Year of order 2005 Customer Country Site Name Amagerforbrndingen Denmark Amager 2005 Reno Syd Denmark Skanderborg 2005 Novopan A/S Denmark Pindstrup 2005 TAS I/S Denmark Kolding 2005 Dalum Papir Denmark Dalum 2005 Aalborg Portland Denmark Aalborg Portland 2005 Energi E2 Denmark Avedrevrket Power Stations Retrofit Revision air heater for boiler 1 Cement Industry Retrofit Supply and replacement of two complete tube banks for WHR boilers Pulp and Paper Retrofit Supply and replacement of complete primary superheater Waste Burning Plant Upgrading Supply and installation of a complete HP steam by-pass station Wood rocessing Retrofit Supply and replacement of secondary and primary superheater Waste Burning Plant Upgrading Supply and replacement of panel walls in 3rd pass Branch of Industry Project Type Description AI Boiler Type Manufacturer Fuel Not AI type Vlund Solid Waste AT-23 Aalborg Solid Waste Not AI type Vlund Wood Waste AT-23 Aalborg Solid Waste Not AI type Helsingr N-gas AV-7 Aalborg Process gas SO Aalborg Coal

AFTER SALES SERVICE


Boiler Steam Data Flow t/h 25 Press. barg 47 Temp. C 380

Waste Burning Plant Retrofit

Supply and installation of new ash hoppers

18

47

430

45

60

420

31

40

420

60

55

480

Hot water

774

250

545

g Print date:

26-Oct-2005

More than 38,000 Aalborg boilers world-wide

Page

2 of 16

SELECTED REFERENCES
Year of order 2005 Customer Country Site Name Energi E2 Denmark Avedrevrket 2005 Hammel Fjernvarme Denmark Hammel 2005 Energi E2 Denmark Amagervrket 2005 Sby Fiskeindustri Denmark Sby 2005 Energi E2 Denmark Amagervrket 2005 KAN Denmark rhus Nord 2005 Novopan A/S Denmark Pindstrup Wood processing Retrofit Supply and replacement of secondary and primary superheater Waste Burning Plant Retrofit Supply and replacement of two superheater sections Power Stations Upgrading Supply and installation of openings for soot blowers Food Processing Retrofit Supply and replacement of tube plate and tubes in 2nd pass Power Stations Upgrading Supply and installation of ash handling system below boiler Waste Burning Plant Upgrading Supply and installation of economizer Branch of Industry Project Type Description AI Boiler Type Manufacturer Fuel SO Aalborg Coal AV-7 Aalborg Flue gas SO Aalborg Coal - Straw AR-4D Aalborg N-gas SO Aalborg Coal - Straw AT-23 Aalborg Solid Waste Not AI type Vlund Wood Waste

AFTER SALES SERVICE


Boiler Steam Data Flow t/h 774 Press. barg 250 Temp. C 545

Power Stations

Upgrading

Installation of by-pass line for economizer at boiler 1

420

175

540

10

Sat.

420

175

540

25

78

430

45

60

420

g Print date:

26-Oct-2005

More than 38,000 Aalborg boilers world-wide

Page

3 of 16

SELECTED REFERENCES
Year of order 2005 Customer Country Site Name Motor Oil, Hellas Denmark Corinth Refineries 2004 Elsam A/S Denmark Nordjyllandsvrket 2004 Motor Oil, Hellas Denmark Corinth Refineries 2004 Elsam A/S Denmark Skrbkvrket 2004 Elsam A/S Denmark Nordjyllandsvrket 2004 Norsk Hydro Denmark Troll C 2004 Danisco Sugar Denmark Nakskov Sugar Sugar Factory Retrofit Supply and replacement of primary and secondary superheaters primary and Supply and replacement of Platform Retrofit Supply of economizer in stainless steel Power Stations Retrofit Supply of complete spray nozzles for HP superheater Power Stations Retrofit Replacement of 91 thermometer pockets in HP system Refinery Retrofit Supply and replacement of generating system, superheaters and oilburners Power Stations Retrofit Replacement of 172 thermometer pockets in HP system Branch of Industry Project Type Description AI Boiler Type Manufacturer Fuel Not AI type Lentjes HFO BE Aalborg Coal Not AI type Babcock HFO BE Aalborg N-gas BE Aalborg Coal AV-14 Aalborg GT Not AI type SMV N-gas/HFO

AFTER SALES SERVICE


Boiler Steam Data Flow t/h 40 Press. barg 48 Temp. C 410

Refinery

Retrofit

Supply and replacement of generating system, superheaters and oilburners

972

290

580

50

48

410

972

290

580

972

290

580

15

70

67

480

g Print date:

26-Oct-2005

More than 38,000 Aalborg boilers world-wide

Page

4 of 16

SELECTED REFERENCES
Year of order 2004 Customer Country Site Name Reno Syd Denmark Skanderborg 2004 Energi E2 Denmark Amagervrket 2004 Boliden Mineral AB Denmark Skellefthamn 2004 Vlund Denmark Fasan 2004 Elsam A/S Denmark Nordjyllandsvrket 2004 Alstom Denmark A/S Denmark Studstrupvrket 2004 Elsam A/S Denmark Studstrupvrket Power Stations Upgrading Supply and installation of heating coil Power Stations Retrofit Cutting and re-welding of main steam pipeline Power Stations Retrofit Replacement of 3 superheater headers Waste Burning Plant Upgrading Supply and installation of complete support burner system with cap. 2 x 9,5 MW Metal Industry Retrofit Supply and replacement of furnace walls Power Stations Upgrading Supply and installation of ash handling system Branch of Industry Project Type Description AI Boiler Type Manufacturer Fuel AT-23 Aalborg Solid Waste SO Aalborg Coal - Straw Not AI type Babcock Process gas Not AI type Vlund Solid Waste BE Aalborg Coal BE Aalborg Coal AR-4D Aalborg Oil

AFTER SALES SERVICE


Boiler Steam Data Flow t/h 18 Press. barg 47 Temp. C 430

Waste Burning Plant Upgrading

Supply and replacement of superheater and part of furnace

420

175

540

50

40

420

25

47

380

972

290

580

1080

250

540

14

15

Sat.

g Print date:

26-Oct-2005

More than 38,000 Aalborg boilers world-wide

Page

5 of 16

SELECTED REFERENCES
Year of order 2004 Customer Country Site Name Elsam A/S Denmark Studstrupvrket 2003 Elsam A/S Denmark Nordjyllandsvrket 2003 Carbery Milk Ireland Carbery 2003 KAVO Denmark Slagelse 2003 Aars KVV Denmark Aars 2003 Danisco Sugar Denmark Nakskov Sugar 2003 Aalborg Kommune Denmark Aalborg Power Stations Upgrading Supply and installation of two 25 MW dual fuel burners Food processing Upgrading Supply and installation of bio gas burner Waste burning plant Retrofit Supply and replacement of superheater Waste burning plant Upgrading Supply and installation of complete support burners system with cap. 2 x 25 MW Food processing Retrofit Partial replacement of heating surface Power Stations Retrofit Replacement of HP by-pass valves Branch of Industry Project Type Description AI Boiler Type Manufacturer Fuel BE Aalborg Coal BE Aalborg Coal PIONEER GT5 Aalborg Gas AT-23 Aalborg Solid waste AT-23 Aalborg Solid waste Not AI type SMV Oil Not AI type Danstoker Gas/oil

AFTER SALES SERVICE


Boiler Steam Data Flow t/h 1080 Press. barg 250 Temp. C 540

Power Stations

Retrofit

Overhaul of coal burners

972

290

580

29

30

Sat.

20

67

430

16

47

430

70

64

480

25

g Print date:

26-Oct-2005

More than 38,000 Aalborg boilers world-wide

Page

6 of 16

SELECTED REFERENCES
Year of order 2003 Customer Country Site Name Danisco Sugar Denmark Assens Sugar 2003 Kolding KVV Denmark Kolding 2003 Energi E2 Denmark Asnsvrket 2003 Energi E2 Denmark Avedrevrket 2003 Amagerforbrndingen Denmark Amager 2003 Elsam Kraft A/S Denmark Enstedvrket 2002 Tinfos Jernvrk - ye Smeltevrk Norway Tinfos Jernvrk Metal Industry Upgrading Supply and installation of spray cooler Power stations Upgrading Supply and installation of new oil burners on aux. Boilers Waste burning plant Retrofit Supply and installation of steam piping and steam header Power Stations Upgrading Unit 2 - supply of heating surface for air heater Power Stations Retrofit Unit 2 - repair of re-superheater Waste burning plant Retrofit Supply and replacement of superheater Branch of Industry Project Type Description AI Boiler Type Manufacturer Fuel Not AI type B&W Oil AT-23 Aalborg Solid waste Not AI type B&W Coal Not AI type Vlund Bio fuel Not AI type Vlund Solid waste AQ-9 Aalborg Oil Not AI type

AFTER SALES SERVICE


Boiler Steam Data Flow t/h 40 Press. barg 40 Temp. C 420

Food processing

Retrofit

Scrapping of coal fired travelling grate for installation of oil burners

31

40

420

25

47

380

19

11

320

57

77

450

Aalborg/Babcock Process gas

g Print date:

26-Oct-2005

More than 38,000 Aalborg boilers world-wide

Page

7 of 16

SELECTED REFERENCES
Year of order 2002 Customer Country Site Name Ahlstom Helsingborg Sweden Helsingborg 2002 Dalum Papir Denmark Dalum 2002 Eskildstuna Energi & Milj Sweden Eskildstuna 2002 Vestforbrnding Denmark Copenhagen 2002 Good Year Turkey Adabazari 2002 Reno Nord Denmark Aalborg 2002 Energi E2 Denmark Nstved KVV Power Stations Upgrading Supply and installation of burner unit as replacement for a GT10 gas turbine Waste Burning Plant Retrofit Supply and replacement of superheater, furnace, panel walls and attemperator Tire factory Retrofit Supply and replacement of evaporator and economizer sections Waste Burning Plant Upgrading Supply of panel walls cladded with Inconel 625 Power Station Retrofit Supply and replacement of panel walls in furnace Pulp and Paper Retrofit Supply and replacement of superheater tubes, economizer and attemperator Branch of Industry Project Type Description AI Boiler Type Manufacturer Fuel Not AI type Schelde Gas Not AI Helsingr Gas/oil Not AI CFB Not AI Vlund Solid waste PIONEER GT-4 Aalborg GT fluegas AT-23W Aalborg Solid waste AV-14 Aalborg Gas

AFTER SALES SERVICE


Boiler Steam Data Flow t/h 60 Press. barg 90 Temp. C 490

Power Stations

Retrofit

Repair of Schelde boiler

60

55

480

Hot water

10

25

210

35

66

425

70

70

428

g Print date:

26-Oct-2005

More than 38,000 Aalborg boilers world-wide

Page

8 of 16

SELECTED REFERENCES
Year of order 2002 Customer Country Site Name Aalborg Portland Denmark Aalborg 2002 Aarhus Olie Denmark Aarhus 2001 Burmeister & Wain Scandinavian Contract Barbados BWSC - Barbados 2001 Gren Kraftvarmevrk Denmark Gren Kraftvarmevrk 2001 Sahinler Enerji Turkey Sahinler Enerji 2001 Norske Skog Norway Hnefoss 2001 Fiskernes Fiskefabrik Denmark Fiskernes Fiskefabrik - Skagen Food Processing Upgrading Installation 4 x economizers Pulp and Paper Retrofit Overhaul combustion grate Textile Industry Upgrading 2 x Heat exchangers Power Stations Retrofit Production C-HEX for CFB boiler Power Stations Retrofit Replacement of exhaust gas boiler for Diesel Engine Unit D13 Food processing Retrofit Supply and replacement of front panel wall tubes. Chemical cleaning of boilers Branch of Industry Project Type Description AI Boiler Type Manufacturer Fuel AV-7 Aalborg Process gas Not AI HFO AV-6 Aalborg Exhaust CFB Ahlstom/AI Solid waste KBK Aalborg AZC Aalborg Wood AR-4 Aalborg Gas

AFTER SALES SERVICE


Boiler Steam Data Flow t/h 0 Press. barg 0 Temp. C Hot water

Power Stations

Retrofit

Supply of 6 pcs tube banks for waste heat recovery boilers

50

40

200

6.1

11

Sat.

35

66

425

43

80

500

20

12

Sat.

g Print date:

26-Oct-2005

More than 38,000 Aalborg boilers world-wide

Page

9 of 16

SELECTED REFERENCES
Year of order 2001 Customer Country Site Name Statoil Norway Krst 2001 Ahlstom Helsingborg Sweden Helsingborg 2001 CP Kelco Denmark Lille Skensved 2001 Gren Kraftvarmevrk Denmark Gren Kraftvarmevrk 2001 Carlsberg Bryggerierne Denmark Carlsberg - Copenhagen 2001 Amagervrket Denmark Amagervrket block 2 2001 Ouagadogo Burkino Faso Ouaga Power Stations Upgrading Exhaust gas boilers Power Stations Retrofit Side panel replacement Breweries Upgrading Gas conversion og boiler 2 and 3 Power Stations Retrofit Replacement of LUFO sections Pulp and Paper Retrofit Supply an replacement of lower ECO section Power Stations Service Commissioning of Royal Schelde boiler Branch of Industry Project Type Description AI Boiler Type Manufacturer Fuel AX-4 WHR Aalborg Gas Not AI type Schelde Not AI type Vlund Gas/coal CFB Aalborg Solid waste AR-4 Aalborg Gas SO Aalborg Coal AV-6 Aalborg Exhaust

AFTER SALES SERVICE


Boiler Steam Data Flow t/h 100 Press. barg 60 Temp. C 370

Gas Plant

Upgrading

Upgrading stand-by heat equipment

60

90

490

50

65

480

105

92

505

16

Sat.

420

175

540

Hot water

g Print date:

26-Oct-2005

More than 38,000 Aalborg boilers world-wide

Page 10 of 16

SELECTED REFERENCES
Year of order 2001 Customer Country Site Name Amagervrket Denmark Amagervrket block 2 2000 Assens Sukkerfabrik Denmark Assens Sukkerfabrik 2000 Gren Kraftvarmevrk Denmark Gren 2000 Scanraff Refinery Sweden Scanraff, Lysekil 2000 NV Kraft A/S Denmark Power Stations Upgrading Rebuilding of combustion air intake from inside to outside of building. Refinery Upgrading Modifications to existing economiser. Power Stations Upgrading Supply and installation of extra economizer in CFB boiler. Sugar Factory Retrofit Supply and replacement of economizer for coal fired boiler. Branch of Industry Project Type Description AI Boiler Type Manufacturer Fuel SO Aalborg Coal Not AI type Vlund Coal CFB

AFTER SALES SERVICE


Boiler Steam Data Flow t/h 420 Press. barg 175 Temp. C 540

Power Stations

Retrofit

Condenser tube replacement block 2

40

65

430

105

92

505

Ahlstrom/ Aalbor Coal/Straw AV-11 AI Process Gas BE 972 290 580 22 42 390

Coal 2000 Scottish and Southern Energy United Kingdom Townsend Hook 2000 Energi Randers Denmark Randers Kraftvarmevrk Power Stations Retrofit Acid cleaning of two coal fired boilers Power Stations Retrofit Repair of welds in economizer in HRSG Not AI type Schelde DE Flue Gas + SF SO Aalborg Coal 113 110 525 142 43 480

g Print date:

26-Oct-2005

More than 38,000 Aalborg boilers world-wide

Page 11 of 16

SELECTED REFERENCES
Year of order 2000 Customer Country Site Name Boliden Sweden Rnnskrsverken 2000 Borlnge Energi Sweden Borlnger Energi 2000 Electricity Supply Board Ireland North Wall Power Station 1999 Arab Paper Manufacturing Co Saudi Arabia Damman 1999 Burmeister & Wain Scandinavian Contract Bahamas Bahamas 1999 Norske Skogindustrier Norway Follum 1999 ye Smeltevrk Norway Tinfoss Jernvrk Metal Industry Control System Replacement of complete control system for waste gas fired boiler. Wood Processing Upgrading Supply of two tube airheaters for heating of combustion air for wood fired boiler. Power Stations Retrofit Supply and replacement of heating surfaces for waste heat recovery boiler. Pulp and Paper Upgrading Supply of equipment for conversion of existing burners from DO to HFO firing. Power Stations Retrofit Supply and replacement HP evaporator section for HRSG unit. Waste Burning Plant Upgrading Modification and retrofit of waste burning boiler unit. Branch of Industry Project Type Description AI Boiler Type Manufacturer Fuel Not AI type Babcock Process Flue Gas Not AI type

AFTER SALES SERVICE


Boiler Steam Data Flow t/h 50 Press. barg 40 Temp. C 420

Metal Industry

Retrofit

CE boiler. Supply and replacement of roof and sidewalls for first pass.

Hot water

Solid Waste Not AI type Cockrill GT Flue Gas AR-4N Aalborg HFO/DO AV-6N Aalborg DE Flue Gas AZC Aalborg Waste Wood AI Aalborg CO gas + HFO 55 65 450 43 80 500 8.5 10 Sat. 20 10 Sat. 200 36 320

g Print date:

26-Oct-2005

More than 38,000 Aalborg boilers world-wide

Page 12 of 16

SELECTED REFERENCES
Year of order 1999 Customer Country Site Name Carlsberg Brewery Denmark Carlsberg Copenhagen 1999 Compenhia de Electricidad de Macau Macau Coloane Power Station 1999 Burmeister & Wain Scandinavian Contract Denmark Guam Electricity Supply 1999 Gren Kraftvarmevrk Denmark Gren 1999 Kemira Danmark A/S Denmark Kemira 1999 Tate & Lyle Sugars United Kingdom Tate & Lyle Sugars 1999 Nykbing Sugar Factory Denmark Nykbing Sugar Factory Upgrading Conversion from HFO firing to bio gas/HFO firing Sugar Factory Retrofit Supply and replacement of superheater 1 and 2 Fertilizer Upgrading Supply and installation of economizer for district heating in HRSG unit. Power Stations Retrofit Supply and erection of C-HEX Power Stations Retrofit Repair of superheater Power Stations Retrofit Branch of Industry Project Type Description AI Boiler Type Manufacturer Fuel AR-4 Aalborg Diesel Oil AV-6N Aalborg DE Flue Gas AV-6N Aalborg DE Flue Gas CFB

AFTER SALES SERVICE


Boiler Steam Data Flow t/h 16 Press. barg 5 Temp. C Sat.

Breweries

Upgrading

Replacement of burner equipment for three boilers and installation of new SRO equipment for automatic operation of units. Supply and replacement of economizer, evaporator and superheater in HRSG unit

19.6

10

Sat.

10

10

224

105

92

505

Ahlstrom/Aalborg Straw/coal AX-4 WHR Aalborg GT+SF AX-4 Aalborg HFO AR-4N Aalborg Boi Gas + HFO 18 16 Sat. 70 45 377 35 45 424

g Print date:

26-Oct-2005

More than 38,000 Aalborg boilers world-wide

Page 13 of 16

SELECTED REFERENCES
Year of order 1998 Customer Country Site Name Scanraff Refinery Sweden Scanraff Refinery 1998 Bjlvefossen Norway lvik 1998 Kolding Kraftvarmevrk Denmark Kolding Kraftvarmevrk 1998 Avenmore Foods Ireland Avenmore Foods 1998 Statoil Refinery Denmark Statoil Refinery 1998 Dead Sea Works Israel Potash House 1997 Helsingr Kraftvarmevrk Denmark Helsingr Kraftvarmevrk Power Stations Upgrading Supply and installation of 5 MW N-gas burner for supplementary firing in existing HRSG unit. Chemicals Retrofit Supply and replacement of superheaters for two boilers Refinery Retrofit Welding up of cracks in reactor shell. Material 105 mm 1 Cr 0,5 Mo. Food Processing Retrofit Supply and replacement of furnace walls in coal fired boiler Waste Burning Plant Retrofit Supply and replacement of walls in 2nd pass Primary Metal Industries Retrofit Supply and replacement of evaporating section and general repair to remaining heating surfaces. Branch of Industry Project Type Description AI Boiler Type Manufacturer Fuel AV-6N Aalborg Process Flue Gas Not AI type Flkt Process Flue Gas AT-23W Aalborg Solid Waste AZC Aalborg Coal Not AI type Process AX-4 WHR Aalborg

AFTER SALES SERVICE


Boiler Steam Data Flow t/h 22 Press. barg 42 Temp. C 390

Refinery

Retrofit

Repair of economizer

60

37

420

31

60

420

32

15

Sat.

127

66

510

DE Flue Gas + HF AV-14 Aalborg GT flue gas + N-g 69 63 512

g Print date:

26-Oct-2005

More than 38,000 Aalborg boilers world-wide

Page 14 of 16

SELECTED REFERENCES
Year of order 1996 Customer Country Site Name Amagerforbrndingen Denmark Amagerforbrndingen 1994 Randers Kraftvarmevrk Denmark Randers Kraftvarmevrk 1994 Copenhagen Pectin Denmark Copenhagen Pectin 1994 Instituto Nicaraguense De Energia Nicaragua Planta Managua Unit 3 1994 Nakskov Sukkerfabrik Denmark Nakskov Sukkerfabrik 1993 Corporacion Dominicana de Electricidad Republica Dominicana Haina Power Station unit 2 1992 Instituto Nicareguense de Energia Nicaragua Planta Nicaragua unit 1 & 2 Power Stations Upgrading Complete rehabilitation incl. replacement of firing equipment for two Italian built boilers Power Stations Upgrading Complete rehabilitation incl. replacement of fring equipment for American built boiler Sugar Factory Upgrading Dismantling, transportation and reerection of the complete boiler unit. Power Stations Upgrading Complete rehabilitation of Italian built 45 MW power station unit. Food Processing Upgrading Modification of boiler evaporating system and replacement of rear wall due to cavitation at water side. Power Stations Retrofit Replacement of 8000 tubes in condenser. Branch of Industry Project Type Description AI Boiler Type Manufacturer Fuel Not AI type Vlund Solid Waste SO Aalborg Coal Not AI type Vlund Coal Not AI type Ansaldo HFO Not AI type SMV N-gas + HFO Not AI type CE HFO Not AI type Ansaldo HFO

AFTER SALES SERVICE


Boiler Steam Data Flow t/h 40 Press. barg 60 Temp. C 420

Waste Burning Plant Retrofit

Unit 3. Erection of two superheaters.

113

110

525

50

65

430

198

110

515

70

67

480

223

90

516

215

105

516

g Print date:

26-Oct-2005

More than 38,000 Aalborg boilers world-wide

Page 15 of 16

SELECTED REFERENCES
Year of order 1991 Customer Country Site Name Egyptian Electricity Authority Egypt Suez Thermal Power Station 1983 Treschow Fritse Norway Treschow Fritse, Larvik Wood processing Retrofit Rehabilitation of the total boiler heating surfaces and installation of new stoker and grate for wood and waste firing Branch of Industry Project Type Description AI Boiler Type Manufacturer Fuel Not AI type Russian Petrocoal + HFO Not AI type -

AFTER SALES SERVICE


Boiler Steam Data Flow t/h 204 Press. barg 90 Temp. C 50

Power Stations

Upgrading

Complete rehabilitation of four Russian built power station boilers and four 22 MW steam turbines.