UNDERGROUND STRUCTURES
Our design technology may be 10 years ahead but our work ethics remains 50 years behind
29.09.2011
DESCRIPTION OF PROJECT
The project is situated on the 8-lane Barakhamba Road, which is an arterial road of Connaught Place with prestigious and high-rise commercial establishments on either side. Careful planning was required in the execution of work to ensure that at least four lanes were available to existing traffic at all times. The project consists of a double track underground station (250 m long, 30 m wide) with rectangular tunnel on either side. Total length of project is 645 m constructed by cutand-cover method with top down approach with maximum depth of excavation as 18 m. Diaphragm wall was preferred over other methods such as sheet piling, soldier piles etc. to avoid excessive noise as well as to minimize the effect of construction on buildings in the vicinity. Seismic analysis for the project was carried out adopting state-of-art methodology for underground structures.
MRTS VIADUCTS
DMRC PHASE-II DESIGN CONTRACTS: UNDERGROUND STRUCTURES VISWA VIDHYALAYA JAHANGIRPURI UNDERGROUND CORRIDOR (DMRC CONTRACT BC-2)
Client: SENBO Engineering Ltd DESCRIPTION OF PROJECT
Structural design consultancy for underground tunnel from ch. 10015 to ch 8857, with station at GTB Nagar (250 m long, 30 m wide). Tunnels are provided on either side of the station, with a ramp at one end. The structure supports two tracks with maximum depth of 17.0m. The highlight of the project was the crossing beneath th flowing water of Najafgarh Drain
SERVICES PROVIDED
Detailed Engineering & Approval of DMRC Specialist Advice during construction
Structural Design Consultancy for Underground Stations and Tunnel with Cut & Cover And Top Down Construction Including Temporary Works. CENTRAL SECRETARIAT-GURGAON CORRIDOR (DMRC CONTRACT BC-16)
Client: CEC-SOMA JV
DESCRIPTION OF PROJECT
The project comprises of 4 nos. underground stations and tunnels between ch.21150.80m to 24600.00m. The stations are at Race Course, Jorbagh, INA and AIIMS. All the stations were constructed by cut and cover method. 800mm thick Diaphragm walls were installed for top down method of construction. The length of each station is 318m & width is 21m including 20m workshaft areas of both ends for launching & retrieval of Tunnel Boring machines. The stations consist of island platform with trains on both sides. The clear span for the roof slab is 20.65m The project was done in association with M/s CECI, Taiwan. TCPL involvement was to design all stations & temporary structures etc. while the Tunnel and workshaft designs were carried out by M/s CECI Taiwan
SERVICES PROVIDED
Detailed Engineering & Approval of DMRC Specialist Advice during construction
MRTS VIADUCTS
SERVICES PROVIDED
Detailed Engineering & Approval of DMRC Specialist Advice during construction
Chennai Metro Rail Corporation Ltd. DETAIL DESIGN OF UG STATIONS AND TUNNELS
Client: Afcons Transtunnelstroy JV PROJECT PERIOD : OCT 2010 ONWARDS PRELIMINARY DESIGN DURING TENDERING
The project consisted of tunnel and 19 nos. UG stations for The North South and East West Lines of Chennai Metro Rail Corporation. The design and planning for all activities related to Under ground stations, D-walls, Workshaft areas, Calculation of BOQs, drawings for tender, Instrumentation schemes etc. done for the contractor to bid for the project.
MRTS VIADUCTS
VEHICULAR UNDERPASSES
COMPLETE VIEW
DURING CONSTRUCTION
SERVICES PROVIDED
Tender Preparation Detailed Engineering Specialist advice during construction.
RAILWAY UNDER BRIDGE AT RAILWAY CROSSING NO. 7 BETWEEN SHALIMAR BAGH AND AZADPUR FRUIT MANDI, DELHI
CLIENT: PWD GNCTD
DESCRIPTION OF PROJECT The project comprises construction of underpass using box pushing technique below railway track and rest of the portion to be constructed using diaphragm wall (D-Wall). The railway part within their ROW shall be got constructed by them and the portion that is outside the Railway Row shall be got constructed by PWD. Use of D-wall makes it possible to create a retaining wall with in the constrained space which is not possible in case of a conventional Retaining Wall. Similarly Box pushing makes it possible to create underpassage below live Railway Tracks. SERVICES PROVIDED
Tender Preparation Detailed Engineering Specialist advice during construction.
UNDERPASSES
SERVICES PROVIDED
Tender Preparation Detailed Engineering Specialist advice during construction.
UNDERPASSES
The project involved construction of a vehicular underpass of length 680m (approx.). The total diaphragm wall length involved in the project is around 750m which was designed for various excavation & construction stages anticipated to occur during construction. It also includes RCC base slab with tension piles and RCC voided slab at deck level integral with diaphragm wall in the closed portion of the underpass provided for traffic movement at ground level.
UNDERPASSES
UNDERPASSES AT BADARPUR
CLIENT: HINDUSTAN CONSTRUCTION CO The project involves construction of 7 vehicular underpass and 3 pedestrian underpasses. Construction method of Vehicular Underpass is RCC/PSC voided slab supported over pier shaft. Construction method of Pedestrian Underpass is RCC Precast Box
UNDERPASSES