THE RURAL ELECTRIFICATION AUTHORITY BIDDING DOCUMENTS FOR REA/2012-2013/OT/025 DESIGN ,SUPPLY AND INSTALLATION OF LOKICHAR - 23MVA 66/33KV

SUBSTATION AND ASSOC IATED STRUCTURES VOLUME 2 TECHNICAL SPECIFICATIONS SEPTEMBER 2012 These Bidding Documents have been prepared following the guidelines of the World Ban Standard Bidding Document for Procurement

TECHNICAL SPECIFICATIONS

TABLE OF CONTENTS 1 1.1 1.2 1.3 1.4 1.5 1.5.1 1.5.2 1.5.3 1.5.4 1.5.5 1.6 1.7 1.8 1.8.1 1.8.2 1.8.3 GENERAL SPECIFICATIONS 1 GENERAL 1 DOCUMENT PRIORITY 1 COMPLETENESS OF WORKS 1 SPACE REQUIREMENT 2 DOCUMENTATION AND DRAWINGS 2 General 2 Bid Drawings 3 Progress Plans 4 Exchange of Interface Information 4 Final Documentation 4 CONTRACTOR'S QUALITY ASSURANCE PROCEDURES GUARANTEES AND PARTICULARS 5 MANUFACTURING AND SHIPMENT 5 Places of Manufacture and Sub-Contractors Inspection and Testing 6 Pac ing, Transportation and Storage 6

5 5

3 3.1 3.1.1 3.1.2 3.1.3 3.1.4 3.1.5 3.1.6 3.1.7 3.1.8 3.1.9 3.1.10 3.1.11 4 4.1.1 5 30 5.1.1 5.2 5.2.1 6 6.1.1

PROJECT SPECIFIC DATA 22 DEFINITIONS 22 Design Data, High and Medium Voltage 22 Design Data, Low Voltage Equipment 23 Phase Relationship 23 Colour Coding 24 Environment 24 Noise 25 Auxiliary Power 25 Electric Service During Construction 25 220 V AC Un-interrupted supply (UPS) 26 Operation and Control 26 Interface between Contractors and towards Employer 27 PARTICULAR TECHNICAL SPECIFICATIONS 1 Particular technical specifications SWITCHGEAR 1 PARTICULAR TECHNICAL SPECIFICATIONS SUBSTATIONS CONTROL, PROTECTION. Control, protection and cabling Substations 30 PARTICULAR TECHNICAL SPECIFICATIONS-TRANSFORMERS Distribution and Auxiliary Transformers 76 PARTICULAR SPECIFICATIONS SUBSTATIONS CIVIL WORKS PARTICULAR SPECIFICATION CIVIL WORKS 84 55 84

1.9 1.9.1 1.9.2 1.9.3 1.9.4 1.10 1.11 1.12 2 2.1 2.2 2.3 2.4 2.5 2.5.1 2.5.2 2.5.3 2.5.4 2.5.5 2.5.6 2.5.7 2.5.8 2.5.9 2.6 2.6.1 2.6.2 2.6.3 2.6.4 2.6.5 2.6.6 2.6.7 2.6.8 2.7 2.7.1 2.7.2 2.7.3 2.7.4

ERECTION, INSTALLATION AND COMMISSIONING 7 Storage at Site 7 Wor on Live Substations 7 Erection. 8 Testing and commissioning 8 ON THE JOB TRAINING 9 TOOLS 9 SPARE PARTS 9 GENERAL TECHNICAL SPECIFICATION 10 STANDARDS 10 UNITS 10 AUXILIARY POWER INTERRUPTIONS 10 SELECTIVITY 10 DESIGN AND MATERIALS 10 General 10 Electrical Equipment Materials 11 Bolts, Studs, Nuts, Screws, Washers, etc 12 Surface Treatment and Painting, Electrical Equipment Insulating Oil 13 Sulphur hexafluoride gas (SF6) 13 Loc ing Devices and Padloc s 13 Nameplates and signs 13 Tool Rac in the switchgear Room 13 EQUIPMENT 14 Standardisation 14 Degree of Protection 14 Indicators and Instruments 14 Fuses and Miniature Circuit Brea ers 15 Relays and Contactors 15 Motors 15 Motor control gear 16 Computer Based Controllers 17 CONSTRUCTION AND ERECTION 18 Switchboards, Panels and Cabinets 18 Wiring and Terminal Bloc s within Enclosures 18 Cable Laying and Routing 19 Earthing (Grounding) 21

12

7 PARTICULAR TECHNICAL SPECIFICATIONS CABLES 116 Particular technical specifications 66, 33 AND 11 V Cables 116 8 PARTICULAR TECHNICAL SPECIFICATIONSTELECOMMUNICATIONS 129 8.1 GENERAL REQUIREMENTS 129 8.1.1 SCOPE OF WORK 129 8.1.2 OPGW 130 8.1.3 POWER LINE CARRIER 136 8.1.4 RADIO SYSTEM 139 9 SCOPE OF WORK - SUBSTATIONS 146 9.1 SCOPE OF WORK - SUBSTATIONS 146 9.1.1 General 146 9.1.2 Standard Substation 147 9.1.3 66KV and 33 V Switchgear Outdoor Type 147 9.1.4 11 V Switchgear Outdoor Type 148 9.1.5 11 V Switchgear Indoor Type Error! Boo mar not defined. 9.1.6 Auxiliary transformer 150 9.1.7 MV Power Cables from Transformer to Indoor Switchgear 150 9.1.8 MV Power Cables from Indoor Switchgear to line termination tower 150 9.1.9 Control, Protection, Metering and Signalling 150 9.1.10 Auxiliary AC Supply Equipment 153 9.1.11 DC Supply System 154 9.1.12 Earthing System 155 9.1.13 Ancillary Equipment 155 9.1.14 Power transformers 155 9.1.15 Training in control and protection system (LS-008a, 008b) 156 9.1.16 Factory Acceptance Test (LS 001,002,003,004,005,006,007) 156 9.1.17 Test Equipment (TS 001) 157 9.1.18 Final documentation 157 9.1.19 GSU MGADI. 158 9.1.20 Mandatory Spare Parts and Tools 160 9.1.21 Recommended Spare Parts and Tools 161 10 TECHNICAL SCHEDULES 162 10.1 TECHNICAL SCHEDULES 162 10.1.1 PREAMBLE 162 10.2 TECHNICAL SCHEDULES SUBSTATIONS 163 10.2.1 SCHEDULE VI-1a TECHNICAL GUARANTEES, OUTDOOR SWITCHGEAR 163 10.2.2 SCHEDULE VI-2a TECHNICAL GUARANTEES, INDOOR MV INDOOR SWITCHGEAR 171 10.2.3 SCHEDULE VI-2b INFORMATIVE DATA MV INDOOR VOLTAGE SWITCHGEAR 177 10.2.4 SCHEDULE VI-2b INFORMATIVE DATA MV INDOOR VOLTAGE SWITCHGEAR Error! B oo mar not defined. 10.2.5 SCHEDULE VI 3b INFORMATIVE DATA, CONTROL SYSTEM 183 10.2.6 SCHEDULE VI 4a TECHNICAL GUARANTEES, PROTECTION ETC. 184 10.2.7 SCHEDULE VI 4b INFORMATIVE DATA, PROTECTION ETC. 190 10.2.8 193 10.2.9 SCHEDULE VI 5b INFORMATIVE DATA, CABLES 194 10.2.10 194 10.2.11 SCHEDULE VI 5b INFORMATIVE DATA, CABLES 195 10.2.12 SCHEDULE VI 6a TECHNICAL GUARANTEES, EARTHING 196 10.2.13 SCHEDULE VI 6b INFORMATIVE DATA, EARTHING 197 10.3 TECHNICAL SCHEDULES TRANSFORMERS 198 10.3.1 SCHEDULE VI 7a - TECHNICAL GUARANTEES, POWER TRANSFORMERS 198 10.3.2 SCHEDULE VI-7b - INFORMATIVE DATA, POWER TRANSFORMERS 212 10.4 SCHEDULE VI 8A - TECHNICAL GUARANTEES, DISTRIBUTION TRANSFORMERS 229 10.5 SCHEDULE VI-8B - INFORMATIVE DATA, DISTRIBUTION TRANSFORMER 233 10.6 SCHEDULE VI-8B - INFORMATIVE DATA DISTRIBUTION TRANSFORMERS SHEET 2 OF 2 235 10.7 SCHEDULE VI-9A- GAURANTEE DATA TELECOMMUNICATION SYSTEM 237

10.8 SCHEDULE VI-9B- GAURANTEE DATA TELECOMMUNICATION SYSTEM 238 10.9 SCHEDULE VI-9C- GUARANTEED TECHNICAL SPECIFICATIONS FOR FIG-8 PARTICULAR TECHNICAL SPECIFICATIONS TELECOMMUNICATION) FIBER OPTIC CABLE 239

1 GENERAL SPECIFICATIONS 1.1 General The scope of wor , data sheets, special and general specifications constitute th e complete technical specifications and must be read as a whole. If more than on e contractor contributes to the completion of the plant each contractor is oblig ed to cooperate, adapt solutions and exchange information so that the plant form s a functional and optimised entirety. 1.2 Document Priority If in conflict, the ran ing of documents in the technical specifications, in dec reasing priority, is as follows:

In the event of any difference between the Drawings and the Specifications, the latter shall prevail. In the event of any difference between scaled dimensions a nd figures on the drawings, the figures shall prevail. If the Bidder is of the opinion that there is conflict or disagreement between t he particulars of the documents, standards etc., this must be clearly stated in the Bid, failing which, the materials and equipment offered shall be deemed to c omply in every respect with the current Specification both in manufacture and in performance, and compliance thereof shall be insisted upon without additional c ost to the Employer. 1.3 Completeness of Wor s 1.1.1 All apparatus, accessories or fittings which may not have been specifica lly mentioned, but which are usual or necessary in the respective equipment for the completeness of the finished wor in an operable status, shall be deemed to be included in the Contract and shall be provided by the Contractor without any extra charge. All equipment shall be complete in all details, whether or not suc h details are mentioned in the Specifications. This includes fixation details an d connection clamps and/or terminals. 1.1.2 All materials and s illed labour, whether of temporary or permanent natu re, required by the Contractor for the design, manufacture, erection and testing at site of the equipment shall be supplied and paid for by the Contractor. All computer equipment shall be delivered with all software and licences necessary t o achieve the specified functionality as well as the software necessary for prog ramming, testing, service and maintenance through the lifetime of the equipment. 1.1.3 Any reference in the quantity and price schedules, the delivery period s chedule or in the various clauses and schedules of the text of either the Specif ication or the Bid, to any equipment shall imply equipment that is complete with all accessories, apparatus and fittings as outlined in sub clause 1.1.1 and 1.1 .2 above. The Bidder shall be responsible for ensuring that the equipment supplied is fit for the purpose intended. Available information on the characteristics of the sy

1. 2. 3. 4. 5. 6.

Scope of Wor s Particular technical specifications Project Specific Design Data General technical specifications General Specifications Standards

stem, to which the wor s will be connected and associated, will be supplied on r equest to the Bidder who shall be responsible for obtaining and determining all applicable nowledge relevant to the wor s. 1.4 Space Requirement The Bidder shall chec the dimensions of rooms and outdoor plots where electrica l equipment is proposed to be erected. The rooms and plots must accommodate the equipment as well as having wor space for operators and maintenance personnel. The Bidder shall in his bid present arrangement drawings showing how he intends to adapt the equipment to the space available. If the space is not sufficient th e Bidder shall indicate necessary enlargements. Failing to do so the Bidder must bear the cost of later modifications of the facilities. 1.5 Documentation and Drawings 1.5.1 General Contractor's obligations with regard to preparation and submission of drawings, calculations, samples, patterns, models, etc. are stated in the Conditions of Co ntract. The Contractor shall prepare and submit to the Project Manager for approval dime nsioned general and detailed design drawings and other pertinent information of all the Plant and equipment specified in the Bid Documents. Unless otherwise agr eed the information shall be exchanged on paper. Approval of drawings shall not relieve the Contractor of his obligations to supp ly the Plant in accordance with the Specifications. The Contractor is responsibl e for any errors that may appear in the approved documents. He shall as soon as an error has been detected, deliver the corrected documents to the Project Manag er for re-approval. If the plant is to be connected to existing equipment the connection shall be do cumented in a coherent and overlapping way at least containing terminal identifi cation in old equipment. Schematic diagrams shall contain complete loops within new and old equipment. All text on documents provided by the Contractor shall be in the English languag e in addition, if necessary, to that of the country of origin. All drawings shal l be dimensioned in millimetres. The Contractor shall, during the total project time, maintain a List of Document ation to be updated by him whenever needed. The List of Documentation shall incl ude the date of original issue of each document submitted as well as the dates o f every revision. The List of Documentation shall also include a time schedule f or the submittal of the documentation. Symbols used for electrical equipment shall be in accordance with IEC 60617. The Contractor shall establish a coherent system for physical and functional refere nce designation in accordance with IEC61346. A similar systematic scheme shall b e defined for cable numeration. These schemes shall be used throughout on the dr awings and documentation and the designation shall be labelled on the components and cables. In addition to what is stated in Conditions of Contract, the following shall app ly: A1 A3 The sizes of all documents and drawings shall conform to the ISO standard, i.e.: 594mm x 841mm A2 420mm x 594mm 297mm x 420mm A4 210mm x 297mm

Sizes larger than A1 shall be avoided. The schematic diagrams and, apparatus and cable lists shall be of size of A4 except for one original and possible transpa rency copies of schematic diagrams that shall be in A3. Scales to be used on the drawings shall be 1:10, 1:20, 1:40, 1:50 and multiples of this series. All drawings made special for this project including civil wor s drawings, mecha nical drawings, layout drawings and circuit diagrams shall be compiled on a comp uter aided drawing system and as part of the as built documentation be handed ov er on a CD with a format readable in AutoCAD version 14 or another format to be agreed upon in addition to the paper copies. All drawings shall be bound in hard covers. 1.5.2 Bid Drawings The Employers drawings attached to the Bid Documents are of informative character . These drawings are intended to illustrate the basic requirements to be satisfi ed. It is the responsibility of the Contractor to prepare a detailed layout show ing the manner in which the various items of equipment offered can be accommodat ed to best advantage within the available area. The Contractor is at liberty to offer arrangements based on significantly differ ent principles where it is considered that these offer economic or technical adv antages. It is emphasised, however, that the main Bid should comply with the pri nciples shown in the enclosed drawings, other arrangements being submitted solel y as alternatives to the main offer. Significant changes in the layouts caused by the Employer may warrant price adju stments. However, no adjustments will be applied for minor changes due to incorp oration of the Contractor's equipment. The Bidder shall in his Bid enclose overall drawings showing dimensions, main wo r ing principles, internal components and fixing methods to a detail level allow ing the Employer to evaluate the functionality and completeness of the plant and equipment. The following specific drawings shall be enclosed with the Bid: Single Line Diagram for each pant Layout proposals for each plant Proposal for arrangement of the apparatus and machinery Topological drawings of the Control System 1.5.3 Progress Plans The Progress Plans shall at least contain the following milestones: Essential information delivered from Employer Documentation for approval from Contractor to Employer Release of factory documentation Factory Tests Shipment Site ready for erection Start erection Ready for pre-commissioning Ready for commissioning Test run Ta ing over Submittal of final documentation 1.5.4 Exchange of Interface Information The Contractors shall in due time supply interface information to other sub-cont ractors where needed. The Contractor is in particular required to chec that all foundations and fixations of his equipment is sufficiently dimensioned to meet the forces acting upon it. If the Contractor feels that he lac s such informatio n from other contractors he is obliged to request such from the Project Manager.

The Contractor cannot claim liability exemption for his own contractual respons ibilities because of actions performed or omitted by other sub-contractors. 1.5.5 Final Documentation The Contractor shall supply final as built documentation ta ing into account all c hanges done under erection and commissioning. The Contractor shall also deliver manuals for operation and maintenance. These s hall at least contain the following information: Detailed description of the equipment, the individual components, relevant clear ances, tolerances, allowable temperatures, settings etc. Descriptions of main principles including flow diagrams, single line diagrams, c ircuit diagram, connection diagram, cable schedules, software documentation etc. Operational instruction. These shall illustrate the operational sequences in a c lear and concise way. Test and adjustment procedures containing instruction for test and adjustment of the equipment under operation, after inspection and maintenance Test reports Spare part lists Maintenance instructions split into: o Manuals for preventive maintenance indicating periodic inspections, clea ning, lubrication and other routine maintenance. o Repair manuals describing fault location, dismantling, re-assembly etc. The documentation shall leave the operators and maintenance personnel in positio n to operate the plant in a safe and optimal way and to perform repairs usual to be done by such personnel. The Project Manager shall approve the manuals before final submission. 1.6 Contractor's Quality Assurance Procedures The Contractor shall have established a quality assurance system based on ISO 90 01 also covering sub-contractors. The Bidder shall include in the Bid a document ation of the system with a list of current procedures, an organisation chart of the quality organisation and the name of the quality manager. He shall also subm it a list of quality revisions performed in the last twelve months with a list o f closed and unclosed findings as well as planned revisions during the coming tw elve months as well as a list of findings. The documentation shall give special emphasises on how subcontracts are included in the quality assurance system. The Employer shall be entitled to perform quality revision at the Contractor or any subcontractor with two wee s notice. 1.7 Guarantees and Particulars The Wor s shall comply with the technical guarantee data stated in the Bid. The Contractor shall be responsible for any discrepancies, errors and omissions in t he particulars and guarantees. 1.8 Manufacturing and Shipment 1.8.1 Places of Manufacture and Sub-Contractors All equipment offered should be the product of recognised and experienced manufa cturers and shall be of basic design and size similar to such that has been in s uccessful continuous operation for at least three years preferably under similar climatic conditions. Proven plant reliability and high availability are of prim e importance and the attention of the Bidder is drawn to these particular requir ements. The manufacturer's identity and places of manufacture, testing and inspection be fore shipment for the various portions of the Contract Wor s shall be specified in the Technical Schedules and shall not be departed from without the agreement of the Project Manager. As soon as practicable after entering into the Contract, the Contractor shall, h

aving obtained the Project Manager's consent in accordance with the Conditions o f Contract, enter into the Sub-contracts he considers necessary for the satisfac tory completion of the Contract Wor s. All Sub-contractors and Sub-suppliers of components and materials shall be subje ct to the approval of the Project Manager. Information shall be given on each Su b-order sufficient to identify the material or equipment to which the sub-order relates, stating that the material is subject to inspection by the Project Manag er before despatch. If the Employer at any stage in the design and production period finds out that the sub contractor do not fulfil the requirements in the specifications and it i s obvious that the required quality cannot be achieved by corrective measure he can request the subcontract to be suspended and the wor s to be produced elsewhe re without extra cost for the Employer. 1.8.2 Inspection and Testing The Contractor shall submit for approval a programme of quality control and insp ection procedures to assure that the product during manufacture and on completio n comply with the specified requirements. The programme shall relate the quality control and inspection activities to the production cycle. The Contractor shall provide details of quality control and inspection procedures used. The Contract or shall retain responsibility for quality control and inspection activities mad e by his sub-contractors and shall indicate on the programme, which items are to be sub-contracted and how they are to be inspected and tested both at subcontra ctors wor s and by Contractors acceptance control. All materials used in the Contract Wor s are subject to inspection by the Projec t Manager and it is the Contractor's responsibility to advise the Project Manage r when equipment and materials are available for inspection, at least one month in advance. Factory tests on equipment shall be made according to the applicable IEC Standards, or as specifically specified or according to standards approved by the Project Manager. Routine tests shall be made on each unit of all equipmen t. Type tests shall be made on one unit of each type of different equipment. Instea d of carrying out the type tests the Contractor may submit certificates from acc redited body of tests made on equipment of the same type; however, the Purchaser reserves the right of accepting these certificates or to reject them partially or totally. On complex systems the Bidder shall propose factory acceptance tests (FAT) to be performed. The Project Manager shall be at liberty to demand any additional testing at the manufacturer's wor s, at site or elsewhere in order to verify that the equipment complies with the conditions of the Specifications. A test programme shall be submitted to the Project Manager for approval at least one month ahead of the commencement of testing. The program shall include tests to be performed at sub contractors wor s. Measuring apparatus shall be approved by the Project Manager and if required sha ll be calibrated at the expense of the Contractor at an approved laboratory. 1.8.3 Pac ing, Transportation and Storage The Supplier shall provide such pac ing of the Goods as is required to prevent t heir damage or deterioration during transit and temporary storage up to their fi nal destination as indicated in the Contract. The pac ing shall be sufficient to withstand, without limitation, rough handling and exposure to extreme temperatu

res, salt and precipitation. Pac ing case size and weights shall ta e into consi deration, where appropriate, the remoteness of the Goods' final destination and the absence of heavy handling facilities at all points in transit. Indoor electr ical equipment must be enclosed in welded polythene envelopes inside pac ing cas es and the envelopes shall be evacuated or have a desiccant inside. The following information must be clearly stencilled or printed on each pac ing case, crate, cas , drum, bundle or loose piece, care being ta en that the number and other particulars on each pac age agree with those entered in the pac ing l ist accompanying the Invoice: Employer's Identity Supplier's Identity Destination Contract No. Pac age No. Item Code Weight, dimensions Sub-Project (Plant Identity).

The mar ing shall be durable. The mar ing shall be upon the body of the pac age. Mar ing upon a batten fastened on the case, etc. shall not be used. In the case of bags, bundles and loose pieces, the shapes of which do not permit the mar s to be put on the actual pac age, each bag, bundle or loose piece shal l have two metal labels each with two holes. Securely fastened by independent wi res. Each label shall be die-stamped with the above particulars. Goods belonging to different plants shall not be mixed, but ept in separate pac ing cases, bundles or similar.

The Contractor shall be responsible for all transportation; from wor s to port o f shipment and onwards to port of unloading, as well as all handling and transpo rt to sites and handling on site. 1.9 Erection, Installation and Commissioning 1.9.1 Storage at Site The Contractor shall be responsible for proper storage of equipment when deliver ed at the different sites until ta ing over. Care shall be ta en to assure adequ ate storage to avoid damage to equipment due to rain or strong sunshine. The res ponsibility also covers security measures against theft and vandalism. 1.9.2 Wor on Live Substations If wor is to be done on substations in operation the following factors are of p aramount importance: (i) Minimisation of outage time and (ii) adaptation to oper ational constraints. All wor must be planned with this in mind. The Contractor must obey to all instructions and safety rules given by the Government and the E mployer and must strictly follow all instructions from the Employers supervisory personnel. The Contractor shall appoint his Project Manager/Technician who will be authorised to receive wor permits at the wor sites as required by safety ru les. All outages shall be discussed with the Employer and the Project Manager at least one wee before the outage is required. The Contractor will normally only be allowed to have only one high voltage circuit out of operation at a time. No wor must start before Employers site manager has authorised the wor , establish ed the required earthing and mar ed the safe area. All switching on live parts s hall be done by the Employer. In the rare cases where more than one circuit have to be ta en out of operation the Contractor must be prepared to do the wor dur ing nights or at off-pea time. The Contractor and his personnel must respect th e physical constraints as well as constraints for scheduling set by these circum stances. However, the Employer will co-operate in ma ing the wor conditions and

the scheduling as efficient as possible for the Contractor and eep a responsib le person with switching authority at site during all wor ing hours (including n ight time). If physical constraints ma e it necessary to replace cabinets needed for operati on, the Contractor must as far as possible erect and connect the new cabinets te mporarily adjacent to the one in operation. A quic disconnection and removal of the old cabinets can then be performed and the new cabinets pulled in with most of its cables already fitted. Location of new cabinets shall be approved by the Project Manager and a proposal for such shall be given by the Contractor one mo nth prior to erection. 1.9.3 Erection. The Contractor shall carry out erection, testing at site and commissioning of th e Plants specified in the Specifications. All wor , methods of wor and wor mans hip, whether fully specified herein or not, shall be of the highest order in all respects, the generally accepted requirements and commonly recognised good prac tice for first-class wor of the nature are to be adhered to. The Contractor shall provide all staff, such as engineers, supervisory staff, s illed and uns illed labour necessary to carry out and complete the Contract Wor s on schedule as specified. Information regarding site staff shall be shown in t he relevant Schedule. The Contractor shall provide all vehicles, erection, tools and equipment necessa ry to carry out the Contract Wor s, including personnel transport. At the comple tion of the Contract, the Employer reserves the right, at his discretion, to ta e over vehicles, any tools, special tools, test equipment and other construction equipment used by the Contractor in connection with the Contract, at depreciate d prices to be mutually agreed upon at that time. 1.9.4 Testing and commissioning Testing at site shall be carried out by experienced testing engineers approved b y the project manager. Functional tests shall be inherent in all test procedures . The Contractor shall record the test results in an approved test form in such a manner that the test reports can be used as the basis for future maintenance t ests. Test methods and equipment shall be noted on the test sheets. The test pro tocols shall be submitted to the project manager in advance for approval A complete test report in 4 sets shall be handed over to the Project Manager not later than one month after the Plant being commissioned. The test engineers sha ll at site eep a complete record of correction made during testing and one set of corrected drawings shall be ept at site after commissioning and one set hand ed over to the Project Manager. Commissioning shall be carried out by the Contractor in the presence of the Empl oyer's engineers and the Project Manager. Once the pre-commissioning tests are complete, the testing engineer shall submit all the preliminary tests reports for review prior to the energising of the equ ipment. The tests shall be accompanied with a complete procedure for energising and loading of the equipment. The procedure shall include; a detailed commission ing schedule showing the sequence to follow step by step in all connections, inc luding control of phase sequence and other pertinent factors. Switching of energ ized components will be performed by the Employer. 1.10 On the Job Training The Employer shall be allowed to ta e part in erection, pre-commissioning and co mmissioning thus ta ing part in a transfer of nowledge scheme. Before the erect

ion starts, the Contractor shall arrange a one-day course in understanding of th e Contractors documentation and reference system. The contractor shall also demonstrate to the operators all the operations of the substation before the tests run of the station. 1.11 Tools The Supplier shall supply in loc able boxes, for the Employers use, any special t ools that may be required for assembly, dismantling adjustments and maintenance of the equipment. The tools shall be unused and in new condition at the time of handover. Suitable special spanners shall be provided for bolts and nuts, which are not properly accessible by means of an ordinary spanner. 1.12 Spare Parts Spare parts supplied under the contract shall be pac ed and preserved for long t ime storage.

2 GENERAL TECHNICAL SPECIFICATION 2.1 Standards Ratings, characteristics, tests and test procedures, etc. for the electrical equ ipment encompassed by this Specification shall comply with the provisions and re quirements of the standards of the International Electro-technical Commission (I EC), unless otherwise expressly stated in Particular Technical Specifications. W here the IEC standards do not fully cover all provisions and requirements for th e design, construction, testing, etc. and for equipment and components that are

not covered by IEC Recommendations recognised national standards shall be applie d. The rules of CEE (International Commission for the approval of electrical equ ipment) and the standards of CENELEC (Comit Europeen de Normalisation Elecrotechn ique) may also be applied in such cases. The latest revision or edition in effect at the time of Bid Invitation shall app ly. Where references are given to numbers in the old numbering scheme from IEC i t shall be ta en as to be the equivalent number in the new five-digit number sch eme. The Bidder shall specifically state the Precise Standard, complete with ide ntification number, to which the various equipment and materials are manufacture d. The Bid Documents do not contain a full list of standards to be used, as they only are referred to where useful for clarification of the text. 2.2 Units The SI-system (meter, Newton, second) shall be used throughout the wor s covered by this Specification. 2.3 Auxiliary Power Interruptions The Contractor shall ensure that the plants as a whole will function without int erruptions if auxiliary AC power disappears. The plant shall be shut safely down by long interruptions in AC supply or by faults in the DC supply. 2.4 Selectivity The contractor is responsible for selectivity in the auxiliary AC and DC power c ircuits and shall present calculations proving the selectivity between main and sub distributions under maximum and minimum short-circuit levels. 2.5 Design and Materials 2.5.1 General Design and calculations shall be governed by the design criteria given in the Bi d Documents, standards and normal design practice. Necessary safety factors shal l be included. The supplier shall assure himself that the apparatus is suitable for intended use and the environment and stresses to which it will be exposed. H e must also assure that the equipment is compatible with equipment it shall be c onnected to, or wor together with. The design shall be reliable and simple. The design shall incorporate every reas onable precaution and provision for the safety of the general public as well as for all those engaged in the operation and maintenance of the equipment itself o r equipment connected to or installed in close proximity to it. All apparatus shall be designed to ensure reliable and safe operation under the atmospheric conditions prevailing at the Site and under such sudden variations o f load and voltage as may be met with under wor ing conditions of the system. Th e plant shall withstand without permanent wea ening or deformation from short ci rcuit current within the rating of the apparatus (including those due to faulty synchronising) as well as normal atmospheric over voltages ta ing into account t he use of lightning arresters. Special considerations shall be given to pressure rises by short circuits and fi re ris . All material and equipment shall be designed and arranged so that over pressure will be relieved in a safe direction and so that fire ris is minimised and consequences of a fire reduced. The indoor 11 V switchboard shall be design ed with a duct on top of the board for pressure release. All plastic material us ed in boxes, panels and boards shall be halogen free and self-extinguishable. The contract supplies shall be designed to facilitate inspection, cleaning and r epairs and for operation, in which continuity of service is the first considerat ion.

All conductors and current carrying parts must be dimensioned with ample cross s ections so that temperatures are ept within limits in operation and under short circuits. Temperature rises on all equipment shall be ept within limits set in IEC standards provided nothing else is specified. For all current carrying part s the permissible short circuit duration shall be at least 1 second. All electri cal connections shall be secured by bolts or set screws of ample size, fitted wi th loc nuts or loc washers of approved types. The equipment shall as far as possible be factory mounted with internal cables a nd internal equipment installed before shipment. Plug-in components can be shipp ed separately. Equipment for use outdoors or in wet or damp rooms shall be constructed so that water runs off. It shall also have devices draining any inside condensation that may form. Axial bearings on such equipment must be equipped with durable sealin g preventing water to ingress. 2.5.2 Electrical Equipment Materials All materials supplied under this Contract shall be new and of the best quality and of the class most suitable for wor ing under the conditions specified. They shall withstand the variations of temperature and atmospheric conditions arising under wor ing conditions (including start and stop) without distortion deterior ation or undue stresses in any parts and also without affecting the suitability of the various parts of the Wor s for which they were designed. The Plant shall be designed for a lifetime of 40 years. Equipment with a shorter life cycle shal l be identified and so arranged that they are easy to replace. No welding, filling or plugging of defective parts will be permitted without the sanction in writing of the Project Manager. Materials that are susceptible to mould growth under tropical conditions shall b e treated to exclude moisture and prevent growth of mould after all machining ha s been carried out. Copper and aluminium used as electrical conductors shall be of the electrolytic type and comply with the respective ASTM or DIN Standards. Cast iron shall not be used for chambers of oil-filled apparatus or for any part of the equipment that is in tension or subject to impact stresses. Exception is made where it can be shown that service experience has been satisfactory with t he grade of cast iron and the duty proposed. 2.5.3 Bolts, Studs, Nuts, Screws, Washers, etc All bolts, studs, nuts, etc., shall have a standard metric threading and conform to the relevant standards as regards shape and tolerance. They shall be of Stre ngth Class 8.8 and mar ed accordingly. All bolts, studs, nuts, washers, screws, etc., used outdoor or in wet or moist e nvironment shall be in stainless steel or hot dip galvanised. If hot-dip galvani sed bolts and nuts are used, special considerations shall be ta en related to pr e-stressing. Bolts, nuts, studs and screws that require frequent tightening and unbolting during inspection or maintenance procedures, shall be of stainless ste el. All bolts and nuts shall be hexagonal, either normally or of the round head soc et type and secured in an approved manner against becoming loose during operatio n. The Contractor shall supply the net quantities plus 5% of all permanent bolts, s crews and other similar items and materials required for installation of the wor

s at the site. Any such rivets, bolts, screws, etc., which are surplus after th e installation of the equipment has been completed shall become spare parts and shall be wrapped, mar ed and handed over to the Employer. Taper pins shall have threaded stems with nuts where dismantling of the pins is li ely to be required. Bolts shall not protrude more than 10 mm beyond the nut but not less than two fu ll threads. 2.5.4 Surface Treatment and Painting, Electrical Equipment Panel boards, cubicles, cabinets, etc. in dry rooms shall have interior surfaces painted with at least one priming and one finishing coat of anti corrosion pain t. Exterior surfaces shall be adequately treated to be substantially corrosion r esistant, with one priming coat, and two finishing coats. Outdoor installations and indoor installations in wet and damp rooms shall at le ast have one priming coat and two layers of paint on zinc powder basis applied a fter perfect cleaning. Structural supports outdoor and in wet or moist rooms and parts that cannot be r eadily painted, shall be hot-dip galvanised. All galvanising shall be in accorda nce with BS 729 or other internationally approved standards. Steel below ground shall in addition to galvanising be protected with Bitumen or a substance of sim ilar quality. The particulars of priming and finishing paintings shall be stated in the Bid, w ith specifications of paint, together with a listing of colours available, for e ach of the plant and equipment. The Employer is not bound to accept the finishing colour proposed by the Bidder. Determination of colour shall be at the option of the Employer and shall be fin alised at the time of approval of drawings. 2.5.5 Insulating Oil All electrical equipment requiring insulating oil or other insulating liquids sh all be furnished with the first filling including flushing, if required. An exce ss of 10% of the net amount of oil or liquid required for each component shall a lso be furnished by the Contractor as spare. The Contractor shall endeavour to employ, as far as practicable, one type and ma e of insulating oil only for all the electrical equipment.

2.5.6 Sulphur hexafluoride gas (SF6) The SF6 gas shall comply with the requirements of IEC 60376. In addition to the quantity of gas required to fill the equipment supplied, 20% shall be supplied a s spare. The high-pressure cylinders for shipment and storage of the SF6 gas with the applicable national regulations. All the necessary pipes, lexible tubes and valves for coupling to the switchgear for filling g all the gases to be used, with all necessary instructions for the his equipment, shall be provided. shall comply couplings, f or evacuatin storage of t

2.5.7 Loc ing Devices and Padloc s Facilities for applying safety or security padloc s to circuit brea er operating mechanisms, disconnector and switch operating handles, control switches, contro l cubicles, outdoor cabinets etc. shall be provided for all equipment accessible by unauthorised personnel. The facilities shall be suitable for padloc s having a hasp diameter of 10 mm. Padloc s are not required.

2.5.8 Nameplates and signs Mar ing shall be in corrosion resistant material with permanent lettering. All e quipment shall be mar ed in accordance with standards and local practice. The Co ntractor must mar all components in a clear and unambiguous way so that it can be related to the documentation. All operating mechanisms as pushbuttons, switch es and handles must be mar ed in a precise way and necessary warning signs must be supplied. All outdoor nameplates and signs shall be made of non-corrosive weatherproof mat erial as trafolyte aluminium or stainless steel. Letters shall be white and engraved on blac bac ground. For aluminium and steel signs blac letters on metallic bac ground shall be used. For warning signs red bac ground shall be used. 2.5.9 Tool Rac in the switchgear Room A tool rac shall be installed in the switchgear room for all the, handles and t ools required for operation of the switchgear including panel/marshalling boxes eys. The rac shall be easily accessible to operators and not cause obstruction to operations. 2.6 Equipment 2.6.1 Standardisation The Contractor shall be responsible for the standardisation of all small mechani cal and electrical equipment, materials and devices for the Wor s. He shall arra nge and perform the necessary co-ordination wor with his subcontractors for the purpose of such standardisation. Such equipment, devices, fittings, etc. shall comprise, but not necessarily be restricted to, the following: Programmable controllers, control devices and control switches Electrical instruments and meters Terminals and terminal bloc s Primary, secondary and auxiliary relaying devices Contactors, fuses, miniature brea ers and the li e. Lamps, bulbs, soc ets, plugs, etc. Lubricants Oil Where electrical soc ets are installed for lamps, hand tools, measuring equipmen t etc., local standard soc ets with earth connection shall be used for 16 A sing le phase soc ets (lower rating shall not be used). Other soc ets shall be accord ing IEC 60309 (CEE type). The Contractor shall endeavour to use components avail able in the local mar ed. 2.6.2 Degree of Protection Enclosures for electrical equipment shall have the following degree of protectio n (ref IEC 60034, IEC 60059, IEC 60529 and IEC 60947): Motors/Motor Terminal boxes IP 54/IP 65 Dry Transformers IP 2x Limit switches IP 65 Indoor switches IP 5x Outdoor switches IP 54 Medium voltage enclosed switchgear IP 42 (IP 20 with front door open) Low voltage switchgear and control cabinets: Indoor IP 3x Outdoor IP 54 With open door IP 20 Junction boxes IP 65

Light fittings Outdoor and wet areas Indoor

IP 4x IP 2x

2.6.3 Indicators and Instruments All status and position indication lamps shall be of the light emitting diode ty pe and be replaceable without use of soldering or special tools. In unmanned operation a switch shall be arranged for turning off the indication lights for the substation. A switch for lamp test shall be arranged. All indication contacts shall be galvanic isolated and potential free. Temperature indicators shall be of the PT 100 type protected to suit the environ ment where it is to be used. Pressure indicators shall be of corrosion proof material, IP 54, vibration class 1. The scale shall indicate bar or equivalent m water column. The diameter shal l be 160 mm and the measuring pipe shall be equipped with stop choc . If the ind icator is exposed to vibration it shall be filled with damping liquid (glycerine ). Limit switches for pressure, temperature and flow (even if combined with the ind icators) shall be of class 1 without noticeable hysteresis. Where more than one limit is required each limit shall be independently settable. Set points shall b e easily readable. Flow meters shall be graded in litres/s from zero to well above required value. Flow meters for water shall be electronic without moving mechanical parts. Panel instrument shall be accuracy class 1.5 or better, dimensions 96x96 mm with non-reflective glass. Measuring converters shall be of accuracy class 0.5 with 4-20 mA output, DC auxiliary voltage and galvanic isolated potential free output . All semaphores shall be of LED type. 2.6.4 Fuses and Miniature Circuit Brea ers Miniature circuit brea ers shall replace fuses in control and power circuits 63 amps and below. They shall be approved as circuit brea ers and have a brea ing c apacity sufficient to brea the short circuit at the place of use (i.e. no upstr eam bac up fuses for reduction of fault level shall be necessary). All circuit b rea ers used in DC circuits must be approved for the relevant DC voltage and cur rent. Where nothing else is specified, LV power fuses above 63 amps shall be of high r upturing capacity cartridge, type NH gl, according to DIN VDE 0636 and IEC 60269 . All fuse bases shall have a load switching capacity and a thermal rating equal to the rating of the largest fuse it can accommodate. Fuse replacement shall be possible without use of special tools and with IP 20 protection against live pa rts. 2.6.5 Relays and Contactors All resetting of relays and contactors must be possible without dismantling of a ny covers and without ris for electrical shoc . All contactors and relays used in DC circuits must be approved for the relevant DC voltage and current. Limit switches not mounted in enclosures shall be of the proximity type without need for separate power supply and equipped with light emitting diodes to indica te position.

2.6.6 Motors 2.6.6.1 General As far as possible and if nothing else is specified, motors shall be three phase squirrel cage motors complying with IEC 60034 and with dimensions according to IEC 60072. Such motors shall have the following data: Continuous rating 130 % of mechanical load Frequency band for continuous rated operation without exceeding temperature clas s 47 57 Hz Voltage band for continuous rated operation without exceeding temperature class -15 % - +10 % Maximum start current with direct start Motors above 75 W 5 x In Motors between 35 and 75 W 6x in Insulation class F Temperature rise B Direct starting range 75 110 % of Un Motors shall have sealed ball or roller bearings. If the bearing is not sealed f or life it shall withstand two years of operation before refill of lubricants. Outdoor motors and motors erected in moist environment shall be equipped with st ill-stand heaters controlled from the starter. The heater shall be so dimensione d that maximum temperature is not reached even if the heater remains connected u nder operation. Motors shall withstand three consequent starts without overheating. Motors over 20 W shall be equipped with thermistor based temperature protection. The three line connections of A.C. motors shall be brought out to a terminal box sealed from the motor. The terminal arrangement shall be suitable for the recep tion of aluminium and copper cable. A permanently attached diagram or instructio n sheet shall be provided giving the connections for the required direction of r otation. If only one direction of rotation is permitted, this shall be clearly m ar ed. Motors to be connected to variable speed drives shall be special adapted to this . 2.6.6.2 Special Motors Other types of motors shall only be used where squirrel cage motors are inconven ient to use (and then only after approval by the project manager) or if DC motor s are specified. Such motors shall as far as possible follow the requirements se t above. Brushes shall be designed with a constant brush pressure and shall withstand at least 5 000 hours of operation before they have to be replaced. It shall always be at least two brushes in parallel and the brush-holders shall not touch the co mmutators when the brushes wear out. The press fingers shall not carry the curre nt and each brush shall be separately adjustable. Where single phase motors are used the motors shall be grouped so as to form, ap proximately, a balanced three phase load. 2.6.7 Motor control gear Control gear shall comply with the requirements of IEC 60947, the control gear b eing rated according to the duty imposed by the particular application. No repla cement of equipment shall be necessary after short circuit (ref. IEC 60947) Motor contactors shall comply with IEC 60947 class of intermittent duty 0 3 and

utilisation category AC4. The contactors, and their associated apparatus shall b e capable of switching the stalled current, and shall have a continuous current rating of at least 50% greater than the full load current of the motors they con trol. The operating currents of overload trips fitted to motor contactors shall be sub stantially independent of ambient temperature conditions, including the effect o f direct sunlight on the enclosure in which the contactors are installed. Where small motors are connected in groups, the group protection shall be arrang ed so that it will operate satisfactorily in the event of a fault occurring on a single motor. Each motor or group of motors shall be provided with control gear for starting a nd stopping by hand and automatically. Overload and single-phasing protection sh all be provided. Facilities for padloc ing the supply in off position shall be p rovided. 2.6.8 Computer Based Controllers Computer Based Controllers inclusive Programmable Logical Controllers (PLC) can be used for individual control functions. Such equipment shall be designed for i ndustrial environment and application in high voltage plants. The control equipm ent must be fed from the general station DC supply. The control equipment must be equipped with internal watchdog function giving exte rnal potential free alarm by internal fault. The operational status shall be fro zen by fault or un-normal function so it can be re-established after restart. Th e process must be shut down to a safe stage if fatale faults occur in the contro ller. Analogue and digital in- and out puts must be galvanic isolated and potential fr ee and must, together with the enclosure, screen against disturbance from electr omagnetic field occurring by short-circuit, switching over voltages or lightning discharges. The control equipment shall be tested according IEC 60255 and fulfi l relevant EMC requirements for Industrial Environment. Digital in- and outputs shall be tested and approved for switching of DC voltage s supplied by the main plant battery (AC values are irrelevant). Programmes shall be stored in flash ram or similar storage medium and shall not be destroyed or changed by power failure (i.e. Separate bac up battery shall not b e used). The memory shall contain the last program version. All programming of control sequences shall be documented in a self-explanatory w ay not requiring special program nowledge for understanding (function bloc pro gramming or similar) Communication between various controllers (and the main control system) can be o ver fibre optical cable provided agreement between the contractors. Such communi cation must use open protocols to be approved by the Project Manager. The Bidder shall in any case present a verification of transmission quality. The Controllers shall be delivered with software and software licences needed fo r testing, setting ad reconfiguration. If hardware other than laptop is required for this such shall be included in the supply. 2.7 Construction and Erection

2.7.1 Switchboards, Panels and Cabinets Switchboards, control, panel boards and cabinets shall be of robust construction

, formed of a steel frame and covered with smooth steel plate (outdoor cabinets can be of aluminium). The steel plate shall be properly stiffened to prevent dis tortion. Panels shall normally be covered at their rear with hinged doors. The f rames of the boards shall be designed to permit firm anchoring on the floor. The frames shall permit easy erection, and allowance shall be made for extension of the board by similar additional panels. Panes for power circuits shall be in ac cordance IEC 6034 (minimum partly type tested apparatus (PTTA)). All enclosures shall be ventilated so that the temperature inside the enclosure do not raise mo re than 5 C above ambient even with possible heaters connected. Outdoor-cabinets and cabinets for moist environments shall be provided with ther mostat-controlled heaters to inhibit collection of moisture. The heater must be arranged not to overheat any cables or equipment. Openings for drainage of conde nse shall be provided at the lowest point in the cabinets. All major or important compartments containing electrical equipment shall be pro vided with a single phase 16 A soc et and internal lighting facilities switched off by a door switch. Unless otherwise specified or agreed upon, all instruments, apparatus and device s on the panel fronts shall be provided for flush mounting. Flush mounted relays shall be provided with transparent cover. The cover shall be hinged to allow re setting and adjustment. All terminals and all equipment shall be accessible with out dismantling other components. Equipment shall not be mounted in swing out do ors. However, proper swing out frames may be used provided they can be opened wi ll full load without twisting or distorting the panel. Windows shall be provided in front of rac mounted equipment. 2.7.2 Wiring and Terminal Bloc s within Enclosures All wiring shall be stranded copper conductor, PVC. Insulated, suitable for oper ation at voltages below 1000 V and in compliance with the provisions of the appl icable IEC Recommendations. Conductors shall not be smaller than 2.5 mm for curre nt transformer circuits and 1.5mm for all other control circuits. The selection o f conductor sizes for current transformer circuits shall be supported by calcula tions. For wiring within boards the "bunch" pattern shall be adopted. For a small numbe r of connections, wiring may be grouped using flexible plastic bands or equivale nt. For a large number of connections a system using support strips or U-shaped troughs (with covers) shall be used. Ample space shall be provided for running o f cable within the enclosures. The screens or screened pairs of multicore cables shall be earthed in accordance with a coherent earthing philosophy to be wor ed out by the main Contractor and approved by the Project Manager. The screen and earth wires shall be terminated in terminals dedicated for this use. All free conductors in connecting cables s hall be terminated in terminals that shall be temporarily connected to earth and special mar ed. Though, in field boxes the free conductors can be laid orderly and short-circuited or insulated. The length shall allow future connection. Multi-stranded conductor ends shall be fitted with a suitable crimped thimble (b ootlace ferrule type). The thimble shall be of correct type and length according to the core size and crimple tools shall be specially adapted to the thimble an d cross section used. Each wire shall be separately terminated unless otherwise approved. It shall be possible to wor on small wiring for maintenance or test purposes wi thout ma ing a switchboard dead. The wiring identification shall be by numbered ferrules, sleeves or other approv

ed means. All wiring shall terminate at terminal bloc s. The latter shall be of the moulde d type not less than IP20 and provided with barriers to separate power from cont rol cables. It shall be possible to replace a single terminal bloc without dism antling a whole row. They shall be clearly mar ed, the designations being those entered in the respective wiring diagrams. Terminal bloc s using screws acting d irectly on the wire (conductor) as well as spring type terminal bloc s are not a cceptable. To avoid squeezing of the wire the screw pressure shall be applied by a pressure plate having smooth edges. OBA terminal bloc s are not acceptable. Onl y terminal bloc s that are operated using screw drivers are acceptable. Terminal bloc s for current and voltage transformers shall be separated and spec ially mar ed. They shall be equipped with a sliding splice for separation and ban ana soc ets on both sides for testing. The splices shall be so arranger that they fall into closed position when loose. Where appropriate, other terminal bloc s shall be equipped with facilities for testing, such as short-circuiting, separat ing splices, plugs, etc. All such device shall be accessible even when paralleli ng strips are used. Only one conductor shall be connected to each side of a terminal bloc and the b ranch offs shall be made by interconnecting the necessary number of neighbouring bloc s by means of copper strips. Terminal bloc s shall be located at least 300mm from the bottom of the panel and shall be easily accessible. Terminal bloc s for different voltages shall not be mixed between one another. All conductors in a multi-core cable shall be termin ated on the same terminal bloc . The bloc s shall be grouped for each voltage an d they shall be clearly mar ed for easy identification of the system voltage. Th ere shall be at least 20 % spare terminals on each bloc . 2.7.3 Cable Laying and Routing The final routing of HV and LV cables in indoor and outdoor installations shall be determined by the Contractor from the directives given in Particular Specific ations, and the principles shown in the layouts on the drawings. All cable routi ng and arrangement shall be subject to the Project Manager's approval and must a dapt to obstacles as tubes and ventilation channels. All penetrations of fire zo ne separations shall have the same fire classification as the separation itself. Cables shall be laid on corrosion resistant (aluminium or hot dipped galvanised) cable trays and rac s and by raising cables fixed to cable ladders. The trays s hall be dimensioned and fixed so that it allows one man to climb on it in additi on to the cable load. Each tray shall have at least 15 % spare capacity. The dis tance between each tray shall at least be 300 mm. For exposed outdoor installati ons cables shall be laid in covered cable trenches, plastic or steel ducts, depe nding on the available space. Branch offs to individual equipment shall be fixed and supported all the way to the connection box. Cables and cable supports shall be properly fixed and secure d against movement under short-circuit and strain caused by erection wor . Parti cular attention shall be given to termination in confined areas where personnel may climb under erection and maintenance. Flexible tubes of spiral type shall not be used whereas tubes of plica type can. Low power cables, i.e. cables for control, metering, etc. shall not be run in cl ose parallel to high power cables or earth wires, but shall be run at the greate st possible separating distance. The minimum distances are: High and medium voltage versus control and measuring cables Low voltage power cables versus control and measuring cables 800 mm 400 mm

Necessary EMC consideration shall be ta en in accordance with EMC standards. Additionally, cables for extra low power, i.e. mA and mV circuits and cables con nected to low power solid state electronic circuits, shall be laid in separate s heet steel trays with covers. The DC trip and AC voltage supplies and wiring to main protective gear shall be segregated from those for bac -up protection to th e greatest extent possible. Single-phase power cables shall be run in trefoil configuration, single-phase DC power cables shall be run in parallel. Special care shall be ta en so that clos ed magnetic circuits do not form around single phase cables. Cables below 25 mm2 cross section shall be copper. Larger cross sections may be aluminium. Minimum cross sections shall be as follows: Measuring cables for current Control and other measuring cables Power cables 2.5 mm2 1.5 mm2 according 120 % max load current

All cross section must be chec ed against max load current, allowable burden on measuring transformers, short circuit values, voltage drop, protection requireme nts and selectivity. The cables shall be mar ed with item designation in both ends as well as by entr ances in enclosures. The cable mar ing shall be fire proof. Cables shall be laid in full runs and not spliced unless approved by Project Man ager. Termination of multi-stranded conductor ends shall be with a suitable crim ped thimble as specified above. All other cable lugs or similar shall be of crim ped type adapted to the cable type and cross-section used. The tools used should be special approved for the lugs and cable type used. The cable suppliers instructions regarding handling and bending radius shall be f ollowed. Fibre optic cables shall not contain metallic material and be so laid that they have proper mechanical protection. I.e. cables not constructed for embedding sha ll be laid in protective tubes.

2.7.4 Earthing (Grounding) An embedded earthing system shall be designed and supplied by the contractor. Th e embedded earthing system shall be arranged connected to exposed and accessible earthing bars. From here an exposed earthing system shall be arranged. The Cont ractor is responsible for installation and connecting of his equipment to this n etwor so that all precautions are ta en regarding safety (ref. National regulat ions) and shielding against disturbances. Cables shall be earthed and shielded i n accordance with earthing philosophy wor ed out by main switchgear contractors. For details of the earthing system refer to clause 5.1.1.9.1

3 PROJECT SPECIFIC DATA 3.1 Definitions Whenever the following terms or words are found in the specifications and/or oth er documents, they shall have the following meaning: "High Voltage Equipment" (HV): Mostly used for equipment provided for a maximum operating voltage higher than 5 2.5 V (generically also used for voltages down to 1000 V). "Medium Voltage Equipment" (MV): Equipment provided for a maximum operating voltage higher than 1000 V and up to 52.5 V. "Low Voltage Equipment" (LV): Equipment provided for operation at 1000 V or below. (For transformers the term Low Voltage Winding is used for the side with lowest rated voltage regardless va lue) AC means Alternating Current, DC means Direct Current, Where protection degree I P xx is mentioned it shall generally be according to IEC 60529 Degree of Protecti on Provided by Enclosure. 3.1.1 Design Data, High and Medium Voltage The rating and design criteria for the HV and MV plant and equipment shall be as follows: Item 1 2 3 SYSTEM VOLTAGE 66 V 33 V 11 V System 50 Hz, 3 phase Neutral point earthing Solid earthed Nominal voltage of networ s Parameters

66 V

33

11 V

4 Highest system voltage as defined by IEC-60038 72.5 V 36 V 12 V 5 Short circuit and earth fault current, symmetrical r.m.s. value (min bre a ing current) not less than 31.5 A 25 A 25 A 6 Thermal short-circuit current, 3 second not less than 31.5 A 25 A 25 A 7 Dynamic pea current (min ma ing current)not less than 80 A 63 A 63 A 8 Rated current of busbars and bus coupler if not given in Scope of Wor s, for each individual substation 1250 A 1250A 1250 A 9 Minimum rated current of isolating switches and circuit brea ers if not given in Scope of Wor s 800 A 800A 630 A 10 Insulation level according IEC 60071: 10a Switching surge withstand voltage Phase-to-earth N/A N/A N/A N/A Longitudinal impulse component of combined test N/A N/A N/A N/A 10b Lightning impulse withstand voltage (1.2/50 m/s Vpea ) 325 V 170 V 95 V 10c Test voltage at power frequency 1 min dry and wet. To earth and between phases 140 V 70 V 38 V 11 For the design and erection of the conductors in the switchyard the foll owing minimum distances shall be observed 11a Phase to earth [mm] 700 500 500 11b Phase to phase [mm] 790 435 250 11c Busbars phase to phase [mm] 1250 11e Height to live parts above ground [mm] 3500 2900 2900 11f Height to live parts above ground at transformer transport routes [mm] 5000 12g Lowest part of insulators above ground [mm] 2 500 12 Maximum temperature rise of conductors above ambient temperature (40 C) 40 C 13 Maximum wind pressure on conductors and cylindrical objects 400 N/m2 14 Maximum wind pressure on flat surfaces 820 N/m2 15 Minimum nominal creepage distance as defined in IEC 60815, Table II 25 mm/ V (inland area) 31 mm/ V (in coast and industrial area) Note 1) Ref IEC 60038) Note 2) For all current carrying parts the permissible short circuit duration shall be a t least 1 second. Indoor equipment shall be arch tested in accordance with IEC 6 0298 amendment 2. The dynamic or momentary short circuit current on which the eq uipment design shall be based shall be computed by multiplying the r.m.s. value of the symmetrical short circuit current by the factor 1.8 x . Note 3) Ref IEC 60071) All High and Medium Voltage equipment shall be designed for installation at 2200 m above sea level. IEC 60071 shall apply with the specified correction factor f or the altitude above sea level. 3.1.2 Design Data, Low Voltage Equipment Low voltage installation shall be in accordance with EMC directives. The rating and design criteria for low voltage equipment shall be as follows:

AC Voltage Nominal system voltage 415/240 V -15%, +10% (+ or 6%), TN - CS System frequency 50 Hz ( + or 2%) DC System 110 V, & (48V for communication) Power frequency Test Voltage 1 min 2.5 V Thermal rating of conductors 120 % of load Max short-circuit Current 25 A AC LV equipment can, after the Project Managers approval, be rated for lower shor t-circuit current if calculation demonstrates that lower values are applicable a t the place of installation. DC equipment shall be adapted to the actual values at sites as shown in calculations. 3.1.3 Phase Relationship The phase relations and designations shall be in accordance with the existing sy stem of the Employer. The phase sequences will be made nown to the Contractor a t a later date, but not later than 1 month from date of commencement. The standa rd phase colours are Red, Yellow, Blue (RYB). 3.1.4 Colour Coding All wires must have ferrules at all terminations to distinguish each signal. In addition the wires shall have the following colours: Circuit Voltage transformers Current transformers A.C. Circuit D.C. Circuit Grounding circuit Colour of Wire Red Blac Yellow Blue Green with yellow stripe

(Following coloured ferrules shall be provided on each wire in order to identify phase and polarity. Phase and Polarity A.C. First phase Second phase Third phase Neutral Grounded Positive Negative Colour of ferrules Red Yellow Blue Blac Green with yellow stripe Red Blac

Auxiliary DC Supply

Ferruling system should be submitted to the Employer for approval before commenc ement of wor s. 3.1.5 Environment Unless otherwise specifically stated in Particular Technical Specifications or S cope of Wor s, any equipment, component and assembly shall be designed for the f ollowing service conditions: Parameter Max Ambient air temperature Outdoor +40C Indoor +40C 24 hour average Ambient temperature for Relative humidity

Min 1C 1C maximum +30C 1C cables in the ground 90%

+40 C

1C

Height above sea level 2200 m Below 1000m

Cooling water temperature N/A N/A EMC Class (IEC 61000) Industrial environments Seismic coefficient 0.15 Wind pressure on project area of conductors and cylindrical objects 430 N/m 383N/m2 Maximum wind pressure on steel members on 1.5 times projected area 820 N/m Rainfall conditions Average 800-1700 mm/year Maximum 160mm in 24 hrs Annual mean iso eraunic level Max 180 thunderstorm days Pollution (IEC 60815) Heavy :class II Wherever any of these maximum or 24 hour average temperatures exceed the normal service condition temperatures of the IEC Recommendations for the relevant equip ment, or of such other standard which is approved to be applied, the permissible temperature rises of the IEC Recommendations or the standard shall be reduced b y the same amount as the difference between the above figures and the normal ser vice condition temperatures. The Contractor shall guarantee these reduced temper ature rises. All air cooled equipment shall be cooled with convection (i.e. without fans) pro vided other cooling methods are not explicitly allowed for in the specifications . 3.1.6 Noise The equipment shall as far as possible not generate undue vibrations or botherso me noise. Provided nothing else is specified the following requirements shall no t be exceeded: Machine hall, wor shop etc. (one meter from the machine) max 85 dB(A) Office, control room, day room etc. max 55 dB(A) Emergency diesel generator (7 meter from engine room) max 85 dB(A) 3.1.7 Auxiliary Power 3.1.8 Electric Service during Construction Metered electric supply at 415/240V, 3 phase, 50 Hz TN-S will be available at th e substation sites. All tools and equipment supplied by the Contractor shall be suitable for this supply system. The Employer, while endeavouring at all times t o maintain the supply, can accept no responsibility for the consequences that ma y arise from the failure or cessation of the electric supply. 3.1.8.1 Power Supply On HV substations the power for the auxiliary service is in general supplied fro m the station transformers connected to the tertiary windings of the transformer s whereas on MV substations the. Power is supplied from station transformers con nected to the MV busbars. The system is shown in detail on the single-line diagr ams enclosed in the drawing section and further specified in Scope of Wor . Less important MV substations may ta e the auxiliary voltage from the general surrou nding grid. Equipment needing uninterrupted supply shall be fed from permanently charged station batteries. If other voltage sources or voltage levels then give n below, are required they shall be included in the Bid. Such voltages shall not be brought out of the cabinet where they are used. All the substations shall have an automatic change over scheme for the two 415V power supply sources at the substations 3.1.8.2 AC Auxiliary Supply Components in the AC low voltage main distribution system shall have a voltage r ating of 415/240 volts, 50 Hz. The system shall be 3 phase, the transformer neut ral grounded (TN-CS) For lighting, small power soc et outlets, domestic appliances and other small po

wer, 230V shall be used. 16 A soc ets shall be of the British Standard type with square pins. 3.1.8.3 DC Auxiliary Supply The DC auxiliary supply shall be (unless otherwise stated in Scope of Wor s): For control, protection and alarm circuits All bulbs and any voltage sensitive relays shall be rated 125/52 V. 3.1.9 220 V AC Un-interrupted supply (UPS) DC/AC UPS shall supply dedicated computer and measuring equipment. The supply sh all be 230 V IT. 3.1.10 Operation and Control The operations, control procedures, monitoring and protective devices for the pl ants are described in Particular Technical Specifications. The Contractor shall ta e all measures and furnish all requirements necessary fo r effecting the intended method of operation and control. The station functional control shall be possible in a hierarchic structure as fo llows: Supervisory Control from a Supervisory Control and Data Acquisition (SCADA) Syst em. The old system is outdated and a new will be established where 66 V and bel ow will be connected to Regional Control Centres (RCCs) in Nairobi. All equipmen t and stations to be refurbished under this project shall be prepared for normal day-to-day operation from these centres. The RCCs are subordinated to the Natio nal Control Centre (NCC). The station HV and LV switchgear shall be controlled f rom RCC. Indications shall be available both in NCC and RCC. Local Control from the local relay and protection panels and from the instrument sections on MV switchboards. If these contains full mimic and display functions the remote control can be omitted in MV panels. Direct Control/Emergency Control from the apparatus itself. The stations shall function without interruptions even if connection to higher l evels fails. A local/remote switch shall be accommodated on each control positio n bloc ing remote operation but not indication. The position of this switch shal l be indicated in the higher levels of operation. The control shall include operation of all circuit brea ers and motorised discon nectors. Status indication shall be available in the supervisory system for all HV and MV brea ers in the system as well as busbar voltages, line and transforme r load in A (plus MW and MVAr). For on-load tap changers position indication and raising/lowering of the tap changer position shall be possible supervisory and remotely. MV transformers may be equipped with automatic voltage control functio ns and manual override shall then only be possible if the automatic function is bloc ed locally. Relay trips and other relevant alarms shall also be transferred . Direct control of all station switchgear at the respective switchyards/panels sh all be possible. Interloc ing devices and automatic change-over systems shall be incorporated in the control circuits in the quantity needed to guarantee non-interruption and co rrect sequence of operation of the equipment. Protective devices shall be suppli ed in accordance with the Particular Technical Specifications, and the particula r needs of such equipment furnished with the aim of ensuring a safe and reliable operation of the plants in the event of electrical and mechanical disturbances or in case of mal-operation by the plant personnel shall be ta en into considera tion.

110V-IT

The signals and command to be transmitted are given in Particular Technical Spec ifications All equipment, instruments and devices in the substation necessary for superviso ry, remote and local control as well as for protection, signalling and indicatio n shall be included in the Bid and hence the Contract, it being understood so th at the enumeration found in Scope of Wor s, in this respect is indicative but no t limiting. 3.1.11 Interface between Contractors and towards Employer For substations to be extended, all connections shall be made and all equipment and drawings be provided by the Contractor to ensure proper operation of the com plete plants, although this should not be specifically mentioned in the Scope of Wor s Section. The Employer will for such stations, supply to the Contractor wi thin one month from the date of commencement all documentation available for ada ptation to the existing plant. All equipment specified under the various lots within a plant. specified in the Particular Technical Specifications and Scope of Wor s shall constitute a comple te and functioning system together with equipments covered by any other lot even if this lot is contracted by separate contractor. The Contractor shall pay spec ial attention to the Power Transformers. All necessary equipment and connections required to form a complete wor ing plant and not mentioned under the Power tra nsformer shall be included in the switchgear contract whether or not specificall y mentioned in these Particular Technical Specifications. The Contractor shall supply and execute all cable connections between the contro l room and the transformer marshalling boxes and cabinets as well as supply all AC power for motors and DC voltage for control, indication and alarm purpose. Th e Contractor shall also provide all necessary connections to the control system from other sources li e voltage and current transformer terminals, etc. The Contractor shall connect the transformer to the grid and supply clamps for t he transformer bushing. He shall also design and construct the transformer found ations based on Transformer Contractor's specifications and drawings and supply and erect LV cables from auxiliary transformer terminals to the auxiliary voltag e board. For the substations to be refurbished or extended the Contractor shall provide a nd ma e drawings of the cable connections from actuators, sensors, transducers a nd relays to the Distributed Control Units as well as all materials required. He shall also document the adaptation to the existing plant with complete circuit diagrams, cable lists etc including proper cross references. The Contractor shall connect the switchgear to the line landing span erected by the Line Contractor

PARTICULAR TECHNICAL SPECIFICATIONS

4.1.1 Particular technical specifications SWITCHGEAR 4.1.1.1 General These Particular Technical Specifications covers the particular technical requir ements of the equipment to be procured under this contract. In order to give the necessary bac ground, equipment not needed in this specific tender may be included. The Scope of Wor will in such cases give the limitatio ns in the supply. The Plant and Equipment is detailed in the section Scope of Wor s. Where a Turn Key Delivery is requested this shall cover engineering, design, manufacture, tes ting before shipment and pac ing sea worthy or otherwise as required, delivery C IP site, unloading, storage, civil wor s, erection and commissioning. The Turn Key Stations shall furthermore cover a complete supply for substation i ncluding apparatus supports, cable rac s and conduits with associated fixing mat erial, insulators, conductors and clamps for busbars and apparatus connections, earthing systems, all cabling and connections, control an protection panels as w ell as any other equipment and materials not specifically mentioned or quantifie d, but which are required to ma e a complete and proper functioning substation. 4.1.1.2 Design Data Provided no special data are given below, the equipment shall be designed in acc ordance with the requirements given in Project Specific Data The tentative single-line diagrams, layout plans and sections for the various pr ojects are shown on the drawings enclosed to the Tender Documents. The drawings will be submitted with the bidding documents. The contractor is free to propose alternative solutions as options. General Clauses for HV and MV Switchgear 4.1.1.2.1 Brea ers and Switches Brea ers and switches equipped with motor drive shall be provided for electrical local and remote control. The control voltage for closing and opening commands and for the energy storage of circuit brea ers is 110V DC from station battery. The motor drive for switches shall be AC. The complete operating mechanism, including the controls, shall be built-in wate rtight and dust-proof cubicles fulfilling the requirements for outdoor enclosure s as stated in the General Specifications. All parts shall be easily accessible without dismantling other parts. Direct, local push buttons for operating the br ea er shall be located not more than 1.7 m above ground. All wiring shall lead t o terminals. 10% of the terminals shall be spare. A local/remote control selector switch shall be provided in the cubicle. With th e selector switch set to local control, operation from any remote source apart f rom the protective relays shall be inhibited. The switch shall have contacts for remote indication. A sufficient number of auxiliary contacts, with at least 10 NO and 10 NC contact s as spare, for 110 V DC shall be provided for control and interloc purposes. Motors shall be designed in accordance with valid IEC publication and shall be e ffectively protected by miniature circuit brea ers, with alarm contacts. 4.1.1.2.2 Circuit Brea ers All circuit brea ers shall be provided with means to prevent contact pumping whi le the closing circuit remains energised should the circuit brea er either fail to latch or be tripped during closing due to the operation of the protective rel ays.

The opening device of a circuit brea er shall be provided with two independent t rip coils, connected to separate terminal bloc s in the terminal cubicle, allowi ng for the connection of two independent opening command circuits. A local position indicator, visible with the panel door closed, shall be mounted in the front panel of the operating mechanism cubicle. A cran , lever or other similar suitable device shall be provided to permit char ging the operation mechanism by hand in the event of a failure of the auxiliary supplies or in the event of a failure of the energy-storing device. It shall be possible to determine the available operating energy stored by the m echanism prior to operating the circuit brea er. An alarm shall be given in the event of the stored energy falling below a minimum rated level. If the stored operating energy is below a minimum rated level in one or more of the mechanisms, closing and auto- reclosing shall be bloc ed in all phases. 4.1.1.3 Measuring Transformers If output of measuring transformers are not given the Contractor shall calculate the necessary output based on the instruments and cable length he needs. The ou tput of the measuring transformers for measuring and protection purposes shall b e determined according to the technical requirements, but shall not be less than 125% of the overall computed (design) burden of the connected apparatus and con ductors. However, the transformer shall not be loaded less than 60 % of rated bu rden. Power frequency test voltage on secondary windings, 1 min. 2,5 V Overvoltage inter-turn test, 1 min. 3.5 4.1.1.3.1 Current transformers The current transformers shall be designed to carry continuously a current of 12 0% of the primary rated current. The rated current of the secondary windings shall be 1 A, unless otherwise speci fied in Scope of Wor s, the different cores shall have the following characteris tics. The core(s) for measuring: Accuracy (if not otherwise specified in scope of wor ) class 1 Instrument security factor equal to or less than 5 The core(s) for energy metering: Accuracy (if not otherwise specified in scope of wor ) class 0.5s Instrument security factor equal to or less than 5 The core(s) for protection: Accuracy Accuracy limit factor equal to or greater than The core(s) for busbar protection: To be adapted to the protection scheme offered The core characteristic shall be optimised to the selected scheme in sections wh ere new busbar protection shall be installed. The characteristics of the current transformers shall comply with the provisions stipulated in IEC 60044. The Contractor shall demonstrate that the current transformers selected will ens ure correct functioning of the associated protective equipment.

class 5 P 20

4.1.1.3.2 Voltage Transformers The windings for measuring purposes shall be designed as follows: The core(s) for measuring: Accuracy (if not otherwise specified in scope of wor ) class 1 The core(s) for energy metering: Accuracy (if not otherwise specified in scope of wor ) class 0.5s The core(s) for protection: Accuracy

The secondaries shall be provided with miniature circuit brea ers with alarm con tacts. The characteristics of the voltage transformers shall comply with the provisions stipulated in IEC 60186 (and IEC 60358 for capacitive voltage transformers). The Contractor shall demonstrate that the voltage transformers selected will ens ure correct functioning of the associated protective equipment. The contractor s hall also describe the actions ta en to avoid ferro-resonance in the circuit. 4.1.1.4 SF6 gas 4.1.1.4.1 Low Density Warning For all components using SF6 gas as isolation media a system for visual continuo usly monitoring of the gas density shall be provided. At a certain low density a signal shall be given to indicate that refilling should ta e place. At the extr eme low density circuit brea ers should be automatically bloc ed against operati on. 4.1.1.4.2 Gas Refilling SF6 gas refilling equipment mounted on a trolley shall be provided for each subs tation. The gas handling apparatus to be supplied couplings for all apparatus in the station and shall have sufficient storage facilities for the maximum quanti ty of gas that could be removed when carrying out maintenance or repair wor on the largest section of the switchgear. 4.1.1.5 High and Medium Voltage Outdoor Switchgear 4.1.1.5.1 General The substation design should be such as to minimise the number of levels of cond uctors and to ensure that the consequences of a failure of one set of high-level conductors are limited to the loss of that circuit and a single bus bar section . This principle shall also be applied with regard to earth wire conductors. All apparatus shall be erected on galvanised steel supports dimensioned for the weight of the apparatus as well as short-circuit forces, the climatic forces and the forces arising under operation. Steel lattice landing gantries shall be arr anged for incoming lines design for the last slac span. Vehicle access to permit the transport of major switchgear equipment shall be pr ovided. This shall be achieved without the need to de-energise circuits. All brea ers and switches shall come ready for distribution automation. This Section covers the technical requirements of the high voltage equipment to be installed at the outdoor switchyards. 4.1.1.5.2 Circuit Brea ers The three-phase circuit brea ers shall be of the outdoor, single pressure SF6 Th e brea ers shall be mounted on steel structures. For 132 V and lower voltage three-phase rapid auto-reclosing only is required a

class 3 P

nd the mechanism can be common for all poles. A spring-operated mechanism is preferred. Hydraulic mechanism can be used. Pneum atic operating mechanism is not accepted. The brea ers shall be capable of handling the following operation cycle, accordi ng to the IEC recommendations: 0-t-CO-t'-CO t2=15 sec

The total brea ing time (opening time plus duration of the arc) of the brea ers shall be as short as possible, but in no case is it to be longer than 50 msec. The stored energy shall for all types of operating mechanisms be sufficient to a llow a complete O-C-O cycle. 4.1.1.5.3 Disconnectors/Isolators and Earthing Switches Disconnectors and earthing switches shall be manufactured in accordance with IEC 60129. All shall be mounted on steel structures. The contact surfaces shall be heavily silver-plated. The contact pressure shall be ensured by means of springs. Each three-phase isolating switch and each three-phase earthing switch shall be equipped with its own independent operating mechanism. In the case of a complete failure of the operating mechanism all switches shall be operable manually by means of a lever or cran or another feature. The manual mechanism shall allow safe switching under energised but no load conditions and shall be operated from a standing position. Disconnectors shall have mechanical interloc ing to attached earth switches. The interloc ing shall prevent closing of earth switch when the disconnector is in closed position, and disconnect the motor and prevent closing of the disconnecto r when the earth switch is closed. 4.1.1.5.4 Measuring Transformers The measuring transformers shall be single-phase, oil-immersed, mounted in one i nsulator. They shall be mounted on steel structures. Each transformer shall be e quipped with an oil level gauge to be easily visible from the ground. The transf ormers shall be supplied including oil filling. The oil of the measuring transfo rmer shall be hermetically sealed against the ambient air. The sealing method sh all be described in the Tender, as well as the method of compensation for change s in the oil volume due to temperature changes. Gas cushion shall not be used. T he Bidder shall indicate the measures provided for relieving dangerous pressure rises that may develop due to an internal electrical fault. The primary connections of all measuring transformers shall be silver-plated. Al l secondary connections shall be connected to a terminal bloc , which shall be l ocated in a dust-proof and watertight terminal box and shall be clearly labelled . An earth connection to the housing shall be provided. For sensitive earth faul t protection, torsoidal CT shall be installed in all feeders. 4.1.1.5.5 Lightning Arresters The lightning arresters shall be of the metal oxide gapless type, complying with IEC 60099-1. For tendering purposes the lightning arresters shall have the following characte

t = 0.3 sec

t' = 3 min and

CO-t2-CO

ristics (the Contractor shall chec the values by calculations to be approved by the Project Manager): 33 V 11 V (1) Continuous operating voltage (r.m.s.) ( V) 22 7 (2) Rated discharge current (8/20 ms)( A) 10 10 (3) Rated Voltage ( V) 27 9

42 20 54

As all other main parts of the switchyard they shall be mounted on steel structu res. The lightning arresters shall be fitted with a pressure relief device. Surge counters shall be supplied for each single-phase arrester for voltages abo ve 33 V. The earth conductor from the arrester to the counter as well as the in-terminal of the counter shall be suitably insulated or screen protected against accidenta l touching. 4.1.1.5.6 Line Traps The line traps shall comply with IEC 60353. They shall be suitable for mounting directly on the associated coupling capacitors, or separately on post insulators . The traps shall be secured against birds nesting. The line traps shall have the following characteristics: 1) 2) 3) 4) Minimum Inductance Min. resistive impedance Minimum rated current Short time current 0.2 mH >570Ohm 1250 A 31.5 A

The Bidder shall furnish with the Bid a diagram showing the resistive impedance of the traps as a function of the frequency. The line traps shall be of the band tuned type. Tuning device and surge arrester according to IEC 60353 shall be installed. The tuning device shall be adjustabl e in the range 260 502 Hz. Each line trap shall be enclosed by bird barriers Every line trap shall be supplied with a line matching unit as per specification s in paragraph 4.1.1.5.8 below. 4.1.1.5.7 Coupling Capacitors The capacitor shall have a rated capacitance of not less than 2000pF and shall m eet the insulation level and test voltage equivalents of IEC recommendation for each device (IEC 60358 Coupling capacitors and capacitor dividers) 4.1.1.5.8 Line Matching Units Phase to phase coupling units complete with coupling filters and protection circ uit, including hybrid transformer. The high frequency coupling units shall be assembled in a sheet steel box or sim

The main coil with its spar n 500 Hz.

gap shall have a self-resonant frequency higher tha

66 V

ilar and be suitable for mounting on the pedestal support for the coupling capac itor. The filters are to be suitable for outdoor use in a hot dusty/humid climat e and are to have weather proof door seals together with breather holes to avoid condensation. The units are to have an earthing switch which should preferably be interloc ed with the box door/lid such that the latter cannot be opened unles s the earth switch is closed to earth the device, and clear ON/OFF position of t his switch should be indicated. The terminal of the filter, which shall be conne cted directly to the substation earth, shall be clearly designated. The device s hall meet requirements of IEC 60481. The device shall be fitted with a rating plate clearly defining but not limited to the following data: Manufacturers Name Type Serial number Pea envelope power Available bandwidth or wor ing range

Technical requirements: Bypass filter: Impedance, equip. side unbalanced Impedance, line side 240/320 Ohm Nominal PEP at < 50 Hz < 400 W Nominal PEP at > 100 Hz < 1000 W Coupling capacitance 1.5 to 20nF 75/125 Ohm

Drain Coil: Inductance, adjustable 0.2 0.7 mH Impedance at power frequency < 1.5 Ohm Earthing Switch: Rated current 300 A rms Lightning Arrester: Rated voltage 660 V Max. 100% impulse spar over voltage Rated discharge current 5 A

4.1.1.6 Conductors, Insulators, Accessories 4.1.1.6.1 Conductors Unless otherwise stated in Scope of Wor s, the conductors shall be concentricall y laid, stranded, flexible conductors made of round aluminium, aluminium alloy o r copper wires. The alloy shall be aluminium alloy 6201-T81 in accordance with A STM Standard B 398-67 (equilvalent IEC standard) or aluminium alloys of similar approved composition, as nown under the trade name "ALDREY". The same type of conductor may be used for the overhead earth wires, the cross-s ections being at least the equivalent of 95 mm2 copper. Other earth wires shall always be of copper. The cross-sectional area of the conductors shall be chosen according to the elec trical and mechanical requirements, and shall be proposed in the Tender. Rated c urrents are given in Scope of Wor s, for each substation. The minimum factor of safety for busbars or other connections based on elastic limit shall be 2.5. The number of different cross-sectional areas to be used for the current carryin g conductors shall be strictly limited. For overhead earth wires the same crosssectional area shall be used for all substations. All wires ma ing up the conductor shall be free from dirt, splints, scratches an

3 300 V

d all imperfections not consistent with the best commercial practice. The conductor shall be tightly and uniformly stranded with no loose strands and when subjected to 50% of ultimate strength, it shall show no high wires but shal l maintain a true cylindrical form. Any Cu-Al connections shall be made with spe cial junction pieces, outdoor as well as indoor. Supply and erection of conductors and earth wires from dead end towers to gantri es will be provided for under other contracts. It is however, the Contractor's r esponsibility to supply and erect the clamps and connections to the inta e. 4.1.1.6.2 Tubular Conductors If tubular bus bars are used they shall be made of aluminium-magnesium-silicon t ubes in accordance with IEC 60114. They shall be designed to withstand thermal a nd dynamic stresses under normal duty and maximal short-circuit current without damage. Fastening shall be so that thermal expansion is accommodated without any undue stresses. 4.1.1.6.3 Insulators The post and string insulators shall be of the silicon rubber type. The post ins ulators shall be dimensioned in accordance with IEC 60273. They shall comprise f ully interchangeable units of either the pedestal or solid core cylindrical type and shall be designed so that they can be used either upright or inverted. The string insulator units shall comply with the provisions of IEC 60120, IEC 60 305 and IEC 60372. The type of insulator and the characteristics of the discs an d the number of discs per string shall be chosen according to the electrical and mechanical requirements, and shall be proposed in the Tender. Minimum factors of safety shall be: 2.5 For complete insulators based on electro-mechanical failing load test (IEC 60383) For insulator metal fittings based on elastic limit 2.5

Each insulator shall be mar ed with the initials or trademar of the manufacture r and with the guaranteed electromechanical strength. All mar ings shall be plai nly legible and durable. 4.1.1.6.4 Accessories For all accessories as clamps, connections, etc., care shall be ta en to fulfil all conditions required concerning current carrying capacity, mechanical strengt h, glow discharge characteristics, corrosion resistivity and easy mounting, etc. All accessories shall comply with VDE Standard 0210 and 0212 and with the corres ponding DIN specifications or with other similar and approved specifications and shall be tested according to the same specifications. 4.1.1.6.5 Cable Ducts All necessary cable ducts from the switchyard to the control building to be incl uded in the tender. The cable ducts are specified in Section - Civil Wor s. 4.1.1.6.6 Cable Marshalling Kios s For each switch bay a separate dust and waterproof, cable marshalling ios shal l be provided, minimum IP 54. It shall be possible to securely fix the hinged fr ont door in open position. All secondary cables coming from the circuit brea ers, disconnecting switches, i nstrument transformers, etc., shall be collected in this cable marshalling ios . From here, a minimum amount of multicore or fibre optic cables shall lead to t

he control room. The cable marshalling ios s shall be equipped with rows of terminals for all po tential and current circuits, including the necessary test terminals with bushin gs and lashes. At least 10% of the terminals shall be spare. For the switch bays, which are not entirely equipped with switchgear, the ios s shall have all necessary terminal s plus 10% spare as if the switch bays were complete. The ios s shall be ventilated by means of suitable openings, covered with dust filters and have drainage plugs at its lowest location. Each ios shall be equipped with a thermostat controlled heater in order to avo id any moisture. The heaters shall be so located that it does not damage any equ ipment or cables when let on. An internal AC, single-phase soc et outlet for hand lamps and small tools, and a n AC three phase soc et outlet for heavy tools shall be provided in each and eve ry cable marshalling ios . All these outlets to be according to the same standa rds as for the control building. Miniature circuit brea ers, with alarm contact, shall be provided for the voltag e transformer secondaries. All terminals, soc et outlets and other parts of the ios s shall be easily acce ssible without dismantling any part. 4.1.1.7 Tests Tests shall be made in accordance with the applicable standards. Type test shall be carried out on one sample of the equipment or as requested by the employer.

4.1.1.7.1 Conductors, Insulators, Accessories Tests for physical and electrical properties on conductors shall be made in acco rdance with ASTM Standard B 398 and 399 ( IEC Equivalent) or other equivalent an d approved standard. These tests on wires shall be made on wires removed from th e complete conductor. All wires ma ing up the conductor sample shall be tested. Sampling, inspection, tests and acceptance of the insulators shall be in accorda nce with ASA Standards C 29.1 (IEC Equivalent), Test Methods of Electrical Power Insulators and C 29.2, Wet Process Porcelain Insulators (Suspension Type). 4.1.1.7.2 Tests on the Switchyard on Site All electrical equipment and installations shall be tested for correct connectio ns of the high-voltage circuits as well as of the control and measuring circuits , installation, insulation, and earthing. All electrical equipment and installations shall be subjected to a complete oper ational test to chec the correct operation thereof in terms of the operational requirements specified in these Specifications. 4.1.1.8 Autoreclosers 4.1.1.8.1 General Auto-reclosers are used on less important 33/11 V substations instead of circui t brea ers and control systems. The autorecloser shall be designed for pole moun ting with the following features: (I) Ability to distinguish between permanent and transient/temporary

faults (ii) Ability to interrupt fault currents and thereafter restore every supply. (iii) Ability to switch normal load currents. (iv) Ability to coordinate with other protective devices such at drop out fus es, sectionalisers and circuit brea ers controlled by normal IDMT protection cur ves. 4.1.1.8.2 Modes of operation Autoreclosers shall be equipped to provide three phase trippings and reclosures, then loc out after a pre-selected sequence of three phase unsuccessful reclosur es. If a reclosure is successful the operating mechanism shall re-set to ma e availa ble the full sequence of operations. A minimum availability of four opening operations shall be provided with an auto reclose facility on the first three, the fourth opening shall cause loc out. On ce the recloser is loc ed out manual resetting is required in order to restore s ervice. It shall be possible by a programmable setting device to select erations which the recloser will perform automatically and also hich may be applied to each individual operation independent of ions. (this also means to bloc the recloser function when used rea er) the number of op the time delay w the other operat as transformer b

4.1.1.8.3 Operating Mechanism The closing mechanism shall charge a spring during closing which drives the trip ping mechanism. Solenoid mechanism shall not be used. The tripping shall be coil initiated via commands from the control/protection sy stem. 4.1.1.8.4 Power Supply The recloser shall be completely self contained deriving all its energy from the feeding side of the HV networ . High voltage operated solenoids are preferred. The control and protection facilities may be operated by means of current tran sformers on the feeding side bushings. If batteries are provided for control, p rotection and tripping batteries are provided for control, protection and trippi ng functions detailed capacity calculations are to be provided showing the numbe r of in/out operation the battery can handle in addition to the normal control/p rotection requirements of the stated ambient temperatures. A minimum of 2000 in /out operations are required with a minimum battery life span of 5 years. A low battery voltage signal shall be provided. 4.1.1.8.5 Control Cabinet A separate control cabinet shall be provided connected to the recloser by means of a multicore cable. The cabinet shall have a heater for connection to externa l power supply. The cabinet shall be dust and vermin proof and protected agains t direct sunshine by means of a shade. Ingress of water shall not be possible. 4.1.1.8.6 Control Requirements A microprocessor based control unit for the recloser is required which also inte grates the protection relays. The control unit shall have a soc et for serial c ommunication and downloading of information to a hand-held external unit from th e memory. The autorecloser shall have facilities for manual tripping and loc ing out by me

ans of an external handle or similar. The following control functions shall be provided on the front panel: local/remote control selection closing/tripping autoreclose in/out (one trip to loc out) protection engaged/disengaged earth fault in/out sensitive earth fault in/out relay status. Energy profiles; Demand registers

Local status indications shall be included in addition to the above control func tions. The control unit shall also have facilities for remote control/indication. 4.1.1.8.7 Protection Requirements Relay characteristics settings shall preferably be performed on the front panel as well as selection of the operating sequence. Dead times and reclaim time shall be selectable in steps. The protection system shall have facilities for: phase faults earth faults sensitive earth fault.

The phase and earth fault protection shall have standard inverse IDMT characteri stics and definite time. The trip setting range for phase faults shall minimum cover 20 to 800 A while for earth faults 10 to 400 A. The sensitive earth fault relay shall be of the definite time type with instanta neous element, adjustable between 2 and 10A in steps. Time delay should be sett able between 0 and 20 secs. in steps. The relays shall be equipped with in rush restraint facilities. A counter is to be provided to eep record of the number of in/out operations. 4.1.1.8.8 Insulating and Interrupting Medium The interrupting medium shall be vacuum. The insulating medium shall be SF6 or solid insulation. The SF6 gas used shall comply with IEC publication 60376. Unless otherwise stated, the insulating oil used with autoreclosers shall be of the standard mineral uninhibited type and shall comply with the requirements of IEC 60269. In addition to the quantity of gas required to fill the supplied equi pment, 20% shall be supplied as spare. Where SF6 gas filled autoreclosers are offered, the supplier shall provide the u ser with necessary instructions for refilling the gas and maintaining its requir ed quantity and quality. The autorecloser shall have facilities for loc out in c ase of low pressure with an associated indicator flag easily seen from the groun d. A pressure gauge easily read from the ground shall also be provided.

Reclosers using oil as interrupting medium are not acceptable and will be reject ed. Where gas filled reclosers are offered the supplier shall include in the qu otation the cost of one set of gas filling equipment. One set of gas filling eq uipment shall be supplied with the reclosers. 4.1.1.8.9 Ratings a) The reclosers will be used on networ s with nominal operating voltages of 33 V. The maximum system voltage will be 36 V. The rated one minute power frequen cy withstand voltage shall be at least 95 V when contacts are opened with Basic Insulation Level at least 170 V. b) The continuous current rating shall be at least 400 A. The short time 3 secon ds current rating shall be at least 12 A. The interrupting current shall be at least 12 A. The closing and latching capability shall be at least 20 A. 4.1.1.8.10 Bushing Current Transformers The bushing current transformers for protection shall be single core and provide d on all phases. They shall be rated as per design requirements if not specifie d. If current transformers are used to provide power supply to control, protection and tripping these are to be dimensioned with 30% spare capacity. The cores for this supply shall be separate from the protection core. 4.1.1.9 Alternative Indoor 66 V Switchgear For very confined substations in the Nairobi an alternative with indoor 66 V sw itchgear is to be included in the Bid. The 66 V brea ers shall be mounted on a trolley behind a steel wall together with earthing switches and measuring transf ormers. In principle the arrangement shall be as for enclosed switchgear below w ith the exception of the enclosure. The steel wall shall protect operators from any danger followed from live part and possible arching. The motor operated trol ley shall act as a disconnector and be retractable from front of steel wall. The earth switch shall also be operated from here. 4.1.1.10 Medium Voltage Indoor Switchgear 4.1.1.10.1 General This section covers the manufacture and supply of indoor metal enclosed, metal c lad type 33 V and 11 V switchboards constructed and tested in accordance with IEC60298 as well as circuit brea ers, associated equipment and spares. All bays shall be clearly labelled in English language with feeder or transforme r name. The following documents were referred to during the preparation of this specific ation, and may be referred to; however in case of conflict, the provision of thi s specification shall ta e precedence. Unless otherwise specified, the latest revision, edition and amendments of the s tandard shall apply IEC 60298: AC metal - enclosed switchgear and contro1, gear for rated vo ltages above 1 V and up to 72.5 V . IEC 60051 Direct acting indicating analogue electrical measuring instruments and their accessories. IEC62271-100 - High-voltage alternating circuit brea ers. IEC 60044-1 : Current transformers IEC 60044-2: Voltage transformers IEC 60255: Electrical Relays ANSI 37: Medium voltage AC metal - enclosed switchgear and control gear

Tests shall be made in accordance with IEC 60298. Arc tests, as specified in IEC 60298 Annex AA are required. The arch type test shall be performed by an intern ationally recognised test institution for the full short circuit current in at l east 1 sec. 4.1.1.10.2 Panels The whole switchgear equipment and components shall be designed and constructed in accordance with IEC 60298. The board shall be complete with all the relevant components including, busbars, circuit brea er, cable compartment, instrument tr ansformers, protection relays, instruments and controls. The switchgear board, shall be constructed to 1P41 degree of protection in accor dance with IEC 60529. A type test report for the degree of protection of the swi tchgear panels from a third party reputable testing laboratory or certified by t he national standards and testing authority (NSTA) or a laboratory accredited to the NSTA shall be submitted with the tender for evaluation purposes. The panel shall have restricted dimensions suitable for installation in limited spaces. Inparticular and without compromising the insulation level, busbar curre nt rating and short circuit current performances, the width of the panels shall not exceed 800mm. The LV compartment shall not be less than 650 mm in height, to ensure adequate s pace for mounting the relays and other devices and accessories and adequate spac e for the cable truc s, terminal bloc s and wiring. The depth of the switchgear, i.e., from the front to the bac shall be ept to the minimum and in any case n ot exceeding 1800 mm. The switchgear panel or cubicle shall be built up of separate metal clad-compart mented cubicles with earthed metal partitions. The compartments shall be for bus bar, cable connection, circuit brea er, current transformer and control (LV) com partments. The circuit brea ers shall be mounted on an inbuilt carriage to facilitate isola tion and withdrawal of the circuit brea er. Where the carriage is fixed in the c ompartment and does not allow complete withdraw of the circuit brea er outside i t's compartment, then a purposely built trolley shall be provided equipped with a lowering/raising gear to lower the circuit brea er to the floor, and to raise the circuit brea er to it's compartment by one person. This requirement shall be demonstrated during FATs The complete switchgear shall be such that the complete switchboard is of flushfront design Each of the switchgear panels shall have four separate compartments as follows: LV Compartment Circuit Brea er Compartment Busbars Compartment Cable, CTs, VTs and Earth Switch compartment The circuit brea er, busbars and cable compartments shall be provided with arc v enting outlet to the top of the switchgear board. The top of the complete switchgear board shall be equipped with arc by-products venting chamber to direct the arc by products outside the switchgear room. The d esign of the arc chamber shall be adequate to handle arc by products at the rate d withstand level of the switchgear board of 25 A, 3 seconds. The design of the arc chamber shall be complete in every way with provision of connection to the switchgear wall at least at two points and the terminal explosion flaps to be fi tted on the switch gear wall.

The low voltage section shall be completely separate from the high voltage secti on. All the protection relays, auxiliary relays, energy meters indication lamps, instruments, control and selection switches and any other associated accessorie s will be mounted in this compartment. The switchgear shall be designed for erection with the rear side close to a wall as well as for free standing erection. The manufacturer shall provide a single line layout drawings giving the requirements to be provided(built into) in the s witchgear room. The switchgear shall be of arc resistant design as per IEEE/ANSI C37.20 and henc e ensure complete safety for a switching personnel standing in-front or at the r ear of the switchgear board. A copy of the type test report shall be submitted w ith the bid for tender evaluation purposes. Where the venting is intended to penetrate an external overed such that it meets all environmental conditions oof, vermin-proof). The cable compartment should have an anti vermin guard gainst rats, rodents etc The circuit brea er compartment door shall be provided c ing. wall, the vent shall be c (e.g. rain-proof, dust-pr plate giving protection a with provisions for padlo

The doors shall he capable of withstanding the effects of maximum internal arcin g fault without being blown off and causing danger to personnel and other equipm ent. This should be proven by successful testing, as per ANSI C37.20.7 or equiva lent IEC standards. The busbar shall be single, three phase, air insulated. The primary busbars and connections shall he of high conductivity and electrolytic material, high grade copper, and shall be in unit lengths. The busbars shall preferably have a PVC co ver to prevent accidental short-circuits Busbars, connections and their support shall be rated 1500 A as required continu ously under ambient conditions and capable of carrying the short-time current as sociated with the short circuit ratings of the circuit brea ers, for 3 Seconds. Busbars shall he extensible at both ends, such extension shall entail the minimu m possible disturbance to the existing busbar. Provision shall be made for loc ing busbar and circuit shatters separately in th e circuit brea er compartment. These shutters shall open and close automatically during the rac ing in and rac ing out of the circuit brea er Provision shall be made for integral circuit earthing and for busbar earthing. M eans of earthing shall be by circuit brea er or purposely built earth switch. Me chanical interloc s to ensure correct switching operation shall then be provided . It shall not be possible to close the earth switch on the incomer panel, when the incoming 11 V cable is live. The earth switch shall be easy to operate by one operator and he spring loaded t o ensure effective ma e operation independent of the operator action. The Status of the earth Switch shall be visible from the front of the Panel. It shall not be possible to rac -in the circuit brea er into the service position w ith the earth switch in closed position. The mechanical interloc between the ci rcuit brea er and the earth switch shall be strong enough to guarantee safety of the switching personnel and the switchgear. The earth switch shall be equipped with auxiliary contacts for local and supervi sory indication of the status of the earth switch. The earth switch operating le ver shall be covered by a shutter and shall only be accessible when it is permit ted to operate the earth switch.

The operation of the Earth Switch shall be set in such a way that during both th e close and open operations, a clearance of at least 9 inches shall be maintaine d between the operating handle and the bottom of the switchgear panel. It shall not be possible to insert the earth switch operating handle into positi on except when the circuit brea er is in the test or isolated position. The eart h switch shall be equipped with padloc ing facilities when in the closed positio n All earthing facilities shall be rated for fault ma ing at the rated switchgear short-circuit current. Earthing switches shall be provided for earthing each of the Busbar Sections sep arately. All the interloc s required to ensure safe operation of the busbar eart h switch shall be built into the switchgear board. In particular it shall not be possible to close the earth switch when any of the circuit brea er on that part of the busbar is in service position, i.e., all the circuit brea ers shall be w ithdrawn for the Busbar earth to be closed. Once the Busbar earth has been close d, it shall not be possible to rac -in any circuit brea er. Indications for busbars earth On and OFF shall be provided and visible from the front of the board. The Panel wiring for protection, instruments, indication and metering circuits a nd other control accessories shall be completely done. All circuits for connecti on to external cables such DC & AC auxiliary supplies, external tripping, superv isory control and indications shall be wired up to the terminal Bloc at the Bac of the panel where external cables shall be connected. A t least 12 spare term inals shall be provided on the terminal board for any future requirements. It is emphasized that Each Switchgear panel will have a terminal bloc at the ba c of the panel where all external cables such as for 110V DC supply, 240V AC su pply, connection of SCADA, measurands/commands and alarms shall be made. 110V DC, 110V AC and 240V AC supplies for circuit brea er control, alarm circuit s, protection relays, metering and motor supply for each panel, shall be control led by suitably rated miniature circuit brea ers. The switchgear panels shall be tropical vermin proof. The plates shall be of hig h quality mild steel of at least 2mm thic ness thoroughly cleaned by shot blasti ng or other approved methods. They shall then be given a primary coat and two coats of contrasting colour of d urable andeather resisting paint. The final coat shall be gloss and Admiralty Gr ey (shade No.632) as specified in BS 381C. The final thic ness of the paint shal l not be less that 80 Microns at any point within the switchgear panel.

Anti-condensation heaters shall be provided inside each switchgear panel. They s hall belocated so as not to cause injury to personnel or damage to equipment. Th e heaters shall becontrolled by a hygrostat with a variable humidity and tempera ture setting. The heaters shall be dimensioned to ensure that condensation canno t occur within the switchgear panel. Heaters of adequate rating shall be provide d for the circuit brea er, cable and LV compartments.The 240V AC supply, for the heaters shall be controlled by a suitably rated single poleminiature circuit Br ea er. The circuit brea er cubicle shall have a limit switch which shall be wired to pr ovide SCADA indications on whether the brea er is fully rac ed in or fully rac e d out(withdrawn). Suitable means shall be provided to monitor the status of the HV cable, i.e., wh ether it is live or dead. The monitoring device shall be a three phase device wi th illumination in red colour for live status visible from the front of the pane l without opening any compartment doors. The indications shall be labeled R, Y & B or L1, L2 & L3. The device shall meet the requirements of IEC 61243-5. Each switchgear panel shall be provided with Tinned Copper earth bar of adequate cross section area to be able to withstand the rated short-circuit current of 2 5 A for 3 seconds, and arranged so that the bars of adjacent panels are joined

together to form a common earth busbar. Provision shall be made at either end th e assembled switchgear board for connection of the earthing bar to the substatio n earthing grid. Manual close & open push buttons shall be provided on the circuit brea er compar tment door for manual close and open of the circuit brea er both in the service and in the test(withdrawn) position. The manual close and open push buttons shal l be clearly labeled with CLOSE and OPEN Labels and with I(red) and O(Green) Sym bols and colour codes as per the IEC standard. The complete switchgear board shall be equipped with ARC protection, consisting of ARC protection relays and arc sensing devices located in the Cable, Circuit B rea er and Busbar Compartment of each panel. Optical sensors shall be used. The sensors shall operate upon occurrence of a flash (light) from the ARC. The senso rs shall be connected to the ARC protection Relays via fiber cables or any other suitable means that is already in use. The ARC protection relay shall monitor b oth the operation of the Optical sensors and overcurrent relay and shall only op erate upon operation of both the sensing devise and the pic up of the overcurren t element. it shall also be possible to select the operation of the scheme due t o the operation of the sensor but with longer time delay. Upon operation of the ARC protection, all circuits within the fault zone shall be tripped by the arc p rotection relay. The ARC protection scheme shall have means for indicating the A RC occurred. The scheme shall be secure and immune to mal-operation, the fundame ntal operating time of the ARC protection scheme shall preferably be 50ms and in any case not more than 100ms. However adjustable time delay and overcurrent pic -up shall be provided. The design of the complete scheme shall be to the approval of the employer. A si ngle line drawing shall be enclosed with the bid to show how the scheme is implemented. V.

The brea ers shall be capable of handling the following operation cycle, accordi ng to the IEC recommendations:

0 t CO t1 CO

t = 0.3 sec

t1 = 15 sec

The total brea ing time (opening time plus duration of the arc) of the brea ers shall be as short as possible, but in no case is it to be longer than 60 msec. The circuit brea ers shall be designed for switching of capacitor ban s and shal l be such that restri ing during brea ing operation cannot occur. A spring-operated mechanism shall be provided and the mechanism shall be equippe d for electrical local (from switchgear) and remote control (from control centre ). If not otherwise stated in Scope of Wor s, the control voltage for closing an d opening commands and for the operating mechanism motor(s) shall be: 110 V DC + 10% 20%, unearthed, from battery

A local position indicator shall be mounted in the front panel of the operating mechanism cubicle. The circuit brea ers shall be mounted on manual operated truc s so that they can be moved into counter contacts of the switchgear (draw-out/jac up down type). All brea ers of same rating shall be fully interchangeable. Each cubicle shall be provided with facilities for local control and position in dications. All truc s for circuit brea ers and disconnectors shall be incorporat ed in the interloc ing system.

4.1.1.10.3 Circuit Brea ers and Disconnectors The three phase circuit brea ers shall be vacuum type for 66 and 33

The stored energy shall for all types of operating mechanisms be sufficient to a llow a complete O C O cycle. A sufficient number of auxiliary contacts for 110 V DC shall be provided for con trol and interloc purposes. Motors shall be designed in accordance with valid IEC publication and shall be e ffectively protected by miniature circuit brea ers, with alarm contacts. All wiring shall lead to terminals. 10% of the terminals shall be spare. 4.1.1.10.4 Circuit Isolation and Interloc s The arrangement of the secondary isolating contacts must be such that when the b rea er is in the test position, the secondary isolating contacts are still made so that the secondary circuit may be tested without the need for jumper connecti ons. It must be possible to leave the brea er trolley in disconnector open posit ion with closed cabinet door. Clearly labelled mechanical interloc s shall be provided to prevent: (a) a closed brea er from being withdrawn from or inserted into the isolatin g contacts. (b) the brea er from being withdrawn or replaced except when its mechanism i s in the "off" position. (c) the brea er being closed in the service position when the secondary circui ts are not properly connected. 4.1.1.10.5 Switch-Disconnectors and Fuses Cabinets for station transformers for local LV supply to be equipped with switch -disconnectors, fuse holders and earthing switches. Such brea ers do not need to be erected on trolley but the arch test requirements prevail and the cubicle mu st be extensible with standard cubicles on both sides. The disconnector must be so arranged that it is possible to insert a isolating plate between the live and dead contacts when wor ing in the cubicle. Such plate should be part of the sup ply. Transformer Cubicles shall be provided with fuse tripping devices via stri er pi n. The HRC fuses must conform to DIN (IEC equivalent) regulation for 12 V or 36 V. 4.1.1.10.6 Shutter Mechanism Substantial safety shutters are to be provided to cover the brea er isolating so c ets, on both the busbars and circuit connections. These shutters are to be aut omatically actuated by the brea er. Each shutter shall be capable of being separately operated and padloc ed in the closed position.

4.1.1.10.7 Earthing All cubicles shall be connected to earth via conductors with min. 70 mm2 cross s ection. Neutral terminals of voltage transformers shall be connected via separate, insul ated conductors to the main earth conductor. Cubicle doors shall be separately earthed if live equipment is fixed to the door s.

Permanent earthing facilities shall be installed on all incoming and outgoing fe eders and on the busbar in one point (or if split busbars in each section.). It shall be possible to connect the earthing devices from outside with closed doors . Earthing devices shall have reliable position indicators and sufficient ma ing capacity shall be proved. Capacitive voltage indicators shall be arranged to avoid closing of earthing swi tches against energised components. 4.1.1.10.8 Cable Connection The cable termination compartment for feeders shall have adequate space for hous ing of cable terminals up to, 2x3x1 core 300 mm2 Al XLPE (two single core set) f or the and shall be complete with cable terminations, bolts, nuts and cable glan ds (the cable terminals shall be for 1x3x150 mm2 Cu cable) The cable termination compartment for the connections to the 66/11 V transformers must allow for cabl es dimensioned for 24 MVA. For cable test purposes, must it be possible to loosen the connection between ca bles and the measurement transformers from the front of the switchboard, with en ergised busbars without removing any apparatus. The Bidder shall demonstrate thi s in his Bid. 4.1.1.10.9 Measuring Transformers 4.1.1.10.9.1 Current Transformers All current transformers shall have bar primaries and shall be resin encapsulate d and generally comply with IEC 60044. All current transformers shall have a max imum short-time current rating for one second. Feeder circuits shall be equipped with a current transformer on three phases wit h four cores: For measuring and instruments, not less than 15 VA, Class 0.5: 33 V: Ratio 200-400/1 amp

For overcurrent and earth fault protection, not less than 15 VA, Class 5P20: 33 V: Ratio 200-400/1amp

For overcurrent and earth fault protection, not less than 15 VA, Class 5P20: 33 V: Ratio 200-400/1amp

Busbar protection core as per the design Transformer bushings shall be equipped with a current transformer on each phase with four separate cores: For differential protection and restricted earth fault, not less than 15 VA, Cla ss X 33 V: Ratio adapted to transformer rating 11 V: Ratio adapted to transformer rating For instruments, not less than 15 VA, Class 0.5: 33 V: Ratio adapted to transformer rating

11

11

11

V: Ratio 1500/1 amp

V: Ratio 1500/1 amp

V: Ratio 1500/1 amp

Loose Transformers for Transformer Neutral (a) Two lose single phase current transformers for connection of Restricted Earth fault Protection and Neutral Overcurrent Protection Ratio as per design 4.1.1.10.9.2 Voltage Transformers Three phase voltage transformers shall have the following characteristics

hgears 3 3

with accuracy class 0.5 for the measuring winding and class 3 P of capacity betw een 100 to 200 VA for the protection winding in accordance with IEC 60186. Each busbar section and each 33 V feeder shall be equipped with a three-phase v oltage transformer. The voltage transformers shall be equipped with both primary H.V. and secondary L.V. fuses, and shall be so arranged that the H.V. fuses are not accessible unle ss the voltage transformer is withdrawn. The transformer shall be resin encapsulated of the electromagnetic type. 4.1.1.11 Protection and Control 4.1.1.11.1 General Each MV panel shall be supplied complete with numeric protection relay and contr ol units. Maximum of two protection functions can be combined in one unit. It s hall be possible to bloc remote control (but not indication) locally. Such bloc ing shall be indicated remotely. All requirements and facilities described in t he Section Control and Protection below shall be incorporated as appropriate. 4.1.1.11.2 Arc Detection The complete 33KV board shall be fitted with arc detection or pressure detection devices in the cubicles which instantaneously trips the incomer circuit brea er s or those in a combination with the bus-section brea er, to isolate the faulty part in case of a short circuit on the busbar or in a circuit brea er cubicle. T he arch detection shall be insensitive to sunlight and flashlight. Rapid trippin g scheme shall not influence the test requirements given above. The scheme is to be approved by the Project Manager. 4.1.1.11.3 Optional Equipment and Accessories Bidders shall advise and quote, in detail for accessories and maintenance tools and equipment that they would recommend is provided with such a switchboard inst allation. It is emphasised that full information must be provided as to the costs of repla cement materials, such as gas ets, seals, 'O' rings, spare contacts and mechanis ms, etc.

Ratio

11000 / 110/ 3

for 11 V switchgears 3

Ratio

33000 / 110/

Ratio

11

V: Ratio adapted to transformer rating

66000 / 110/ 3

for 66 V switchgears 3 for 33 V switc

Bidders shall also specify all equipment, and costs, which will be required to m aintain the switchgear in a fully operative condition throughout its service lif e of at least twenty-five years. This should include gas lea age detection equip ment, pressure testing equipment, gas cleaning equipment? and gas recharging equ ipment. 4.1.1.12 MV Cables and Accessories 4.1.1.12.1 General All cables accessories and materials shall be in accordance with the latest edit ions (including all amendments) of IEC and ISO recommendations. All cables shall be suitable for operation: on a system with direct earthing of the transformer neutral under maximum load (ONAF conditions) plus 10 % specified for respective transfor mers in the climatic conditions prevailing at site No joints shall be allowed. Only dry vulcanising processes shall be used. Specia l precautions shall be ta en to avoid ingress and spreading of moisture and deve lopment of water-treeing. The Tenderers shall documents the construction measure s used to achieve these requirements. 4.1.1.12.2 Conductors All conductors shall be stranded copper or aluminium. The conductor shall be cle an, uniform in size, shape and quality, smooth and free from scale, splits, shar p edges and other harmful defects. The conductor shall be in accordance with IEC 60228. The conductor shall be filled with swelling powder to stop axial ingress of moisture. 4.1.1.12.3 Cable The conductor shall be covered with: An extruded semi-conducting layer A layer of dry vulcanised cross-lin ed polyethylene (XLPE) insulation An extruded strippable semi-conducting layer A water tight copper or aluminium seal A layer of swelling tape to prevent axial ingress of water along the screen A layer of earthing screen of stranded aluminium or copper An outer LDPE (low density polyethylene) sheath for water tightness and mechanic al protection. 4.1.1.12.4 Laying-up and Fillers of Three Phase Cables The cores of three-phase cable shall be laid-up together with suitable fillers, wormed circular and binding tapes applied overall. 4.1.1.12.5 Manufacturers Identification The manufacturers identification shall be provided throughout the length of the c ables by means of a tape under the sheath printed with the manufacturers name. Al ternatively the manufacturers identifications may be embossed on the outer PVC sh eet together with identification and voltage mar ings 4.1.1.12.6 Armour All cables shall be armoured according to approved manner 4.1.1.12.7 Testing Notwithstanding that cables are manufactured to approve standards all cables, ac cessories and materials shall be subjected to and withstand satisfactorily the t est requirements detailed in this specification. All materials shall withstand s uch routine tests as are customary in the manufacture of the cables and accessor ies included in the Contract. The manufacturer shall have established a quality

control system based on regularly accelerated test of production samples accordi ng to CENELEC HD605. This system shall be described in the Bid. 4.1.1.12.8 Sealing and drumming The cable shall be wound on strong drums arranged to ta e a round spindle of a s ection adequate to support the loaded cable drum during installation and handlin g. The drums shall be lagged with closely fitting battens that shall be securely fixed to prevent damage to the cable. Wooden drums shall be constructed of seas oned timber to prevent shrin age of drums during shipment and subsequent storage at site. Each drum shall be clearly mar ed including indication of direction of rolling. The ends of the cables shall be suitable sealed to prevent ingress of moisture. The end of the cable left projecting from the drum shall be securely protected a gainst damage by mishandling during transport and storage. 4.1.1.12.9 Current carrying Capacity and Design Parameters The maximum continuous current carrying capacity and maximum permissible continu ous conductor temperature, and the factors for determining such rating and tempe rature shall be based on recommendations found in IEC 60287, subsequent amendmen ts and all conditions prevailing on the Site 4.1.1.12.10 Terminations Detailed drawings showing the types of cable sealing ends, terminal arrangements shall be submitted to the Project Manager for approval. Stress cones or other a pproved means shall be provided for grading the voltage stress on the core insul ation of the cables. The terminations and joints for the cables shall be of an appropriate heat shrin or cold type jointing its incorporating a suitable arrangement for stress con trol, and rain sheds for outdoor use. Termination its shall include suitable heat shrin tubing to effectively shroud , seal and insulate the exposed cable conductor and shall include a heat shrin glove to effectively seal the crutch of the cable to prevent ingress of moisture into the interstices of the cable. Suitable arrangements shall be provided to e arth the cable screens and armour Terminations into cable boxes shall include brass compression glands and bac nu ts of the correct size, which shall secure the cable outer sheath and ensure eff ective continuity between the cable armouring wires and the metal enclosures on which the cables are terminated. At all rising terminations the cable inner shea th shall pass through the gland to terminate not less than 6 mm above the gland 4.1.1.12.11 Joint and termination material Heat shrin ing tubing and moulded parts shall be flexible, flame retardant, poly ofin-based material of electrical insulating quality, and shall be obtained from an approved manufacturer. They shall be suitable for use indoors or outdoors in the conditions prevailing on site The material shall reduce to predetermined size and shape when heated above 120 C . The components shall also be provided with an internal coating of hot melt adh esive compound that shall not flow or exude at temperature below 85 C. All parts and materials shall be tested to a program of tests to be agreed with the manufa cturer. Each part shall bear the manufacturers mar , part number and any other necessary mar ing to ensure correct identification for use on the correct size and type of cable. Each set of parts shall be pac ed as one unit with full and complete ins tallation instruction and clearly mar ed to show the application.

4.1.1.13 Auxiliary Supply and Substation Lighting 4.1.1.13.1 General This section covers the technical requirements of the low voltage AC and DC supp lies, switchyard lighting and other auxiliary equipment. The station service is to be supplied from the station transformers. If availabl e a bac -up supply from the district grid may be brought in to the station. No m ore than one station transformer shall be connected to the bus at any time. If t he voltage disappears the supply shall automatically be switched over to an alte rnative supply if such is available. From the main low voltage switchboard, (AC and DC) feeders shall supply the subdistribution boards of the plant. Domestic installations are part of the Civil Wor s. The temperature rise of the conductors above ambient air shall not exceed 40 C at rated current 1250 A in the three phases. 4.1.1.13.2 Switchboards and Panels AC The switchboards and panels shall be designed, constructed and tested in accorda nce with IEC 60439: Low-voltage Switchgear and Control gear Assemblies. The boards shall be vermin proof. The boards and panels shall be self-ventilated . No ventilating fans shall be used. Permissible temperature rise shall not be exceeded even when the free space avai lable for future feeders is mounted with feeder equipment and loaded with rated current. The covers (outside covers and doors, including hinges and loc s) shall safely w ithstand the overpressure caused by short circuit currents and shall protect per sonnel against injury. The main switchboards and the larger ones of the sub-distributions shall be of t he floor mounted prefabricated metal enclosed type, with separate compartments f or each feeder, etc. Small sub-distributions may be of the wall mounted steel sh eet or cast metal type. All boards and panels shall be designed for easy access to the equipment, cable terminals, etc. during erection, maintenance, disassembly and extensions. In addition to the required number of outgoing circuits, one more of each rating employed shall be fully equipped ready for connection of future circuits. Furth ermore, each board and panel shall have at least 20% free space available for fu ture extensions. The main switchboard shall be designed so that additional panels can be added in the future (including possibilities for extending the busbars). Operating handles, operating switches and push buttons, signalling lamps, positi on indicators, instruments, etc., shall be placed on the fronts. Relays which ar e not incorporated on the circuit brea ers shall be placed in separated compartm ents, metal shielded from the current carrying parts. The ing all can busbars shall be of copper and shall have three phases and neutral. A ground bar of copper shall also be provided and a grounding conductor connection sh be brought to each feeder compartment, where the feeder grounding conductor be connected to it.

Fuses may be used in exceptional cases such as on very light loaded circuits, or in combination with small contactors and where the use of fuses is justified fo r the purpose of selectivity. In the design of the distribution systems and in the selection of circuit brea e rs, MCB's, fuses and protection relays due attention shall be paid to the select ivity of brea er tripping at overloads and at short circuits. Full selectivity s hall be achieved, only the feeder or circuit which has an overload or short circ uit shall trip. Undelayed MCB's shall be used only as the last brea er of a circuit. Selectivity between MCB's and fuses shall be proved, with ample margin. The circuit brea ers shall be manually operated, except for the brea ers in the feeders from the auxiliary transformer which shall be electrically operated. All circuit brea ers and MCB's shall have three-phase overload and short circuit protection to be provided as a part of the brea er assembly or provided separat ely as for the transformer circuit brea er (in this case separate current transf ormers shall be included). The ratings of the overload and the short circuit pro tections shall be selected according to the current rating of the cable or circu it to be protected, and in accordance with the requirements of the selectivity a s stated above. The brea ers for DC shall be two-pole, and with thermal overload and magnetic sh ort-circuit protection in both poles. All such circuit brea ers, miniature circu it brea ers, switches, contactors, fuses, etc., shall be of a type specifically designated for the use on DC, and the dynamic current and the ma ing and brea in g capacities shall be ample for the short-circuit power of the batteries. All DC circuit brea ers, miniature circuit brea ers, switches and contactors sha ll have an alarm contact or an under voltage relay with alarm contact shall be p rovided. Circuit brea ers on the main DC switchboards which are rated 50 A and higher sha ll be withdrawable 4.1.1.13.4 Current Transformers The current transformers shall have synthetic resin insulation or equivalent dry insulation. The cores for measuring purposes of current transformers shall have accuracy cla ss 1 and instrument security factor less than or equal to 5. The cores for prote ction shall have accuracy class 5P and accuracy limit factor greater than or equ al to 20. Power frequency test voltages, 1 minute: Overvoltage inter-turn test 3.5 V Secondaries 2.5 V 4.1.1.13.5 Instruments and Relays The instruments shall be 96 x 96 mm square pattern with (at least) 90o pointer d eflection.

4.1.1.13.3 Circuit Brea In general, circuit brea ers uits. Miniature circuit brea ers shall be rated for full d.

ers ad Fuses shall be used for all feeders and distribution circ ers, MCB's, may be used on small circuits. The brea short circuit power. No bac up fuses shall be use

Instruments shall be of the three element type, for unbalanced three-phase load and loaded neutral conductor. The relays shall preferably be of the solid state type. The instruments and rela ys shall, as far as applicable, be of the same ma e and type as those of the oth er parts of the plant. 4.1.1.13.6 Tests Tests shall be made in accordance with the applicable standards. 4.1.1.14 415/240 v Auxiliary Supply 4.1.1.14.1 Auxiliary Transformers Station transformers are part of the scope of supply. 4.1.1.14.2 Distribution Boards Current carrying capacity of main transformer circuit brea er shall not be less than 1250 A. Automatic switchover between the sources shall be arranged within t he main board. The board shall be equipped with instruments for measuring of cur rent and voltage in all phases as well as energy meters for recording of energy consumption. The board shall be equipped with tariff metering. Continuous curren t rating of the phases and neutral from the transformer and of the busbars in th e main switchboard shall be at least 1250 A. The current rating of the feeders s hall be ample for the actual load and have at least 50% reserve capacity compare d to the actual load. The figures given in these specifications are indicative o nly. Only a limited number of different ma es, types and ratings shall be used, for the purpose of standardisation and interchangeability. 4.1.1.14.3 Switchyard Lighting The switchyard lighting shall be by means of floodlights with 400 W for bay ligh ting and 70 W for perimeter lighting. The lighting shall be constructed with hig h pressure sodium lamps. The housing shall be of high pressure die-cast aluminiu m with a non-corrosive finish. Refracting front covers of etched vandal-resistan t polycarbonate shall be provided. The enclosure protection shall be min. IP65. The switch bay and transformer illumination level shall be 50 lux on 0.85m heigh t in the switchyard and for the transformers. The perimeter illumination level s hall be 5 lux. The perimeter lighting shall be controlled by photocells. All nec essary supports, fixing material and cabling from the distribution board shall b e included. 4.1.1.14.4 DC Emergency Lighting Emergency lighting is provided for in under Civil Wor s.

4.1.1.14.5 Hand Lamps and Portable Hand Sets The portable battery handsets are for additional DC lighting during maintenance wor s, etc., in case of AC failure. A loc er, with the provisions of housing two handsets, shall be placed in the entrance hall of the substation. AC soc et out lets shall be fitted in the loc er for continuous charging of the batteries. The charging control shall be automatic and a pilot lamp shall indicate that chargi ng is on. The handsets shall be provided with on/off switch. The handset shall give flow of approximately 200 lumen, and the battery shall ha ve the capacity of running the lamp for 2 hours. A type with a short fluorescent tube is preferred. 4.1.1.14.6 Cloc A cloc shall be installed in the control room. It shall be of the analogue type , having continuously moving hands. For temperature variations between -1 and +4

4.1.1.15 DC SUPPLY 4.1.1.15.1 General This section covers the technical requirements of the batteries and battery char gers, the main DC switchboards and the sub-distribution boards and panels for th e DC auxiliary supply of the plants. 4.1.1.15.2 Distribution Boards The DC busbars shall have two poles. The bars and the connection conductors to t he brea ers shall be insulated. All boards shall have instruments for reading of voltage and current (two directions) and be equipped with relays giving alarm b y high and low voltage and by earth lea age in all insulted poles. 110 V DC shall be used for the main circuits of the control and protection and f or DC motors, unless otherwise stated in Scope of Wor s. For HV stations the 110 V DC shall comprise of two independent systems i.e. doub le batteries and chargers allowing one system to carry all loads while the other system is out of services or when boost charging one battery. The two 110 V bat teries shall be located in separate rooms. Under normal operational conditions the two systems shall each carry 50% of the load. Trip 1 circuits and trip 2 circuits shall be connected to separate systems . All boards and panels shall be supplied with the necessary internal wiring. Batt ery connections and cabling in the battery rooms shall also be included. Miniature circuit brea ers and DC distributions for control, protection, etc., a nd which are placed on the control, measuring and protection boards shall be inc luded in those boards. All instruments and protection relays on the rectifiers and on the boards and pa nels shall be included. Starters, contactors and protection for motors shall be included whenever such e quipment is not provided as part of the motor supply. 4.1.1.15.3 Batteries The Contractor shall calculate and determine the battery capacities, the power r atings of the chargers, the number of sub-distribution boards, the number and si ze of circuits, etc., to suit the requirements of the equipment to be installed, but also considering the future extensions as indicated on the drawings. The number of cells shall be selected so that the voltage of the battery does no t exceed 110% of the rated voltage during float charging. The capacities of the batteries shall be selected to permit a 10 hour service wi thout AC power with DC loads as specified below. At the end of this period the v oltage of the DC networ s (measured on the busbars of the main distributions) sh all be at least 90% of the rated voltage with the batteries being loaded as spec ified. The 30 V or 110 V batteries shall be loaded with the switchyard load. Alarms shall be provided for battery faults.

0oC with ambient relative humidity of up to 80%, the cloc ter than +/-2 seconds deviation in 30 days.

accuracy shall be bet

The batteries shall be of the Nic el Cadmium type. The polarity of the cells, and of the complete battery, shall be engraved and ea sily legible. Bolted insulated interconnections between the cells shall be inclu ded. 4.1.1.15.4 Chargers The rated current of the battery chargers shall be selected to allow for recharg ing a fully discharged battery in 5 hours, in addition to simultaneously supplyi ng the DC load. In addition the chargers shall comply with the following technical data and requ irements: Power supply 415 V AC three-phase or 240 V AC single-phase Output voltage adjustable between 110 V or 30 V 15% Stability of the output voltage less than 1% for the maximum input voltage and fr equency variations, and from 1% to 95% of rated output current Maximum deviation of the current limitation +/- 2% of rated current Ripple of output voltage without the battery connected less than 4% pea -pea of the rated output volta ge with battery connected less than 1% pea -pea of the rated output voltage Dry type transformers and solid state (thyristor or transistor) rectifiers shall be used throughout. Each charger shall be supplied with reactor to reduce rippl es. The chargers shall be completely equipped for a fully automatic and controlled c harging and float charging of the batteries, and shall be of a constant voltage type with current-limiting device. Each of the charges for the 110 V or 30 V batteries shall be rated to maintain n ormal charging and float-charging of both batteries. By means of an automatic change-over switch the charger shall change from normal charging and float-charging to boost charging of the battery. After the boost c harging, the charger shall switch bac to float charging. Each charger shall be complete with instruments, brea ers and protection, includ ing but not limited to:

The above devices shall be placed on the front of the charger cubicle and the al arms shall also be transferred to the National Control Centre/Regional Control C entre. 4.1.1.15.5 Battery Conductors and Fuses Conductors from the batteries to the fuse boxes shall be mounted short circuit a nd earth fault proof. That is, the conductors shall be single pole insulated and in addition placed on insulators, separate for each pole. All conductors shall be placed at minimum 5 cm distance from each other, even at crossings. The conductors shall lead through insulating pipes in the wall of the battery ro om to closed fuse boxes made of insulating material on the wall outside the batt

Brea ers and protection on AC and DC side, with alarm contacts One V-meter for the DC voltage One A-meter for the DC current One lamp indicating that the charger is charging Alarms for "high volts", "low volts", "earth fault" and "fail"

ery room. For the 110 V or 30 V DC system there shall be one box for pole. The w all-holes shall be tightened against gas intrusion.

PARTICULAR TECHNICAL SPECIFICATIONS SUBSTATIONS CONTROL, PROTECTION.

5.1.1 Control, protection and cabling Substations 5.1.1.1 Control Protection and Metering 5.1.1.1.1 General The sections below cover the technical requirements for the systems of control, protection, metering and signalling of the sub-stations. The control and relay b oards shall include all equipment as specified in Scope of Wor s, needed for com plete installations. Any computer solution proposed shall be based on hardware a nd software well proven in HV installations. All data storage media shall be che c ed for internal faults and virus before delivery. The supplied and installed instruments, relays, switches and other equipment sha ll properly match the equipment to which it shall be connected, and which is inc luded in the sections dealing with the different types of switchgear for transfo rmers, transmission lines and other items. The complete and detailed scheme of control, protection, alarms, etc., shall be proposed by the Contractor for each individual sub-station project. In this deta iled planning the Contractor shall carefully consider the future extension of th e plants. The Bidder shall guarantee the availability of spares in 10 years from cessation of normal production. This shall be demonstrated in the bid The control, metering and protection equipment can be placed in common panels bu t not as integrated functions. The panels shall not be unnecessarily crowded but have space for moderate extensions. All control functions and status indication s shall be clearly arranged in a mimic diagram. The bay control unit shall have a mimic diagram for all the equipment in the bay. The equipment shall be on a mo dular basis connected to terminals inside the panels and easy to replace. For in door MV switchgear the control and protection can be located in the instrument c ompartment in the switchboard. All data and parameters specified to the individual distributed control units, s hall be stored in a non-volatile memory so no local logic or information will be lost due to power supply failure. Overview of Substation Automation SAS

This Substation Automation System (SA) comprises full station and bay protection as well as control, monitoring and communication functions and provides all fun ctions required for the safe and reliable operation of the substations. It shall enable local station control via a Personal Computer (PC) by means of a human machine interface (HMI) and control software pac age, which shall contain an extensive range of system control and data acquisition (SCADA) functions. It shall include communication gateway, interbay bus, intelligent electronic devic es (IED) for bay control and protection. The communication gateway shall secure the information flow with Regional Contro l Centres. The interbay bus shall provide independent station-to-bay and bay-tobay data exchange. The bay level intelligent electronic devices (IED) for protec tion and control shall provide the direct connection to the switchgear without t he need of interposing components and perform control, protection, and monitorin g functions. In order to meet the requirements of this specification the detailed design of t he SA is within the manufacturers responsibility, but subject to approval by REA. This specification covers the design, manufacture, inspection, training and test ing at the manufacturers wor s and at site, delivery to site, installation and co mmissioning. 5.1.1.1.2 Design of SAS

The Substation Automation System (SA) shall be suitable for operation and mainte nance of the complete substation including future extensions. The offered produc ts shall be suitable for efficient and reliable operation of outdoor or indoor s ubstations for distribution and transmission. The systems shall be of the state-of-the art based on IEC61850, IEC60870-5-101,1 03,104 for operation under electrical conditions present in high-voltage substat ions, follow the latest engineering practice, ensure long-term compatibility req uirements and continuity of equipment supply and the safety of the operating sta ff. The offered SA shall support remote control and monitoring from Regional Control Centre via gateways. The system shall be designed such that personnel without any bac ground nowledg e in microprocessor-based technology are able to operate the system easily after having received some basic training. Cubicles shall incorporate the control, monitoring and protection functions spec ified, self-monitoring, signalling and testing facilities, measuring as well as memory functions, event recording and disturbance recording. The basic control f unctions are to be derived from a modular standardized and type-tested software library. For safety and availability reasons the Substation Automation System shall be ba sed on a decentralized architecture and on a concept of bay-oriented, distribute d intelligence. Functions shall be decentralized, object-oriented and located as close as possib le to the process. The main process information of the station shall be stored i n distributed databases. The typical SA layout shall be structured in two levels, i.e. in a station and a bay level. The system shall accommodate control, data acquisition, alarm handling and trend analysis. The figure below illustrates the main principles. However, the Employ

er wants to eep a conventional bac up control facility with indication at bay level (local control). I.e. control of motorised brea ers and switches, status i ndication of all brea ers and switches, analogue or digital indication of measur ands (I and Imax all phases, MW and MVAr) and alarm annunciation shall be presen ted by discrete components. The control of high and medium voltage circuit brea ers, isolating switches and tap changers shall ta e place in a hierarchy with four levels as described in Pr oject Specific Data Section. From each level one may bloc access from higher le vels: The control units shall ta e auxiliary voltage form the station battery and be e quipped with self-supervision systems giving alarm by internal faults. The system shall be fail-safe eeping all equipment in the last status by loss o f communication to higher systems.

At bay level, the IEDs shall provide all bay level functions regarding control, monitoring and protection, inputs for status indication and outputs for commands . The IEDs should be directly connected to the switchgear without any need for a dditional interposition or transducers. Each bay control IED shall be independent from each other and its functioning sh all not be affected by any fault occurring in any of the other bay control units of the station. The data exchange between the electronic devices on bay and station level shall ta e place via the interbay bus. The bus shall be realized using fibre-optic cab les or Ethernet. At station level, the entire station shall be controlled and supervised from the station HMI. It shall be possible to control and monitor the bay from the bay l evel equipment, in the event that the communication lin fails. The station wide interloc ing shall also be available when the station computer fails. To provide highest reliability the station HMI and the gateways shall wor compl etely independent meaning retrieving the process data directly from the bay leve l devices. Additionally the gateway and the station HMI shall be configured full y redundant to ensure full functionality in case of single point of failure. Clear control priorities shall prevent that operation of a single switch can be initiated at the same time from more than one of the various control levels, i.e . SCADA, station, bay level or apparatus level. The priority shall always be on the lowest enabled control level. The station level contains the station-oriented functions, which cannot be reali sed at bay level, e.g. alarm list or event list related to the entire substation , gateway for the communication with remote control centres. A dedicated master cloc for the synchronization of the entire system shall be p rovided. This master cloc should be independent of the station computer and of the gateway, and should synchronize all devices via the interbay bus. The SA shall contain the following main functional parts: Human Machine Interface (HMI) with process database Separate gateway for remote supervisory control via SCADA

Master cloc (e.g. GPS receiver) Collection of the relevant data concerning the substation and distribution of th e data where needed Bay and station level devices for control, monitoring and protection Bay-oriented local control panels. 5.1.1.1.2.1 Signal List

The signal list shall be agreed between the REA and the Supplier and sha ll comprise the following; Commands for all CBs and motorized switchgear Status Indications Alarms Set Point Regulation Measurands The design shall include mapping of the Signal list from the supplier (as addres sed & used in the HMI) to the requirements of the Regional Control Centre (super visory level) signal requirements. The design of the SCMS SA system shall include the following; Control mode selection Select-before-execute principle Command supervision: Interloc ing and bloc ing Double command Autoreclosing Monitoring pole discrepancy and trip function Transformer tap changer control Display of interloc ing and bloc ing Brea er position indication Alarm annunciation Measurement display Local HMI (local guided, emergency mode) Data storage for at least 200 events 5.1.1.1.2.2 Select-before-execute

For safety reasons the command is always given in two stages: selection of the o bject and command for operation. These two commands are realized with one contact each; only when both contacts a re closed, is the final command (open or close) executed.

5.1.1.1.2.3

Station HMI

The operator station HMI shall provide basic functions for supervision and contr ol of the substation. The operator shall give commands to the switchgear on the screen via mouse clic s on soft- eys. The HMI shall give the operator access to alarms and events displayed on the scr een. Aside from these lists on the screen, there shall be a printout of alarms o r events in an event log. An acoustic alarm shall indicate abnormalities, and all unac nowledged alarms sh all be accessible from any screen selected by the operator. SCMS shall include the following displays &functions: Control of all switching devices Real time indication of status, alarms and devices

Display of measured values, high/low limit chec ing. Indication of real and historical values Data Archiving Disturbance Monitoring and analysis Trend display facilities Protection device information Remote access to SCS from the Central Control Centre via the SCADA system Remote communications Indication of automatic tap changer relay status Manual local and remote setting of tap changer relay Self chec & diagnostic: These functions are essential for system operation Safety and easy maintenance. Manual data setting (can be performed by the operator) using the following functions: Device status setting Analogue data setting Control inhibit setting Alarm inhibit setting Maintenance tag setting High/Low limit setting Protections relay parameter setting, etc. Also, all required signals related to the control, status indications and monito ring of the switchgear and other relevant equipment shall be provided to the SCS . The configuration of the station HMI shall be made using the operator station in the Windows environment. The various functionalities shall be customized by eas y-to-use interactive configuration tools. The configuration shall include the vi sual presentation of the object, adaptations needed in the process database, and adaptations of the communication configuration data.

5.1.1.1.2.4

SCMS Equipment

Substation Computer The substation computer coordinates the operation of the SCS. The functionality shall include: o Alarm Grouping o Event Logging o SCS Management software The substation master control shall be capable of automatic restart in the event of power failure without loss of functionality or local database. It shall be readily possible to update the substation computer software to alter or extend the SCS functionality. The Tenderer shall s tate how this is achieved. Substation Local Area Networ Local substation communications shall use Ethernet LAN to connect the components of the SCS using IEC 61850 protocols. The LAN may be of star-coupler configurat ion. Fibre optic can be used only in instances where the lengths are too long to be handled by Ethernet LANS. No single point of failure of the substation LAN s hall result in any loss of substation control functionality. The station controller must be able to receive and transmit information from fut ure extensions on an IEC 61850 protocols.

. Operator Wor station The Operator wor stations / HMIs shall consist of high performance computer and monitor with computer des . It shall be fully integrated into the SCS on the sub station LAN. The proposed HMIshall be based on the latest PC technology availabl e on the mar et at the time of offering. The operator des and chair shall be of high quality construction, appropriate t o continuous use by the operator. Printers Two high performance printers shall be provided, each capable of connection to t he substation LAN. 1 off Matrix printer Logger, for events and for operator log. 1 off Colour Printer to print screen shots or other information Satellite Cloc Time synchronization and event time tagging with resolution of at least 1 ms sha ll be provided by a satellite GPS cloc signal as the Master cloc , The secondar y cloc shall be provided via the SCADA system. Audible Alarm One common sounder should be provided to give at least two distinct audible alar ms in case of alarms/faults or events. The sounder shall be configurable according to the event type and to the control status of the SCS (Local/Remote). An auto-silencing scheme shall be provided fo r the alarm and the sounder shall be controlled by distinctly labeled Audible ala rm ON/OFF control switch. The complete unit may be mounted in suitable relay/control panel.

5.1.1.1.2.5

Data Transmission

The SCS shall be able to communicate with the ABB type SCADA system using a vari ety of open protocols. The RCC shall be capable of remote access to the SCS via the SCADA system. The protocols currently supported are IEC 60870-5-101 &IEC 608 70-5-104. This communication lin must be via an approved communication mode complete with the terminal equipment all supplied, installed & commissioned by the Contractor . Common Bay Unit The Common Bay Unit (CBU) shall be provided for monitoring of common services. T he CBUshall be located in Control/Relay Room. 5.1.1.1.3 Control Stations

5.1.1.1.3.1 Distributed Control Units Outdoor switchgear shall have a control and relay panel in the control room with facilities for Local Control. The local control for indoor brea ers can be loca ted in the instrument cabinet. The protection and control functions can also be combined in one unit. Signals from protection equipment can alternatively be har dwired to bay control unit. The bay control unit shall handle position indications from circuit brea ers, di sconnectors, earthing switches and transformer tap changer. It shall control clo

sing and opening of circuit brea ers and receive time tag, store and display ala rms and measurements. The position indication from the on load tap changer shall be ta en from a poten tiometer switch supplied and mounted on the transformer. The alarm handling capacity must be sufficient to handle all normal alarms from the switchgear, the protection, the transformer and the tap changer. All commands from the remote and supervisory control can be given to bay control unit, which execute the commands. Conventional interloc s should be retained. All microprocessor based control equipment such as bay control units shall be ga lvanic ally isolated from the environments outside panels, using opto couplers o r interposing relays for signals, galvanic isolated measuring transducers for me asurements and relays or contactors for commands. All data and parameters specified to the individual distributed control units, s hall be stored in a non-volatile memory so no local logic or information will be lost due to power supply failure. Editing and input of local data and parameters shall be performed locally by sui table programming equipment to be included in the supply. Preferably it should a lso be possible to edit any such local data at higher control level and download this information. 5.1.1.1.3.2 Interface with Supervisory Control and Data Facilities In order to interface and achieve the desired functionality of the SCADA/EMS sys tem, data concentrators in substations shall be based on standard IEC 60870-5-10 1 protocol. The following SCADA facilities shall be available from the substatio n. Supervisory control of all circuit brea ers and motorized line and bus bar isola tors. Remote controls of on-load tap changers. Status Indications of all circuit brea ers, isolators, positions of on-load tap changers and local/remote, Automatic/ Manual, Main/Follower mode of automatic voltag e regulators where applicable. These shall be reported by exception, but system shall allow scan by demand. Alarms; Bay alarms, Transformer alarms, Bus bar alarms, station alarms and warni ng shall be collected by the SCADA. Measurements; bus bar voltages, frequency active & reactive power, 30, 48 & 110 V DC voltages and line currents. Energy measurements, this shall be at interconnection points and feeders. Where data concentrators will capture and process data for transmission to the c ontrol centres it is expected that the following functions shall be provided: Single command outputs, double command outputs for supervisory (on/off) control of circuit brea ers, isolators etc with chec -before-execute function. Regulation command outputs e.g. raise/lower command outputs for transformer tap changer control and set point transmission with validity chec before execution. Single and double state digital inputs. Each status (open/closed) of two state d evices such as circuit brea ers or isolator position should be acquired independ ent from each other and chec ed for validity. Either undefined sates li e open a nd closed or neither open nor closed shall be alarmed with run-time monitoring a dapted to the HV equipment operation parameters. Transformer tap changer position indication should be processed as coded signals , by digital measurement input modules. Analogue measured inputs with pre-processing including validity chec , local lim it supervision and measurement transmission on exception (only if a significant

individually selectable change occurs). Measurement transmission with a resolution of at least 10 bit plus sign as this is the most economical way to increase the overall accuracy of the measurements. Metering pulse inputs for acquisition of energy values with internal storage to allow cyclic acquisition of meter readings. Sequential event recording with time stamping of events (time stamp 10ms, resolu tion 1 ms) Selectable priority levels for data acquisition to speed up the acquisition of c ircuit brea er status changes and important measurements. The Contractor shall as part of his supply fill in I/O lists for each substation in the format to be specified by the employer. The I/O lists will comprise the name tag, address tag (fitted to the SCADA Contractor's system of addressing the information), ASDU type in accordance with the agreed interoperability list and other information as required. 5.1.1.1.4 Automatic Voltage Regulator The transformer bay shall be equipped with an automatic voltage regulator acting on the on line tap changer The automatic voltage regulation function shall pur sue to eep a constant (but adjustable) voltage on the low voltage side of the t ransformer by raising or lowering the tap changer (however, an appropriate hyste resis shall be included to avoid over-frequent tapping). The regulation shall be achieved either by a freestanding relay or as a function in the control system. If connected in parallel the transformers shall be regulated in a master-slave, circulating current or negative reactance system where each transformer can be s elected as master. If the master is tripped another transformer shall ta e over as master. Manual switchover to conventional tap changing (local and remote) shall be accom modated. Necessary bloc ing by out of range stepping (including inappropriate difference between parallel units) and disconnected transformer shall be included. The actu al tap position shall be displayed locally and remote as well as the identificat ion of the master unit.

5.1.1.1.5 Indicating and Metering Instruments and Metering Transducers (if used) Remote indication of measurands shall ta e place on the station controllers VDU. Where local instruments are used, they shall be of the dial type which is easily legible, with blac graduations and numerals on a white bac ground. The instrum ents shall have a dimension of 96 x 96 mm. The error of the instruments shall be maximum 1.5% rec oned on the total length of the scale. All instruments shall b e of a narrow frame type. Preferably the measurements shall be performed directly in the SCS or in the pro tection relays. However, if needed, the metering transducers (converters) shall be installed in the boards and shall be suitable for connection to the potential and current transformers. The cases shall be hermetically sealed against moistu re and dust. Transducer output shall be an impressed DC current of 0-10 mA outpu t. The maximum meter reading at the receiving end shall be equivalent to 30% ove rload of the source value. The permitted resistive load shall be at least 1000 o hms. The accuracy class shall be minimum 1%. The auxiliary voltage, if required (preferably not) shall be 110 V or 30 V DC. The W and VAr measurements shall be of the three-element (three-wattmeter) type when connected to primary systems with grounded neutral. W and VAr measurements

for transmission lines shall be such that the direction of the power flow is ind icated by negative direction towards the substation and positive direction out o f the substation. The voltage shall be measured phase-phase voltage, one reading is sufficient. The scale on the different types of instruments shall be proposed by the Contrac tor and be subject to approval by the Project Manager. 5.1.1.2 Factory Acceptance Test The Control system with Station Control Unit and Field Units shall undergo a fac tory acceptance test where the total system is connected and all measurements an d controls are simulated. 5.1.1.3 Training An in-depth training in the application, fault finding and maintenance of the co ntrol system shall be provided. The training must include but not be limited to the following: System configuration Programming tools Picture editing Operating system System maintenance Any other training regarded necessary by the Bidder Communication protocols, IEC 60870 Protection device settings and configurations 5.1.1.4 Spare Parts and Tools The Contractor shall furnish a list of recommended spare parts and test equipmen t for the purchased SA system to maintain reliable SCMS operation. The spare par ts list shall be subdivided into: Short-term spare parts that is necessary for two (2) years of operation. These s pare parts shall be included in the contract and shall comprise at least one spa re module for supplied equipment and basic tools for system maintenance. Long-term spare parts that is necessary for ten (10) years of operation. 5.1.1.5 System Maintenance Editing and input of local data and parameters shall be performed locally by sui table programming equipment to be included in the supply. Preferably it should a lso be possible to edit any such local data at higher control level and download this information. The programming equipment shall also be suitable for fault di agnostic. Laptop Computer for maintenance, information transfer and emergency HMI A Personal Computer (PC) as a service unit shall be foreseen for on site modific ations of the control and protection devices. This service unit shall be used fo r documentation, testing, commissioning & future maintenance wor on the SCMS.

5.1.1.6 Protection 5.1.1.6.1 General Requirements The protection relays to be installed for the protection of transmission lines, transformers and other HV/MV equipment shall be numeric of robust type, insensit ive to changes of temperature, vibration, etc. Input from the measuring transformers shall be based on 1A, 110 V AC. The relays

power supply must accept a rated operating voltage input range from 24-240 V AC/ DC without the use of external resistors and without external reconnections and shall be designed to withstand the high voltage interference which is normally e xperienced in high voltage switching stations. There shall be galvanic isolation on all inputs and outputs including power supp ly input. Isolated opto inputs must accept a rated operating voltage from 24-240 V AC/DC without the use of external resistors and without external reconnection s. The Contractor shall endeavour to standardise the equipment by using as few diff erent types of instruments, relays, switches and other devices as possible. 5.1.1.6.2 Relay Construction and Mounting The relays shall comply with the requirements of IEC 60255. Modular constructed equipment shall be tested as a complete assembly and details of such tests shall be agreed with the Project Manager when details of the construction are nown. Constructional details shall satisfy the following requirements as appropriate: Relay contacts shall be suitable for ma ing and brea ing of the maximum currents which they require in normal service: The protective relays shall be provided w ith sufficient contacts for circuit brea er tripping. All protective relays, whi ch initiate tripping, shall have not less than two independent pairs of contacts of which one shall operate the tripping relay or circuit brea er trip coil with out the interposition of auxiliary contactors and without the use of reinforcing contactors. A watchdog relay must detect internal fault including low auxiliary voltage. The auxiliary voltage supply to each discriminative relay unit shall be continuousl y monitored and an alarm shall be given whenever the voltage exceeds the limits for reliable protection operation. The measured service currents and/or service voltages must be visible at the fro nt display of the relay. In order to see all values at the same time, a four-lin e front display must be used. It shall also be possible to select default displa y. The relay must store a record of the fault-trip values to facilitate post fault analysis including, such as currents, voltages, operating time identification of the faulted phase and faulted zone etc. The values must be available at the fro nt display of the relay and transferable to the supervisory system. The storage must not be dependable of the auxiliary supply. It must be possible to do all settings both from the relay front panel and/or wi th a PC through connection in the front panel of the relay The relay must have a complete number eyboard in the front panel for settings a nd downloading of measured values on the front panel display Wherever practicable the design of the relay schemes shall be based on the "fail -safe" principle. For example, care shall be ta en to ensure that loss of DC sup ply or an open circuit does not cause incorrect opening or closing of circuit br ea er. Circuit brea er or disconnector repeat relays should be of the on-latchin g type and a discrepancy alarm shall be provided to chec correct operation of t he relays following a circuit brea er or disconnector operation. The loc out tripping relays shall be of the latching type and shall be hand and electrically reset. In order to achieve a high degree of security in function, the protection system

of each high voltage main component (lines, power transformers, shunt reactors, etc.) shall consist of two separated protection sets, main 1 and main 2 where a pplicable. Where two protection sets cover the same fault they shall be divide d into two electrically and mechanically separate parts by means of: Separated DC power supply, separated boards, separate current transformer cores, separate voltage circuits, separated tripping devices, separate tripping coils, separated cables, separated relay protection channels.

The restricted earthfault and differential functions for the transformers shall also follow the same principle for separation as outlined above. The Auxiliary relays for protection trip shall have operating speed of less than 7 millisecond. Strict requirements shall be given on selectivity in isolation. Only the minimum possible part of the plant shall be tripped to isolate the fault or clear the a bnormal conditions. The Contractor shall for each substation carry out the protection plan for relay settings. The plan shall be submitted to the Project Manager for approval. All necessary intermediate current and voltage transformers, converters and auxi liary power supply units shall form part of the supply. The users manuals must be user-friendly and divided into one general hardware an d software description and one setting manual describing only the specified func tions and necessary settings for the different types of relays 5.1.1.6.3 Relay Testing Facilities Each protection relay shall be provided with facilities for the connection of re lay testing equipment. The facilities shall include plugs for connecting the tes ting equipment and switches for disconnecting the primary circuit of the relay, short circuiting current transformer circuits (ma e before brea ) and disconnect ing the tripping circuit. Programmable relays shall be delivered with software and software licences neede d for testing, setting and reconfiguration of the relays. If hardware other than laptop is required for this such shall be included in the supply. 5.1.1.6.4 Fault Clearing Time The protection system plus the circuit brea ers shall have fault clearing time o f not more than 60 ms for voltages 132 V and above and 100 ms for voltages belo w. 5.1.1.6.5 Trip Circuits All trip circuits shall be duplicated with one group tripping the circuit brea e r directly and the other routed via a trip relay with heavy duty contacts. All l oc out trips shall be routed via a hand reset/electrical reset relay with heavy duty contacts. Closing of circuit brea ers from substation control systems or lo cal operation cubicle shall be inhibited if the loc out trip relays are not rese t. The trip circuit supervision shall be independent of the protection relays an d provided to monitor each pole of each trip circuit on circuit brea ers with se parate mechanism per pole with the circuit brea er in both the open. The status of the trip circuit shall be indicated on the panel.

An alarm shall be given to signal faulty trip circuits. The alarm shall be time delayed to prevent operation during momentary dips in the DC supply. 5.1.1.6.6 Fault Recorder and Fault Locators Fault recorders and fault locators must be integrated in the line protec tion relays and use the same input parameters as the main protection function. T he fault locators must provide records for fault analysis in the Standard Common Format for Transient Date Exchange (IEEE-COMTRADE) Necessary signals from the tra nsformers shall be included. 5.1.1.6.7 Supervision The supply shall include hardware and software for remote setting, supervision a nd data acquisition of the protection relays, fault locators and fault recorders . The software will be installed on a central PC with windows XP and windows 7 ope rating system. This PC will be shared with other Contractors. The centrally inst alled software shall ma e it possible to contact the relays over the telephone n etwor via modems installed in each substation. The Contractor shall supply and install the modems, connect the relays and test the complete chain of control. The protection relays shall also communicate with the bay control units over the open protocol IEC 870-5-103. 5.1.1.6.8 5.1.1.6.8.1 Protection of HV system 66 Transmission Line Protection

Facilities shall be provided to enable one protection (main or bac up) to be ta en out of service for maintenance or testing without affecting the operation of the other in any way. The facilities shall include duplicate brea er trip coils, separately fused DC circuits and the use of separate CT and VT windings. The pr otection relays shall be arranged to initiate a single set of auto-reclosing equ ipment. The line protection schemes shall contain the following protection relays: (i) (ii) (iii) (iv) (v) ing to (vi) (vii) (viii) Distance Protection Relay Three phase directional over current and Earth fault relay Sensitive Earth fault relay Auto reclose Relay Trip circuit supervision visible from the front of the panel without hav open the panel door. Autoreclose IN/Out switch Brea er maintenance Brea er failure

Distance Protection One complete distance relays of full scheme non-switched type for phase/earth an d phase/phase faults and with up to four measuring zones. In addition to the abo ve the numerical relays must have the following characteristics: . Ratings: AC Inputs: 110V, 1Amp (three phase). Power Supply Voltage: 110VDC. (Universal power supply of 30-300VDC is preferred) The relays shall be of Numeric design. Impedance criteria. Three zones phase phase Protection. Three zones phase earth Protection Additional Zone 4 Protection Automatic Switch on to fault. Independent settings for each zone.

All these functions must be integrated in a compact pac age and a user-friendly menu driven interface should be available to enable the setting and testing of t he relays. Three phase numeric directional over current and earth fault relay Should incorporate the following features: Relay must be of Numerical design. Current setting range for over current relay 0.5In-2.4In Current setting range for earth fault relay 0.05In-0.8In Quadrature connection for polarising voltage (Vn=110) Applicable on the LV side of a Dyn1 transformer High set Element, with a setting range of 1-32In The phase and earth directional elements should be individually selectable. I.D.M.T characteristics according to BS 142 or IEC 60255 and Definite time chara cteristic The normal operating boundary shall be +/-90 degrees from relay characteristic a ngle Relay sensitivity should be 1% of rated value of current and current polari sing voltage at an angle equal to the relay characteristic angle. Time setting multiplier 0.05 - 1.0 Bro en conductor protection feature Negative sequence Protection Feature Highset Element for both over current and earth fault Protection, with a setting range of 1-30In. Thermal Protection. Dedicated Brea er Fail Protection. Circuit Brea er Maintenance Incorporate Fault records, Event Records and disturbance records. Configurable output relays with ability to output starting elements to control T ripping of other upstream Protection relays. Must provide all technical and operations manuals and configurations and setting s software. Sensitive Earth Fault Relay. Should incorporate the following Features; Relay must be of Numerical Type Current setting range for earth fault relay 0.005In-0.8In Definite time delay characteristic; setting range, 0- 30 Seconds. Circuit Brea er Maintenance Fault records, Event Records and disturbance records.

one of ded.

Distance to fault measurement. Display: On operation, the relay should display the faulted phase(s), time and z operation and distance to fault. Power Swing detection: Bloc ing/non bloc ing selectable by user. Scheme communication logic and residual current compensating. IDMT Three Phase/Over current & Earth fault Protection. Fuse failure supervision. Auto- reclose logic 1 and/or 3 phases. Three pole tripping logic. Disturbance and event records including software for disturbance analysis. Fault record should be incorporated. At least six (6) Binary inputs. Mho/Quadrilateral characteristics. Stability against Switching inrush currents and Reverse faults. Clear faulted phase indication. Clear fault identification even for boundary conditions. Software necessary for all above functions shall be provided. Three sets of Installation, Commissioning and maintenance manuals shall be provi

Autoreclose relay Selectable 1 - 3 autoreclose shots Independent set dead time for each shot Autoreclose inhibit after manual close Separate input for over current high set element and I.D.M.T element Autoreclose inhibition for over current high set element. 5.1.1.6.8.2 Transformer Protection 66-33 V Transformers (HV side) The protection contains the following protection relays on the HV side: (i) (ii) sistor (iii) (iv) s (v) (vi) (vii) Biased differential protection relay for two winding Transformer. HV & LV restricted earth Fault relay. This should include stabilising re and voltage dependent resistor (metrosil) HV Three-Phase Over current and Earth fault Protection Relay Auxiliary relays with annunciator for the following transformer function Tx Buchholz gas Tx Buchholz surge OLTC Buchholz gas OLTC gas relay Pressure relief Winding temperature Alarm Winding temperature trip Oil temperature alarm Oil temperature trip Tx oil level low OLTC oil level low Standby earth fault relay. HV Master trip Trip circuit supervision relay for HV brea er

Biased differential protection for a two winding transformer. Overall differential protection equipped with over current stabilising for exter nal faults and insensitive to in-rush current. The operating time of the protect ion shall be less than 20ms. This is considered main 1 transformer protection This should incorporate the following features: Relay Must be of Numerical design Pic up setting range, 0.1 to 0.5In Should incorporate a high-set Element with a setting range of up to 20In. Magnetising current inrush restraint Integral CT ratio compensation (0.1-2) and vector group compensation Measurement and indication on the MMI, of phase, differential and bias currents Storage of Fault records and Event records; the Fault flags should be accessible on the relay LCD screen without opening the relay cover. Overfluxing restraint Overfluxing protection with Alarm and Trip functions 5th harmonic restraint feature on the differential Element. Appropriate Dual Bias characteristic to ensure relay stability for heavy through faults Should incorporate a disturbance recorder feature. Red L.E.D to indicate Tripping Relay Self diagnostic and Alarm feature Ability to Latch output contacts to prevent TX re-energizing before carrying out investigations.

Drop off /pic up ratio >90% Low transient overreach < 10%

Three phase numeric IDMTL over current and earth fault relay Should incorporate the following Features; Relay must be of Numerical Type Current setting range for over current relay 0.5In-2.4In Current setting range for earth fault relay 0.05In-0.8In I.D.M.T characteristics according to BS142 or IEC 60255 i.e. SI,VI,EI,LTI, inclu ding definite time for the high-set Elements. Time setting multiplier 0.05 - 1.0 Bro en conductor protection feature Negative sequence Protection Feature Highset Element for both over current and earth fault Protection, with a setting range of 1-30In. Thermal Protection Dedicated Brea er Fail Protection. Circuit Brea er Maintenance Fault records, Event Records and disturbance records. Configurable output relays with ability to output starting elements to control T ripping of other upstream Protection relays. Drop off /pic up ratio >90% Low transient overreach < 10% Restricted Earth fault relay Relay must be of Numerical type Relay should reject harmonics produced by C.T saturation The offer should include the associated stabilising resistor and voltage depende nt resistor (metrosil) Current setting range 0.05-0.8In Operating time < 25ms at 5 times the setting Restricted earth fault and differential protection functions shall be provided i n separate units. LV side protection defined below. 5.1.1.6.8.3 Transformer Protection 66-33 V Transformers (LV side) The protection shall be as follows: (i) Three phase over current and earth fault relay (ii) Three phase directional over current and earth fault relay (iii) LV Master trip relay (iv) Trip circuit supervision visible from front of panel without opening rel ay compartment door. The characteristics of the relays shall be as above. 5.1.1.6.8.4 Under Frequency Relay Each busbar shall be equipped with a separate under frequency relay for load she dding of all outgoing brea ers. Each trip circuit shall be equipped with a clear ly mar ed isolating lin . The relay shall be numeric having two independently time delayed settings in the range 50-47Hz with a resolution of 0.1 Hz. 5.1.1.6.8.5 Busbar Protection 66 V and above. Busbar protection schemes shall be provided at busbars for voltages 66 V and ab ove. Low impedance schemes will be acceptable provided full busbar protection co verage to include single phase and phase to phase faults can be achieved. The ty pe of tripping criteria has to be fully described and preference will be given t

o systems with more than two criteria chec s before tripping. The busbar protect ion relays must be of the numeric type with full discrimination between the busb ars even with closed bus coupler. It shall have CT supervision, 5.1.1.6.8.6 Brea er Bac up Protection The brea er bac up protection shall only isolate the busbar to which the faulty brea er is connected. I.e. the station shall, as far as possible, remain in oper ation by a brea er failure. The busbar protection can be used for selection of b rea ers to be tripped. 5.1.1.6.8.7 Bypass Trip Logic, Bus Coupler Where bus coupler is specified or already installed, the trip signals of any byp assed circuit brea er shall be instantaneously transferred to the bus coupler. Electrical interloc s shall be provided to ensure that only one circuit can be p ut on bypass at any one time. This is only possible through the reserve busbars. The bus coupler protection shall in addition to possible bypass consist of a 3-p ole IDMTL overcurrent relay and one IDMTL earth fault relay, all with standard i nverse characteristics as well as brea er failure bac -up protection. 5.1.1.6.9 Synchronizing Equipment Circuit brea ers and the secondary side transformer circuit brea ers at 66 V an d above shall have chec synchronism (controlled closure) equipment. Closure of the circuit brea er shall only be possible when the phase angle, slip and voltage difference between the measured voltages are within preset ranges. Permitted phase angle difference shall be adjustable in the range of 5 to 100 de grees, the slip shall be adjustable in the range of 0.05 to 0.5% and the voltage difference shall be adjustable from 2 to 20%. 5.1.1.6.10 Relay Test Equipment The relay test equipment shall be a portable three phase unit with facilities fo r testing of over current relays, negative sequence relays, differential relays, earth fault relays both directional and non directional as well as auto reclosi ng equipment. All sources of test units shall be integrated in the unit Digital display for volt and amps shall have 1% accuracy whereas the digital timer shall have a resolution not less than 1 ms. It shall be possible to connect the unit to a personal computer and necessary software for data recording and data handli ng shall be included. 5.1.1.6.11 Relay Settings The Contractor based on networ and equipment requirements shall provide the pro tection setting. The Contractor, prior to ma ing all commissioning tests, shall apply the setting s to the equipment. 5.1.1.7 Metering All metering equipment shall meet the requirements in IEC 60687 and IEC 61036. Meters shall be designed for 110 V+15/25 %, 50 (47-53) Hz and 1/5 A secondary vo ltage/current from measuring transformers. Auxiliary supply for the meters shall be 110 V, 50 Hz from the voltage transformers, or 110 V DC from the DC supply s ystem. Secondary current 1 or 5 A from current transformers shall be decided on a later stage for each individual meter. 5.1.1.7.1 Meters for Outgoing 33, and 11 V lines Electronic meters for active power, reactive power (Wh and VArh) and data record ing units shall be provided for each outgoing feeder for registration of power i

rrespective of the direction of power flow. The Wh meters and recorders shall be of class 0.5 and class 0.5 for the VArh. The scale on the different type of ins truments shall be proposed by the Contractor and be subject to approval by the P roject Manager. The meters shall be able to communicate with the control system with pulses and on an IEC 60870-5-103 protocol. 5.1.1.8 LV cables and Cable Rac s 5.1.1.8.1 General This chapter covers the technical requirements of the external cables and appurt enance, cable laying, supply and erection of cable rac s, etc., for all installa tions described under these Specifications except for the cables included in Dom estic Installations (light, small power, etc.), which is described under Civil W or s. The supply and installation of the internal cables between the various parts of equipment shall be included in the Chapter in which the relevant equipment is sp ecified. The cable trenches including trench covers as well as conduits and cable rac s s hall be furnished and installed by the Contractor. Other necessary materials and equipment for laying, fixing, terminating, etc. of the cables shall also be pro vided by the Contractor. For calculation of the length of cables, cable rac s, etc., the Bidder shall use the measurements computed from the Drawings. No alteration in the lump sum pric es shall be made due to possible rearrangement of any installation, changes in t he building constructions, or any other reason, which may influence the quantity of cables and appurtenances to be supplied. If, however, a considerable change in location of a switchyard should be made, t he price shall be reduced or increased proportionally to the amount of reduction or increase in the distance between the switchyard and the control building. No price adjustment shall be made for deviations of less than 25 metres. The cables shall be delivered in full lengths, and consequently no joints are pe rmitted. All accessories shall be provided, such as potheads, galvanised and pai nted steel supports, clamps, etc. 5.1.1.8.2 Technical Requirements

5.1.1.8.2.1 Cables The design, manufacture, rating and testing of all cables shall comply with the provisions and requirements of the applicable IEC recommendations, supplemented by recognised national standards if necessary. 40 oC maximum design ambient temperature shall be applied for all cables internally in the switchyard, between the switchyard equipment and the control building and inside the control building. All cables shall be of termite proof design, e.g. by brass tape or equal approve d techniques. Wherever the ris of inductively transferred disturbances during abnormal (short -circuit, earth fault) conditions as well as during normal conditions exists, th e cables shall be screened. In order to have a minimum number of types of cables, all cables shall be standa rdised as much as possible as regards cross-sections, number of cores and mar in g of cores.

For the three-phase low-voltage system, four wire grounded neutral system shall be used. The low voltage power cables (AC and DC) and all cables for control, measuring, etc., shall be PVC insulated and PVC-sheathed with an earthed concentric copper screen. The conductors shall be of electrolytic copper. Further requirements are stated in General Specification of Wor s, "Wiring and T erminal Bloc s". 5.1.1.8.3 Cable Laying The main guidelines and general requirements for the cable laying are stated in General Specification of Wor s, Cable Laying and Routing. Medium-voltage, low-voltage power cables and control and measuring cables shall be segregated from each other throughout the plant. The cables shall be laid in an orderly manner and crossings in the same plane sh all be avoided. All cables shall be laid on cable rac s where they are not running in cable duct s or trenches, or in protecting tubes. The cable rac s shall be designed to allow the laying of the cable from the side (s) without pulling through. All rac s and fixing devices shall be hot-dip galva nised. The Contractor shall supply trenches and conduits of concrete. The last section of a cable on the switchyard may be laid in a conduit or a pipe , they shall be laid in such a way that cables easily can be exchanged without d igging. 5.1.1.8.4 Diagrams and Calculations The Contractor shall deliver cabling plans and diagrams showing each cable conne ction. Drawings for the cable rac s, fixing features, etc., shall also be provided by t he Contractor. All dimensioning calculations shall be submitted to the Project Manager for appr oval. The Bidder shall in his Bid give detailed information about the different types of cables proposed.

5.1.1.8.5 Tests Factory tests and site tests shall be performed in accordance with the applicabl e IEC recommendation. Type test certificates shall be submitted on request. 5.1.1.9 Earthing (Grounding) System 5.1.1.9.1 General

The phase colour identification code to be applied shall be made ntractor shortly after the award of the Contract.

nown to the Co

This chapter covers technical requirements of the earth electrode systems and th e earthing conductors for the connection of metallic parts, of lightning arreste rs and of the system neutrals, designed to protect persons and material and to a llow for the correct service, operation and maintenance of the installations. The substation earthing system shall be designed principally according to ANSI/I EEE 80 - 1986 Guide to Safety in AC Substation Grounding. The earthing system shall consist of the earth electrode system in the ground un der the switchyard, and of the earthing conductors, over-ground and in the build ings. The Contractor shall design the complete earthing system. He shall measure and v erify the specific earth resistance at all places where earthing electrodes will possibly be buried, he shall ma e drawings of the earthing electrode grids, cal culate the resulting earth electrode resistance, and supply all information abou t the planned earthing electrode systems. He shall also ma e drawings of the ear thing conductors, over ground and in the buildings and ma e the necessary calcul ations for the dimensioning of the earthing conductor systems. All the above sha ll be submitted to the Project Manager for approval. For Biding purposes the earth resistivity shall be ta en as 2500 ohm-metres. The contractor shall be responsible for providing and installing the underground earthing system of the switchyard and for the connecting of all related equipme nt to this earthing system and shall furnish all required materials for this pur pose. The earthing system shall earth operational electric systems of any type a nd voltage such as transformer neutrals, lightning arresters, secondaries of ins trument transformers, etc. Moreover, the Contractor shall ta e the necessary measures and furnish the requi red material for the safe earthing of: All steel structures, metal parts and overhead ground wires of the switchyard. All fences of the station, whereby for outer fences special care shall be ta en to avoid injurious step and touch voltages for personnel standing outside and in side these fences. All metal parts, even if these do not constitute a conducting part of an electri c system of the plants, such as machinery, operating des s, piping, sewers, rail s, metal tan s, lighting, fixtures, cable rac s, etc. All operational electric systems such as power and instrument transformers, ligh tning arresters etc. All connections between equipment and the earthing networ shall be exposed (not embedded) and easily accessible for chec ing of the transition points. Bare con ductors, as part of the earthing system, embedded directly in the concrete will not be accepted. Similarly, bolted connection of metallic constructions, do not form an acceptable earthing connection. The layout drawings, the detailed calculations for the earthing system and the r elevant data, which the Contractor will use as basis for his design, shall be su bmitted to the Project Manager for approval. The Contractor shall also be respon sible for performing all measurements and final chec ing of the whole of the ear thing system. Further requirements related to the earthing system are specified in Particular Specifications. 5.1.1.9.2 Technical Requirements, General The earthing system shall be constructed and installed to comply with the requir

ements of local regulations and of the applicable Standards. More specifically and independent of (or in addition to) the regulations and sta ndards, the earthing system shall provide: Adequate protection for personnel against dangerous voltages, currents and arcs Safe touch voltages and step voltages A low earthing impedance for the lightning arresters A low earthing impedance for the transformer neutrals and a sufficiently low neu tral conductor impedance Limitation of the induced or capacitive transformed, voltages on low voltage, lo w current and electronic cables, circuits, panels and other equipment. That short circuit, earth fault and double earth faults currents will flow throu gh the earthing systems and not through other conducting parts or building const ructions to a hazardous extent. The maximum resistance of the earth electrode grid in the switchyard and under t he control building shall be 0.5 ohm during the dry period. In addition, the ear th electrode system as well as all other earthing systems shall be designed and constructed for the operating voltages, the design short circuit capacities and the corresponding short circuit and earth fault currents which are specified in General Specification of Wor s, and in the other Sections of these Specification s for the respective voltage systems. The overall resistance between the earthing grid system and the surrounding soil shall be in the range between 10 and 20 ohms. If necessary, additional earthing rods shall be applied to achieve the specified value. The dimensioning shall be co-ordinated with the relay protection scheme of the v arious parts of the plant. In any case, however, the earthing conductors shall b e dimensioned for carrying the earth fault current and double earth fault curren ts of the various parts of the plant for at least 1 (one) second without any har m to the conductors or connections. The conductors shall be reliably protected against mechanical damage and corrosi on. Buried connection shall be made by compressed clamps or by approved welding proc ess. No bolted clamps may be used under ground surface. Connections above earth shall be screwed and shall be easily accessible for control. All connections sha ll be protected against corrosion. 5.1.1.9.3 Earthing Electrode System Under the Control Building The conductors shall be of electrolytic copper with dimensions at least 30 x 3 m m for flat bar or at least 95mm2 stranded wire. Copper-weld with approximately t he same conductivity may be used. Risers shall be copper stranded wire at least 95 mm2. The conductors shall be placed on the ground after the excavation is completed a nd just before the concreting starts. Care must be ta en that the earth wire is in good contact with the soil and preferably embedded into it. Under the building the grid of conductors shall be placed with an average distan ce between conductors of not more than 10 m. At all crossings the conductors sha ll be interconnected by brazing or welding. The grid shall also be connected to the concrete reinforcement at several places as well as to the earthing grid of the switchyard area. Vertical risers shall be brazed or welded to the conductors .

The risers shall be placed in the concrete shuttering, and led out of the shutte ring at appropriate places approximately 30 cm above the floors. Care shall be t a en to protect the risers against damage during shuttering and concreting. Connecting terminals for the screwed connections between the risers and the abov e-floor main earthing conductors shall be placed at easily accessible places and protected against mechanical damage. The above information describes the minimum requirements. The final design and c onstruction for the achievement of the total requirements of the earthing system s shall be made by the Contractor. 5.1.1.9.4 Earthing Electrode System of the Switchyard The conductors shall be of electrolytic copper with dimensions at least 30 x 3 m m for the flat bar or at least 95 mm2 stranded wire. Copper-weld with approximat ely the same conductivity may be used. The risers shall be of at least 95 mm2 stranded copper wire or equivalent copper -weld. The conductors shall be placed forming a grid covering the whole switchyard area . The average distance between the conductors shall not be more than 20 m. A conductor shall also be placed outside the fence along the whole length of the fence at a distance and at a depth suitable for the potential gradation needed to avoid dangerous touch voltage between the fence and the ground. Trenches for the earthing grid shall be excavated in the ground to reach soil of good conductivity and a layer of at least 25 cm of the same material shall be p laced over the conductor. The conductor shall at no place be less than 80 cm bel ow the ground level. Where advantageous for achieving low resistance to ground, vertical copper-weld earthing rods may also be used, in addition to the horizontal grid. Connecting terminals for the screwed connections between the risers and the on-g round earthing conductors shall be placed in easily accessible locations. The above information describes the minimum requirements. The final design and c onstruction for the achievement of the total requirements of the earthing system shall be made by the Contractor. 5.1.1.9.5 Earthing Conductors In the control building a main earthing bus shall be installed on each floor in the cable trenches. The conductors for these main earthing buses shall be of electrolytic copper wit h dimensions of at least 150 mm for flat bar or stranded conductor. All the risers from the earthing electrode systems shall be connected to these m ain buses by disconnecting screw connections. At appropriate places at the end o f the buses they shall be interconnected, thus to the greatest extent forming in terconnected grids or loops. Branch-offs to switchgear, panels and other parts, which shall be earthed, shall be of electrolytic copper with adequate dimensions for each item to be earthed. Each item shall be directly connected to an earthing conductor and not through a series connection of other metallic parts.

Where rows of switchgear cubicles, boards and panels occur, each cubicle, board or panel shall be earthed individually. The fence of the switchyard shall be earthed at distances of not more than 20 m. Earthing conductors for low current and electronic systems shall be insulated an d shall be run from the systems, panels, etc., directly to a main earthing bus c lose to a connection to the earthing electrode system, These earthing conductors shall not be mixed with the earthing of the high power systems. Earthing switches and lightning arresters shall have a riser directly connected to the current carrying part in addition to a riser connected to the structure. All outdoor earthing conductors shall be insulated with spacers or conduits agai nst contact with galvanised steel structures. 5.1.1.10 Site and Commissioning Tests

5.1.1.10.1 General Tests as described below shall be used as a guideline and may be changed or vari ed after written agreement from the Project Manager, due to changes of design ma nufacturing of construction techniques. 5.1.1.10.2 Test of Wiring a. Insulation Resistance Test at 2.5 V a.c. for one minute shall be carrie d out on all A.C and DC. Protection, control, alarm and indication circuit to en sure that wiring is in satisfactory condition. Ocular inspection shall be made o n cable glands, cable jointing, fuse or circuit brea er ratings and small panel items, such as indicating lamps. b. Static equipment which may be damaged by the application of test voltage s shall have the appropriate terminals disconnected. c. Inter-relay, inter-unit and cubicle wiring carried out at site is to be chec ed to the appropriate circuit and/or wiring diagram. This may be done by us ing bells or buzzers. D.C. supplied from the station battery may also be used. W here it is found necessary during re-commissioning wor to effect site modificat ion to the secondary wiring, site copies of the appropriate schematic and wiring diagrams shall be suitably mar ed as agreed with the Project Manager before the circuit is commissioned. d. Loop resistance measurements are to be done and on all current transform er circuits. Separate values are required for current transformer and lead resis tances and all measurements are to be recorded on lead resistance diagrams. e. Pilot cable impedance and phase angle measurements shall be made when pi lot cable is to be used with unit type protection. The Contractor providing the pilot cables shall measure these values.

5.1.1.10.3 Test of Relays a. All relays are to be examined to ensure that they are in proper wor ing conditions and correctly adjusted, correctly labelled and that the relay case, c over, glass and gas ets are in good order. a. Secondary injection shall be carried out on all a.c. relays, using volta ge and current of sinusoidal waveform and rated power frequency. For circulating current protection employing high impedance voltage setting test shall be acros

s the relay and stabilising resistance. The operation setting for the type of pr otection is to be established by secondary injection, where it is not possible t o ascertain this value. 5.1.1.10.4 Test of DC Circuits Tests are to be carried out to prove the correctness of all DC polarities, the o perating levels of DC relays and the correct functioning of DC relay schemes, se lection and control switching, indications and alarm. 5.1.1.10.5 Test of Instruments Instruments and instrument transformer circuits shall be chec ed for polarity of direction and for calibration including any interposing transformers or transdu cers. These chec s shall be made on all current transformer ratios where applica ble. 5.1.1.10.6 Tests on Conductors, Insulators and Accessories None required. 5.1.1.10.7 Tests on the Switchyard on Site All electrical equipment and installations shall be tested for correct connectio ns of the high-voltage circuits and shall be subjected to a complete operation t est to chec the correct operation thereof in terms of the operational requireme nts specified in these specifications. The resistance to earth of the earthing system of the switchyard shall be measur ed. The earthing systems shall be chec ed for conductivity and reliable connecti ons. 5.1.1.10.8 On Load Test On load tests are required, but due to the hazards inherent they shall be carrie d out under the direct supervision of the Project Manager and/or the Employer. T he following tests are required: a. an operation and stability test shall be carried out for on-load commiss ioning. b. test for restraint shall be carried out to prove the characteristic of p rotective and measuring systems with directional characteristics. c. on-load chec s shall be made after the protective gear has been placed i n service to ensure that all connections and test lin s have been replaced and t est leads removed, as well as to confirm the integrity of the current transforme r circuits. Where necessary, voltage readings shall be ta en at the terminals on each relay to ensure that loop connections between the relays are complete. Spe cial attention shall be paid to bro en delta voltages and residual current circu its were zero voltage or current respectively may not be proof of the completene ss of the circuit. 5.2 PARTICULAR TECHNICAL SPECIFICATIONS-TRANSFORMERS General This Specification provides for the manufacture, supply, testing before shipment , delivery, erection and commissioning of the transformers detailed in Scope of Wor s. Particular reference is also made to General Specification, General Techn ical Specification, Project Specific Data and IEC 60076. The transformer shall be designed for a 40 years lifetime under full load operat ion and be supplied together with all auxiliary equipment for a complete install ation. All connections and contacts shall be of ample section and surface for carrying

continuously 120 % of the specified current without undue heating. Fixed connect ion shall be secured by bolts or set screws of ample size, adequately loc ed. Lo c nuts shall be used on stud connections carrying current. On outdoor equipment, all bolts nuts and washers in contact with non-ferrous par ts that carry current shall be of phosphor bronze. Wherever possible, bolts shall be fitted in such a manner that in the event of t he nut wor ing loose and falling off, the bolts will remain in position. Power Transformers Design Criteria Service Conditions The transformer shall be capable of operating continuously outdoors at any tappi ng during the ambient conditions specified in the section: Project Specific Data Note that the average maximum ambient temperature in any one day is 30 C. The max imum temperature rise shall therefore not exceed 55 C of the top oil and 60 C of t he winding above the maximum ambient temperature of 40 C. For temperature correction due to attitude reference is made to IEC 60076 which limits the temperature rise further when tested a normal altitude. The altitude used in the calculations shall be 2 200m asl. Rating The transformers shall comply with the ratings specified in Scope of Wor s under the stated service conditions without exceeding the temperature rise limits spe cified above, over the complete tapping range. If the voltage on the secondary ( LV) side is reduced or raised by up to 5 % from the rated voltage, the temperatu re rises of any part shall not rise by more than 5 oC (at rated power on any pri mary tapping). Tapping All tappings shall be designed for constant VA output, the rated voltage of eac h winding of the transformer on the principal tapping shall be as specified in S cope of Wor s and unless otherwise specified, shall correspond to the system nom inal voltage. The tapping ranges shall be as specified in Scope of Wor s. Noise The transformer, tap-changing equipment and supplementary cooling equipment shal l operate without undue noise and every care shall be ta en in the design and ma nufacture to reduce noise to the level of that obtained in good modern practice. The noise level of the transformer shall not exceed 78 dB(A) when tested in acc ordance with IEC 60076. Radio Interference The design of the transformer shall be such that they will not cause any objecti onable interference with radio reception in the vicinity of the transformer, eit her by direct radiation or by transmission through the power-lines and system to which the transformer may be connected, when energising at full rated voltage a nd when delivering any load up to the continuous maximum rating. Interchangeability and Parallel Operation All transformer of any one type shall be identical and interchangeable with one another. No alteration to control circuits shall be permissible for this purpose except by means of built-in terminal boards fitted with lin s for effecting the alteration. All parts are to be made accurately to dimensions so that any corre sponding parts will be interchangeable and any spare parts will fit into place w ithout need of adjustments. Where similar equipment has previously been supplied , components shall interchange with those on previous contracts, unless otherwis e approved. The transformer shall be suitable for parallel master-follower operation with ea

ch other and with previously supplied transformer of similar rating which shall remain in service on the substations covered by this contract, both in respect o f transformer characteristics and control circuits on all relevant taps. The new and old transformers shall share the load subject to the tolerances of impedanc e and voltage laid down in, IEC 60076. Insulation Levels When assembled complete with connections as in service, electrical clearances in air shall be adequate to withstand the required impulse withstand voltage given in Project Specific Data. The Bidder shall propose in his Bid details of bushin gs with drawings showing air clearances and creepage distances. The creepage dis tance shall not be less than 31 mm/ V line voltage in Coast and industrial area and 25 mm/ V for inland installations. Care shall be ta en to ensure that no fit tings are located so as to interfere with the external connections to the bushin g terminals. The insulation test levels are given in Project Specific Data. All transformers shall be designed for full insulation on all terminations also the neutral termi nation. Short Circuit Performance The transformer shall be capable of withstanding, without damage, the effects of a symmetrical three-phase short circuit and a phase to earth short circuit unde r conditions specified in IEC 60076. It can be assumed that during a short circuit, nominal voltage will be maintaine d on one side of the transformer with a short on the other, the external impedan ce being zero. It can also be assumed that up to four transformers may be connec ted in parallel between HV and LV busbars. Frequency The normal frequency will be 50 cycles per second. The transformer shall, howeve r, be suitable for continuous operation with frequency variation of plus or minu s 2.5 % from the normal, without exceeding the temperature rise limit specified. Flux Density The maximum flux density in any magnetic component under any condition of voltag e and frequency specified under all the operating conditions given in this speci fications shall not exceed 1.9 Tesla. Thermal ability. The transformer shall be capable of withstanding the fault level at its rated v oltage and impedance for 2 seconds. The design should cater for the expected lif etime of the transformer. The thermal ability to withstand short circuit shall b e demonstrated by calculation as per IEC 60076-5 and the calculation shall be su bmitted with tender. The duration of the current to be used for the calculation of the thermal ability to withstand short circuit shall be 2 seconds while the m aximum permissible value of the average temperature of each winding shall be as per IEC 60076-5. As a minimum, the short-circuit apparent power of I I V and 33 V systems shall be ta en as 500MVA and 1000MVA respectively (as per IEC 60076-5 ) in order to obtain the value of the symmetrical short circuit current to be us ed for the design and tests.

Construction General Transformers shall be of the oil immersed core type (i.e. not shell type) suitable f or outdoor use, they shall be dried out at the manufacturers wor s and it should be possible to commission them without further dry out. Designs shall be such that water does not collect on any of the equipment. Parti cular attention shall be paid in the design of all equipment to ensure that ther

e is not damage to wor ing parts or insulation through the ingress of dust, inse cts or vermin which are prevalent for long periods in the year. Cores The transformer core shall be built up of laminations of the best quality non-ag eing cold-rolled grain oriented silicon sheet steel of high permeability and low loss coefficient. All joints between laminations shall be of the interleaved ty pe and the laminations shall be clamped securely. Bolting of the core should be avoided to reduce losses. On no account shall butt joints be offered. The crosssection of the core shall form an approximate circle. The laminations shall be separated by hot-oil proof insulation, and the clamping of the frame shall be firm to ensure even pressure over the whole of the core l aminations so as to prevent undue vibrations or noises. The core sheets shall be insulated with high-grade oil-proof insulation, for exa mple magnesium-silicate-phosphate. Paper will not be accepted. The core clamping arrangement and framewor shall be efficiently insulated from the cores and withstand a test voltage of 2 V, 50 HZ during 1 minute. The core shall be designed and built up in such a manner as to avoid accidental or slow d evelopment of short circuit paths through the iron and framewor . The core, framewor , clamping arrangements and general structure of the transfor mer shall be of robust design, capable of withstanding any shoc to which they m ay be subjected during transport, installation or service. Suitable axial cooling ducts shall be provided to ensure free circulation of oil and efficient cooling of the core. The ducts shall be proportioned so that the maximum temperature at any point will be within the prescribed limits of tempera ture rise. Lifting lugs or other similar means shall be provided for conveniently lifting t he complete assembly (with windings). Provision shall be made for efficient arrangement of guides to prevent movement of the core and windings during transport, installation or service. The framewor of the core shall be so designed as to prevent the presence of oil poc ets, which would prevent complete emptying of the oil from the tan through the drain valve. Windings The windings shall be circular and consist of high quality rectangular section c opper, wound with age resisting paper of high dielectric strength. The current d ensities in the windings shall be stated in the Bid. The amount of insulation between turns shall be determined not merely by normal volts per turn, but also by due consideration of the line voltages and the servi ce conditions, under heavy lightning storms. Adequate insulation and clearances between the windings shall be provided and al l insulation and clearance between live parts must be adequate for operation at 5 per cent over the highest tap voltages on all the windings. The insulation of the end turns of each winding adjacent to the transformer term inals shall be reinforced between turns to protect the windings satisfactorily a gainst surges and transients. Details of the reinforcements shall be given in th e Bid. None of the materials used shall shrin , disintegrate, carbonise or become britt

le under the action of hot oil, to an extent lowering the lifetime below 40 year s when the transformer is operated continuously at the maximum specified loading . The windings shall be so placed that they remain electrostatically balanced with their magnetic centres coincident under all conditions or operation. To prevent excessive static voltage, static end rings shall be provided, wherever necessar y, at the live end of the windings. The windings, connections and trappings of the transformer shall be clamped in p osition and braced so as to withstand shoc s or undue stresses during transport, short circuit conditions, and other transient causes. No mechanical movement of the coils should be possible with dead short circuit on the transformers. All windings and all fibrous and hygroscopic materials used in the construction of the transformer shall be dried under vacuum and impregnated with hot oil. Ful l details of the drying out and vacuum treatment shall be furnished by the Bidde r. Leads from windings to terminal board and bushings shall be rigidly supported to prevent damage from vibration and short circuit forces. Adequate provision shall be made for the circulation of oil round and between th e winding so that a low temperature gradient between the conductors and the oil is assured and any danger of excessive local heating is avoided. The finished width of any duct and clamping arrangement shall be such as not to impede the free circulation of oil through the ducts. It is essential that the windings shall be subjected to a thorough shrin ing and seasoning process, so that no further shrin ing of windings occur at site. Howe ver, clamping arrangement shall be provided for ta ing up any possible shrin ing of coils when in service. All similar coils shall be strictly interchangeable. Full detailed description o f the windings shall be submitted with the Bid. When specified in Scope of Wor s, stabilising windings shall be provided. The wi ndings shall be capable of withstanding the forces to which they are subjected u nder all conditions, particularly the forces due to a short circuit between term inals or between any terminal and earth with full voltage maintained on all othe r windings intended for connection to external sources of supply. When stabilisi ng windings are to be used for purposes other than decreasing zero sequence impe dance, this will be declared in the scope of wor and the windings must be desig ned accordingly. Unless otherwise specified, only one terminal of the stabilising winding shall b e brought outside the tan and a suitable bushing shall be provided for this pur pose through the tan cover. When used additionally for an auxiliary supply each corner of the winding shall be brought out. It shall be possible to earth the winding externally to the main tan by means o f a flexible bolted lin to be provided by the supplier between the terminal and a suitable pad on the tan cover. The neutral points of star connected windings shall unless otherwise specified i n Scope of Wor s be brought out to bushings located on the tan cover and connec ted to an earthing bus attached to the main transformer earth terminal. Where the star point of a winding is not specified to be brought out through a n

eutral bushing, the connection shall, nevertheless, be available under the main tan cover plate to permit the subsequent fitting of a neutral bushing. The subs equent installation of this bushing shall not necessitate any alteration to, or repositioning of existing fittings. Internal Earthing Each part of the core shall be electrically earthed to the transformer tan . The internal earth connection shall be of the detachable lin type and shall be loc ated in an accessible position. The magnetic circuit shall be earthed to the clamping structure at one point onl y through a removable lin placed in an accessible position beneath an inspectio n opening in the tan cover. The connection to the lin shall be on the same sid e of the core as the main earth connection and be ta en from the extreme edge of the top yo e. The main core clamping structure shall be connected to the tan b ody Magnetic circuits having an insulated sectional construction shall be provided w ith a separate lin for each individual section and the arrangement of the conne ctions shall be to approval. Where oil ducts or insulation parallel to the plane of the laminations divide th e magnetic circuit into two or more electrically separate parts, the ducts or ba rriers shall be bridged and the magnetic circuit shall not be regarded as being of sectional construction. Where coil clamping rings are of metal, each ring shall be connected to the adja cent core clamping structure on the same side of the transformer as the main ear th connection. All earthing connections, with the exception of those from the individual coil c lamping rings, shall have a cross-sectional area of not less than 90 mm2. Connec tions inserted between laminations may have the cross-sectional area reduced to 25 mm2 where in close thermal contact with the core. Transformer Tan Each transformer shall be enclosed in a steel tan of welded construction, suita bly stiffened by means of channel or angle sections welded to the tan , for with standing the stresses imposed during transit to site and subsequent operation wi th no signs of oil lea age. The transformer tan shall have a removable lid on t op, i.e. Bell type transformer tan s are not permitted. The tan shall be complete with all accessories and shall be designed to allow t he complete transformer (tan ed and filled with oil) to be lifted by crane or ja c s, transported by road, rail and water without overstraining any joints and wi thout causing subsequent lea age of oil. Corrugated tan s are not acceptable. The tan s must be so constructed as to be capable of withstanding an internal po sitive pressure of not less than 70 Pa without any permanent deflection of any parts. The tan must also be capable of withstanding a vacuum of 50 mm of mercur y absolute when emptied of oil. Guides shall be provided inside the tan to facilitate the lowering into the tan of the core and coils and their raising and correct positioning. The guides sh all extend from the bottom of the tan to within 150 mm of the top of the tan . The tan covers shall be of adequate strength and shall not be distorted when li fted in the lifting eyes to be provided. Inspection openings/manholes suitably b olted shall be provided as necessary to give easy access to bushings, tap change r connections and earth connections. Each inspection opening shall be of ample s ize for the purpose for which it is provided. Covers for such openings shall not weight more than 25 g and shall be provided with lifting eyes.

All oil-pipe connections shall have flanged joints provided with gas ets, prefer able set in grooves or held in position by stops to prevent over compression of the gas ets. Four jac ing lugs shall be fitted 500 mm above ground level and four holes with a diameter of not less than 50,8 mm shall be provided on the jac ing lugs in ord er to permit the transformer to be slewed in any direction. The base of the tan shall be reinforced and so designed that it shall be possib le to move the complete transformer unit in any direction without injury when us ing rollers, plates or rails. A design which necessitates rails being placed in a particular position shall not be used. Wheels, where specified, shall be plain, flanged uni-directional or bi-direction al, whichever is specified in Scope of Wor s. Bi-directional wheels shall be des igned so that it is possible to change the direction of the wheels without remov ing them from the transformer, and provision shall be made for loc ing the wheel s parallel or at right angles to the major axis. Grease nipples or cups shall be provided for lubricating the swivel bearings and the wheel bearings. The Employ er will provide the wheel gauge. Lifting lugs shall be fitted capable of lifting the transformer complete with wi ndings and filled with oil. The tan cover shall be fitted with poc ets for a thermometer and for the bulbs of the winding temperature and oil temperature indicators specified. Protection shall be provided when necessary for each capillary tube. The thermometer poc et shall be fitted with a captive screwed cap to prevent ingress of water. The poc ets shall be located in the position of maximum oil temperature and it shall be possible to remove the instrument bulbs without lowering the oil in the tan .

The tan and cooling equipment shall be designed to permit vacuum treatment on s ite. The maximum safe permissible vacuum (millimetres of mercury) which may be a pplied above oil level, to the tan , cooling equipment and to the conservator, w ithout causing permanent distortion, shall be stated in the Bid. Two earthing terminals located at opposite side of the tan , capable of carrying for 30 seconds the full lower voltage current of the transformer, shall be prov ided. Provision shall be made at positions close to each of the four bottom cor ners of the tan for bolting the earth terminals to the tan structure to suit l ocal conditions.

Gas ets Oil-resisting synthetic rubber gas ets will be preferred. If cor or similar mat erial is used oil-resisting synthetic rubber be applied as a bonding medium. The Contractor shall submit details of gas et material for approval. Spare unused sets of gas ets shall be supplied for use on site for all positions where joints have to be made after transportation of the transformer. Current Transformer Current transformer for winding temperature measurements shall be mounted inside the transformer on a bushing turret, and in the connection between winding and neutral point for auto-transformers. Accuracy class 3 shall be used for temperature indication.

A rail for connection of safety belt shall be arranged on the tan

cover.

Current Transformers Current transformers as indicated in scope of wor s shall be mounted in the bush ing turrets. Bushings Bushings shall be fitted to the equipment as specified in Scope of Wor s. Bushin gs for 66 V and above shall be of the condenser type. Other bushings may be of solid porcelain. All terminals shall be mar ed to correspond with the mar ings on the diagram pla te. The transformer bushings shall withstand accidental arcing or flashover without seals or other vital parts becoming damaged. Stresses due to expansion and contr action in any part of the bushing shall not lead to development of bulges, hairline crac s or other defects. Suitable connecting clamps shall be able to absorb shoc s due to vibration of the connecting jumpers. The bushings shall withstand internal vacuum in the transformer tan . All the bushings of any transformer shall have a rated current of at least 120% of the rated currents of the windings to which they are connected (in order not to limit over-loads). Painting and Galvanising Oil-filled transformer shall have their interior surfaces sandblasted and finish ed with two coats of anti-corrosive and oil-resistant priming paint. Exterior su rfaces shall be sand-blasted and have two rust inhibiting priming coats and one intermediate coat with paint on zinc chromate or urethane al yd basis or equival ent; one final coat of weather and oil resistant paint. Minimum total thic ness 0.16 mm. The radiator external surfaces shall be hot-dip galvanised with a zinc deposit o n average not less than 400g/m2. Outdoor control and marshalling boxes/cabinets shall have at least one prime coa t and two layers of paint on zinc powder basis to be applied after perfect clean ing. The particulars of priming and finishing paintings shall be stated in the Bid, w ith specifications of paint, together with a listing of colours available, for e ach of the plant and equipment. The Employer is not bound to accept the finishing colour proposed by the Bidder. Determination of colour shall be at the option of the Employer and shall be fin alised at the time of approval of drawings. The exterior finish of outdoor control cabinets shall be in the same colour as t hat for the transformer. Should any paint wor be damaged during transit or erection, this shall be made good on site. All interior and exterior surfaces, subject to corrosion, that cannot readily be painted, or where galvanising is explicitly specified, shall be hot-dip galvani sed with an average thic ness not less than 0.1 mm. Bolts and nuts associated wi th galvanised parts shall be hot-dip galvanised. Fittings The transformer shall be supplied with the fittings specified in Scope of Wor s. These fittings shall comply with the following clauses.

Conservator The conservator shall be mounted on the main tan but not obstruct connection to overhead connection.. The conservator shall be fitted with a removable end on which shall be mounted t he oil gauge. The conservator tan shall be mounted to slope lightly downwards t owards the drain valve, which shall be adjacent to the removable end. The pipe connecting the conservator to the tan shall extend at least 50 mm into the conservator and shall be brought out from the highest point of the main tan cover. A valve shall be provided immediately adjacent to the conservator. All poc ets and bushing turrets of the main tan shall be connected into this pipe b etween the transformer and the Buchholz relay.

The conservator shall be so dimensioned that it will permit all expansion over t he wor ing range of temperatures from no load with the transformer cold and at 5 oC ambient air temperature to full load at 45 oC ambient air temperature while the sump pipe remains covered with oil and the oil level is visible or indicate d. In any case, the volume of the conservator shall be at least 10% of the trans former oil volume. The oil connections from the transformer tan to the conservator vessel shall be arranged at rising angle to the horizontal. The Buchholz relay (see Clause 4.6) shall be fitted in this pipe in such a position that inspection, testing and di smantling is possible with the transformer in operation. A step valve shall be p rovided between the conservator and the relay. The conservator shall be equipped with the following fittings: a) A sump formed by extending the inlet pipe inside the conservator. b) A manhole formed by bolting one end-plate of the conservator. c) A drain valve with flanged plug. d) A flanged filling plug. e) An oil level gauge. f) A filter valve. Dial-type Oil Gauges Dial-type oil gauges, where specified, shall be of the magnetically operated typ e, in which brea ing of the gauge glass will not release any oil. The gauge shal l be fitted with at least two circuit-closing, potential free, low-oil-level ala rm contacts wired to the marshalling box. Silica-Gel Breathers Each conservator shall be fitted with a silica-gel type dehydrating breather to approval. The breather shall be provided with an oil cup or other device which p revents contact between the dehydrating agent and the air outside the transforme r. If an oil cup is provided, the oil should be visible from the outside and the lowest oil level should be mar ed.

Unless the silica-gel container is transparent the breathers shall have a window for inspection of the colour and condition of the silica-gel. Explosion-Vents An over-pressure device of the spring release type or similar shall be used for pressure relief in case of explosion or sudden overpressure. The type shall be a pproved by the Project Manager. Separate oil compartments as OLTC compartment sh all have separate explosion vents. The explosion-vent shall be provided of sufficient size for the rapid release of any pressure which may be generated within the tan and which might result in d

The weight of the dehydrating agent shall be not less than 0,5 s of oil in the transformer and cooler.

g per 1500 litre

amage to the equipment. The device if used shall be so placed that any discharge from it will not be deposited on any part of the transformer or its associated equipment. Buchholz Relays Buchholz relays shall be of the double-float type with separate floats for alarm and shut-down at low and high speed gas development and shall be of approved ma nufacture suitable for operation in transformer oil as specified over the temper ature range -10 oC to 115 oC. The two contact sets shall not be exposed to oil a nd shall be wired to the marshalling box. The relays must be interposed in the connecting pipe between the oil conservator and the transformer tan in such a manner that all gas from the tan must pass through the relay as it rises to the oil conservator. Two copper pipes shall be connected to the two pet coc s on the relay and extend ed to position 1 m above ground level and fitted with stop coc s for sampling an d testing purposes. The stop coc s are to be labelled and easily accessible and be clear of surrounding steel-wor . The sight window of the relay shall be readi ly visible from ground level. Separate oil compartments compartment shall have s eparate Buchholz relays. However the OLTC chamber shall be equipped with pressur e rise relay instead. Temperature Indicators The local temperature indicators shall be of the dial-type graded in oC with a m anually resettable pointer to register the highest temperature reached. The loca l indicators shall be mounted on the transformer tan in a suitable weatherproof steel cabinet with a loc able door. The cabinet shall be so positioned as to al low easy access to and readability of the gauges. Each transformer shall be provided with winding temperature indicators of the "t hermal image" type compensated for changes in ambient temperature (one for each winding type: common, series, HV, LV and tertiary as appropriate). The indicator shall have a load - temperature characteristic approximately the same as the ho ttest part of the windings. The primary current transformer for operating the in dicator shall be built into the main transformer tan on the bushings. Informati on shall be included in the maintenance instructions in the form of either a gra ph or table showing the relationship between current injected into the heater co il and the corresponding temperature reading. The indicators shall be provided with two sets of alarm/trip contacts, adjustabl e to close at any temperature between 45 oC and 150 oC such adjustment being pos sible without dismantling the instrument. Where supplementary forced cooling is specified, two additional set of contacts shall be provided on the winding tempe rature indicators, for automatic start of the cooling fans in two stages. The di fferential between "switch on" and "switch off" temperatures must also be variab le in the range 15 C to 30 C. The instrument and set points shall have an accuracy of 1% of full scale deflecti on and the indicated temperature must reflect the hot spot temperature to within 3 oC under all operating conditions. Test lin s are to be provided for calibrat ion purpose. One temperature indicator of the capillary type for measurement of the top oil t emperature shall be provided for each transformer. Cooling Definition The types of cooling shall be designated by the IEC lettering symbols: a. Natural Air Circulation (ONAN)

By radiators directly attached to the tan . b. Forced Air Circulation (ONAF) By fans cooling the radiators. Declaration of Ratings The Bidder shall declare in the Schedule of Technical Guarantees the rated power available under the operating conditions ONAN or ONAF (as required in Scope of Wor s) and the ratings shall be indicated on the rating plate. Radiators The transformers shall be fitted with detachable radiators (tube coolers are not accepted). Suitable valves, with blan ing plates shall be provided at the inlet and outlet of each radiator so that it may be removed without draining oil from the tan . Inlet and outlet valve "OPEN" and "CLOSED" positions shall be clearly mar ed. The valves shall be readily accessible and easy to operate. Lifting fac ilities, a drain coc and an air release vent shall be provided on each radiator . Radiators shall be hot dip galvanised and designed so that it is possible for th e whole of the cooling surface to be cleaned. They shall also be designed so tha t they shall withstand dry-out vacuum without distortion or causing lea age of h ot oil. Forced-Air Cooling ONAN/ONAF The forced-cooling equipment shall be designed to start automatically from windi ng-temperature relay control at predetermined temperatures recommended by the Co ntractor. The equipment shall be designed to start in 2 stages at preset tempera tures. Indicate setting values are as follows: Stage 1 65C Stage 2 75C On 50C 60C Off

The cooler arrangement must allow for the maintenance or failure of any one fan or radiator without losing more than 20 % of the total cooling capacity. All fans shall operate as a unit. Fan blades and fan ducting shall be of alumini um alloy, stainless steel, galvanised steel, or other corrosion-resistant metal and shall be designed to eep noise and vibration to a minimum. All fans shall b e provided with galvanised wire-mesh guards. It shall be possible to remove fan assemblies complete without dismantling other equipment. Cooler Capacity The coolers and fans shall be so dimensioned that at least 80 % of the transform er capacity remains (in both ONAN and ONAF) if one cooler or one fan is removed. Cooler Control Equipment All the necessary automatic control, motor contactors, protective devices and sw itches for the forced-cooling equipment shall be assembled in cabinet or marshal ling box mounted on the transformer. The cooler control equipment shall include:

An isolating switch rated to carry and brea full-load current for each group of fan and pump motors. A "Cooler Auto" - "Cooler-Manual" changeover switch. Magnetic contactor for each group of fan motors. Contactor coil leads shall be w ired to the terminal board. A set of normally-closed contacts shall be provided on each motor contactor for alarm purposes.

All equipment must be in accordance with the requirement given in general techni cal specifications. Off-load Tap Changer Transformer, if specified in Scope of Wor -load tap changer operated by means of an d in each operating position. This switch n. The tap changer shall be indelibly mar rresponding to the diagram plate. s, shall be provided with a ganged off external handle which can be pad-loc e shall have a rotary motion of operatio ed to indicate the tapping position co

Tap changers with mercury sealing glands are not acceptable. The tapping range shall be as specified in Scope of Wor s. Drain, Filter and Sampling Valves General All valves shall be attached by bolted-on flanges and shall not be screwed or we lded to the tan . Drain valves or isolating valves larger than 101,6 mm (4"B.S.P .) and of the double-flanged gate-type construction may have bodies of cast iron or cast steel. All valves shall be opened by turning counter-cloc wise when fac ing the hand wheel. Every valve shall be provided with an indicator to show clearly the position of the valve. Means shall be provided for padloc ing the valves in their open and closed posit ion. All valves shall be suitable for operation in conjunction with transformer oil a s specified in IEC Publication 60296 at temperatures up to 115 oC. Drain Valves Drain valves shall be of suitable dimensions in relation to the volume of oil in the transformer tan and coolers. Oil Sampling Valves Oil sampling valves shall be of the screwed globe type; handle or gate valves lo cated so as to permit sampling of oil from the extreme bottom of the transformer tan and the bottom of the tap changer compartment. Filtration Connections Filtration connections, which shall have flanges drilled to BS 4504 Table 6, for 50,8 mm (2") valves, or screwed 50,8 mm (2"B.S.P.) female, shall be as follows:

The oil conservator drain valve located within easy reach of the ground, by mean s of a pipe extension if necessary shall be suitable for a filter connection. Valve Entries All valve entries shall be blan ed off with gas etted bolted-on plates or plugs. Rating and Diagram Plates Rating diagram and valve plates shall be to IEC 60076, stamped or emboss ed on brass or stainless steel. They shall show the employers Order Number and sh all have a blan space for the Employers serial number. The diagram plate shall s how the internal connections and the voltage vector relationship of the terminal s. Where applicable, rating or diagram plates shall show locations, ratio,

A valve at the top and bottom of the main tan . The drain valve of the main tan may be used for this purpose if of the size described above.

Overload and single-phasing relays. Fuses, lin s and terminal boards to approval to ma e a complete assembly.

rating and accuracy class of current transformers. Rating diagram and valve plat es shall be approved by the Project Manager. Oil The oil shall be of the uninhibited mineral type and comply with BS 148, IEC 602 96 or equivalent standard. Oil shall preferably be supplied in bul from within Kenya and dried and cleaned on site. If oil is provided in drums, these shall have a volume of approximatel y 200 l and be full. A separate price shall be quoted for transformer oil. On-Load Tap Changers General The transformer's voltage control equipment shall, if specified in Scope of Wor , be of the tap changing type for varying its effective transformation ratio whi lst the transformer is on load and without producing phase displacement. The onload tap changing equipment shall comply with IEC 60214. The tappings shall be a rranged in the electrical centre of the higher winding. The tap changing equipment shall be of the 3-phase type, preferably with combine d diverter and selector switches and shall be designed so that it will not be po ssible for the main transformer winding to be open circuited or for a portion th ereof to be short circuited, except through a transition impedance. All tap chan gers for transformers shall be of the vacuum type. Generation from any type of control shall cause one tap movement only. The equipment shall be so arranged as to ensure that when a tap change has comme nced, it shall be completed independently of the operations of the control relay s or switches. Failure of the auxiliary supply during a tap change operation mus t not inhibit the independent completion of the tap change operation. An auxiliary supply of 415/240 volts, 50 Hz, 3-phase 4-wire AC. will be availabl e for operating the tap changing equipment and all its accessories. All equipmen t shall operate correctly at any voltage between the limits of 85 % and 115 % of nominal value. Tap changing equipment shall be capable of carrying the same currents due to ext ernal short-circuit as the transformer windings and shall withstand the impulse and dielectric tests of the associated winding. The tap changer connection and s witches shall be capable of handling continuously currents at least 20 % above t he highest operating current in order no to limit overloading. Where oil type used, it shall not mpartments which contain contacts oil in the main transformer tan tacts not used for ma ing or brea be possible for the insulating oil in those co for ma ing or brea ing current to mix with the or with the oil in compartments containing con ing current

Drop-down tan s which necessitate the provision of pits in the foundations are n ot acceptable. Where it is necessary to remove parts, or the whole of the on-load tap-changer f or transport purposes, it shall be possible to complete erection on site with th e transformer windings covered with oil. Construction The number of the tappings in use shall be indicated mechanically at the transfo rmer , electrically at the local control room panel and digitally at the Control Centre. The tap-changing switches and mechanism shall be mounted in an easily accessible

The oil compartment for the tap changing switch shall be fitted with its own ove r-pressure device and Conservator; together with suitable oil level indication a nd drain valves. The conservator shall be dimensioned such that applicable expan sion rates can be met. All switches forming part of the main tap-changing apparatus shall be readily ac cessible and it shall be possible to examine or repair such apparatus without lo wering the oil level in the main transformer tan . Each compartment in which the oil level is not maintained from the conservator s hall be provided with an oil gauge of approved design. Limit switches shall be provided to prevent the over-running of the mechanism an d shall be connected directly in the circuit of the operating motor. In addition , mechanical stops or other approved devices shall be provided to prevent the ov errunning of the mechanism under any condition. Approved means shall be provided to protect the motor and control circuits. The whole tap-changing equipment shall be of robust design and capable of giving satisfactory service without undue maintenance under the conditions to be met i n service, including frequent operation. An externally visible mechanical recorder shall be fitted to the mechanism to in dicate the number of tap-change operations completed by the equipment. At least five digits must be provided. No provision for resetting the counter is to be ma de. Operation The tap changer shall be operated in the following modes: From an automatic voltage regulator in the substation (normal control). The control is part of the switchgear contract. Directly on the motor control cabinet in the switchyard (direct control). From the control room in the substation (local control). From the Control Centre (remote control).

A bloc ing switch shall be provided on the motor control cabinet/marshalling box with two positions: local/remote (supervisory). When the switch is in local position, control can only ta e place from the contr ol cabinet on the transformer and vice versa for the other position. All the necessary equipment li e relays, contactors, etc. shall be provided, wir ed up to terminal bloc s to facilitate the functions outlined above. A potentiom eter switch of the ma e before brea type shall be provided for local and remote reading of tap position. The numbers shall range from 1 upwards, the lowest num ber representing a tapping position corresponding to the maximum number of high voltage winding turns, i.e. the highest plus-percent positions. The lowest minus -percent position shall be represented by the highest number. Cray or BCD codes shall be provided as an alternative for remote supervisory reading of tap posit ion. Unless specifically as ed for in this document, all equipment for control and in dication required in the control room shall be provided by the supplier of the c ontrol room equipment. Operating voltage for direct and local control shall be 2 40V AC.

cabinet on the transformer tan s base.

and shall be supported from the main tan or it

Facilities shall also be provided to prepare the transformer for parallel operat ion with one or more transformers on the master - slave principle. An out-of-ste p device shall be provided and arranged to prevent further tap changing after a definite time interval when the transformer on parallel control is one tap out o f step. Tapping Switches The switch shall be mechanically robust and provided with a device between the h andle and the switch to permit operation without strain in the event of imperfec t alignment between switch and handle; the switch operating shaft shall be fully insulated as between tan and switch and shall be provided with a suitable oil and vacuum tight gland where it passes through the tan . The use of wood shall be avoided wherever possible and all the supports and term inal boards shall be completely unaffected by hot oil and non-moisture absorbent . High grade insulating materials shall be used in the construction of tapping s witches which shall be designed with special attention to the elimination of poi nts where trac ing is li ely to occur. Alarm and Trip Signals All alarm contacts shall have ample inductive ma ing and brea ing at the specifi ed alarm and tripping voltage. Any auxiliary relays associated with the trip circuits shall be DC operated and suitable for the specified alarm and tripping voltage. Alarm and trip relays shall be provided with independent potential free contact. The following alarms shall be provided, wired up to terminal bloc s in the trans former cabinet: ulating tomatic Tap changer not operating. Transformers on parallel control are out of step. Partial or complete failure of the voltage transformer supply to the voltage reg relay. This alarm shall be inoperative when the transformer is on non-au control. Fan failure, alarm. Gas relay transformer, alarm. Gas relay transformer, trip. Protective relay OLTC, trip. Oil gauge low level transformer, alarm. Oil gauge low level transformer, trip Oil gauge low level OLTC, alarm. Oil gauge low level OLTC, trip. Pressure relief device transformer operated, trip. Pressure relief device OLTC operated, trip. Top oil temperature high, alarm. Top oil temperature critical, trip. Winding temperature high, alarm. Winding temperature critical, trip.

Local Control Cubicles and Wiring Cabinets Each power transformer shall be provided with a weatherproof (IP 54) local mech anism/control cubicle for control of the tap changer and the same for instrument ation and control of cooling fans. The cubicle shall be mounted on the side of t he transformer tan . The cabinets and equipment installed there shall strictly f ollow the requirements found in general technical specifications. All cubicles and cabinets shall be complete with the requisite front panels. Bid der shall provide in their Bid a complete list of all control, alarm, protection and indication facilities and equipment included in the Bid price each item to be identified with its function.

All indicating analogue instruments shall be flush mounting and the dials shall preferably be not less than 95 mm diameter if circular or, if rectangular have n o side less than 95 mm. An indelible chart showing lubrication points and specifying recommended lubrica nts and frequency of application shall be provided in all mechanism cubicles. Provision for outgoing connections from the transformer control cubicles and cab inets shall be made for multicore cables. An undrilled removable glad plate to a ccommodate compression-type glands provided by the Employer shall be supplied. E ach terminal box shall have an earthing stud for earthing of the incoming cable screens. Wiring and Terminal Bloc s The switchgear contractor shall lay and connect control and power cables from th e indoor control and switchgear to the local cabinets described above. All inter nal cabling between the transformer primary points and local cubicles and cabine ts shall be provided by the Contractor. The cable laying and fastening shall be as described in general technical specifications. Manufacturing, Inspections and Tests The Contractor shall document the progress in factory with photographic records of the progress included in the progress reports. These colour photographs shall upon completion of the wor s be submitted in bound form together with explanato ry description to the Employer. Inspection/Witnessing of Tests The Employer and the Project Manager, reserves the right to inspect the transfor mer at any stage of manufacture or to be present at any of the tests specified. Such inspection shall not relieve the Contractor of his responsibility for meeti ng all the requirements of the specification, and it shall not prevent subsequen t rejection if such material or equipment is later found to be defective. The contract shall include financial provision for participation by the Employer in Factory Acceptance Tests as described in scope of wor s. The Contractor shal l in good time inform when testing will ta e place and shall give the Employer/P roject Manager not less than twenty eight days notice in advance. No transformer shall be tan ed, or despatched from the Contractor's wor s without approval of Project Manager. Based on the Contractor's manufacturing programme, factory insp ection will ta e place as required by the Employer/Project Manager. Factory Tests Bushing Tests The Contractor shall submit for approval test records and data for all bushings. These records shall show the test performed on the bushings including but not n ecessarily restricted to the following tests: Standard, one minute, 50 Hz dry withstand tests for all bushings. Type test of impulse withstand voltage.

All recorded test figures shall be given with the bushings serial number. Transformer Tests Routine Tests Routine tests as far as applicable shall be carried out according the IEC Public ation 60076. The following routine tests shall be applied to all transformer:

Resistance measurements of all windings for all tappings. Ratio tests for all tappings and vector relationship tests. Measurement of no-load losses and currents. Measurements of impedance voltages (at maximum, principal and minimum tappings), short circuit impedances and load losses. Load losses shall be measured at both rated currents when ONAN and ONAF cooling are specified. Determination of efficiencies at 50%, 75%, 100% and 120% load at maximum tempera ture of the winding and 0.8 power factor lagging and unity power factor for all ratings (ONAN, ONAF ratings). Zero sequence impedance measurement. Induced voltage and separate source voltage withstand power frequency, dielectri c tests on all windings on all phases including neutral points. Full wave impulse withstand tests. The transformer shall be subjected to a compl ete series of tests. Such tests shall be applied to the HV winding line terminal of each phase as well as to the neutral points. Tests on on-load tap changers. Routine tests on all transformer accessories such as motors, contactors wiring, etc. Partial discharge measurements. Measurements of capacity between the windings and each winding and ground. Oil lea age test. The complete oil filled transformer with bushings and radiator s fitted and any other attachment normally in contact with oil shall be tested a t a positive pressure measured at the tan bottom of twice the column of oil in the transformer when the transformer is cold, but in any case not less than 70 Pa. Alternatively the radiators may be tested separately with the same pressure. The test period shall be not less than 12 hours. Core insulation test, 2 V, 50 Hz for one minute. Special tests Chopped wave impulse test on each transformer. The test shall be carried out in conjunction with the full wave test as described in IEC 60076-3. Type Tests The following type tests shall be carried out on one transformer of each type: Temperature rise test. Details of the test procedure shall be agreed between Con tractor and Project Manager before testing commences. Noise measurements. Vacuum test. The transformer tan and radiators filled with oil shall be subject ed to a vacuum test. Bushings need not be fitted and the radiators and conservat or may be tested as separate units. Site Tests Testing at site by the Contractor shall be carried out to prove that the transfo rmer in all respects complies with provisions and guarantees set forth in the Co ntract. Tests shall include but not be limited to the following: m. Dielectric oil tests. Insulation dryness by an agreed method. Electrical and functional control of voltage control equipment and cooling syste

Erection Erection shall be carried out on foundations made by the switchgear contractor o r by the Contractor under supervision by the Project Manager. The Contractor sha ll ascertain that the transformer have been erected according to the Terms of Co

Core to tan

insulation.

ntract before commissioning ta es place. All heavy erection equipment li e lifting cranes and other equipment to be used for erection purpose shall be provided by the Contractor. The Contractor shall a lso provide all special equipment for erection and testing purpose. Such equipme nt shall be listed in the Bid. Delivery and Transport The transport to site is the Contractors sole responsibility. Under road part of the transport, the transport must be in accordance with the rules for road trans port in the respective countries. If any special investigations, permits or arra ngements are necessary for the road transport these has to be arranged for by th e Contractor. Cost for such shall be included in the price. Shipment of transformer in any position other than the upright one is not permis sible. All shafts, bearings and machined surfaces exposed for transport to the site sha ll be given a temporary protective coating to prevent corrosion. If it is necessary to remove bushings or radiators for transport blan ing-off pl ates and a spare set of gas ets shall be provided. Where the supply of oil is included in the contract, and transport weight limita tions permit, the transformer shall preferably be transported with sufficient oi l to cover the core and windings. The tan shall be sealed for transport to prev ent all breathing. The remainder of the oil to be supplied separately at the tim e of delivery. Alternatively, where the above method is not applicable or practicable, the tran sformer shall be transported filled with dry nitrogen under slight positive pres sure. This pressure and the temperature at the time of filling shall be communic ated to the Project Manager and a pressure gauge suitably protected is to be fit ted to each transformer to facilitate inspection of the gas pressure on arrival at site. Every precaution shall be ta en to ensure that the transformer arrive a t site in a satisfactory condition so that subsequent to oil filling, they may b e put into service without the necessity for further drying out. Should the posi tive gas pressure disappear during transport and the transformer allowed to brea the, additional drying out at site if required shall be the responsibility of th e Contractor. All accessories and spares which are shipped separately must be clearly mar ed f or identification with the transformer for which they are intended. All pipe wor and valves shall have further mar ings showing the correct points of assembly which shall also be shown on assembly drawing to be supplied. Full details must be supplied on methods of drying out the windings, if found ne cessary, on arrival and on the method to be adopted for oil filling and oil puri fication on site. Any special apparatus required for oil filling must be supplie d as part of this contract. The transformer shall be shipped with an impact recorder having capacity of four months recording. Full details of the proposed methods of transport shall be su bmitted for approval. Evaluation of Losses Guaranteed Output and Losses, Liquidated Damages Failure to meet the guaranteed outputs and losses will be dealt with as follows: Transformer Output

If the guaranteed continuous output at rated voltage of any transformer has to b e reduced below the guaranteed value in order to maintain the temperature rises of any part of the transformer within the guaranteed limits, liquidated damages shall be paid at the rate of USD 2 577 per VA. Transformer Losses If the total transformer losses of any transformer, as determined by these, with out any tolerances, at rated voltage, frequency and 100% rated VA (on principal tapping) exceed the guaranteed total losses, the excess in losses shall be capi talised at the rates stated in below and the resulting amount shall be paid as l iquidated damages. The payment on account of failure of one or more transformer to meet the guarant eed output and guaranteed losses shall be applied individually, as the case may be, and shall therefore be understood to be cumulative. Rejection Limits Should any transformer fail to meet the guaranteed output by more than 5% (five per cent) or the total losses should exceed the total guaranteed losses by more that 1/5 (one fifth), and should the Contractor fail within a reasonable time to modify the transformer in order to increase the output and/or reduce the losses sufficiently, the Purchaser shall have the option to reject the transformer. Evaluation of Losses Transformer losses will during tender evaluation be evaluated based on the follo wing figures (ref Bid data Sheet):

If nothing other is specified in Scope of Wor , Load losses will be evaluated ba sed on the ONAF rating for transformer with combined ONAN/ONAF cooling. The Bidd er must submit losses in the Guarantee Schedules without tolerances. Drawings to be submitted with Bid The following shall be included with the Bid: (Note: if complete design drawings are not available, drawings should be submitt ed of an existing design equivalent in all essential detail to that being offere d). a. Dimensioned outline drawings of the transformer and any auxiliar y plant showing: The arrangement and position of all fittings and accessories. Any section to be removed for shipment and their separate dimens ions and weights. Principal dimensions and minimum clearances (phase/phase and pha se/earth). Weight, sling angles and height from ground level to crane hoo applicable for lifting: The tan cover The complete transformer The cores and coils out of the tan Position and function of all valves. Position and function of all access openings. Total weight and distribution of weight to enable founda tions to be designed (to be designed by the Employer). c. Drawings showing the arrangement of the core and windings including core clamping arrangement. -

Load losses: No load losses:

USD 1070/ W USD 4300/ W

d.

Complete details of the tap changer.

c. Detailed drawings of the tapping switch showing internal details of switch and mechanism, tapping connections and change-over lin board. e. Fully dimensioned drawings of all proposed bushings including cross-sect ions and full electrical characteristics. f. A calculation of the thermal ability to withstand short-circuits. e. Schematic wiring diagrams of automatic voltage control, cooler c ontrol, and protection systems with fully detailed description of the operation. f. Drawings of proposed rating and diagram plates.

Catalogues of all accessory equipment and fittings.

5.2.1 Distribution and Auxiliary Transformers General This specification covers the manufacture; testing, supply and delivery of pole mounted distribution type transformer and spares. General Design Transformer shall be of the mineral oil immersed core (wound core or shell type sh all not be provided) type suitable for outdoor use with Oil Natural Air Natural (ONAN) cooling. Primary and secondary bushings shall be located on top cover Transformer shall be designed to deliver full rated power continuously on any ta pping within the specified tapping range under the following conditions:i) With the voltage of the untapped winding at rated value, without the nee d to de-rate the transformer at the extreme tap positions and without exceeding IEC temperature limits. ii) With voltage applied up to 10% in excess of the rated tapping voltages a nd without injurious overheating. Transformer shall be connected in accordance with IEC 60076 or equivalent : thre e phase transformers to Vector Group reference Dynll. All L.V. neutrals shall be brought out of the tan to a readily accessible termi nal and shall not be earthed inside the tan , unless otherwise specified in the enquiry. Transformer on a particular contract with similar voltage ratios and connections shall be suitable for parallel operations on all relevant taps under which cond itions they should share the load in proportion to their ratings subject to the tolerances on impedance laid down in IEC 60076. Low impedance transformer are preferred, a maximum of 5% being envisaged on any size with no plus tolerance. When requested in the enquiry, sealed designs shall be offered and the following details shall apply: i) Unless otherwise approved, sealing shall be effected by means of a bolte d cover design employing non standard bolts on the top cover ( eys shall be supp lied for each transformer).

ii) Any holes or plugs used to facilitate vacuum/pressure testing, lea ing or oil filling of the transformer shall finally be sealed by welding.

test

iii) The expansion of the oil level shall be accommodated by the tan itself (i.e. no gas filled pillow will be accepted). The bidder must submit documentati on showing tests simulating 40 years of expansion and contraction of the tan wi thout impairment of the rib welding. An oil level gauge shall be provided. Pressure valves, pressure/vacuum gauges, non-return valves and drain valves shal l not be fitted. Earth stud required at both H.V. and L.V. ends of transformer. The transformer shall operate without undue noise and every care shall be ta en in the design and manufacture to reduce noise to the level of that obtained in g ood modern practice. The noise level of the transformer shall not exceed 60 dB(A ) when tested in accordance with IEC Publication 60551. Windings Tappings shall be provided in the H.V. windings, preferably in the centre of the windings, to permit variation of the number of H.V. turns without significant v ariation in the VA rating. The variations shall be effected by means of a manua lly operated tapping switch to be provided. All windings and terminations shall be fully insulated and those for service abo ve 1000 volts shall be designed for impulse voltage tests. Conductor material sh all be cupper. No foil windings shall be used. Designs shall be such that electrical stresses are as uniform as possible throug hout the windings under impulse conditions. Windings shall be vacuum impregnated and insulating materials shall not be liabl e to soften, shrin , become brittle, carbonise, deteriorate, or collapse in any way during service. Cores The magnetic circuit shall be earthed to the core clamping structure, at one poi nt only, and the core assembly to the tan . Where transformers are not sealed r eadily accessible removable bolted lin s shall be employed for the earthing conn ections. The general construction of the cores, framewor and the clamping arrangements s hall be robust and such that they will be capable of withstanding completely any stresses which may occur due to handling, transport or service. All cores and yo es shall be terminated and clamped by means of a suitable framewor . Suitabl e means shall be provided for lifting the cores from the tan s.

Particular attention shall be paid to maintaining low core loss consistent with sound design. Tapping Switches The transformer shall be provided with approved off-circuit type tap changing eq uipment. A fully insulated off-circuit, externally manually operated ganged tapping switc h shall be supplied, capable of withstanding the specified impulse voltage when connected to the transformer windings.

It shall not be possible for the core to move relative to the tan ng or transport.

during handli

Clearly visible tap position indication shall be provided. The tapping switch s hall be operated by means of an external handle that can be positively located a nd loc ed in each operating position. The switch shall be mechanically robust and provided with a device between the h andle and the switch to permit operation without strain in the event of imperfec t alignment between switch and handle; the switch operating shaft shall be fully insulated as between tan and switch and shall be provided with a suitable oil and vacuum tight gland where it passes through the tan . The use of wood shall be avoided wherever possible and all the supports and term inal boards shall be completely unaffected by hot oil and non-moisture absorbent . High grade insulating materials shall be used in the construction of tapping swi tches which shall be designed with special attention to the elimination of point s where trac ing is li ely to occur. Tapping switches shall be mounted on supports made of suitable high strength ins ulating material and shall be provided with self-aligning spring loaded wiping c ontacts capable of maintaining good electrical contact without the need for peri odic maintenance. All clearances between tapping switch contacts and leads shall be indicated on d rawings submitted at the time of Bidding and such clearances shall be sufficient to prevent trac ing or flashover in the event of carbon or sludge deposits form ing on lea age paths. H.V. tappings : Minus 2.5% : 0% : Plus 2.5% : Plus 5% : Plus 7.5%. Outdoor Bushings All line terminals and neutral connections where specified, shall be brought out to porcelain outdoor type terminal bushings in accordance with DIN 4253 with mi nimum creepage distance 31 mm/ V in Coast and industrial area and 25 mm7 V in in land installations. Arcing horns shall be fitted on all transformer bushings. As an alternative factory mounted surge arresters are acceptable. Tan s and Conservators General Drain valves may be either screwed or flanged whilst conservator isolating valve s shall be flanged. Drain valves shall be complete with captive plugs that shal l be either of non-ferrous metal or galvanised. All internal steel surfaces or tan s and conservators shall be shot blasted and cleaned, and a coat of protecting compound, unaffected by hot oil, should be app lied. All external surfaces and parts made of steel are to be thoroughly shot blasted and cleaned, after which two coats of priming paint, preferably of zinc chromate , one intermediate coat and one coat of finishing paint are to be applied. The Project Manager shall approve the colour. Transformers on which the paints are found to fla e off or deteriorate within th e guaranteed period shall be suitably cleaned and repainted free of charge by th e supplier. Tan s Each transformer shall be housed in a tan of welded steel plate construction su itably stiffened where necessary but with a flat base. Wheels or rollers are not required.

Each tan shall be provided with the accessories specified Table 1, the lifting lugs called for shall be suitable for lifting the transformer bodily by means of a hoist or crane when it is completely assembled and ready for service. All transformers shall be provided with four fixing lugs on the base drilled wit h 15 mm holes for bolting to a platform. The fixing holes shall project beyond t he ends of the tan and be placed to provide the most practical stable arrangeme nt. No radiators or tube coolers shall be used. ribbed tan s shall, if needed, be su pplied in order to achieve the necessary cooling under the conditions prevailing at site. Conservators Conservators shall be of dimensions such that oil expansion may occur over the w or ing range temperature from no load with the transformer cold at minus 5 C ambi ent air temperature to full load at plus 45 C ambient air temperature while the su mp pipe remains covered and the oil level is visible or indicated. The fittings detailed in Table 1, shall be provided on all transformer conservat ors. Drain plugs shall preferably incorporate approved sampling facilities, and shall be mounted at the lowest part of the conservator tan and so designed that the sampling device can be readily cleared in the event of its being bloc ed by an a ccumulation of sludge etc., without the necessity of having to dismantle the dev ice completely. Oil level gauges on conservator tan s shall be of the refracting plate glass or other approved type, mar ed wit the level at 20oC at no-load and capable of indi cating the level of oil over the specified wor ing range. Where dehydrating breathers are specified they shall be of the Silica gel type ( cobalt free), in accordance with DIN 42567, which give indication of moisture ab sorption by change in colour of the charge. The breather shall be covered by a m etal tube to avoid vandalism. An inspection window shall be provided and mounted in a position convenient for inspection. The breather is to incorporate an oil seal to prevent contact with the external air when breathing is not ta ing plac e. The breather to be fitted on the L.V. end of the transformer. Where only a vent pipe without a brea er and incorporating a filling hole is spe cified, it shall preferably be fitted with a cap and provided with very fine mes h incorrodible anti-vermin gauze. Accessories and Fittings All transformers shall be provided with accessories and fittings in accordance w ith Table 1, unless otherwise specified in the enquiry. Rating and diagram plates shall be of engraved steel, brass or other approved in corrodible material. Where a thermometer poc et is provided, it shall be of a thin walled metal mount ed in the tan cover. The poc et shall project 25mm outside of the tan and shall be threaded along th e whole projecting portion, a screwed cap shall be provided to cover the poc et when not in use. Lightning arresters equipped with galvanised brac ets suitable for bolting to a vertical surface shall be mounted directly on to the transformer tan . The moun

ting surface shall be such that the centre lines of the arresters are parallel w ith the centre lines of the associated bushings, and at the same spacing as the bushings. Table 1 ACCESSORIES AND FITTINGS FOR DISTRIBUTION TRANSFORMERS Item No Transformer Tan Fittings 1. Conservator (Sealed type) 2. Drain valve with captive sealing plug 3. Lifting lugs 4. Thermometer Poc et 5. Rating and diagram plate 6. Hanger irons 7. Platform mounting lugs 8. Earthing Terminal 9. Lightning arrester brac ets 10 Arching Horns 11. Lightning Arrestors 11. Dial type thermometer 12 Jac ing pads 13. 14. 15. 16. Oil gauge Mounting plate for Item 5 (to be suitable for mounting marshalling box Item 16) Lashing down facilities Marshalling box for Item 10 of Tan fittings and Item 7 of Conservator fittings Conservator Fittings 1. 2. 3. 4. 5. 6. 7. 8. Drain plug Sampler Separate filling hole with cap. Dehydrating breather Plain breather Oil gauge Gas & oil actuated relay Conservator isolating valve N = Not Required Y Y Y Y N Y N N

Y Y Y (if LA offered) Y Y (as alternative) N Required only when the mass of the complete transformer is 1000 g or more Y

Y = Required

Insulating Oil The transformer shall be filled with low viscosity mineral insulating oil, which complies in every respect with the provision of IEC 60296. Tests The following tests shall be carried out: a) Routine covering test certificates shall be submitted, immediately after

15-315

VA

N Y Y N Y N

N Y N

completion of tests in the factory, for each and every transformer. b) As a type test, temperature rises test on each different rating of trans former. c) As a special test, an impulse voltage withstands test including chopped waves on each different rating of transformer. Note: If tests to b) and c) above have been carried out satisfactory on design s identical in all essential details, these tests may be waived on the productio n of acceptable covering test certificates. Pac ing and Transport Transformer shall be transported to destination with their tan s full of oil up to the service level. Bushings and any accessories or fittings li ely to be damaged shall be protected adequately against damage in transit. Drawings and Diagrams With Bid The following drawings shall be supplied with any Bid unless identical drawings have been previously supplied, in which case a statement in the Bid of the appli cable drawing subjects, numbers and revisions will suffice together with details of the references under which previous supply was made: General arrangement drawing of each rating of transformer offered showing:i) Minimum clearance (phase to phase and phase to earth) on H.V. and L.V. b ushings including clearance H.V. to L.V. ii) Positions and identification in a separate legend of all fittings with t ype numbers. iii) iv) Size and position of all fixing holes. Total weights with and without oil and core lifting height and weight.

Detail dimensioned drawings of tapping switch illustrating type of material, cle arances, between tapping points and to earth and method of operation. Detailed dimensioned drawing of bushings, silica gel or plain oil seal type brea ther, and conservator. Note: Where sealed transformers are offered, a cross arrangement drawing shall be submitted with the Bid showing, in particular, details of the tan construct ion and internal tan finish and the depth of the expansion space above the oil. With Contract Latest issues of the drawing shall be supplied under the contract; if no modific ations are applicable to the drawings supplied with the Bid, this shall be confi rmed in writing under the contract and further drawings need not be supplied. Rating and diagram plate drawing shall be supplied. Evaluation of Losses As for the main transformers

PARTICULAR SPECIFICATIONS SUBSTATIONS CIVIL WORKS

6.1.1 PARTICULAR SPECIFICATION CIVIL WORKS 6.1.1.1 General 6.1.1.1.1 Location of the Wor s The locations of the sites are as described under the relevant clauses in scope of wor s in Volume 2. 6.1.1.1.2 Type of Wor s The wor s to be constructed under this Contract include the following: Wor for access road Earthwor s for sub-station platform Subsoil drains and storm water drains 100 mm thic layer of stone to platform surface Fencing Concrete bases and Stub columns Cable Trenches Switchgear Building Transformer foundations Any other wor s necessary for full completeness

6.1.1.1.3 Switchgear Building The switchgear building shall contain the following rooms: Switchgear room to accommodate all the switchgear panel plus a space that would accommodate 6 more feeder panels in the future. Battery room (to accommodate both protection and communication batteries) Office room (4mX4m). Office furniture (cabinets, chairs and office table) Kitchen Communication equipment room (5mX4m) Toilet facility Control and protection Panel room to accommodate the necessary Protection and co ntrol panels and space for future expansion. In addition a guardhouse with toilet facilities located at the main gate shall b e constructed. The guardhouse area shall be clearly demarcated from the restrict

ed area. All the rooms shall be pressurised to avoid dust. 6.1.1.1.4 Sequence of Construction The Contractor must complete all the civil wor s in time to provide a clean and complete site for the mechanical and electrical erection. The Contractor shall be responsible for timely delivery of materials to site and for compliance with the specified or agreed construction programme.

6.1.1.1.5 Drawings The Drawings issued with these documents are for tendering purposes only. Drawi ngs for this project shall be made by the Contractor or his civil consultant, an d be to the approval of the Project Manager. 6.1.1.1.6 Use of Site The Contractor will restrict his activities to within the Sites. Access for oth ers to wor on the site concurrently with this Contract shall be maintained as f ar as possible. Where it is necessary for persons on foot or in vehicles, inclu ding other Contractors, to cross the site whilst wor is in progress, the Contra ctor shall provide warning signs on either side of the Wor and flagmen if neces sary to guide such persons safely across the Site. The cost of maintaining acce ss for others and assisting the passage of others across the Site shall be deeme d to be covered by and included in the rates entered by the Contractor in the Pr ice Schedules. 6.1.1.1.7 Plan of Operations and Temporary Wor s The Contractor shall, in accordance with Conditions of Contract and before comme ncing wor on Site, submit to the Project Manager a fully detailed programme sh owing the order of procedure and method by which he proposes to carry out the co nstruction and completion of the Civil Engineering wor s, and particulars of the organisation and staff proposed to direct and administer the performance of the Wor s. The information to be supplied to the Project Manager shall include Drawings sho wing the general arrangements of his temporary offices, camps, storage sheds, bu ildings and access roads, and details of Constructional Plant and Temporary Wor s proposed. 6.1.1.1.8 Contractor's Office and Accommodation, etc. The Contractor shall be responsible for his offices, accommodation, storage and wor shops. The Contractor may fence this area for his own security for the dura tion of the Contract but any such fence erected together with all buildings, pla nt and materials shall be removed, all holes filled in and the site left in a ti dy and level condition upon completion of the Contract. 6.1.1.1.9 Dealing with Water The Contractor shall eep the whole of the Wor s free from water and he will be deemed to have included in his rates in the Price Schedules for all pumping, sho ring, temporary drains, sumps and other measures and provisions necessary for su ch purposes and for clearing away and ma ing good to the satisfaction of the Pro ject Manager damage caused thereby. The Contractor shall eep all existing drainage channels clear and shall not obs truct the passage of water to or away from any such drainage channels. 6.1.1.1.10 Liaison with Police and Other Officials

Contractor shall cooperate closely with the Police and other officials of the ar ea concerned regarding their requirements in the control of wor men, movement of traffic, or other matter. 6.1.1.1.11 Explosives and Blasting The Contractor shall use explosives for blasting in connection with the wor onl y at such times and places and in such a manner as the Project Manager may appro ve, but such approval shall not relieve the Contractor from his responsibility f or injury, loss, inconvenience and annoyance to persons, the Wor and adjoining structures, roads, places and things and injury or damage to animals and propert y consequent on the use of such explosives. The Contractor shall be entirely li able for any accident that shall occur and shall save the Project Manager harmle ss and indemnified from all claims arising from such use of explosives. The Contractor shall eep in his office at the Site copies of Laws applying to t he transport, storage and use of explosives and shall also submit to the Projec t Manager a copy of any instructions or notices which the Contractor may issue t o his staff or wor men or post about the site in compliance with such Laws. The Contractor shall submit to the Project Manager details of the explosives, wh ich he proposes to use, and of his proposals for the transport and storage of ex plosives. 6.1.1.1.12 Wor s Executed by the Project Manager or by Other Contractors The Project Manager reserves the right to execute on the site, wor s not include d under this Contract and to employ for this purpose either his own employees or other contractors. The Contractor shall ensure that neither his own operations nor trespass by his own employees shall interfere with the operations of the Project Manager or his Contractors employed on such wor s and the same obligations shall be imposed on the Project Manager or his contractors in respect of wor being executed under t he Contract. The Contractor shall provide unhindered access to all parts of the site to the P roject Manager, authorised representatives of the Project Manager and of public bodies and corporations, and to contractors employed by the Project Manager, and he shall ma e available to such authorised persons the use of all temporary acc ess trac s in or about the site. Where wor s are being carried out concurrently in one area careful co-ordination of operations will be required so that interference can be minimised. The Proj ect Manager shall have the power to regulate and rearrange the order of executio n of the Wor s under this Contract to achieve the best co-ordination practicable . The Contractor's programme shall ta e into consideration all information on c o-ordination available at the time of its preparation and it shall be flexible e nough to allow for subsequent changes that may become necessary. The rates tend ered for the Wor s shall include the costs of complying with the requirements of this Clause. 6.1.1.1.13 Water Supplies for the Wor s The Contractor shall ma e his own arrangements for the supply of potable water f or his staff on site and water for the Wor s. The Contractor must ma e all arrangements including the supply of pumps and moto rs, labour and the li e to abstract water and must pay royalty to the owners. T hese costs shall be included in his prices. If the Contractor fails to obtain permission to utilise existing water sources, he may have to drill boreholes near the sites at suitable locations.

The Contractor shall obtain the Employer's or the Project Manager's prior approv al before utilising any water source for the Wor s.

6.1.1.1.14 Employer's Approval of Finished Wor s The Contractor shall obtain the approval of the Project Manager for each section and each stage of construction. Approval of any section of any stage will not be given, and the Contractor shall not proceed with any subsequent stage, until all tests required by the Project Manager have been carried out, and the results have shown that the section complies with the Specification. Any wor s rejecte d by the Project Manager as not complying with the Specification shall be repla ced by the Contractor at his own expense. 6.1.1.1.15 Preservation of Trees No tree shall be removed without prior permission of the Project Manager who wil l limit the removal of trees to the minimum necessary to accommodate the permane nt Wor s. 6.1.1.1.16 Survey Beacons During the progress of the Wor s, the Contractor shall not remove, damage, alter or destroy in any way any permanent beacons or survey beacons. Should the Contr actor consider that any survey beacon will be interfered with by the Wor s, he w ill notify the Project Manager, who, if he considers necessary, will ma e arrang ements for the removal and replacement of the beacon. If the Contractor removes or disturbs a beacon without the prior permission of t he Project Manager he shall be liable for the full cost of its replacement toget her with the full cost of re-establishing the data relevant to it. 6.1.1.1.17 Basic Survey and Setting Out The Contractor will survey the sites in detail, and the exact locations shall be agreed with the Project Manager. The details of beacons and benchmar s shall be provided in the site survey drawi ngs. The Wor s are located on the drawings and the Contractor shall appoint a suitabl y qualified Surveyor to set out the Wor s from the beacons and shall plot cross sections at 20 m intervals and submit to the Project Manager for approval. No separate payment will be made for any wor in connection with the setting out of the Wor s, nor any other Wor s required by the Contractor to ensure the accu rate location and construction of the Wor s. 6.1.1.2 EARTHWORKS 6.1.1.2.1 Bush Clearing The areas of the platform and borrow pit shall be cleared of all trees, vegetati on and roots. These shall be neatly stoc piled within 3 m of the site at locat ions agreed with the Project Manager and shall remain the property of the land o wner. 6.1.1.2.2 Access and Internal Roads Where necessary access roads to the substation sites shall be constructed. Inte rnal substation road and wal paths shall be compacted to 100% MDD after grading shall have a well done paving bloc finish that can withstand load weight of no t less than 80mm , 49N/mm2. The road shall also be lined with erbline and chann els and shall be constructed to a fall that will allow proper drainage of the ro

ad. The road shall have adequate drainage provided. A-Gravel Access and Internal Roads (Gravel Wearing Course GWC) A.1 General All new access and internal roads will be gravel standard and their alignments w ill be designed to accommodate construction and future maintenance traffic. Any damage occasioned by whatsoever cause during construction shall be repaired by spot gravelling, reshaping and re-compaction at the end of contract such that the road to be handed over will be defects free. A.2 Materials Requirements Gravel standard roads comprise of a single layer of selected granular material p laced directly on the sub grade to serve as a pavement and as surface-wearing co urse. The gravel for the single layer should be of adequate quality to guarantee the f ollowing: a) General In general gravel wearing course materials should comply with the following: They should have sufficient cohesion to bind the particles together and prevent the surface from ravelling and becoming corrugated in the dry season. The amount of fines and plasticity should be limited so as to avoid the occurren ce of dusty and slippery conditions in dry during the dry and wet weather respec tively. b) Grading Requirements: Grading curve of the gravel should be within the class 1 envelope (initial daily number of commercial vehicles less than 150) to guarantee good stability. The g rading to consider is that obtained after processing and compaction. Grading after compaction Sieve Size (mm) % passing by Class 1 Class 2 37.5 100 28 100 95 100 20 95 100 85 14 80 100 65 10 65 100 55 5 45 85 35 92 2 30 68 23 77 1 25 56 18 62 0.425 18 44 14 - 50 0.075 12 - 32 10 - 50 weight

100 100 100

c) Plasticity Requirements Plasticity index of the gravel should not exceed 15 and shall not be less than 5 in wet areas (annual rainfall greater than 500 mm per year). In dry areas (ann ual rainfall less than 500 mm per year) maximum plasticity index shall be 30 but subject to a minimum of 10. d) Bearing Strength Requirements A minimum CBR (after 4 days soa ) of 20% at 95% MDD and OMC (Modified AASTO T180 ) is required e) Construction Procedures Gravel materials are excessively coarse in their as dug state. Appropriate process ing is therefore necessary to bring them to the required gradation. This is norm

ally done on the road by using grid, cleat or sheeps foot rollers. Oversized part icles which cannot be bro en down to the required size shall be removed. The minimum thic ness of a compacted layer shall not be less than 125 mm. A.3 Pavement. The single gravel layer should consist of a minimum thic ness necessary to avoid excessive compressive strain in the sub grade and to compensate for the expecte d gravel loss under traffic during the period between re-gravelling. Where the top 300 mm layer of the formation level emban ment or natural ground s ub grade has a CBR greater than 5%, the following thic nesses shall be provided: Roads within the Switch Yard not subjected to heavy commercial vehicles The minim um compacted thic ness of 125mm. Access roads outside the Switch Yard and roads within the Switch Yard li ely to be subjected to heavy commercial vehicles during construction and during periodi c maintenance. Provide a 250 mm thic compacted layer. In addition to the above, where the in situ sub grade or the emban ment material has CBR strength of less than 5% then: Top 300 mm layer of the fill / emban ment shall be made with selected imported m aterial with CBR (after 4 days soa ) of between 7 and 13%. Where in situ sub grade an improved sub grade 300 mm thic of imported materials with CBR (4 days Soa ) of between 7 and 13% shall be laid. The above thic ness shall extend to cover the shoulders. A cross fall of 4% shal l be provided. Compaction will be in layers not thic er than 200 mm and will achieve compacted densities of 95% MDD (Modified AASHTO T180) at compaction moisture contents of b etween 80% and 105% OMC. a) Existing Bitumen Standard Access and Internal Roads All shall be reinstated to their original standard of materials and construction . b) Quality Control Tests shall be performed by the contractor on soils and gravels undergoing compa ction under the supervision of and at frequencies determined by the Project Mana ger and shall include: Determination of the Atterberg Limits in accordance with BS 1377. Determination of particle size distribution in accordance with BS 1377. Determination of dry density / moisture content relationship in accordance with BS standard compaction and modified AASHTO T180 as appropriate. California Bearing ratio (CBR) in accordance with AASHTO T193. Field dry density as set out in BS 1377.

6.1.1.2.3 Removal of Top Soil The top soil within the areas of platform and shall be stripped to an approximat e depth of 200 mm and stoc piled at locations agreed with the Project Manager fo r later use on emban ment slopes. Overburden in the borrow pit shall also be stripped to a depth specified by the Project Manager and stoc piled for later use in rehabilitation.

6.1.1.2.4 Classification of Materials Materials excavated and either placed in the Wor s for the formation of the plat form or carted to spoil will be paid for in the following three classes of mater ial: "Roc " "Roc " shall include all material which requires blasting for its removal or can not be extracted by ripping with a single tine heavy duty ripper of at least 5 t onne mass towed by a crawler tractor in good condition with a net available flyw heel power rating of not less than one hundred and thirty-five W engine power a nd with a minimum bare tractor mass of 15 tonne. The use of explosives by the C ontractor to excavate does not in itself imply that a material is Roc in terms of this Contract. Individual boulders greater than 0.2 m3 in volume shall be in cluded in this class when their nature and size are such that they cannot be rem oved without recourse to blasting. "Hard Material" "Hard Material" or "Decomposed Roc " shall include all material such as consolid ated gravels, decomposed or stratified roc , stones or boulders less than 0.2 m3 in volume which cannot be classified as "Roc " but which in the opinion of the Project Manager requires additional processing, such as ripping or brea ing dow n by compressor tools before normal loading processes may be employed. For the purpose of this clause normal loading processes will include the use of graders or dozers to stoc pile material. "Common" "Common Material" shall be all material not defined as Roc or Hard Roc . All materials shall be classified as "Common" unless otherwise certified by the Project Manager. Should the Contractor during excavation encounter any material which in his opinion should be classified as roc or hard material, then he sha ll request the Project Manager to so certify the material before excavation of t hat material commences. 6.1.1.2.5 Order of Wor The construction of cuttings, side drains and emban ments shall proceed in a met hodical and orderly manner. It shall be solely the Contractor's responsibility to arrange his methods and programme of wor so as to ensure that the earthwor s are carried out by the most efficient and economical method possible with the t ype of plant employed on the Wor s. All trimming of cuttings, and emban ments, drains and shoulders to the specified slopes and shapes, shall be carried out concurrently with the earthwor s that a re being carried out at that particular site and level. 6.1.1.2.6 Fill Material "Fill-material" shall mean material deposited in accordance with these specifica tions from any of the classes specified in order to build up an earthwor s const ruction to formation level as shown on the Drawings or as ordered by the Project Manager. The Contractor shall obtain the fill material from a source approved b y the Project Manager. Fill materials will generally be obtained from cuttings. If the material obtaine d from this source is insufficient or unsuitable extra material shall be obtaine d from borrow areas. All fill material (other than roc fill in lower layers) sh all pass 75mm BS sieve size. The following materials are generally unsuitable for construction of fills. All materials containing more than 5% by weight of organic matter (such as top s

oil, materials from swamps, plants and vegetable matter) All expansive soils such as blac cotton soils with swells of more than 3% as me asured in the CBR test. All clay soils with plasticity index exceeding 50. All materials having a moisture content of 105% of the optimum moisture content (standard compaction) Roc fill can be used provided that boulders greater than 0.2 M3 in volume or 60 0 mm in size are not used and that this material is not placed within the top 60 0 mm to formation level. The best materials from cuttings or borrow areas should be reserved for the upper layers of the fill. Compaction of fill Materials other than roc fill shall be placed in layers of compacted thic ness not exceeding 300 mm. Thic er layers can only be permitted where very heavy com pacting equipment is available and trial sections have proved that the required compaction will be readily achieved over the layer depth. The minimum layer thic ness shall be twice the maximum particle size of the compacted material.

Fill material shall be compacted throughout to a dry density of at least 95% MDD at OMC (standard Compaction AASHTOT99) except the top 300 mm of the fill which shall be compacted to 100% MDD (AASHTO T99). Where roc fill is used it should be placed in the bottom of the emban ment. The largest sizes but shall be placed in layers of 1.0 meter thic . The interstices shall then be filled with smaller roc s and approved filler material. The whole layer shall then be compacted until the interstices are completely filled or un til the required settlement is obtained. Heavy vibratory rollers are generally t he most suitable machines for compacting roc fill. The specified compaction shall be achieved over the full width of the emban ment . Any area inaccessible to the roller shall be consolidated and compacted using ap proved mechanical tampers. Compaction of In situ Sub grades After removing the top soil and/or 600 mm of expansive soils and before placing fill, improved sub grade or gravel wearing course, the upper 300 mm of in situ s ub grade will be compacted to 100% MDD standard compaction. Compaction in cuts w ithout improved sub grade will li ewise be compacted to 100% MDD standard compac tion 6.1.1.2.7 Spoil Material "Spoil-material" shall mean material excavated in accordance with these specific ations from any of the classes specified, and which, being obtained from the exc avation of side drains, cuttings or below the road, emban ment is unsuitable for the requirements of the Wor s. Spoil material shall be removed from the Site t o a spoil tip which should be to a site acceptable by respective local authoriti es and shall be approved by the Project Manager. 6.1.1.2.8 Expansive Material When expansive material is encountered, it shall be removed to a depth 600 mm be low the formation or the existing ground level, whichever is greater. Material r emoved shall be stoc piled for later use in slope protection or spoiled to a tip as instructed by the Project Manager. 6.1.1.2.9 Surplus Material "Surplus-material" shall mean material excavated in accordance with these specif ications from any of the classes specified and which is temporarily surplus to t

he fill requirements and shall be carted to a designated stoc pile for re-use la ter elsewhere in the Wor s, or to an approved spoil tip. 6.1.1.2.10 Side Drains Where side drains are required excavating the lines, slopes and widths as design ed by the Contractor and approved by the Project Manager shall shape them. The s ide drains shall be finished off so that the formation levels and camber or supe r elevation of the formation, level and cross fall of the shoulders, and shape a nd invert levels of the side drains are everywhere in accordance with the Drawin gs. Any excess depth or width excavated from the side drains shall be bac filled and made good to the satisfaction of the Project Manager at the Contractor's expens e. All other types of drains are specified separately in this Specification.

a)

Excavation Level

Unless otherwise directed, the formation of the platform can be founded on roc . However, roc shall be excavated to an average level 150 mm below the formation and in no place less than 100 mm below the formation.

Any excess excavation in roc below the formation shall be bac filled and compac ted. Excess excavation in the invert of drains shall not be bac filled, but the roc surfaces shall be trimmed, and all loose particles removed, to allow free d rainage of water. c) Excess Excavation of Slopes

Where side slopes are over-excavated no bac filling will be required but the slo pes shall be trimmed to a neat shape and safe angle as is acceptable to the Pro ject Manager. The sloping sides of all cuttings shall be cleared of all roc fr agments, which move when prised with a crowbar. d) Hard Material

The provisions of this Clause do not apply to hard and common materials, which m aterials shall be excavated to the lines and levels shown on the Drawings or as instructed, within the permitted tolerances. 6.1.1.2.12 Setting Out and Preparation for Earthwor s The Contractor shall set out the earthwor s and the tops of cuttings and toes of emban ments at intervals 10 m. Reference pegs shall be provided clear of the e arthwor s and at right angles to the centre lines, from which the centre lines a nd levels can be re-established at any time. Before the construction of any earthwor s in the fills, the levels of the existi ng ground shall be agreed between the Contractor and the Project Manager. If the Contractor fails to ta e the requisite levels then the ground levels determined by the Project Manager shall be ta en as correct. 6.1.1.2.13 Construction of Earthwor s to Formation All earthwor s up to formation shall be formed and completed to the correct line s, slopes, widths and levels shown on the Drawings and with the sub grade parall el to and at the correct depth below the profile, camber, cross fall or super el

b)

Bac filling for Surfaces

6.1.1.2.11

Excavation in "Roc "

evation shown for the finished level, unless otherwise directed by the Project M anager. Emban ments and fills shall be constructed only of suitable material obtained fr om the excavation of cuttings. If the Contractor encounters material which he c onsiders unsuitable for earthwor s, then he shall forthwith inform the Project Manager, who shall instruct the method of use or disposal of such material. If insufficient material can be obtained from the cuttings, additional material may be borrowed from approved borrow pits. The Project Manager may direct that certain soils be excluded from certain laye rs and other soils set apart or obtained from borrow and used only for these lay ers, in which case the Contractor shall comply with the Employer's or the Projec t Manager's directions and shall allow in his price for such selection of materi als. 6.1.1.2.14 Unsuitable Material Information Where, in the opinion of the Project Manager, unsuitable material occurs in cutt ings, the Contractor shall excavate it to the depths and widths directed and rep lace it with selected fill material to form an improved formation. 6.1.1.2.15 Spreading and Compaction of Emban ment and Fills Emban ments and fills shall be laid out and compacted to achieve a stable platfo rm with sufficient bearing capacity and stability.

6.1.1.2.16 Drainage of Wor s All cuttings, emban ments and borrow pits shall be ept free of standing water a nd drained during the whole of the construction. Should water accumulate on any part of the earthwor s, either during constructio n or after construction, until the end of the maintenance period, giving rise to soa ing or eroding conditions in the earthwor s, the Project Manager may order the Contractor to remove and replace at the Contractor's expense any material wh ich has been so affected. All drains shall be maintained throughout the Contract in proper wor ing order. The Contractor must allow in his price for draining the earthwor s satisfactoril y at all stages during the construction and arrange his methods and order of wor ing accordingly. 6.1.1.2.17 Sub-grade Layer During this process the sub grade layer shall be graded to level, parallel to th e cross fall or chamber and profile shown on the approved design drawings or dir ected by the Project Manager and to agreed tolerance. 6.1.1.2.18 Tolerances The following tolerances will be permitted in the finish of the formation to roa ds and platform: a) The level of the formation should be within +/- 100 mm and - of that specified. b) On the final trimmed slope of earthwor s a variation of + or - o ne fifth of the specified slope will be allowed. c) The tolerances permitted in the overall width of the bottom of cuttings

shall be plus or minus 150 mm in the distance between centre lines and the toe o f cuttings slopes, and plus 150 mm in the case of emban ments. 6.1.1.2.19 Protection of Emban ment Slopes The top soil and expansive material removed from the Wor s shall be placed on em ban ment slopes as directed by the Project Manager. The slopes shall be trimmed to form a gradient not less than 1 on 5 unless otherwise directed. 6.1.1.2.20 Grassing of Slopes The surface of emban ment slopes, after placing of top soil, shall be planted wi th grass. Unless instructed otherwise by the Project Manager, the type of gras s shall be indigenous. While planting, the area shall be irrigated for as long a s necessary to ensure that the grass is properly established and has completely covered the ground. Grass should only be planted in the rainy season.

6.1.1.2.21 Borrow Pits Where it is necessary to borrow material for construction, suitable pits shall b e provided by the Contractor to the approval of the Project Manager. All borrow pits must be carefully cross sectioned before and after excavation in order to determine the quality of earth excavated. After removal of material for use, the area must be rehabilitated by the Contractor so that it will not prove a hazard to man or beast or a source of er osion. The sides of the excavation must first be sloped and then any previously stoc piled top soil spread as far as possible. At some borrow pit locations, further cleaning and fencing etc., may be required . 6.1.1.2.22 Soil Sterilisation In order to stop the growth of vegetation and incidence of ants, the Contractor shall apply an approved herbicide before any spreading of stone over the platfor m area. Insecticide to be used around Switchgear building. 6.1.1.2.23 Earth Electrode The Contractor shall install earthing electrodes in trenches as outlined in the Specifications for Earthing in chapter 4.1.Particular specifications. 6.1.1.2.24 Platform Areas The substation platform areas shall be at least 1.5 times the area required by t o equipment to be installed. 6.1.1.3 MATERIALS FOR THE WORKS 6.1.1.3.1 General All materials shall comply with appropriate local or regional standards unless o therwise required hereinafter. Such standards shall be to the approval of the P roject Manager. The Contractor shall before placing any order for materials or manufactured arti cles for incorporation in the Civil Wor s, submit for the approval of the Projec t Manager the names of the firms from whom he proposes to obtain such materials, etc., together with a list of the materials and manufactured articles giving th e origin, quality, weight, strength, description, etc., which he proposes that t he firms should supply. No materials or manufactured articles shall be ordered

or obtained from any firm of which the Project Manager shall not have previously approved. All materials shall be delivered to the site a sufficient period of time before they are required for use in the Wor s to enable the Project Manager to ta e suc h samples as he may wish for testing and approval. Any materials condemned as u nsuitable for Wor s shall be removed from the Site at the Contractor's expense. The Contractor may propose alternative materials to those specified, provided th at they are of equivalent quality and, subject to the Employer's or the Project Manager's approval such materials may be used in the Wor s. 6.1.1.3.2 Standards Concrete pipes, porous concrete pipes, cast iron manhole covers and gratings, br ic s, concrete erbs, bituminous surfacing, cement, steel and aggregates shall c omply with local or regional standard to be approved. 6.1.1.3.3 Filter Bac fill for Sub-soil Drains This shall be graded crushed stone as for platform surfacing (below). 6.1.1.3.4 Stone for Pitching Stone for pitching to drains, inlets and outlets of culverts, to emban ments and around structures shall consist of sound un-decomposed roc . Precast concrete t iles may also be used. 6.1.1.3.5 Stone for Platform Surfacing The stone shall be hard and durable crushed roc with a maximum particle size of 60 mm and not more than 15% shall pass a 9.5 mm sieve. The stone layer to be spread uniformly over the finished surface of the platform shall have a thic ness of 100 mm. 6.1.1.4 DRAINAGE AND STORM WATER 6.1.1.4.1 Drainage The Contractor shall provide sub-soil and storm water drainage, including draina ge of cable ducts. The drainage system shall be to the approval of the Project M anager. Drainage shall be in accordance with relevant Codes for Practice published by au thoritative Standards organization such as the British Institution, e.g. BS 8301 , BS 6031 and CP 2005. A surface water drainage system covering the entire substation site shal l be installed to allow total drainage of the substations. The number of runs a nd outfalls and pipe sizing must be sufficient to cope with the severest precipi tation, with a factor of safety of 1:2 within the substation site and other area s in which maintenance will be carried out. The drainage must allow uninterrupt ed access. Emban ments and cuttings are to have drainage facilities at their top or bottom. The formation level of the site is to be formed with uniform cross-fal ls of about 1 in 300 in the same direction as the natural drainage path of the s urrounding environment. Surface water from roofs of buildings except the equipment room shall be drained to down pipes, which connect with the general site drainage system. Sur face water from the equipment building roof shall be drained to the main reservo ir tan . In areas where there is a ris of water runoff the substation shall be p rotected from failure by means of gabions, retaining walls, and stone pitching o

r otherwise to the employers approval. The contractor shall install precast 600 mm concrete culverts for storm dr ain with the 200mm thic concrete haunching for the purpose of providing free fl ow of storm water drain at the substation entrances and or exits. Also 200mm thi c reinforced concrete plastered head walls shall be installed. Foul drainage The foul drainage will be connected to a sewage drainage system where applicable or to standard septic tan for 20 persons to be constructed by the contractor. All the necessary authority shall be sought by the contractor p rior to connection, and all regulations of the council shall be adhered to.

6.1.1.5 FENCING 6.1.1.5.1 Fencing The Contractor shall construct fencing along the perimeter of sub-stations, incl uding gates where necessary and shall comply with the requirements of the follow ing Clauses. All the substation fences shall be of dressed Natural stone. The substations sha ll have electric fence and a razor wire on top of the perimeter wall. 6.1.1.5.2 Dimensions Height of the stone fence: 2 700 mm Height of chain lin fabric: 2 000 mm Barbed wire: 3 wires above fabric, height of 300 mm, on supporting arms facing o utwards from Site at 450 angle. Maximum distance between posts or columns: 3 000 mm, except where interrupted by gate. Terminal posts: including end, corner and straining posts; 89 mm outside diamet er 114 mm outside diameter at gates. Embedment lengths of terminal posts: Corner and straining posts End posts Gate posts 1 100 mm 1 200 mm 1 400 mm

Tension bars and bands: locate at terminal posts to fix fabric, bottom wire and barbed wire. Top rail: "extra-strong" pipe, 43 mm outside diameter. Braces: "extra-strong" pipe, 43 mm outside diameter for attaching end and gate p osts to adjoining posts. Use two braces at corner and restraining posts. Gate width: free distance between 2 gate posts, 1 500 mm for single gate, 5 000 mm double gates. Double gates: one leaf for normal traffic, other leaf to remain closed by means of drop bolt loc ing into centre rest, inoperable from exterior. Gates: able to open in either direction to 900.

Gate hardware: three hinges, latch with padloc ate, latch catch.

accessible from either side of g

Top of posts and uprights: weatherproof tops. 6.1.1.5.3 Materials Fabric: ASTM A 392, 2 000 mm high, 3.8 mm diameter (No. 9 gauge) steel wire, 50 mm diamond pattern, twisted and barbed finish at top, nuc led wires at bottom, zinc coated. Pipes: ASTM A 120, steel pile, hot-dipped zinc coated after welding, diameter an d weight size as shown on drawings, unthreaded ends, free from burrs. Fence fittings: ASTM F 626, hot-dipped zinc coated according to ASTM A 123. Barbed wire: ASTM A 121, 2.51 mm diameter wire in strand (No.12-1/2 gauge), 2 st rands with 4-point barbs spaced at 125 mm, Class 3 zinc coating. Bottom wires: 5 mm (No. 6 gauge) steel wire, 500 g/m2 zinc coating. This shall be surrounded by a concrete beam (C20) as shown on the drawings. Fence fittings: ASTM F 626, steel tension bars and bands, nuts and bolts, weathe r proof tops of commercial aluminium alloy, malleable cast iron, or rolled or pr essed steel, cast iron and steel fittings hot-dipped galvanised with 500 g/m2 ac cording to ASTM A123. Concrete: 20MPA at 28 days 6.1.1.5.4 Installation Install fencing and gates according to ASTM F 567 unless otherwise indicated, an d to drawings and this Specification. Level ground surface so that space between finished ground surface elevation and bottom of fabric does not exceed 50 mm. Plumb and align posts to within 10 mm. Install posts of a gate at same elevation regardless of difference in ground lev el. Set posts in concrete footings in form of truncated cone, according to ASTM F 56 7, and as follows: FOUNDATIONS ORDINARY SOIL (Dimensions) Line Posts Depth 1000 mm Diameter at top 250 mm Diameter at bottom 150 mm SOLID ROCK Terminal Posts Line Posts Terminal Posts 1600 mm 300 mm 500 mm 300 mm 150 mm 150 mm 350 mm 400 mm 150 mm

Ma e joints in fabric at terminal posts. Fasten as follows: a) b) Every 450 mm along top rail, braces and bottom wire; Every 300 mm on line posts.

Secure barbed wire to terminal and gate posts with tension bands, and to gate up rights with hoo s. Install bottom wire in middle of last line of mesh.

6.1.1.6 CONCRETE AND BUILDING WORKS 6.1.1.6.1 Earthwor s Preliminary design and calculations of foundations The Contractor may ascertain for himself the nature of the sub-soil cond itions over the sites of the wor s for his additional data, which he may require , for preparation of his bid. The contractor may collect any other data he deem s necessary for his bid. Soil Investigations The Contractor shall be required to perform sub-soil tests within the area of th e switchyard to the depth and by the method of test specified by the Project Man ager. The details of performing the test, tools and equipment to be used for, sh all be submitted to the Project Manager for approval. The sub-soil tests shall be carried out by any method as stated hereafter under the supervision of a qualified person, who shall be subject to approval of the P roject Manager. The soil tests should result in parameters significantly different from those gi ven for tendering purposes; price adjustments for foundations may be adjusted pr oportionally, subject to negotiations.

Excavation Excavation for concrete foundations shall be carried out in strict accordance wi th the requirements of the Project Manager and to fit in with the programme of c onstruction. Shoring and Timbering of Excavation The Contractor shall be entirely responsible for the safety of all excavations, for the prevention of injury to wor men and for the stability of the faces of th e excavation. The adjacent road surfaces must remain trafficable, and crac ing or cave-ins mus t be avoided. All shoring and timbering shall be done to the approval of the P roject Manager, who may order such shoring or timbering to be strengthened or al tered if he considers this necessary in the interests of the wor or to safeguar d against accidents to wor men or cave-ins. For the purpose of measurement the following categories of shoring shall apply: Dewatering The whole Wor s shall be constructed in the dry and the Contractor shall be held responsible for eeping all excavations free from water, whatever the source or cause may be, and shall properly deal with and dispose of water by use of suffi cient temporary wor s, plant and appliances so as to ensure that the whole Wor s is executed in a satisfactory dry and safe manner, and costs for all dewatering operations shall be included in the price for civil wor s. Excavation to be Approved In no case shall bro en stone for under drainage or concrete be placed in an exc avation until the surface on which such materials are to be placed has been appr oved by the Project Manager. The Contractor shall advise the Project Manager whenever the bottom of any excav ation is ready for inspection or whenever it is necessary to cover up the wor . In default of such notice the foundation shall on the order of the Project Mana ger be uncovered by the Contractor and reinstated without extra charge.

Disposal of Excavated Material All material excavated under this Contract shall be disposed of in accordance wi th the instructions issued by the Project Manager. Selected material required f or bac -filling shall be removed to a tip found by the Contractor and the Contra ctor shall be responsible for ensuring that the required amount of spoil is set aside. Other Services Where trenches pass near or across other services, the Contractor shall ta e eve ry precaution against damaging such services. These services shall be properly supported in the trench until bac -filling is complete and the bac -filling shal l be thoroughly compacted under and around such services. Bac filling Bac -filling shall be carried out either with selected spoil as set aside, or wi th imported selected spoil, or other material to the approval of the Project Man ager. No bac -filling shall be done until all the formwor has been removed together w ith pieces of timber, cement bags, vegetation and or other rubbish. All bac -filling shall be compacted in layers not exceeding 150 mm thic and sha ll be sprayed with water to bring the moisture content to the optimum for dense compaction. Compaction shall be to approved standard. 6.1.1.6.2 CONCRETE, FORMWORK AND REINFORCEMENT Material Aggregates a) Shall conform to BS 882. b) c) Shall be heaped separately on hard, self draining surfaces. Normal size of coarse aggregate shall be 20 mm.

Reinforcement Shall conform to BS 4449. Cement Shall a) Conform to BS 12. b) c) d) e) Be either normal Portland or P.C. 15. Be used within 6 wee s of manufacture. Be stored in a manner to exclude any moisture. Be stored in a manner to ensure use of the earliest consignment.

f) Different types of cement from different manufacturers shall not be mixe d for a single cast or structural element. g) If concrete is to be exposed Item 4.f to apply for whole project.

Water Shall be fit to drin

Additives shall not be used Before concreting Design Mixes Not less than 2 wee s before the start of concrete wor , the Contractor shall su bmit to the Project Manager for his approval a statement of proposed mix propor tions for the various grades required in the project. (Note: the grade is the characteristic strength or the cube strength below which not more than 5% of the result may be expected to fall when tested at 28 days). The statement shall include proportions of cement, fine and coarse aggregate, an d water, the maximum and minimum slump and the target strength for each grade. A certificate by recognised laboratory that the proposed mix will meet the requi rements must accompany the statement. The proportions stated may not later be altered without the written approval of the Project Manager. Cost of mix designs to be borne by the Contractor. Formwor Formwor shall be sufficient to leave the concrete finishes specified on drawing s and to be within the tolerances specified in the following table and to provid e an acceptable surface for applied finished, where required.

Line and Level Poc ets, Sleeves etc. Bases

1 mm per metre not exceeding 5 mm +/- 5 mm +/- 50 mm

The concrete shall have a smooth finish free of projections, voids, etc. The ty pe of ties to be used shall be such that the required finish is achieved and doe s not become marred by subsequent corrosion. Ties to be set out to definite pat tern to the Employer's or the Project Manager's approval. Rubbing down is allow ed only after the Employer's or the Project Manager's approval of the surface to be treated. Reinforcement Shall not be heated or re-bent without the Employer's or the Project Manager's p ermission. Shall be free from any material li ely to impair bond or initiate corrosion. Shall be bent and fixed according to the Project Manager bending schedules. Shall be tied with soft iron wire. Shall be supported to maintain the following minimum cover during concreting. a) The greater of the diameter of the bar or 40 mm for external unplastered face. b) . NOTE: Holding down bolts shall be supplied under the civil wor s part or by th e main contractor if he so decides, and in any case be included in the turn ey p rice. The greater diameter of the bar or 15 mm for internal face. Shall be inspected by the Project Manager.

Construction Joints Shall be avoided if possible, but if inevitable shall be pre-planned in consulta tion with the Project Manager and temporary stop ends inserted. Before placing of concrete against a construction joint, the formed face shall be hac ed down t o expose the coarse aggregate, ept continuously wet for 24 hours. Vertical fac es should be covered with cement/water slurry and horizontal faces should be cov ered with 15 mm layer of cement/sand grout. New concrete should then be placed immediately. Camber To formwor shall not be at the expense of the overall depth of the concrete. Weather Concrete shall not be placed if temperatures above 30 degrees Celsius or below 0 degrees Celsius are expected during concreting Batching Shall a) Be by mass in accurately calibrated scales or be volume in soundly const ructed gauge boxes ma ing due allowance for bul ing of the fine aggregate.

Mixing Shall a) Be in a machine in good condition, large enough to carry the whole mix, controlled by a competent experienced operator. b) Be for sufficient time to ensure complete mixing of the ingredients.

Placing Shall a) Be under the control of a competent, experienced overseer. b) c) Be in a manner to prevent separation of the ingredients. Be a continuous process until the pour is complete.

Compaction a) Shall be by immersion (po er) vibrator in the hands of experienced opera tors. b) Concrete shall not be moved by vibrator.

c) Shall be sufficient to remove all air poc ets and honey-combing and to e nsure complete dense concrete cover to all reinforcement. Testing a) Ma ing of concrete cubes by Contractor under Project Manager's supervisi on. Contractor shall arrange for transport of cubes to approved testing laborato ries. Cubes to be in sets of 3. Curing a) Shall commence early on the morning following the placing of the concret e.

c)

Membranes shall not be used.

b)

Shall be effected by

eeping the concrete in a permanently wet state.

b)

Be in proportion to whole sac s of cement.

d) Shall continue for a minimum of seven (7) days or such longer time as ma y be required by the Project Manager. Stripping of Formwor a) To soffits shall not be struc ut see below for (props). b) te. c) e.

To vertical faces shall not be struc until 14 days after placing concre Props to soffits shall not be struc

d) Shall not be stripped without the Employer's or the Project Manager's ap proval who has the power to vary the above items. Patching a) To defective wor shall not be underta en before the item has been shown to the Project Manager. b) Is a sign of poor wor manship? The Project Manager shall have the right to reject the complete element if an unreasonable amount of patching has to be done, or if patching will spoil the appearance of the finished concrete. Records Are to be ept by the Contractor, showing date and time of each concrete pour, t he weather conditions, the temperature, the number of the cubes which represent the concrete, the slump and any other items which the Contractor and/or the Pro ject Manager consider relevant. These records are to be made available for the Project Manager inspection when required. FOUNDATIONS Foundations to Transformers and for circuit brea ers, switches and insulators pe destals shall be at a depth not less than 1200 mm from the existing ground level . Cable Ducts and Trenches The Contractor is responsible for all civil engineering wor s required f or the cable runs between switchgear and buildings, in reinforced concrete cable trenches. Cable entries into buildings and road crossings shall be through 150 mm diameter heavy gauge ducts or in reinforced concrete cable trenches Two (2) lines of 150 mm diameter heavy gauge of spare ducts shall be provided. Trench co vers inside the building will be of 6mm thic Metal Chequer plates reinforced wi th 25x25x4mm angle iron welded underneath along the edges and across X formation a nd with facilities for easy handling on removal, except in areas where heavy tra ffic is expected where covers will be of concrete finished with terrazzo to matc h the floor finish. Trench covers outside buildings shall be of reinforced conc rete, designed for the maximum li ely imposed loads appropriate to their locatio n. The trenches and ducts shall be silt proof to prevent silt and debris from en try. The trenches shall be raised to a level that eeps away storm water from fl owing in . The trench covers will be constructed such as to allow easy access to the trench by means of handles or otherwise installed for every fourth slab. Co ncrete cable trenches shall be adequately drained to soa pits of adequate capac ity or shall be connected to the general drainage system such that they will rem ain as dry as possible. The trench covers will be fitted into grooved sides of t he trench walls for a flush top of trench and covers. Where the cable trench is crossing roads the ducts shall be constructed in such way that they will be able to withstand the weight imposed on them.

until 7 days after placing of concrete (b

until 14 days after placing concret

Power cables and control cables shall be laid on suitable galvanized cable rac s or cable trays and in separate trenches. Cable entries into buildings shall be sealed to prevent the entry of dust, vermin water, etc., using suitable material s.

6.1.1.6.3 BUILDER'S WORK Setting out Walling The Contractor shall provide proper setting out rods and set out all wor on the same for courses, openings, heights, etc. and shall build the walls and piers, etc. to the widths, depths and heights indicated on the drawings and as directed and approved by the Project Manager. Materials a) Cement Cement shall be as described in concrete Wor s, Part 6B. b) Fine Aggregates Fine aggregates for concrete bloc s shall be as described for fine aggre gate in Concrete Wor s.

c)

Coarse Aggregate Coarse aggregate for concrete bloc s shall be good, hard, clean aggregat es from an approved quarry. It shall be free from all de-composted materials and shall be graded up to 7 mm, and all as described for coarse aggregate, Concrete Wor s. Concrete Bloc s Concrete bloc s for walling shall be provided by the Contractor complying with B .S. 6073, and made in approved bloc manufacturing machines. Minimum thic ness of bloc s in external walls shall be 150 mm, and in internal w alls the thic ness shall be minimum 100 mm. Bloc s in external walls shall be hollow type. The volume of the cavities shall be not more than 50 % of the gross volume, and the dimensions of the cavities ar ranged so that each cavity is vertically continuous when the bloc s are bonded. Bloc s in internal walls shall be of the solid type. Samples of the proposed blo c types shall be approved by the Project Manager before any walling wor is com menced. Bloc s shall be cast under sheds in suitable bloc manufacturing machines either power driven or hand operated. The form shall be of steel, and accurately made to size to give the required shape and squareness of bloc . The concrete shall b e vibrated during casting to achieve a dense and uniform concrete. The material shall contain only sufficient water to obtain full chemical reaction of the ceme nt and to give proper wor ability of the constituents. The ratio of combined aggregate to cement shall not exceed 3:1. The Contractor s hall present his proposal for mix recipe supported by test results for the Proje ct Manager's approval.

Concrete shall have minimum 28 days strength of 20 N/mm2 in accordance with B.S. 1881. Mixing shall ta e place in mechanical mixers so as to thoroughly mix the constituents to a uniform consistency before casting. On removal from the machine the bloc s shall be carefully deposited on edge on b

oarding or a clean concrete floor under sheds so as to prevent drying out by the sun for 3 days. During this time bloc s shall be ept constantly damp. The bloc s may then be laid on edge in the open and ept damp by spraying or covering wi th wet hessian or by other means for a further 5 days. The bloc s may then be st ac ed if required, but not more than one metre high, and in such a way as to pre vent damage to the edges and corners.

No bloc s may be used in building or be transported to site before having reache d required 28 days strength criterion. All concrete bloc s shall be of even text ure and properly mixed ingredients and all portions of the bloc shall be proper ly set and hardened concrete. Bloc s shall be free from crac s or blemishes and shall be true to shape and siz e with clean sharp edges and corners and with corners truly square. Damaged bloc s shall immediately be removed from the site. No dimension of a bloc shall dev iate individually by more than 3 mm from the correct size. The average length, w idth and height of a sample of 15 bloc s should neither be longer nor less than 2 mm than the correct size. Dressed natural stone bloc s at least 200mm width may be used as alternative to the concrete bloc s. Cement Mortar The cement mortar is to be mixed in the proportions of 1 Cement, 4 Sand, and tho roughly incorporated with a sufficiency of water. Any cement mortar which has be en left for more than one hour shall not be used in the Wor s. Building Walling All bloc wor shall be laid in ra ing stretcher bond solidly bedded, jointed and flushed up in mortar. Where wall faces are to be plastered the joints shall be ra ed out to form a ey. The bloc s shall be thoroughly wetted for at least 24 h our before laying. Walls shall be carried up evenly course by course. During lay ing an open joint not less than 15 mm wide shall be left between the ends of all concrete lintels, whether pre-cast or cast in-situ and the bloc s adjacent to t hese ends. These open joints shall be left as long as possible during constructi on and not filled until plastering or other wor s render such filling necessary. All such joints shall be properly filled in before the completion of the wor . External walls shall be reinforced with two 8 mm high yield steel bars in every third horizontal mortar joint. Bloc wor which is not to be rendered or plastered shall be finished with a fair face and the bloc s shall be selected for even texture and unmar ed faces, regu lar shape and square unbro en arrisses. The bloc wor shall be pointed as the wo r proceeds with a neat joint. Where bloc wor is the be rendered or plastered t he joint shall be ra ed out 10 mm deep as the wor proceeds to form an adequate ey. galvanised steel ties with fishtailed end cast into the concrete spaced at alter nate courses and extending not less than 150 mm into the bloc joints. All morta r joints are not to exceed 15 mm or less than 12 mm. Lintels Concrete lintels shall be used for all openings and shall be reinforced with two 12 mm high yield steel bars. Lintels shall have a minimum bearing of 500 mm at the ends. Structural Steelwor s Switchgear building Structural steelwor shall be shop-fabricated from structural shapes of medium g rade carbon steel in suitable lengths for easy transport and erection. The struc tural members shall be jointed or fixed on site by bolting or welding. Site weld s should be minimised.

All wor manship and fabrication shall be in accordance with the best practice an d shall generally comply with the requirements of B.S. 449. The greatest accurac y shall be observed to ensure that all parts fit together correctly on erection within the tolerances stated in this section. Steelwor s shall include all mater ials, bolts and attachments, cleats, brac ets, gussets, etc. Where required in the Contract, the Contractor shall design the steelwor to com ply with the information given on the Contract Drawings. Loading and factors of safety shall comply with relevant codes and regulations. Shop drawings shall be prepared using welding symbols to B.S. 499 where appropriate. design calculation s and shop drawings must be submitted to the Project Manager for his approval pr ior to fabrication of members. The approval of shop drawings and calculations by the Project Manager shall not relieve the Contractor of the full responsibility for any discrepancies, errors, omissions or failure arising therefrom. All steelwor shall be transported, handled, stored on Site and erected so that members are not damaged or subjected to excessive stresses. Fabrication and erec tion shall comply with B.S. 5950 Part 2. Roofing Materials, accessories and fixings shall be ordered from an approved supplier an d the Contractor shall as and when required by the Project Manager, submit and d eliver samples of any materials for inspection and testing. Roof sheeting shall be hot dip galvanised troughed mild steel sheeting and shall be of minimum thic ness 0.6 mm. The sheeting shall have approved plastic coatin g on face side. Type and brand of such sheeting shall be proposed by the Contrac tor with his Tender together with supporting specifications. The sheets shall be laid with 200 mm end laps and double corrugation side laps a way from the prevailing wind. The sheets shall be fixed to lightgauge steel purl ins with galvanised coach screws and seating washers. Holes for screws shall be carefully drilled in the ridges of the corrugations. G reat care shall be exercised to avoid damage and disfiguration to the surface co ating of the sheets. At eaves and exposed edges the corrugations shall be closed with purpose made corrugation closers. Maximum load acting on the building in accordance with local or regional standar ds. Switchgear building - ceiling All rooms included 33 V switch-gear is assumed to have ceilings consisting of f ore-manufactured sheets, mounted on steel or tree grids jointed to roof structur es. Roof Drainage Gutters and down pipes shall, unless otherwise shown on the drawings, be approve d plastic coated steel of diameters 200 mm and 150 mm respectively. One down pip e shall be provided for approximately every 50 m2 roof area. Joints shall be lapped 150 mm in the direction of the flow and soldered. Slip jo ints shall be provided to allow for expansion. All hangers, brac ets, and fasten ings should be of the same metal as the gutter or of compatible materials. Gutte rs and down pipes including supports shall be designed for a concentrated load o f 100 g. Screens or strainers shall be provided to prevent debris from clogging the down pipes.

Metalwor

Unless otherwise specified, metalwor shall be carried out in accordance with th e provision of B.S. 5950 and other relevant BSI standards. All steel shall unless otherwise specified, be hot dip galvanised. Prior to fabrication the Contractor shall submit shop drawings to the Project Ma nager for approval. Metal Doors a) General Metal doors shall be supplied by approved manufacturers. All doors shall be painted as specified under Painting and Decorating. All loc s shall be master- eyed with three master eys supplied in addition to three regu lar eys for each door or gate. Doors shall be measured by the number of doors of specified dimensions. The rate shall include all supplies, site wor s, painting and hardware. b) Doors Door frames shall be pressed steel frames made from minimum 2 mm thic eting and reinforced where door closers are fixed.

steel she

Thresholds shall be made from rolled steel sheeting approximately 100 mm wide an d 12 mm high. Door shall be filled with mineral wool acoustic insulation and lined both sides with steel sheeting minimum 1.25 mm thic . Total thic ness of door shall be 45-5 5 mm. All doors shall have fire rating Class A 30. Placing of doors in accordance with Switchgear building drawing. Internal door frames are to be built to walls truly vertical and square with six ties per frame. External door frames are to be built in to walls truly vertical and square with eight/ten ties per frame. All door frames are to be from an approved manufacturer and illustrated in the M anufacturer's Catalogue. Door frames are to be complete with 100 mm, loose pin steel hinges welded in pos ition and adjustable stri ing plate. Frames shall generally be built-in during construction of the walls and securely fixed. A gap shall be left between the top of the frame and the soffit of the l intel during construction. Frames shall be adequately strutted to prevent distor tion and shall be protected from damage during other wor .

Walls shall be built as close as possible to the frames and the gap filled solid with mortar at each course. Render shall be neatly brought up to the frame and well tamped into any remaining cavities. The junctions between window frames or external door frames and external finish or bloc wor shall be caul ed tight wit h approved mastic or mortar wherever required, and neatly pointed. Mastic so use d shall have long-term resistance against weather, insects and ultra-violet ligh t.

Door frames and similar components shall be fixed with countersun ts with heads set into the frames.

screws or bol

Doors wider than 800 mm shall have three 100 mm hinges. Other doors may have two hinges except where specified or detailed otherwise. Door stops shall be fitted by screwed fixings where necessary. The following type of timber doors shall be used unless otherwise instructed by the Project Manager and shall be of approved manufacture, true to shape and free from twists or warps: internal doors shall be hollow core doors consisting of s eleton frames covered with 4 mm plywood for painting. They shall be 47 mm thic overall unless otherwi se approved. Aluminium or Steel Windows Unless otherwise indicated windows shall consist of aluminium sub frame with cle ar glass. Windows shall be from an approved supplier and the details thereof sha ll be approved by the Project Manager. Windows shall be operable and provided wi th corrosion resistant metal insect screens. Frames shall generally be built-in during construction of the walls and securely fixed. Placing of windows in accordance with Switchgear building drawings. Widows are t o be built in to walls truly vertical square with six ties per frame. All aluminium or steel windows are to the from an approved manufacturer and illu strated in the Manufacturer's Catalogue. Windows are to be fitted complete with casement fastening, stays etc. All windows shall have approved burglar bars, and approved means of opening/loc ing.

Door and Window Furniture Ironmongery shall be strongly made, well finished, good quality "stoc pattern" articles. Ironmongery for windows and doors shall be galvanised or other approve d manufacture for external use. Samples of all items shall be submitted to the P roject Manager for approval before they are used for the Wor s. All doors shall be loc able. External doors shall have approved security loc s. Three eys for each loc , clearly labelled, shall be handled over to the Project Manager and all ironmongery shall be cleaned, oiled, adjusted and left in perfe ct wor ing order. MV Switch-gear, Room Openings for pressure release In the MV switch-gear room it is necessary to arrange for openings for pressure release in case of explosion in one of the switch-gears. To avoid damage in the room/building any pressure shall be released through the openings as described. Location of these openings must be beneath the ceiling on both longitudinal wall s in the switch-gear room. The Contractor must calculate number and size of thes e pressure openings, and submit his proposal for approval. Switchgear building SCHEDULE OF MATERIALS AND FINISH

ROOM

FLOOR

WALLS

CEILING REMARKS/NOTES

33 V plastering/ Plastering/ Sheet/plate Switchgear painting painting NOTES: Sheets for ceilings = prefabricated/-manufactured colour and type in according w ith approval of the employer. Switchgear building: External/internal colour in accordance with approval of th e employer. 6.1.1.6.4 PLASTER AND FLOOR COVERINGS Materials Cement and water to be as before described. The sand to be screened through a s ieve of 10 to 15 and meshes to 1 cm and to be washed if directed. Mixing All materials for mixing are to be used in proper gauge boxes and they are to be stri e measured and not tamped down in boxes. Proper non-absorbent stages are to be used for mixing and storing mortar. No foreign matter must be mixed with the mortar. The materials are to be mixed dry before adding water through a fine hose spray. No cement mortar which has ta en its initial set will be allowed to be used. Plaster Thic ness Unless otherwise specified all wall plasters should not be less than 13 mm thic and not more than 19 mm thic .

Cement Plaster Cement plaster for external use to be composed of one part cement to four parts sand and for internal use to be one part cement to five parts sand. Form Key Ra e out joints and roughen if necessary to form ey for plaster.

All bric wor and concrete wor s should be brushed down to remove dust and any o ther loose material. Wetting All internal and external bric e plastering.

or concrete surfaces are to be wetted well befor

Repairing Defects All defective plaster, crac s, hollows, etc., are to be cut out to a rectangular shape, the edges undercut to form a dovetail ey and to be made good to finish flush with the edge of the surrounding plasterwor . All patches will be to the approval of the Project Manager and if the defects ca n not be made good satisfactorily then the whole surface is to be removed and re -plastered at the Contractor's expense. 6.1.1.6.5 GLAZING AND PAINTING Glass All glass is to be of approved manufacture, free from bubbles, waviness, scratch

All cement plaster must be

ept wet for at least 7 days.

For concrete surfaces, hac and apply 1:1 cement sand slush to form uously wet for 7 days and then apply plaster.

ey. Contin

es or other imperfections and is to be well bedded, puttied and bac puttied and secured with glazing pins or clips in steel sashes or with sprigs in wood sashe s. All glass shall be carefully cut to the required sizes so that all panes of figu red or textured glass are uniform in appearance with the pattern parallel to the edges and wired glass shall be so cut that the wires are parallel to the edges. Putty Putty for glazing to steel sashes is to be of approved proprietary brand.. Reba tes are to be thoroughly bac puttied before glazing and all putty is to be care fully trimmed and cleaned off so that bac putty finishes level with the top of sections internally, external putty covers sight lines exactly and finished stra ight and true. Rough surfaces to putty will not be allowed and any defective pu tty will be cut out and replaced at the Contractor's expense. Rebates of wood sashes are to be given one coat of priming immediately before gl azing. Mirrors Glass mirrors are to be of the thic ness specified, of selected quality glass, s ilvered on bac , with protective sealing coat and arrised edges, unless otherwis e described. Generally Allow for removing and replacing all crac ed, bro en or defective glass and leav e thoroughly clean and perfect at completion. Materials for Decoration All paints, primers, varnishes, emulsions, stopping, etc., to be of approved man ufacture. The contractor is to use proprietary ready mixed paints obtained from an approve d supplier. When a coat of proprietary paint is applied, the manufacturer's priming and prev ious coats suitable for the particular type are to be used. All materials must be brought on to the site in unopened tins, and no dilution o r adulteration will be permitted, unless approved by the Project Manager. Emulsion Paint Emulsion paint shall be PVA (Polyvinyl Acetate) al ali-resisting formulated with high washability and capable of resisting a 8 000 scrub test. The first coat t o be specially formulated base coat for direct application to the specified surf ace. Fillers Higher grade cellulose fillers are to be used internally and premixed filler to be used externally. High Gloss Paints Primers for application to bare metal to be red oxide primer for iron and steel. For galvanised metal to be an approved zinc chromate or galvanised iron primer . For application on wood or plaster etc., to be an approved al ali primer. Finish enamels Finish enamels to be synthetic enamel high capacity paint with high coverage and

high gloss finish unless otherwise described. Wor manship All surfaces are to be free from moisture, dust, grease and dirt and rubbed down smooth according to approved practice. All plaster to be free from efflorescence and treated with one coat of petrifyin g liquid, approved sealer or al ali primer if required. Hardwall plaster to be glass papered before decorating. Rectifying defects to decorated surfaces due to dampness, efflorescence, chemica l reaction, etc., will be to the Contractor's account, as these surfaces must be chec ed and the appropriate precautions ta en before applying the decoration. Metalwor must be scraped free of rust, primed as described and finished as late r specified. Galvanised sheet iron, pipes, etc., are to be cleaned down to remove manufacture r's ammoniated dichromate protective covering, primed as described and finished as later specified. Coated pipes are to be cleaned down, stopped and primed with one coat of alumini um primer and finished as later specified. All nots in woodwor to be treated to prevent bleeding. Large or loose nots t o be cut out and be replaced with sound wood, or cut bac and filled. Small no ts to be treated with two thin coats of Shellac in methylated spirits. Woodwor to be glass papered to a smooth surface with all sharp arises removed, all crac s, crevices, holes, etc., to be scraped out, primed as described and stopped w ith hard stopping, faced up and rubbed down to an even surface and finished as l ater specified.

Every coat of paint must be a good covering coat and must dry hard and be well r ubbed down to a smooth surface before the next coat is applied, otherwise the Co ntractor will be required to apply extra coats at his own expense. Each coat of paint to be of a distinctive colour: sample colours are to be prep ared for the final coat which is to be an approved colour scheme and must not be applied without the permission of the Project Manager. After undercoats are o n, the painter shall chec all wor and grainfill as necessary with filler as de scribed. NOTE: a) All paints specified are to be obtained from an approved manufacturer an d used in strict accordance with their instructions. Their representative will chec the paints being used and the method of application and will advise accord ingly. b) This section of the wor to be carried out by an approved firm of decora tors who must allow for the very best finish possible and of the highest quality obtainable. c) The prices must allow for the removal and refitting of all beads, fittin gs, fastenings, ironmongery, etc., removed for decoration purposes to be carried out by s illed tradesmen of the appropriate trade.

All metal and woodwor priming coat.

to have the specified number of coats in addition to the

6.1.1.6.6

SUBSTATION BUILDING SIZES.

Proposed substation control buildings should be in conformity with relevant buil ding codes with regard to room size and safety. The building must meet the requ irements described in the scope of wor and ta e into consideration future expan sion. Specific requirements of the building are described in clause 6.1.4.1.3

6.1.1.6.7 IRONMONGERY General All ironmongery shall be of e articles will be accepted e solid brass and not brass in finish on solid brass or

AND METALWORK the best respective types required and no alternativ unless approved. Articles described as brass must b finish. Chromium plated articles must be plated sat other approved metal.

Where items for ironmongery are required to be fitted to steel door frames, etc. , the Contractor must ensure that the Manufacture ma es provisions for the corre ct fitting or loc stri ing plates, hinges, cleat holes, bolt eeps, etc. Loc s and Loc s are ided with or s with Keys to be two levers unless otherwise described. All loc s are to be prov two eys which must be handed over to the owner on completion of the W identification labels attached.

Steel Steelwor for general building construction is to be of approved manufacture com plying generally with the appropriate British Standards and free from all defect s, oil, dirt, loose rust, scale or other deleterious matter. 6.1.1.6.8 ELECTRICAL INSTALLATION Scope of Wor s This section of the specification relates to the supply, installation, testing a nd commissioning of the complete electrical services within the switchgear build ing, including: 1. 2. 3.

LV Switchgear Lighting Small Power

The switchgear building consists of a switchgear room. A full specification of the electrical equipment proposed by the contractor shal l be included in the Bid. The Employer reserves the right to reject any of the contractor suppliers if he feels the product does not meet with the contract specification. Electrical Services General Description The complete electrical installation shall comply with all local standards and r ates. Should there be any conflict between local standards and what has been specified the sub-contractor should draw it to the attention of the Project Manager. Lighting a. Luminaries shall be fluorescent lamps except for the toilets and outdoor lighting (except switchyard and perimeter lighting) where GLS lamps can be util ised. In switchgear room: 250 lux is required. In offices 500 lux is required. b. All luminaries shall be supplied, installed and tested by the electrical

sub-contractor. c. All metal wor on the luminaries shall be connected to an insulated eart h protective conductor. d. Lighting Control Switches e. Outdoor lighting shall be controlled from an automatic photo cell. f. Lighting control switches shall be flush pattern with white finished pla tes. g. Grid switches shall have 5 or 10 amp rating, generally where fluorescent discharge luminaries are controlled switches have 10 amp rating where as with l ow energy PL lamp, 5 amp switches shall be installed.

Soc et Outlets and Accessories Reference should be made to the Standards given above for details on the soc et outlets and accessories. Soc et outlets to be mounted at 300 mm above floor level. Conduit cast into the building structure shall be of the heavy duty PVC type. P VC conduits shall not be fixed to the surface of the structure. AC Installation The Contractor shall supply and install three number AC units including wiring a nd insulator for the unit. Fire Safety Facilities Portable fire extinguishers shall be provided under this Contract. Portable, wal l mounted, hand held extinguishers shall be 5.5 g pressurized control discharge BCF units. The number of units within the Substation shall be a minimum of 4 Num ber. The body of the extinguisher shall be seamless, welded and brazed as appropriate . The extinguisher shall be capable of being released by means of a lever-operated valve provided with a safety pin. Extinguishers shall be capable of controlled partial discharge. The type shall be of that recharge unit that is locally available. The extinguishers shall be walls mounted and attached and located in a manner af fording quic release from the supporting brac et. They shall be installed so t hat the top of the extinguisher is not more than 1.5meters above the floor. In no case shall the clearance between the bottom of the extinguisher and the floor be less than 0.1 meter. The extinguishers shall be positioned so that the inst ructions for operation face outwards.

7 PARTICULAR TECHNICAL SPECIFICATIONS CABLES Particular technical specifications 66 and 33 V Cables Cables General All cables accessories and materials shall be in accordance with the latest edit ions (including all amendments) of IEC and ISO recommendations. All cables shall be suitable for operation: on a system with direct earthing of the transformer neutral under maximum load (ONAF conditions) plus 10 % specified for respective transfor mers in the climatic conditions prevailing at site No joints shall be allowed. Only dry vulcanising processes shall be used. Specia l precautions shall be ta en to avoid ingress and spreading of moisture and deve lopment of water-treeing. The Tenderers shall documents the construction measure s used to achieve these requirements. Conductors All conductors shall be stranded copper or aluminium. The conductor shall be cle an, uniform in size, shape and quality, smooth and free from scale, splits, shar p edges and other harmful defects. The conductor shall be in accordance with IEC 60228. The conductor shall be filled with swelling powder to stop axial ingress of moisture. Cable The conductor shall be covered with: An extruded semi-conducting layer A layer of dry vulcanised cross-lin ed polyethylene (XLPE) insulation An extruded strippable semi-conducting layer A water tight copper or aluminium seal A layer of swelling tape to prevent axial ingress of water along the screen A layer of earthing screen of stranded aluminium or copper An outer LDPE (low density polyethylene) sheath for water tightness and mechanic al protection. Laying-up and Fillers of Three Phase Cables The cores of three-phase cable shall be laid-up together with suitable fillers, wormed circular and binding tapes applied overall Manufacturers Identification

The manufacturers identification shall be provided throughout the length of the c ables by means of a tape under the sheath printed with the manufacturers name and Property of REA. Alternatively the identification may be embossed on the outer PVC sheet together with identification and voltage mar ings Armour All cables shall be armoured according to approved manner Testing Notwithstanding that cables are manufactured to approved standards all cables, a ccessories and materials shall be subjected to and withstand satisfactorily the test requirements detailed in this specification. All materials shall withstand such routine tests as are customary in the manufacture of the cables and accesso ries included in the Contract. The manufacturer shall have established a quality control system based on regularly accelerated test of production samples accord ing to CENELEC HD605. This system shall be described in the Bid. Sealing and drumming The cable shall be wound on strong drums arranged to ta e a round spindle of a s ection adequate to support the loaded cable drum during installation and handlin g. The drums shall be lagged with closely fitting battens that shall be securely fixed to prevent damage to the cable. Wooden drums shall be constructed of seas oned timber to prevent shrin age of drums during shipment and subsequent storage at site. Each drum shall be clearly mar ed including indication of direction of rolling. The ends of the cables shall be suitable sealed to prevent ingress of moisture. The end of the cable left projecting from the drum shall be securely protected a gainst damage by mishandling during transport and storage. Current carrying Capacity and Design Parameters The maximum continuous current carrying capacity and maximum permissible continu ous conductor temperature, and the factors for determining such rating and tempe rature shall be based on recommendations found in IEC 60287, subsequent amendmen ts and all conditions prevailing on the Site Terminations Detailed drawings showing the types of cable sealing ends, terminal arrangements shall be submitted to the Project Manager for approval. Stress cones or other a pproved means shall be provided for grading the voltage stress on the core insul ation of the cables. The terminations for the cables shall be of an appropriate heat shrin design in corporating a suitable arrangement for stress control, and rain sheds for outdoo r use. Termination its shall include suitable heat shrin tubing to effectively shroud , seal and insulate the exposed cable conductor and shall include a heat shrin glove to effectively seal the crutch of the cable to prevent ingress of moisture into the interstices of the cable. Suitable arrangements shall be provided to e arth the cable screens and armour Terminations into cable boxes shall include brass compression glands and bac nu ts of the correct size, which shall secure the cable outer sheath and ensure eff ective continuity between the cable armouring wires and the metal enclosures on which the cables are terminated. At all rising terminations the cable inner shea th shall pass through the gland to terminate not less than 6 mm above the gland

Heat Shrin Materials Heat shrin ing tubing and moulded parts shall be flexible, flame retardant, poly ofin-based material of electrical insulating quality, and shall be obtained from an approved manufacturer. They shall be suitable for use indoors or outdoors in the conditions prevailing on site The material shall reduce to predetermined size and shape when heated above 120 C . The components shall also be provided with an internal coating of hot melt adh esive compound that shall not flow or exude at temperature below 85 C. All parts and materials shall be tested to a program of tests to be agreed with the manufa cturer. Each part shall bear the manufacturers mar , part number and any other necessary mar ing to ensure correct identification for use on the correct size and type of cable. Each set of parts shall be pac ed as one unit with full and complete ins tallation instruction and clearly mar ed to show the application. Installation This extract from KPLCs Medium Voltage Underground Distribution Handboo determine s the minimum acceptable conditions for installation of medium voltage cables. General The cables will be laid in trenches that will be as straight as possible avoidin g sharp bends. The areas where trenches are to be excavated will be mar ed clearly on the groun d. If the location of other services is nown, they will be mar ed in order to t a e necessary precautions. Before construction commences trial pits will be made in order to confirm the so il strata of the planned trenches and to confirm the location of other services. Safety precautions such as covering the trench, fencing and warning signs will h ave to be provided for during the period of wor . When designing the plan for the trench layout, the minimum radius will be as in the following table. TABLE 3.1: BENDING RADII Bending radii Single core Recommended 17xD 15xD Minimum 15xD 12xD At sealing ends 12xD 10xD D = cable diameter Cable Mar er Cable mar ers shall be installed at the beginning and end of the cable run on th e surface all along the route, at all changes of direction, and above all joints , above cable duct entries and exits and at an interval not exceeding 50m along the cable route. This information as well as details about the joint (i.e. joint location) will be also recorded on a map. Excavation of Trenches The trench will be dug vertically to a minimum depth of 600mm or more as require d. All precautions must be made so as not to cover any services e.g. fire hydrants with soil that may be encountered in the path of the trench. 3-core

During construction on public roads passage and access of motorists and pedestri ans to commercial areas must be maintained. In order to reduce the cost of reinstatement on roads and pavements the digging shall be done at intervals of 2-3 m and a gallery or tunnel dug underneath. If trenches are constructed in soggy or inconsistent soil, the cables will be la id inside a duct as a protective measure and precautions ta en to prevent the en try of water at the ends or joints of the ducts The bottom of the trench must be made of firm material in order to prevent colla pse of the base that may subject the cable to mechanical stress. When several cables of different voltages are laid in the same trench they will be placed at different depths. The cables of the higher voltage will be placed d eepest. Where the trench is too deep as to cause instability to the walls of the trench shoring will be placed to provide lateral support to the trench walls. The separation between two groups of cables will be a minimum of 250mm. If this separation cannot be attained they will be laid in ducts or will be separated by a layer of bric s. Joint Holes Where cable joints are required to be made in the course of a cable run, a joint hole shall be excavated of sufficient size to enable the cable jointer to wor efficiently and unimpeded. Bac filling of Trenches Once the cable has been laid the trenches must be bac filled to an adequate com paction level. Care must be ta en to ensure that the first layer covering the ca bles will be free of roc s or any sharp mechanical objects. The bac fill will be laid in layers of 150mm, which should be compressed and wa tered if necessary in order to ma e the soil sufficiently compact. Pavement Reinstating The pavement shall be reinstated bac to the standard of the original pavement. New materials will generally be used in accordance with Municipal regulations. Ducts Road crossings when necessary will be done with ducts in the following manner they will be installed in a level position and concreted where possible to prov ide mechanical protection through out its length, they will have a depth of 1.2m . future expansion will be provided for by providing one or several spare ducts de pending on the location of the crossing. at all times the cables should be adequately protected. road and railway crossings must be planned in full detail. drainage of the trenches must be provided for during and after construction. In crossings with other normal underground services, a prudent distance will be maintained in view of future excavations, and when there is a possibility of ser vice interference, as is the case of other electric cables, waste water sewers e .t.c.

The ducts will be fabricated from PVC or concrete with a smooth interior surface and an interior diameter of not less than 2 times the diameter of the cable to be housed inside it, and in no case will this diameter be less than 150 mm. The joints of ducts will be sealed with cement, in which case the bottom of the trench must be carefully levelled after setting down a layer of fine sand or red soil in order to permit continuous joints. The ducts will be laid in such a manner that there is no abrasion between the in sulation of the cable and the surface of the duct. In the cases of single core cables the cable will have to be anchored to prevent movement due to magnetic effects by concreting the ducts at the ends of the joi nts. This shall not apply to three core cables. When constructing a duct a length of wire will be left inside to facilitate the fitting of cleaning elements as well as the cables themselves. The cleaning will consist of passing inside a cylinder in order to remove concre te that will pass through the joints and later passing a broom or a rag to remo ve the residue. Direct Burial For armoured cables the following criteria for burial will be met: the trench must have a 150mm layer of fine sand upon which the cable shall be la id to protect the cable from mechanical damage due to sharp objects. On top of t he cable another 150mm of fine sand will be laid. Both layers will cover the ent ire width of the trench. the sand should be well graded any materials used for bac filling the trench must meet the approval of the REA Construction Supervisor in charge. the cables must be buried at a depth of not less than 600mm. Exceptions could be made for roc y areas where the minimum depth can not be attained in this case t he cable will be laid in a duct. Cables must be protected with a layer of protecting slabs, which will also indic ate their presence. For armoured cables the excavated materials with out mechanically sharp objects will be adequate enough to bac fill the trench. Cables shall not be buried in areas within the substation boundaries. Necessary cable trenches shall be prepared instead to the satisfaction of the clients proje ct Manager. Galleries When the number of cables justifies the use they shall be laid in galleries. The cables will be fixed to the cable trays by means of brac ets or clamps. All metallic elements will be earthed with independent connectors if there are c ircuits of different voltages. Electric cables will not be installed where there are inflammable materials. Parallel Separation Low Voltage Cables Medium Voltage cables may be laid parallel to Low voltage cables as long as ther e is always a minimum distance of 250 mm between them. When this distance cannot

be attained, a solid bric wall shall separate them or they will be placed in d ucts. Medium Voltage Cables The distance to be maintained in the case of parallel situations of underground Medium Voltage lines is 250mm. If this distance cannot be achieved a protective bric wall will be installed between them, or one of them will be installed with in ducts. Telecommunication Cables In the case of parallel laying of subterranean electric cables and telecommunica tions wires, they must be as far as possible from each other. As long as the cab les both electric and telecommunications are buried, a minimum separation of 2 m eters must be maintained at all times. This distance could be reduced further to 250mm between ducts. The clearances must be in accordance with agreements between REA, KPLC and Water Steam etc. In parallel layouts between power cables and buried water pipes a minimum distan ce of 0.5m will be maintained in a horizontal projection. If these clearances ca nnot be maintained the cables will be laid in ducts. Oil Pipe Lines The minimum distance between the cables and the oil pipelines will be 0.5 m. The cable will be protected from any gas lea s. Sewers In parallel layouts of electric cables with sewerage conduits, a minimum distanc e of 0.5 m will be maintained, the cables will be adequately protected if this d istance cannot be maintained. Fuel Storage Tan s There will be a minimum distance of 1.20 meters between cables and fuel storage tan s, apart from providing adequate protection for the electric cables. Foundations of Other Services When there are structural supports for public transport, suspended telecommunica tion wires, street lighting, the electric cables will be laid at a distance of a t least 500mm from the outer extremities of the supports or foundations of the s tructures. This minimum distance shall further be increased to 1.5m if the suppo rt or foundation is subject to continuous stress towards the curb sides. If this separation cannot be maintained a resistant mechanical safety measure mu st be used throughout the length of the support and its foundation, extending to a length of 500mm, on both sides of outer extremes. Crossing of Roads and Railroad Trac s Public Roads When crossing streets and roads cables must be laid at depths of at least 1.2m. The ducts must be durable and mechanically strong, and must have a minimum diame ter of 150mm in order to permit the easy passage of the cables within the tubes. Conditions specified in the Electric Power Act must be observed at all times. S pare ducts must be provided where necessary. Railroad trac s Crossing railroad trac s must be done with conduits laid perpendicular to the tr ac s at a minimum depth of 1.6 m. This depth must be measured from the bottom si de of the trac s crossbars. It is recommended that the crossing ta es place at th

e narrower points of railroad areas. Conditions specified by municipalities and the Railroad companies shall ta e precedence. Crossing Other Services Low Voltage Cables When medium voltage cables cross low voltage cables, a minimum distance of 250mm must be ept between them. If this cannot be achieved, medium voltage and low v oltage cables must be separated by pipes, conduits, or solid bric divisor walls . Medium Voltage Cables When crossing other medium voltage cables, the minimum distance to be observed b etween them is 250mm. If this distance cannot be maintained solid bric s must be laid between them. Telecommunication Wires When crossing telecommunication wires, the electric cables must be situated with in conduits of appropriate mechanical resistance, maintaining a minimum distance of at least 250mm, between the outer sides. The electric cable must be protected in PVC or concrete duct and in such a way t hat it guarantees that the distance between the cables is greater than the minim um established for parallel layouts. The crossing must be at least 1m from a junction box for telecommunications wire s and joints for electric cables will not be installed next to crossings of tele communications cables. Water Steam etc. There should never be a water pipe joint over the cable. A water pipe joint must be at least 2.0 m from a crossing. Gas The minimum distance in crossings with gas pipelines shall be of 250mm. The cros sing shall not be made over gas pipelines joints. Sewers In crossing sewage pipes it is recommended that the electric cable should be abo ve the sewer line where possible. Fuel Depots Electric cable crossings over fuel deposits will be avoided at all times, the el ectric cables must be laid bordering the fuel tan s, maintaining a minimum dista nce of 1.2 metres. Transporting Cable Drums Loading and unloading from truc s or appropriate trailers will always be made th rough an adequate bar that passes through the centre of the cable drum. The cable drums will always be transported upright and never on its side. When several cable drums are transported together they must be aligned bac to b ac and have stopping bloc s to prevent movement. The stoppers should be uniform so that they do not pierce the cable insulation. The stoppers should span the whole length of the cable drum. An alternative to stoppers may be to have wooden pieces nailed to the platform s upporting cable drums. The stoppers will be placed at the reels of the cable dru

ms. The cable drum must not be tied down with ropes, cables or chains. Upon off load ing the cable drum the roll must not drop down from the truc or trailer, a prov isional ramp with an inclination of not more than 1/4 will instead be constructe d in the case where there are no pulleys for lifting the drum. The roll can be r olled of the ramp by means of guide ropes. Sand can be placed at the bottom of t he ramp to act as shoc absorber and bra e for the cable drum. When rolling the drum on the ground the rotational direction must be observed so that the cable does not come loose. When the drum is rolled care must be ta en to ensure that the drum is not rolled on rough ground. Care must also be ta en to ensure the reel is not bro en becau se the splinters can puncture the cable. Where possible the cable drums should not be exposed to the elements. Laying of the Cable The cable drum will be installed on the site in such a way that the cable is ree led out of the top part of the drum and is not forced when the cable is laid. During cable laying the drum will always be supported by means of a mechanical j ac and a bar of the appropriate strength. The base of the jac s will be sufficiently large as to ensure stability during o peration. When ta ing off the wood stoppers care must ensured that the material used in na iling them does no damage to the cable. The cables must always be unrolled and laid with the greatest care to avoid tors ion or in s and always maintaining the correct bending radius of the cables (re f: 3.1) When the cables are being laid the wor ers must be distributed uniformly along t he trench. The cables should also be laid using cable rollers. Mechanical Protection Underground electric lines must be protected against possible brea downs caused by landslides, contact with hard bodies, and clashing of metal tools. For this p urpose, a protective layer of hatari slabs of class 15 concrete will be placed. Warning Signs All cables must have a protection slab placed over the cables buried at least 20 0 mm above the cable layer. When the cables or groups of cables of different vol tages are placed in vertical layers the protection slab must be placed over each layer. Identification The cables must bear mar s indicating the year of manufacture, manufacturer's na me, and cable characteristics (size and voltage level). Fibre Optic Cable General Specifications a. The equipment to be supplied shall conform in all respects to this speci fication. Unless another standard is specifically mentioned in this specificati on, all material and practices employed in the wor s must be in accordance with

such other authorised standard appropriate to the country of manufacture, which in the opinion of this company shall ensure an equivalent or higher quality. Alternative solutions, which deviate from the specifications required, may be su bmitted separately in addition to this tender. Such alternatives should be full y detailed and the price indicated, they may be considered for adoption after th e comparison of quotation submitted in accordance with this specification. b. All material used under this Contract shall be new, of the highest quali ty and of the class most suitable for wor ing under the conditions specified, sh all withstand the variations of temperature and atmospheric condition arising un der wor ing conditions without distortion or deterioration or setting up of undu e stresses on, or impairing the effectiveness of any part. c. The cable shall be an all dielectric, Single Mode, 24 fibres, Optical Fi bre cable Specifically manufactured for underground Installation. The cable is t o be laid in the same trench as 33 V 300sq mm s/c XLPE copper power cables. A w ritten confirmation must be obtained from the cable manufacturer giving an assur ance that the cable so offered is suitable for underground installation along si de the 66 V Power cables and that it will give a reliable communication lin sui table for Protection of the 66KV cable, Speech and Data Transmission. d. The Manufacturer shall also submit a list showing Locations where simi lar cables have been laid underground along side single core Power cables rated 66 V or above and the duration over which the cables have been in Operation. Standards The optical cables herein specified must be in accordance with the following sta ndards. IEC 60793 1 , Optical Fibres-Part 1 : Generic Specifications. IEC 60793 2 , Optical Fibres Part II : Product Specifications.

All cables must conform to ITU G652 and G655 Geometrical characteristics The fibre cables specified herein will fulfil the following geometrical specific ations. The cable should have 24 fibres Core diameter 9-10 microns Cladding diameter 125.0 2.0 microns Mode field concentricity error 1.0 micron Cladding non-circularity 2.0 % Coating diameter 245 8 microns Mode field diameter 9 1 Micron Optical characteristics The single-mode fibre cable specified herein must fulfil the following optical s pecifications Attenuation coefficient: At 1310 nm. At 1550 nm. Total chromatic dispersion For 1280 nm At 1550 nm. Labda 1340 nm 2.9 ps/(nm*Km) 18 ps/(nm*Km) 0.35 dB/ Km. 0.22 dB/ Km.

Cable cut-off wavelength:

Labda

1250 nm.

Conditions of operation All the optical fibres shall be able to wor without significantly degradation i n its characteristics in the temperature range 20 C to 70 C. The shipping and st orage temperature range of the cable shall be 50 C to 70 C. The installation temperature range of the cable shall be 5 C to 70 C. NOTE: The cable will be for underground installation alongside 3 No. 33KV Medi um voltage single core cables. It should have the pre-requisite Mechanical Prote ction to prevent damage during installation and due to other Human activities su ch as excavation. The cable should also be Rodent resistant. The cable must be s pecifically manufactured for underground installation and must be all dielectric , hence unaffected by Electromagnetic induction from the 66KV Cables. This must be specifically stated in the Tender Offer. Additional Requirements The cables shall additionally meet the following standards. Tenderers shall giv e technical documents on whether they meet these standards. Standards summary Test carried on cables Cable Test Type Applicable Standard 1 Water Ingress Test IEEE 1138 2 Seepage of Flooding Compound IEEE 1138 3 Short Circuit Test IEEE 1138 4 Aeolian Vibration Test IEEE 1138 5 Galloping Test IEEE 1138 6 Sheave Test IEEE 1138 7 Crush Test IEEE 1138 8 Impact Test IEEE 1138 9 Creep Test IEEE 1138 10 Fibre Strain Test IEEE 1138 11 Strain Margin Test IEEE 1138 12 Stress Strain Test IEEE 1138 13 Cable Cut-Off Wavelength IEEE 1138 14 Temperature Cycle Test IEEE Std 563 15 Cable Self Damping IEEE Std 4 16 Lightning Test EIA/TIA-455-16A 17 Salt Spray Corrosion MCIT 048-200 6508 18 Temperature Cycling/Ageing/ Water Immersion MCIT 048 200 6508 19 Tension Cycle Sustained Loading MCIT 048 200 6508 20 Gas Tube Tightness Test MCIT 048 200 6508 21 Twist Test MCIT 048 200 6508 22 Bend Test IEC 794 23 DC Resistance 24 Generic fibre specifications IEC 60793, IEC 60794 25 Ageing Test EN187000

Colour code The colour coding of fibres and tubes shall be in accordance with table below. Number Primary Secondary 1 Natural Red

E.t.c. for the 48 fibres. All colour codes must be able to distinguish each fibre strand from all other fi bre in the same cable.

8 8.1

PARTICULAR TECHNICAL SPECIFICATIONSTELECOMMUNICATIONS General requirements

In order to achieve the desired SCADA functionality telecommunication lin s base d on OPGW and Radio shall be established lin ing the SAS in new substations to r espective control centres. Necessary engineering required to transmit data and speech signals to the Regional and National Control Centre(s). Fibre lin s shal l be based on 48 fibre - OPGW while Radios shall be UHF point-to- point or Point

2 3 4 5 6 7 8

Red Blue Yellow Blac Violet Brown Green

Natural Natural Natural Natural Blue

-to-Multipoint lin s These specifications describe the basic requirements for the various systems. Tenderers are requested to submit with their offers the detailed catalogues, bro chures and technical drawings with the specific items on offer clearly mar ed fo r the products they intend to supply. Tenderers must indicate on the specifications sheets whether the equipment offer ed comply with each specified requirement. The tender documents shall be accompanied by Type test and Routine test certific ates, certified by the National Testing or the National standards Institute of t he country of origin. At her discretion, all equipment shall be subjected to inspection by the clients Engineers or her representative at the place of manufacture, where all routine t ests on randomly pic ed sample(s) shall be carried out in their presence. Test r eports shall be completed for each equipment and made available to REA after the tests have been carried out. All the dimensions and capacities of the equipment to be supplied shall not be l ess than those required in these specifications. Deviations from the basic requi rements, if any, shall be explained in detail in writing with the offer, with su pporting data such as calculation sheets, etc. The Procuring entity reserves the right to reject the products, if such deviations shall be found critical to the use and operation of the products. The Tenderers are requested to indicate the shortest possible delivery period of each product. 8.1.1 SCOPE OF WORK

The scope includes detailed system design, manufacture, supply, installation, te sting, commissioning, remedying of defects, maintaining the wor s during the def ects liability period and any incidental wor necessary for the proper completio n of the wor in accordance with this project. Scope shall include integration o f STM-1and Radio lin s to the existing KPLC Networ Management System. In some c ases there shall be need to upgrade existing Telecommunication equipment in orde r to achieve data and speech routing to Regional and National control centres. S urvey and necessary preparation wor s on existing systems, Equipment and substat ions to achieve specified functionality shall be in the scope of supply. The co ntractor shall determine the necessary radio towers heights, Line traps, Line ma tching Units and Bloc ing line traps where required and their support structures . Contractors shall be required to submit for approval detailed design of system before manufacture. In addition all substations shall be equipped with a Base Radio capable of commu nicating with the existing ASTRO trun ing radio system for use during switching operations. All communication equipment supplied under this project shall be type approved b y the regulator, Communication Commission of Kenya (CCK) and the Kenya Bureau of Standards (KBS) where applicable. It is the responsibility of the contractor to obtain these necessary approvals. The employer shall apply for allocation of required frequencies from the CCK onc e the contractor has finalised detailed Radio propagation analysis. The type of required communication lin shall be detailed in scope of supply for

individual stations. Notwithstanding employers recommendation bidders are required to present a compl ete solution for communication from substations to Control centres based on prel iminary survey during bid preparation. The lin s to be established include but not limited the following; New Substation Source station Proposed communication media Equipment in Terminal station Control Centre substation reports to 1 Lo ichar Substation Tur wel Gorge 220/66KV Substation Lessos Substation

8.1.2 OPGW Technical Description The transmission line earth wire integrating optical fibres shall be of design a nd construction to ensure long service with high economy and low maintenance cos ts. It shall be suitable in every respect for continuous operation at nominal pa rameters as well as in transient operating conditions under the climatic conditi ons peculiar to the site. Where an existing line without OPGW is used for the fi bre to reach terminal station, necessary modification on existing towers/poles s hall be done by contractor to enable line carry required OPGW. The OPGW shall incorporate at least 48 optical fibres. The OPGW constitution sha ll be of stranded aluminum-clad steel (ACS) wires or Galvanized steel wires (GS) . Other OPGW types are acceptable if the required performance characteristics ar e met.

Stranding tolerances as well as inspection and testing shall be as per IEC 61089 as far as applicable, and to the respective manufacturing standards.

The OPGW manufacturer shall have ISO 9000 quality assurance system certified and shall prove a minimum experience in successful supply of similar OPGW in the la st 5 years. The OPGW installation shall include all cable fittings (tension and suspension s pirals, vibration dampers, earth connection etc.), joint boxes, termination boxe s, fibre connectors and other accessories required for a complete wor ing fibre lin . Optical fibre parameter and performance

The OPGW, access cables and underground cables shall have at least 48 (forty-eig ht) single mode optical fibres with following characteristics: Transmission wavelength: 1310 nm and 1550 nm Mode field diameter: 9.0 to 11.5 micrometers ( m), including tolerances Optical cladding diameter: 125 m 2.4% Cable Attenuation: not greater than 0.38 dB/ m for every fibre in every drum at optical wavelength of 1310 nm; and not greater than 0.22 dB/ m for every fibre i n every drum at optical wavelength of 1550 nm Joint attenuation: not greater than 0.1 dB at optical wavelength of 1310 nm and

All materials used shall be of the best quality and wor manship, and shall be of the highest class throughout with the designs and dimensions of all parts such that the stresses to which the OPGW are subjected to shall not render them liabl e to distortion or damage under the most severe conditions encountered during in stallation as well as in service. Special attention shall be paid to the OPGW stranding process to ensure the nece ssary tightness between different layers in order to avoid slippage or relative movement of strands or cage formation during stringing.

Existing PLC

not greater than 0.2 dB at 1550 nm for every fibre, measured on the fully instal led joint Total dispersion: not greater than 3.5 ps/ m.nm at optical wavelength of 1310 nm and not greater than 19.0 ps/ m.nm at optical wavelength of 1550 nm Core numerical aperture: less than 0.23 Life span: greater than 30 years The Contractor is required to supply a graph of attenuation versus wavelength ov er the range of 1200 nm to 1600 nm No joints shall be allowed in any fibre in any drum length. Discontinuities will be acceptable if: Less than 0.10 dB in magnitude measured at 1310 nm, and OTDR traces from both ends of the cable at 1310 and 1550 nm wavelength show a di fference of less than 0.05 dB/ m for every fibre in every drum. Power Meter & Light source. The test shall be used to verify that the measured l oss is in average equal or less than the calculated lin budget. The Contractor shall state the refractive index of the optical fibres at 1310 nm and 1550 nm.The overhead earth wire shall be Fibre Optic Ground Wire (OPGW) wit h a minimum of 48 strands. The fibre optic earth wire supplied shall be suitable for installation on transm ission line and shall be supplied complete with all necessary fittings and optic al joint boxes. The earthwire fittings and optical joint boxes shall be type app roved. The fibre optic earth wire shall comprise an optical sub-unit containing optical fibres over which shall be laid aluminium, aluminium alloy or aluminium coated steel strands. The clad steel wire incorporated in fibre optic earthwire shall c omply with the requirements of IEC 61232. Shaped aluminium or aluminium alloy wi re sections shall conform to the requirements of the appropriate IEC standard. The optical sub-unit shall withstand the temperature rise associated with the sp ecified lightning fault current flowing in the earthwire without damage. The fib re optic earthwire (OPGW) shall be manufactured in continuous lengths of not les s than 2,000 m. The overall system design of the fibre optic system shall meet the following min imum requirements: Single failure or degradation in any optical fibre not more than one year averag ed over five years; Failures or degradations affecting more than one optical fibre, not more than on e in ten years; Increase in optical system transmission attenuation due to accumulated ageing an d other effects at the end of five years and not more than 0.05 dB/ m. OPTICAL FIBRES Optical fibres shall be single mode fibre and shall conform to IEC 793-2-BI. The fibre coating material shall be mechanically strippable. The optical fibres shall be capable of being jointed by fusion technique. There shall be no measurable long term or short-term optical attenuation change due to the temperature rise associated with a fault current flowing in an earth wire, or a lightning stri e on the earth wire.

OPGW FITTINGS The fibre optic earth wire shall be with approved conductor fittings. The applic ation of these fittings shall not damage the earth wire or fibres, either mechan ically or optically. At each support, a bypass device shall be provided to guide the cable around the earth wire fittings associated with the support. OPTICAL JOINT BOXES Optical joint boxes shall be provided to protect the splice joint of optical fib res, either when individual lengths of the fibre optic OPGW, are jointed or betw een the fibre optic earth wire and the underground fibre optic cable. The joint boxes shall consist of external steel or die cast aluminium housing pr oviding protection to IEC 529 IP 44 and an internal die cast aluminium or high i mpact plastic ABS box to IEC 529 IP54 The external housing shall be designed so that the rainwater is directed away fr om the door and there shall be no water ingress when the door is opened. The joint boxes shall be supplied complete with all fittings to secure and seal the cable in the gland plates or blan the unused spigots. The cable cleats to s ecure the fibre optic OPGW or underground cable shall be fitted inside the box. The cleats shall not have a detrimental effect on the performance of the optical fibres when tightened to the recommended torque. The top and bottom of the joint box shall be vented and the vents provided with the vermin shields. The box shall be supplied complete with internal splice cassettes to accommodate the required number of splices. The glands shall be fitted to accommodate eithe r the fibre optic OPGW or underground fibre optic cable. FIXING CLAMPS A bolted clamping system shall be used to attach the OPGW to the inside of the s upport, without drilling or modifications to the support steel wor . The attachment clamps shall be capable of being attached and detached from the s upport, without affecting the OPGW. NON METALLIC UNDERGROUND FIBRE OPTIC CABLE The fibre optic cable shall be circular in cross section and shall be designed s o that any cable strain is so directly imported on the optical fibres. The cable shall not include any metallic components to prevent high-induced voltages when used in switching or substation compounds. It shall be suitable to withstand ha rsh environmental conditions. PROTECTIVE TREATMENT Fibre optic earth wire Where two layers of wire strands are provided over the optical sub-unit, the ext ernal surface of the optical sub-unit and the inner strand layer shall be grease d, using approved conductor grease. Ingress of Moisture The cable shall be capped before shipment to prevent the ingress of water.

Optical Joint boxes Optical joint boxes (steel exterior) shall be hot dipped galvanised after manufa cture to meet the requirements of BS 729. INSTALLATION General The supplier of the OPGW shall be responsible for the supervision of installatio n by the Contractor; to ensure that system reliability requirements are met. Wor manship The Contractor shall ensure that the fibre optic cable are not strained or damag ed either mechanically or optically during stringing and/ or jointing. Fibre optic joints Optical fibre joints in the OPGW, or between the OPGW and the non-metallic under ground fibre optic cable, shall be housed in optical joint boxes. The joint boxe s shall be located immediately above the anti-climbing device for convenient acc ess by technical personnel. All joint boxes shall be earthed to the support stee l wor using approved multi-wire / multi-strand flexible aluminium earth bond. 4.1.6.1. Optical Distribution Flames (ODF) Each Optical Line Terminal Equipment (OLTE) or SDH multiplexer shall include an optical distribution frame, installed inan own wall mounted fixed cubicle. Assignment between station fibre cable and OLTE's shall be made by using patch c ords between the termination box and the optic distribution frame. Capacity of t he optic distribution frame shall allow free assignment between each individual fibre of the station fibre optic cables and the relevant optical I/O ports of th e OLTE's. The optic distribution frame shall be equipped with low loss optical connectors (< 0.3 dB including the loss in the bul head, loss in the connector splice & th e loss in the pig tail) of the screw-on type. Auxiliary connectors shall be prov ided to facilitate testing and maintenance of the fibres/equipment. All spare fi bres shall be properly terminated and spliced on connectors of the same type wit hin the frame

8.1.2.1 FIBRE TERMINAL EQUIPMENT Specifications The terminal equipment shall be the type SDH STM-1 optical terminal equipment. SDH (STM-1) multiplexer shall be installed in rac s that are EMC compatible and suitable to wor in HV system environments. The multiplexer shall be based on the SDH technology, wor ing on the basic trans mission Bit Rate of 155.520 Mbit/s (STM-1). It shall be in accordance with the l atest ITU-T SDH recommendations such as: G.703, G.704, G774, G.783, G.784, G.785 , G.811, G.812, G.813, G.823, G.825, G.826 and M.3010. The equipment shall be able to perform both, multiplexing and line terminating f unctions. The SDH Equipment (Terminal Equipment, Add/Drop Multiplex, Synchronous Digital Cross-Connect) to be offered shall meet the following requirements:

It shall have at least all the functions outlined in ITU-T G.783. The PDH electrical tributary interfaces to the SDH equipment shall conform to IT U-T G.703. The SDH electrical and optical interfaces shall conform to ITU-T G.703 and G.957 . The cross-connect offered shall be capable of providing non-bloc ing connection between virtual containers. The Optical Power to be offered shall be such that under normal operating condit ion, the BER of the system at the receiver is better than 1x10-10. Error perform ance versus the receive signal shall be verified during the factory acceptance t ests. The multiplex structure shall conform to ITU-T G.707. Details of the Multiplex s tructure for the offered equipment including the usage of the overhead bits shal l be detailed with the offer. The synchronous optical interface protection shall be achieved by having 1+1 pro tection. The laser shall automatically cut-off when the lin is disturbed. Redun dant cross connect, where failure on either one shall not cause lin outage, and path protection on the traffic interface and the 2 Mbit/s levels shall also be provided. Timing and synchronization shall conform to ITU-T G. 783, G.811, G.812 and G.813 . Timing references, number of timing references available, switching time to a different timing reference, type and level of cloc s shall be stated in the offe r. The equipment shall automatically switch to another cloc if the reference timin g is lost and automatically revert bac upon restoration. The accuracy of the in ternal cloc as well as the details of the cloc signal distribution shall also be stated in the offer. The equipment shall be capable of diverting timing references between the STM-1, 2 Mbit/s and G.703 tributary interfaces. The SDH equipment shall be wired for the full STM-1 capacity, however equipped u nder the scope of this specification to receive at least four (4) PCM tributarie s as specified below. However, if higher PDH signals other than the 2 Mbit/s are required to be routed through, the same shall be possible just by adding the re spective interface cards and no extra wiring needed. It shall have 2 Mbit/s outp uts where it can directly be connected to digital telephone exchanges or telepro tection equipment. The jitter and wander tolerance for PDH and SDH interfaces shall conform to ITUT G.823 and G.825. Jitter and wander characteristics of SDH multiplex and line e quipment shall conform to ITU-T G.783. The Contractor shall submit the details of the power budget calculations stating the following (based on 0.25 dB/ m optical fibre attenuation at 1550 nm): Transmitter Power Minimum receive Signal @ BER 1x10 10 Connector Loss Repair Splice Loss Power Penalty (Chromatic dispersion and LD reflection Loss) Maintenance Margin (> 2dB) Other Loss System Margin The SDH equipment to be offered shall provide the followings: A data communication channel to the Telecommunication Management Networ , in acc ordance with ITU-T G.773 for the purpose of integration of the new equipment int o the Telecommunication Networ Management System. A Craft interface in accordance with ITU-T G.773 to allow a local terminal to ac cess the networ element. An engineer orderwire which shall have conference and selective calling features. Performance monitoring in accordance with ITU-T G.784 and G.826.

Optical safety as per ITU-T G.783. The alarm functions shall include but not limited to: Alarms classified as critical, major, minor, and information. Indications of loss of incoming signal. Visual and audible indication of alarms. Test function of alarm indicators to ensure wor ability of alarm indicators. Alarm functions shall be detailed by the Contractor, e.g. if implemented in Tele communication Networ Management System. 8.1.3 POWER LINE CARRIER State-of-the-art single side band multipurpose DPLC terminals shall be installed in the networ . The modulation shall be single step without use of intermediate frequencies. It shall be possible to operate transmitter and receiver in adjace nt frequency bands or in non-adjacent bands The equipment shall be operated with a channel bandwidth of 8 Hz in each direct ion in a carrier frequency range of 40 Hz to 500 Hz. The Bidder shall state th e range of channel bandwidths > 8 Hz that are available for increasing the data rate. The methods of transmission shall be clearly stated with the offer. Any limitations in paralleling their own or other manufacturers equipment shall b e stated with details of necessary frequency spacing. The equipment shall be com patible on the line side with any existing equipment, both analogue and digital, i.e. coexistence shall be possible. Where limitations of offered equipment exis t, bidders shall in scope of supply lin s extending to respective Regional Contr ol centre. The design of the DPLC terminal equipment shall be modular, based on dedicated p rocessors and interfaces for the different services as necessary (data, speech a nd teleprotection) and shall employ self-monitoring functions. All DPLC terminals shall be equipped with data transmission interfaces for conne ction to the RTUs and with telephone interfaces (2/4 wire) for connection to the PAX/PABXs and/or to remote subscriber telephone sets. The installation of different interface cards in any combination, according to t he needs of the different lin s in the networ shall be possible. The Bidder sha ll describe any restriction regarding combination of interfaces. The equipment shall be furnished with local failure indication by LEDs and poten tial free contacts for external alarm annunciation (for higher level supervision and monitoring in a future SCADA system). Besides a general alarm/warning, single alarms shall at least be generated for: Transmitter failure, Receiver failure, Signal-to-noise ratio too small DC supply failure. The terminals shall be equipped with a telephone handset to be used for maintena nce purposes or in emergency situations and with a test tone generator. Provision shall be made for terminating the HF output with an appropriate dummy load for test purposes. The bidder shall perform calculations in accordance with IEC 60663 detailing cou pling equipment, line attenuation and any other losses in order to show that the proposed PLC system will attain a signal-to-noise ratio of not less than 30 dB for full digital operation under fair weather conditions.

Digital Transmission Multiplexing System The unit shall be a universal service multiplexer, which for a given bandwidth t ransfers speech and data channels in a multitude compared to traditional technol ogies. It shall use latest Digital Signal Processor (DSP) technology, permitting the implementation of a transmission system, which is robust, and economical wi th bandwidth. If the bidder proposes an external MUX, the advantages of the solu tion shall be explained. The system shall use Multi Carrier Modulation for converting the digital data to a suitable line signal. Important channel parameters shall be continuously moni tored in order to detect and compensate changes in line characteristics resultin g in optimal transmission quality at all times. The systems data rate shall be programmable over the range of 1200 bit/s to 64 bit/s. The Bidder shall state the range of available system data rates and DPLC transmission bandwidths. An adjustment facility shall permit optimal capacity ut ilization of the presently available bandwidth. In case of channel noise ratio changes, the data rate shall be automatically adj usted to new conditions. In case of worse signal-to-noise ratio, the data rate s hall be reduced until an adequately low bit error rate in reinstated. When the c onditions improve, the transfer rate shall automatically raise accordingly. The step width for this rate adjustment shall be programmable. The equipment shall be capable of boosting protection-signaling inputs along wit h suppression of voice/tele-control during transmission of protection trip-signa ls. In substations with low traffic volume, a PABX switching system may not be econo mically viable. In such cases a local subscriber shall access the remote PAX on two-wire basis via a connection to the multiplexing system. The standard perform ance features shall be available at the subscriber station.

Data Channels The DPLC equipment shall be capable for data transmission. It is foreseen to ope rate the data channels for the SCADA data transfer at a rate between 2400 to 960 0 bit/s. It shall be possible to utilize the capacity of speech channels, which are not in use for improving of data transmission capacity. The Tenderer shall s tate with his offer the data rates possible. Service and Test Functions It shall be possible to connect a PC with the appropriate software based on an M S-Windows-XP-Professional (latest build) to the DPLC terminal and perform any se rvice and test functions. The change of transmission frequency, change of bandwi dth and sideband, the configuration of speech, data and teleprotection channels and the execution of test procedures shall be programmable as a minimum. The PC shall also be used for monitoring of the DPLC equipment. Power supply Each DPLC terminal equipment shall be connected individually to one feeder of th e DC supply distribution panels. No inter-equipment looping of supply circuits i s allowed.

8.1.4

RADIO SYSTEM

8.1.4.1 UHF Point To Point Radio Description A solution is sought to connect a remote station to a master station for data an d voice communication. The radio, the data communication Equipment (DCE) is to connect data terminal eq uipment (DTE) via a standard RS232 serial interface at a data rate of 9600bps. Standard connectors must be used: DB25 or DB9 The DCE is to be fully transparent to data from DTE at both ends. For voice communication, One analogue, 2- wire telephone is to be extended to th e remote station, hence, an FXO is to be provided at the master station and an F XS (with a ringer) at the remote end. A VHF 2-way Base Radio shall also be provided for each remote site. The radio shall be supplied with a wall mounted, loc able, 12-U cabinet, with th e interfaces (Data, voice and antennae) extended to a more accessible place. The vendor shall carry out site surveys, to determine the line of site and perfo rm RF path calculations for optimal performance of the Radio lin . The vendor shall also supply antennas, feeder cables and other accessories neces sary for installation of the remote Radio, and shall also install and test the R adio lin . The minimum performance parameters of the radio lin shall be: Fade margin: >30dbm SNR: >30dB The installation shall be professional with standard grounding of the feeder cab les and the equipment, The vendor is to decide on how to integrate the solution on condition that, any additional equipment li e a multiplexer must meet the networ management specifi cations of the radio. Specifications for the UHF radio equipment and VHF 2-way Base Radio are given be low. UHF point to point radio specifications General Standard: ETSI Transmission: Subrate, Frequency Band: 300-512 MHz Channel size: >25,

Modulation: Digital,

Transmitter Output control range: minimum 10 steps of upto 10dB. Freq. Stability: < 1.5 ppm. Output power: 30dBm Residual BER: <1x10-6 Interfaces: Data: EIA 530 D25 DCE / G.703 Oderwire: DTMF capable Ethernet NMS: 10 Base-T Configuration Port: RS-232, 300 bps 115.2 Kbps Alarms: At least 2 programmable outputs, 2 programmable inputs Antenna: 50 Ohms impedance

Data rates: 64 bps with overhead

Networ Management Local LED Indicators: LED status indicate-Power, general alarm, TX alarm, Rx ala rm, I/O alarm Element Management: Full management via command line interface, Full IP based ma nagement through SNMP and HTML Web Server. Remote element management: Able to manage remote radio over the air. Environment Temp:-10 to +60C Humidity: <95% non condensing Electrical Power consumption: <80W Voltage range: 48 Vdc Mechanical Rac mounted standard cabinet 1 U

Agency Approvals Transmission: FCC Part 90, 74, 22, IC RSS-119 EMC: ETS 300 385, FCC Part 15 System Performance Receiver Sensitivity at (10-6 BER) : <-90dbm System Gain at (10-6 BER) : >120db

8.1.4.1.1 POINT TO MULTIPOINT RADIOS Description A solution is sought to provide Remote radios to operate in an existing point to multipoint radio communication system based on the UHF licensed frequency band, to be used for data acquisition. For this solution, two Master Radios are alrea dy existing at Juja and Ngong and the scope shall only be limited to remote radi o and necessary Engineering wor s at the Radio NMS at the control centre. The system consists of a Master station, with a master Radio, and remote station s with remote radios. The radio system provides a transparent data channel, where communication is man aged by the central data acquisition system. The remote radios must operate with an existing master radio of type MDS 4790 wh ose specifications are outlined. The remote radio shall be supplied with a wall mounted, loc able, 12-U cabinet, with the interfaces (Data and antennae) extended to a more accessible place. The vendor shall carry out site surveys, to determine the line of site and perfo rm RF path calculations for optimal performance of the Radio lin . The vendor shall also supply antennas, feeder cables and other accessories neces

Weight: Max 10 gs

sary for installation of the remote Radio, and shall also install and test the R adio lin . The minimum performance parameters of the radio lin shall be: Fade margin: >30dbm SNR: >30dB The installation shall be professional with standard grounding of the feeder cab les and the equipment, with lightning protection. Voice communication at the remote stations to be realized through one VHF, Twoway base radio for each station, compatible with an existing, APCO, Project 25(P 25) based VHF digital trun ing Radio system. The specifications for the VHF base radio shall be outlined. MASTER RADIO SPECIFICATIONS General Ma e: MDS 4790 Actual operating frequency: TX 360MHZ, RX 370MHZ Data Rate (Data): 110 bps - 38.4 Kbps Frequency programmability: 6.25 Hz increments to any MAS channel pair Operational modes: asynchronous - half-duplex, full-duplex, protected. Modulation: digital Latency (Rx-Tx-Rx): <10 ms including RTS/ CTS delay CTS Delay: 0-255 msec programmable in 1 msec increments Range: Up to 50 miles RF Data Rate: upto 19,200 bps Frequency Bands: 330 - 512 MHz Networ wide diagnostics: Management software managing the master and remote rad ios. The software used is Insite 6. REMOTE RADIO SPECIFICATIONS General Data Rate (Data): 110 bps 19.2 Kbps Modulation: digital Range: Up to 50 miles RF Data Rate: 19200 @ 25 Hz Frequency Bands: 330 - 512 MHz

Transmitter Frequency Stability: +/- 1.5 ppm Carrier power: 0.1 to 5 Watts Programmable Carrier power Accuracy: Normal +/- 1.5 dB Duty Cycle: Continuous Output Impedance: 50 Ohms Receiver Type: Double Conversion Super heterodyne Selectivity: >70dB Bit Error rate: <1x10-6 @ -110 dBm typical Interfaces Data interface: EIA/RS-232, DB25 Female Data Rates: 120019200 bps, asynchronous Diagnostic: RS232, DCE, 300 bps 115.2 Kbps Management Local: Via -Diagnostic port -Front panel display: DCD, RX activity LED, TX activity LED. Networ wide management Environmental

Temperature: -30C to +60C Humidity: Min 95% at 40C (104F) non condensing Mechanical Rac mounted standard cabinet Max 1 U Weight: Max 5 gs Electrical Primary power 48 Vdc Power required < 30 Watts nominal Agency Approvals Transmission: FCC Part 90, 74, 22, IC RSS-119 EMC: ETS 300 113, EN 300, 279

Electrical Power Supply: 13.8V DC 20% Negative ground Standby at 13.8V DC 20%: 0.85A Transmit current at rated power 13.8V DC 20%:13A (50W) Receive at 13.8V DC 20%: 3.2A Environmental Operating Temperature: 30 C / +60 C Ingress Protection: IP54 certified

SPARE PARTS The bidder shall include any special tools and test The Contractor shall furnish a list of recommended spare parts and test equipmen t for the fibre and OLTEs. The spare parts list shall be subdivided into: short-term spare parts that are necessary for two (2) years of operation. These spare parts shall be included in the contract and shall comprise at least one sp are module for supplied equipment and basic tools for system maintenance. long-term spare parts that are necessary for ten (10) years of operation.

8.1.4.2 SPECIFICATIONS FOR VHF 2-WAY BASE RADIO General APCO. PROJECT 25 compatible for trun ing system Frequency range: 136-174 MHz Modulation: C4FM of QPSK-C family Protocol: Project 25-CAI (4.4 bps IMBE, 2.8 bs Error Correction Coding, 2.4 bps Embedded Signaling) Channel Bandwidth Analogue: 12.5/25/30 Hz (136-174 MHz) Digital: 12.5 Hz Voice coder Voice Coding Method IMBE (CAI): Improved Multi Band Excitation (IMBE) Frame Re-sync Interval: 180 mSec (Clear Digital Mode) Forward Error Correction: Golay code Signaling Signaling Rate:9.6 bps Error Correction Techniques: Golay, BCH, Reed-Solomon codes Transmitter RF Power:10-50W Max Freq Separation: Full Bandsplit Freq Stability Operating Freq Accuracy<2ppm

TOOLS AND TEST EQUIPMENT The bidder shall include special tools and test equipment needed to maintain the fibre (including OTDR and splicing Kit), PLC, Radios and OLTEs over their expec ted lifetime. Bidder shall provide relevant technical data/pamphlets for all the items. The test it shall include necessary laptops and all equipment applicati ons and their licences. The test equipment and other special tools proposed shall be of the same type as used by the contractor for erection and commissioning. The test equipment shall not however be available to the contractor during erection and commissioning. DOCUMENTATION: a. The Contractor shall provide all necessary drawings, design specificatio ns, design details, operation and maintenance manuals. All manuals and As-BuiltDrawings documents shall be supplied in three hard copies and a softcopy in PDF. b. The following documentation should be provided for the system in the cou rse of the project. It shall be consistent, CAD supported and of similar loo /fe el: c. Control Room Layout d. Single-Line Diagram e. Bloc Diagram f. Circuit Diagram g. List of Apparatus/ Equipment h. List of Labels i. Functional Design Specification (FDS) j. Test Specification for Factory Acceptance Test (FAT) . Logic Diagram l. List of Signals m. Operators Manual n. Product Manuals o. Calculation for uninterrupted power supply (UPS) dimensioning p. Concept and contract for maintenance q. It is necessary to present the technical description and the technical d ata for the whole system and for any equipment and function r. Time plan for the project realization. TRAINING: The Contractor shall provide 2 wee s and 1 wee training for four REA staff at t he suppliers factory premises on SCMS and OLTE and on site during installation wo r s. The scope of each service shall be given. On completion of the training, REA staff shall be able to modify and ma e change s to the configuration of the SCMS and OLTEs including the HMI and signal list mapping to accommodate any future changes as well as interfacing & data transmis sion to the RCC. TESTING The formal stages of testing to be performed fall intothe following three catego ries: Type Tests Equipment shall pass these tests in order to be accepted for use unde r this Contract Factory Acceptance Tests (FAT) Systems shall pass these tests before they may be shipped to site. The employer shall witness FATs unless he waives this in writi ng. FAT shall be carried out for fibre, SCSMS and OLTE Site Acceptance Tests (SAT) Systems shall pass these tests before they may be pu t into operation and before they are Ta en Over

SYSTEM ACCEPTANCE The System will be accepted by REA if both: The System and all items of equipment have successfully completed all the specif ied tests All failures, problems and reservations noted during the tests have been correct ed to the satisfaction of REA. If either of these conditions has not been complied with, then the necessary cor rective action shall be agreed between the Contractor and REA.

9 SCOPE OF WORK - SUBSTATIONS 9.1 SCOPE OF WORK - SUBSTATIONS 9.1.1 General The Bidder shall examine the scope of wor s in this section in close connection with the other documents and particulars forming these Bidding Documents. Special attention shall be paid to General Specifications and Particular Technic al Specifications, in which the general technical requirements are specified. Th e drawings enclosed in are for bidding purposes only. If the Specifications and/or Drawings do not contain particulars of materials or goods, which are necessary for the proper and safe completion, operation, and m aintenance of the equipment in question, all such materials shall be deemed to b e included in the supply. In the event of any conflict between the Drawings and the Specifications, the la tter shall prevail. In the event of any conflict between scaled dimensions and figures on the Drawin gs, the figures shall prevail. Should the Bidder find discrepancies in or omissions from these Specifications o r from the other Documents, or should he be in doubt as to their meaning, he sho uld immediately contact the Project Manager for interpretation, clarification or correction thereof before submitting his Bid. Such action shall, however, in no case be considered as a cause for altering the closing date of the Bid. The scope of wor for equipment shall cover engineering design, manufacture, tes ting before shipment and pac ing sea worthy or otherwise as required, delivery C IP site, of all equipment as specified in the preceding chapters.

For substations contracted on turn

ey basis the substation contractor shall be

responsible for design, material supply, transport, erection and commissioning a s well as having the full responsibility for civil wor s including design and co nstruction of transformer foundations and control building. The Contractor shall design and construct the transformer foundations with oil c ollection pit, oil trap and fire damper consisting of crushed stones laying on a galvanised steel grating. Loose equipment for the Employers rehabilitation shall be complete with documenta tion and ancillaries li e programs, licences and programming tools. Equipment that is to be dismantled and removed from existing substations is to b e recovered by the Contractor and deposited to sites within or in the immediate vicinity of each substation. Such sites are to be designated by the Employer. Th e recovered equipment is to be ta en over by the Employer at these sites. OVERVIEW OF KPLC SCADA SYSTEM KPLC has a SCADA (Supervisory, Control & Data Acquisition) system that is contro lled from the Regional Control Centres& the National Control Centre. The Nationa l Control Centre (NCC) is at Juja Rd and controls the entire transmission networ & substations (ie some 66 V, all 132 V, all 220 V & soon to be introduced 400 V stations.) There are 4 regional control centres in total at Juja Rd (Nairobi region), Rabai (Coast region), Lessos (West Kenya region) & Kiganjo (Mt Kenya region). These R egional Control Centres monitor & control the 11KV, 33 V & 66 V Distribution net wor s & stations in their specific regions. The Control Centres all run ABBs Networ Manager WS500 which is the software used for monitoring & Control of all the incorporated substations. The Communication protocols currently supported by KPLCs front end servers (ABBsPCU 400) for data telegram exchange with Remote Terminal Units (RTUs) & Station Control Managemen t Systems (SCMS) in the substations in its SCADA system are IEC 60870-5-101&IEC 60870-5-104. The automated 33/11 V Distribution substation will be required to communicate wi th the front end server (ABBs PCU400) via the communication protocols outlined ab ove. The automated Distribution Station must communicate with the Regional Contr ol Centre under which it shall be monitored &controlled. The interconnected KPLCs telecommunications system is based a bac bone of SDH STM 1 terminal equipment, FOX 515 from ABB and includes Power Line Carrier and Radio . A networ management system (NMS) for the telecommunication system has been in stalled at NCC. 9.1.2 Standard Substation This section defines the standard substation components. The actual quantities t o be included in the price schedules are found for each substation in the subseq uent sections.

(a) 3 (three) autorecloser (b) 4 (Four) earthing switch (c) 2 (two) set of busbars (d) 2 (two) set of current transformers (e) 2 (two) bay control unit with display and measuring functions (f) 2 (one) 3-phase over current relay function with auto re-close function. The auto-reclose function must be selectable with an external switch

9.1.3 9.1.3.1 9.1.3.2 2 (two)

66KV and 33 V Switchgear Outdoor Type 66KV Switchgear Outdoor Type 66 V Feeder Bay complete bay shall be equipped with:

(g) 2 (two) Earth fault relay function (h) 2 (two) sensitive Earthfault function (i) 2 (two) restricted fault relay function (if not provided on the HV tran sformer bay panel) (j) 2 (two) lot of necessary interposing relays, MCBs, terminal bloc s and wi ring to form a complete operative bay control. The control scheme shall be prepa red for SCADA operation. Note: 66KV Power Factor Correction Equipment (LC Circuit) switchgear shall be eq uipped with the necessary protection and control relays for Capacitor ban s. . 9.1.3.3 Transformer Bay 1 (one) complete bay shall be equipped with: (a) 1 (one) circuit brea er (b) 2 (two) isolator with motor operation (c) 1 (one) earthing switch (d) 1 (one) set of busbars (e) 1 (one) complete set of three-phase line including clamps for the flying busbars and for connection between the gantries, to the transformer bushings, t o the busbars and to and between the apparatus. (f) 1 (one) set of current transformers (g) 1 (one) set of steel structures for support (h) 1 (one) bay control unit with proper display, for measurements (V,I,MVAR ,MW) (i) Tapchanger voltage regulating relay (AVR) (j) 1 (one) multifunctional protection unit as per 4.1.2.4.2.2 Section VI Pa rticular Technical specifications substations control, and Protection ( ) HV overcurrent protection relay. (l) 1 (one) loc -out trip relay with electrical/hand reset facilities (m) 1 (one) lot of necessary interposing relays, MCBs, terminal bloc s and wi ring to form a complete operative bay control. The control scheme shall be prepa red for SCADA operation 9.1.3.4 66KV Feeder Bay 1 (one) complete bay shall be equipped with: (n) 1 (one) circuit brea er (o) 2 (two) isolator with motor operation (p) 1 (one) earthing switch (q) 1 (one) set of busbars (r) 1 (one) complete set of three-phase line including clamps for the flying busbars and for connection between the gantries, to the busbars and to and betw een the apparatus. (s) 1 (one) set of current transformers (t) 1 (one) set of voltage transformers (u) 1 (one) set of steel structures for support (v) 1 (one) set of control/protection panel (w) 1 (one) bay control unit with display and measuring functions (x) 1 (one) multifunctional protection unit. (y) 1 (one) loc -out trip relay with electrical/hand reset facilities (z) 1 (one) lot of necessary interposing relays, MCBs, terminal bloc s and wi ring to form a complete operative bay control. The control scheme shall be prepa red for SCADA operation. 9.1.3.5 Bus Bar Protection 1 (one) bus bar protection unit included in the control panel for all 66 and 33 V bus bars.

9.1.4.1 33 V Feeder Bay 1 (one) complete bay shall be equipped with: ( ) 2 (two) autorecloser (l) 2 (two) earthing switch (m) 2 (two) set of busbars (n) 2 (two) set of current transformers (o) 2 (two) bay control unit with display and measuring functions (p) 2 (one) 3-phase over current relay function with auto re-close function. The auto-reclose function must be selectable with an external switch (q) 2 (two) Earth fault relay function (r) 2 (two) sensitive Earthfault function (s) 2 (two) restricted fault relay function (if not provided on the HV tran sformer bay panel) (t) 2 (two) lot of necessary interposing relays, MCBs, terminal bloc s and wi ring to form a complete operative bay control. The control scheme shall be prepa red for SCADA operation. 9.1.4.2 Switch Board Panel for 33 V Feeder Indoor panel 1 (one) complete bay shall be equipped with: (u) 2 (two) circuit brea er (v) 2 (two) earthing switch (w) 2 (two) set of busbars (x) 2 (two) set of current transformers (y) 1 (two) bay control unit with display and measuring functions (z) 1 (two) 3-phase over current relay function with auto re-close function. The auto-reclose function must be selectable with an external switch (aa) 2 (two) Earth fault relay function (bb) 2 (two) sensitive Earthfault function (cc) 2 (two) restricted fault relay function (if not provided on the HV tran sformer bay panel) (dd) 1 (one) lot of necessary interposing relays, MCBs, terminal bloc s and wi ring to form a complete operative bay control. The control scheme shall be prepa red for SCADA operation. 9.1.4.3 Switch Board Panel for Indoor Bus- Sectionaliser 1 (one) complete bay shall be equipped with: (a) 1 (one) circuit brea er (b) 1 (one) set of protection current transformers. (c) 2 (two) earthing switches (one on each busbar section if not located els ewhere) (d) 1 (one) set of busbars including droppers and risers (e) 2 (two) set of voltage transformers (one on each busbar section if not l ocated elsewhere) (f) 1 (one) bay control unit with display (g) 1 (one) overcurrent function and 1 (one) relay function (h) 1 (one) lot of necessary interposing relays, MCBs, terminal bloc s and wi ring to form a complete operative bay control. The control scheme shall be prepa red for remote operation. .

9.1.4

33

V Switchgear Outdoor Type

9.1.4.4 Current Transformers for Neutral current measurements (a) 1 (one) current transformers for neutral current measurements one on eac h winding 9.1.4.5 Lightning Arresters (a) 66 V lightning arrestors erected close to HV side of power Transformer (b) 3 (three) 33 V lightning arresters erected close to LV side of power transf ormer 9.1.5 Auxiliary transformer (a) 1 (one) 33/0.433 V auxiliary transformer, 50 VA, Dyn11 with built on l ow voltage fuses. The transformers shall be installed outdoor 9.1.6 MV Power Cables from Transformer to Indoor Switchgear (a) 1 (one) lot of 33 V cable from main transformers to 33 ated for 120 % of nominal transformer rating

of support structures for lightning arresters and transforme of 33 V cable from switchgear to auxiliary transformer of 33 V cable terminations for auxiliary transformer and sw of support structures for auxiliary transformer.

9.1.7 MV Power Cables from Indoor Switchgear to line termination tower (g) 1 (one) lot of 33 V cable from indoor 33 V switchgear to terminal towe r (h) 1 (one) lot of 33 V cable terminations for switchgear connection and li ne connection (i) 1 (one) lot of support structures for cable terminations in terminal tow er 9.1.8 Control, Protection, Metering and Signalling 9.1.8.1 Substation Automation System General 1 (one) lot complete system (equipment and soft ware) for substation control. To the extent the internal control and interloc ing system for the equipment sup plied is not included for that particular equipment, it shall be included herein . All interconnections needed to form a complete installation shall also be incl uded herein. The control system specified hereunder shall include all necessary equipment for control, protection, metering and signalling. The system shall include all inst ruments, meters, switches, position indicators, inscriptions and mimic diagrams, protective and auxiliary relays, terminal bloc s, internal wiring and any other equipment required to form a complete installation. Drawings showing the control system, protection units and the boards as they are proposed shall be supplied with the Bid. The space needed for the boards should not exceed the available space. Information defining the internal local control communication protocol shall be submitted with the Bid. Complete sets of schematic diagrams for control, protection, indication, meterin g, signalling, alarms, etc. shall be supplied as part of the project and shall b e subject to the Project Manager's approval.

(b) 1 (one) lot onnection (c) 1 (one) lot r connection (d) 1 (one) lot (e) 1 (one) lot itchgear connection (f) 1 (one) lot

of 33 V cable terminations for transformer and switchgear c

V switchgear, r

The requirements as to submission of diagrams, drawings and other documents with the Bid and after award of Contract are stated in the standard form of contract . 9.1.8.1.1 Scope.

The system design shall be sub divided into 2 sub groups, depending on the type of substation automation system (SAS); I. 66-33 V Distribution Stations with SCMS (Substation Control and Monitori ng Systems) and shall be controllable from the RCC II. 66-33 V Distribution Stations with SCMS (Substation Control and Monitori ng Systems) which shall not be controllable by the interconnected SCADA system b ut shall be prepared for future connection. Stations in the first category are: a) LOKICHAR Stations in Category 2 a) None The supply and services to be performed by the Contractor shall comprise the des ign, manufacture, factory testing, pac ing, transport, insurance, unloading, sto rage on Site, construction wor s and erection, corrosion protection, site testin g, submission of documentation, commissioning, training of REAs personnel and war ranty of the wor s. The proposed SA system for the above wor should offer at least the following fu nctionality: Full operational control, reporting, alarm and indication facilities for the sub station from the RCCs (Supervisory level). Full operational control, alarm and indication facilities for the substation fro m the Human Machine interface (HMI) wor stations in the substation control room( Substation Level). Operational control of each new circuit/bay from the protection relay panel usin g the bay control unit LCD display (Bay level). Control of each item of plant from the Local Control Cubicle (LCC) (Local Level) The control facilities from each control point are to be interloc ed (hardwired) to prevent operation of any device simultaneously from more than one control po int. At least one fully operational control point shall remain available in the event of a single equipment or communications failure. Complete facilities must exist for the proper loc out and maintenance tagging of circuits and plant items to ensure the safety of personnel and the security of the system The SA system shall use open communication protocols and be readily interfaced w ith third part devices operating on open protocols. The Tenderer shall describe such interfaces and provide an experience list of devices with which the offered control system has previously been interfaced. The SCMS shall typically include: Station Level: 2 independent Gateways (Main and Hot-standby) for communications to theSCADA sys tem. 1 Operator Wor station/HMI, and the complete wor place (des , chair). color printer. To print screen shots Operator log printer Satellite cloc , complete with GPS Receiver, Antenna and necessary time synchron ization ports. Interface for laptop computer for maintenance, information transfer and emergenc yHMI Laptop Computer for maintenance, information transfer and emergencyHMI

UPS system for SCMS. Communication networ equipment [station (system) LAN, Field Communication Netwo r , Various optical couplers, etc.]. interface for control and monitoring of the circuit/bay Interface for protection devices that cannot directly interface with the substat ionLAN Approved communication lin & its terminal equipment from the Substation to the Regional Control Centre. 9.1.8.2 SCADA Interface (a) 1 (one) lot complete system (equipment and soft ware), with communicatio n gateway, data concentrator etc. for interface to a regional (RCC) SCADA system and to the national (NCC) SCADA system. For a point-to-point communication lin the IEC 60870-5-101 protocol shall be im plemented. As part of the supply necessary engineering of the substation signal list (I/O l ist) shall be included. The engineering shall be carried out on the format presc ribed by KPLC. 9.1.8.3 Control and Measuring Cables (a) All external cables, conventional or fibre optical, for control, protect ion, measuring, indication, etc., for the complete plant. Wiring between the swi tchyard apparatus, transformers, the board(s) and the control system in the cont rol building and the interconnections between the various apparatus in the switc hyard shall be included. 9.1.8.4 Telecommunications a) In order for the SCADA data to be transferred to the Regional control ce ntre at Juja Road substation, the bidder shall design and commission an appropri ate communication system based on Radio or other communication media for data an d speech requirement. Equipment supplied shall be digital and latest technology and shall comply to th e latest ITU-T, IEC, ITU-R, IEEE and ETSI standards. It is required that one remote subscriber be implemented in each substat ion. Interface for data transmission shall be according to ITU-T recommendati on V.24 or V.35 Bit error rates of 1x10-6 shall not be exceeded. b) It is the responsibility of the contractor to interconnect with existing SCADA and Telecommunications system. However use of existing infrastructure whe re possible shall be encouraged. c) The Tenderer shall acquaint himself with all the sites and determine the requirements for towers or masts to suit his design. When a new tower or mast i s necessary is necessary, the Tenderer shall supply drawings for the proposed in stallation. The tenderer shall provide details of loading and guy stresses for m asts or towers to be erected on buildings. All antennae mounting components incl uding wave-guides, cables, cable clamps and external cable connectors shall be s pecified. d) All communications equipment installed in the country must be type appro ved by the Communications Commission of Kenya (CCK). The Contractor will obtain the type approval. The CCK has to be consulted and give approval for each new project and an applic ation has to be submitted stating the location of the sites and request for the frequencies to be used. Unless otherwise stated this application for frequencies is normally done by KPLC. The radio frequency plan shall be prepared by the Contractor and closely coordin ated with KPLC during the project design stage. All path surveys shall be carrie d out by contractor.

e) The Contractor shall provide a list of recommended spares, the quantitie s and prices to last for a period of five (5) years after expiry of guarantee pe riod. f) The contractor shall offer training for four (4) technical appointees of the employer for 2 wee s at manufacturers premises. Terms and conditions similar to 4.2.15 g) The contractor shall provide necessary configuration software pre-instal led on a maintenance laptop with a one time software license. 9.1.9 9.1.9.1 1 (one) mber of Auxiliary AC Supply Equipment Main AC Distribution Board main distribution board designed for minimum 200 A with the necessary nu panels for:

(a) 1 (one) circuit brea er, manual operated, minimum 200 A, for the feeder from the station supply transformer. (b) 2 (two) current transformers 200/1/1 A with two cores, one core for meas uring and one for protection. (c) 1 (one) constant time overcurrent relay. (d) 1 (one) earth fault relay. (e) 1 (one) A-meter function with selector switch. (f) 1 (one) V-meter function with selector switch. (g) 1 (one) lot of feeder circuit brea ers with electro-magnetic and thermal releases. The brea er ratings shall be chosen to suit the different consumers t o be connected. 20% of the brea ers of each size shall be spare and readily moun ted. 9.1.9.2 Sub-distribution Boards and Panels (a) 1 (one) lot of all necessary sub-distribution boards and panels (includi ng the distribution panel for lighting and small power of the control building). The boards shall be completely equipped with busbars, circuit brea ers, miniatur e circuit brea ers etc. Contactors, motor starters, instruments, operating switc hes, push buttons, indicating lamps, etc., shall be included whenever required. 20% of the brea ers of each size shall be spare and readily mounted. 9.1.9.3 Cables (a) 1 (one) lot of all necessary armoured power and control cables for suppl y to the main distribution board and to the sub-distribution boards, panels and equipment except for the cables for lighting and small power which are included in the civil Goods under separate contract. 9.1.10 DC Supply System 9.1.10.1 Battery i. (1 (one) 110 V battery. Capacity at least 200 Ah/10h for substations wit h more than 10 MVA installation of transformer capacity ii. The 48V batteries shall be included in the bid for communication equipme nt and the RTU. The battery shall be at least 100A/10Ah The capacities to be recommended by the Bidder, based upon the calculated consum ption considering a fully developed substation. Batteries shall be installed in separate room with EX proof ventilation fan (for 110 V batteries only). 9.1.10.2 Charger (a) 1 (one) DC charger for the 110 V battery. (b) 1 (one) DC charger for the 48 V Battery. The chargers shall be complete with instruments, brea ers on AC and DC side, and protection. 9.1.10.3 Switchboard

1 (one) switchboard 110 V DC. The board shall have: (a) 1 (one) circuit brea er with magnetic and thermal release for the feeder from earache charger and battery. (b) 1 (one) A-meter with shunt for each battery. (c) 1 (one) V-meter with selector switch for the voltage between the poles a nd between poles and earth for each battery. (d) 1 (one) set of contacts on the front for banana jac s for the battery vo ltage and earth. (e) 1 (one) battery monitoring devices with alarm contacts. (f) 1 (one) lot of all necessary circuit brea ers and miniature circuit brea ers for the outgoing feeders and circuits. 20% of the brea ers of any size shall be spare and readily mounted. 9.1.10.4 Battery Conductors and Fuses (a) 1 (one) set of conductors for the battery in the battery room. (b) 2 (two) single pole fuse boxes with main fuses for the battery, placed o n the wall outside of the battery room, and two fuses for the battery monitoring device. 9.1.10.5 Sub-distribution Boards and Panels (a) 1 (one) lot of all necessary sub-distribution boards and panels. The boards shall be completely equipped with busbars, miniature circuit brea ers , fuses, etc. Contactors, motor starters, instruments, operating switches, push buttons, indicating lamps, under-voltage relays with alarm contact, etc., shall be included whenever needed. 9.1.10.6 Cables (a) 1 (one) lot of all necessary DC power supply cables, including wiring to the apparatus in the switchyard. 9.1.11 Earthing System An earthing networ shall be installed comprising the following: (a) 1 (one) lot of underground earthing system covering the platform and con trol building with risers(b) 1 (one) complete set of "above-floor" earthing s ystem for the control building, as applicable, with connections to the risers fr om the under-ground system. 9.1.12 Ancillary Equipment 9.1.12.1 Station Equipment (a) 2 (two) self-contained, rechargeable, portable hand-held lights. (b) 1 (one) audible alarm system with the necessary wiring. 9.1.12.2 Earthing Devices (a) 1 (one) set of three phase portable earthing devices for outdoor 33 V w ith operating rods suitable for earthing of the bay conductors and busbars. (b) 1 (one) set of voltage indicator for 33 V and 11KV with audible and vi sual indication for voltage 9.1.12.3 Cable Accessories (a) 1 (one) lot of all connecting material, cable boxes and material for fix ing the cables. Terminals and terminal labels to the extent that this is not included in other s ections.

9.1.12.4

Rac s, Conduits, Ducts, etc

(a) 1 (one) lot of all cables, rac s and trays to the extent necessary for t he proper distribution of cables. All the conduits and protection tubes, wherever cables may deteriorate or where cable laying may otherwise present difficulties. 9.1.13 Power transformers To be supplied as specified for each sub station, and in accordance with below d ata. 9.1.13.1 Type of transformers Main data for the transformers that shall be supplied: Pos. 1 Rating MVA (ONAN Voltage Tapping range 23 66/33 8 x 1.67% yes Dyn11 OLTC Vector group

9.1.13.2 CT's for Power Transformers Transformer Ratings CT Ratios - Amps Neutral Bushings Protection (KV) (MVA) Phase Bushings HV LV 66/33 23 200/1 400/1 400/200/1 Standby. HV over current Note: Each function on separate core

9.1.13.3 Civil Wor s 9.1.13.4 Platform wor s Platform with fence roads and ditches shall be constructed as specified in parti cular specifications and in scope of wor . 9.1.13.5 Switchgear buildings Switchgear buildings shall be constructed as specified in particular specificati ons and in scope of wor . Control Panels and medium voltage indoor switchgears of different Voltage levels shall be installed in separate rooms 9.1.13.6 Transformer foundations Transformer foundations shall be constructed as specified particular specificati ons and in scope of wor . 9.1.13.7 Cable Trenches Cable trenches shall be constructed as specified in particular specifications an d in scope of wor . 9.1.14 Training in control and protection system (LS-008a, 008b) The training includes travel, accommodation and per diem for the 4 (four) REA en gineers as well as all course material and other expenses acquired by the Contra ctor. The training shall be held at the manufacturers. The training shall cover design, application, testing, commissioning and maintenance of the relevant digi tal control and protection systems. The training course shall have a minimum of 2 (two) wee s duration. 9.1.15 Factory Acceptance Test (LS 001,002,003,004,005,006,007) The FAT shall include shall be done by 3 participants from REA and the Project M anager for the following major equipment: 66 and 33KV Circuit brea ers Protection and control system Transformers

Biased Differential Restricted/

Indoor switchgear Power Cables Instrument transformer Disconnectors/ Isolators FAT shall be carried out as prescribed in the particular technical specification s of the equipment. The employer shall cater for the travel cost and per diem fo r the participants. 9.1.16 Test Equipment (TS 001) Lap top computers: One unit, set up with comprehensive software. The pc shall be supplied with all the necessary accessories and ports and loaded with latest op erating system. The Lap top must be able to run all the relay and equipment soft wares supplied under the contract. 9.1.17 Final documentation As built drawings: 5 paper copies delivered in binders 3 CD-ROM copy (all drawings in auto card ) 1 set of transparencies Operation and maintenance manuals: 1 copy

9.1.18 LOKICHAR SUBSTATION EQUIPMENT. New substation, One new transformer shall be installed at Lo ichar Trading Centr e 23MVA, 66/33 V. Sl No Description Unit Qty LOK-001 Supply 23MVA, 66/33KV Power Transformer with MR-Germany/China OLTC & R TCC Panel NO 1 LOK-002 SF6,Circuit brea ers 66 V, 1250/2000 A, 31.5/40 A No. 3 LOK-003 Vacuum, Circuit brea ers 33 V, 1250A, 25/20 KA No. 3 LOK-004 Switching disconnectors 66 Kv, 1250 A, 31.5KA with earthing switch Set 4 LOK- 005 Switching disconnectors 33 V,800 A, 25KA with earthing switch Set 6 LOK-006 66 V, 10 A, Station Class Surge Arrester No. 9 LOK-007 33 V, 10 A, Station Class Surge Arrester No. 12 LOK-008 66KV, 200-100/1-1-1-1, CT No. 9 LOK- 009 33KV, 400-200/1-1-1-1, CT No. 9 LOK-010 66KV, 66KV/3/110V/3, VT No. 3 LOK-011 33KV, 33KV/3/110V/3, VT No. 2 LOK-012 66 KV C & R Panel for SF6 CB With TVM & Protection Relays Set 3 LOK-013 33 KV C & R Panel for SF6 CB With TVM & Protection Relays Set 3 LOK-014 Bay Marshalling Kios (Outdoor) No. 2 LOK-015 150mm sq. ACSR Overhead Conductor on 66KV Side Mtr. 600 LOK-016 150mm sq. ACSR Overhead Conductor on 33KV Side Mtr. 1200 LOK-004 66 V Bus Post Insulator Nos 9 LOK- 005 33 V Bus Post Insulator Nos 12 LOK-006 66 V Suspension & Tension Polymer Insulator Nos 21 LOK-033 33 V Suspension & Tension Polymer Insulator Nos 24 LOK-015 Insulator Hardware's Lot 1 LOK-016 Clamps & Connectors for all the above equipments Lot 1 LOK-018 5 C x 2.5 Sq.mm Control Cables Mtr. 500

Foundation Bolts & Structures for CB,CT,BPI, ISOLATOR, LA, 110V Battery, 165AH, VRLA Type Set 1 110V, 50A Battery Charger with DCDB for above battery No 66KV, Outdoor Power Factor Ban s with C&R Panel SET 1 48V DC Charger/Batteries for Telecommunication Systems Costs Substation Automation Systems Costs Lot 1 Telecommunication (PLCC based system) Costs Lot 66KV Line Wave Traps for PLCC Systems Costs Lot 66KV Coupling Capacitors for above PLCC Lot 4 50KVA, 33/0.433KV, Substation Transformer Lot 33KV, Drop Out Fuse for above Substation Transformer Lightning Mast - Tubular Structure No 8 AC Distribution Board No 1

9.1.19 Mandatory Spare Parts and Tools All spares and tools specified below are to be of ma es and types that match wit h the equipment in the scope of wor s, to the extent possible. Spares and Tools are to be delivered to REA's Kisumul stores 9.1.19.1 For Transformers The following spares and tools are to be provided for each type of transformer o ffered: Item no. Item Code1 Unit (1) Mandatory Spares and tools Spares for transformers Spares ST-001 Auxiliary relay of each type. ST-002 Switches each type ST-003 Lamps each type Sets Qty

Sets 6

Sets 1

LOK-020 LOK-022 LOK-023 LOK-024 LOK-025 LOK-026 LOK-027 LOK-028 LOK-029 LOK-030 18 LOK-031 18 LOK-032 LOK-033 LOK-034 LOK-035 1 LOK-036 LOK-037 LOK-038 LOK-039 LOK-040 LOK-041 LOK-042 LOK-043

5 C x 4 Sq.mm Control Cables Mtr. 10 C x 2.5 Sq.mm Control Cables Mtr. 10 C x 4 Sq.mm Control Cables Mtr. 15 C x 2.5 Sq.mm Control Cables Mtr. 40 mm dia, GI Pipe Earth Electrode 20 mm dia, GI Spi e Earth Electrode 75 x 12 mm MS Flat MT 4 15 x 6 mm MS Flat for Equipment Raiser 32 mm dia MS Round for Earth Mat Foundation Bolts & Structures for 132KV

500 500 500 500 Nos Nos

10 10

MT 3 MT 13 Structure & Gantry

MT MT 1 SET

2 3 1 No 3

Tools for Transformers TT-001 Complete set of slings for lifting SS-001 SS-002 SS-003 20 SS-004 SS-005

Spares 66 V disconnector Sets 1 33 V Fuses for Fuse Switches Sets 10 Assorted MCB's for AC and DC distribution boards Trip coils for each type of Circuit Brea er Close coils for each type of Circuit Brea er Sets 1

Tools TS-003 Lap tops

9.1.20 Recommended Spare Parts and Tools The Bidder shall recommend additional spares and tools suitable for the offered equipment. The prices are to be entered in Price schedule No. 6, which shall not be added to the Grand Summary Prices. The recommended spares and tools are to b e specifically discussed and agreed on during contract negotiations

TECHNICAL SCHEDULES 9.2 9.2.1 TECHNICAL SCHEDULES PREAMBLE

1.1 The Technical Schedules shall be filled in and completed by the Bidder, and submitted with the Bid. The type test reports and the relevant manufacturers technical documents shall be provided for reference. 1.2 All documentation necessary to evaluate whether the equipment offered is in accordance with this Specification shall be submitted with the Bid. 1.3 All data entered in the Schedules of Technical Guarantees are guaranteed values by the Bidder and cannot be departed from whatsoever. 1.4 All data entered in the Schedules of Informative. Data are also guarante ed values by the Bidder. These data may only be altered following the Project Ma nager's written consent.

9.3

TECHNICAL SCHEDULES SUBSTATIONS

ST-004 ST-005 ST-006 ST-007 ST-008 ST-009 ST-010 ST-033 ST-012 ST-013

Contactor each type Sets Valve each type Sets 1 Gas ets complete set Sets Silica gel (complete filling) Dial type thermometer Mercury (or similar) thermometer Oil gauge each type Sets Gauge glass each type Sets Glass cylinder for silica gel breather Bushing of each type Sets

1 1 Sets Sets 1 1 Sets 1 Sets 1 1 1 1 Sets

Sets Sets Sets 2 2

SCHEDULE VI-1a TECHNICAL GUARANTEES, OUTDOOR SWITCHGEAR Sheet 1 of 4 OUTDOOR SWITCHGEAR 33 V Reference Doc Item Particulars Unit Guar. Fig Guar. Fig a.2 Circuit Brea ers (Type __________) Brea ing Medium SF6/Vacuum Manufacturer Rated voltage V Maximum service voltage V Rated frequency Hz Rated continuous current A One minute power frequency withstand voltage, dry and wet to earth V rms across open brea er pole V rms Impulse withstand voltage 1.2/50 ms to earth V pea across open brea er Brea ing capacity at rated voltage symmetrical A rms asymmetrical A rms Ma ing capacity A pea Brea ing capacity of capacitive current A

9.3.1

SCHEDULE VI-1a TECHNICAL GUARANTEES, OUTDOOR SWITCHGEAR Sheet 2 of 4 OUTDOOR SWITCHGEAR 33 V Item Particulars Unit Guar. Fig Reference Doc 9.3.1.1.1.1 Circuit brea ers continued Overvoltage factor for disconnection of unloaded transformers (w ithout voltage limitation by lightning arresters) Rated inductive current switching capacity A Permissible 1 second short-time current A rms Dynamic short-time current A pea Opening time, interval of time between the instant of applicatio n of tripping impulse to the instant when the main contacts have separated in al l poles m.sec. Ma e time, interval of time between the initiation of closing op eration and the instant when the current begins to flow in the main circuit m.sec. Total brea time, interval of time between the instant of applic ation of tripping impulse to the instant of final arc extinction in all poles at 100% brea ing capacity m.sec. under phase opposition m.sec. Rate of rise of recovery voltage (RRRV) at 100% short circuit cu rrent 3-phase V/msec 1-phase RRRV out of phase duty V/msec Minimum temperature rise at rated current of main contact C a.3 Earthing Switches Rated short-time current 1 sec. A rms Rated dynamic short-circuit current Ma ing Capacity

SCHEDULE VI-1a TECHNICAL GUARANTEES, OUTDOOR SWITCHGEAR Sheet 3 of 4 OUTDOOR SWITCHGEAR 33 V Item Particulars Unit Guar. Fig Guar. Fig Reference Doc a.4 9.3.1.1.1.2 Current Transformers Manufacturer Rated voltage V Maximum service voltage V Rated frequency Hz One-minute power frequency test voltage of primary winding V rms secondary winding V rms Lightning impulse withstand voltage V pea Rated primary currents A Rated secondary current A Short-time thermal rating 1 second A rms Short-time dynamic rating A pea Burden and accuracy class of measuring core protection core Instrument security factor of the measuring core Accuracy limit factor of the protection core a.5 Voltage Transformers, Type __________ Manufacturer Rated voltage V Maximum service voltage V rms One-minute power frequency test voltage primary winding V rms secondary winding V rms Lightning impulse withstand voltage Burden and accuracy class of a. measuring winding protection winding Ratio V Country of Manufacture Cubicles Circuit brea ers Current transformers Voltage transformers

a.6

SCHEDULE VI-1b INFORMATIVE DATA OUTDOOR SWITCHGEAR Sheet 1 of 3 Item Particulars Unit 33 V b.2 9.3.1.1.1.2.1 Circuit Brea ers Reference standard Type of brea er and designation Voltage drop across main contacts at rated current mV Type of main contact mm Type of arch control device m/s Method of closing Method of tripping Max. percentage of recovery voltage across any brea % Minimum clearance between live parts and earth, in SF6 or vacuu m mm

V pea

Min distances between phases

SCHEDULE VI-1b INFORMATIVE DATA, OUTDOOR SWITCHGEAR Sheet 2 of 3 Item Particulars Unit 33 V Reference Doc Number of opening operations permissible before inspection and m aintenance of contacts, gas treatment etc. at rated current at maximum short circuit current For SF6 brea ers Normal gas density for SF6 circuit brea er (represented by gas p ressure) at 20C Bar at 40C Bar Minimum gas density for safe operation at 20C Bar at 40C Bar Quantity of gas required per 3-pole brea er g Operating pressure of relief device Bar Method of monitoring pressure and temperature compensation Max. permissible dew point temp. C Max. permissible acidity level Max. permissible lea rate %/year For vacuum brea ers Vacuum in brea chamber torr Max. permissible lea rate % For all brea ers Control voltage V DC Type of operating device Motor voltage AC of DC Max. permissible service voltage V Min. service voltage V Starting current of motor Power consumption of motor When starting W When running W Power consumption of Closing coil W Trip coil W Heater W SCHEDULE VI-1b INFORMATIVE DATA, OUTDOOR SWITCHGEAR Sheet 3 of 3 Item Particulars Unit 33 V Reference Doc Auxiliary switch Rupturing current at 110 V DC A Number of free NO contacts Number of free NC contacts Test voltage 50Hz, 1 min. V Manufacturer's of: Support insulators Brea er insulators Operating mechanism 9.3.1.1.1.2.2 NOTE In addition to the characteristics listed above, the following informati on shall be given for all switchgear: Layout and overall dimensions drawings descriptions b.3 9.3.1.1.1.2.3 Earthing Switches

mm

Reference standard Type of isolating switch Min. creepage distance (live parts to earth) mm Min. isolating distance (clearance between open contacts) Current Voltage Material of contact surface Total contact pressure Type of operating device weight of earthing switch Transformers Reference standard Type designation Overall dimensions Total weight of one current transformer g Type of insulation transformers Reference standard Type designation Overall dimensions Total weight of one current transformer g Type of insulation Type of insulation

b.4

b.5

9.3.2

SCHEDULE VI-2a TECHNICAL GUARANTEES, INDOOR MV INDOOR SWITCHGEAR Sheet 1 of 6 MV INDOOR SWITCHGEAR 66 V Item Particulars Unit Guar. Fig. Reference Doc a.1 Cubicles Manufacturer Metal Clad type Rated Voltage V Maximum service voltage V Rated frequency Hz Rated continuous busbar current A One minute power frequency withstand voltage, dry and wet to earth V rms Impulse withstand voltage 1.2/50 ms to earth V pea Permissible 1 second short-time current A rms Dynamic short-time current A pea Arch tested in accordance with IEC 60280 amendment 2 Yes/no

Impulse withstand voltage 1.2/50 ms to earth V pea across open brea er Brea ing capacity at rated voltage symmetrical A rms asymmetrical A rms Ma ing capacity A pea

a.2

Circuit Brea ers (Type __________) Brea ing Medium SF6/Vacuum Manufacturer Rated voltage V Maximum service voltage V Rated frequency Hz Rated continuous current A One minute power frequency withstand voltage, dry and wet to earth V rms across open brea er pole V rms

SCHEDULE VI-2a TECHNICAL GUARANTEES, MV INDOOR SWITCHGEAR Sheet 2 of 6 MV INDOOR SWITCHGEAR 66 V Item Particulars Unit Guar. Fig Reference Doc 9.3.2.1.1.1 Circuit brea ers continued Overvoltage factor for disconnection of unloaded transformers (w ithout voltage limitation by lightning arresters) Rated inductive current switching capacity A Permissible 1 second short-time current A rms Dynamic short-time current A pea Opening time, interval of time between the instant of applicatio n of tripping impulse to the instant when the main contacts have separated in al l poles m.sec. Ma e time, interval of time between the initiation of closing op eration and the instant when the current begins to flow in the main circuit m.sec. Total brea time, interval of time between the instant of applic ation of tripping impulse to the instant of final arc extinction in all poles at 100% brea ing capacity m.sec. under phase opposition m.sec. Rate of rise of recovery voltage (RRRV) at 100% short circuit cu rrent 3-phase V/msec 1-phase RRRV out of phase duty V/msec Minimum temperature rise at rated current of main contact C a.3 Earthing Switches Rated short-time current 1 sec. A rms Rated dynamic short-circuit current Ma ing Capacity

SCHEDULE VI-2a TECHNICAL GUARANTEES, MV INDOOR SWITCHGEAR Sheet 3 of 6 MV INDOOR SWITCHGEAR 66 V Item Particulars Unit Guar. Fig Reference Doc a.4 9.3.2.1.1.2 Current Transformers Manufacturer Rated voltage V Maximum service voltage V Rated frequency Hz One-minute power frequency test voltage of primary winding V rms secondary winding V rms Lightning impulse withstand voltage V pea Rated primary currents A Rated secondary current A Short-time thermal rating 1 second A rms Short-time dynamic rating A pea Burden and accuracy class of measuring core protection core

Brea ing capacity of capacitive current A

a.5

Instrument security factor of the measuring core Accuracy limit factor of the protection core

a.6

SCHEDULE VI-2a TECHNICAL GUARANTEES, MV INDOOR SWITCHGEAR MV INDOOR SWITCHGEAR 66 V Item Particulars Unit Guar. Fig Guar. Fig. a.1 Cubicles Manufacturer

a.6

Country of Manufacture Cubicles

9.3.3

SCHEDULE VI-2b INFORMATIVE DATA MV INDOOR VOLTAGE SWITCHGEAR Sheet 1 of 6 MV INDOOR SWITCHGEAR Item Particulars Unit 66 V Reference Doc b.1 Cubicles Reference standard Type of conductors Conductor material Cross-section of busbars mm2 Cross section of branch off mm2 Temperature rise of busbars at rated current oC Distances between Busbar phases branch offs

Rated Voltage V Maximum service voltage V Rated frequency Hz Rated continuous busbar current A One minute power frequency withstand voltage, dry and wet to earth V rms Impulse withstand voltage 1.2/50 ms to earth V pea Permissible 1 second short-time current A rms Dynamic short-time current A pea Arch tested in accordance with IEC 60280 amendment 2 Yes/no

Voltage Transformers, Type __________ Manufacturer Rated voltage V Maximum service voltage V rms One-minute power frequency test voltage primary winding V rms secondary winding V rms Lightning impulse withstand voltage Burden and accuracy class of a. measuring winding protection winding Ratio V Country of Manufacture Cubicles Circuit brea ers Current transformers Voltage transformers

V pea

Sheet 4 of 6 Reference Doc

mm mm mm

Live parts and earth

mm mm mm

Are busbars insulated? If so state insulation material Class of protection IP Short circuit test certificate designation Overall dimensions of the complete cubicle length height width

m mm Min distances between phases

SCHEDULE VI-2b INFORMATIVE DATA, MV INDOOR SWITCHGEAR Sheet 2 of 6 MV INDOOR SWITCHGEAR Item Particulars Unit 66 V Reference Doc Number of opening operations permissible before inspection and m aintenance of contacts, gas treatment etc. at rated current at maximum short circuit current For SF6 brea ers Normal gas density for SF6 circuit brea er (represented by gas p ressure) at 20C Bar at 40C Bar Minimum gas density for safe operation at 20C Bar at 40C Bar Quantity of gas required per 3-pole brea er g Operating pressure of relief device Bar Method of monitoring pressure and temperature compensation Max. permissible dew point temp. C Max. permissible acidity level Max. permissible lea rate %/year For vacuum brea ers Vacuum in brea chamber torr Max. permissible lea rate % For all brea ers Control voltage V DC

b.2

Thic ness of plates mm Movement in isolator function Hor./vert. Isolation distance mm shutters when isolated or withdrawn? Yes/no Weight of complete cubicle with circuit brea er etc. 9.3.3.1.1.1.1 Circuit Brea ers Reference standard Type of brea er and designation Voltage drop across main contacts at rated current mV Type of main contact mm Type of arch control device m/s Method of closing Method of tripping Max. percentage of recovery voltage across any brea % Minimum clearance between live parts and earth, in SF6 or vacuu

Type of operating device Motor voltage AC of DC Max. permissible service voltage Min. service voltage V Starting current of motor Power consumption of motor When starting W When running W Power consumption of Closing coil W Trip coil W Heater W

SCHEDULE VI-2b INFORMATIVE DATA, MV INDOOR SWITCHGEAR Sheet 3 of 6 MV INDOOR SWITCHGEAR Item Particulars Unit 66 V Reference Doc Auxiliary switch Rupturing current at 110 V DC A Number of free NO contacts Number of free NC contacts Test voltage 50Hz, 1 min. V Manufacturer's of: Support insulators Brea er insulators Operating mechanism 9.3.3.1.1.1.2 NOTE In addition to the characteristics listed above, the following informati on shall be given for all switchgear: Layout and overall dimensions drawings descriptions b.3 9.3.3.1.1.1.3 Earthing Switches Reference standard Type of isolating switch Min. creepage distance (live parts to earth) mm Min. isolating distance (clearance between open contacts) mm Material of contact surface Total contact pressure Type of operating device weight of earthing switch b.4 Current Transformers Reference standard Type designation Overall dimensions Total weight of one current transformer g Type of insulation b.5 Voltage transformers Reference standard Type designation Overall dimensions Total weight of one current transformer g Type of insulation Type of insulation 9.3.4 SCHEDULE VI 3a TECHNICAL GUARANTEES, CONTROL SYSTEM 9.3.4.1.1.1.1.1 Sheet 1 of 1 SUBSTATION CONTROL SYSTEM (SCS) Item Particulars Unit Guar. Fig

a.1

Control system response and update time under "moderate load" conditions The control system shall be designed to yield the following response and update times under "moderate load" conditions Time ta en to completely refresh data held with the SCS: a. maximum b. average s s Time ta en to carry out a complete status chec of all indicatio ns and alarms a. maximum b. average s s The time between selection and display of a VDU diagram fully up dated from the existing main computer data base shall not exceed s

The time between selection of a control function and chec bac shall not exceed s The time between execution of a control function and successful completion being displayed at the Operation Wor shop shall not exceed for a. Circuit brea er (operating time = 250 ms) s b. Isolator (operating time = 10s) s The time between the occurrence of the first change of state/ala rm and display at the Operator Wor station shall not exceed s The time between selecting display of analogue measurements and the corresponding value in the database being displayed shall not exceed s The time between successive updates of the data base with analog ue measurements shall not exceed s a. Networ MW measurements b. Other analogue measurements s s a.2 Equipment Reliability Mean time between failure shall be not less that: Each computer h VDU h Logging printer h System console h Communication system h 9.3.5 SCHEDULE VI 3b INFORMATIVE DATA, CONTROL SYSTEM Sheet 1 of 1 SUBSTATION CONTROL SYSTEM (SCS) Item Description Unit Data b.1 General System Considerations Software Pac age Which RTU communication protocols are supported Real-time database Pac age Is an SQL interface supported Database Management Tool

Pac age Is an SQL interface supported? Man-machine Interface Pac age State type of man-machine interface software

9.3.6

SCHEDULE VI 4a TECHNICAL GUARANTEES, PROTECTION ETC. Sheet 1 of 3 CONTROL, PROTECTION, METERING, SIGNALLING Item Particulars Unit Guar. Fig Reference Doc a.1 Indicating Instruments To be filled in for each AC and DC Ampere meter and Voltmeter an d for each Wattmeter, VAr-meter, Frequency-meter and other indicating instrument s: Instrument for: (A, V (AC), V (DC), W, etc.) Error % Max. admissible current %.IN Max. admissible voltage %.IN a.2 Meters To be filled in for each meter Meter for (MWh, MVArh): Error with 5% load % Error with 10% load % Error with 20% load % Error with 100% load % Max. admissible current %.IN a.3 Metering Converters (Transducers) Converter for (MW, MVAr, A, etc): Error % Linearity % Max. admissible current for 0.5 seconds %.IN Max. admissible current continuously %.IN Max. admissible voltage for 0.5 seconds %.IN Max. admissible voltage continuously %.IN SCHEDULE VI 4a TECHNICAL GUARANTEES, PROTECTION ETC. Sheet 2 of 3

b.2

Operator Wor station Reference standard Type designation Weight g Mounting arrangement VDU Reference standard Type designation Diagonal screen size Usable display area Weight g Mounting arrangement Alphanumeric Keyboard Reference standard Type designation Mounting arrangement

mm max. mm

CONTROL, PROTECTION, METERING, SIGNALLING Item Particulars Unit Guar. Fig Reference Doc a.4 Protection Relays To be copied and filled in for each type of relay as applicable Relay for ____________________: Accuracy of the adjustable tripping time sec. Min. possible tripping time ms Drop out ratio % Directional sensitivity (dist. relay only) %.UN Max. admissible current during 0.5 sec. %.IN Max. admissible current continuously %.IN Relation between tripping coil current and holding coil current (diff. relay only) % Limit value of the adjustable tripping current (O.C.R.) %.IN Limit value of the instantaneous tripping current (O.C.R.) %.IN Limit value of the adjustable tripping voltage (O.V.R.) %.IN Limit value of the instantaneous tripping voltage (O.V.R.) Distance Protection Shall incorporate the following features: . one of ded. Ratings: AC Inputs: 110V, 1Amp (three phase). Power Supply Voltage: 110VDC. (Universal power supply of 30-300VDC is preferred) The relays shall be of Numeric design. Impedance criteria. Three zones phase phase Protection. Three zones phase earth Protection Additional Zone 4 Protection Automatic Switch on to fault. Independent settings for each zone. Distance to fault measurement. Display: On operation, the relay should display the faulted phase(s), time and z operation and distance to fault. IDMT Three Phase/Over current & Earth fault Protection. Fuse failure supervision. Auto- reclose logic 1 and/or 3 phases. Three pole tripping logic. Disturbance and event records including software for disturbance analysis. Fault record should be incorporated. At least six (6) Binary inputs. Mho/Quadrilateral characteristics. Stability against Switching inrush currents and Reverse faults. Clear faulted phase indication. Clear fault identification even for boundary conditions. Software necessary for all above functions shall be provided. Three sets of Installation, Commissioning and maintenance manuals shall be provi

Three phase numeric directional over current and earth fault relay Shall incorporate the following features: Relay must be of Numerical design. Current setting range for over current relay 0.5In-2.4In Current setting range for earth fault relay 0.05In-0.8In Quadrature connection for polarising voltage (Vn=110) Applicable on the LV side of a Dyn1 transformer High set Element, with a setting range of 1-32In The phase and earth directional elements should be individually selectable. I.D.M.T characteristics according to BS 142 or IEC 60255 and Definite time chara

cteristic The normal operating boundary shall be +/-90 degrees from relay characteristic a ngle Relay sensitivity should be 1% of rated value of current and current polari sing voltage at an angle equal to the relay characteristic angle. Time setting multiplier 0.05 - 1.0 Bro en conductor protection feature Negative sequence Protection Feature Highset Element for both over current and earth fault Protection, with a setting range of 1-30In. Thermal Protection. Dedicated Brea er Fail Protection. Circuit Brea er Maintenance Incorporate Fault records, Event Records and disturbance records. Configurable output relays with ability to output starting elements to control T ripping of other upstream Protection relays. Must provide all technical and operations manuals and configurations and setting s software. %.IN

Shall incorporate all the features as listed

Shall incorporate all the features as listed

a.4

Protection Relays To be copied and filled in for each type of relay as applicable Relay for ____________________: Accuracy of the adjustable tripping time sec. Min. possible tripping time ms Drop out ratio % Directional sensitivity (dist. relay only) %.UN Max. admissible current during 0.5 sec. %.IN Max. admissible current continuously %.IN Relation between tripping coil current and holding coil current (diff. relay only) % Limit value of the adjustable tripping current (O.C.R.) %.IN Limit value of the instantaneous tripping current (O.C.R.) %.IN Limit value of the adjustable tripping voltage (O.V.R.) %.IN Limit value of the instantaneous tripping voltage (O.V.R.) Biased differential protection for a two winding transformer. Relay Must be of Numerical design Pic up setting range, 0.1 to 0.5In Should incorporate a high-set Element with a setting range of up to 20In. Magnetising current inrush restraint Integral CT ratio compensation (0.1-2) and vector group compensation Measurement and indication on the MMI, of phase, differential and bias currents Storage of Fault records and Event records; the Fault flags should be accessible on the relay LCD screen without opening the relay cover. Overfluxing restraint Overfluxing protection with Alarm and Trip functions 5th harmonic restraint feature on the differential Element. Appropriate Dual Bias characteristic to ensure relay stability for heavy through faults Should incorporate a disturbance recorder feature. Red L.E.D to indicate Tripping Relay Self diagnostic and Alarm feature Ability to Latch output contacts to prevent TX re-energizing before carrying out investigations. Three phase numeric IDMTL over current and earth fault relay Should incorporate the following Features; Relay must be of Numerical Type Current setting range for over current relay 0.5In-2.4In Current setting range for earth fault relay 0.05In-0.8In I.D.M.T characteristics according to BS142 or IEC 60255 i.e. SI,VI,EI,LTI, inclu ding definite time for the high-set Elements. Time setting multiplier 0.05 - 1.0 Bro en conductor protection feature Negative sequence Protection Feature Highset Element for both over current and earth fault

Restricted Earth fault relay Relay must be of Numerical type Relay should reject harmonics produced by C.T saturation The offer should include the associated stabilising resistor and voltage depende nt resistor (metrosil) Current setting range 0.05-0.8In Operating time < 25ms at 5 times the setting %.IN

Shall incorporate all the features as listed

Shall incorporate all the features as listed

ripping

Protection, with a setting range of 1-30In. Thermal Protection Dedicated Brea er Fail Protection. Circuit Brea er Maintenance Fault records, Event Records and disturbance records. Configurable output relays with ability to output starting elements to control T of other upstream Protection relays. Drop off /pic up ratio >90% Low transient overreach < 10%

Shall incorporate all the features as listed SCHEDULE VI 4a TECHNICAL GUARANTEES, PROTECTION ETC. Sheet 3 of 3 CONTROL, PROTECTION, METERING, SIGNALLING Item Particulars Unit Guar. Fig Reference Doc a.5 Auxiliary Circuit Brea ers To be filled in for each type of AC and DC brea er: Min. operating voltage %.UN Max. operating voltage %.UN Drop out voltage V Service life (min. number of contact operation) a.6 Manufacturer's Name Control room boards Local relay boards Protection relays Auxiliary contactors Country of Manufacture Control room boards Local relay boards Protection relays Auxiliary contactors

a.7

9.3.7

SCHEDULE VI 4b INFORMATIVE DATA, PROTECTION ETC. Sheet 1 of 2 CONTROL, PROTECTION, METERING, SIGNALLING Item Particulars Unit Data Reference Doc b.1 Indicating Instruments To be filled in for each type of instrument: Reference standard Type (moving coil, iron type, etc.) Consumption of internal resistance VA/ohm Size mm b.2 Meters To be filled in for each type of meter: Reference standard Type Consumption of internal resistance VA/ohm Size mm b.3 Metering Converters (Transducers) To be filled in for each type for converter: Reference standard Type Consumption, current VA Consumption, voltage VA Time constant ms Size mm b.4 Alarm Annunciators To be filled in for each annunciator panel: Reference standard Type Number of annunciators

b.5

Control -

Size of each annunciator (area of the cap) Total size of panel mm Room Board Height m Width mm Length mm Relay boards Height Width Length

mm

SCHEDULE VI 4b INFORMATIVE DATA, PROTECTION ETC. Sheet 2 of 2 CONTROL, PROTECTION, METERING, SIGNALLING Item Particulars Unit Data Reference Doc b.6 Protection Relays To be copied and filled in for each relay with the applicable items of t he data below: Relay for ____________________: Reference standard Consumption VA Limit values of the adjustable tripping time sec. Limit values of the adjustable sensitivity % Limit values of the adjustable operating quantity (current, volt age, frequency, etc.) in % of normal % Limit values of the instantaneous operating quintet in % of nomi nal value % Size mm For distance relay only: Starting impedance adjustable between ohm/ph Earth fault tripping current adjustable between x.IN b.6 ow: Relay for ____________________: Reference standard Consumption VA Limit values of the adjustable tripping time sec. Limit values of the adjustable sensitivity % Limit values of the adjustable operating quantity (current, volt age, frequency, etc.) in % of normal % Limit values of the instantaneous operating quintet in % of nomi nal value % Size m For distance relay only: Starting impedance adjustable between ohm/ph Earth fault tripping current adjustable between x.IN 9.3.8 9.3.9 SCHEDULE VI 5b INFORMATIVE DATA, CABLES Sheet 1 of 2 POWER CABLES, CONTROL CABLES, CABLE RACKS Item Particulars Unit Data Reference Doc b.1 Low Voltage Cables Conductor material Insulation material Armouring/screen Protective coating Overall diameter of cable of biggest cable Protection Relays To be filled in for each relay with the applicable items of the data bel

mm/mm b.2 Control and Measuring Cables Conductor material Insulation material Armouring/screen Protective coating Overall diameter of cable of biggest cable Weight of heaviest reel, including cable Size of biggest reel, diameter/width mm/mm b.3 Special Cables To be used for: Relevant informative data

9.3.10 9.3.11 SCHEDULE VI 5b INFORMATIVE DATA, CABLES Sheet 2 of 2 POWER CABLES, CONTROL CABLES, CABLE RACKS Item Particulars Unit Data Reference Doc 11 V Voltage Cables Conductor material Insulation material Armouring/screen Protective coating Overall diameter of cable of biggest cable Weight of heaviest reel, including cable Size of biggest reel, diameter/width mm/mm 33 V Voltage Cables Conductor material Insulation material Armouring/screen Protective coating Overall diameter of cable of biggest cable Weight of heaviest reel, including cable Size of biggest reel, diameter/width mm/mm 33 V Voltage Cables Conductor material Insulation material Armouring/screen Protective coating Overall diameter of cable of biggest cable Weight of heaviest reel, including cable Size of biggest reel, diameter/width mm/mm

Weight of heaviest reel, including cable Size of biggest reel, diameter/width

mm g

mm g

mm g

mm g

Special Cables, Optical fibre Relevant informative data

9.3.12 SCHEDULE VI 6a TECHNICAL GUARANTEES, EARTHING Sheet 1 of 1 EARTHING SYSTEM Item Particulars Unit Guar. Fig Reference Doc a.1 Resistance to Earth of Earthing Electrode System (for each substation) Under the control building max. ohms Under the switchyard max. ohms Complete earthing system ohms

9.3.13 SCHEDULE VI 6b INFORMATIVE DATA, EARTHING Sheet 1 of 1 EARTHING SYSTEM Item Particulars Unit Data Reference Doc b.1 Reference standard Material of earth conductor Max. temp of any earth conductor during 1 sec. rated phase - gro und fault Method of interconnecting earth grid conductors

9.4 9.4.1

TECHNICAL SCHEDULES TRANSFORMERS SCHEDULE VI 7a - TECHNICAL GUARANTEES, POWER TRANSFORMERS Sheet 1 of 7

HV POWER TRANSFORMERS Guaranteed Data Item Description Unit 23MVA 66/33KV 2.5MVA 1. Continuous maximum rating on any tapping when operation under the ambien t conditions specified in Section VI, Clause 4.1.3.2.1 Design criteria: With ONAN cooling; HV winding MVA LV winding MVA TV winding MVA With ONAF cooling; HV winding MVA LV winding MVA TV winding MVA 2. 3. Rated frequency Hz Rated no-load voltage at rated frequency on: HV, principal tapping V HV, extreme plus tapping HV, extreme minus tapping LV, V TV, V 4.

Tapping ranges from principal tapping: HV, no of plus tappings HV, no of minus tappings HV, steps in % of rated voltage %

5. W 6. A

No-load losses at rated voltage and frequency No-load current at rated voltage and frequency

V V

SCHEDULE VI-7a - TECHNICAL GUARANTEES, POWER TRANSFORMERS

Sheet 2 of 7

HV POWER TRANSFORMERS Guaranteed Data Item Description Unit 23MVA 66/33KV 2.5MVA 7. Load losses at 75oC at rated currents, the third winding being open:

9. Total losses at 75oC on principal tapping and unity power factor and rat ed currents: ONAN W ONAF including input to cooling plant

10. Impedance voltages at 75o referred to mutual capacities at rated frequen cy and 100% rating: Principal tapping: HV HV LV HV HV LV LV, TV, TV, LV, TV, TV, ONAN ONAN ONAN ONAF ONAF ONAF % % % % % % -

SCHEDULE VI-7a - TECHNICAL GUARANTEES, POWER TRANSFORMERS HV POWER TRANSFORMERS Guaranteed Data Item Description Unit 23MVA 66/33KV Extreme plus tapping: HV HV LV HV HV LV LV, TV, TV, LV, TV, TV, ONAN ONAN ONAN ONAF ONAF ONAF % % % % % % 2.5MVA

Extreme minus tapping: HV - LV, ONAN HV - TV, ONAN % % -

8.

Cooling plant power consumption

HV HV LV HV HV LV

LV, TV, TV, LV, TV, TV,

ONAN ONAN ONAN ONAF ONAF ONAF

W W W W W W

Sheet 3 of 7

LV HV HV LV

TV, LV, TV, TV,

ONAN ONAF ONAF ONAF

% % % %

11. Temperature rise after continuous operation with rated MVA, under the am bient conditions specified in Section VI, Clause 4.1.3.2.1 and the rated conditi ons giving the highest losses: Top oil (by thermometer) oC Windings (by resistance) oC 12. Efficiency on principal tapping max. temperature of winding and unity po wer factor and TV winding open: 120% load, ONAN 100% load, ONAN 50% load, ONAN 120% load, ONAF 100% load, ONAF 50% load, ONAF % % % % % %

SCHEDULE VI-7a - TECHNICAL GUARANTEES, POWER TRANSFORMERS

Sheet 4 of 7

HV POWER TRANSFORMERS Guaranteed Data Item Description Unit 23MVA 66/33KV 2.5MVA 13. Inherent voltage regulation on principal tapping, 75oC and unity power f actor: % 14. Inherent voltage regulation on principal tapping, 75oC and 0.8 power fac tor lagging: % 15. 16. 17. 18. Vector group TV winding open % 80% of full load on LV winding and 20% on TV winding TV winding open % 80% of full load on LV winding and 20% on TV winding

No. of phases per transformer Type of cooling -

Whether star connected windings shall be fully insulated or graded HV winding LV winding -

19.

Insulation levels of star points

20.

Method of system earthing: HV system -

HV winding LV winding

V V

LV system

SCHEDULE VI-7a - TECHNICAL GUARANTEES, POWER TRANSFORMERS HV POWER TRANSFORMERS Guaranteed Data Item Description Unit 23MVA 66/33KV 21. Method of transformer earthing: 22. 23. 24. 2.5MVA

Sheet 5 of 7

HV windings - star point LV windings - star point TV winding - one corner of closed delta -

Whether TV windings are to be brought out to separate bushing insulators Indoor or outdoor installation System highest voltage according to IEC:

25. Maximum flux density at rated voltage on principal tapping and rated fre quency: 26. Transformer legs Transformer yo es T T

Maximum flux density at most onerous voltage and frequency conditions: Transformer legs Transformer yo es T T

SCHEDULE VI-7a - TECHNICAL GUARANTEES, POWER TRANSFORMERS Sheet 6 of 7 HV POWER TRANSFORMERS Guaranteed Data Item Description Unit 23MVA 66/33KV 2.5MVA 28. Maximum current density in windings at rated output: HV, HV, LV, LV, TV, TV, 29. A higher voltage, ONAN lower voltage, ONAF A/mm2 ONAN A/mm2 ONAF A/mm2 ONAN A/mm2 ONAF A/mm2 A/mm2

Magnetising current at rated nominal voltage on principal tapping

27.

Specific core loss

HV LV TV

V V V

W/ g

30. 31. 32. 33.

Maximum hot spot temperature of winding oC Equivalent resistance referred to HV side Equivalent reactance referred to HV side Maximum current carrying capacity of bushings: HV LV TV A A A ohms ohms

34.

Rated service voltage of bushings: HV V LV V TV V HV, neutral LV, neutral

SCHEDULE VI-7a - TECHNICAL GUARANTEES, POWER TRANSFORMERS HV POWER TRANSFORMERS Guaranteed Data Item Description Unit 23MVA 66/33KV 2.5MVA 35. 1 minute, 50 Hz dry withstand voltage: HV bushing V LV bushing V TV bushing V HV, LV neutral bushings 36.

1 minute, 50 Hz wet withstand voltage: HV bushing V LV bushing V TV bushing V HV, LV neutral bushings

37.

Impulse withstand voltage:

38.

Maximum noise level

Transformer and tap changing equipment energised and at no-load with ONAN cooling dB dB Same as above but with ONAF cooling (fans running)

HV bushing LV bushing

V V

V V

Sheet 7 of 7

9.4.2

SCHEDULE VI-7b - INFORMATIVE DATA, POWER TRANSFORMERS

Sheet 1 of 9 HV POWER TRANSFORMERS Item Description Unit 23MVA 66/33KV 2.5MVA 1. Type of transformer (core or shell type) 2. 3. Number of core legs Type of windings: HV LV TV Type of insulation: HV, winding LV, winding TV, winding -

4.

Tappings Tapping connection Core bolts (if any) Core bolt washers (if any) Core lamination designation Specific core loss w/cm3 5. Type of axial coil supports: HV winding LV winding TV winding Winding conductor material HV LV -

6.

7. 8.

Type of joints in the magnetic core (butt type, interleaved etc.) Calculated thermal time constant: ONAN hours ONAF hours

SCHEDULE VI-7b - INFORMATIVE DATA, POWER TRANSFORMER HV POWER TRANSFORMERS

Sheet 2 of 9

Item 9.

Description Unit Type of bushings: HV LV TV HV, LV neutral -

23MVA 66/33KV

10.

Principal bushing insulator materials: HV LV TV HV, LV neutral -

11.

Total creepage distance over porcelain externally: HV bushing LV bushing mm mm

HV bushing LV bushing

Sides mm Bottom mm Top mm

15.

Number of radiators per transformer

SCHEDULE VI-7b - INFORMATIVE DATA, POWER TRANSFORMER HV POWER TRANSFORMERS Item Description Unit 23MVA 66/33KV 16. On-load tap changer: Type (resistor type, reactor type, etc.) Total number of tappings including principal Rated currents of: Selector switch A Diverter switch A Resistors A

Maximum overcurrent of: Driving Selector switch Diverter switch Resistors motor input A A A W

14.

Thic ness of radiator plates

13.

Thic ness of transformer tan :

12.

Protected lea age distance over porcelain externally (90o shadow) mm mm

mm -

Sheet 3 of 9

Type of driving motor (3-phase etc.) Monitoring contact: sec. sec.

Closing time in advance of parting of diverter switch Opening time after diverter switch contacts have fully opened

Diverter switch opening time sec. Time from point of no return to parting of diverter switch contacts sec. 17. Whether outdoor cabinets/ ios s are provided with heaters

SCHEDULE VI-7b - INFORMATIVE DATA, POWER TRANSFORMER HV POWER TRANSFORMERS Item Description Unit 23MVA 66/33KV 18. Forced air cooling system:

State if fans are blowing directly on radiators Total number of fan units per transformer Cooling capacity of each complete cooling system W Total oil quantity in completely filled transformer Total weight of oil in completely filled transformer Total oil quantity in conservator l

19. p 20. l 21. 22. l 23. 24.

Total quantity of oil in conservator between highest and lowest level Volume of conservator tan l g

26.

Weight of each radiator: Filled with oil g Empty g

27.

Total weight of bushings:

HV LV

g/each g/each

25.

Weight of core/winding assembly g

Weight of copper in windings

Sheet 4 of 9

SCHEDULE VI-7b - INFORMATIVE DATA, POWER TRANSFORMER Sheet 5 of 9 HV POWER TRANSFORMERS Item Description Unit 23MVA 66/33KV 2.5MVA 28. Total weight of complete transformer erected at site tons 29. tons 30. Weight of transformer as arranged for transport Filling medium during transport -

31. Overall dimensions of transformer completely erected at site, including bushings, radiators: Length mm Width mm Height mm 32. Overall dimensions of transformer arranged for transport: Length mm Width mm Height mm 33. Maximum lift of core/winding assembly incl. lifting beam, slings, etc. f or untan ing mm 34. 35. 36. 37.

SCHEDULE VI-7b - INFORMATIVE DATA, POWER TRANSFORMER Sheet 6 of 9 HV POWER TRANSFORMERS Item Description Unit 23MVA 66/33KV 2.5MVA 38. Efficiency of fan motors % 39. 40. Power factor of fan motors at rated output Material in rating and diagram plates %

Rated output per fan unit Speed of fan motors rpm

m3/min.

Continuous rating of fan motors Hp Starting current of fan motors A

41. n -

Are on-load tap changing equipment prepared for fully automatic operatio

42. Are on-load tap changing equipment prepared for local, remote control (c ontrol room) and supervisory (NCC) operation and indication 43. Are on-load tap changing equipment prepared for fully automatic parallel operation with similar transformers 44. 45. 46. Whether first filling of oil is included -

Whether tap changer cubicle and wiring cabinet are provided Whether winding, and top oil indicators are provided

47. Whether cooling fans are automatically operated from the winding tempera ture indicators 48. 49. Whether pressure relief device is to be fitted Whether Buchholz relay is fitted -

SCHEDULE VI-7b - INFORMATIVE DATA, POWER TRANSFORMER Sheet 7 of 9 HV POWER TRANSFORMERS Item Description Unit ____MVA ____MVA 50. Whether all internal cabling/wiring on transformer is supplied to form a complete self contained unit 51. Are the following alarms/trip signals provided: Tap changer not operating, alarm Tap changers out of step, alarm Voltage transformer failure Fan failure, alarm Oil/gas flow transformer, alarm Oil/gas flow transformer, trip On load tap changer protective relay operated, trip Oil gauge low level, alarm Oil gauge low level, trip Tap changer oil gauge level low, alarm -

Tap changer oil gauge level critical, trip Top oil temp. high, alarm Top oil temp. critical, trip Winding temp. high, alarm Winding temp. critical, trip 52.

Are the following temperature indicators provided: HV winding LV or common winding TV winding

SCHEDULE VI-7b - INFORMATIVE DATA, POWER TRANSFORMER Sheet 8 of 9 HV POWER TRANSFORMERS Item Description Unit ____MVA ____MVA 53. Are the following oil level gauges provided:

54. 55. 56.

Tap change indicator provided Tap change in progress indicator

Tap changer out of step indicator

57. Potentiometer switch for remote/supervisory on-load tap changer position indicator 58. Will the tests specified in Section 3-II - Clause 10 be adhered to? If deviations, please state underneath

Main conservator tan On-load tap changer conservator tan

SCHEDULE VI-7b - INFORMATIVE DATA, POWER TRANSFORMER HV POWER TRANSFORMERS Item Description Unit 7.5MVA 2.5MVA 59. State all Standards applied underneath:

Sheet 9 of 9

60. State identity of transformer manufacturer and all sub-manufacturers inc luding the parts manufactured below: Transformer: Cooling equipment On-load tap changer Current transformers Bushings Core steel Oil Buchholz relay Breather Thermometer Other equipment to be listed by the Bidder: -

9.5

SCHEDULE VI 8a - TECHNICAL GUARANTEES, DISTRIBUTION TRANSFORMERS Sheet 1 of 2 DISTRIBUTION TRANSFORMER Guaranteed Data Item Particulars Unit 50KVA 33/0.433 V

2.

Normal voltage between phases at no load a) H.V. b) L.V. Volts Volts

3.

Tappings a) Plus b) Minus % %

1.

Continuous Maximum Rating C.M.R.

VA

4.

Performance Data at Sea Level, corrected at 75% a) b) c) d) e) f) g) No load loss at normal primary voltage watts No load loss at 10% primary over voltage Load loss at C.M.R. watts Impedance volts at C.M.R. and normal ratio Regulation at C.M.R. and unity power factor Regulation at C.M.R. and 0.8 power factor Max temperature rise at C.M.R.: i) Top oil by thermometer oC ii) Average winding by resistance iii) Hot Spot corresponding to (ii) watts % % %

SCHEDULE VI-8a - TECHNICAL GUARANTEES, DISTR. TRANSFORMERS DISTRIBUTION TRANSFORMER Guaranteed Data Item Particulars Unit 50KVA 33/0.433 V 5. Type of insulation used on windings a) H.V. b) L.V. 6. Lightning Impulse Insulation level of:

Sheet 2 of 2

7. Are test certificates supplied supporting the level stated in Clause 6 Yes/No 8. Silica gel Breather

a) b)

Ma e of unit fitted Size of unit

a) b) c)

H.V. winding Vp L.V. winding Vp Tap change equipment and connections i) To earth Vp ii) Between contacts Vp

9.6

SCHEDULE VI-8b - INFORMATIVE DATA, DISTRIBUTION TRANSFORMER Sheet 1 of 2 DISTRIBUTION TRANSFORMER Item Particulars Unit 50KVA 33/0.433 V 1. 2. Transformer type (sealed or breathing) Type of windings HV LV 3. Type of insulation HV winding LV winding 4. 5. 6. Type of tap changer Tap changer designation Type of axial coil supports HV winding LV winding 7. Winding conductor material HV winding LV winding 8. 9. 10. Core laminations designation Specific core loss Type of bushings HV LV w/cm3 -

9.7 of 2

SCHEDULE VI-8b - INFORMATIVE DATA DISTRIBUTION TRANSFORMERS

11.

Bushing insulator material HV

DISTRIBUTION TRANSFORMER Item Particulars Unit

50KVA

33/0.433 V

Sheet 2

LV 12. Creepage distance across bushings HV LV 13. 14. 15. 16. 17. mm mm

Type of cooling system

Total weight

Overall dimensions Length mm Width mm Height mm

18.

State all standards applied underneath:

19.

State identity of manufacturer underneath:

9.8

SCHEDULE VI-9a- GAURANTEE DATA TELECOMMUNICATION SYSTEM

UHF Lin Radios Type: Item 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Particulars Unit Employer's requirement Tender Value Output Power W 1 - 25 Sensitivity (12dB SINAD) V 0.35 Frequency Range MHz 403 - 420 Frequency Stability ppm + 2 Channel Spacing Hz 12.5/20/25 Channel capacity Signaling standards CCIR, ZVEI and EEA Mode of Operation Simplex/semi-duplex/duplex Antenna connectors N-female Antenna impedance 50 Temperature range OC -30 to + 60 Voltage (nominal) V DC 13.2 Designed for continuous-duty cycle operation Y/N Power consumption @ full power W Power consumption, standby mode W Mounting Rac or wall-mounting brac et

Volume of conservator tan

Total oil quantity

9.9 SCHEDULE VI-9b- GAURANTEE DATA TELECOMMUNICATION SYSTEM UHF Lin Antenna Type: Item 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

9.10 SCHEDULE VI-9c- Guaranteed Technical specifications for fig-8 Particular technical specifications Telecommunication) fibre optic cable Item Feature Minimum requirement Tendered offer 1 Maximum Operating Load 9000 N 2 Minimum Bending Radius Installation Long Term 20xO.D. 10xO.D. 3 Max. Compressive Loading 4000 N / 10 cm 4 Impact Resistance 4.4 J, 3 x 2 times 5 Twist (Torsion) 10 turns of 180 on 125xO.D.sample, both ways. 6 Storage Temperature Range -50 C to +70 C 7 Operating Temperature Range - 40 C to +70 C 8 Core Fluid Penetration 1 m sample, 1 m water head for 24 Hrs 9 Distance Between Poles Up to 100M 10 Warranty 15 years 11 UV Resistance 12 Outer Cable Mar ings Property of Kenya Power & Lightening Company 13 Pac ing Rolls for various sections to be determined by distance between section poles but not less than 1000M 14 Length mar ing Every meter

Particulars Unit Employer's requirement Tender value Antenna Type Frequency band (minimum) MHz 400 - 420 Impedance 50 Polarization Vertical or horizontal Gain dBi > 10 Front to bac ratio db > 20 Half-power Beam Width, vertical deg. < 40 Half-power Beam Width, Horizontal deg. < 50 Bandwidth MHz > 10 SWR < 1.5:1 Max. power W 150 Connection N-female Mounting On 30-58 mm tube Wind survival rating m/s Wind surface m2 Wind load @ 40 m/s N Weight g Dimensions mm

15 Color Grey (to ma e it unique) 16 Performance Allowed attenuation per Km for the 9/125 micron single m ode fiber optic cable 1310 0.4 db 1550 0.3 db 17 Fusion splice loss Maximum allowed loss 0.1db

SCHEDULE VI-9d- Guaranteed Technical specifications for ADSS specified in partic ular technical specification -Guaranteed General specifications for Approach cab le item Feature Description Tendered offer 1 Maximum Operating Load 9000 N 2 Minimum Bending Radius Installation Long Term 20xO.D.

10xO.D. Max. Compressive Loading 4000 N / 10 cm 3 Impact Resistance 4.4 J, 3 x 2 times 4 Twist (Torsion) 10 turns of 180 on 125xO.D.sample, both ways. 5 Storage Temperature Range - 50 C to +70 C 6 Operating Temperature Range - 40 C to +70 C 7 Core Fluid Penetration 1 m sample, 1 m water head for 24 Hrs 8 Warranty 15 years 9 Manufacturer Factory Location 10 UV Resistance 11 Outer Cable Mar ings Property of Kenya Power & Lightening Company 12 pac ing Rolls of 1000M per drum 13 Length mar ing Every meter 14 Color Grey (to ma e it unique) 15 Performance Loss per Km for single mode 9/125 1310 < 0.4db 1550 <0.3db 16 Splice loss < 0.1 db

SCHEDULE VI-9e- Guaranteed Technical specifications for ADSS specified in partic ular technical specification - Guaranteed General specifications for Optical Dis tribution frame (ODF) Item Feature Minimum requirement Tendered offer 1 Fiber optic ODF Fiber optic patch panel 48 ports SM wall mounted with e nclosure splice tray cassette, pigtails terminated on SC connectors