Eaw KF750
Eaw KF750
Eaw KF750
TR-0750 Truss
Figure 1
Single Cabinet application Capture the hoist ring of the truss with suitable rigging equipment (Figure 3). Be sure that all hardware, fasteners, cables and lifting chains are fitted and secured before hoisting the truss/speaker assembly.
When hoisting, lift entire system a short distance and check each and every connection thoroughly before proceeding.
Figure 3 Single cabinet Application
2000 APC Incorporated, Signal Hill, CA 90806 USA (562) 424-1100
040301
Two Cabinet Array Application Permanently bolt two truss/speaker assemblies together using the two side holes of the truss with a hex bolts and washers. Capture the hoist ring of each truss with suitable cable or equivalent rigging equipment and bridle to a pear ring or other suitable link (Figure 4). Be sure that all hardware, fasteners, cables and lifting chains are fitted and secured before hoisting the truss/speaker array assembly.
When hoisting, lift entire system a short distance and check each and every connection thoroughly before proceeding.
Three Cabinet Array Application Permanently bolt three truss/speaker assemblies together using the two side holes of the truss with a hex bolt and washers. Capture the hoist ring of the two outside trusses with suitable cable or equivalent rigging equipment and bridle to a pear ring or other suitable link (Figure 5). Be sure that all hardware, fasteners, cables and lifting chains are fitted and secured before hoisting the truss/speaker array assembly. Figure 5: When hoisting, lift entire system a Three Cabinet Application short distance and check each and every connection thoroughly before proceeding. Four Cabinet Array Application Permanently bolt four truss/speaker assemblies together using the two side holes of the truss with a hex bolt and washers. Capture the hoist ring of the two left trusses with suitable cable or equivalent rigging equipment and bridle to a pear ring or other suitable link (Figure 6).
Repeat procedure to the other two right trusses then bridle the two bridles together using a pear ring or other suitable link (Figure 6). Be sure that all hardware, fasteners, cables, and lifting chains are fitted and secured before hoisting the truss/speaker array assembly. When hoisting, lift entire system a short distance and check each and every connection thoroughly before proceeding.
Five Cabinet Array Application Permanently bolt five truss/speaker assemblies together using the two side holes of the truss with a hex bolt and washers. Capture the hoist ring of the three left speakers with suitable cable or equivalent rigging equipment then bridle to a pear ring or other suitable link (Figure 7).
Repeat procedure to the three right speakers (Figure 7). Be sure that all hardware, fasteners, cables and lifting chains are fitted and secured before hoisting the truss/speaker array assembly. When hoisting, lift entire system a short distance and check each and every connection thoroughly before proceeding.
2000 APC Incorporated, Signal Hill, CA 90806 USA (562) 424-1100
040301
This TR-0750-LT suspension truss supports the Eastern Acoustic Works KF700 series touring speakers only. Do not use for any other purpose. Important: Rigging loudspeakers requires experienced, trained professionals. Improperly installed loudspeakers can result in property damage, personal injury, death and/or liability to the installing contractor. Due to the wide variety of overhead structures, materials and rigging combinations, these instructions assume that the installing contractor will exercise proper judgment in selecting the proper rigging location and rigging equipment. As a guide, the installation, when completed, should be capable of supporting between ten times the actual combined applied load. Read these important instructions for the best rigging results. Do not exceed the working load limit of 1025 lbs./466 Kg. Use only Grade 8 hardware. This truss supports a maximum of 5 KF750 speakers in a vertical column. Make sure that all of the following items are included before proceeding: 1 pc. TR-0750-LT truss 1 pc. Hardware Kit Box contents: 1 pc. U-Hanger assembly 2 pcs. Split lock washer,grd 8 1 pc. Hoist ring, 2500 lbs WLL 8 pcs. Flat washer, grd 8 1 pc. -10 Hex nut, grd 8 2 pcs. -13 Nylock hex nut, grd 8 5 pcs. Flat washer, grd 8 2 pcs. -13 x 5.5 Hex bolt, grd 8 2 pcs. -10 x 2.5 Hex bolt, grd 8 4 pcs. -13 Eyebolt 2 pcs. -10 Nylock hex nut, grd 8 Step 1. Attach speaker to truss bar See fixed cable instruction that comes with the speaker or the attached TR-009-FC fixed cable instruction sheet. Step 2. Place the TR-0750-LT truss on a flat surface making sure the arrows of the This End Up labels and the four threaded holes face upward. Step 3. Attach four 1/2-13 eyebolts and 1/2 washers to the four threaded holes of the truss (Figure 1). Tighten the eyebolts permanently. Step 4. Array/Cluster Procedures Before starting, be sure that all the rigging gear above the truss bar can support ten times the actual gross weight of the suspended system (1025 lbs./466 kg.).
Figure 1
Figure 2
03/01/01
Single Cabinet application Attach one end using suitable rigging gear such as aircraft cables, lifting chain or span sets to each eyebolt using a rated shackle or other suitable rigging fasteners. Loop the unattached end of the rigging gear over the overhead rigging truss or beam and attached back to the eyebolt. Repeat for other three eyebolt (Figure 3).
Lift the entire system a short distance and check all hardware, fasteners, and lifting gear in the system to be sure they are fitted, aimed and secured thoroughly before proceeding.
Two or more Cabinet Array Application Permanently bolt two truss/speaker assemblies together using the two side holes of the truss with -10 x 2.5 hex bolts, lock and flat washers and nylock nut. Attach one end using suitable rigging gear such as aircraft cables, lifting chain or span sets to each eyebolt using a rated shackle or other suitable rigging fasteners. Loop the free end of the gear to the overhead rigging truss or beam and closing the loop to the other end of the gear (Figure 4 and 5).
Lift the entire system a short distance and check all hardware, fasteners, and lifting gear in the system to be sure they are fitted, aimed and secured thoroughly before proceeding.
1635 E. Burnett Street Signal Hill, CA 90806 USA Tel: (562) 424-1100 Fax: (562) (562) 424-1100 2001 APC Incorporated, Signal Hill, CA 90806 USA 424-3520
Web Page: www.allenproducts.com
03/01/01