Purple Line Work Session
Purple Line Work Session
Locally Preferred
Alternative We are
Here
FTA Decision on
Entry into PE
Management
Preliminary Engineering
Oversight
Project
FTA Decision on
Entry into Final Design
Full Funding
Final Design Grant Agreement
Construction
2
New Start Steps – Next Year
3
Next Steps and Schedule
6
Single Track vs. Double Tracking
Purpose and Outreach Report
“The Georgetown Branch Trolley track between Bethesda and Silver Spring is a distance of 4.4 miles
(22,585 feet). Of the 22,585 feet of track, only 8,320 linear feet consisted of double track.
All of the light rail alternatives being examined in the DEIS/AA now underway include a double track
corridor.
System
Preservation
Operating
Costs
Jones Bridge Road Alternatives
Cost Effectiveness Average
Annual
Total Capital Costs (CE) Measure – Weekday
Alternative Operating Costs Notes
(2007) Annualized Cost Per Boardings –
(2007)
Hour Of User Benefit 2030
Medium
$579,820,000 $17,300,000 $14.01 51,800
Investment BRT
Medium Reviewed In
Investment BRT Response To Town
$597,000,000 $17,300,000 $15.62 50,000
via Jones Bridge of Chevy Chase
Road Concerns
Medium Included By MTA
Investment BRT For Comparison
via Branch & $585,000,000 $18,300,000 $13.34 58,000 With Medium
Extended To Investment BRT via
Medical Center Jones Bridge Road
Jones Bridge Road Alternatives
% Increase % Increase
TAZ HH / - HH / - Jobs / - Jobs / -
Description Over 25 Over 25
# 2005 2030 2005 2030
Years Years
Area
NIH/National Library of
24 1 1 0% 50 61 22%
Medicine
Bethesda CBD 5 21 48 133% 62 68 10%
Bethesda CBD 4 16 30 89% 137 158 15%
Bethesda CBD 3 18 28 61% 76 87 15%
National Naval Medical
26 0 0 0% 25 32 31%
/ USUHS
Trail on Georgetown Branch ROW
Transitway & hiker/biker trail require 66’ ROW
• Current interim trail 15 - 20’
• Purple Line & permanent trail 60 - 66’
o Transitway 30’
o Trail 14’
o Separation/walls/structures/noise barriers/visual screening 16 - 22’
GOALS
• Trail 3-4’ above level of
transitway (approx 1-1.5 mi)
Silver Spring