Intake BOQ
Intake BOQ
No DESCRIPTION CIVIL WORKS INTAKE Charges for PCC M15 Concrete for 150mm thick Lining including Suitable Steel Shuttering, formwork & scaffolding, Batching & Mixing using Batching plant, Transporting, Placing at site of work using Boompacer and Pump & piping, 2. vibrating with cost of all materials, adm A).LINING IN BED B). LINING IN SLOPES 7 Providing construction joints. 8 Providing expansion joints 9 Pressure relief valves Unit Qty Rate Value
5.
6.
7.
10 11 12 13 14 15 16 17 18
Charges for PCC M15 Concrete for Leveling Course including Suitable Steel Shuttering, formwork & scaffolding, Batching & Mixing using Batching plant, cum Transporting, Placing at site of work using boompacer and Pump , vibrating with cost of all materials, admixt Charges for RCC M20 Concrete for RAFT of PumpHouse including Suitable Steel Shuttering, formwork & scaffolding, Batching & Mixing using Batching plant, cum Transporting, Placing at site of work using Pump & piping, vibrating with cost of all materials, admi Charges for RCC M25 Concrete for PumpFoundations of PumpHouse including Suitable Steel Shuttering, formwork & scaffolding, Batching & Mixing cum using Batching plant, Transporting, Placing at site of work using boompacer and Pump , vibrating with cost of all materials Charges for RCC M25 Concrete for Sub Structure of PumpHouse including Suitable Steel Shuttering, formwork & scaffolding, Batching & Mixing using Batching plant, Transporting, Placing at site of work using boompacer and Pump&piping , vibrating with cost of all materials Up to + 129.5 level cum Up to motor floor level (139.146) cum Motor Floor and beams,slabs cum Up to level +142 cum Up to level of 145 cum Up to level of + 148 cum Upto level of +151 cum Trash rack beams and columns cum RCC Stair case cum Charges for RCC M25 Concrete for Super Structure of PumpHouse including Suitable Steel Shuttering, formwork & scaffolding, Batching & Mixing using cum Batching plant, Transporting, Placing at site of work using Pump & piping, vibrating with cost of all mate Charges for Reinforcement tor steel HYSD Fe 415bars cutting, bending, placing in position, tying with suitable guage binding wire , with necessary cover M.T blocks, for all leads, lifts, Delifts as per approved drawings and as directed by the dept Cement concrete flooring (1:3:6) Sq.mt Tiled flooring Sq,mt Brick masonary in (1:6) cum Plastering with two coats in (1:6) sqm Internal painting two coats OBD sqm External painting with snowcem sqm Fixing Doors ( Alluminium) sqm Rolling shutters sqm
299
1302
S.No 19 20 21 22 23 24
DESCRIPTION Unit False ceiling to Annexe room sqm Roof Trusses MT Gantry girder (ISMB) MT Sheeting to roof of pumphouse sqm Structural steel MT Supply,Erection & Commissioning of Lift (8 passenger capacity) at pump house as nos per I & CAD approved spec. completely FOREBAY Charges for RCC M10 Concrete for Leveling Course including Suitable Steel Shuttering, formwork & scaffolding, Batching & Mixing using Batching plant, cum Transporting, Placing at site of work using Pump & piping, vibrating with cost of all materials, admixt Charges for RCC M20 Concrete for Trash rack side beams Counterfits etc including Suitable Steel Shuttering, formwork & scaffolding, Batching & Mixing cum using Batching plant, Transporting, Placing at site of work using Boompacer and Pump & piping, vibrating with cost of Charges for Reinforcement tor steel HYSD Fe 415bars cutting, bending, placing in position, tying with suitable guage binding wire , with necessary cover blocks, for all leads, lifts, Delifts as per approved drawings and as directed by the Switch gear room Charges for RCC M10 Concrete for Leveling Course including Suitable Steel Shuttering, formwork & scaffolding, Batching & Mixing using Batching plant, Transporting, Placing at site of work using Boompacer and Pump & piping, vibrating with cost of all materials, admixt Charges for RCC M20 Concrete for Cabletrays etc including Suitable Steel Shuttering, formwork & scaffolding, Batching & Mixing using Batching plant, Transporting, Placing at site of work using Boompacer and Pump & piping, vibrating with cost of all materials, admixtu Charges for RCC M20 Concrete for columns,beams etc including Suitable Steel Shuttering, formwork & scaffolding, Batching & Mixing using Batching plant, Transporting, Placing at site of work using Pump & piping, vibrating with cost of all materials, admi Charges for Reinforcement tor steel HYSD Fe 415bars cutting, bending, placing in position, tying with suitable guage binding wire , with necessary and cover blocks, for all leads, lifts, Delifts as per approved drawings and as directed by the Tile flooring Brick masonary in CM (1:6) Plastering with two coats cm (1:6) Internal painting two coats OBD External painting with snowcem Steel work for Doors & Rolling Shutter m.t
Rate
Value
126
5392
494
2.
cum
32
3.
cum
121
4.
cum
236
5. 6. 7. 8. 9. 10. 11.
Note If any item arrives during execution of the work which is not in the above BOQ list, the rate for this will be arrived or