Document Control Procedure
Document Control Procedure
Each incoming document must be listed in the document incoming list.A sample how the list should look likes is given below: Incoming Register
Received Date Our Ref. Doc. Date Doc. Ref Type From Subject Discipline Action By Reference of Reply Status
Each outgoing document must be listed in the document outgoing list.samples of the lists look like is given below.
NCR Register
Proposed Corrective Action Date Acceptance of Proposed Action Date Corrective Action Completion Date NCR Clearance Date
NCR No.
Description
Detailed Description
Date of Issue
Status
Remarks
File Labels
Drawing control All the incoming drawings from contractor should checked with drawing number,revisions, discipline etc. all incoming drawings to be stamped with incoming stamp and registered in the drawing control list. The original drawing will be collected and kept save in drawing control room.all drawings will be strored as hard copy and soft copy.the copies of drawings distributed to team members of the consultant will be recorded in the drawing control list.if a drawing revision was made , it has to be ensured by the drawing control engineer that all superseded drawings will be destroyed. In case a team member requires keeping the superseded drawing, this drawing has to be stamped with the stamp Superseded and keep in the record.