Critical Path Method: Dr. Abdul Rauf

This document discusses calculating the critical path method (CPM) for a project with 11 activities. It lists the activities, their durations, and precedence relationships. It then shows the calculations for earliest start, latest start, and float for each activity to determine the critical path.

Uploaded by

Abdul Rauf
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views

Critical Path Method: Dr. Abdul Rauf

This document discusses calculating the critical path method (CPM) for a project with 11 activities. It lists the activities, their durations, and precedence relationships. It then shows the calculations for earliest start, latest start, and float for each activity to determine the critical path.

Uploaded by

Abdul Rauf
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Critical Path Method

Dr. Abdul Rauf


Imam Muhammad Ibn Saud Islamic University, Riyadh, KSA [email protected]

Eleven activities that make up a project are having following precedence relationship:
Preceding Activity (Pre-req) Activity Duration

C, F, J E B, H C, J A, I J E, F B, H, I

A B C D E F G H I J K

7 6 9 7 3 8 4 9 9 7 5

Calculate CPM, by calculating Earliest Start, Latest start, and Float.

9 C

7 A

16

21

4 G

25

0
0 Start 0

15

22

22

26

8
F

21 12 9 I 12 0 21 21 21

5 K 0

26

12

26

3 E

12

12

6 B

18

26 END

7 J

12

13

19

26

9 H

16

18

7 D

25

10

19

19

26