03 Bat - Form Bast &amp Si

This document contains two Berita Acara Serah Terima (BAST) or handover reports for a construction project. The first BAST is for 100% completion of the original scope of work for renovating an office building in Jombang, Java. The second BAST is for 100% completion of additional work added to the original project scope. Both BASTs were signed on June 21, 2012 and include attachments such as photos documenting project progress.

Uploaded by

Ning Rifah
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
206 views2 pages

03 Bat - Form Bast &amp Si

This document contains two Berita Acara Serah Terima (BAST) or handover reports for a construction project. The first BAST is for 100% completion of the original scope of work for renovating an office building in Jombang, Java. The second BAST is for 100% completion of additional work added to the original project scope. Both BASTs were signed on June 21, 2012 and include attachments such as photos documenting project progress.

Uploaded by

Ning Rifah
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

PT.

CITRA KARSA DINAMIKA


DESIGN-MANUFACTURING-CONSTRUCTION-GENERAL TRADING BERITA ACARA SERAH TERIMA PROGRESS 100% PEKERJAAN KONSTRUKSI BoQ AWAL
No. : 001 / 05 / CKD - BAT / 2012 Date. : 21 Juni 2012

DETAIL PROYEK Nama Project Tipe Pekerjaan Lokasi DETAIL KONTRAK No. PO Tanggal PO Nilai (awal) PO Nilai (actual) PO Tanggal Pekerjaan DETAIL PROGRESS Progress Date
21-Jun-12

Pekerjaan Renovation Office ASMO Jombang Pekerjaan Sipil dan Canopy Jombang

4080038231 3-May-12 Rp. 276.000.000 Rp. 3-May-12

( exclude PPN ) ( exclude PPN ) 1-Jun-12

% of Progress Completed claim 100 % completed

BAST Number / Date 001/05/CKD-BAT/2012 21-Jun-12

PERSETUJUAN BAT

Colliers

Vendor / Kontraktor

Denny Soedharmo

Abdillah Mauludi

Viktor Rendra

LAMPIRAN BAST PO

Progress Report

FOTO PROGRESS 45% (progress lapangan 100%) etc. (WAJIB DILAMPIRKAN)

NOTE

BERITA ACARA SERAH TERIMA KERJA TAMBAH PROGRESS 100% SI (Kerja Tambah)
No. : 002 / 05 / CKD-BAT / 2012 Date. : 21 - Juni - 2012

DETAIL PROYEK Nama Project Tipe Pekerjaan Lokasi DETAIL KONTRAK No. PO Tanggal PO Nilai (awal) PO Nilai (actual) PO Tanggal Pekerjaan DETAIL PROGRESS Progress Date
(TGL SELESAI PEKERJAAN PROGRESS 100%)

Pekerjaan Tambah Renovation Office Pekerjaan Sipil dan Partisi Wiremesh .

Rp. Rp.

(include PPN/ exclude PPN ) (include PPN/ exclude PPN)

% of Progress Completed

BAST Number / Date

001/05/CKD-BAT/2012 21-Jun-12

PERSETUJUAN BAT

Colliers

Vendor / Kontraktor

Denny Soedharmo

Abdillah Mauludi

Viktor Rendra

LAMPIRAN SI (Site Instruction) PO

Foto Selesainya Pekerjaan Tambah

NOTE