Material MM User Manual
Material MM User Manual
TABLE OF CONTENTS Sl No. 1 2 3 4 5 6 7 8 9 10 11 12 13 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 9200578.doc Topic Creation of Material Master Creation of Vendor Master Creation of Purchase Requisition Creation of Request for Quotation against Purchase Requisition Maintain Quotation Compare Quotation Creation of Purchase Order against Purchase Requisition Release Purchase Order Goods received against purchase order Goods issue to cost center Creation of Reservation Goods Issue Against Reservation Material transferred to Blocked stock Return Delivery to Vendor Invoice Verification Creation of Stock Transport Order Goods Issue Against Stock Transport Order Goods Receipt against Stock Transport Order Remove from Storage Place in Storage Creation of Service Master Creation of Service Purchase Order Service Entry sheet Check Stock Report Creation of Frame Work Order Transfer Posting storage location to storage location(One step) Transfer Posting Plant to Plant (One step) Goods receipt w/o purchase order ( Scraps ) Creation of Info Record Maintain Source List Check Stock Report by using MMBE Physical Inventory Physical Inventory count Physical Inventory difference posting Goods on Loan - issue Goods on Loan issue reversal Goods on Loan - Receipt Page 2 27 44 49 59 65 70 83 86 95 104 110 118 122 127 140 148 152 157 165 171 177 183 189 198 204 211 217 223 235 240 245 254 260 267 278 287 Page 1
37 38
296 306
a material. This data is sorted according to various criteria including data of a descriptive nature (such as size, dimension and weight) and data with a control function (such as material type and industry sector). In addition to this data, which can be directly maintained by the user, it also contains data that is automatically updated by the system (such as stock levels). Desired Output Output Comments
Procedural Steps Step 1: Calling the Transaction Via Menus Via Transaction Code Logistics -> Materials Management -> Material Master -> Material -> Create (General) -> Immediately MM01
9200578.doc
Page 2
Key that specifies the branch of industry to which the material is assigned. (In our case it is media) Key that assigns the material to a group of materials such as raw materials, operating supplies or trading goods. It is depend upon the material type)
We dont type any thing else here. The system automatically allots material internal code number.
9200578.doc
Page 4
Step 3: Step Name Step Description Field Name Basic Data 1 Basic Data 2 Purchasing MRP1 MRP2 MRP3 General Plant Data Storage 1 General Plant Data Storage 2 Accounting 1 Accounting 2 Description/Purpose/Comments
9200578.doc
Page 5
9200578.doc
Page 6
9200578.doc
Page 7
Step 4: Step Name Step Description Plant Storage Location CNI1 Key uniquely identifying a plant. 0100 Number of the storage location at which the material is stored. A plant may contain one or more storage locations.
9200578.doc
Page 8
Step 5: Step Name Step Description Material Base Unit of measure Text containing up to 40 characters that describes the material in more detail. (You can enter one material description in each of any number of languages) Unit of measure in which stocks of the material are managed. The system converts all the quantities you enter in other units of measure (alternative units of measure) to the base unit of measure. (In Inventory Management, the base unit of measure is the same as the stock keeping unit). Key that you use to group together several materials or services with the same attributes, and to assign them to a particular material group.
Material Group
9200578.doc
Page 9
9200578.doc
Page 10
Step 6: Step Name Step Description In this screen we have not make any entry.
9200578.doc
Page 11
Step 7: Step Name Step Description Base unit of measure Order Unit Purchasing Group Material Group Unit of measure in which stocks of the material are managed. The system converts all the quantities you enter in other units of measure (alternative units of measure) to the base unit of measure. Specifies the unit of measure in which the material is ordered. Key for a buyer or a group of buyers, who is/are responsible for certain purchasing activities. Key that you use to group together several materials or services with the same attributes, and to assign them to a particular material group.
9200578.doc
Page 12
9200578.doc
Page 13
Step 8: Step Name Step Description Batch Management Specifies whether the material is managed in batches. If applicable
9200578.doc
Page 14
Step 09: Step Name Step Description MRP TYPE Manual Re-order point Lot size and fixed lot size MRP CONTROLLER In this column we have to mentioned MRP type ( VB or ND ) In this column we have to mentioned re-order quantity In this column we have to mentioned the FX ( fixed quantity ) and quantity amount We have to mentioned in this column MRP controller (CFM )
9200578.doc
Page 15
9200578.doc
Page 16
Step 10: Step Name Step Description In this screen we have to enter delivery period of goods and safety stock
9200578.doc
Page 17
Step 11: Step Name Step Description In this screen we have to enter availability check
9200578.doc
Page 18
Step 12: Step Name Step Description In this screen we are not entering any data
9200578.doc
Page 19
Step 13: Step Name Step Description In this screen we are not entering any data
9200578.doc
Page 20
Step 14: Step Name Step Description Valuation Class Price Control Moving Average Price Default value for the valuation class for valuated stocks of this material. Indicates the price control used to valuate the stock of a material. You have the following options: * Standard Price (S) * Moving Average Price (V) The system calculates the moving average price automatically by dividing the material value in the stock account by the total of all storage location stocks in the plant concerned. It changes the price with each valuation-relevant movement.
9200578.doc
Page 21
9200578.doc
Page 22
Step 15: Step Name Step Description In this screen we are not entering any data
Step 16: Step Name Step Description This is the last screen we are reached then enter save by using the floppy button at menu bar.
9200578.doc
Page 24
To change Material To display Special Features Points to be noted Tips and Tricks 9200578.doc
- MM02 - MM03
Page 25
Procedural Steps Step 1: Calling the Transaction Via Menus Via Transaction Code Logistics ->Materials Management ->Purchasing -> Master Data -> Vendor ->Central -> Create XK01
9200578.doc
Page 26
9200578.doc
Page 27
Step 2: Step Name Description of the Screen Field Name Company Code Purchasing Organization Account Group Company code Description/Purpose/Comments 1000 - The company code is an organizational unit within financial accounting. CNIH - Denotes the purchasing organization. The account group is a classifying feature within vendor master records. DOME IMPO PLNT The system issued separate code for company as like 1, 2
9200578.doc
Page 28
We dont type anything else here. The system automatically allots vendor code number
9200578.doc
Page 29
Step 3: Step Name Step Description Title Name Search Term Street/House number Postal code/city City Country Region(State, province, Country) Choose the title from the entries in the drop down list box. Address component: Name of an address Short description for a search help. Street name as part of the address. If different postal codes are maintained for the PO Box and Street address of an address, this field contains the Street address postal code. City name as part of the address. In some countries, the region forms part of the address. The meaning depends on the country.
9200578.doc
Page 30
9200578.doc
Page 31
Step 4: Step Name Step Description In this screen we are not entering any data
9200578.doc
Page 32
Step 5: Step Name Step Description In this screen also we are not entering any data
9200578.doc
Page 33
Step 6: Step Name Step Description Rec.Account The reconciliation account in G/L accounting is the account which is updated parallel to the sub ledger account for normal postings (for example, invoice or payment).
9200578.doc
Page 34
9200578.doc
Page 35
Step 7: Step Name Step Description Payment Terms Payment Methods Data can be entered in the field for the terms of payment key in various ways as you enter a business transaction: List of payment methods which may be used in automatic payment transactions with this customer/vendor if you do not specify a payment method in the item to be paid.
9200578.doc
Page 36
Step 8: Step Name Step Description In this screen we are not entering any data
9200578.doc
Page 37
Step 9: Step Name Step Description In this screen also we are not entering any data
9200578.doc
Page 38
Step 10: Step Name Step Description Order currency Terms of payment Incoterms Key for the currency on which an order placed with a vendor is based. Payment period of the vendor If the primary Incoterm is, for example, FOB ("Free on Board"), then the second field provides details of the port from which the delivery leaves (for example, "FOB Boston"). Determines which calculation schema (pricing procedure) is to be used in purchasing documents containing this vendor number. SD & SC for Domestic Vendor and SI for imports Indicator specifying that provision has been made for goods-receipt-based invoice verification for a purchase order item or invoice item.
9200578.doc
Page 39
9200578.doc
Page 40
Step 11: Step Name Step Description In this screen we are not entering any data
9200578.doc
Page 41
Step 12: Step Name Step Description This is the last screen we are reached at the time of vendor master creation. Then save the data we are entered by using the floppy button at menu bar.
9200578.doc
Page 42
- XK02 - XK03
9200578.doc
Page 43
Procedural Steps Step 1: Calling the Transaction Via Menus Via Transaction Code Logistics ->Materials Management ->Purchasing -> Purchase Requisition->Create ME51N
9200578.doc
Page 44
9200578.doc
Page 45
Step 2: Step Name Description of the Screen Material Plant Quantity Requisitioner Purchasing Group Alphanumeric key uniquely identifying the material. Plant in which you produce or for which you wish to procure materials or services. Specifies the quantity to be ordered, as stipulated in the purchase requisition. Indicates for whom the material or external service shown in the purchase requisition is to be ordered. Key for a buyer or a group of buyers, who is/are responsible for certain purchasing activities
9200578.doc
Page 46
9200578.doc
Page 47
Step 3: Step Name Description of the Screen After entering all the above details, please check and then to save by using the floppy button at menu bar.
To change P R To Display P R
- ME52N - ME53N
9200578.doc
Page 48
Creation of Request for Quotation Against a Purchase Requisition You use this component if you wish to manage and compare Requests for quotation (RFQs) issued to vendors and the Quotations submitted by the latter in response to them.
Procedural Steps Step 1: Calling the Transaction Via Menus Via Transaction Code Logistics ->Materials Management -> Purchasing -> RFQ/quotation -> Request for quotation -> Create ME41
9200578.doc
Page 49
9200578.doc
Page 50
Date by which the vendor is to submit the quotation. Denotes the purchasing organization. Key for a buyer or a group of buyers, who is/are responsible for certain purchasing activities.
9200578.doc
Page 51
We may select Purchased requisition from this. After selection the below said screen to be displayed
9200578.doc
Page 52
Step 3: Step Name Description of the Screen Purchase Requisition No. Enter the number of the purchase requisition you wish to reference.
9200578.doc
Page 53
Step 4: Step Name Description of the Screen Storage Location Select the lines Number of the storage location at which the material is stored. A plant may contain one or more storage locations. Then adopt
9200578.doc
Page 54
Step 5: Step Name Description of the Screen Delivery Date Date on which the goods are to be delivered or the service is to be performed.
9200578.doc
Page 55
Step 6: Step Name Description of the Screen From here we can go to header and then select the vendor address. Then select the vendor address from the master and save the data first.
9200578.doc
Page 56
Step 7: Step Name Description of the Screen RFQ created under the number 60000000006 Next vendor address, we can go through the vendor and directly post the data. RFQ created under the number 6000000007
9200578.doc
Page 57
- ME42 - ME43
9200578.doc
Page 58
Maintain Quotation Contains a vendor's prices and conditions and is the Basis for vendor selection.
Procedural Steps Step 1: Calling the Transaction Via Menus Via Transaction Code Logistics ->Materials Management -> Purchasing -> RFQ/Quotation -> Quotation -> Maintain ME47
9200578.doc
Page 59
9200578.doc
Page 60
Step 2: Step Name Description of the Screen RFQ Enter the number of the document.
9200578.doc
Page 61
Step 3: Step Name Description of the Screen Net Price Net price per price unit.
9200578.doc
Page 62
Step 4: Step Name Description of the Screen After entering the net price, we can go the item conditions (Iine top red mark) After entering the below, we can save the data.
9200578.doc
Page 63
Step 5: Step Name Description of the Screen This is the last screen after entering all the data.
To Display quotation
- ME48
9200578.doc
Page 64
Compare Quotation
Procedural Steps Step 1: Calling the Transaction Via Menus Via Transaction Code Logistics ->Materials Management -> Purchasing -> RFQ/Quotation -> Quotation -> Price comparison ME49
9200578.doc
Page 65
9200578.doc
Page 66
Step 2: Step Name Description of the Screen Purchasing Organization Quotation Denotes the purchasing organization. Alphanumeric key uniquely identifying purchasing document. Please enter the RFQ numbers. If we given collective number we may enter collective numbers.
9200578.doc
Page 67
Step 3: Step Name Description of the Screen After entering the RFQ numbers then execute (F8)
9200578.doc
Page 68
9200578.doc
Page 69
Procedural Steps Step 1: Calling the Transaction Via Menus Via Transaction Code Logistics ->Materials Management -> Purchasing -> Purchase Order -> Create -> vendor/supplying plant known ME21N
9200578.doc
Page 70
Step 2: Step Name Description of the Screen In this screen please enter the Purchase Requisition No. then system automatically picks up all the details from purchase requisition. After that we can at least enter the vendor only. 9200578.doc Page 71
This is quantity screen. Here we can enter the quantity. But reference to PR the qty will comes automatically. If we dont require the PR quantity, we can change the qty at the time of creation of P O.
9200578.doc
Page 72
9200578.doc
Page 73
9200578.doc
Page 74
9200578.doc
Page 75
9200578.doc
Page 76
In the above screen at the bottom of the screen there is a tax code. There we can enter the tax structure of vendors. For calculating taxes click double in the tax code. Please see
9200578.doc
Page 77
This screen is condition screen. Here we are entering the price , freight, excise duty and all other items.
This the texts screen. Here we are entering the specifications of the materials.
9200578.doc
Page 78
All the entries have been made then check the purchase order by clicking the check button after hold.
9200578.doc
Page 79
9200578.doc
Page 80
9200578.doc
Page 81
Procedural Steps Step 1: Calling the Transaction Via Menus Via Transaction Code Logistics ->Materials Management -> Purchasing -> Purchase Order -> Release -> individual release ME29N
9200578.doc
Page 82
Description of the Screen Go to Purchase Order then select the other purchase order and enter the purchase order number which we have to be released.
9200578.doc
Page 84
9200578.doc
Page 85
Procedural Steps Step 1: Calling the Transaction Via Menus Via Transaction Code 101 Logistics ->Materials Management -> Inventory Management -> Goods Movement ->Goods Receipt -> For Purchase Order -> MIGO_GR-GR for purchase order (MIGO) MIGO Goods receipt for purchase order into warehouse/stores
9200578.doc
Page 86
9200578.doc
Page 87
Description of the Screen Ref: Purchase Order Indicates the document you want to reference when you enter the transaction.
After entering the purchase order number, the system will picks up all the details from the purchase order automatically.
9200578.doc
Page 89
Step 4: Step Name Description of the Screen After entering the qty the storage location is to be specified. (Where)
9200578.doc
Page 90
Step 5: Step Name Description of the Screen If there is the material received is in batch, then enter the batch number
9200578.doc
Page 91
After entering all the data please click () the item ok button in the below of the screen and then to check the entries which we are made. If there is no any mistake the entry as shown in green colour. E.g.
9200578.doc
Page 92
If there is any mistake at the time of creation of GR there is a red button is coming. In this error message we have not entered the Delivery note. That is error message.
9200578.doc
Page 93
After rectifying the error, please save the data by clicking the floppy button at menu bar.
9200578.doc
Page 94
9200578.doc
Page 95
Procedural Steps Step 1: Calling the Transaction Via Menus Via Transaction Code 201 Logistics ->Materials Management -> Inventory Management -> Goods Movement -> Goods movement MIGO -> Goods issue others MIGO Goods issue : consumption for cost center from warehouse
9200578.doc
Page 96
Step 2: Step Name Description of the Screen In this screen we select the material code and enter.
9200578.doc
Page 97
Step 3: Step Name Description of the Screen Enter the issue quantity as per base unit of measure.
9200578.doc
Page 98
Step 4: Step Name Description of the Screen In this screen we will enter the plant and storage location for stock maintained
9200578.doc
Page 99
Step 5: Step Name Description of the Screen Enter the batch details (If applicable). One more batch materials issued we may use X icon by click mouse
9200578.doc
Page 100
Step 6: Step Name Description of the Screen This column is very important. Enter the particular materials issued for which cost center printing expenses ( for FI account assignment )
9200578.doc
Page 101
Description of the Screen After entering the cost center, click check button at the top of the menu bar by mouse. Yellow indicator is only warning message. So no need to check anything else.
9200578.doc
Page 102
Step 8: Step Name Description of the Screen Then, we close the warning box green tick by using mouse and post the document. Material document posted
9200578.doc
Page 103
Creation of Reservation
Procedural Steps Step 1: Calling the Transaction Via Menus Via Transaction Code Logistics ->Materials Management -> Inventory Management -> Reservation->Create MB21
9200578.doc
Page 104
9200578.doc
Page 105
Step 2: Step Name Description of the Screen Movement Type (which transaction do you want) Plant Enter the number of the required movement type or choose a movement type from the list of possible entries. Key uniquely identifying a plant.
9200578.doc
Page 106
Step 3: Step Name Description of the Screen G/L Account Number Cost Centre Material Number Quantity The system determines the G/L account automatically. However, if you wish, you can enter it yourself. Key uniquely identifying a cost center. Number of the material that you want to move. Enter the quantity to be moved in any unit of measure for the material.
9200578.doc
Page 107
9200578.doc
Page 108
Step 4: Step Name Description of the Screen After entering all the datas, please save the same by using floppy button at menu bar.
9200578.doc
Page 109
Goods Issue against Reservation This is goods issue from storage location to Cost center against reservation. This is doing With out reservation also.
Procedural Steps Step 1: Calling the Transaction Via Menus Via Transaction Code Movement type Logistics ->Materials Management -> Inventory Management -> Goods Movement -> MIGO_GI-Goods Issue (MIGO) MIGO 201 (GI for cost center)
9200578.doc
Page 110
9200578.doc
Page 111
Step 2: Step Name Description of the Screen Goods Issue Reservation (Reference document for MIGO transaction) Number of Reservation Indicates the business transaction that you want to enter in the system. Indicates the document you want to reference when you enter the transaction. Please enter the reservation number
After entering the Reservation number the system would automatically picks up the details of materials which we are entered earlier at the time of creation of reservation.
9200578.doc
Page 112
Step 3: Step Name Description of the Screen Then go to quantity area of the screen. There the quantity will comes automatically. If we have no sufficient stock of the required material, we can change the quantity
9200578.doc
Page 113
Step 4: Step Name Description of the Screen Storage Location (Where) Number of the storage location at which the material is stored. A plant may contain one or more storage locations.
9200578.doc
Page 114
Step 5: Step Name Description of the Screen Reservation 9200578.doc Reservation details will come automatically Page 115
9200578.doc
Page 116
After entering all the data please click and then click the floppy button at menu bar for save. This is the last screen.
Business Process Description: Before Return delivery we have to transferred the particular material To blocked stock from unrestricted use stock due to identify actual UN restricted use stock.
9200578.doc
Page 117
Procedural Steps Step 1: Calling the Transaction Via Menus Via Transaction Code Movement Type Logistics ->Materials Management -> Inventory Management -> Goods Movement -> Transfer posting -> others MIGO 344
9200578.doc
Page 118
9200578.doc
Page 119
Step 2: Step Name Description of the Screen After enter the data check and save the documents by using mouse at the top of the menu bar
9200578.doc
Page 120
Step 2: Step Name Description of the Screen After save the documents - particular material is transferred to blocked stock. We can see the blocked stock details by MMBE code.
9200578.doc
Page 121
Procedural Steps Step 1: Calling the Transaction Via Menus Via Transaction Code Movement Type Logistics ->Materials Management -> Inventory Management -> Goods Movement -> Return Delivery MIGO 122
9200578.doc
Page 122
Step 2: Step Name Description of the Screen Material Document Indicates the document you want to reference when you enter the transaction. (Number of the material document with which a goods movement was posted.)
At the time of entering the material document number, system may automatically picks up the details. For E.g. At the time of creation of material document there may be two or three items in that GR. But we have to return only one material from that document. At that time we may select the material which we have to be returned only from the document.
9200578.doc
Page 123
Step 3: Step Name Description of the Screen In this screen we have to enter the quantity of returned material
9200578.doc
Page 124
Description of the Screen In this screen we have to enter the reason for movement and select blocked stock. It is very important.
9200578.doc
Page 125
Step 5: Step Name Description of the Screen After checking the entered data we can save the data by using the floppy button at menu bar.
If you return the material after Invoice verification, you will create credit memo for particular purchase order at Invoice verification option, then you will do return delivery. Otherwise error throws by the system. Credit memo creation is same procedure as like invoice verification. You will select Credit memo instead of invoice in the header item (Transaction)and enter the particular Purchase order the system automatically pickup the all details, and then you will select the return material enter the return quantity and value. If one more materials are in the particular PO, you may delete by deletion indicator (bottom).
9200578.doc
Page 126
Procedural Steps Step 1: Calling the Transaction Via Menus Via Transaction Code Logistics ->Materials Management -> Logistics Invoice verification -> Document Entry -> Enter Invoice MIRO
9200578.doc
Page 127
9200578.doc
Page 128
Step 2: Step Name Description of the Screen Basic Data The 1st column. Invoice Date Reference Purchase Order/Scheduling agreement Specifies the issue date of the original document. The reference document number can contain the document number of the business partner, but a different entry can also be made. Specifies the document category to which the invoice refers.
After entering the purchase order number the system may automatically picks up all datas from the GR.
9200578.doc
Page 129
9200578.doc
Page 130
Step 3: Step Name Description of the Screen Payment The 2nd screen. Baseline date Date to which the periods for the cash discount deadline and the due date for net payment refer. This is the case for line items in open item accounts. (During document entry for open item accounts, the date may be defaulted. For this, terms of payment key must have been specified in the customer's/vendor's master record for which a default value is requested in the document.) Key for defining payment terms composed of cash discount percentages and payment periods. (Data can be entered in the field for the terms of payment key in various ways as you enter a business transaction) The due date for net payment is calculated from the baseline date for payment and the maximum permissible target dates in the terms of payment. It is not stored in the document line item but is always recalculated during ABAP evaluations via logical data bases (on the basis of the current terms of payment) and displayed in this field. Payment method with which this item is to be paid.
Terms of payment
Due on
Payment method
9200578.doc
Page 131
9200578.doc
Page 132
Step 4: Step Name Description of the Screen Details The 3rd screen Unplanned Delivery costs Enter the amount of the unplanned delivery costs without taxes.
After entering the un planned delivery cost (if any) there is no any other entry.
9200578.doc
Page 133
9200578.doc
Page 134
Step 5: Step Name Description of the Screen Tax - This is the 4th screen. Calculate Tax Balance (On top) If you select this field, the system calculates the taxes automatically during simulation or posting. Indicates the difference between the gross invoice amount and the sum of the tax amounts, unplanned delivery costs and the net total.
9200578.doc
Page 135
Step 6: Step Name Description of the Screen After entering the tax details of partys invoice, then go to the basic data of the screen. Text Contains an explanatory text on the line item.
After entering these, please enter the amount of invoice (To be shown in the top balance) Then the Green signal is shown i.e. the entry you had made is correct.
9200578.doc
Page 136
Step 7: Step Name Description of the Screen Simulate By entering the number of an item in an invoice document, you can go straight to the line that you want to process. The system places the line selected at the top of the invoice item display.
9200578.doc
Page 137
Step 8: Step Name Description of the Screen After click the post its goes to blocked for payment. We have to release the same through release invoice option at Invoice verification option.
9200578.doc
Page 138
9200578.doc
Page 139
Procedural Steps Step 1: Calling the Transaction Via Menus Via Transaction Code Logistics ->Materials Management -> Purchasing -> Purchase Order -> Create -> Vendor/supplying plant known ME21N
9200578.doc
Page 140
Step 2: Step Name Description of the Screen Supplying plant Purchasing organization Purchasing Group Company code Number and name of the vendor (external supplier) or supplying plant from which the materials are to be procured. Denotes the purchasing organization. (CNIH) Key for a buyer or a group of buyers, who is/are responsible for certain purchasing activities. The company code is an organizational unit within financial accounting. ( 1000 )
9200578.doc
Page 141
Step 3: Step Name Description of the Screen Material Plant Purchase Order Qty Enter a material number if you want to order a material with a material master record. Plant in which you produce or for which you wish to procure materials or services. Quantity ordered by the buyer, to be supplied by the vendor.
9200578.doc
Page 142
9200578.doc
Page 143
Step 4: Step Name Description of the Screen After entering all the data, please check by clicking the above check key or control+shift+F3. Now the entered datas are correct. Therefore the yellow button
9200578.doc
Page 144
Description of the Screen If there is any error at the time of entering the details then the red button is coming. Here for Eg. we have no entered the P O qty, therefore we cannot save the details.
9200578.doc
Page 145
Please note the following:Application Log: Message type visualization as icon The message type indicates the seriousness of a message and is visualized by an icon. Stop: A Cancel Red: E Error Yellow: W Warning Green: I/S Information/success message
9200578.doc
Page 146
Step 6: Step Name Description of the Screen After rectifying the error, we can save the data by using the floppy button at menu bar or (Control+S)
9200578.doc
Page 147
Goods Issue against Stock Transport Order Issue of goods from one plant to another plant against Stock transport order
Procedural Steps Step 1: Calling the Transaction Via Menus Via Transaction Code Movement Type Logistics ->Materials Management -> Inventory Management -> Goods Movement -> MIGO_GI-Goods Issue (MIGO) MIGO 351
9200578.doc
Page 148
Step 2: Step Name Description of the Screen Enter P O (STO) number Storage location Indicates the document you want to reference when you enter the transaction. Number of the storage location at which the material is stored. A plant may contain one or more storage locations.
Description of the Screen Item OK () Indicates that you are posting a goods movement for this item. When this indicator is set, this item is adopted into the material document that is to be posted. You also have to set this indicator if you want to check the item before the posting is carried out. Check the document before posting.
Check
9200578.doc
Page 150
Step 4: Step Name Description of the Screen After checking the data post the data
9200578.doc
Page 151
Procedural Steps Step 1: Calling the Transaction Via Menus Via Transaction Code Movement Type Logistics ->Materials Management -> Inventory Management -> Goods Movement -> Goods Receipt -> For Purchase Order -> MIGO_GR - GR for Purchase Order (MIGO) MIGO 101
9200578.doc
Page 152
Indicates the business transaction that you want to enter in the system. Indicates the document you want to reference when you enter the transaction.
After entering the stock transport number the system will picks us all the details. Here we have to enter only storage location of the receiving plant.
9200578.doc
Page 153
Step 3: Step Name Description of the Screen Item OK () Indicates that you are posting a goods movement for this item. When this indicator is set, this item is adopted into the material document that is to be posted. You also have to set this indicator if you want to check the item before the posting is carried out. Check the document before posting.
Check
9200578.doc
Page 154
9200578.doc
Page 155
Remove from storage (Transfer posting plant to plant) Issue of Goods from one plant/storage location to Another plant/storage location
Procedural Steps Step 1: Calling the Transaction Via Menus Via Transaction Code Movement Type Logistics ->Materials Management -> Inventory Management -> Goods Movement -> MIGO 303
9200578.doc
Page 156
Step 2: Step Name Description of the Screen Remove from storage Indicates the business transaction that you want to enter in the system.
After entering the remove from storage, the system will automatically picks up the movement type in the right side i.e. 303 (Remove from storage).
9200578.doc
Page 157
Step 3: Step Name Description of the Screen In this screen we first select the item which we would be sending to another location. Then enter the plant name After entering the plant we may also enter the destination, to where the material has been send. Then enter the storage location. Then enter the quantity.
9200578.doc
Page 158
Step 4: Step Name Description of the Screen Goods recipient Unloading point Specifies the recipient for whom the material or the service is destined. Specifies the point at which the material is to be unloaded
9200578.doc
Page 159
Step 5: Step Name Description of the Screen Partner (Vendor) Specifies the name of the vendor.
From here we have to select the vendor code from vendor master list.
9200578.doc
Page 160
Step 6: Step Name Description of the Screen After entering all details then click for item ok and then check.
9200578.doc
Page 161
Step 7: Step Name Description of the Screen The above entered data are correct. Therefore the message document is ok. For e g. Here we are not entered the quantity. Then check
9200578.doc
Page 162
Step 8: Step Name Description of the Screen After rectifying errors we may check the data and then post by using the floppy button at menu bar.
9200578.doc
Page 163
Place in storage (Goods Receipt Receiving Plant) Receipt of goods against document number of 303 movement.
Procedural Steps Step 1: Calling the Transaction Via Menus Via Transaction Code Movement Type Logistics ->Materials Management -> Inventory Management -> Goods Movement -> MIGO 305
9200578.doc
Page 164
Step 2: Step Name Description of the Screen Material Document number Indicates the document you want to reference when you enter the transaction. (Here we can enter the material document number from where the material has been dispatched)
After entering the material document number, the system will automatically picks up all the details from that material document number.
9200578.doc
Page 165
Step 3: Step Name Description of the Screen Storage location (Where) Number of the storage location at which the material is stored. A plant may contain one or more storage locations.
9200578.doc
Page 166
Step 4: Step Name Description of the Screen Partner (Vendor) Specifies the name of the vendor. For Batch stock only
9200578.doc
Page 167
Step 5: Step Name Description of the Screen After entering all details then click for item ok and then check
9200578.doc
Page 168
9200578.doc
Page 169
Description of the Screen There is no mistake at the time of entering data, then it will comes document is ok. After seeing that message we may post.
9200578.doc
Page 170
Procedural Steps Step 1: Calling the Transaction Via Menus Via Transaction Code Logistics ->Materials Management -> Service Master -> Service -> Service Master AC03
9200578.doc
Page 171
This is the initial screen for service master. It is the last data we are entered in the system. For every time at the time of creating service master, the last data will appear in the screen.
For creating new service click Text, consisting of up to 40 characters, concisely describing the material. The material short text, sometimes termed the "(short) description", briefly identifies the material in words. Key used to differentiate between services according to their usage. The service category defines certain attributes of the service and has a control function. Unit of measure in which stocks of the material are managed. The system converts all the quantities you enter in other units of measure (alternative units of measure) to the base unit of measure. The service contains the measure as activity unit Key that you use to group together several materials or services with the same attributes, and to assign them to a particular material group.
Service Category
9200578.doc
Page 173
9200578.doc
Page 174
After entering the text please post the data by using floppy button at menu bar.
For getting the new number, we may then goes to service master display. At that time the last entered data is coming.
9200578.doc
Page 175
9200578.doc
Page 176
Procedural Steps Step 1: Calling the Transaction Via Menus Via Transaction Code Logistics ->Materials Management -> Purchasing -> Purchase Order -> Create Vendor/Supplying plant known ME21N
9200578.doc
Page 177
Step 2: Step Name Description of the Screen Vendor Purchasing Organization Purchasing Group Company code
vendor (external supplier) or supplying plant from which the materials are to be procured. Denotes the purchasing organization. Key for a buyer or a group of buyers, who is/are responsible for certain purchasing activities. The company code is an organizational unit within financial accounting.
9200578.doc
Page 178
Step 3: Step Name Description of the Screen A (Account Assignment Category) I (Item category in purchasing document) Short Text Specifies whether accounting for an item is to be effected via an auxiliary account (such as a cost center). Key defining how the procurement of a material or service item is controlled. (Normally it is service) Short description of the material. If the item does not refer to a material master record, you must enter a short text. If you have specified a material number, the short text is copied into the item from the corresponding material master record. Plant in which you produce or for which you wish to procure materials or services. A material group comprises several materials or services having the same attributes.
9200578.doc
Page 179
9200578.doc
Page 180
Step 4: Step Name Description of the Screen The balance things are remains the same as normal purchase order and we have to maintain each service entries and enter GL account and cost centre.
9200578.doc
Page 181
Step 5: Step Name Description of the Screen In this screen we select tax code by click the button
9200578.doc
Page 182
Step 6: Step Name Description of the Screen This screen is final of service Purchase order.
9200578.doc
Page 183
9200578.doc
Page 184
Step 1: Step Name Description of the Screen : In this screen we have to select other purchase order button and enter the Purchase order number and enter.
9200578.doc
Page 185
Description of the Screen: In this screen we entered purchase order and displayed all the details. And we have to enter service number enter then click green flag at the top of screen for release the service.
9200578.doc
Page 186
Description of the Screen: This is final screen of service entry after released click save button by mouse
9200578.doc
Page 187
Step 3: Step Name Description of the Screen This screen is service entry sheet posted. Then its goes to invoice verification. Invoice verification is as usual for regular purchased invoice verification.
9200578.doc
Page 188
Procedural Steps Step 1: Calling the Transaction Via Menus Via Transaction Code Logistics ->Materials Management -> Inventory Management -> Environment-> Stock -> Stock on posting date MB5B
9200578.doc
Page 189
Step 2 : Step Name Description of the Screen Material Number This portion we have to enter any material code for knowing the stock.
For executing the same we may enter the clock button at menu bar or F8. If we are not enter the materials number in the particular column, the system displayed all stock materials. Usage of Plant option we can see plant wise materials stock details Usage of Storage locations - we can see storage location wise stock details . Title stock details only
9200578.doc
Page 190
Step 3: Step Name Description of the Screen Then execute the above transaction. From this we have to get the stock of that material only with our all plants. Title stock with out day wise details
9200578.doc
Page 191
Step 4: Step Name Description of the Screen From the above if we enter any name of a plant we can get the stock the material available with that plant only. For Eg: Without title stock We can see day wise goods receipt and consumption details.
9200578.doc
Page 192
9200578.doc
Page 193
Step 5: Step Name Description of the Screen For calculating the total stock first we have to click the quantity and then go to sigma button at menu bar or shift F7. In the below screen the blue color shows the selection.
9200578.doc
Page 194
Step 6: Step Name Description of the Screen For further details we may goes to sub total (Control+F1) on the top. And from right to left we have to select the data which we require.
9200578.doc
Page 195
Step 7: Step Name Description of the Screen From the above screen select the details from the side column and copy the same to next field then click, the same may be shown.
After selecting the same from the above and then copy and then enter. At that time the below shown screen is appear. 9200578.doc Page 196
9200578.doc
Page 197
Procedural Steps Step 1: Calling the Transaction Via Menus Via Transaction Code Logistics ->Materials Management -> Purchasing -> Purchase Order -> Create-> Vendor/Supplying Plant known ME21N
9200578.doc
Page 198
Step 2 : Step Name Description of the Screen This screen is in addition to the standard purchase order. Validity start Validity end Date as of which services can be performed or materials delivered. Date up to which services can be performed or materials delivered.
9200578.doc
Page 199
Indicates whether the delivery date is to be entered and displayed as a calendar day, week or month. D For day format, W For week format, M For month format Date on which the goods are to be delivered or the service is to be performed. Quantity to be delivered by the vendor in respect of this schedule line. This quantity is referred to by Goods Receiving and Invoice Verification for checking purposes.
At the time of entering the scheduled quantity the purchase order quantity will increase.
9200578.doc
Page 200
9200578.doc
Page 201
Step 4: Step Name Description of the Screen Only the above two screens are differ from standard purchase order. All other things are remains same. After entering all data we may check the same by clicking check button at the top of the menu bar.
Then post the data by clicking the floppy button at menu bar.
9200578.doc
Page 202
9200578.doc
Page 203
Transfer Posting Storage Location (One Step) This is the transaction which are transferred materials from One storage location to another storage location by one Step transaction. This is done within the unit.
Procedural Steps Step 1: Calling the Transaction Via Menus Via Transaction Code Movement Type Logistics ->Materials Management -> Inventory Management -> Goods Movement -> MIGO_TR Transfer Posting (MIGO MIGO 311
9200578.doc
Page 204
9200578.doc
Page 205
Step 3: Step Name Description of the Screen Material Plant Storage Location Storage Location Dest.) Up to 40 characters of text that describes the material in more detail. The material short text is a description of the material. Key uniquely identifying a plant. Number of the storage location at which the material is stored. A plant may contain one or more storage locations. Storage Location Desc. Transfer Posting
9200578.doc
Page 206
Step 4 : Step Name Description of the Screen Quantity Specifies the unit of measure in which the goods movement or inventory count is entered.
9200578.doc
Page 207
Step 5: Step Name Description of the Screen This screen we have not making any entry.
9200578.doc
Page 208
Description of the Screen Item OK When this indicator is set, this item is adopted into the material document that is to be posted. You also have to set this indicator if you want to check the item before the posting is carried out. And then check the data
Step 7: Step Name Description of the Screen Post the data by using the floppy button at menu bar.
9200578.doc
Page 210
Transfer Posting Plant to Plant (One Step) This is the transaction which are transferred materials from One plant to another plant by using one step transaction. This the material send by us is directly goes to the receiving
9200578.doc
Page 211
Procedural Steps Step 1: Calling the Transaction Via Menus Via Transaction Code Movement Type Logistics ->Materials Management -> Inventory Management -> Goods Movement -> MIGO_TR Transfer Posting (MIGO MIGO 301
Step 2 : Step Name Description of the Screen Material Plant (1) First we enter the material number which you want to transfer. Key uniquely identifying a plant. (From where we have to send the materials).
9200578.doc
Page 212
Plant description transfer posting. (Enter the destination plant) Description of storage location Storage location, description of transfer posting.
Step 3 : Step Name Description of the Screen Quantity Specifies the quantity to be moved in the unit of entry. The quantity is automatically converted to the stock keeping unit (base unit of measure).
9200578.doc
Page 213
Step 4: Step Name Description of the Screen Goods Recipient Unloading point Specifies the recipient for whom the material or the service is destined. Specifies the point at which the material is to be unloaded
9200578.doc
Page 214
Step 5: Step Name Description of the Screen After entering all the details then click (Item ok) button in the bottom of the screen and then check the data by clicking check button at the top of the menu bar.
9200578.doc
Page 215
Step 6: Step Name Description of the Screen After checking if there is no any mistake, the green signal has come into the screen. Then post the data by using the floppy button at menu bar.
9200578.doc
Page 216
Goods receipt without purchase order This is the transaction which materials are moved into scrap
Page 217
Output
Comments
Procedural Steps Step 1: Calling the Transaction Via Menus Via Transaction Code Movement Type Logistics ->Materials Management -> Inventory Management -> Goods Movement -> MIGO_TR Transfer Posting (MIGO MIGO 501
Step 2: Step Name Description of the Screen Goods receipt Indicates the business transaction that you want to enter in the system.(In Customizing for Inventory Management, you can define which transactions you can choose in the step Settings
9200578.doc
Page 218
Movement Type
Material
for Transactions and Reference Documents). Goods receipt w/o purchase order scrap (501) Specifies a key for the type of goods movement. Each goods movement (for example, purchase order to warehouse) is allocated to a movement type in the system. Enter the material code which we would like to move to scrap
Step 3: Step Name Description of the Screen Quantity 9200578.doc Specifies the quantity to be moved in the unit of entry. The quantity is Page 219
Step 4: Step Name Description of the Screen Plant Key uniquely identifying a plant.
9200578.doc
Page 220
Storage Location
Number of the storage location at which the material is stored. A plant may contain one or more storage locations.
Step 5: Step Name Description of the Screen After entering all data, please click for item ok and then check. 9200578.doc Page 221
Step 6: Step Name Description of the Screen After entering these, then post the data by using floppy button at menu bar.
9200578.doc
Page 222
9200578.doc
Page 223
You use this component if you wish to store information on a vendor and a material as master data at purchasing organization or plant level. You can create purchasing info records for different Procurement types (standard, subcontracting, pipeline, consignment). But we have to use always standard.
Procedural Steps Step 1: Calling the Transaction Via Menus Logistics ->Materials Management -> Purchasing -> Master Data -> Info -Record-> Create
9200578.doc
Page 224
ME11
Enter the vendor's number. Enter a material number if you want to define the purchasing info record using a material master record. If you enter nothing, the purchasing info record will be defined without reference to a material master record. Page 225
9200578.doc
Denotes the purchasing organization. Specifies the key for a production facility or branch office within the company (that is, the company code). It is not mandatory. If we want to define info record for particular plant, we can use this option.
Step 3: Step Name Description of the Screen Reminder 1 A positive number of days means that a letter or message urging
9200578.doc
Page 226
Reminder 2 Reminder 3 Order Unit Equal to (Numerator for conversion of order unit to base unit
delivery or submission of a quotation etc. is to be issued n days after the due date. its not mandatory A positive number of days means that a letter or message urging delivery or submission of a quotation etc. is to be issued n days after the due date. its not mandatory A positive number of days means that a letter or message urging delivery or submission of a quotation etc. is to be issued n days after the due date. its not mandatory Specifies the unit of measure in which the material is ordered. Numerator of the quotient for conversion of the order unit into the base unit. Eg: The alternative/order unit of measure is Tons (Ton). The base unit of measure is Kg. 1000 kg correspond to 1 Ton. We may select variant order unit - active or non-active
Kind of certificate (e.g. certificate of origin) issued by the vendor. Its not mandatory. Number of the certificate issued in the country of origin (for instance the certificate of origin). Its not mandatory. Country in which the certificate of origin was issued. In some countries, the region forms part of the address. The meaning depends on the country.
9200578.doc
Page 227
9200578.doc
Page 228
Step 4: Step Name Description of the Screen Planned delivery time Purchasing group Standard order quantity GR based invoice verification Net Price Tax code Incoterms Enter the number of days taken by the vendor to supply the material. The planned delivery time is needed for planning material requirements and for scheduling. Select -Who is the purchasing responsibility. Enter -Standard order quantity of particular vendor Indicator specifying that provision has been made for goodsreceipt-based invoice verification for a purchase order item or invoice item. Price arrived at after taking all discounts and surcharges into account. Enter the tax code of particular materials of this vendor Enter particular vendors delivery mode here. Example TO -PAY
9200578.doc
Page 229
9200578.doc
Page 230
Step 5 : Step Name Description of the Screen In this screen we are not entering any data.
9200578.doc
Page 231
Step 6: Step Name Description of the Screen In this screen also we are not entering any data. But we can select condition option by using mouse and enter the condition details
9200578.doc
Page 232
Step 7: Step Name Description of the Screen After selecting conditions Material cross price pick up from previous screen then we will enter the condition details by selecting option
9200578.doc
Page 233
Step 8: Step Name Description of the Screen Enter the conditions - Below we enter Insurance cess educational cess as conditions for net price for Vendor GVG material Imported newsprint ( Example )
9200578.doc
Page 234
Description of the Screen Save the data first by clicking the floppy button at menu bar.
9200578.doc
Page 235
Comments
Procedural Steps Step 1: Calling the Transaction Via Menus Via Transaction Code Logistics ->Materials Management -> Purchasing -> Master Data -> Source List -> Maintain ME01
9200578.doc
Page 236
Step 2: Step Name Description of the Screen Material Plant Alphanumeric key uniquely identifying the material. Specifies the key for a production facility or branch office within the company (that is, the company code). You use the plant key to determine, for instance, which plant is to receive ordered goods.
9200578.doc
Page 237
9200578.doc
Page 238
Step 3 : Step Name Description of the Screen Valid From Valid to Vendor Purchasing Organization Plant Order Unit Date from which the source list record is valid. The date to be checked is normally the delivery date (depending on the application in question). Date until which the source list record is valid. You can use the vendor number to keep track of requests for quotation, purchase orders and outline agreements. Denotes the purchasing organization. Key for the factory or branch of a company (that is, a company code), from which the material is to be procured. Specifies the unit of measure in which the material is ordered.
9200578.doc
Page 239
After entering the data please save the entry by clicking the floppy button at menu bar
9200578.doc
Page 240
Stock Overview
To see current stock details
Desired Output
Output Comments
Input Values
Input Values Explanation
Procedural Steps
Step 1: Calling the Transaction
Via Menus
Via Transaction code
Logistics -> Materials Management -> Inventory Management -> Environment -> Stock -> MMBE Stock overview MMBE
9200578.doc
Page 241
9200578.doc
Page 242
9200578.doc
Page 243
Step 3: Step Name Step Description Then execute the data by clicking
9200578.doc
Page 244
Step 4: Step Name Step Description After executing the same the following screen is come.
9200578.doc
Page 245
Physical Inventory
Business Process Description: To check the material stock between system and manual
Desired Output
Output Comments
Input Values
Input Values Explanation
Procedural Steps
Step 1: Calling the Transaction Via Menus
9200578.doc
Page 246
9200578.doc
Page 247
Step 2: Step Name Description of the Screen In this screen we create physical inventory document- initial screen Plant Storage location Other information Enter the plant for physical inventory document creation Enter the Plants storage location for physical inventory to be done Select by Tick any one of Posting Block or Freeze book inventory . 1. If you select posting block, you cannot do the any GI or GR entry until the particular material physical inventory to be posted. 2. If your select Freeze book inventory you can do all the entries. But material quantity freeze at the time physical inventory document created. 3. Point 1 is better way to follow.
9200578.doc
Page 248
9200578.doc
Page 249
Step 3: Step Name Description of the Screen In this screen we select material code number and enter, If batch applicable we enter batch one by one. If we select newsprint reels we will enter all batches one by one.
9200578.doc
Page 250
Step 4: Step Name Description of the Screen Select material and batch number ( If applicable ) enter. As soon as Its automatically go to next line. There is no more material for physical inventory, you may save the documents by click mouse at the top of menu bar (Red icon ) as usual.
9200578.doc
Page 251
Step 5: Step Name Description of the Screen Physical inventory document posted
MI02 MI03 -
9200578.doc
Page 252
Step 6: Step Name Description of the Screen After creation of documents we can take print out for particular documents to take physical inventory at storage location - 0100
9200578.doc
Page 253
Step 7: Step Name Description of the Screen We may check the particular material stock by using MMBE option. Material 10000014 Offset black ink Chennai General storage location stock is 400 kg.
9200578.doc
Page 254
Business Process Description: To Enter actual availability stock at the particular storage location to check with system.
Desired Output
Output Comments
Input Values
Input Values Explanation
Procedural Steps
Step 1: Calling the Transaction Via Menus
9200578.doc
Page 255
Description of the Screen This is initial screen of inventory count. Here we enter the physical inventory document number and enter
9200578.doc
Page 257
Step 3: Step Name Description of the Screen In this screen we will enter the physically availability quantity only.
9200578.doc
Page 258
In this screen we entered 399 Kg in quantity column. But as per MMBE stock is 400 kg. (Test for shortage quantity)
9200578.doc
Page 259
Then post the document - click by mouse - Count entered for physical inventory document .
9200578.doc
Page 260
Business Process Description: After enter the counted material, we may post the relative document even its No difference.
Desired Output
Output Comments
Input Values
Input Values Explanation
Procedural Steps
Step 1: Calling the Transaction Via Menus
9200578.doc
Page 261
9200578.doc
Page 262
Description of the Screen In this initial screen of difference posting, we enter the phys.inventory document number and enter
Description of the Screen After entering the document number the system pick up the relative details. Ie Material number 10000014 batch- difference quantity difference value) Ex. System stock 400 kg. But we enter 399 kg. as above. So the system automatically calculates the difference quantity value. Then we must select the movement type for reason (Any one reason of Movement type 702) and enter and save. System automatically writes off the difference quantity
9200578.doc
Page 264
Step 3: Step Name Description of the Screen This is last screen of physical inventory posting.
9200578.doc
Page 265
Step 4: Step Name Description of the Screen We can see the particular materials physical inventory period details by using code number MI 22
9200578.doc
Page 266
9200578.doc
Page 267
Business Process Description: Material issued to other company as loan basis Desired Output
Output Comments
Input Values
Input Values Explanation
Procedural Steps
Step 1: Calling the Transaction Via Menus
Logistics ->Materials Management -> Inventory management ->Goods movement -> Goods movement (MIGO ) -> Goods issue others
MIGO 901 ( Goods on loan issue )
9200578.doc
Page 268
9200578.doc
Page 269
Step 2: Step Name Description of the Screen In this screen we have to enter the quantity of loan issue. If Batch applicable (Newsprint reels), when we enter the batch number the system automatically pickup the weight details from stock.
9200578.doc
Page 270
Step 3: Step Name Description of the Screen In this screen we have to enter the Plant name and storage location as usual.
9200578.doc
Page 271
Step 4: Step Name Description of the Screen In this screen we have to enter the vendor name for whose we sent to material as loan basis.
9200578.doc
Page 272
Step 5: Step Name Description of the Screen In this screen we have to enter the batch details. If we enter one more batch, select X icon to display that box.
9200578.doc
Page 273
Step 6: Step Name Description of the Screen In this screen we have to enter the batch details. At the time we have to enter 1 in the qty. column. The system picks up the weight details from reel batch. Avoid entering weight here. We have to enter the weight at the quantity column at the time of GOODS RECEIPT only
9200578.doc
Page 274
Step 7: Step Name Description of the Screen After entering the data check the document as usual by mouse
9200578.doc
Page 275
Step 8: Step Name Description of the Screen If the Documents is OK post the document.
9200578.doc
Page 276
Step 9: Step Name Description of the Screen After save the documents we have to see the Goods loan to vendor details by using T. code no. ZM024 and execute.
9200578.doc
Page 277
Step 9: Step Name Description of the Screen In this screen we can see the Loan issue details ( Quantity with value )
9200578.doc
Page 278
Business Process Description: Reversal of material issued to other company as loan basis Desired Output
Output Comments
Input Values
Input Values Explanation
Procedural Steps
Step 1: Calling the Transaction Via Menus
Logistics ->Materials Management -> Inventory management ->Goods movement -> Goods movement (MIGO ) -> Goods issue others
MIGO 902 ( Goods on loan issue reversal )
9200578.doc
Page 279
9200578.doc
Page 280
Step 2: Step Name Description of the Screen In this screen we have to enter the Plant, storage location as usual. Check the movement here one more.
9200578.doc
Page 281
Step 3: Step Name Description of the Screen In this screen we select the Vendor name for loan reversal
9200578.doc
Page 282
Step 4: Step Name Description of the Screen In this screen we enter the batch details. One more batch, select X icon to be display this box.
9200578.doc
Page 283
Step 5: Step Name Description of the Screen In this screen we have to enter the qty. with batch ( because this is issue reversal. ) then check and adopt
9200578.doc
Page 284
Step 6: Step Name Description of the Screen After entering the all data check the document by using mouse. Then document OK indicator to be displayed in the bottom of the screen.
Description of the Screen This is last screen of this movement. The Document is posted
9200578.doc
Page 286
Step 8: Step Name Description of the Screen After save the documents we can see the Goods loan to vendor- issue reversal details by using T. code no. ZM024
9200578.doc
Page 287
Business Process Description: Material received from other company as loan basis Desired Output
Output Comments
Input Values
Input Values Explanation
Procedural Steps
Step 1: Calling the Transaction Via Menus
Logistics ->Materials Management -> Inventory management ->Goods movement -> Goods movement (MIGO ) -> Goods issue others
MIGO 903 ( Goods on loan receipt )
9200578.doc
Page 288
9200578.doc
Page 289
Description of the Screen In this screen we have to enter the plant and storage location. Check one more the movement type here.
Description of the Screen In this screen we have enter the Vendor name for whose we have to receive the materials from loan basis
9200578.doc
Page 291
Step 4: Step Name Description of the Screen In this screen if batch applicable we have to enter the material quantity with batch. Then check and adopt
9200578.doc
Page 292
Description of the Screen After entering all data click check button by using mouse. Document is OK message to be displayed
Description of the Screen Then post the document. Material documents is posted.
9200578.doc
Page 294
Description of the Screen If we want to see loan details received from vendor use code number ZM029. Then select Vendor and execute. The movement type comes automatically.
9200578.doc
Page 295
9200578.doc
Page 296
Business Process Description: Material received from other company as loan basis - RETURN Desired Output
Output Comments
Input Values
Input Values Explanation
Procedural Steps
Step 1: Calling the Transaction Via Menus
Logistics ->Materials Management -> Inventory management ->Goods movement -> Goods movement (MIGO ) -> Goods issue others
MIGO 904 ( Goods on loan Receipt Reversal )
In this screen we have to enter the material and enter 9200578.doc Page 297
9200578.doc
Page 298
In this screen enter the weight. If batch applicable select batch icon X
In this screen we enter the plant and storage location (Material to be returned from which location) Check the movement type one more here.
9200578.doc
Page 300
9200578.doc
Page 301
Description of the Screen In this screen we select batch of materials. And we must enter 1 in the qty. column instead of weight because it is receipt reversal (issue). Then check and adopt. This is just same batch code having 10 digits otherwise error come.
9200578.doc
Page 303
9200578.doc
Page 304
Step 8: Step Name Description of the Screen In this screen we can see loan receipt reversal from vendors details
9200578.doc
Page 305
Business Process Description: Creation of Frame work purchased order for A.M.C. Desired Output
Output Comments
Input Values
Input Values Explanation
Procedural Steps
Step 1: Calling the Transaction Via Menus
Logistics ->Materials Management -> Purchasing -> purchase order- create vendor / supplying plant known
ME21N
9200578.doc
Page 306
9200578.doc
Page 307
Step 2: Step Name Description of the Screen In this P.O. screen first we select Framework order; enter the validity period of A.M.C.. Vendor. And we must select K (cost centre A column) and D (Service - I column)
9200578.doc
Page 308
Step 3: Step Name Description of the Screen In this screen we have to enter short text (service description) activity - Plant- Material group and Tax code. Check service based IV indicator also.
9200578.doc
Page 309
Step 4: Step Name Description of the Screen In this screen we have to maintain the service details with price. Select and enter the service number, quantity (i.e. Activity) and price.
9200578.doc
Page 310
Step 5: Step Name Description of the Screen After entered the price, we have to enter the G.L. account and cost centre for that service.
9200578.doc
Page 311
Step 6: Step Name Description of the Screen Enter the G.L. account (Repair and maintenance) and cost centre
9200578.doc
Page 312
Step 7: Step Name Description of the Screen After entering the G.L. account and cost centre save the documents.
9200578.doc
Page 313
9200578.doc
Page 314