This document is a daily schedule and log for the crew of the International Space Station. It details the activities of the Commander (CDR), Flight Engineer 1 (FE-1), and Flight Engineer 2 (FE-2) over a 24 hour period, including morning inspections, breakfast, exercise, experiments, maintenance tasks, crew conferences, media events, and planning meetings. Key events include testing a thruster, purging hardware, collecting plant experiment data, transferring cargo between modules, and preparing equipment for return to Earth.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
39 views2 pages
NASA: 190904main 092607 TL
This document is a daily schedule and log for the crew of the International Space Station. It details the activities of the Commander (CDR), Flight Engineer 1 (FE-1), and Flight Engineer 2 (FE-2) over a 24 hour period, including morning inspections, breakfast, exercise, experiments, maintenance tasks, crew conferences, media events, and planning meetings. Key events include testing a thruster, purging hardware, collecting plant experiment data, transferring cargo between modules, and preparing equipment for return to Earth.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2
Page 1 of 2
Radiogram No. 6182u Form 24 for 09/26/07
ATTITUDE CONTROL THRUSTER [ДО] INHIBIT. TESTING PRIMARY ЛКЦ2Б36 WITH ВД-СУ MODE DEACTIVATED AND БИТС POWERED OFF GMT CREW ACTIVITY
06:00-06:10 CDR, FE-1 Morning inspection
06:00-06:05 FE-2 SLEEP - data logging 06:05-06:10 FE-2 Morning inspection 06:10-06:40 Post-sleep 06:40-07:30 BREAKFAST 07:30-07:45 Daily Planning Conference (S-band) 07:45-08:15 . Kentavr suit adjustments. Tagup with specialists (S-band) 08:15-09:15 FE-2 Physical Exercise (CEVIS) 08:15-08:35 FE-1 Elektron purge and power down PLASMA-ISS. Hardware installation and setting up. Tagup with specialists (S- 08:15-09:30 CDR band) 08:35-09:05 Sampling water from Elektron Water Supply System [СВО] FE-1 Changeout of multi-filtration unit assembly for Elektron SVO (БКО #507024, b/c 09:05-09:35 00043063R (ФГБ1ПГО_4_406_1). Discard removed unit 09:15-10:45 FE-2 Physical Exercise (RED) 09:35-11:05 FE-1 Physical Exercise (TVIS) Day 2 09:45-10:00 10:10-10:25 CDR PLASMA-ISS. Experiment ops. Tagup with specialists (S-band) 10:30-10:45 10:55-11:10 11:05-11:25 FE-1 PLANTS-1. Data collection and downlink 11:20-11:35 PLASMA-ISS. Experiment ops. Tagup with specialists (S-band) CDR 11:35-12:00 PLASMA-ISS. Hardware stow. Tagup with specialists (S-band) 11:45-11:55 PAO hardware setup FE-1 11:55-12:40 Activation of Progress 361 (DC1) 12:00-12:40 CDR СОЖ Maintenance 12:10-13:50 FE-2 Hardware Pre-pack for Return on 10A 12:40-13:00 Removal and inspection of quick-release screw clamps, interface video 13:00-13:20 CDR, FE-1 ТКГ-СО1 [Progress-DC1] and СО1-СУ [DC1-DM] Transfer Hatch Closure 13:20-14:20 СО1-ТКГ [DC1-Progress] Hatch Leak Check 13:50-14:20 FE-2 ISS-15 FE-2/ ISS-16 FE-2 Crew Conference (Ku + S-band) 14:20-15:20 LUNCH 15:20-15:30 FE-1 Downlink DC1-to-Progress Interface Video (Ku + S-band) 15:20-15:30 CDR, FE-2 Crew prep for PAO TV greetings dedicated to the 50th Anniversary of the first satellite launch (Ku + 15:30-15:50 . S-band) 16:00-16:45 CDR Prep for Work 16:00-16:05 Payload status check FE-2 16:05-16:15 CWC audit Page 2 of 2
16:35-17:35 FE-1 Physical Exercise (TVIS) Day 2
16:45-17:20 CDR Physical Exercise (RED) 16:45-16:50 HAM radio setup FE-2 16:50-17:00 HAM radio session 17:20-19:15 CDR Physical Exercise (TVIS) Day 2 17:20-17:25 Setting up v/camera 17:25-17:35 US hardware transfer to RS prior to Soyuz relocation FE-2 17:35-17:55 PCS relocation 17:55-18:10 Questionnaire - journal entry 17:55-18:15 FE-1 IMS update 18:10-18:45 FE-2 Prep for Work 18:15-19:15 FE-1 18:45-18:50 MSG – daily deactivation of the SAME experiment 18:50-19:10 FE-2 Prep for Work 19:10-19:15 Transfer TVIS/RED/CEVIS/HRM data to MEC 19:15-19:30 Daily Planning Conference (S-band) 19:30-20:00 DINNER 20:00-20:30 Daily food prep 20:30-21:30 Pre-sleep 21:30-09:00 SLEEP Task List FE-1 GSF-JAXA. ТБУ temperature monitoring (in the morning) Note: See OSTP for references to US activities. End of Radiogram