0% found this document useful (0 votes)
100 views1 page

Incident

This incident report from Sara suole pvt, ltd in Bangalore, India describes a power outage on their UPS system that lasted 929 minutes in March 2012. The report classifies the incident as involving the UPS system and notes that the root cause is still being identified as they await a detailed analysis from the vendor that handles maintenance.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
100 views1 page

Incident

This incident report from Sara suole pvt, ltd in Bangalore, India describes a power outage on their UPS system that lasted 929 minutes in March 2012. The report classifies the incident as involving the UPS system and notes that the root cause is still being identified as they await a detailed analysis from the vendor that handles maintenance.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

INCIDENT / EVENT REPORT

SITE LOCATION: BUILDING NUMBER: DATE OF EVENT: REPORT NUMBER: EVENT CLASSIFICATION:
Classification Prompt: Classification SAVE 01. UPS system, 02. Generator system

India/Bangalore/Sara suole pvt,ltd Sara suole

Sara suole/march /2012/01 Save-01

03. Operator intervention 04. Redundant equipment

05. Preventative maintenance 06. Other (Equipment Failure)

FACILITIES SYSTEMS DOWNTIME: EQUIPMENT DOWNTIME:

NA 929 Mints

BRIEF DESCRIPTION:

BACKGROUND

FACTS

ACTIONS TAKEN

IDENTIFICATION OF ROOT CAUSE Awaiting detailed RCA from AMC Vendor. SIGNED BY: Jayaraj DATE:

You might also like