Fatigue Assessment of Concrete Bridges - Euro Norms: Ravindra Kumar Goel
Fatigue Assessment of Concrete Bridges - Euro Norms: Ravindra Kumar Goel
F,fat
, to be applied to all fatigue loads when calculating the stress range.
The value for
F,fat
is defined in the National Annex and is recommended
by EC2 to be taken as 1.0. The resisting stress range at N
*
cycles,
Rsk
o A ,
given in 2-1-1/Tables 6.3N and 6.4N, also has to be divided by the
material partial safety factor
s,fat
. The recommended value for
s,fat
from
2-1-1/2.4.2.4(1) is 1.15.
5.3 In real fatigue assessment situations for concrete bridge design, there will
be more than one stress range acting on the steel element throughout its
design life. 2-1-1/6.8.4(2) allows multiple amplitudes to be treated by
using a linear cumulative damage calculation, known as the Palmgren
Miner summation:
( )
( )
0 . 1 < =
i i
i
Ed
N
n
D
o A
o A
2-1-1/(6.70)
where:
n(
i
) is the applied number of cycles for a stress range of
i
N(
i
) is the resisting number of cycles for a stress range of
i
, i.e.
the number of loading cycles to fatigue failure
5.4 For most bridges, the above is a complex calculation because the stress
in each component usually varies due to the random passage of vehicles
from a spectrum. Details on a road or rail bridge could be assessed using
the above procedure if the loading regime is known at design. This
includes the weight and number of every type of vehicle that will use each
lane or track of the bridge throughout its design life, and the correlation
between loading in each lane or track. In the majority of cases this would
require lengthy calculations.
log
N
log
Rs
k
N
*
log f
yk
b = k
1
b = k
2
1
1
220
5.5 As an alternative to the use of 2-1-1/(6.70), 2-1-1/6.8.5 allows the use of
simplified fatigue Load Models 3 and 71, from EN 1991-2, for road and rail
bridges respectively, in order to reduce the complexity of the fatigue
assessment calculation. It is assumed that the fictitious vehicle/train alone
causes the fatigue damage. The calculated stress from the vehicle is then
adjusted by factors to give a single stress range which, for N
*
cycles,
causes the same damage as the actual traffic during the bridges lifetime.
This is called the damage equivalent stress and is discussed in section
below.
5.6 Euro Norm 2-1-1/6.8.4(3) requires that, where prestressing or reinforcing
steel is exposed to fatigue loads, the calculated stresses shall not exceed
the design yield strength of the steel as EC2 does not cover cyclic
plasticity.
5.7 Euro Norm 2-1-1/6.8.4(5) relates to assessment of existing structures,
which is strictly outside the scope of EC2, so its inclusion is curious. Its
reference to corrosion is not explicit about either the degree of corrosion
or its nature (e.g. general or pitting) so a single value of stress exponent to
cover all situations is dubious. Nevertheless, it was not intended that any
such allowance for corrosion be made in new design.
2-2/6.8.4(107) permits no fatigue check to be conducted for
external and unbonded tendons lying within the depth of the concrete
section. This is because the strain, and hence stress, variation under
service loads is small in such tendons. Consideration should be given to
fatigue in external tendons which are outside the depth of the structure
(such as in extradosed bridges) as the fluctuation in stress might be more
significant here. This situation is covered by EN 1993-1-11.
6.0 VERIFICATION USING DAMAGE EQUIVALENT STRESS RANGE
In the damage equivalent stress range method described by 2-1-1/6.8.5(1)
and 2-1-1/6.8.5(2), the real operational loading is represented by N
*
cycles
of an equivalent single amplitude stress range,
s,equ
(N
*
) which causes
the same damage as the actual traffic during the bridges lifetime. This
stress range may be calculated for reinforcing or prestressing steel using
2-2/Annex NN. 2-1-1/6.8.5(3) contains a verification formula for
reinforcing steel, prestressing steel and splicing devices:
fat , s
*
Rsk *
equ , s fat , F
) N (
) N (
o
o
A
s A 2-1-1/(6.71)
where:
s,equ
(N
*
) is the appropriate damage equivalent stress range
(converted to N
*
cycles) from 2-2/Annex NN.
Rsk
(N
*
) is the resisting stress range limit at N
*
cycles from the
221
appropriate S-N curves given in 2-1-1/Tables 6.3N or
6.4N
6.2 Euro Norm 2-1-1/(6.71) does not cover concrete fatigue verification. 2-
2/Annex NN3.2 provides a damage equivalent verification for concrete in
railway bridges but there is no similar verification for highway bridges. For
highway bridges, concrete can be verified using the methods in 2-2/6.8.7.
7.0 OTHER VERIFICATION METHODS
7.1 Euro Norm 2-1-1/6.8.6(1) and (2) give alternative rules for fatigue
verifications of reinforcing and prestressing steel components. These
methods are intended as an alternative to checking fatigue resistance
using 2-1-1/6.8.4 or 6.8.5.
7.2 Euro Norm 2-1-1/6.8.6(1) allows the fatigue performance of reinforcement
or prestressing steel to be deemed satisfactory if the stress range under
the frequent cyclic load combined with the basic combination is less than
k
1
for unwelded reinforcement or k
2
for welded reinforcement. The values
of k
1
and k
2
may be given in the National Annex and EC2 recommends
taking values of 70 MPa and 35 MPa respectively. The meaning of
frequent cyclic loading is not explained but it implies a calculation based
on the fatigue load models in EN 1991-2. Assuming this to be the case, it
will usually be preferable to perform a damage equivalent stress
calculation using 2-2/Annex NN as this also uses the fatigue load models
of EN 1991-2 and will lead to a more economic answer.
7.3 Euro Norm 2-1-1/6.8.6(2) allows the stress range alternatively to be
calculated directly from the frequent load combination to avoid the need to
calculate stress ranges from fatigue load models or directly from traffic
data. However, the recommended allowable stress ranges above would
mean that elements would rarely pass such a check.
7.4 Where welded joints or splicing devices are used in prestressed concrete
construction, 2-1-1/6.8.6(3) requires that no tension exists in the concrete
section within 200 mm of the prestressing tendons or reinforcing steel
under the frequent load combination when a reduction factor of k
3
is
applied to the mean value of the prestressing force. The value of k
3
is
defined in the National Annex. EC2 recommends taking a value of 0.9.
This value is increased to 1.0 in the UKs National Annex (in the same
manner as r
sup
and r
inf
in 2-1-1/5.10.9) to limit the number of load cases to
be considered for SLS and fatigue design. The criterion ensures that the
stress range for such details is kept small for the majority of cycles since
the concrete will generally remain in compression.
222
7.5 VERIFICATION OF CONCRETE UNDER COMPRESSION OR SHEAR
The general fatigue verification procedure for concrete given in 2-
2/6.8.7(101) requires a cumulative damage summation, like that in 2-1-
1/6.8.4, to be carried out using traffic data. For rail bridges, this lengthy
calculation can be avoided by using the simplified damage equivalent
stress verification of 2-2/Annex NN.3.2. Neither the Annex nor 2-
2/6.8.7(101) itself, however, gives appropriate data for road bridges.
7.6 As a simpler alternative, 2-1-1/6.8.7(2) gives a conservative verification
based on the non-cyclic loading used for the static design:
fat cd
c
fat cd
c
f f
,
min ,
,
max ,
45 . 0 5 . 0
o o
+ s 2-1-1/(6.77)
but limited to 0.9 for f
ck
50 MPa or 0.8 for f
ck
> 50 MPa, where:
c,max
is the maximum compressive stress at a fibre under the frequent load
combination (compression measured as positive);
c,min
is the minimum compressive stress under the frequent load
combination at the same fibre where
c,max
occurs.
c,min
should be
taken as 0 if negative (in tension);
f
cd,fat
is the concrete design fatigue compressive strength defined
in the code as:
( ) |
.
|
\
|
=
250
1
0 1 ,
ck
cd cc fat cd
f
f t k f | 2-2/(6.76)
Where
k
1
is a coefficient defined in the National Annex and is recommended
by EC2 to be taken as 0.85;
cc
(t
0
) is the coefficient for concrete strength at first cyclic loading from
2-1-1/3.1.2(6);
t
0
is the age of the concrete in days upon first cyclic loading i.e. the
age at which live load is first applied;
f
cd
is the design compressive strength of concrete. A value for
cc
of
1.0 is intended to be used here in conjunction with k
1
= 0.85, as k
1
performs a similar function of accounting for sustained loading;
For concrete road bridges, this alternative concrete fatigue verification is
unlikely to govern design, other than possibly for very short spans where
the majority of the concrete stress is produced by live load. It will
therefore generally be appropriate to use this simplified check. No
guidance is given on the calculation of the concrete stresses; ignoring
concrete in tension will be a conservative assumption.
223
7.7 Euro Norm 2-1-1/6.8.7(3) permits the above simplified verification of
concrete to be applied to the compression struts of members subjected to
shear and requiring shear reinforcement. Since the compression struts
have transverse tension passing through them (see discussions in section
6.5 of this guide), f
cd,fat
has to be reduced by the factor , defined in 2-1-
1/6.2.2(6) and the verification becomes:
fat , cd
min , c
fat , cd
max , c
f
. .
f v
o
v
o
45 0 5 0 + s
7.8 The stresses
max , c
o and
min , c
o can be calculated for reinforced concrete
beams, with shear reinforcement inclined at an angle to the horizontal,
from the following expression obtained by re-arranging 2-1-1/(6.14):
|
|
.
|
\
|
+
+
=
o u
u
o
cot cot
cot 1
2
z b
V
w
Ed
c
V
Ed
is the relevant shear force under the frequent load combination and
the other symbols are defined in 2-1-1/6.2.3. The concrete stress
increases with reducing strut angle so in this case it is conservative to
base on its ULS value in the above calculation rather than the larger
angle
fat
from 2-1-1/(6.65).
7.9 For members subjected to shear but not requiring shear reinforcement, 2-
1-1/6.8.7(4) provides the following expressions for assuming satisfactory
fatigue resistance in shear:
For 0
max ,
min ,
>
Ed
Ed
V
V
:
c Rd
Ed
c Rd
Ed
V
V
V
V
,
min ,
,
max ,
45 . 0 5 . 0 + s 2-1-1/( 6.78)
but limited to 0.9 for f
ck
50 MPa or 0.8 for f
ck
> 50 MPa,
or, for 0
max ,
min ,
<
Ed
Ed
V
V
:
c Rd
Ed
c Rd
Ed
V
V
V
V
,
min ,
,
max ,
5 . 0 s 2-1-1/( 6.79)
where:
V
Ed,max
is the design value of the maximum applied shear force
under the frequent load combination;
V
Ed,min
is the design value of the minimum applied shear force
under the frequent load combination in the cross-section
where V
Ed,max
occurs;
V
Rd,c
is the design shear resistance from 2-2/(6.2.a).
224
8.0 CONCLUSION
It is seen that Euro norms contain explicit provisions for accounting fatigue
effects in concrete structures. The fatigue assumes special significance in
the design of railway bridges, where dynamic impacts are considerable.
Therefore, it is necessary to design the new concrete bridges on Indian
Railways taking into due consideration, the fatigue effects. Since existing
IRS Concrete Bridge Code does not contain such provisions, use of Euro
norms may be considered.
9.0 REFERNCES
9.1 Proceedings of Workshop on Euro Codes, 11
th
to 13
th
Sept., 2008,
organised by Indian Concrete Institute (New Delhi Centre).\
9.2 Euro Code EN 1992-2-2