> > BA R E C O I L S M A D E TO M E A S U R E
GCO
SPECIAL CONSTRUCTION Our experts are happy to provide advice for the specific requirements of heat exchangers on demand by the customer. The high flexibility of Guntner manufacturing plants enables the accomplishment of even the most challenging requirements.
HIGH PROTECTION AGAINST LEAKAGES Approved, patented Guntner floating coil system for fin types F N + K , Through the patented floating coil principle the coil can expand and contract without affecting the refrigerant carrying core tubes. This helps to prevent refrigerant losses due to tube fractures and prolongs the service life of the bare coil.
www.guntnerus.com
www.guntnerus.com
H
staggered
/8 9.53 mm
3
G/S/C
A/E/C
F
staggered
1 /2 12 mm
C Z V/W
HFC, Water, Brine, CO2 R717 NH3, R717, HFC, Water, Brine, CO2 HFC, CO2 NH3, R717, HFC, Water, Brine, CO2
N
in line
5 /8 15 mm
V/W
V/W/G
A/E/C/V/W
K
staggered
7 /8 22 mm
F/V/W
F/V/W/G
F/A/E/G
NH3, CO2
www.guntnerus.com
Dimensions
www.guntnerus.com
Application Refrigerated goods Aggressive ambient air (salt, detergents, ammonia) No Yes, which type?
Parameter Air quantity max. pressure drop of air in coil cfm in H2O Air heater Air cooler Evaporator Condenser
Air inlet temperature / room temperature F Air inlet humidity / WB temperature Air outlet temperature / capacity 1. Brine / water inlet temperature 2. Brine / water outlet temperature 3. Brine / water quantity / Capacity Brine concentration Brine type Max. pressure drop Brine / Water Evaporation temperature Superheating temperature Condensing temperature + Subcooling Hot gas temperature Recirculated rate Refrigerant Max. Dimensions 1. Lmax max. installation length (unit inst.) 2. H installation height (unit installation) 3. T installation depth L for duct installation (length of frame) inch mm inch mm inch mm inch mm psi F F % F F %
H for duct installation (height of frame) inch mm Soldered connection Threaded connection Flanged connection Installation position / Connections horizontal vertical AD (air direction) to the right vertical AD (air direction) to the left
www.guntnerus.com
Construction GCO
PRESSURE TEST Heat exchangers for water/brine operation will be tested with 250 psig. For all other heat exchangers the test pressure is: 250, 500 or 725 psig.
CONNECTIONS Soldered connection / welded flanges Thread Flange acc. to ASTM A182 / ANSI B16.5
ACCESSORIES AND SPECIAL CONSTRUCTION Droplet separator Drip tray Defrosting (electrical, hot gas) Cover and bottom sheet squared, or smooth cross braced with drain hole Painted casing Breather / drain vent. Variable fin pitch