ListofTables.................................................................................................................................................ii ListofFigures.iii Abstract..v Chapter 1 2 3 4 5 6 7 8 Introduction.1 Background..2 DesignDevelopment....6 3.1Objectives.6 3.2ConceptSelection10 FinalDesign...15 4.1DesignDescription16 4.2EngineeringAnalysis18 4.3CostAnalysis.22 4.4Materal/ComponentSelection23 Manufacturing/Assembly26 ProjectPlanning.28 6.1ProjectManagementPlan.28 6.2DesignVerificationPlan.29 Conclusions&Recommendations..30 FinalProjectUpdate.31 8.1Materials..31 8.2DesignChanges32 8.3Manufacturing....34
ii
iii
ListofFigures Figure1JetavatorSetup.p.5 Figure2RotatatingSegmentSetup...p.6 Figure3BallandSocketSetupp.6 Figure4InternalManeuveringVanes...p.7 Figure5JetavatorReferencePhotop.12 Figure6ManeuveringVanesReferencePhoto..p.12 Figure7RotatingSegmentsReferencePhoto.p.13 Figure8ManeuveringVanesInstallationp.13 Figure9Ballandsocketsetupsusceptibilitytoerosionp.13 Figure10Furtherdevelopmentofballandsocketconceptp.15 Figure11Isometricviewofsolidmodeldesign..p.17 Figure12Explodedviewofsolidmodeldesign..p.18 Figure13Heattransferinnozzle..p.20 Figure14Thermalexpansionofnozzle.p.21 Figure15Thermalexpansionofcollar..p.23 Figure16Forcesonnozzle....p.24 Figure17GraphiteNozzle..p.25 Figure18InconelFlange.p.26 Figure19RapidPrototypedComponents..p.33 Figure20Prototypedcouplersandbracketsp.34 Figure21DesignFlawsp.34
iv
Abstract
The objective of this project was to design, build and test a thrustvectoring system for a solid booster rocket. The project was sponsored by Stellar Exploration. A two member team of Harsimran Singh and Dane Larkin worked towardtheobjective.
CHAPTER1Introduction
Theprojectdescribedinthisdocumentisathrustvectoringsystemthatwillbeimplementedin StellarExplorationssolidfueltestrocket.ThisdocumentwilloutlineBackgroundresearchon thestatusofthrustvectorcontrol,theprojectrequirementsandobjectives,howthesuccessof the project will be evaluated, and prototype design. In addition the methods used and the timeline the project will follow will be thoroughly outlined. The success of this project is dependentonthecooperationofDaneLarkinandHarsimranSinghandontheparticipationof theirsponsorStellarExplorationateachpartoftheprocess.DaneLarkinandHarsimranSingh are responsible for delivering a viable prototype to Stellar Exploration. Stellar exploration is expectedtoreviewtheprogressanddesignreviewsateachstageofthedesign.Thefinalgoals ofthisprojectaretodesignandbuildafunctioningthrustvectoringsystemforusebyStellar Explorations.
CHAPTER2Background
Stellar Exploration Incorporated is a small technology company which focuses on low costscientificandspaceexplorationprojects.Thecompanyhiresapproximatelythreefulltime engineers.StellarExplorationrequiresathrustvectoringsystemforitsSilverSwordrocket.By allowingoperatorstocontrolthedirectionofthrust,thethrustvectoringsystemwillmakeup forthedragproducedandlossinperformanceincurredbytherocketfins.Whatfollowsisalist ofbackgroundresearchondifferentthrustvectoringsystemswhichhavebeenusedinthepast. Fixednozzlesystems Fixednozzlesystemsasthenamestatesrefertonozzlesthataresolidmountedinthe frameofthevehicle.Theflowinsidethenozzleitselfisthenchangedtomovethethrustvector. These were some of the first systems of thrust vector control developed in the Polaris and minute man rockets. The classification of fixed nozzle systems falls into these categories, secondary injection systems where the flow is the nozzle is changed by the addition or rerouting of fluid flow, and mechanical deflection where a mechanical element changes the directionofflow. Liquidinjection Liquidinjectionencompassesanyadditionofafluidthatchangesthecharacteristicsof thecombustion.Bychangingthecombustionononesideofthenozzlethethrustvectorcanbe changed.Themethodofinjection,aswellasthefluidthatisinjected,arebothtopicsofmuch debate and research. one of the biggest decisions when considering this method of thrust vectoringistheliquidthatwillbeusedthetwomaindivisionsarewhethertheliquidwillinhibit thecombustionorcontributetocombustion.Combustioninhibitorswilltendtocooloneside ofthenozzlewhilecombustioncontributorswilladdfuelorotheradditivestoincreasethrust on one side of the nozzle. Advantages of this method of thrust vectoring are that it has fast responsecapabilityandaddtothrustbyaddingmasstothefluidstream.Thedisadvantagesof thissystemarethattheyareheavyandtheamountthevalveopensisnotlinearlyrelatedto therateofchangeofthethrustvector. Gasinjection Gasinjectionisverysimilartoliquidinjectionthedifferencebeingthatinsteadofnew gas being added to the fluid stream combustion gasses are rerouted from behind the nozzle into the diverging section changing the flow through the nozzle itself. The advantages of this methodarethatadditionalfluidsdonotneedtobestoredonboardandsothesystemoverallis lighter in weight. The downside to this method however, is that the hot combustion gasses
haveto beroutedth hroughvalves.Instatio onarytestst thevalvesco ouldneverb bemadereliable enought toconsiderf furthertestin ng. Jetvane Thejetvane deflectorischaracteriz zedbyanyf finorplatet thatisdirec ctlyplacedinthe exitingflowofthenozzle.Asth heplateorf finmovesit willcausetheflowexit tingthenozz zleto deflectfr romthecen nterlineoftherocket.A Advantageso ofthesesys stemsareth hattheforce eson actuators sarelowan ndthusthey ycanbecap pableofquic ckresponse times.Sinc cetheblade esare directlyintheexhaustthiscause esthedesign nertomake oneofthreechoices,th hepropellan ntcan burnrela ativelycool,thepropella antcanburn nforrelative elyshortper riodoftime,orthevane escan bemade eofexoticheatresistan ntmaterial.T Theotherp problemwith hthismetho odisthata large deflectionofthevan nemustbem madeinord dertocause achangein nthethrust vector.The large deflectionandthein nherentdrag goffluidont thevanesre educethrust t. Jetavator Thejetavator risasimilarconcepttot thejetvane ethedifferen ncebeingth hatinsteado ofthe vanesbe eingintheflowthenozz zletheyare positioned aroundthe perimetero ofthenozzle eand are parallel to the flow. This sy ystem has similar heat r restrictions to the jet v vane. Advant tages thatthedefl ectionofthejetavatori islinearlyre elated includet tothede eflectionoft vector.Thed downsideso ofthis thethrustv design,b besidestheh heatconside erationsmen ntionedinth hejet vanesec ction,aretha atthesystem mcanbehe eavyandtha atthe jetavator restricts t he exit diam r meter. Nota able applica ations areF16andthePola arisA1. rSetup Fig1.Jetavator Jettab ysteminvolv vesaplateattheendof fthenozzle thatcanberotatedinto oand Thejettabsy t antages tha the thru deflectio is at ust on out of the nozzle disrupting the flow. Initial adva proportio onaltothea areaofthetabthatisex xposedtoth eflowthism makescontrollingthesy ystem relatively yeasy.Thedownsideof fthissystem misthatwhe enthetabis sinthefluid dstreamthe eflow stallsonthetab.The estalledflow wcauseslotsoferosion ontheinsid deoftheno ozzle.Testing gwas stoppedonthismeth hodbecause eofthematerialerosion nproblems.
Movable enozzle Movable noz M zzles control the direction of the e exiting flow by having the nozzle itself w weredeveloped move.Th hesearemo orerecently developedt technologies s.Thereaso onthatthey morerec cently,anda arenowbeco omingmorepopular,is thatitwasd difficulttosu upportthethrust on the nozzle while sealing the gasses and remaining flexible. M n e d g Moveable no ozzle systems are broadlyc categorizedintothetype eofflowins sidethenozz zle. joint Flexiblej The flexible joint system is the sim j m mplest desig of the m gn movable nozz systems. The zle system uses a seal that attaches on the outside of t movable nozzle and the other end u o the e r attaches totherigidstructure.T Thenozzlec cannowbed designedwithouttheco oncernofse ealing thejointsincethefle exiblesealw willholdthenozzlepres ssure.Thead dvantageof fthesesyste emsis thatther rearenosp plitlinesand dthrustlossisnegligible e.Disadvant tagestothis sdesignare ethat thesealw willbeexposedtohight temperature es Rotatable In nitiallyrotata ablenozzles swerecante edinadirect tionandnee ededtobeu usedingrou upsto manage rollpitchan ndyawthesesystemsrequiredlarg gebearings andthemo ovementish highly difficulttocontrol lasallthree enozzlesha avetobein synchroniza ation. Future developme e ents resulted in a segm d mented nozzl that has t le three segme entseachatt tachedbycu utsthataren notperpend diculartothe eaxis oftherocketbym movingthese egmentsrela ativetoeach hotherthea angle oftheexitingflowischanged. Fig2.Rot tatingSegm mentSetup Thedesignof fthisnozzle eisjustasth henamesay ysitresemb blesthemot tionofabal lland socket with one inn ball conn w ner necting to the rigid fra me and the e outer ba remainin mobile as the flow transfers from the all ng s e convergingportiono ofthenozzle etothediv vergingnozz leitcrosses s Ball thesplitlinebetweentheinnerb ballandouterball.
Socket
Fig g3.BallandSocketSetu up
Internalmaneuverin ngvanes Vanesarepla V acedalongt theinsidew wallofthero ocketnozzle e.Beinginthedirectpa athof the hot thrust gases the vanes are maneuvered by ac t s, ctuators to d direct the th hrust in ord to der bettergu uidearocket tprojectile.Thistypeofsystemisco ommonons surfacetoai irmissiles.
Fig4.InternalManeuveringVan nes
CHAPTER3DesignDevelopment
3.1Objectives
ThisteamseekstodevelopathrustvectoringsystemfortheSwordFishrocketbuiltby Stellar Exploration. The thrust vectoring system will help steer the rocket through the fifteen secondboostphase,andwillgounfunctionalthereafter.Asdescribedinthebackground,many solutionscurrentlyexisttovectorarocketsthrust.However,sincemostofthesesolutionsmay notsuitStellarExplorationsrequirements,wehaveputtogetheratableofspecificationsusing the Quality Function Deployment (QFD) method to translate customer requirements to engineeringspecifications.Thesolution(s)whichbestmatchesthesespecificationsarefurther examinedandgivenmoreconsiderationfordevelopment.TheAppendicessectionprovides a house of quality that this team used in the QFD method. This team also provides a specificationstableintheAppendicessection. This team approximated the target values at the bottom of the house of quality, and intendstosubmitthetargetvaluesforreviewandpossiblemodificationbyStellarExploration. Each target value is assigned a relative weight. For example, the target value regarding heat requirements has a relative weight of 14.3%. This figure indicates the importance of heat requirementsrelativetootherdesignspecifications. Thederivationofrelativeweightproceedsasfollows: 1. Theusersqualitativerequirementssuchasinstallation,safety,etcarelisted ineachrowofthehouseofquality. 2. Each customer requirement is assigned an importance weight (i.e. 7.0 for durability). 3. Theimportanceweightsforallcustomerrequirementsareaddedupandthe importance weight for each particular customer requirement is divided by this sum. The resulting figure is then multiplied by one hundred and called the relative weight for the particular customer requirement (i.e. 15.9% for durability). 4. Along each column are listed quantifiable technical requirements such as frequencyresponse,weight,etc. 5. The intersecting cell between each column and row indicates how the respective customer requirement correlates with the respective technical
requirement.Ifthereisnocorrelation,thecellisleftblank.Thecellisfilled withasolidtriangleifthereisslightcorrelation,withahollowcircleifthere is medium correlation, and with a symbol that resembles theta if there is strong correlation. For instance, heat requirement (quantitative) has light correlationwithsafety,mediumcorrelationwithresponsetoanglechange, strongcorrelationwithdurability,etc. 6. Eachlevelofcorrelationisassignedanumericalvalue.Avalueofzeroforno correlation,oneforlightcorrelation,threeformediumcorrelation,andnine forstrongcorrelation. 7. Take the relative weight for each customer requirement and multiply it by the correlation value in each cell of each respective row (i.e. 15.9*9 for durabilityandheatrequirements). 8. Adduptheresultingvaluesalongeachcolumn,andanimportanceweightis obtained for each technical requirement (i.e. 425 for heat requirements). Thisvalueisplacedatthebottomofthehouseofquality. 9. Sum up the importance weights for all technical requirements, and divide into the importance weight for a particular technical requirement. Multiply the result by one hundred to obtain the relative weight for that technical requirement(i.e.14.3%forheatrequirements). The relative weight indicates the importance of a particular technical requirement for our design. Having a relative weight of 14.3%, heat requirement has a higher relative weight thananyothertechnicalrequirement.Italsohasstrongcorrelationwiththegreatestamountof customerrequirements.Therefore,thisteamshouldhavethegreatestconcernregardingheat requirement throughout the design, build, and test process. Not satisfactorily meeting heat requirementswillresultinthegreatestadverseimpactonmostcustomerrequirements. Thefollowingtableofengineeringspecificationshighlightsfromlefttoright,thetypeof technical parameter, this teams target numerical value for that parameter, the tolerances it mustmeet,theriskofnotmeetingeachtarget(High(H),Low(L),orMedium(M)),andhowthis
team will meet each parameter (analysis (A), test (T), similarity to existing designs (S), or inspection(I)). Table1 Spec.# Parameter Description Frequency response Weight Temperature Pressure Thrustangle TargetValue (units) 20Hz Adds<4lbs ontosystem Withstand 1300F Withstand 600psi 7degrees fromcentral axis <5.75in diameter1 <30watts Tolerance Risk Compliance
1 2 3 4 5
M M L L M
6 7 8
Max. Max.
L L
A,I A,S
5000cycles Min. L A,T 150 9 0.5seconds 0.001 H A,T,S forhalfcycle second 10 Drag Addsless Max. L A,T than1% 11 Actuation 0.05 Max. M A,T error degrees *ForfurtherreferenceseethebottomofthehouseofqualityinAppendixA.
1
SeeAppendixB
FrequencyResponse:Amountofcyclestheactuatorscanachieveinonesecond. Weight:Onceinstalledontotherocket,thesystemwedesignmustnotaddmorethan4lbs.to therocketspreinstallationweight. Temperature: The system must withstand the high temperatures that result from fuel combustionandotherfactors.
Pressure:Thesystemmustwithstandallpressuresresultingfromtherocketsthrustandother factors. ThrustAngle:*Seefrequencyresponseabove. Size:Thesystemmustbeabletofitwithina5.75indiameter.*AlsoseeAppendixB. Powerusage:Thesystemmustusenomorethan30wattsofpowerfromtherocketspower supply. Cycles till failure: The system must cycle thrust direction a minimum of 5000 cycles before failure. Slew Rate: Amount of times in one second that the system can cycle direction of thrust between 7 degrees from the rockets central axis. The risk of not being able to meet this requirementishigh.Thethrustvectoringsystemrequiresahighcyclingspeedbecauseitmust finish steering the rocket to the correct trajectory within 15 seconds of launch. This team is unsurewhetheritcandesignasystemtoachievethisspeedwithinthegivenpowerandsize restrictions.Ifthecyclingspeedisachieved,thisteamisunsurewhetherallcomponentsofthe systemwillfunctionproperlyatthedesiredslewrateforafulldurationof15seconds. Drag:Onceinstalledontotherocket,thesystemmustaddnomorethan1%oftherockets preinstallationdrag. ActuationError:Theactualthrustanglemustnotdeviatemoreorlessthan0.05degreesfrom theintendedthrustangle.
10
Column1 Criteria
inst tallation eas se Saf fety dura ability inte erface ease hea at requ uirements resp ponse to ang change gle low weight eas of se man nufacture low drag Cos st
54.4 20.7 10 03.35 57 10 03.35 111.3 1 10 03.35 11.5 57 13.8 645 56.45
8.5 9 8 7 4 7.5 8 6 10 6 74
57 7.8 20 0.7 127 7.2 79 9.8 63 3.6 119. .25 127 7.2 13 3.8 1 114 13 3.8 7407 7.4
9 9 8. .5 9 6. .5 8. .5 8 7 1 10 8 83. .5
61.2 2 20.7 7 135.15 5 102.6 6 103.35 5 135.15 5 127.2 2 16.1 1 114 4 18.4 4 8338.5 5
57.8 20.7 143.1 102.6 119.25 127.2 79.5 16.1 108.3 16.1 7957.95
100.1
Fig5.JetavatorFig6.Maneuve eringVanes
11
Fig7.RotatingSe egments
on Installatio
Theballa andsocketconceptwasea asiesttoinsta allontotheS SwordfishRoc cket,thusrec ceivingthehi ighest ratingof9 9fortheinst tallationeasecategory.Unlikethejeta avatordesign, ,whichrequirestheinstallation ofmultipl lemaneuvera ablevanesan ndactuationm mechanismsa aroundthero ocketsend(S SeeFig.a),th heball andsocke etdesignonly yrequiresonemovablepa art,andtwoa actuationme echanisms.In nstallationof vanes inside the nozzle or boattail would also be more challeng ing than inst e b tallation of th ball and s he socket mechanism. It w would require this chine work o the on team to do mac noz zzle or boat ttail in order to make room fo at least three or uation mech hanisms in tight actu spa ace (See Fig d). Althou g. ugh a ier cylinder mechanism is easi to inst tall than th jetavator and he r inte ernalvanesm mechanisms, itstill requires more m moving parts than s Fig8.VaneInstallati theba ion allandsocketdesign. Safety Sa refore every design received a afety concern are very lo for each design conce ns ow ept, and ther highratingof9inthatcategory. EdgesS SusceptibletoEr rosion Durability y Si incethebolts sandflanges intheballan ndsocketdes signcanupta ake great loa ads, and the overall num e mber of com mponents in the design is relatively low, this designs implementation will proviide a durab n ble mechanism. However, this teams selected des , sign still has a lower rati ing thanthe cylinderdesig gninthedu urabilitycategory.Therea asonbeingth hat ing t round it edges. the inlet of the rotati nozzle is susceptible to erosion ar This issue could lead to a notice e eable degrad dation in per rformance. T The
Fig9.Erosio on
12 jetavatorandinternalvanedesignshavelowerratingsthanbothaforementioneddesigns.Thegreater numberofsmallmovingpartsinthejetavatorandinternalvanemechanismincreasestheprobability offailure. Interfacing Anotherselectionparameterishowwelleachtypeofmechanisminterfaceswiththeelectronic controlsystemonboardtherocket.Again,theballandsocketdesignslownumberofmovingpartsand simplicityofactuationgivesitahighratingof9. HeatRequirements Theratinggiventoeachmechanismintheheatrequirementscategoryindicateshowwelleach typeofdesignwouldwithstandheatfromtherocketexhaust.Thecylinderpoweredconceptwasgiven thehighestratingduetothefactthatthecylinderswouldmaneuverthenozzlefromoutsideoftheflow regime.Thus,thesystemhastheleastpercentageofitssurfaceareaexposedtoheat.Internalvanes, which would be placed directly in the path of the flow regime (see Fig b), will have the greatest percentage of surface area exposed to exhaust heat. This is why the particular design was given the lowestratingintheheatrequirementscategory. SystemResponse Theresponsetoanglechangecategoryindicateshowfastaparticularmechanismrespondsto signalsfromtheelectroniccontrolsystem.Themechanismwiththeleastcomplicatedmannerofsetup andmotionisgiventhehighestrating. Weight This team gave the ball and socket design the highest rating in the weight category for two reasons.Onereasonisthelownumberofcomponentsrequiredforthedesign.Secondly,theballand socket design requires redesign of the outward nozzle shape. We expect the redesign to reduce the overallweightoftherocket. Manufacturability Out of the four possible designs we considered, the ball and socket design rated among the highest in ease of manufacturability. The jetavator and internal vane based designs have many small componentstothem.Thismakesitmoredifficultandtimeconsumingtopreciselymanufacturethem. The relatively large size and lower number of components in the cylinder and ball and socket based designsmakesthecomponentsmucheasiertomanufacture. Drag Thedesignthatprovidesthelowestamountofdragisonethatresultsintheleastamountof surfaceareaexposedtoairflowaroundtherocket.Sincemostcomponentsofthejetavatordesignare located around the outer edge of the rockets back end (Fig. a), this particular design results in the
13 amountofsurfaceareaexposedtoairf flow.Thiscon nsiderationre esultedinthe elowestratingof5 greatesta forthedragcategory y.Theinterna alvanebased ddesignresulltsinallmech hanismsofth hethrustvect toring systembe eingplacedin nsidetherocketnozzleor rboattail(Fig g.b).Thus,ze eroareaisex xposedtoair rflow, andahigh hestratingof f10isassigne ed. Cost Fo the cost category the ball and soc or e cket design i s assigned th highest ra he ating. The ball and socketde esignwillcost ttheleasttoprototypedu uetothelowe ernumberof fcomponents sandrelative eease ofmanufa acture. FurtherConceptDevelopment Ournext stepsinvolve etheresolutio onofsomed designissues, aswellasfu urthermodific cationstoimprove ourdesign n.Firstthiste eamneedsto odecidewhet therornotou urnozzlesho ouldextendoutsideoftheboat e, tail. If it does extend outside, this team pred d dicts lower b back pressure possibly g greater speed and d ion,moreroo omtomaneuv verthenozzle e,butincreas seddrag. accelerati
BoatTail
Iftheent tirelengthof thenozzlein nFig.fissho ortenedandm madetostay yinsidetheb boattail,this team predictsv verylowdrag g,greaterbac ckpressure,a andverylittle espacetoma aneuverthen nozzleforeffe ective operation of the entire system. One adverse possibility of the shorten nozzle b n O f ned being rotated to a d certain an ngle is the flow of gases partially thr rusting agains the walls of the boat st tail before e exiting throughtheback. Anotherissueiswheth hertoround theedgesof fthenozzlein nlettopreventerosionalo ongtheedge esand improve flow perform f mance (See Fig e). In addit g tion, this team is consider m ring coating t outside o the the of nozzles rotating end with a mater that will prevent frictiion and make actuation e r w rial p e easier. Coatin the ng insidewallsofthenoz zzlewithlightheatresista antmaterial isanotherop ptionunderc consideration n.This teampred dictsthatthe eheatresista antcoatingw willhelpminim mizeperform mancedegrad dationdueto oheat effects.
14
LinearactuatoranalysisandselectionisdiscussedfurtheroninthisreportunderAnalysisand Material/ComponentSelection
15
Fig11
*NOT TE:Actua atorsetup pandpro ototyper requirementshave echange ed. SeeC Chapter8 8forfurtherdetai ils
16
Fig12
4.1Des signDescription
ItemNo. .1Socket:T Thesocketh holdsthecon nvergingand dthroatsectionsofthe nozzle(Item mNo. 3;alsore eferredtoas stheball).Thisballandsocketsetu pallowsthe enozzletoro otateindiffe erent direction nswiththeh helpofactua ators.Thisite emwillbem madeofgrap phite. Item No.2Flange: Flanges serve a two tier purpose. T F They hold t together the ballandso e ocket setupagainstthepr ressureprod ducedbyho otgasflowt throughthe nozzle,and dserveplatf forms ntingtheact tuators(Item mNo.4). formoun
17
These items will be made of Inconel 718. It was decided that in addition to the required ductility,theflangeswouldneedtodemonstratesuperiorstrengthathightemperatures.Thus, Inconelisassumedtobeagoodchoicefortheserequirements. Item No.3Ball (interchangeably called nozzle from this point on): This component is a convergingdiverging nozzle which accelerates hot gas flow from subsonic to supersonic. The outside of the converging section is shaped like a sphere to allow rotation via the balland socketsetupforthesakeofvectoringthrustindifferentdirections. This item will be made of graphite. Graphite was chosen for its resistance to oxidation and suitable thermal properties. These thermal properties included low conduction and thermal expansion coefficients. The balls outside diameter was made small enough to make up for thermalexpansionduetohightemperaturesduringoperation. Item No.4Actuator Assembly: Actuators push and pull against the diverging section of the nozzle,causingrotationallalongtheconvergingsphericalsection. Actuatorsweremainlychosenbasedonhowmuchforceeachcouldsupply.Analysisrevealed thateachactuatorwouldneedtoputout20poundsofforce.Thistakesintoaccountthateach actuator would be working against both the weight of the nozzle and the pressure built up insidethenozzle. Item No.5Actuator Mount: Holds the actuator in place and connects the actuators to the divergingsectionofthenozzle. ItemNo.6Collar:Mountsontothe divergingsectionofthenozzleand servesasamountfor theactuatormounts.ThisitemwillbemadeofInconel718. Amajordesignconsiderationwasmakingthiscollarthickenoughsothatitdidntpopoutofits slotoncethermalexpansiontookeffect.
18
Fig13.Heattransf ferinnozzle e Objective e Tocomputethetemperature(s)insidethenozzlewallsa andattheno ozzlesurface es. Assumptions Theheat ttransferwa assimplifiedasonedime ensionalcon nductionthroughawall. . Method/ /Approach 1. St tartoutby lookingupw whattypical lconvection ncoefficientsforforcedconvectionflow ofgasses.The esevaluesra angefrom25250depe endingonho owturbulent ttheflowis. . 2. Useavalueo U of200w/mK Kbecauseth heelectronic csneedtola astthrought theextento ofthe burn time. Analysis is do for a du A one uration of f fifteen secon and usin a .2inch thick nds ng pyrolyticcarb bon.
19
Results Analysis results gave a relatively constant temperatur through the wall rig around 3400 e re ght degrees. This tempe erature analysis really gave a start g ting point to be able t start choosing to s. materials
ThermalExpansionA Analysisont theNozzle Due to temperature of up to 3400 degr t es o rees Fahren nheit, this t team expect the nozz to ts zle undergothermalexp pansion.The econtactstr ressesbetwe eenthenozz zleandflang gesuponthe ermal expansio onofthenoz zzlemaygen neratemore efrictiontha anthesolen noidactuatorsusedtorotate thenozzl lecanactuallyovercome e. SystemS Sketch
Directionof fNozzleExpan nsion Nozzlefits here
Socket Fig14.Th hermalexpa ansionofno ozzle Objective e The purp pose of this analysis is to find the point of m s e maximum e expansion al long the ou utside surface of the nozzle. Doing so will allow this team t o take ther o o rmal expansion into acc count duringdi imensionspe ecification. Assumptions 1. The thermal expansion at each cross section o the nozzle will be ap a of pproximately the y sa ame as the thermal expansion for a hollow c cylinder with the same inner and o h outer diametersasthegivencr rosssection. Approach h/Method 1. The nozzle converges on the inside and has a spherical o n e a outside surf face. Due to the o va aryinginner randouter diameters,t thermalexp pansionanal lysishadto beconductedat more than one point along the no m o ozzle length to see whe the greatest amount of ere ex xpansionwo ouldoccur.
20
2. Thermal expansion analysis was conducted at the thinnest cross section of the nozzle (theentrance)aswellasthethickestcrosssection(thethroat). Results *SeeAppendixEformoredetailedAnalysis
Table3
We recommend a 0.008112 inch tolerance between the nozzle and the flanges. Mounting O ringsonthenozzleissuggestedinordertomakeupforthelossinrotationalstabilityresulting fromthetolerance.Thisisdiscussedinmoredetaillaterinthereport. ThermalExpansionAnalysisonInconelCollar AcalculationofthethermalexpansionfortheInconelcollarmountedonthedivergingsection ofthenozzlewasrequired.Thecollarisabout0.15inchesthick,andwehadtoconfirmthatit would not expand enough to overcome the depth of its mounting slot. The mounting slot is 0.06inchesdeep.
21
SystemS Sketch
Collarplace esonmountings slot(0.06 inchesinde epth)viathisraisededge, whichis0.0 06inchesinheig ght.
Directionofcollarexpansion
Fig15.T Thermalexpansionofco ollar Objective e Theobjectiveofthis sanalysisist tocompute theradiale expansionof fthecollar, andconfirm mthat itisnotg greaterthanthedeptho ofthecollarsmountingslot. Assumptions 1. Approximatecollartobeahollowcylinder. A Method/ /Approach 1. Apply a basic thermal expansion eq A c quation to t collar us the sing advanced mechani of ics materialsprin m nciples. Results RadialEx xpansiononCollar:5.303 38*10^3inc ches Depthof fSlot:0.06in nches Conclusio ons/Recomm mendations Thetherm malexpansionoftheco ollardoesnotcleartheslotdepth.It tisgoodtou useasis.
22
SealMoun nts(Pointofa actionfor frictionfor rces) Colla arMount(Po ointsofaction n for actuation forc a ces)
Fig g16.Forces onnozzle Assumptions Inthisan nalysisitwas srealizedthattheseals mountedov vertheball shapedsect tionofthen nozzle wouldbe ethemainfr rictioncomp ponenttopr rovideresista ancetomot tion. Method/ /Approach Themaximumpressuredifferenceacrossth henozzlewa asusedtoap pproximate thenormal force thatwou uldbeonthe eseals. Results Theresultsofthisan nalysistoldu usthattheforcerequire edtobreakt thefrictionw wouldbear round 40lbs.
4.3CostAnalysis
Theprice eofInconel component tsvariesdep pendingon thegradeo ofInconelth hesponsorw wants used.Thelowestpri iceisforInc conel600(i.e.barprice e.Cell#8),w whilethehig ghestprice isfor
23
Inconel 718 (i.e. bar price. Cell #8). Incone 718 is ma 7 r el ainly used in aerospace and gas n e nozzle applicatio ons,butInco onel600ma aysufficeduetothevery ysmalloper ratingtime. Inconelf fastenershavealeadtim meof12w weekstoman nufacture.T Thecostofthefinished parts canbese eenintheta ablebelow(F Fasteners.Cell#8).
Table4
Material M
Co omponent(s)
Quantity
Price $256 64 eners:$34$4 8 44 Faste each Bar: $1450$ $2400 each eners: Hex Head Faste Quot teRequested $90e each12
Graphite1 Nozzle2 1,6 Diameter,1 3 12 Solid Lon ng, Gra aphiteRod Inconel5 Fastene ers,Flanges, ,6 8re eadymade 7 6 fast teners, Collar Dia meter; 6 long soli dbar;HexH Head m r, 4mm diameter 12 mm mlongfasten ners 9 10 Grafoil ORingSeals 4 11
CarbonF Felt13 Insulati ion14 N/A 15 N/A16 A Aluminum m17 LinearA Actuators 18 8 19 $80e each 20
Total:~$1910$2870 21
24
Regardin ngoxidationproperties,thesolidfue elusedtopo owertheroc cketishighly yoxidative.Since metalsoxidizeeasily y,fuelflowt throughana aluminumo orstealnozzlewillhave ahighlyadv verse impact on the syste o ems perfor rmance. However, grap phite does not oxidize easily, and the d oxidative enatureofthefuelwillh haveaneglig gibleimpact tduringthe17secondsofoperation n. Inadditio on,graphite ehasacoeff ficientofexp pansionof2 2.2in/in Fc comparedto o12.3in/in Ffor aluminum and a min m nimum of 5.5 in/in F fo steel. A llower therm expansio for the n or mal on nozzle requires a smaller to olerance between the nozzle and f n flange. This poses less risk to rotat tional stabilityd duringopera ation. Flanges Our team chose to have flange and fasteners of the system ma out of m es ade Inconel.A AlthoughInc conel718ismostsuitab bleforgasno ozzleapplica ations,we maygow withalower rgradeofIn nconelduet tothesmall operationt timeof17 seconds.Inconelwasselectedfo oritssuperioryieldand drupturestr rengthsat extremetemperatur res. Fig1 18.InconelF Flange However r,oneimpor rtantthingto onoteistha atwewillon nlyuseIncon nelinourpr rototypedes signif StellarEx xplorationsp pecifiesthat ttheprototy ypeneedsto obetested underextre emetemperature condition ns. Fasteners Thisteam mchoseInco onel20X3slottedflatheadsocket tcapfasteners.Wefeltflatheadsc crews tobeappropriate,a astheywouldnegateth heriskofint terferenceb betweenfas stenerheads sand othercom mponentsofthesystem m.
25
Actuatorselection Theselectionofactuatorswasdifficultduetoforceandspacerequirements.Initiallysolenoids were thought more suitable because of their ability to produce very quick movements. The problemwithsolenoidsisthatfortheforcedesiredthelightestonesarearoundthirtypounds. Thisweightwouldnotbereasonabletoaddtotherocket. Duetothestatedreasons,linearactuatorswerethendecidedupon.Manyactuatorsthatcould provide the desired force were very large. After a long search, two actuators that would be suitablewerefound.OnewastheTNAseriesmadebyZaber.Theseactuatorsare3incheslong and can produce a peak thrust of 14.6lbs. However, they sell this actuator for one thousand dollarsapiece.TheactuatorchosenwastheFrigelliL12seriesactuator.Theseactuatorscome in a range of options with different gearing and lengths of stroke. The 10mm (.394in) stroke option with a 210 to 1 gear ratio that with a 12 volt battery will produce a peak force of 45N(10.1lbf)at2.5mm/s(.0984in/s).Fouroftheseactuatorswillberequiredineachdirection toproducethe40lbf.Eachactuatorisequippedwithitsownfeedbackpotentiometerthatwill givethelengthofeachactuatorsotheycanbecontrolledmoreaccurately.Thecostofthese actuatorsis80dollars.The12voltmodelwilldrawaround130mAatpeakforce.Thatmeans thatthesystemwilluse12.48wattsmaximum. Grafoil Grafoil seals were selected due to their good combination of rigidity and flexibility under the givencircumstances.Thesecharacteristicswillhelpthesystemtomaintainstablerotation.In addition,thismaterialcanwithstandupto6000degreesFahrenheit. CarbonFelt Carbonfeltprovidedthelowestthermalconductivityofanymaterialwecouldfind.Hence,it wasthebestchoiceforinsulation.Inaddition,itcanbeusedinlowenoughamountsforitto nothaveabigeffectonthesystemsweightspecifications.
26
CHAPTER5Manufacturing/Assembly
Manufacturing/Assembly
NozzleParts ThisteamplanstomanufacturethenozzleonaCNClathemachine.FacilitiesontheCalPoly campushavemachineswhicharecapableoffollowingtheshapeprofileofournozzledesign. Afterobtainingtheoverallshapeofthenozzle,slotsforOringsandcollarwillbemadeona lathemachine. Flanges Theflangeswillbemanufacturedinasimilarfashionasthenozzleparts.However,inaddition, boringandthreadingisrequiredforwheretheboltswillbeplaced. FurtherFabricationandAssemblyInstructions The boat tail will need to be modified from its current design to provide more space for the componentsofthesystemtomove.Whatneedstobedonefirstistheinsiderearsectionthat iscurrentlyacontinuationofthenozzlemustbelathedsothatthenewnozzlewillhaveroom tomaneuverinsideit.Theotherthingthatmustbedoneistocutnotchessothattheactuators willhaveroomtomove.Thiscanbeaccomplishedusingthechopsawfirsttocreatetheangled cutsandthenarotarycuttingbladetofinishthebottompartofthetrapezoidshapedcuts. Thecollarthatisplacedaroundthenozzletoprovideattachmentpointsfortheactuatorswill be manufactured by taking a ring of the metal (either steel or inconel) being used for the flangesandlathingthecircularportionthentheringwillbecutandtabswillbeweldedtothe endsofthering.Thesetabswillbeusedtoclampthecollarontothenozzle.Thelaststepwill betodrillholesforthescrewsthatwillholdtheactuatorbrackets.*Forfurtherdetail,seethe ManufacturingsectioninChapter8.
27
Assembly of the entire system starts with inspection of the parts all dimensions should be checked so that problems will not be encountered later. After all the dimensions have been checkedthefirstpartsthatcanbeputtogetheraretheactuatorbracketsandthecollar.The brackets can be attached using hex head screws coming from the inside of the collar and holdingthebracketsonwithonewasherandanutatthisstagetheycanjustbetightenedby handandbetighteneddownlater.Onceallthebracketsareattachedthecollarcanbeslipped downoverthesmallendoftheball/nozzleandfittedintothelocatingslotaboltcanbeslipped through the hole in the tabs and finger tightened. Take the grafoil seals and cut two lengths thatwillfitintotheslotsontheroundpartoftheball.Thispiececannowbeputaside.Now measureanotherlengthofgrafoilfortheslotinthecarbonsocket.Placethesocketdownona benchsothattheslotwiththesealispointingup.Nowtheballcanbeplacedintothesocket. Take the two flanges and the remaining actuator brackets and attach them to their correspondingholesintheflangeswithprovidedbolts.Nowtheflangescanbeplacedonthe socket around the ball aligned with the bolt holes. Care should be taken to place the grafoil sealsintotheslotsintheflangeswithoutdamagingthem.The20x3inboltscanbeplacedin the holes in the flange and through the socket. Washers and nuts can be tightened onto the boltssecuringtheballandflangestothesocket.Thenextthingistofittheactuatorsintothe brackets place the actuator in the brackets using the M4 bolts provided. These bolts can be tightenednextyoucantightentheboltsholdingtheactuatorbracketsdownandmoveonto thenextactuatoruntilalleighthavebeenattached.Oncealltheactuatorsareinplacethebolt forthecollarshouldbetightened.Thenextstepistofliptheholeassemblyoverandinsulate the chamber where the batteries and controller will be kept. Care should be taken with the assemblyinthispositionsinceitmaybeunstable.Takingtheinsulatingcarbonfeltlooselywrap thissectionwithlongstripsoverlappingthepreviousendwitheachsuccessivepassuntilthere isjustenoughroomtoplacethebatteriesandotherelectricalcomponentsdirectlyupagainst thealuminumfuselage.Oncetheelectronicshavebeenhookeduptheentireassemblycanbe insertedintothefuselageandassemblyiscomplete. This rocket nozzle is designed to be used once so no maintenance schedule or repair is recommended.
28
CHAPTER6ProjectPlanning
6.1ProjectManagementPlan
Thisteamhascompletedthefinaldesignphaseoftheproduct.Theoriginalplanwastohave thisfinaldesignreportcompletedbyFebruary1,2011(GanttChart,Row34).However,wehave beendelayedbyafewdays,andthisreportisnowcompleteonFebruary5,2011. The first milestone was the Project Requirements Document (Gantt Chart, Row 14). This document showed a translation of all customer requirements to engineering specifications. Requirementssuchasdurability(QFD,Row3)weretranslatedtorequirementssuchasability towithstandaspecifiedhightemperature. MilestonesincludingthePreliminaryDesignPresentation(GanttChart,Row20),creationofthe solid model (Gantt Chart, Row 25), Conceptual Design Report (Gantt Chart, Row 28), and ConceptualDesign Review (GanttChart, Row 29) served to present the basicworkings of the system. The Conceptual Design Report included everything from the Project Requirements Document,afinalizeddesignconcept,aprojectmanagementplan,etc.TheConceptualDesign ReviewconsistedofapresentationoftheConceptualDesignReportsmainpartstotheproject sponsor. The current report is a more detailed version of the Conceptual Design Report. The content takes into account detailed analysis used to finalize system dimensions. It also expands on additionalsubsystemssuchastheactuators. For the final design phase of the project, Harsimran Singh handled the thermal expansion analysis and contact stress analysis. This is in addition to taking charge in acquisition of materialssuchasgraphite,Inconelbars,andInconelfasteners.DaneLarkinsofarhandledthe digitalsolidmodelingofthedesignandanalysisrelatingtoactuationofthesystem.Thisisin additiontotakingchargeinacquisitionofmaterials/componentssuchaslinearactuators,graph foilOringsandcarbonfeltinsulation.
29
6.2DesignVerification/TestingPlan
Planstovalidatetheconceptwillbeginbymeasuringgeneralattributesoftheassemblysuchas overallweightsizeandclearancebetweenmovingpartsandrangeofmotionofthenozzle. Aftergeneralattributeshavebeenmeasuredtheassemblywillbefittedintoatestfixturethat resemblesthebackendoftherocket.Theactuatorscanthenbehookeduptofunction generatorsthatwillproducevoltagetomovethenozzle.Withthefunctiongeneratorshooked up,measurementoftheactuationspeedcanbeobtained.Thenexttestwouldbetosetthe functiongeneratorsupsothattheywouldbeabletocyclethenozzlethroughthetwodegrees offreedomfor5thousandcycles.Duringthepreviousteststhepowerrequirementswillbe measuredbyoscilloscopes.Thesetestswillbeabletoshowthatourdesignmeetsthe requirementsthatweresetoutatthebeginningoftheproject. Inaddition,thesystemprototypemustundergotherequiredgasflowtesting.Thiswillverify thatthesystemreactsasdesiredtooperationaltemperaturesandpressures.
30
CHAPTER7ConclusionsandRecommendations
The outside diameter of the nozzles converging and throat sections is designed a specific amount smaller than the inside diameter on each flange cross section to take thermal expansion during operation into account. The Orings mounted on top of the nozzle are specificallydimensioned to make up for the difference indiameter. These Orings reestablish therotationalstabilityofthenozzle,whichwouldotherwisebecompromisedbythenozzlenot being flush with the flanges. Any careless changing of these dimensions will have an adverse impactonsystemperformance. This team has left it up to the sponsor to decide which grade of Inconel should be used. Although industry generally uses 718 grade for aerospace and gas nozzle applications, we recommend the use of a lower grade such as Inconel 600 or 625. Systems in industry are expected to operate for much longer durations than the 17 second operating time of our system.Inaddition,Inconel718isamuchmoreexpensivegrade.TheuseofInconel600willbe acheaperfinancialalternativeforStellarExploration.EvenifStellarExplorationdecidestouse Inconel718forfutureapplications,theuseofalowergradewouldbemorepracticalatleast forthecurrenttestingpurposes. Unless overall system dimensions are increased, we recommend continued use of flat head fastenerstonegatethepossibilityofinterferencebetweenthefastenerheadsandotherparts ofthesystem. TheInconelcollarmountedonthedivergingsectionofthenozzleispredictedtoexpand0.0032 inchesunderthegivenconditions.Werecommendnotmakingitsmountingslotshallowerthan adepthof0.0032inches.
31
8.1Mat terials
Thenozz zle,flangesa andsocketarerapidpro ototypemod delsmadeen ntirelyoutofathermop plastic called Ac crylonitrile butadiene st b tyrene (ABS). All actuat mounting brackets a coupler are tor and rs alsorapid dprototypemodels,but taremadeo ofresinbase edrapidprototypemate erialinstead.
Sock ket
Nozzle
Flange
32 Resin R
Fig 20
andthreadedstockarestandardsteelp partsboughtf fromahardw warestore. Allboltsa
Fig21.Des signFlaws
33
In order to resolve these issues, the number of m r e mounting p points was first decreased from 16 to 8 by cou upling two actuators at each poin The couplers (see y a nt. yellow bloc in cks h ssembly, th hus allowin mountin points to be ng ng o Fig 22) increased the length of the as f ck e T nted any s sort of interference du uring moved further bac from the flanges. This preven nozzle rotation. The couplers are fixed to the rest o the asse r of embly with o the shel rod off lf ends.
34
8.3Manufacturing
Aspreviouslystated,mostpartsoftheprototypesuchasball,socket,flangesandmountswere rapid prototyped. The only machined component is the collar. The collar was manufactured usingalathe.Themanufacturingprocessisasfollows:
Angle
Fig23.MachinedSectionofSolidbar 2. Hollowoutthemachinedbarsectiontodesiredthickness.Takecaretoleaveraised edgealongcollarsinsidesurface.Thisedgemustfitintothecollarsmountingslot. 3. Drillholeswhereactuatormountsmustbeplaced 4. Makeacutdownthecollar.Thiscutmustbehalfwaybetweentwoactuatormounts 5. Weldtabsontoedgesofthediscontinuity.
radius
MachinedBarSection
36
7degrees 7
ratus Fig25.TestAppar thenozzlew withvertexfa acingdown. 2. Placethetriangleinsidet 3. Alignaweigh A htedstringal longtriangle esvertex.
Wei ightedString
Fig2 26.Pretestsetup
37
Alignmenta at7degrees
Sw witch
Fig28.W Wiring
38
APPENDIX A
39
Column1 Criteria
installation ease Safety durability interface ease heat requirements response to angle change low weight ease of manufacture low drag Cost
Jetavator Vanes BallandSocket Cylinders Column2 Column3 Column4 Column5 Column6 Column7 Column8 Column9 Column10 Weight Rating Score Rating Score Rating Score Rating Score
6.8 2.3 15.9 11.4 15.9 15.9 15.9 2.3 11.4 2.3
8.5 9 8 7 4 7.5 8 6 10 6 74
57.8 20.7 127.2 79.8 63.6 119.25 127.2 13.8 114 13.8 7407.4
61.2 20.7 135.15 102.6 103.35 135.15 127.2 16.1 114 18.4 8338.5
57.8 20.7 143.1 102.6 119.25 127.2 79.5 16.1 108.3 16.1 7957.95
100.1
40
Title: Author: Date: Notes:
Legend
Strong Relationship Moderate Relationship Weak Relationship Strong Positive Correlation Positive Correlation Negative Correlation Strong Negative Correlation Objective Is To Minimize Objective Is To Maximize Objective Is To Hit Target
9 3 1
Column # Direction of Improvement: Minimize (), Maximize (), or Target (x) Quality Characteristics (a.k.a. "Functional Requirements" or "Hows") Weight / Importance
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Our Company
liquid injection
thrust vanes
Competitor 3
frequency response
heat requirements
Relative Weight
drag measured
actuation error
angle of thrust
liquid injection
Our Company
rotatable
flexible joint
Competitor 3
thrust vanes
Demanded Quality (a.k.a. "Customer Requirements" or "Whats") installation ease safety durabillity interface ease heat requirements response to angle chage low weight ease of manufacture low drag cost
flexible joint
slew rate
pressure
rotatable
Row #
weight
power
size
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
3 3 9 9 9 9 9 9 9 9
15.6 2.2 15.6 11.1 15.6 20.0 8.9 2.2 6.7 2.2
7.0 1.0 7.0 5.0 7.0 9.0 4.0 1.0 3.0 1.0
2 3 4 3 2 2 2 2 5 3
4 5 4 5 2 2 5 2 5 2
2 5 3 3 3 4 2 2 2 2
2 4 4 3 4 5 5 3 5 3
3 4 5 5 4 5 5 4 5 5
Difficulty (0=Easy to Accomplish, 10=Extremely Difficult) Max Relationship Value in Column Weight / Importance Relative Weight
9 9 315.6 10.4
4 9 200.0 6.6
5 9 408.9 13.5
4 9 288.9 9.6
7 9 395.6 13.1
3 9 233.3 7.7
2 9 208.9 6.9
5 9 204.4 6.8
5 9 280.0 9.3
428.9 14.2
Powered by QFD Online (http://www.QFDOnline.com)
less than5.75 d
600 psi
20 hz
41 APPENDIX B
Actuators
Actuators
42
43
44 APPENDIX C
Material/Component Graphite
Vendor www.GraphiteStore.com
Contact
Address:GraphiteStore.com, Inc. 1348 Busch Parkway Buffalo Grove, IL 60089 US Phone: 800-305-1664 (Toll Free US only) 847-279-1925 Fax: 847-279-1926
E-mail: [email protected]
Fasteners
FastenerSolutions,Inc.
InconelRods
CaliforniaMetaland Supply,Inc.
LinearActuators
FirgelliTechnologies
$34$44 Name: Matt Bridges foreach Office:866 463 2910 ext. 242F fastener Cell: 225-200-7909 Quote Fax: 225-927-9292 Requested http://www.fastenersolutions.com onSmaller Dimension Fasteners Phone:8007076061 $1450 $2400for Fax:8007073439 eachbar http://californiametal.com $80each Phone:2063479684
Fax:2063479684 [email protected],www.firgelli.com
GrafFoil CarbonFelt
www.sealsales.com ChemShine
$90each N/A
45 APPENDIX D
SECTION A-A 35
.15 .06 18
.05
DRAWN BY: DANE LARKIN TOLERANCE: .001 NEXT ASSY: DWG #: 001 UNITS: INCHES SCALE: 1/4 DATE: 2/5/11
3
INIT:
INIT:
46
5.75
3.50 2.92
50 R2.88 1.13 .19 .50 .30 2.38 .10 A .19 .75 .10 .19 SECTION A-A DRAWN BY:DANE LARKIN TOLERANCE: .001 NEXT ASSY: DWG #: 004
5 4
45
6X
.25
R1.76 .09
.40
3.50
.17 INIT:
47
SECTION B-B
.25 3.75 2.25 .80 .95 1.70 5.75 6.00 2.50 .40
4.76 B B 15
DRAWN BY: DANE LARKIN TOLERANCE: .001 NEXT ASSY: DWG #: 002 UNITS:INCHES SCALE:1:4 DATE: 2/5/11
3
INIT:
CKD BY: SIMRAN SINGH MATERIAL: ALUMINUM TITLE: MODIFIED BOAT TAIL GROUP:
2 1
INIT:
48
.07 A .12
.50
.10
18
.25
.06 .14
1.74
A SECTION A-A
DRAWN BY: DANE LARKIN TOLERANCE: .001 NEXT ASSY: DWG #:003 UNITS: INCHES SCALE: 2:1 DATE:2/5/11
3
INIT:
CKD BY: SIMRAN SINGH MATERIAL: STEEL OR INCONEL TITLE: COLLAR GROUP:
2 1
INIT:
49
.20 2.00
25
R.13X4
50 .53
13
2.60
R1.95
R2.35
.10 DRAWN BY: DANE LARKIN TOLERANCE: .001 NEXT ASSY: DWG #: 005
5 4
CKD BY: SIMRAN SINGH MATERIAL: ALUMINUM OR INCONEL TITLE: FLANGE GROUP:
2 1
INIT:
50
DRAWN BY:DANE LARKIN TOLERANCE: .001 NEXT ASSY: DWG #: 006 UNITS:INCHES SCALE: 1:2 DATE: 2/5/11
3
INIT:
INIT:
51
6 3
4 5
ITEM NO. 1 2 3 4 5 6
DRAWN BY:DANE LARKIN TOLERANCE: .001 NEXT ASSY: DWG #: 007
5 4
INIT:
QTY.
1 2 1 8 16 1
ID 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
Task Name selecting projects project presentations project preference form sponsor communication team introduction to sponsor visit the sponsor team contract projects requirement Doc background research QFD development specification Development method of approach management plan project Requirements Doc Correct Requirements Doc Idea Generation brain storming PEW diagram conceptual model preliminary design presentation Conceptual Design Enhance design requirements doc priliminary calculations initial drawings solid model proto type preliminary plans for constructioon and te conceptual design report conceptual design review Design finalization reanalyze certain design aspects make changes to concept student presentations Design Report Doc manufacturing Task Split
Duration
Start
52 APPENDIX E Finish
12 19 26
Oct '10 3
10
17
24
Nov '10 31 7
14
21
Dec '10 28 5
3 days? Tue 9/21/10 Fri 9/24/10 3 days? Tue 9/21/10 Thu 9/23/10 0 days Fri 9/24/10 Fri 9/24/10 6 days Wed 9/29/10 Thu 10/7/10 0 days Wed 9/29/10 Wed 9/29/10 0 days Wed 10/6/10 Wed 10/6/10 0 days Thu 10/7/10 Thu 10/7/10 17 days? Mon 9/27/10 Tue 10/19/10 17 days? Mon 9/27/10 Tue 10/19/10 1 day? Thu 10/14/10 Thu 10/14/10 2 days? Thu 10/14/10 Sat 10/16/10 1 day? Mon 10/18/10 Mon 10/18/10 2 days? Mon 10/18/10 Tue 10/19/10 0 days Tue 10/19/10 Tue 10/19/10 31 days Mon 10/25/10 Mon 12/6/10 13 days? Thu 10/21/10 Tue 11/9/10 9 days? Thu 10/21/10 Tue 11/2/10 1 day? Fri 11/5/10 Fri 11/5/10 1 day Fri 11/5/10 Sat 11/6/10 0 days Tue 11/9/10 Tue 11/9/10 19 days? Wed 11/10/10 Mon 12/6/10 19 days? Wed 11/10/10 Mon 12/6/10 7 days Wed 11/10/10 Thu 11/18/10 10 days Fri 11/12/10 Thu 11/25/10 0 days Thu 11/25/10 Thu 11/25/10 1 day? Fri 11/26/10 Fri 11/26/10 2 days? Tue 11/23/10 Wed 11/24/10 0 days Fri 12/3/10 Fri 12/3/10 0 days Mon 12/6/10 Mon 12/6/10 18 days? Thu 1/6/11 Tue 2/1/11 5 days Thu 1/6/11 Wed 1/12/11 1 day? Thu 1/13/11 Thu 1/13/11 0 days Tue 1/18/11 Tue 1/18/11 0 days Tue 2/1/11 Tue 2/1/11 42 days? Mon 2/7/11 Tue 4/5/11 External Milestone Inactive Task Inactive Milestone Inactive Summary Manual Task Duration-only Page 1
10/19
11/9
11/25
12/3 12
53
ID 36 37 38 39 40 Task Name contact sponsor about materials machineing and assembly testing fixing anything that is broken final project design report Duration 5 days? 21 days? 11 days? 6 days? 0 days Start Mon 2/7/11 Fri 2/11/11 Mon 3/14/11 Tue 3/29/11 Fri 6/3/11 Finish 12 Fri 2/11/11 Sat 3/12/11 Mon 3/28/11 Tue 4/5/11 Fri 6/3/11 19 26 Oct '10 3 10 17 24 Nov '10 31 7 14 21 Dec '10 28 5
Task Split Project: senior Project.mpp Date: Fri 2/4/11 Milestone Summary Project Summary External Tasks
External Milestone Inactive Task Inactive Milestone Inactive Summary Manual Task Duration-only Page 2
54
'10 5 12 19 26 Jan '11 2 9 16 23 Feb '11 30 6 13 20 Mar '11 27 6 13 20 27 Apr '11 3 10 17 24 May '11 1 8 15 22 Jun '11 29 5
12/3 12/6
1/18 2/1
Task Split Project: senior Project.mpp Date: Fri 2/4/11 Milestone Summary Project Summary External Tasks
External Milestone Inactive Task Inactive Milestone Inactive Summary Manual Task Duration-only Page 3
55
'10 5 12 19 26 Jan '11 2 9 16 23 Feb '11 30 6 13 20 Mar '11 27 6 13 20 27 Apr '11 3 10 17 24 May '11 1 8 15 22 Jun '11 29 5
6/3
Task Split Project: senior Project.mpp Date: Fri 2/4/11 Milestone Summary Project Summary External Tasks
External Milestone Inactive Task Inactive Milestone Inactive Summary Manual Task Duration-only Page 4
56 APPENDIX F
57
58
Page 1 of 1
Close
Grade: GR001CC
Manufacturer: Method of Manufacturing: Description: Graphtek LLC Isostatically Pressed High strength, wear resistant graphite
PROPERTY Density Shore Hardness Flexural Strength Oxidizing Atmosphere Neutral Atmosphere Porosity Electrical Resistivity Thermal Conductivity Ash Content CTE
lb/in
mpa C C
ohm/cm F/ft)
85 4.6
W/(m 2 . K/m)
Microns/m C
Close
http://www.graphitestore.com/pop_up_grades.asp?gr_name=GR001CC
2/5/2011
59
L12 Specifications
Gearing Option Peak Power Point 1 Peak Efficiency Point Max Speed (no load) Backdrive Force 2 Stroke Option Weight 50 12 N @ 11 mm/s 6 N @ 16 mm/s 23 mm/s 43 N 10 mm 28 g Positional Accuracy 0.1 mm Max Side Force (fully extended) 50 N Mechanical Backlash Feedback Potentiometer Duty Cycle Lifetime Operating Temperature Storage Temperature Ingress Protection Rating Audible Noise Stall Current 100 210 23 N @ 6 mm/s 45 N @ 2.5 mm/s 12 N @ 8 mm/s 18 N @ 4 mm/s 12 mm/s 5 mm/s 80 N 150 N 30 mm 50 mm 100 mm 34 g 40 g 56 g 0.2 mm 0.2 mm 0.3 mm 40 N 30 N 15 N 0.1 mm 2.75 k/mm 30%, 1% linearity 20 % 1000 hours at rated duty cycle 10C to +50C 30C to +70C IP54 55 dB at 45 cm 450 mA at 5 V & 6 V, 200 mA at 12 V
Benefits
Compact miniature size Simple control using industry standard interfaces Low voltage Equal push / pull force Easy mounting
1 1 N (Newton) = 0.225 lbf (pound-force) 2 a powered-off actuator will statically hold a force up to the Backdrive Force
Applications
Robotics Consumer appliances Toys Automotive Industrial automation
cm AWG leadwires with . mm pitch female header connector
Dimensions (mm)
60 L12 Specifications
Load Curves
Current Curves
Gearing Option
Current (mA)
6 V Models
Gearing Option
Speed (mm/s)
V Models
Gearing Option
Force (N)
Force (N)
Model Selection
The L12 has five configurable features. L12 configurations are identified according to the following scheme:
Basis of Operation
The L12 actuator is designed to move push or pull loads along its full stroke length. The speed of travel is determined by the gearing of the actuator and the load or force the actuator is working against at a given point in time (see Load Curves chart on this datasheet). When power is removed, the actuator stops moving and holds its position, unless the applied load exceeds the backdrive force, in which case the actuator will backdrive. Stalling the actuator under power for short periods of time (several seconds) will not damage the actuator. Do not reverse the supply voltage polarity to actuators containing an integrated controller (I controller option). Each L12 actuator ships with two mounting clamps, two mounting brackets and two rod end options: a clevis end and a threaded end with nut (see drawing on page 4). When changing rod ends, extend the actuator completely and hold the round shaft while unscrewing the rod end. Standard lead wires are 28 AWG, 30 cm long with 2.56 mm (0.1") pitch female header connector (HiTec and Futaba compatible). Actuators are a sealed unit (IP54 rating, resistant to dust and water ingress but not fully waterproof).
L12-SS-GG-VV-C-L
feature options 10, 30, 50, 100 Any stroke length between 10 and 100 mm is available on custom orders, in 2 mm increments.
50, 100, 210 Other gearing options may be possible on custom orders. 06 6 V (5 V power for Controller options B and P) 12 12 V
C: Controller
B Basic 2-wire open-loop interface, no position feedback, control, or limit switching. Positive voltage extends, negative retracts. S 2-wire open-loop interface (like B option) with limit switching at stroke endpoints.
P Simple analog position feedback signal, no on-board controller. I Integrated controller with Industrial and RC servo interfaces (see L12 Controller Options section). Not available with 10mm stroke length configurations.
Ordering information
Sample quantities may be ordered with a credit card directly from www.firgelli.com. Please contact Firgelli at [email protected] for volume pricing or custom configurations. Note that not all configuration combinations are stocked as standard products. Please refer to www.firgelli.com/orders for current inventory.
Custom option codes will be issued by Firgelli for custom builds when applicable.
Miniature Linear Motion Series L12 Firgelli Technologies Inc. for more info call 1 (888) 225-9198 or visit www.firgelli.com
RC Servo Interface Mode: This is a standard hobby-type remote-control digital servo interface (CMOS logic), compatible with servos and receivers from manufacturers like Futaba and Hi-Tec. The desired actuator position is input to the actuator on lead 4 as a positive 5 Volt pulse width signal. A 1.0 ms pulse commands the controller to fully retract the actuator, and a 2.0 ms pulse signals full extension. If the motion of the actuator, or of other servos in your system, seems erratic, place a 14 resistor in series with the actuators red V+ leadwire. PWM Mode: This mode allows control of the actuator using a single digital output pin from an external microcontroller. The desired actuator position is encoded as the duty cycle of a 5 Volt 1 kHz square wave on actuator lead 2, where the % duty cycle sets the actuator position to the same % of full stroke extension. The waveform must be 0V to +5V in order to access the full stroke range of the actuator.
Miniature Linear Motion Series L12 Firgelli Technologies Inc. for more info call 1 (888) 225-9198 or visit www.firgelli.com
62
Miniature Linear Motion Series L12 Firgelli Technologies Inc. for more info call 1 (888) 225-9198 or visit www.firgelli.com