Anpqp Version 2.2-Feb 2011
Anpqp Version 2.2-Feb 2011
Anpqp Version 2.2-Feb 2011
Index
New Revision Summary New Revision Contents 1. Commonised Renault/Nissan Requirements 2. Reinforced Requirements for High Volume Parts 3. Standardisation of Requirements Deployed since V2.1 4. Removal of Duplicated Requirements 5. Other Changes
2
5. Other Changes
Index
New Revision Summary New Revision Contents 1. Commonised Renault/Nissan Requirements 2. Reinforced Requirements for High Volume Parts 3. Standardisation of Requirements Deployed since V2.1 4. Removal of Duplicated Requirements 5. Other Changes
6
Index
New Revision Summary New Revision Contents 1. Commonised Renault/Nissan Requirements 2. Reinforced Requirements for High Volume Parts 3. Standardisation of Requirements Deployed since V2.1 4. Removal of Duplicated Requirements 5. Other Changes
8
Notes The Tier 1 supplier shall a system/procedure in place to select new suppliers and to evaluate current suppliers. Activity Phase 4 Approve sub-supplier Part Submission Warrant (PSW) or equivalent.
Reviewed the items covered by the CSCC and focus on features for Supplier, Manufacturing Process and Product.
Unique DCI
Activity 9.1 (None) DCI Mechanism or structure Electrical function Material Dimensions or mass Other changes Mechanism or structure Electrical function Material (incl. supporting material such as grease, paint, welding rod etc. ) Dimensions or mass Sub-component layout Affecting homologation/safety/regulation
10
Examples of changes: Facility site transfer/relocation Change to a Sub-supplier Change within a Sub-supplier Upgrade or rearrangement of existing tooling or equipment Process related to a Special Characteristic or Key Feature Process related to new technology Control method used Process flow
Activity Purpose: Renault/Nissan requires its suppliers to operate an effective identification and traceability system. Notes: The Tier 1 supplier shall; -manage traceability for all products & components. -deploy the requirements to their sub-suppliers. Requirements may be specified on the drawings and/or data notes. No particular requirements are specified, the supplier must comply with the requirements contained in the ISO/TS 16949 and within the relevant company specific requirements section.
12
Index
New Revision Summary New Revision Contents 1. Commonised Renault/Nissan Requirements 2. Reinforced Requirements for High Volume Parts 3. Standardisation of Requirements Deployed since V2.1 4. Removal of Duplicated Requirements 5. Other Changes
13
14
15
16
Index
New Revision Summary New Revision Contents 1. Commonised Renault/Nissan Requirements 2. Reinforced Requirements for High Volume Parts 3. Standardisation of Requirements Deployed since V2.1 4. Removal of Duplicated Requirements 5. Other Changes
17
18
Index
New Revision Summary New Revision Contents 1. Commonised Renault/Nissan Requirements 2. Reinforced Requirements for High Volume Parts 3. Standardisation of Requirements Deployed since V2.1 4. Removal of Duplicated Requirements 5. Other Changes
19
Newly added Category description appears when you click on each Category name. Product and Process Concept Proposal
Product Quality Targets Study Plan
2 2 (2) 2
Renault Activity 1.2 moved from category 3 Product Reliability Targets Study Plan
Nissan
2. SUB-SUPPLIER MANAGEMENT
Component Supply Chain Chart (CSCC)
20
Phase1
Phase2 3 1 3 2 1 2 2 1 2
Phase3
Phase4
Extended activity
Nissan Renault Nissan
4. PRODUCT DEVELOPMENT
Quality Function Deployment (QFD) HCPP Nissan
Phase1
Phase3
Phase4
Renault
Shortened activity
2 (2) (2) 2 (2) 2
Renault
Renault
Nissan
3 3
3 2
3 2
(2) 3
(2) 2
2 2
(2) 3
(2) 2
2 2
(2)
Updated requirement
Updated glossary
22
End of Slides
23