0% found this document useful (0 votes)
129 views41 pages

6beam Design

This document provides details on the design of beam C/5A-1A. It determines the size of the beam based on the longest span of 8000 mm. The beam is designed to have dimensions of 200 mm width and 400 mm depth. Reinforcement details are provided for bending moments at mid-span and supports. The beam size is increased to 250 mm width and 500 mm depth to satisfy deflection requirements. Reinforcement details are also provided for the lowest bending moment region of span 2A-2.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
129 views41 pages

6beam Design

This document provides details on the design of beam C/5A-1A. It determines the size of the beam based on the longest span of 8000 mm. The beam is designed to have dimensions of 200 mm width and 400 mm depth. Reinforcement details are provided for bending moments at mid-span and supports. The beam size is increased to 250 mm width and 500 mm depth to satisfy deflection requirements. Reinforcement details are also provided for the lowest bending moment region of span 2A-2.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 41

BEAM DESIGN

Beam C/5A 1A

Determine the size of beam based on longest span (8000 mm)


Span = 26
d
d = 8000 = 308 mm
26
Cover
Table 3.4, mild cover = 25 mm concrete grade C30.
Table 3.5, 2 hr Fire resistance cover = 30 mm
Take cover = 30 mm
Say diameter of bar = 20 mm
h = d + /2 + cover
= 308 + 20/2 + 30 = 348 mm
Say take h = 400 mm
2

b = h/2 = 400/2 = 200 mm (b = h/2 h/3)

Figure 3.2 For 2 hrs fire resistance b = 200 mm (min)


b = 200 mm = 200 mm (O.K)
Self wt of beam = 24 x 200 x 400 = 1.9 kN/m
1000 1000
Factored self wt = 1.4 x 1.92 = 2.7 kN/m
Cl. 3.5.3.7 Loads on supporting beam
From slab design n = 10.18 kN/m2
For the purpose of manual calculation take 4 span at the middle.

Span
3

Plan
ly = 8000 = 1
lx
8000

27 x 2 = 54 kN/m

Table 3.15

vx = 0.33
vy = 0.33

Vsy = Vsx = 0.33 x 10.18 x 8 = 27 kN/m


Both sides V = 27 x 2 = 54 kN/m

Span 4-3
4

Plan

ly = 8000 = 2
lx 4000

Vsx = 0.5 x 10.18 x 4 = 20.36 kN/m


Both sides V = 20.36 x 2 = 41 kN/m
5

ly
lx

= 4000 = 1
4000

vx = 0.33

Span 2A 2
Similar to span 3 2A
6

Vsx = 0.33 x 10.18 x 4 = 13.44


Both sides V = 13.44 x 2 = 27 kN/m

Loading Diagram

DF4-5

EC/8 =
EC + EC
8
8
DF 4-3 = 0.5

EC x 8 = 0.5
8 x 2EC

DF3-4 = EC/8 = EC x 8 = 0.33


EC + EC
8 x 3EC
8
4
DF3 2A = 1 0.33 = 0.67
DF2A-3 = EC/4
= EC x 4
= 0.5
EC + EC
4 x 2EC
4
4
DF2A-2 = 0.5
FEM = wl2/12 + 0.754 wl2

FEM5-4 =

2.7 (8)2 + 0.0754 (54) (8)2

12
=

14.4 + 260.6 = 275 k Nm

FEM4-5 =

- 275 kNm

FEM4-3 =

14.4 + 0.0754 (41) (8)2

14.4 + 197.8 = 212.2 kNm

FEM3-4 =

- 212.2 kNm

FEM3-2A =

2.7 (4)2 + 0.0754 (27) (4)2


12

3.6 + 32.6 = 36.2 kNm

FEM2A-3 =

- 36.2 kNm

FEM2A-2 =

+ 36.2 kNm

FEM2-2A =

- 36.2 kNm

.5

.5

.33

2A

.67

+276

-275

+212.2

-212.2

36.2

- 36.2

+15.7

+31.4

+31.4

+ 58.1

+117.9

+ 69.0

+29.0

+ 15.7

- 14.5

- 5.2

- 10.5

- 2.6

-7.3

- 17.3

+ 1.3

+ 8.1

+ 16.5

- 7.3

- 14.5

+ 1.3

+ 4.0
- 1.0
+282.4

.5

- 2.0

-258.8

- 2.0

+258.8

.5
+36.2

-36.2

- 34.5

- 34.5

- 17.3

+ 2.7

+ 2.7

+1.3

- 4.1

- 4.1

- 2.0

- 0.2

+ 0.3

- 54. 2

+ 8.2
- 1.0

- 2.0

+ 1.0

+ 2.0

-142.8

+142.8

Individual Moment
Span 5 - 4

R5 = R4 = 2.7 x 8 + 54 x 6 = 172.8
2
2
M5-1 = 172.8 x 1 2.7 (1)2 = 171.45 kN/m
2
M cL = 172.8 x 4 2.7 (4)2 - 54 (3)2 = 426.6 kNm
2
2
Span 4 - 3
R4 = R3 = 2.7 x 8 + 41 x 6 = 134. 2 kN
2
2
M4.1 = 134.2 x 1 2.7 x 12 = 132.85 kNm
2
2
2
Mc
L = 134.2 x 4 2.7 (4) - 41 x 3 = 330.7 kNm
2
2

10

R3 = R2A = 2.7 x 4 + 2.7 x 3 = 45.9 kN


2
2
M3.1 = 45.9 x .5 2.7 (.5)2 = 22.6 kN/m
2
M cL = 45.9 x 2 2.7 (2)2 - 27(1.5)2 = 56 kNm
2
2
Span 2A 2
Similar to Span 3 2A

M2A.1 = 22.6 kNm


McL = 56 kNm
11

Individual Shear
Span 5 - 4

cL

V5
=
V5.1 =
V
=

172.8 kN
172.8 2.7 x 1 = 170.1 kN
172.8 2.7 x 4 = 54 x 3 = 0

Span 4 - 3
V4
=
V4.1 =

12

134.2 kN
134.2 2.7 x 1 = 131.5 kN

Span 3-2A
V3
=
V3.1 =

45.9 kN
45.9 2.7 x .5 = 44.55 kN

Span 2A-2
Similar to span 3-2A

13

BMD
Shear Span 5 - 4

+172.8

- 172.8

+282.4

+ 282.4

Shear Span 4-3

-258.8

+ 134.2

- 134.2

+ 258.8

+ 258.8

8
- 142.8
8
14

+ 148.7

8
- 142.8
8
- 119.7

8
+175.75

8
-258.8
8
- 169.86

Span 3 2A
3

2A

+ 45.9

- 45.9

+ 142.8

+ 142.8

+ 81.6

- 10.2

+ 45.9

- 45.9

- 54.2

- 54.2

Span 2A - 2

+ 32.36

15

- 59.5

SFD

Beam C/5A 1A
Size of beam 200 x 400
400

200
d

h cover link /2

400 30 10 25/2

347.5 mm

Assume link = 10 mm

= 25 mm

Design beam at Mid Span, M = 156 kN m


k

=
=
=

M
fcubd2
156 x 106
30 x 200 x 347.52
0.215 > 0.156

Design as doubly reinforced beam


16

=
=
=

z=
=
=

0.78 d
0.78 (347.5)
271.05 mm

cover + link + /2
30 + 10 + 25/2
52.5 mm

=
=
=

As =
=
=

17

d (0.5 + (0.25 k )
0.9
d (0.5 + (0.25 0.156)
0.9
0.78 d

(k-k)fcubd2
0.95 fy (d-d)
(0.215 0.156)(30)(200)(347.5) 2
0.95(460)(347.5 52.5)
332 mm2

(12)2 = 113 mm2


4
Provide 3 T12
As
=
339 mm2
Area

As

kfcubd2 + As
0.95fyz
=
0.156(30)(200)(347.5)2 + 332
0.95 (450)(271.05)
=
954 + 332 = 1286 mm2
Area, (25)2 = 491 mm2
4
Provide 3T25, As = 1473 mm2
Design beam at support, M 282.4 kNm
k

18

M
fcubd2
=
282.4 x 106
(30)(200)(347.5)2
=
0.39 > 0.156
Compression reinforcement is required.

d(0.5 + (0.25 k)
0.9
=
d (0.5 + (0.25 0.156)
0.9
=
0.78 d
=
0.78 d
= 0.78 (347.5)
=
271.05 mm
=

=
=
=

As

Cover + link + /2
30 + 10 + 25/2
52.5 mm

(k k)fcubd2
0.95 fy (d d)
=
(0.39 0.156)(30)(200)(347.5)2
0.95 (460)(347.5 52.5)
=
1315 mm2
Provide 3T25, As = 1473 mm2

19

kfcubd2 + As
0.95 fyz
=
0.156 (30)(200)(437.5) + 1315
0.95 (460) (271.05)
=
954 + 1315 = 2269 mm
Provide 5T25, As = 2455 mm2
As

Check max reinforcement


100 x As < 4%
bh
=
100 x 2455 = 3.1 < 4
200 x 400
------------ OK

20

Shear Reinforcement
Vmax
=
175.8 kN
Shear stress, v = V
bd
= 175.8 x 103
200 x 347.5
= 2.53 N/mm2
100As =
100 (2455) = 3.53
bd
200 x 347.5

Table 3.9 vc

by interpolation,
=
(0.98 0.91) x 52.5 + 0.91
100
=
0.947 N/mm2
v - vc
= 2.53 0.947
=
1.583 N/mm2
(vc + 0.4) < v<0.8fcu or 5 N/mm2
<0.8 fcu or 5 N/mm2
1.347 <2.53 <0.8 x 30 = (4.38)

Asv =
Sv
=

bv(v vc)
0.95fyv
200 (1.583)
0.95 (250)
=
1.33
Asv
= 2 x (10)2 = 157.1 mm2
4
Sv
= 157.1 = 118 mm
1.33
Provide R10 120 mm </<
21

300

347.5

400

Deflection (At centre span 5 4)


fs
=
2fyAsreq
3 Asprov
=
2(460)(1286)
3(1473)
=
268 N/mm2
M
bd2

156 x 106
200 x 347.52

M.F

=
=
=

0.55 + [(477 fs) / (120 x (0;9 + M/bd2))]


0.55 + [(477 268) / (120 x (0.9 + 6.46))]
0.55 + 0.24 = 0.79

Actual span/d =

= 6.46

8000 = 23
347.5
Allowable span/d = 26 x 0.79 = 20.54
Actual span/d > Allowable span/d
Fail in Deflection

22

Increase the size of beam to 250 x 500 mm


d
=
=

=
500 cover link /2
500 30 10 25/2
447.5 mm

M =
bd2

156 x 106= 3.12


250 x 447.52

M.F
=

=
0.55 + [(477 268)/(120 x (0.9 + 3.12))]
0.55 + 0.433 =
0.983

Allowable span/d = 36 x 0.983 =


Actual span/d
= 8000
=
447.5
Actual span/d < Allowable span/d
17.88 < 25.56
Deflection ------- OK
23

25.56
17.88

24

25

26

27

28

29

30

31

32

33

34

Span 2A 2, support Moment M


k

=
=

=
=

=
Take =
As

54.2 kNm

M = 54.2 x 106
fcubd2
30x250x447.52
0.036 < 0.156
Design as singly reinforced beam.

d{ 0.5 + (0.25 k )}

0.9
{0.5 + (0.25 0.036)} d
0.9
0.958 d
0.95 d = 0.95 x 447.5 = 425.13 mm

M =
54.2 x 106
0.87fy 0.87x460x425.13
As =
319 mm2
Check min reinforcement As min =
100
Asmin

0.26 x 250 x 500 = 325 mm2


100
As = As min = 325 mm2
Provide 3T12, As = 339 mm2 (T)
35

0.26 x bh

Bottom reinforcement
Provide 3T12, As = 339 mm2 (B)
Shear V =
Shear stress,

100As
bd

vc

59.45 kN
V = V = 59.45 x 103
bd
250 x 447.5
V = 0.53 N/mm2

= 100 (339) =
250 x 447.5

0.3

= (0.5 0.4) x 0.05 + 0.4


(0.5 0.25)
= 0.45 N/mm2
0.5vc
= 0.21 N/m2
vc + 0.4 = 0.82 N/m2
0.5vc < v < vc + 0.4
0.21 < 0.53 < 0.82
min link

36

Asv 04 bvsv =
0.87fyv

0.4 x 250 x Sv
0.87 x 250

0.46 Sv

Say Sv = 250
Asv 0.46 x 250 =
use sv
Asv

=
=

115 mm2

10 mm
2(10)2 = 157.1 mm2
4

Provide R10 250 mm </<

37

Conclusion
Span 5 4 (Beam size 250 x 500)
Support 5

Manual

Computer

Use

- 282.4 kNm

- 251.5 kNm

Top
Reinforcement

5T25

4T25

5T25

Bottom
Reinforcement

3T25

2T20

3T25

Shear Force

175.8 kN

183.4 kN

Shear
Reinforcement

R10-120

R10-125

R10-125

Moment

38

Mid Span 5 4

Manual

Computer

Use

156 kNm

224 kN

Top
Reinforcement

3T12

4T12

4T12

Bottom
Reinforcement

3T25

4T25

4T25

R10-120

R10-125

R10-125

Moment

Shear Force
Shear
Reinforcement

39

Support

Manual

Computer

Use

- 54.2 kNm

- 45.3 kNm

Top
Reinforcement

3T12

2T16

3T12

Bottom
Reinforcement

3T12

2T12

3T12

Shear Force

59.45 kN

59.5 kN

Shear
Reinforcement

R10-250

R10-250

R10-250

Moment

40

Support ,

, &

Top Reinforcement
Bottom Reinforcement
Shear Reinforcement

5T 25
3T25
R10 125

Support 5A 2A &
Top Reinforcement
Bottom Reinforcement
Shear Reinforcement

Mid Span

-, - , 5A -

Top Reinforcement
Bottom Reinforcement
Shear Reinforcement
Mid Span - 2A & 2A Top Reinforcement
Bottom Reinforcement
Shear Reinforcement
41

3T12
3T12
R10 - 250

4T12
4T25
R10 - 125

3T12
3T12
R10 - 250

You might also like