SAP K088 Tutorial: How To Settle Individual Production Order

This document provides instructions for settling a production order at month end using transaction code KO88 in SAP. The KO88 transaction is used to settle individual production orders. During settlement, work in process is posted if the order is incomplete, or variance is posted if the order is complete, which may reverse any previous WIP. The document outlines the 10 steps for accessing and using KO88, including entering the order, period, and fiscal year, running a test, executing the settlement, and viewing the resulting accounting documents.

Uploaded by

ERPDocs
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
100% found this document useful (4 votes)
5K views7 pages

SAP K088 Tutorial: How To Settle Individual Production Order

This document provides instructions for settling a production order at month end using transaction code KO88 in SAP. The KO88 transaction is used to settle individual production orders. During settlement, work in process is posted if the order is incomplete, or variance is posted if the order is complete, which may reverse any previous WIP. The document outlines the 10 steps for accessing and using KO88, including entering the order, period, and fiscal year, running a test, executing the settlement, and viewing the resulting accounting documents.

Uploaded by

ERPDocs
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
You are on page 1/ 7

COST CENTER ACCOUNTING PRODUCT COST CONTROLLING END USER TRAINING DOCUMENTS

KO88 Functionality Production order needs to be settled at the month end. This transaction is used to settle individual production order. During Production order settlement, either Work In Process (if incomplete delivery) or Variance (if complete delivery) is posted. If Variance is posted, any WIP posted before will be reversed. Scenario You want to post settle the production order at the month end Requirements Work in Process and Variance was calculated Menu Path Accounting Controlling Product Cost Controlling Cost Object Controlling Product Cost by Order Period-End Closing Single Functions Settlement KO88 Individual Processing
KO88

Transaction Code

1.

Double click on KO88 - Individual Processing

SAPTOPJOBS

Page 1 of 7

COST CENTER ACCOUNTING PRODUCT COST CONTROLLING END USER TRAINING DOCUMENTS Actual Settlement: Order

2.

Update the following fields:


Field Name Order Period Fiscal year Field Description Number identifying the order Number identifying a fiscal month. Fiscal year for which you calculate variance. 700000 11 2002 Values

3. 4. 5.

Click the Test run Click the Execute Click the Detail lists

checkbox. button. button.

SAPTOPJOBS

Page 2 of 7

COST CENTER ACCOUNTING PRODUCT COST CONTROLLING END USER TRAINING DOCUMENTS Actual Settlement: Order Detail list

6.

Select the relevant line and click the Accounting documents button.

SAPTOPJOBS

Page 3 of 7

COST CENTER ACCOUNTING PRODUCT COST CONTROLLING END USER TRAINING DOCUMENTS List of Documents in Accounting

7.

Click the Continue

button.

SAPTOPJOBS

Page 4 of 7

COST CENTER ACCOUNTING PRODUCT COST CONTROLLING END USER TRAINING DOCUMENTS Display Document: Overview

8.

Click the Back

button.

SAPTOPJOBS

Page 5 of 7

COST CENTER ACCOUNTING PRODUCT COST CONTROLLING END USER TRAINING DOCUMENTS List of Documents in Accounting

9.

Click the Cancel

button.

SAPTOPJOBS

Page 6 of 7

COST CENTER ACCOUNTING PRODUCT COST CONTROLLING END USER TRAINING DOCUMENTS Actual Settlement: Order Detail list

10.

Click the Back