Work Schedule 02
Work Schedule 02
Name of Works
May
June C' means Complete, 'D' means Delivery, 'P' means Paint, 'F' means Fixing & Fitting. The schedule will update in 1st June'2012
July
1. Ceiling Framing & Board Cladding 2. Ceiling paint Duco 3. Civil Work for Toilet 4. Civil Work for Leather Section 5. Farefaced Concrete Pre-Cast Tiles 6. Fare faced Tile Cladding 7. Fare Faced Tile Finishing by Painter 8. Tiles Work for Toilet 9. Toilet Door Fittings 10. Toilet Plumbing Works 11. Toilet Fixture Fittings 12. Custom Made Floor tiles manufacturing 13. Custom Made Floor Tiles Fitting 14. Furniture on Site(Entry Hanger) 15. Furniture on Site (Entry Hanger) Duco 16. Partition work for changing 17. Furniture on Site (Jewelry Back cabinet) 18. Duco Paint for Furniture of Jewlwry on site 19.Furniture from Industry (Reception desk) 20. Furniture from Industry (Jewlry Desk) 21. Wall Fixed Furniture From Industry 22. Continious Tray at Bottom 23. Barcelona Sofa 24. Prototype Hanger from Industry 25. Divider Furniture from on Site 26. Divider Furniture Paint duco 27. FAMKAM BRAND Name Furniture from Industry 28. FAMKAM Logo for Reception Back Wall 29. Reception Back Wall Treatment 30. Leather Section Wall & Floor 31. Leather Section Furniture 32.Leather Section Brand Wall 33. Glass Partition for Office 34. Furniture for Office 35. Mirror All 36. Entry Steel Fabrication 37. Entry Glass 38. Vertical Glass Fins (Tempered) 39.Waiting Lounge Floor & Jewlry Floor 40. Electrical Works 42. AC Fitting 42. Auto Shutter
21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 C
C
7 8 9 10 11 12 13 14 15 16 17 19 20 21 22 24 25 26 27 28 29 30 1 2
C
10
C
C C C
C D C
C C C C
C C C C C D D D D D D D D
C C C C
D D C C C C C
C
C
C C C C C C
C C C
D F F F F
C C C C F F F F C
F F D
F F F
F F C C D F
F F F F
F F F F