Product Development Workflow

The document outlines a 6 week product development plan. It includes 2 weeks of planning and design work including requirements gathering, wireframing and visual design. This is followed by 2 weeks of development and QA work where specific features or "stories" will be developed, tested and fixed if needed. The final 2 weeks include further development, QA and bug fixing with the goal of a final deliverable by the end of the 6 weeks. Stakeholders and their roles are defined for each phase.

Uploaded by

punitlodaya
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
20 views

Product Development Workflow

The document outlines a 6 week product development plan. It includes 2 weeks of planning and design work including requirements gathering, wireframing and visual design. This is followed by 2 weeks of development and QA work where specific features or "stories" will be developed, tested and fixed if needed. The final 2 weeks include further development, QA and bug fixing with the goal of a final deliverable by the end of the 6 weeks. Stakeholders and their roles are defined for each phase.

Uploaded by

punitlodaya
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Planning & Design

2 Weeks

2 Weeks

2 Weeks

Product Roadmap Requirements (Index)

Detailed Requirement Research & Iterate

Draft Version of Requirements

Finalize Requirements Technical Validation

Product Backlog

2 Future Dev Sprints Backlog

Current Sprint Backlog

Design

Success Factors
Project Lead (Owner) Product Manager (Owner) Interaction Designer (Owner) Dev Lead (Owner) Project Manager (Owner)

Basic Wireframe

Detailed Wireframe Review and Iterate

Visual Design Review and Iterate HTML, CSS and JS

Visual Designer (Laborer) UI Engineer (Laborer) Dev Team (Laborer) QA Team (Laborer)

Development & QA

2 Weeks

M Story 1 (Week 1) Write Test Case Development Reviews/Demos QA Testing Bug Fixing Story 2 (Week 2) Write Test Case Development Reviews/Demos QA Testing Bug Fixing QA Dev

T QA Dev

Th

Th

Dev PM QA Dev QA QA Dev QA Dev QA Dev QA Dev PM QA Dev PM QA Dev QA Dev

Final Deliverable

Project Lead Product Manager Interaction Designer Dev Lead Project Manager

Visual Designer UI Engineer Dev Team QA Team

Next Sprint Planning