personal effects, household goods, and vehicles, as allowed by the FAR 31.205-35, are included. General and administrative expenses in accordance with the disclosed cost accounting practices are included. Fee is not applicable to costs in this WBS item.
Volume II
02_1007 BMDSTB
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
4-22