0% found this document useful (0 votes)
868 views

Work Measurement Time Study Worksheet

This document is a worksheet for conducting a continuous time study using the work measurement method. It contains fields to record the operator name, element description, reference number, date, analyst name, cycle number, total time, number of observations, average time, leveling factor, normal time, occurrence, base time, start and stop times for each observation, timing device used, total and standard base times, performance rating and allowance, standard time in minutes and hours, work units, and units per hour. Remarks can also be included.

Uploaded by

Erdal Tokat
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
868 views

Work Measurement Time Study Worksheet

This document is a worksheet for conducting a continuous time study using the work measurement method. It contains fields to record the operator name, element description, reference number, date, analyst name, cycle number, total time, number of observations, average time, leveling factor, normal time, occurrence, base time, start and stop times for each observation, timing device used, total and standard base times, performance rating and allowance, standard time in minutes and hours, work units, and units per hour. Remarks can also be included.

Uploaded by

Erdal Tokat
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

WORK MEASUREMENT TIME STUDY WORKSHEET (CONTINUOUS METHOD)

1. OPERATOR NAME OR NUMBER 2. ELEMENT DESCRIPTION 3. REFERENCE NUMBER 4. DATE OF STUDY 5. NAME OF ANALYST CYCLE 7. NUMBER 1 2 3 4 5 6 7 8 9 10 9. TOTAL TIME 10. NO. OF OBSVS. 11. AVG/SEL 12. LEVELING FACTOR 13. NORMAL TIME 14. OCCURRENCE 15. BASE TIME 22. START TIME 26. REMARKS 23. STOP TIME 24. ELAPSED TIME 25. TYPE OF TIMING DEVICE R 1 T P R 2 T P R 3 T P R 4 T P R 5 T P R 6 T P R 7 T P A B C D E F G H I J 16. TOTAL BASE TIME (Minutes) 17. PF&D ALLOWANCE 18. STANDARD TIME (Minutes) 19. STANDARD TIME (Hours) 20. WORK UNITS 21. UNITS PER HOUR % TIME 6. APPROVED (Initials and Date) 8. FOREIGN ELEMENTS S F T DESCRIPTION

Adobe Professional 7.0

LEGEND:

R - READING

T - TIME

P - PACE RATING

DD Form 2042-1, DEC 76

Reset

PAGE

OF

PAGE(S)
Adobe Professional 7.0

You might also like