Assignment Safety
Assignment Safety
Item 1
Deviation higher
lower
later than
Agitation
No
more lower
Page 1
Sheet1
Possible Cause 1.cooling water valve failed close 2.thermocouple failure 3.controller valve failure 4.failure of mixer
Possible Consequences 1.thermal runaway 2.explosion 3.production of by-product 4. accumulation of heat of reaction 5.production interupt 1.thermal runaway 2.accumulation of reactant 3.production interupt 1.thermal runaway 2.production of by-product 3.production interupt 4. accumulation of heat of reaction 1.no or very little reaction 2.accumulation of reactant 3.production interupt None 1.reactant cannot mixed well 2.production interupt
1.cooling water valve failed open 2.thermocouple failure 3.controller valve failure 1.cooling started late
1.failure of mixer 2.stirrer motor malfunction 3.power failure 1.Strirrer controller motor fail 1.Strirrer controller motor fail 2.not enough power supply
Page 2
Sheet1
Action Required 1. install TAH 2. install back-up cooling valve 3. install check valve
1. install TAL 2.install back-up heat suply 3. install check valve 1.check and monitor reliability of water service 2. install check valve
1.interlock with feed line 2.monomer feed valve must fail closed on power loss
1.install alarm
Page 3